Loading...
HomeMy WebLinkAboutWQCS00195_NOI_NOV2020DV0352_Response_20200824Ramseur NC Department of Where Family and Friends Meet Environmental Quality Received � TOWN OF RAMSEUR AUG 2 7 2020 724 Liberty Street, PO Box 545 Winston-Salem Ramseur, North Carolina 27316 Regional office 336-824-8530 Commissioners Mayor Town Clerk Jim McIntosh Vicki Caudle Carol Akers JC Parrish Tim Cranford Interim Finance Officer Tanya Kenyon Carol Akers Tim Matthews August 24, 2020 Mr. Lon T. Snider Assistant Regional Supervisor NCDEQDWR 450 West Hanes Mill Road Suite 300 Winston Salem, NC 27105 Re: Collection System Permit No WQCS00195 Dear Mr. Snider, LAsr- g :71CHE The Town is in receipt of the Notice of Violation & Intent to Issue Civil Penalty Notice NOV- 2020-DV-0352 concerning the sanitary sewer overflow that occurred during the month of May, 2020 at the West Ridge Pump Station. The overflows occurred as a result of heavy rainfall and Inflow/Infiltration over a two -week period. During the week of May 18 -31 rainfall was measured at 11.7 inches. For the month of May, the total of 11.7" of rainfall was recorded, all occurring within the two - week. period which saturated the soil. The Town's wastewater treatment plant which has a design flow capacity of 0.480 MGD, measured flow greater than 1.0 MGD on several days during this two -week period. The extraneous flow into the pump station exceeded the pumping capacity which resulted in the overflow. The pump station utilizes 3 pumps and all pumps were operating. Attached for your review is a picture of the pump station during the May 20, 2020 overflow. 11 :n in•tn;t,G9O fit^ 'r;�t�Gi? nc�SzniVl� I 41 f The Town continues its efforts to identify and correct Inflow/Infiltration areas of concern. Commissioner Jim McIntosh, Water and Sewer Commissioner, walked most of the creeks during that period with Suez, Contractor for Water/Sewer and Public Works and suggested to them the importance of televising the creek crossings within the wastewater collection system. The overflow resulted from natural events and circumstances uncontrolled by the Town. The overflow was not intentional and the Town did not benefit economically from this event. The Town is committed to operating and maintaining its sewer collection system and has allocated $240,000 for sewer projects and equipment for the 2020/2021 fiscal year to make improvements in the collection system. The Town of Ramseur is a small community of less than 1,500 customers. The assessment of civil penalties will be an encumbrance for our citizens and deduct from the budgeted funds for improvements. The Town respectfully request your office to cease the assessment of civil penalties and afford the Town the opportunity to invest in upgrading the collection system. If you require additional information, please do not hesitate to contact me. - Sincerely, Vicki Caudle, Mayor Serving the Town of Ramseur MUor@townoframseur.org 336-824-4111 - Office 336-736-9016 - Cell Cc: Arnold Allred, ORC Mark Grose, Suez, Project Manager Nadine Blackwell, Suez, Area Manager til R° '(+ • v ��`, 1. \j ��' 7 j� xr ��'�'' ., �•�1 , s*' "�'»�S i jk iY •` �, � '"� �� � " r �i `C'x `TS��if x9 � G , ..T .•'li _ �s13ir�;;C�+ IAA. %�. .IM1 �#. yf �.�a �--ram '• V r Gd +� 3C f �t • i 1 ti-'' „ - {viva f '`r � • `�.` �.... .fir, 3 • i- rt l.' 9jVt�..I �i s.