HomeMy WebLinkAboutNC0044725_Inspection_20230125United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NCO044725 I11 121 23/01/25 I17 18I � I 19 I s I 20L]
21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating 131 QA ---------------------- Reserved -------------------
67
I 72 I n, I 71 I 74 79 I I I I I I I80
70I I 71 I LL -1 I I
LJ
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
10:30AM 23/01/25
16/11/01
Laurinburg Industrial WWTP
16701 Airport Rd
Exit Time/Date
Permit Expiration Date
Maxton NC 283646899
01:OOPM 23/01/25
19/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
James Thomas Croke/ORC/910-318-8282/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Seth Andrew Hatchell,16701 Airport Rd Maxton NC 28364//910-844-5081/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran 0 Sludge Handling Dispo: Facility Site Review Effluent/Receiving Wate
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
ocusigned by: DWR/FRO WQ/910-433-3300 Ext.708/
/4.o w4m 2/22/2023
Hughie White E`7.80007E432
...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax NurrM u5igned by: Date
Mark Brantley DWR/FRO WQ/910-433-3300 Ext.727/ — 6q 2/22/2023
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
NCO044725 I11 12I 23/01 /25 117 18 i c i
(Cont.)
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
All records and log books appeared to be very well organized and maintained. A copy of the NPDES
permit was available for review. Calibration records for equipment appeared to be properly
documneted. The ORC visitation log appeared to be complete and current. Laboratory data was
reviewed and all data that was reviewed appeared to be correct, as reported on the DMR's. At the
time of this inspection, the effluent was very clear and appeared to be free of any visible solids. The
facility appeared to be operated and maintained satisfactorily.
Comments
The facility's effluent sampler should be on flow proportional sampling as required b the facility's
NPDES permit.
I�_1:irl���_1►1�7_1:��ZK�]►1_�]>ty[�7►1;��7:��1��77.`l»:7�1��
Section A. Definitions
Composite Sample
A sample collected over a 24-hour period by continuous sampling or combining grab samples of at
least 100 mL in such a manner as to result in at total sample representative of the wastewater
discharge during the sample period. The Director may designate the most appropriate method
(specific number and size of aliquots necessary, the time interval between grab samples, etc.) on a
case -by -case basis. Samples may be collected manually or automatically. Composite samples may
be obtained by the following methods:
(1) Continuous: a single, continuous sample collected over a 24-hour period proportional to the rate
of flow.
(2) Constant time/variable volume: a series of grab samples collected at equal time intervals over a
24 hour period of discharge and combined proportional to the rate of flow measured at the time of
individual sample collection, or
(3) Variable time/constant volume: a series of grab samples of equal volume collected over a 24
hour period with the time intervals between samples determined by a preset number of gallons
passing the sampling point. Flow measurement between sample intervals shall be determined by use
of a flow recorder and totalizer, and the preset gallon interval between sample collection fixed at no
greater than 1/24 of the expected total daily flow at the treatment system, or
(4) Constant time/constant volume: a series of grab samples of equal volume collected over a
24-hour period at a constant time interval. Use of this method requires prior approval by the Director.
This method may only be used in situations where effluent flow rates vary less than 15 percent. The
following restrictions also apply:
❑ Influent ad effluent grab samples shall be of equal size and of no less than 100 milliliters
❑ Influent samples shall not be collected more than once per hour
❑ Permittees with wastewater treatment systems whose detention time exceeds 24 hours shall collect
effluent grab samples at least every six hours; there must be a minimum of four samples during a
24-hour sampling period
Please respond in writing to this office by March 31, 2023, with plans on how the facility will begin flow
proportional sampling as required.
Page#
Permit: NCO044725 Owner - Facility: Laurinburg Industrial WWTP
Inspection Date: 01/25/2023 Inspection Type: Compliance Evaluation
Permit
Yes
No
NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
■
❑
application?
Is the facility as described in the permit?
■
❑
❑
❑
# Are there any special conditions for the permit?
❑
❑
■
❑
Is access to the plant site restricted to the general public?
■
❑
❑
❑
Is the inspector granted access to all areas for inspection?
■
❑
❑
❑
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? ■ ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ■ ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Record Keeping
Yes
No
NA
NE
Are records kept and maintained as required by the permit?
■
❑
❑
❑
Is all required information readily available, complete and current?
■
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
■
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
■
❑
❑
❑
Is the chain -of -custody complete?
■
❑
❑
❑
Dates, times and location of sampling
■
Name of individual performing the sampling
■
Results of analysis and calibration
■
Dates of analysis
■
Name of person performing analyses
■
Transported COCs
■
Are DMRs complete: do they include all permit parameters?
■
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
■
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
❑
❑
■
❑
operator on each shift?
Is the ORC visitation log available and current?
■
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
■
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility
■
❑
❑
❑
classification?
Page# 3
Permit: NCO044725 Owner - Facility:
Inspection Date: 01/25/2023 Inspection Type:
Laurinburg Industrial WWTP
Compliance Evaluation
Record Keeping
Yes
No
NA
NE
Is a copy of the current NPDES permit available on site?
0
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
0
❑
Comment:
Pump Station - Influent
Yes
No
NA
NE
Is the pump wet well free of bypass lines or structures?
0
❑
❑
❑
Is the wet well free of excessive grease?
■
❑
❑
❑
Are all pumps present?
0
❑
❑
❑
Are all pumps operable?
0
❑
❑
❑
Are float controls operable?
0
❑
❑
❑
Is SCADA telemetry available and operational?
0
❑
❑
❑
Is audible and visual alarm available and operational?
❑
❑
❑
Comment:
Bar Screens
Yes
No
NA
NE
Type of bar screen
a.Manual
❑
b.Mechanical
Are the bars adequately screening debris?
■
❑
❑
❑
Is the screen free of excessive debris?
■
❑
❑
❑
Is disposal of screening in compliance?
0
❑
❑
❑
Is the unit in good condition?
0
❑
❑
❑
Comment:
Oxidation Ditches
Yes
No
NA
NE
Are the aerators operational?
0
❑
❑
❑
Are the aerators free of excessive solids build up?
■
❑
❑
❑
# Is the foam the proper color for the treatment process?
■
❑
❑
❑
Does the foam cover less than 25% of the basin's surface?
0
❑
❑
❑
Is the DO level acceptable?
0
❑
❑
❑
Are settleometer results acceptable (> 30 minutes)?
❑
❑
❑
Is the DO level acceptable?(1.0 to 3.0 mg/I)
0
❑
❑
❑
Are settelometer results acceptable?(400 to 800 ml/I in 30 minutes)
❑
❑
❑
Page# 4
Permit: NCO044725 Owner - Facility: Laurinburg Industrial WWTP
Inspection Date: 01/25/2023 Inspection Type: Compliance Evaluation
Oxidation Ditches Yes No NA NE
Comment:
Secondary Clarifier
Yes
No
NA
NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
0
❑
❑
❑
Are weirs level?
0
❑
❑
❑
Is the site free of weir blockage?
0
❑
❑
❑
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
❑
Is the drive unit operational?
0
❑
❑
❑
Is the return rate acceptable (low turbulence)?
0
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
0
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth)
0
❑
❑
❑
Comment:
Disinfection -Gas
Yes
No
NA
NE
Are cylinders secured adequately?
0
❑
❑
❑
Are cylinders protected from direct sunlight?
0
❑
❑
❑
Is there adequate reserve supply of disinfectant?
■
❑
❑
❑
Is the level of chlorine residual acceptable?
0
❑
❑
❑
Is the contact chamber free of growth, or sludge buildup?
0
❑
❑
❑
Is there chlorine residual prior to de -chlorination?
❑
❑
❑
Does the Stationary Source have more than 2500 Ibs of Chlorine (CAS No.
❑
❑
■
❑
7782-50-5)?
If yes, then is there a Risk Management Plan on site?
❑
❑
0
❑
If yes, then what is the EPA twelve digit ID Number? (1000-
If yes, then when was the RMP last updated?
Comment:
De -chlorination Yes No NA NE
Type of system ? Gas
Is the feed ratio proportional to chlorine amount (1 to 1)? 0 ❑ ❑ ❑
Page# 5
Permit: NC0044725 Owner - Facility:
Inspection Date: 01/25/2023 Inspection Type:
Laurinburg Industrial WWTP
Compliance Evaluation
De -chlorination
Yes
No
NA
NE
Is storage appropriate for cylinders?
0
❑
❑
❑
# Is de -chlorination substance stored away from chlorine containers?
0
❑
❑
❑
Comment:
Are the tablets the proper size and type? ❑ ❑ ❑
Are tablet de -chlorinators operational? ❑ ❑ 0 ❑
Number of tubes in use?
Comment:
Flow Measurement - Effluent
Yes
No
NA NE
# Is flow meter used for reporting?
■
❑
❑
❑
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
0
❑
Comment:
Aerobic Digester
Yes
No
NA
NE
Is the capacity adequate?
■
❑
❑
❑
Is the mixing adequate?
■
❑
❑
❑
Is the site free of excessive foaming in the tank?
■
❑
❑
❑
# Is the odor acceptable?
0
❑
❑
❑
# Is tankage available for properly waste sludge?
0
❑
❑
❑
Comment:
Drying Beds
Yes
No
NA
NE
Is there adequate drying bed space?
0
❑
❑
❑
Is the sludge distribution on drying beds appropriate?
0
❑
❑
❑
Are the drying beds free of vegetation?
■
❑
❑
❑
# Is the site free of dry sludge remaining in beds?
0
❑
❑
❑
Is the site free of stockpiled sludge?
0
❑
❑
❑
Is the filtrate from sludge drying beds returned to the front of the plant?
0
❑
❑
❑
# Is the sludge disposed of through county landfill?
■
❑
❑
❑
# Is the sludge land applied?
❑
❑
0
❑
(Vacuum filters) Is polymer mixing adequate?
❑
❑
0
❑
Page#
6
Permit: NCO044725 Owner - Facility: Laurinburg Industrial WWTP
Inspection Date: 01/25/2023 Inspection Type: Compliance Evaluation
Drying Beds Yes No NA NE
Comment:
Pumps-RAS-WAS
Yes
No
NA
NE
Are pumps in place?
■
❑
❑
❑
Are pumps operational?
■
❑
❑
❑
Are there adequate spare parts and supplies on site?
❑
❑
❑
■
Comment:
Standby Power
Yes
No
NA
NE
Is automatically activated standby power available?
■
❑
❑
❑
Is the generator tested by interrupting primary power source?
■
❑
❑
❑
Is the generator tested under load?
■
❑
❑
❑
Was generator tested & operational during the inspection?
■
❑
❑
❑
Do the generator(s) have adequate capacity to operate the entire wastewater site?
■
❑
❑
❑
Is there an emergency agreement with a fuel vendor for extended run on back-up
■
❑
❑
❑
power?
Is the generator fuel level monitored?
■
❑
❑
❑
Comment:
Influent Sampling
Yes
No
NA NE
# Is composite sampling flow proportional?
❑
■
❑
❑
Is sample collected above side streams?
■
❑
❑
❑
Is proper volume collected?
■
❑
❑
❑
Is the tubing clean?
■
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
■
❑
❑
❑
degrees Celsius)?
Is sampling performed according to the permit?
■
❑
❑
❑
Comment: Samples are collected at timed intervals.
Effluent Sampling
Yes
No
NA
NE
Is composite sampling flow proportional?
❑
■
❑
❑
Is sample collected below all treatment units?
■
❑
❑
❑
Is proper volume collected?
■
❑
❑
❑
Page# 7
Permit: NCO044725 Owner - Facility: Laurinburg Industrial WWTP
Inspection Date: 01/25/2023 Inspection Type: Compliance Evaluation
Effluent Sampling Yes
No
NA
NE
Is the tubing clean? 0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 ■
❑
❑
❑
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type ❑ ❑ ❑
representative)?
Comment: Samples are collected at timed intervals.
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, ■ ❑ ❑ ❑
and sampling location)?
Comment:
Page# 8