Loading...
HomeMy WebLinkAboutUSACE_Bank Credit Release_Tobacco_Road_20230209Wilmington District Mitigation Bank Credit Release Schedule Project Name: Tobacco Road Mitigation Project County: Sponsor Name: EBX 8-Digit HUC: USACE Action ID: SAW-2021-00489 Year Project Instituted: NCDWQ Action ID: Date Prepared: Total Potential Credits Stream Credits Forested Wetland Credits Non -Forested Wetland Credits Credit Classification Warm Warm Warm Water Riparian Non -Riparian Coastal Water Water Pres TC1-C & D Potential Credits from Mitigation Plan 8,311.010 13.472 1874.334 2.096 Potential Credits from MP minus Preservation 8,297.538 Potential Credits from MP minus Preservation & 6,423.20 TC1-C & D Potential Credits from As -Built Survey Alamance 2022 Current and Future Credit Releases Credit Release Milestone Stream Credits Forested Wetland Credits Non -Forested Wetland Credits Projected Release Date Actual Release Date Scheduled Releases Warm Water Cold Water WQ SMUs Scheduled Releases Riparian Non -Riparian Scheduled Releases Coastal 1 (Bank/Site Establishment) 1' Z 15% 976.953 15% 0.314 15% 2 (Year 0/As-Built)3 15% 963.481 15% 0.314 15% 3 (Year 1 Monitoring) 10% 642.320 10% 0.210 10% 4 (Year 2 Monitoring) 10% 642.320 10% 0.210 15% 5 (Year 3 Monitoring) 10% 642.320 15% 0.314 20% 6 (Year 4 Monitoring) 5% 321.160 5% 0.105 10% 7 (Year 5 Monitoring)6 10% 829.754 15% 0.314 15% 8 (Year 6 Monitoring)6 5% 414.877 5% 0.105 9 (Year 7 Monitoring)6 10% 829.754 10% 0.210 Stream Bankfull Standard 10% 642.320 Layered Riffle Standards N/A 1405.751 Total Credits Release to Date Contingencies (if any): Signature of Wilmington District Official Approving Credit Release Date 1 - The first credit release milestone is based on the potential credits stated in the approved mitigation plan. 2 - The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) Execution of the MBI or UMBI by the Sponsor and the USACE; 2) Approval of the final Mitigation Plan; 3) Mitigation bank site must be secured; 4) Delivery of the financial assurances described in the Mitigation Plan; 5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. 3 - The second credit release is based on the credit totals from the as -built survey, and may differ slightly from the credit totals stated in the mitigation plan. 4 - A 10% reserve of credits to be held back until the bankfull event performance standard has been met.