HomeMy WebLinkAboutSupplemental FormsSUPPLEMENT-EZ COVER PAGE
FORMS LOADED
OJECT INFORMATION
1 Project Name
Mitchell County Middle School
2 Project Area ac
14.63
3 Coastal Wetland Area ac
NA
4
Surface Water Area ac
0.3
5
Is this project High or Low Density?
High
6
1 Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided feet
30
8
Will the vegetated setback remain vegetated?
Yes
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
N/A
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration System
12
Bioretention Cell
13
Wet Pond
1
14
Stormwater Wetland
15
Permeable Pavement
16
Sand Filter
17
lRainwater Harvesting RWH
18
Green Roof
19
Level Spreader -Filter Strip LS-FS
20
Disconnected Impervious Surface DIS
21
Treatment Swale
22
Dry Pond
23
StormFilter
24
Silva Cell
25
Bayfilter
26
1 Filterra
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Michael Cain, PE
28
Organization:
Civil Design Concepts
29
Street address:
168 Patton Avenue
30
City, State, Zip:
Asheville, NC 28801
31
Phone numbers :
828-252-5388
32
Email:
mcain@cdcgo.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
CARO
E SI0 .. F/
SEAL -
047788
FNG INEE�
AEL J•G
Signature AVesigner
1� C;l ZIOZ_
D to
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this project have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
Wet Pond
5
Total drainage area (sq ft
329314
6
Onsite drainage area (sq ft)
325292
7
Offsite drainage area (sq ft
4022
8
Total BUA in project (sq ft
154202 sf
9
New BUA on subdivided lots (subject to permitting)
(sq ft
NA
10
New BUA not on subdivided lots (subject to
permitting) (so
Offsite BUA (sq ft)
Breakdown of new BUA not on subdivided lots:
Parking (sq ft
Sidewalk (sq ft
154202 sf
11
NA
12
48007 sf
9872 sf
Roof (sq ft
67783 sf
Roadway (sq ft)
24366 sf
Future (sq ft
NA
Other, please specify in the comment box
below (sq ft)
4174 sf
13
New infiltrating permeable pavement on
subdivided lots (sq ft
NA
14
New infiltrating permeable pavement not on
subdivided lots (sq ft)
Existing BUA that will remain (not subject to
s ft
NA
15permitting)
NA
16
Existing BUA that is already permitted (sq ft)
4792 sf
17
Existing BUA that will be removed (sq ft
4792 sf
18
Percent BUA
47%
19
IDesign storm inches
3.3 in
20
Design volume of SCM cu ft
32541 cf
21 Calculation method for design volume
DITIONALOYFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
Other impervious includes outdoor court
SA/DA
WET POND
1
Drainage area number
1
2
1 Minimum required treatment volume cu ft
15094 cf
GENERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Drawdown Orifice
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC 9 ?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
Yes
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC 12 ?
Yes
16
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
2719.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
2720.00
22
Elevation of the bottom of the vegetated shelf fmsl
2725.00
23
Elevation of the permanent pool (fmsl)
2725.00
24
Elevation of the top of the vegetated shelf (fmsl)
2726.00
25
Elevation of the temporary pool (fmsl)
2726.10
26
Surface area of the main permanent pool (square feet)
8909
27
Volume of the main permanent pool cubic feet
32541 cf
28
Average depth of the main pool feet
5.00 ft
29
Average depth equation used
Equation 2
30
If using a uation 3, main pool perimeter feet
31
If using equation 3, width of submerged veg. shelf (feet)
32
Volume of the forebay cubic feet
6404 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebainches
12in
35
Design volume of SCM cu ft
15094 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter inches
3 in
38
If weir, weir height (inches)
39
If weir, weir length inches
40
Drawdown time for the temporary pool (days)
2.4
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42
Are berms or baffles provided to improve the flow path?
Yes
43
Depth of forebay at entrance (inches)
48 in
44
Depth of forebay at exit (inches)
36 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
permanentpool?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
r, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Fescue
541
Hasa planting plan been provided for the vegetated shelf?
Yes
ADDITIONAL INFORMATION
55
Please use this space to provide any additional information about the
wet pond(s):
Wet Pond 1 10:40 AM 1/5/2023