Loading...
HomeMy WebLinkAboutIncorrect Scan. Needs Removal. Division of Water Resources Facility Number - \o 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: 411 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: ©Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: 00-Z3 Arrival Time: 1('.013 Departure Time: 12',v3 County: C1 xnNS Region: ( .c) • Farm Name:G'pOc , L P 4C.,s A 150"is mt Owner Email: Owner Name: Cjfp rte, pN,e.y5 Phone: Mailing Address: Physical Address: 0.,4566 ,1\ ¢. Facility Contact: 5 _ Title: Phone: Onsite Representative: Integrator: Certified Operator: - Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish •Layer Nie Dairy Cow _ 220 119 Wean to Feeder Non-Layer Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. __Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Discharges and Stream Impacts 1.Is any discharge observed from any part of the operation? ❑ Yes ® No ❑ NA ❑ NE Discharge originated at: ❑ Structure El Application Field ❑Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No 0 NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2.Is there evidence of a past discharge from any part of the operation? ❑ Yes ® No ❑NA ❑ NE 3.Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ® No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 5/12/2020•Continued Facility Number: - Date of Inspection: Waste Collection&Treatment 4.Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes [ZNo ❑ NA ❑NE a.If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Wall ew, Spillway?: ,,m Designed Freeboard(in): I ck Observed Freeboard(in): 4t6 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ® No ❑ NA ❑ NE (i.e.,large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes 2 No ❑ NA ❑NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7.Do any of the structures need maintenance or improvement? • ❑ Yes ® No ElNA ❑ NE 8.Do any of the structures lack adequate markers as required by the permit? ❑ Yes ® No ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9.Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11.Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes �C] No ❑ NA ❑ NE 15.Does the receiving crop and/or land application site need improvement? ❑ Yes VI No ❑ NA ❑ NE 16.Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ® No ❑ NA ❑ NE acres determination? 17.Does the facility lack adequate acreage for land application? ❑ Yes Ep No ❑ NA ❑ NE 18.Is there a lack of properly operating waste application equipment? El Yes r No ❑ NA ❑ NE Required Records&Documents 19.Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes [�(] No ❑ NA ❑ NE 20.Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP El Checklists ❑Design ❑Maps ❑Lease Agreements El Other: 21.Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes [ No ❑ NA ❑NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey 22.Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23.If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes Et No ❑ NA ❑ NE Page 2 of 3 5/12/2020 Continued Facility Number: - Date of Inspection: 24.Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ® No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes 2 No ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26.Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ® No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes © No ❑ NA ❑ NE Other Issues 28.Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ® No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ® No ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30.Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31.Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes ® No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes © No ❑ NA ❑ NE 33.Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes l l No ❑ NA ❑ NE 34.Does the facility require a follow-up visit by the same agency? ❑ Yes [g No ❑ NA ❑ NE Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). Reviewer/Inspector Name: Phone: Reviewer/Inspector Signature: T ) Es-e-I I. Date: -- Page 3 of 3 5/12/2020