Loading...
HomeMy WebLinkAbout20221617 Ver 1_12 - Eastfield Retail- Stormwater Report_20230301STORMWATER CONTROL REPORT EASTFIELD RETAIL BLOCK 1011 US highway 70A Selma, NC Johnston County Bohler Project #: NCR211024 1st NCDEQ Submittal: February 28, 2023 SARI'' ° EA o 4485 �n i S E /1111liIllVll V1AA Charlie Yowell, PE H LER// BOHLER ENGINEERING NC, PLLC 4130 Parklake Avenue, Suite 130, Raleigh, NC 27612 NCBELS # P-1132 I P: 919-578-9000 1 F: 919-703-2665 www.bohlerengineering.com TABLE OF CONTENTS 1. GENERAL PROJECT DESCRIPTION.....................................................................................1 1.1 PROJECT NARRATIVE................................................................................................................1 1.2 EXISTING CONDITIONS.............................................................................................................1 1.3 PROPOSED CONDITIONS..........................................................................................................1 APPENDIX A STORMWATER SCM CALCS APPENDIX B NRCS SOIL RESOURCES REPORT APPENDIX C USGS QUADRANGLE MAP APPENDIX D FEMA FLOOD MAP BOHLER BOHLER ENGINEERING INC, PLLC 1. GENERAL PROJECT DESCRIPTION 1.1 PROJECT NARRATIVE The following stormwater control report is for a proposed retail site east of 1-95 and north of US Hwy. 70 in Selma, Johnston County. The proposed site is 287.49 acres in size, of which 45.0 acres will comprise the proposed limits of disturbance. The site drains directly into two directions, which converge at Bawdy Swamp located in the Neuse River basin. The site is zoned Interstate Business (IB) within the Town of Selma zoning limits. The area within the parcel is currently mostly wooded, undeveloped land. The proposed project will develop the parcel into 182,000+/- sf of retail spaces, associated infrastructure, and all associated stormwater and utility networks are proposed for the site. The site will be accessible off the proposed Providence Boulevard (separate permit/application). 1.2 EXISTING CONDITIONS The current site consists of portions of wooded, undeveloped areas. Of the overall 287.49 acres on the site, approximately 45.0 acres will be disturbed. The remaining acreage will be disturbed and permitted under separate permits at a future time. Slopes on -site within our proposed disturbed area range from approximately 1 % to 15%. No steep slopes (greater than 25%) are anticipated to be impacted per this site plan. The entirety of the site drains directly into two separate unnamed tributaries directly upstream of Bawdy Swamp. 1.3 PROPOSED CONDITIONS As mentioned above, our project is proposing to subdivide the land and construct approximately 182,000sf of retail space. Proposed access will be connected at the proposed Providence Boulevard roundabout. The site will require the stockpiling of fill materials brought to the site while the site is brought to finished grade. Proposed temporary sediment basins will be converted to wet ponds in the final condition to control stormwater. The basin has been designed to control the post -developed stormwater rate to less than the pre -developed rate for the 10 - year storm as well as maintaining at least one foot of freeboard from the 100-year storm elevation to the top of bank BOHLER BOHLER ENGINEERING NC, PLLC PAGE 1 1 APPENDIX A I STORMWATER SCM CALCS BOHLER BOHLER ENGINEERING NC, PLLC BOH LER 1N (: 1 N I' I' H 1 N I: Wet Detention Basin Design Project Information Project: Eastfield Commercial Location: Selma, NC 27576 Project Number: NCR211024 Date: Feb-27-2023 Designed: RMG Checked: GJZ Site Information Sub Area Location: Wet Detention Basin 1 (Big Middle One) Drainage Area (DA) = 1,761,753 sf Impervious Area (IA) = 1,249,595 sf Percent Impervious (I) = 70.9 % Elevations Top of Bank Elevation = 170.75 ft Emergency Elevation = 170.00 ft Temporary Pool Elevation = 167.71 ft Permanent Pool Elevation = 167.25 ft Bottom of Pond Elevation = 163.75 ft Sediment Cleanout, Bottom Elevation = 163.25 ft Basin Areas/Volumes Area of Permanent Pool = 208,261 sf Apermyool (includes main pond & forebays) ) Area of Bottom of Shelf = 160,484 sf Abot shelf (excludes forebays) ) Area of Bottom of Pond = 3,270 sf AbotJ,ond (excluding sediment storage & forebays) Perimeter of Permanent Pool = 4,334 sf P permyond (excludes forebays) (Elev = 167.71 ) Volume, main pool = 520,306 cf V mainyool (from Hydracad) Volume, forebay (sum of forebays) = 73,635 cf V forebay (from Hydracad) Volume, permanent pool = 593,941 cf V perm_pool \"forebay+Vmain_pool) Forebay % of permanent pool volume = 14.2 % NO Average Depth Depth of Pond = 3 ft Depth (dist. btwn. bot. of shelf & btm. of pond, excludes sediment) Average Depth = 3.22 ft Use Average Depth of = 3.00 ft See Wet Basin Supplement Required Surface Area SA/DA = 3.25 (85% TSS Removal via Pond) Min Req'd Surface Area = 57,257 sf (at Permanent Pool) Required Storage Volume - Using Simple Method Design Storm = 1.0 inch (Project Does Not Drain to SA Waters) Determine Rv Value = 0.05 + 0.009 (I) = 0.69 in/in Storage Volume Required = 101,060 cf (above Permanent Pool) Side Slopes of Pond = 2 : 1 Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 208261 > 57257) sf BOH LER Wet Detention Basin Design 1.0 inch Volume Elevation Required Temporary Pool Volume = 101,060 cu ft Elev (fmsl) Volume (CF) Temporary Pool Lower Elevation Bound = 167.25 0 Temporary Pool Upper Elevation Bound = 167.75 108635 Temporary Pool Elevation = 167.71 ft Orifice Sizing - Wet Detention Q2 Days = 0.6287 cfs Q5 Days = 0.2515 cfs Orifice Size = 8.00 in Driving Head (Ho) = 0.04 ft Q Orifice = 0.344 cfs Drawdown Time = 3.4 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Anti -Flotation Device Outside Length = 6.00 ft Outside Width = 6.00 ft Inside Length = 5.00 ft Inside Width = 5.00 ft Bottom Thickness = 0.50 ft Top of Riser = 169.75 ft Invert of Riser = 167.25 ft Area = 36.0 sf Volume = 108 cf Weight = 6,739 Ibs Factor of Safety = 1.50 WT Req'd of Anti -Flotation Device = 10,109 Ibs Volume of Concrete Req'd = 115.4 of Depth Provided = 2.00 ft Volume Provided = 117.5 of WT of Anti -Flotation Device Provided = 10,293 Ibs Contour Incremental Accumulated Contour Area Volume Volume, S Stage, Z sq ft cu ft cu ft ft 167.25 208,261 0 0 0.0 167.75 226,277 108,635 108,635 0.5 168.75 244,407 235,342 343,977 1.5 169.75 262,649 253,528 597,505 2.5 170.75 281,004 271,827 869,331 3.5 (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) (Water Displaced - Top of Riser to Bottom of Riser) (Weight Water Displaced) (Unit WT of Concrete = 150 pcf) Submerged Concrete Unit Weight 87.6 pcf OK BOH LER 1N (: 1 N I' I' H 1 N I: Wet Detention Basin Design Project Information Project: Eastfield Commercial Location: Selma, NC 27576 Project Number: NCR211024 Date: Feb-27-2023 Designed: SJK Checked: CEY Site Information Sub Area Location: Wet Detention Basin 2 (Right) Drainage Area (DA) = 278,753 sf Impervious Area (IA) = 196,657 sf Percent Impervious (I) = 70.5 % Elevations Top of Bank Elevation = 174.50 ft Emergency Elevation = 173.00 ft Temporary Pool Elevation = 170.66 ft Permanent Pool Elevation = 170.00 ft Bottom of Pond Elevation = 164.50 ft Sediment Cleanout, Bottom Elevation = 164.00 ft Basin Areas/Volumes Area of Permanent Pool = 22,883 sf Apermyool (includes main pond & forebays) (Elev = 170.00 ) Area of Bottom of Shelf = 16,574 sf Abot shelf (excludes forebays) (Elev = 169.50 ) Area of Bottom of Pond = 11,153 sf AbotJ,ond (excluding sediment storage & forebays) Perimeter of Permanent Pool = 731 sf Ppermyond (excludes forebays) Volume, main pool = 69,893 cf V mainyool (from Hydracad) Volume, forebay (sum of forebays) = 12,928 cf V forebay (from Hydracad) Volume, permanent pool = 82,821 cf V perm_pool \"forebay+Vmain_pool) Forebay % of permanent pool volume = 18.5 % OK Average Depth Depth of Pond = 5.5 ft Depth (dist. btwn. bot. of shelf & btm. of pond, excludes sediment) Average Depth = 4.18 ft Use Average Depth of = 4.00 ft See Wet Basin Supplement Required Surface Area SA/DA = 2.64 (85% TSS Removal via Pond) Min Req'd Surface Area = 7,359 sf (at Permanent Pool) Required Storage Volume - Using Simple Method Design Storm = 1.0 inch (Project Does Not Drain to SA Waters) Determine Rv Value = 0.05 + 0.009 (I) = 0.68 in/in Storage Volume Required = 15,911 cf (above Permanent Pool) Side Slopes of Pond = 3 : 1 Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 22883 > 7359) sf BOH LER Wet Detention Basin Design 1.0 inch Volume Elevation Required Temporary Pool Volume = 15,911 cu ft Elev (fmsl) Volume (CF) Temporary Pool Lower Elevation Bound = 170.50 11748 Temporary Pool Upper Elevation Bound = 171.50 37495 Temporary Pool Elevation = 170.66 ft 'Frustrum bounds in which Temporary Pool will ultimately reside Orifice Sizing -Wet Detention Q2 Days = 0.1490 cfs Q5 Days = 0.0596 cfs Orifice Size = 2.00 in Driving Head (Ho) = 0.19 ft Q Orifice = 0.046 cfs Drawdown Time = 4.0 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Anti -Flotation Device Outside Length = 6.00 ft Outside Width = 6.00 ft Inside Length = 5.00 ft Inside Width = 5.00 ft Bottom Thickness = 0.50 ft Top of Riser = 173.00 ft Invert of Riser = 170.00 ft Area = 36.0 sf Volume = 126 cf Weight = 7,862 Ibs Factor of Safety = 1.50 WT Req'd of Anti -Flotation Device = 11,794 Ibs Volume of Concrete Req'd = 134.6 of Depth Provided = 3.00 ft Volume Provided = 159.0 of WT of Anti -Flotation Device Provided = 13,928 Ibs Contour Incremental Accumulated Contour Area Volume Volume, S Stage, Z sq ft cu ft cu ft ft 170.00 22,883 0 0 0.0 170.50 24,107 11,748 11,748 0.5 171.50 27,388 25,748 37,495 1.5 172.50 29,725 28,557 66,052 2.5 173.50 32,119 30,922 96,974 3.5 174.50 34,569 33,344 130,318 4.5 (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) (Water Displaced - Top of Riser to Bottom of Riser) (Weight Water Displaced) (Unit WT of Concrete = 150 pcf) Submerged Concrete Unit Weight 87.6 pcf M 230217 - NCR211024 - Pre -Development at POA#3- Retail At Table of Contents Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC TABLE OF CONTENTS Project Reports 1 Routing Diagram 2 Rainfall Events Listing (selected events) 3 Area Listing (all nodes) 4 Soil Listing (all nodes) 5 Ground Covers (all nodes) 2-year Event 6 Node Listing 7 Subcat 2S: Pre -Development Study DA 1 9 Subcat 3S: Pre -Development Study DA 2 10 Subcat 4S: Pre -Development Study DA 3 11 Subcat 5S: Pre -Development Study DA 4 12 Subcat 6S: Pre -Development Study DA 5 13 Subcat 7S: Pre -Development Study DA 6 14 Reach 8R: POA #3 - Retail A West 15 Reach 9R: POA #2 - Retail A East 10-year Event 16 Node Listing 17 Subcat 2S: Pre -Development Study DA 1 19 Subcat 3S: Pre -Development Study DA 2 20 Subcat 4S: Pre -Development Study DA 3 21 Subcat 5S: Pre -Development Study DA 4 22 Subcat 6S: Pre -Development Study DA 5 23 Subcat 7S: Pre -Development Study DA 6 24 Reach 8R: POA #3 - Retail A West 25 Reach 9R: POA #2 - Retail A East 100-year Event 26 Node Listing 27 Subcat 2S: Pre -Development Study DA 1 29 Subcat 3S: Pre -Development Study DA 2 30 Subcat 4S: Pre -Development Study DA 3 31 Subcat 5S: Pre -Development Study DA 4 32 Subcat 6S: Pre -Development Study DA 5 33 Subcat 7S: Pre -Development Study DA 6 34 Reach 8R: POA #3 - Retail A West 35 Reach 9R: POA #2 - Retail A East 2S Pre -Development dy DA1 4S 5S 6S 7S 3S Pre-Developm nt Study pre-Devel pment Study Pre- velopment Study e-Development Study DA 3 A 4 DA 5 DA 6 Pre-Develo ment Study A 9R 8R POA #2 - Retail A East POA #3 - Retail A West Subcat Reach on Link =HydAD ram for 230217 - NCR211024 - Pre -Development at POA#3- Retail epared by Bohler Engineers, Printed 2/27/2023 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC 230217 - NCR211024 - Pre -Development at POA#3- Retail At Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 2-year Type II 24-hr Default 24.00 1 3.59 2 2 10-year Type II 24-hr Default 24.00 1 5.44 2 3 100-year Type II 24-hr Default 24.00 1 8.68 2 230217 - NCR211024 - Pre -Development at POA#3- Retail At Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 3 Area Listing (all nodes) Area CN Description (acres) (su bcatch me nt-n u mbe rs) 22.100 39 >75% Grass cover, Good, HSG A (2S, 3S, 4S, 5S, 6S, 7S) 15.760 61 >75% Grass cover, Good, HSG B (2S, 3S, 4S, 6S) 1.990 74 >75% Grass cover, Good, HSG C (2S, 3S, 4S) 1.110 98 Paved parking, HSG A (2S, 5S) 5.880 98 Water Surface, HSG A (2S) 46.840 57 TOTAL AREA 230217 - NCR211024 - Pre -Development at POA#3- Retail At Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 4 Area Soil (acres) Group 29.090 HSG A 15.760 HSG B 1.990 HSG C 0.000 HSG D 0.000 Other 46.840 Soil Listing (all nodes) Subcatchment Numbers 2S, 3S, 4S, 5S, 6S, 7S 2S, 3S, 4S, 6S 2S, 3S, 4S TOTAL AREA 230217 - NCR211024 - Pre -Development at POA#3- Retail At Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 5 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 22.100 15.760 1.990 0.000 0.000 39.850 >75% Grass cover, Good 2S, 3S, 4S, 5S, 6S, 7S 1.110 0.000 0.000 0.000 0.000 1.110 Paved parking 2S, 5S 5.880 0.000 0.000 0.000 0.000 5.880 Water Surface 2S 29.090 15.760 1.990 0.000 0.000 46.840 TOTAL AREA 230217 - NCR211024 - Pre -Development at POA#3- RetType 11 24-hr 2-year Rainfall=3.59" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 6 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2S: Pre -Development Runoff Area=28.570 ac 23.31% Impervious Runoff Depth>0.37" Flow Length=1,994' Tc=57.5 min CN=57 Runoff=4.28 cfs 0.880 of Subcatchment3S: Pre-DevelopmentStudy Runoff Area=8.700 ac 0.00% Impervious Runoff Depth>0.23" Flow Length=695' Tc=14.4 min CN=52 Runoff=1.21 cfs 0.164 of Subcatchment4S: Pre-DevelopmentStudy Runoff Area=5.120 ac 0.00% Impervious Runoff Depth>0.66" Tc=5.0 min CN=64 Runoff=6.36 cfs 0.283 of Subcatchment5S: Pre-DevelopmentStudy Runoff Area=0.700 ac 47.14% Impervious Runoff Depth>0.80" Tc=5.0 min CN=67 Runoff=1.08 cfs 0.047 of Subcatchment6S: Pre-DevelopmentStudy Runoff Area=3.540 ac 0.00% Impervious Runoff Depth>0.32" Tc=5.0 min CN=55 Runoff=1.61 cfs 0.094 of Subcatchment7S: Pre-DevelopmentStudy Runoff Area=0.210 ac 0.00% Impervious Runoff Depth>0.01" Tc=5.0 min CN=39 Runoff=0.00 cfs 0.000 of Reach 8R: POA #3 - Retail A West Inflow=9.05 cfs 1.303 of Outflow=9.05 cfs 1.303 of Reach 9R: POA #2 - Retail A East Inflow=1.21 cfs 0.164 of Outflow=1.21 cfs 0.164 of Total Runoff Area = 46.840 ac Runoff Volume = 1.467 of Average Runoff Depth = 0.38" 85.08% Pervious = 39.850 ac 14.92% Impervious = 6.990 ac 230217 - NCR211024 - Pre -Development at POA#3- RetType 11 24-hr 2-year Rainfall=3.59" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 2S: Pre -Development Study DA 1 Runoff = 4.28 cfs @ 12.77 hrs, Volume= 0.880 af, Depth> 0.37" Routed to Reach 8R : POA #3 - Retail A West Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.59" Area (ac) CN Description 5.880 98 Water Surface, HSG A 0.780 98 Paved parking, HSG A 0.130 74 >75% Grass cover, Good, HSG C 5.170 61 >75% Grass cover, Good, HSG B 16.610 39 >75% Grass cover, Good, HSG A 28.570 57 Weighted Average 21.910 76.69% Pervious Area 6.660 23.31 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.1 100 0.0130 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.59" 8.3 665 0.0068 1.33 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 22.5 884 0.0010 0.65 17.68 Trap/Vee/Rect Channel Flow, Bot.W=3.00' D=3.00' Z= 2.0 7' Top.W=15.00' n= 0.100 Very weedy reaches w/pools 2.6 345 0.0010 2.22 132.95 Trap/Vee/Rect Channel Flow, Bot.W=3.00' D=4.00' Z= 3.0 7' Top.W=27.00' n= 0.035 57.5 1,994 Total 230217 - NCR211024 - Pre -Development at POA#3- RetType // 24-hr 2-year Rainfall=3.59" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 8 Subcatchment 2S: Pre -Development Study DA 1 Hydrograph 4.28 cfs Type-W-24 hT-------- --- 4 2-year Rainfal1=159" Runoff Area=28.570 6c 3 Runoff Vglurne=0.880 af', Runoff Depth'>0.37" Fibw-Length=9 NV— - 2 Tu=57',.5 min CN=5 - --- 1 � � � � � � ❑Runoff -- -- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- RetType 11 24-hr 2-year Rainfall=3.59" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 3S: Pre -Development Study DA 2 Runoff = 1.21 cfs @ 12.14 hrs, Volume= 0.164 af, Depth> 0.23" Routed to Reach 9R : POA #2 - Retail A East Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.59" Area (ac) CN Description 3.830 39 >75% Grass cover, Good, HSG A 4.380 61 >75% Grass cover, Good, HSG B 0.490 74 >75% Grass cover, Good, HSG C 8.700 52 Weighted Average 8.700 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.3 100 0.0059 0.27 Sheet Flow, Sheet Fallow n= 0.050 P2= 3.59" 8.1 595 0.0058 1.23 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 14.4 N 3 0 LL 695 Total Subcatchment 3S: Pre -Development Study DA 2 Hydrograph ❑Runoff cfs Type Il 24,hr 2 year-Rain#au,--3.5f9"- Runbff Area=8.700 ac Runoff'I Vol'Iumq=0.116t of Runoff DeOh:�0.23" Flow Lehgth=695' Tc;=144 rein (�N='52 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- RetType 11 24-hr 2-year Rainfall=3.59" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 4S: Pre -Development Study DA 3 [49] Hint: Tc<2dt may require smaller dt Runoff = 6.36 cfs @ 11.97 hrs, Volume= 0.283 af, Depth> 0.66" Routed to Reach 8R : POA #3 - Retail A West Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.59" Area (ac) CN Description 0.110 39 >75% Grass cover, Good, HSG A 3.640 61 >75% Grass cover, Good, HSG B 1.370 74 >75% Grass cover, Good, HSG C 5.120 64 Weighted Average 5.120 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Pre -Development Study DA 3 Hydrograph -- I I I I I I I ■Runoff 6.36 cfs 6 5 ----------------------------- -------T- --- ----T--- - ' ---- -- w 4 o ---J----L--------1--------1-- a 3 2 ------- --- Typei124,hr- 2-year Rainfall=3.59" Runbff Area=5.120 ac RupDffoW mip=D.283 of - Runoff Depth>0.66" ---- ---- -- T'c=560 ntin- ON=!64 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- RetType 11 24-hr 2-year Rainfall=3.59" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 5S: Pre -Development Study DA 4 [49] Hint: Tc<2dt may require smaller dt Runoff = 1.08 cfs @ 11.97 hrs, Volume= 0.047 af, Depth> 0.80" Routed to Reach 8R : POA #3 - Retail A West Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.59" Area (ac) CN Description 0.330 98 Paved parking, HSG A 0.370 39 >75% Grass cover. Good. HSG A 0.700 67 Weighted Average 0.370 52.86% Pervious Area 0.330 47.14% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5S: Pre -Development Study DA 4 Hydrograph � � � � � ❑Runoff l I I I I I I ---- -- Typea1 2�yhr- 2-year Rainfall=3.59" Runbff Area=0.700 ac Runoff 'I Vol'lumip=O.'1047'I of Runoff De�lpth>0.80" T'c=5.0 min CN=67 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- RetType 11 24-hr 2-year Rainfall=3.59" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 6S: Pre -Development Study DA 5 [49] Hint: Tc<2dt may require smaller dt Runoff = 1.61 cfs @ 12.00 hrs, Volume= 0.094 af, Depth> 0.32" Routed to Reach 8R : POA #3 - Retail A West Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.59" Area (ac) CN Description 0.970 39 >75% Grass cover, Good, HSG A 2.570 61 >75% Grass cover. Good. HSG B 3.540 55 Weighted Average 3.540 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, H 1 3 0 LL Subcatchment 6S: Pre -Development Study DA 5 Hydrograph 1.61 cfs Type 11 24,hr 2-year Rainfall=3.59" Runbff Area=3.540 ac Runoff Vo1!um_p=0.09*_af Runoff Depth>0.32" T'c=5,0 Min GN='55 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 230217 - NCR211024 - Pre -Development at POA#3- RetType 11 24-hr 2-year Rainfall=3.59" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 7S: Pre -Development Study DA 6 [49] Hint: Tc<2dt may require smaller dt [73] Warning: Peak may fall outside time span Runoff = 0.00 cfs @ 19.72 hrs, Volume= 0.000 af, Depth> 0.01" Routed to Reach 8R : POA #3 - Retail A West Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-year Rainfall=3.59" Area (ac) CN Description 0.210 39 >75% Grass cover. Good. HSG A 0.210 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 7S: Pre -Development Study DA 6 Hydrograph 0.000 - ■Runoff 0.000 -- - - - - -- -----------T--------T--------r--------r----1----F 0.00 Cfs 0.000 -�yjTe_�- -h �'I---- ---- ---- ---- --- - 0.000 --------------------- ---- o.00a -2- ,a�r�Ra1nfaII=-3.-5�'''-------',----'----',----'----',----- -',---- 0.000 0.000 -------------- _Runoff Ate-&O.210-ao--'�--------'--------'----''- ------ O.00o -R no f V91ur ------Ork 0'IG a - -----L o.00a _ --- ----L-------J- u 0.000 - L-------- L--------L-- ------J---- Runoff De�fI I1"----- 3 0.000 --- --CC-- - ------- ----+---- ----+---- --------- ------ ----- --------- a0.000 E: - =�7�©-______+____�----+------------- ------ ------ ---------- - -----I----+----I----+----I---- +---- I ---- +-+----I----+---- ' 0.000 0.000 --------r------------+-------- +---- ---- r----i--- -----�r---�---- 0.000 ---r----r---r----I---- t---- I ---- t---- I ---- r---- I--- --- r---- I----r---- 0 --------r--------r--- T--------T-------- r-- - -- -- - - - - - - - - - - - - - - - - - 0 --------r-----------+--------+--------r----�-- r-------r---�---- 0 -------��----------- ---��----------��----�----------��-------- 5 6 7 8 9 10 11 12 13 14 15 16 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- RetType 11 24-hr 2-year Rainfall=3.59" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 14 Summary for Reach 8R: POA #3 - Retail A West [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 38.140 ac, 18.33% Impervious, Inflow Depth > 0.41" for 2-year event Inflow = 9.05 cfs @ 11.98 hrs, Volume= 1.303 of Outflow = 9.05 cfs @ 11.98 hrs, Volume= 1.303 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs 10 9 8 7- 6- 5- 0 LL 4 3 2 1 0 6 Reach 8R: POA #3 - Retail A West Hydrograph ---;--------rt----I----r 9.05 cfs -------'---- 1--- -' ---- L ----' --- t------ -------I---- -- t-------- ----I---- t ----I ----I - ---- - - - ----- - - - ---I- 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Inflow ❑ Outflow 230217 - NCR211024 - Pre -Development at POA#3- RetType 11 24-hr 2-year Rainfall=3.59" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 15 Summary for Reach 9R: POA #2 - Retail A East [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 8.700 ac, 0.00% Impervious, Inflow Depth > 0.23" for 2-year event Inflow = 1.21 cfs @ 12.14 hrs, Volume= 0.164 of Outflow = 1.21 cfs @ 12.14 hrs, Volume= 0.164 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Reach 9R: POA #2 - Retail A East Hydrograph ❑ Inflow ❑ Outflow 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- ReType 11 24-hr 10-year Rainfall=5.44" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 16 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2S: Pre -Development Runoff Area=28.570 ac 23.31% Impervious Runoff Depth>1.16" Flow Length=1,994' Tc=57.5 min CN=57 Runoff=17.84 cfs 2.772 of Subcatchment3S: Pre-DevelopmentStudy Runoff Area=8.700 ac 0.00% Impervious Runoff Depth>0.88" Flow Length=695' Tc=14.4 min CN=52 Runoff=9.36 cfs 0.636 of Subcatchment4S: Pre-DevelopmentStudy Runoff Area=5.120 ac 0.00% Impervious Runoff Depth>1.70" Tc=5.0 min CN=64 Runoff=17.14 cfs 0.723 of Subcatchment5S: Pre-DevelopmentStudy Runoff Area=0.700 ac 47.14% Impervious Runoff Depth>1.93" Tc=5.0 min CN=67 Runoff=2.66 cfs 0.112 of Subcatchment6S: Pre-DevelopmentStudy Runoff Area=3.540 ac 0.00% Impervious Runoff Depth>1.07" Tc=5.0 min CN=55 Runoff=7.17 cfs 0.315 of Subcatchment7S: Pre-DevelopmentStudy Runoff Area=0.210 ac 0.00% Impervious Runoff Depth>0.24" Tc=5.0 min CN=39 Runoff=0.03 cfs 0.004 of Reach 8R: POA #3 - Retail A West Inflow=27.69 cfs 3.928 of Outflow=27.69 cfs 3.928 of Reach 9R: POA #2 - Retail A East Inflow=9.36 cfs 0.636 of Outflow=9.36 cfs 0.636 of Total Runoff Area = 46.840 ac Runoff Volume = 4.564 of Average Runoff Depth = 1.17" 85.08% Pervious = 39.850 ac 14.92% Impervious = 6.990 ac 230217 - NCR211024 - Pre -Development at POA#3- ReType 11 24-hr 10-year Rainfall=5.44" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 2S: Pre -Development Study DA 1 [47] Hint: Peak is 101 % of capacity of segment #3 Runoff = 17.84 cfs @ 12.68 hrs, Volume= 2.772 af, Depth> 1.16" Routed to Reach 8R : POA #3 - Retail A West Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-year Rainfall=5.44" Area (ac) CN Description 5.880 98 Water Surface, HSG A 0.780 98 Paved parking, HSG A 0.130 74 >75% Grass cover, Good, HSG C 5.170 61 >75% Grass cover, Good, HSG B 16.610 39 >75% Grass cover, Good, HSG A 28.570 57 Weighted Average 21.910 76.69% Pervious Area 6.660 23.31 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.1 100 0.0130 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.59" 8.3 665 0.0068 1.33 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 22.5 884 0.0010 0.65 17.68 Trap/Vee/Rect Channel Flow, Bot.W=3.00' D=3.00' Z= 2.0 7' Top.W=15.00' n= 0.100 Very weedy reaches w/pools 2.6 345 0.0010 2.22 132.95 Trap/Vee/Rect Channel Flow, Bot.W=3.00' D=4.00' Z= 3.0 7' Top.W=27.00' n= 0.035 57.5 1,994 Total 230217 - NCR211024 - Pre -Development at POA#3- ReType 11 24-hr 10-year Rainfall=5.44" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 18 Subcatchment 2S: Pre -Development Study DA 1 Hydrograph - --T---- T-------- T ----'--------T-----T----'F--- T---- T- -------T---- ■Runoff 19 --' - ------'----',---------' 17.84 Cfs ------------------- - - - - ', ---- 18 ----'------------'--------' ---- _TPeI1 �4,hTr ---- ---- 17 -------------------------------- 16 10' yr-Rain#aN=44„--- 1s--- ---- ---- ---- ---- ---- 14 Runoff Aeea=28. 7QAc------------------------'---- ---- _ 12-RunoffVQ1unle-�.77 of -_-+----L---J----L---- ----+---- - - - - - - - - L - - - - L - - - L - - - - L - - - -�-- w 11 -�- ----+----L--- ------------+---- -Rr�r�aff Deptlr?9:�1-6"- 3 10---+----+----+--+----+---+- -- --+----+---+----+---+----+---- 7 TT6=57�5 rain -- --' - - ' -- - -- --' - --- 6 �IY—----,---- ----,I ----,-- ---i-----r-----------,---- ---- 5---y----+---- I----rt----r----i T_ ---r---I----r--------+---- 4---7----T----�r---7----�r---�--- ---------------r--------T---- 3 2---T---- T---- - ---T----T----�----------T----+---�-- 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- ReType 11 24-hr 10-year Rainfall=5.44" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment 3S: Pre -Development Study DA 2 Runoff = 9.36 cfs @ 12.09 hrs, Volume= 0.636 af, Depth> 0.88" Routed to Reach 9R : POA #2 - Retail A East Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-year Rainfall=5.44" Area (ac) CN Description 3.830 39 >75% Grass cover, Good, HSG A 4.380 61 >75% Grass cover, Good, HSG B 0.490 74 >75% Grass cover, Good, HSG C 8.700 52 Weighted Average 8.700 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.3 100 0.0059 0.27 Sheet Flow, Sheet Fallow n= 0.050 P2= 3.59" 8.1 595 0.0058 1.23 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 14.4 N 0 LL 695 Total Subcatchment 3S: Pre -Development Study DA 2 Hydrograph � � � - - - - - ■Runoff - 9.36 cfs ---J----1----1----J----------- ------ -- +--- -'- - -----------'-- ---;----! - ---III- - - - T ----III-----III-- - - - J - - - - 1 - - - -I- - - - 1 --- 7---- t----I- - -- rt---------I-- 5 6 -Type- -24�hr - ---- 7O-VfAar�Rainfa11�5.44"`- - - - - - Run6ff Area-=5.700-ac- - -RWfto#f'I-VoIWmq=0:'63roraf - -------!-Runaf#_ DeptW>"8"-- Flow Le'ng-th=695' - - -II- - - - T - - - - r - r - r - Tc, 14I.4 rr i n (N=I't2 ---t----r--- 7---- r---- ----7---- 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- ReType 11 24-hr 10-year Rainfall=5.44" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 4S: Pre -Development Study DA 3 [49] Hint: Tc<2dt may require smaller dt Runoff = 17.14 cfs @ 11.96 hrs, Volume= 0.723 af, Depth> 1.70" Routed to Reach 8R : POA #3 - Retail A West Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-year Rainfall=5.44" Area (ac) CN Description 0.110 39 >75% Grass cover, Good, HSG A 3.640 61 >75% Grass cover, Good, HSG B 1.370 74 >75% Grass cover, Good, HSG C 5.120 64 Weighted Average 5.120 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Pre -Development Study DA 3 Hydrograph - ---'----�----�---�----�----'----�---- ■Runoff 14 cfs -1----1----L--- J----L---- ---- i---- -------- ; ---- � Type-0-2~4,hT - - - - -'- - - L - - - - L - - - L - - - - L - - - -I- - - - L - - - - - - - - 1L0-�,!w Reflnfall�5 44" - - - - - -1ft rrbff-Areai=5.-t2O 'ac- - ---- -RuTtaffll-Vrol'Ilurnip=O:I1723-laf - -------1- --- ----T - -- ------ jl�N=64-- ---I------------ ----- ----I---- ---- ----I- --I - I ----I - I - -- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- ReType 11 24-hr 10-year Rainfall=5.44" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment 5S: Pre -Development Study DA 4 [49] Hint: Tc<2dt may require smaller dt Runoff = 2.66 cfs @ 11.96 hrs, Volume= 0.112 af, Depth> 1.93" Routed to Reach 8R : POA #3 - Retail A West Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-year Rainfall=5.44" Area (ac) CN Description 0.330 98 Paved parking, HSG A 0.370 39 >75% Grass cover. Good. HSG A 0.700 67 Weighted Average 0.370 52.86% Pervious Area 0.330 47.14% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5S: Pre -Development Study DA 4 Hydrograph 2.66 cf s .................................................. 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- ReType 11 24-hr 10-year Rainfall=5.44" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment 6S: Pre -Development Study DA 5 [49] Hint: Tc<2dt may require smaller dt Runoff = 7.17 cfs @ 11.97 hrs, Volume= 0.315 af, Depth> 1.07" Routed to Reach 8R : POA #3 - Retail A West Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-year Rainfall=5.44" Area (ac) CN Description 0.970 39 >75% Grass cover, Good, HSG A 2.570 61 >75% Grass cover. Good. HSG B 3.540 55 Weighted Average 3.540 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 6S: Pre -Development Study DA 5 Hydrograph I I I I ❑Runoff 7.17 cfs ----1----r--------T----I--- 7 6 5 N I I I I I I ,I I I I I I I 4 3 0 LL I I I I I I 3 2 ---r----r- --- - 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- ReType 11 24-hr 10-year Rainfall=5.44" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment 7S: Pre -Development Study DA 6 [49] Hint: Tc<2dt may require smaller dt Runoff = 0.03 cfs @ 12.03 hrs, Volume= 0.004 af, Depth> 0.24" Routed to Reach 8R : POA #3 - Retail A West Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-year Rainfall=5.44" Area (ac) CN Description 0.210 39 >75% Grass cover, Good, HSG A 0.210 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 7S: Pre -Development Study DA 6 Hydrograph --------'r------------t--------t--------r--------r---y----'r---y---- ■Runoff 0.028 0.03 cfs ------------ - - - --- -- -------------------,---------,---- 0.026 Type _I I_24,h r 0.024 ----' - tO-your Rainfal1=5.44"-- 0.022 -- ---- - -- ------- Runoff -Area--0.-210-ac-- 0.02 1 I I I 1 -- +--- - -- ---- ur�off-Voljum�=0:10041�af - 0.018 0.016---1---- i--------l--- -- ---Ru-noftDepth-0.24"_ 0 0.014 T Cin „ LL -------r---rt----r---+----i--------r--------r--i t=&O-Mim - 0.012 #� 0.01 0.008 - - - - - - - r - - - 7 - - - -I- - - - + - - - -I- - - -I- 0.006 ' ' - - - -' .... - - -'- '-' - - - - -' - - - -- - - - - - - -'- - - - I- - - - - - - 0.004 0.002 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- ReType 11 24-hr 10-year Rainfall=5.44" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 24 Summary for Reach 8R: POA #3 - Retail A West [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 38.140 ac, 18.33% Impervious, Inflow Depth > 1.24" for 10-year event Inflow = 27.69 cfs @ 11.97 hrs, Volume= 3.928 of Outflow = 27.69 cfs @ 11.97 hrs, Volume= 3.928 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Reach 8R: POA #3 - Retail A West Hydrograph ❑ Inflow ---------------------� --- ❑outflow 1�riffQ1 r Are'-38:441fl -pc - ---- -- -- ---- ---- I - ------ -'I -------- -'I -------- ---- ---r----I----r----I----r- r-- ---r----I----r----I----r--- -I- - - - L - - - - L - - - - - - -I- - - - L - - - -I- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- ReType 11 24-hr 10-year Rainfall=5.44" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 25 Summary for Reach 9R: POA #2 - Retail A East [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 8.700 ac, 0.00% Impervious, Inflow Depth > 0.88" for 10-year event Inflow = 9.36 cfs @ 12.09 hrs, Volume= 0.636 of Outflow = 9.36 cfs @ 12.09 hrs, Volume= 0.636 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs N U 3 0 LL 10 9 8 7 6 3 2 1 Reach 9R: POA #2 - Retail A East Hydrograph 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Inflow ❑ outflow 230217 - NCR211024 - Pre -Development at POA#3- RType 11 24-hr 100-year Rainfall=8.68" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 26 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2S: Pre -Development Runoff Area=28.570 ac 23.31% Impervious Runoff Depth>3.11" Flow Length=1,994' Tc=57.5 min CN=57 Runoff=52.86 cfs 7.413 of Subcatchment3S: Pre-DevelopmentStudy Runoff Area=8.700 ac 0.00% Impervious Runoff Depth>2.62" Flow Length=695' Tc=14.4 min CN=52 Runoff=32.02 cfs 1.897 of Subcatchment4S: Pre-DevelopmentStudy Runoff Area=5.120 ac 0.00% Impervious Runoff Depth>3.99" Tc=5.0 min CN=64 Runoff=39.88 cfs 1.701 of Subcatchment5S: Pre-DevelopmentStudy Runoff Area=0.700 ac 47.14% Impervious Runoff Depth>4.34" Tc=5.0 min CN=67 Runoff=5.88 cfs 0.253 of Subcatchment6S: Pre-DevelopmentStudy Runoff Area=3.540 ac 0.00% Impervious Runoff Depth>2.96" Tc=5.0 min CN=55 Runoff=20.72 cfs 0.874 of Subcatchment7S: Pre-DevelopmentStudy Runoff Area=0.210 ac 0.00% Impervious Runoff Depth>1.27" Tc=5.0 min CN=39 Runoff=0.48 cfs 0.022 of Reach 8R: POA #3 - Retail A West Inflow=73.14 cfs 10.263 of Outflow=73.14 cfs 10.263 of Reach 9R: POA #2 - Retail A East Inflow=32.02 cfs 1.897 of Outflow=32.02 cfs 1.897 of Total Runoff Area = 46.840 ac Runoff Volume = 12.160 of Average Runoff Depth = 3.12" 85.08% Pervious = 39.850 ac 14.92% Impervious = 6.990 ac 230217 - NCR211024 - Pre -Development at POA#3- RType 11 24-hr 100-year Rainfall=8.68" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment 2S: Pre -Development Study DA 1 [47] Hint: Peak is 299% of capacity of segment #3 Runoff = 52.86 cfs @ 12.61 hrs, Volume= 7.413 af, Depth> 3.11" Routed to Reach 8R : POA #3 - Retail A West Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.68" Area (ac) CN Description 5.880 98 Water Surface, HSG A 0.780 98 Paved parking, HSG A 0.130 74 >75% Grass cover, Good, HSG C 5.170 61 >75% Grass cover, Good, HSG B 16.610 39 >75% Grass cover, Good, HSG A 28.570 57 Weighted Average 21.910 76.69% Pervious Area 6.660 23.31 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.1 100 0.0130 0.07 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.59" 8.3 665 0.0068 1.33 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 22.5 884 0.0010 0.65 17.68 Trap/Vee/Rect Channel Flow, Bot.W=3.00' D=3.00' Z= 2.0 7' Top.W=15.00' n= 0.100 Very weedy reaches w/pools 2.6 345 0.0010 2.22 132.95 Trap/Vee/Rect Channel Flow, Bot.W=3.00' D=4.00' Z= 3.0 7' Top.W=27.00' n= 0.035 57.5 1,994 Total 230217 - NCR211024 - Pre -Development at POA#3- RType // 24-hr 100-year Rainfall=8.68" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 28 N 3 0 LL Subcatchment 2S: Pre -Development Study DA 1 Hydrograph 52 Tire-M-24�hr----- -----'--- -ioo-year fRainifaifr$.'8" - -Runoff Aeea=28.57a �c-- -R"offVQiurre-t.41 -RunoftDepth�&'i-1" --- -FIbw-Le�nOth--' , I ---- 1 \I-V}}^^��,.V 11',I r11_ ____,i-- - -, --- - - - - - - - + - - - -I- - - - 4 - - - - - - - - -I- - - 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- RType 11 24-hr 100-year Rainfall=8.68" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment 3S: Pre -Development Study DA 2 Runoff = 32.02 cfs @ 12.07 hrs, Volume= 1.897 af, Depth> 2.62" Routed to Reach 9R : POA #2 - Retail A East Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.68" Area (ac) CN Description 3.830 39 >75% Grass cover, Good, HSG A 4.380 61 >75% Grass cover, Good, HSG B 0.490 74 >75% Grass cover, Good, HSG C 8.700 52 Weighted Average 8.700 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.3 100 0.0059 0.27 Sheet Flow, Sheet Fallow n= 0.050 P2= 3.59" 8.1 595 0.0058 1.23 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 14.4 695 Total Subcatchment 3S: Pre -Development Study DA 2 Hydrograph - 32 -------+-------- ----------- 30 ---J----L----'----L---------'-- 28 -------- -------- ----------- 26 --------------------------- 24 --- T---- ----I- T - -- T---------I-- 22 ---+----+----'I----+----'I-----'I-- w20 -------------------'�---�-- I I I I I I 3 18 ---J----L--------L---------'-- 0 a16 ------------------' ----'----'-- 14 --------T--------T----------- 12 10 ---+----T--------+---------I-- 8 -------+-------- ---------- 6 -J-- --L--------L---------'- 4 I I ----'- I I I I --' -- -' ----'- 2 ------- ---- --- -Type-0-24,hT- - - - -'- - L - - - - L - - - L - - - - L - - - -I- - - - L - - - - -I 10+0-year -Rainfallr8.68"-- ---R-urrbff-Acre&=&.70a ac-- - - - T - - - - T - - - T - - - - T - - - -I- - - T - - - - - W"off,_VojumO=1.1897+af - ------ Runoff D"tiv>163"-- - - -'- - - - L - - - - L - - - L - - - L - - -I- - - - I---- --- flow Length=695'-- --- +---- - Tc, 14.-4-rr)ln-- - - -I- - - - T - - - - T - - - T - - - - -------+----r-------r--- N-52- -'- - - - L - - - - L - - - L - - - - L - - - -'- - - - L - - - - 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- RType 11 24-hr 100-year Rainfall=8.68" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 30 Summary for Subcatchment 4S: Pre -Development Study DA 3 [49] Hint: Tc<2dt may require smaller dt Runoff = 39.88 cfs @ 11.96 hrs, Volume= 1.701 af, Depth> 3.99" Routed to Reach 8R : POA #3 - Retail A West Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.68" Area (ac) CN Description 0.110 39 >75% Grass cover, Good, HSG A 3.640 61 >75% Grass cover, Good, HSG B 1.370 74 >75% Grass cover, Good, HSG C 5.120 64 Weighted Average 5.120 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Pre -Development Study DA 3 Hydrograph i----------------------------------- -- - - -- -------------------- ---+----+----I----+---------I--------+----+---+----+--------+---- ■Runoff ----T----I----T----I-- 39.88 cfs-----t----T---T----T----I----T---- 40 --- - - - ---- ------ ---------I 38 ---J----L--------L---------'-- 34 -------T--------T----T---�-- 32 ----------------?---------�,-- 30 ---J----1----1----L---------'-- 26 1 ---T----T--------T----'�---�- u 24 22 ---J----1----1----1----------- LLo 20 ' 18 ---T----T------------'� �- 16 ------------------'---------'- I I I I I I 14 --- ---------------------- 12 T ---+----+--------+---------- 10 -------T--------T----� ----�- 8 ------------------'---------'- 6 ----- +-- - - - --- ---------- 4 I I I I I I ----+--------rt----r----I- -- ---L----L---L-Type-0-2-4-1hi- ------100-yyarRainfafw8:6+8"-- - - � n6ff-5.120ac- - - - - -'- - - - L - - - - L - - - L - - - - L - - - -I- - - - L - - - - -R-ufto#f+VofI'Itrmp-1-�701 & - ----I---- ---- --- ------------ ---- ----II---- -Runoff D"Ov> 99"-- -------- ----IL-----I-- - I---- --------+----+---+--- TIc-5I:D-Min-- ----I---- --- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- RType 11 24-hr 100-year Rainfall=8.68" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 31 Summary for Subcatchment 5S: Pre -Development Study DA 4 [49] Hint: Tc<2dt may require smaller dt Runoff = 5.88 cfs @ 11.96 hrs, Volume= 0.253 af, Depth> 4.34" Routed to Reach 8R : POA #3 - Retail A West Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.68" Area (ac) CN Description 0.330 98 Paved parking, HSG A 0.370 39 >75% Grass cover. Good. HSG A 0.700 67 Weighted Average 0.370 52.86% Pervious Area 0.330 47.14% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5S: Pre -Development Study DA 4 Hydrograph � � � � � � � ■Runoff 1 I I I I I I Type 11 24,hr ---- 100-year-RainfaHr8A$"- Runbff Area=0.700 ac ----'Run—off 'IVo1�;ump=Oj253'I-af- R61noff De�Ipth:�4.314" _ - ------+--------+----I- - -- i----I---- T'c=5.0 min ------! - - - - ----! ---- -ON=67 I T I I T I ....................................................... 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- RType 11 24-hr 100-year Rainfall=8.68" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 32 Summary for Subcatchment 6S: Pre -Development Study DA 5 [49] Hint: Tc<2dt may require smaller dt Runoff = 20.72 cfs @ 11.96 hrs, Volume= 0.874 af, Depth> 2.96" Routed to Reach 8R : POA #3 - Retail A West Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.68" Area (ac) CN Description 0.970 39 >75% Grass cover, Good, HSG A 2.570 61 >75% Grass cover. Good. HSG B 3.540 55 Weighted Average 3.540 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 6S: Pre -Development Study DA 5 Hydrograph ---1----+----r---T-------------r----I----+----r---1----r----I----+---- ❑Runoff --------- ---- ---- - ---- -- 120.72 cfs ----- 1 ---- 1 --- 1---- 21 ---------+--------------------- 20 --- ----t--------t----'------- 19 ------------- - - - - -'---------'-- 18 -------+------------------- 17 -------t--------t----r--- -- 16 ----;---- ----'----?----'-----'-- 15 -------+------------------- N13 ----------------------------- 12 --- ----------------------- 0 11 ---t----t-------------r------ 10 ---------- - - - - -----------�,-- i 6 ---J----1----1----1---------'- 4 -------------------------- 3 --------!--------!---------'- ------- ---_,_Type- -2-4-hr - ----__1U0=yoarRairjfa[[#8 fib"-- - - - - - - -:tu ribff Are&-&54(Yc- - -' _U no ffrYQ�' umIP_=_0,'$ 4t of - ---- -Runoff DPf[v)-7_96'F- ----I---- t----+---t---Tc=5.0-Min - ----it---- �i----�i---------i----_-(y,��--- i5---- - t----Ir---t- ---r--- ---i-------------------------- ---- ---li----t---- I+ --- t---- r---- li----t---- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- RType 11 24-hr 100-year Rainfall=8.68" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 33 Summary for Subcatchment 7S: Pre -Development Study DA 6 [49] Hint: Tc<2dt may require smaller dt Runoff = 0.48 cfs @ 11.98 hrs, Volume= 0.022 af, Depth> 1.27" Routed to Reach 8R : POA #3 - Retail A West Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-year Rainfall=8.68" Area (ac) CN Description 0.210 39 >75% Grass cover, Good, HSG A 0.210 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 7S: Pre -Development Study DA 6 Hydrograph ■ Runoff I I I I I I I --- -- -Type II'-2 lhr- IGO-year-Rai nfal l=8.6'8"- 1- - R-un 6ff Area'=0.210- ac- ---!Rurt_offTVo(um0=0.022! a# -Ru'noft De6th:�1.27"_ Tc=&O Min (N='139 r r T 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- RType 11 24-hr 100-year Rainfall=8.68" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 34 Summary for Reach 8R: POA #3 - Retail A West [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 38.140 ac, 18.33% Impervious, Inflow Depth > 3.23" for 100-year event Inflow = 73.14 cfs @ 11.96 hrs, Volume= 10.263 of Outflow = 73.14 cfs @ 11.96 hrs, Volume= 10.263 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Reach 8R: POA #3 - Retail A West Hydrograph ❑ Inflow 80 ��D Outflow 75 -------1----1----1---- 73.14 cfs - I_ I 11 1_ 1 _L _ -11nf10w Amp= 8:Un 0c 70 -------------------------------------------------------- 65 --------------------- , -- --------,------------ -,--------, --- 60 55 50 N 45 U ---1--------7--------T-- ----Ir---7--------7--------T--- I 40 - - - - - - _I_ I I I I I I I I I I I o--- a 35 -- -- -- -- -- - --- -- -- -- -- -- 30 - Ir- 25 ,'I ---y----I----+----li----r--- -Ir--- ----+---+----li----r--- I I I I I I I I I I I I 20 10 ------------------II - --- r - - - -- - - - -- - -- 5 0 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 5 Time (hours) 230217 - NCR211024 - Pre -Development at POA#3- RType 11 24-hr 100-year Rainfall=8.68" Prepared by Bohler Engineers Printed 2/27/2023 HydroCAD® 10.20-2g s/n 03478 © 2022 HydroCAD Software Solutions LLC Page 35 Summary for Reach 9R: POA #2 - Retail A East [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 8.700 ac, 0.00% Impervious, Inflow Depth > 2.62" for 100-year event Inflow = 32.02 cfs @ 12.07 hrs, Volume= 1.897 of Outflow = 32.02 cfs @ 12.07 hrs, Volume= 1.897 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Reach 9R: POA #2 - Retail A East Hydrograph ----------- -------- -----------------I, ------------------- --- ❑ Inflow 34 ----I ---T---- TT----I----Tr I ----32.02 cfs _ �-----TI--- TII----I----T----I----TI- - flow4ArQTQG+_ ❑Outflow 32 30 28 26 24 I L i L 22 - - -1- - - - - - - - - - - - - - - - - - -- H 20 ___--'I----I� ___--'I----'I----I�-- ---'I----I� ---'I----'I-----'I----'I----I�--- U- - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 18 --- -- -- -- -- - -- -- --- -- -- -- -- -- LL 14 I -------I---- I ----------- I I I -------I---- I ----I---------------- I I I I I I I 12 10 �I - - - -I- - - - - - - r--- - -I- - - - - - - - - - -I- - - - - - - -I-- 8 �I T 1 r T 1 1 6 ---+----r---+- --- - ---t- -----r---+----I----+--------r--- 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) APPENDIX B I NRCS SOIL RESOURCES REPORT BOHLER BOHLER ENGINEERING NC, PLLC a 1`30'00' 1lti! 1'. ,-;. DEPAH'I'MF.NT tlF A GItI(TI: TILE ti0[I. ('0NSF:tt1'ATI0N SEItl'It'F: a.n c...H Thjs soil survey map was compiled by the U. 5. Department of Agriculture, Soil Conservation Service, and cooperating agencies. Base maps are orthophotographs prepared by the U. S. Depart- ment of Interior, Geological Survey From 19s❑ aerial photography. Coordinate grid ticks and land division corners, if shown, are approximately positioned - (joins slteet 1 I? 5 a a 4 000 3000 2000 1 000 0 5 000 10 000 boat 1 .5 ❑ 1 2 3 K lnrn tern Scale - I !24000 JOHNSTON COUNTY, NORTH CAROLINA NO 7 1 SHEET NO. 7 JOHNSTON COLINTY, NORTH CAROI.INA ty � Cr � SHEET NO. 7 OF 16 APPENDIX C I USGS QUADRANGLE MAP BOHLER BOHLER ENGINEERING NC, PLLC PATMENT OF THE INT `i US GS U.S. DEU SRGEOLOGICAL SURV YERIOR science for a changing world -78.3750' 35.6250' 738000ME 39 40 3945000mN 44 43 42 41 40 39 38 37 36 35 34 33 32 The National Map USTopo 41 42 43 44 45 46 47 SELMA QUADRANGLE NORTH CAROLINA - JOHNSTON COUNTY 7.5-MINUTE SERIES -78.2500' 48 49 35.6250' 45 44 43 42 41 40 39 38 37 36 35 34 33 3932000m N 35.5000 ° 39 40 41 42 43 44 45 46 47 48 749000rnE -78.3750'-78.2500' 35.5000' Produced by the United States Geological Survey MN * SCALE 1 :24 000 ROAD CLASSIFICATION m North American Datum of 1983 (NAD83) Cl) Local Connector o World Geodetic System of 1984 (WG584). Projection and N 1 0.5 0 KILOMETERS 1 2 NORTH Ln 1 000-meter grid: Universal Transverse Mercator, Zone 17S AROLINA Secondary Hwy Local Road �N o °rn This map is not a legal document. Boundaries may be 929" 1000 500 0 METERS 1000 2000 169 MILS Ramp 4WD generalized for this map scale. Private lands within government 1°34" 1 0.5 0 1 Y reservations may not be shown. Obtain permission before 28 MILS MILES is Interstate Route US Route O State Route M entering private lands. 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 QUADRANGLE LOCATION F-- N o Imagery .....................................................NAIP, June 2016 - November 2016 X FEET Roads ......................................... U.S. Census Bureau, 2016 UTM GRID AND 2019 MAGNETIC NORTH C-00 Names............................................................................GNIS, 1980 - 2019 1 Clayton DECLINATION AT CENTER OF SHEET �M U) Hydrography...............................National Hydrography Dataset, 2001 - 2018 1 2 3 2 Flowers � CONTOUR INTERVAL 10 FEET Contours............................................National Elevation Dataset, 2008 U.S. National Grid 3 Stancils Chapel v Boundaries ..............Multiple sources; see metadata file 2017 - 2018 NORTH AMERICAN VERTICAL DATUM OF 1988 �� 100,000-m Square ID 4 5 4 POwhatan e4 C) 5 Kenly West Z Wetlands.................FWS National Wetlands Inventory 1983 This map was produced to conform with the LL 6 Four Oaks QV National Geospatial W Program US Topo Product Standard, 2011. � � A metadata file associated with this product is draft version 0.6.18 6 7 8 7 Four Oaks NE 8 Princeton SELMA, NC I--z a Grid Zone Designation ADJOINING QUADRANGLES ' z z 17S 2019 RD pRD "-` �±` "-` Brown Cem❑ - zDo - - Zso CLARK•P gVR - - � .,, _ b - Q �•r ?O �" -- � RISE .` O - ., ., L ■ O ° I RIVER KNOLL.DR HATCHER RD sTON DR �` �, LITTLE DIVINE Rp O - - �— } No RIV39 ER- � ,1L N ,lL ,1L ,1L ,1L y ❑ �c �y w rantLem- 9]. 9yo - o Henry ULLIVAN RD Br al well Cem _ - - ° - Cem - �� - �sllTTl Vinson e DIVINE \ O Brown Cem ❑ o o � Batten Cem BROWNS POND R � � Q z O V O/ Richardson No � Vinson Cem Cerny .r�. 20D' o - ,.dVaLISP CeM joo uc s o tiy0 tiyo o N Pam- APPLE"CS RE(ECCRD - `250 O F/SON A y /`o - 39 - Fo- v LN Wi'lsons ills _ zb0 o 4, • _ 15 0 96 1 200 y SNo q�N, JONES RD O - BERR Y LN emu. /viN`NF oNo Po i _ 7�>/ - - -14. Ltittle Cr c' Lassiter em i �Sp �� p D 6EU� 0 \F` s % o o ply m �. z p'Q N O I `� -O - 'i`.. LP D �HAWKINSRD 0o yc<so ti oo Oso L �� 0 \ / NAG RD Q T OMESTEAD LN O . , D zoo © - �l' e, 0 O 96 301 19 o T J�� /• oG � o Easo Cem 70 I wAL`uTpsr 'Cm DR J `" 0 PECAN _ �� F�� O� W ese„-` � ITF Nc4 0 M,DURWOOD STEPHENSON ' `.Byp �O5 5� 9ooF< ogFS ` L MYRTLE RD Selma �=�,gMpGROUN RD _ E BOOKER DAI Y RD 9LF. \Q° S\ Q Bus STANCIL ST � 2 J - � O 70 ° Memo at QP o `em N SITE LOCATION - WHITLEY DR - FVFR T j l 301 z /y CASTLE F TPlN Memorial ardens z STRICKLAND OR R Q 150 3�� 0� c 9 - h '1 Per BRITT ST , O i m Fj HOLLAND RD q7O Wes O - —Smith eld0 p CROL Fl \� _ 00 FLF S7' sF<y74 A 50 „ Cro ker rl Oeries U-BZ[ff4 „` o o �` ❑ 210 Oakl'a'nd eu££ALo ST- _ S�\301 4- - eights ��� 6�qV 150 p Walls Cem - qNC �' Byp Alt W BL NCH£ ST 70 SMITH I P, NOOC E PEEDIN RD C4S SST o 19 y& Cem MqR ST - rs0 _ o Cat C yURcH „- fiver ppoS - tiNT is ., �� — �pSE�00D-pR 2y �'F.7yOOOq ST �50 OLD GOC SBORO RD Opp \50 � v 0�5° • 'i` � �o .a�J//////'�, ., �° h� l�ST'• \y0 (� �0 EGORDON RD CC CC WI Rowland s;J F ° Pond DR Pi a Level us � _ 301 �Q �" L�O� <Y JQNOF�SST 96 t )p�a5� , 70 APPENDIX D I FEMA FLOOD MAP BOHLER BOHLER ENGINEERING NC, PLLC National Flood Hazard Layer FI RMette 78o1712"W 35o3l'31"N 141 I �... t r 0 + 000 + h'1 FF 3 720261400 K eff.6/20/201 FEMA I -.t7,000 0 250 500 1,000 1,500 2,000 Basemap: USGS National Map: Orthoimagery: Data refreshed October, 2020 Legend SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT Without Base Flood Elevation (BFE) Zone A, V, A99 SPECIAL FLOOD With BFE or Depth ZoneAE,AO,AH,Ve,Aa HAZARD AREAS Regulatory Floodway OTHER AREAS OF FLOOD HAZARD 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Zonex Future Conditions 1% Annual Chance Flood Hazard Zonex Area with Reduced Flood Risk due to Levee. See Notes. zone " Area with Flood Risk due to Leveezone D NOSCREEN Area of Minimal Flood Hazard Q Effective LOMRs OTHER AREAS Area of Undetermined Flood Hazard GENERAL - — - - Channel, Culvert, or Storm Sewer STRUCTURES IIIIIII Levee, Dike, or Floodwall e zo.z Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation a - - - Coastal Transect —sfa^•^^•• Base Flood Elevation Line (BFE) Limit of Study Jurisdiction Boundary — --- Coastal Transect Baseline OTHER _ Profile Baseline FEATURES Hydrographic Feature Digital Data Available AN El No Digital Data Available MAP PANELS El Unmapped 0 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 7/13/2021 at 10:57 AM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data overtime. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes.