HomeMy WebLinkAbout20221617 Ver 1_02 - Block A - Supplemental EZ - Signed_20230301SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
Project Name
2
r1
Project Area ac
3
Coastal Wetland Area
4
Surface Water Area (a
Eastfield Retail
46.48
5 1 Is this project High or Low Density? High
6 1 Does this protect use an off -site SCM? No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided feet
50
8
Will the vegetated setback remain vegetated?
Yes
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration S stem
12
Bioretention Cell
13
Wet Pond
2
14
Stormwater Wetland
15
Permeable Pavement
16
Sand Filter
17
Rainwater Harvesting RWH
18
Green Roof
19
Level Spreader -Filter Strip LS-FS
20
Disconnected Impervious Surface DIS
21
Treatment Swale
22
Dry Pond
23
StormFilter
24
Silva Cell
25
lBayfilter
26
IFilterra
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Charlie Yowell
28
Or anization:
Bohler Engineering
29
Street address:
4130 Parklake Avenue #130
30
City, State, Zip:
Raleigh, NC 27612
31
Phone numbers :
919-578-9000
32
Email:
cyowell@bohlereng.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that
the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
Signature of Designer
2/28/2023
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
2
3
Does this roiect have low H—ify areas?
No
4
If so number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
AREA INFORMATION
Entire Site
1
2
4
Type of SCM
Wetpond
Wetpond
5
Total drainage area (sq ft
1793095 sf
1547451 sf
245644
6
Onsite drainage area (sq ft
1793095 sf
1547451
245644
7
Offsite drainage area (sq ft
8
Total BUA in project (sq ft)
1212727 sf
1038947 sf
173780 sf
9permitting)
New BUA on subdivided lots (subject to
s ft
10permitting)
New BUA not on subdivided lots (subject to
sf
1212727 sf
1038947 sf
173780 sf
11
Offsite BUA (sq ft
12
Breakdown of new BUA not on subdivided lots:
Parking (sq ft
767229 sf
626034 sf
141195 sf
Sidewalk (sq ft
76562 sf
55975 sf
20587 sf
Roof (sq ft
250356 sf
238358 sf
11998 sf
Roadway s ft
118580 sf
118580 sf
Future (sq ft
Other, please specify in the comment box
below (sq ft
13
New infiltrating permeable pavement on
subdivided lots (sq ft
14
New infiltrating permeable pavement not on
subdivided lots (sq ft
15
Existing BUA that will remain (not subject to
ermitting) (sq ft
16
Existing BUA that is already permitted (sq ft
17
Existing BUA that will be removed (sq ft
18
Percent BUA
68%
67%
71 %
19
Design storm inches
1.0 in
1.0 in
1.0 in
20
Design volume of SCM cu ft
144619 sf
124446 cf
20173 cf
21
Calculation method for design volume
Simple Method
Simple Method
Simple Method
ADDITIONAL INFORMATION
22
Please use this space to provide any additional information about the
drainage area(s):
WET POND
area number
ERAL MDC ISM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
Yes
4
Is the SCM located away from contaminated soils?
Yes
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
desi n volume?
Yes
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
Is there an O&M Agreement that complies with General MDC (11)?
N/A
N/A
14
Yes
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
Yes
161
Does the SCM follow the device specific MDC?
Yes
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
Yes
18
Sizing method used
SA/DA
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
163.25
164.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
163.75
164.50
22
Elevation of the bottom of the vegetated shelf (fmsl)
166.75
169.50
23
Elevation of the permanent pool (fmsl)
167.25
170.00
24
Elevation of the top of the vegetated shelf (fmsl)
167.75
170.50
25
Elevation of the temporary pool (fmsl)
167.81
170.82
26
Surface area of the main permanent pool (square feet)
208261
22883
27
Volume of the main permanent pool (cubic feet)
520306 cf
69893 cf
28
Average depth of the main pool (feet)
3.00 ft
4.00 ft
29
Average depth equation used
Equation 3
Equation 3
30
If using equation 3, main pool perimeter (feet)
4334.0 ft
731.0 ft
31
If using equation 3, width of submerged veg. shelf (feet)
3.0 ft
3.0 ft
32
Volume of the forebay (cubic feet)
73635 cf
82821 cf
33
Is this 15-20% of the volume in the main pool?
Yes
Yes
34
Clean -out depth for forebay (inches)
6 in
6 in
351
Design volume of SCM (cu ft)
869331 cf
130318 cf
36
Is the outlet an orifice or a weir?
Orifice
Orifice
37
If orifice, orifice diameter (inches)
8 in
2 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
3
4.5
41
Are the inlet(s) and outlet located in a manner that avoids short-
arcuitin ?
Yes
Yes
42
Are berms or baffles provided to improve the flow path?
No
No
43
Depth of forebay at entrance (inches)
164.25 in
164.50 in
44
Depth of forebay at exit (inches)
164.25 in
164.50 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
Yes
46
Width of the vegetated shelf (feet)
6 ft
6 ft
47
Slope of vegetated shelf (H:V)
6:1
6:1
48
Does the orifice drawdown from below the top surface of the
ermanent pooI?
Yes
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
r, 24-hr storm?
Yes
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
Yes
53
Species of turf that will be used on the dam and embankment
Clean Crop Seed
Clean Crop Seed
54
Hasa plantinq plan been provided for the vegetated shelf?
Yes
Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):
Wet Pond 3 10:36 AM 2/28/2023