Loading...
HomeMy WebLinkAboutNC0086169_Authorization to Construct 2001_20011105 N State of North Carolina 4617;lireirii Department of Environment and Natural Resources Division of Water Quality 1-== Michael F. Easley, Governor NCDENRWilliam G. Ross, Jr., Secretary Gregory J. Thorpe, Ph.D., Acting Director NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES November 5,2001 Ms.Christy L. Hannan Corning Incorporated Post Office Box 1700 Concord,North Carolina 28026 Subject: Authorization to Construct ATC No.086169A01 (formerly 086169ACC) NPDES Permit No.NC0086169 Concord Waveguide Plant Cabarrus County Dear Ms.Hannan: The Division of Water Quality's NPDES Unit has reviewed your request for an Authorization to Construct at the above referenced facility. The Division fmds the proposed improvements to be satisfactory and hereby grants authorization for the following: • Construction of a 60,000 gallon Saleable Acid tank; • Construction of a 10,000 gallon Reject Acid tank; • • Modifications to the existing 3,000 gallon effluent lift station; • Modification to existing process pump; • Installation of all piping, valves, and appurtenances as illustrated on the attached approved design documents. This Authorization to Construct is issued in accordance with NPDES Permit No. NC0086169, issued on October 31, 2001, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the terms and conditions of the permit. The Permittee shall notify the Water Quality Supervisor of the Mooresville Regional Office, telephone number (704) 663- 1699, at least forty-eight(48) hours prior to operation of the installed facilities, so that an in-place inspection can be made. Notification shall be made during the normal office hours of 8:00 a.m.until 5:00 p.m.,Monday through Friday. Engineer's Certification Upon completion of construction and prior to operation of the modified facility,the Permittee shall provide the Division with a certification(copy enclosed)from a professional engineer registered in North Carolina certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct, and the approved plans and specifications. The Certification should be submitted to: NCDENR / DWQ, NPDES Unit, 1617 Mail Service Center, Raleigh,North Carolina 27699-1617. Requirements for Certified Qperator The Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8G, .0200. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays; and must properly manage and document daily operation and maintenance of the facility and comply with all other conditions of Title 15A, Chapter 8G, .0200. Additional Requirements The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit.Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143-215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone(919)733-5083 FAX(919)733-0719 An Equal Opportunity Affirmative Action Employer Internet: http://h2o.enr.state.nc.us/NPDES • 4, Corning Inc.-Concord Facility NPDES Permit No. NC0086169 g ATC No.086169A01(formerly 086169ACC) Page 2 Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143- 215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules,regulations,or ordinances which may be imposed by other government agencies(local, state, and federal)which have jurisdiction. The Permittee shall maintain a copy of the approved plans and specifications on file for the life of the facility. One(1)copy of the approved plans and specifications is enclosed for your records. If you have any questions about this Authorization to Construct,please contact Michael Myers,at(919)733-5083,extension 508. Sincerely, _;.„Kt4rZL.....frfcreieo frt.. Gregory J.Thorpe,Ph.D. Acting Director Enclosures: Project Plans and Specifications(approved) Engineer's Certification Form cc: Mooresville Regional Office,Water Quality(letter only) Technical Assistance and Certification Unit(letter only) Central Files(letter only) NPDES Unit Files(letter and engineer's certification form) State of North Carolina Department of Environment and Natural Resources ` • - Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary NCDENR Gregory J. Thorpe, Ph.D., Acting Director PROFESSIONAL ENGINEER'S CERTIFICATION FOR CONSTRUCTION OF WASTEWATER TREATMENT FACILITIES ATC PROJECT NUMBER: 086169A01 (FORMERLY 086169ACC) Concord Waveguide Plant NPDES Permit No.NC0086169 I, , am a duly registered Professional Engineer please print) in the State of North Carolina and have been authorized to observe (circle one: periodically, weekly, full time)the construction of the subject project for the Permittee: Project No.: 086169A01 (formerly 086169ACC) Project: Corning Inc—Fiber Optic Phase III Expansion Cabarrus County Location: Concord Waveguide Plant The project consists of: • Construction of a 60,000 gallon Saleable Acid tank; • Construction of a 10,000 gallon Reject Acid tank; • Modifications to the existing 3,000 gallon effluent lift station; • Modification to existing process pump; • Installation of all piping, valves, and appurtenances as illustrated on the attached approved design documents. I hereby certify that I did regularly observe this project with due care and diligence and that the construction was completed in substantial conformance with the Authorization to Construct and with the approved plans and specifications. Signature Registration No. Date Upon completion of construction and prior to operation of the modified facility, the Permittee shall provide the Division with a certification from a professional engineer certing that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct, and the approved plans and specifications. The Certification should be submitted to: NCDENR/DWQ, NPDES Unit, 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 5.........4 SOC PRIORITY PROJECT: No To: Permits and Engineering Unit Water Quality Section Date: July 20, 2001 AUTHORIZATION TO CONSTRUCT NPDES PERMIT REPORT AND RECOMMENDATIONS County: Cabarrus MRO No.: 01-98 ATC No. 086169ACC NPDES Permit No.NC0086169 PART I-GENERAL INFORMATION 1. Facility and Address: Corning, Inc. En:o U Post Office Box 1700 Concord,N.C. 28026 a (.0 La LI CC `" 2. Date of On-Site Investigation(if conducted): May14, 1999 3 0 ' IN f2 Wo 3. Report Prepared By: Michael L. Parker,Environmental Engineer II e_ 4. Persons Contacted and Telephone Number: Christie Hannan, (704)569-62:: c 5. Verified Discharge Point(s), List for All Discharge Points: Outfall 001 Outfall 002 Outfall 003 Latitude: 35° 13' 02" Latitude: 35° 12' 34" Latitude: 35° 12' 30" Longitude: 80° 31' 15" Longitude: 80° 31' 31" Longitude: 80° 29'49" Attach a USGS map extract and indicate treatment facility site and discharge point on map. USGS Quad No.: G 16 NE 6. Site size and expansion area consistent with application?Yes. 7. Topography (relationship to flood plain included): The site is well removed from any flood plain(2-4%slopes). 8. Location of Nearest Dwelling: 500+feet from the plant site. PART II-DESCRIPTION OF DISCHARGE AND TREATMENT WORKS 1. Existing Treatment Facility Page Two outfall 001 outfall 002 outfall 003 a. Current permitted capacity: 0.269 MGD 0.269 MGD 0.036 MGD b. Date(s)and construction activities allowed by previous ATCs issued in the previous two years: 086169ACB issued 5/31/2000 for the construction of a 60,000 gallon chloride stabilization tank, a 21,000 gallon equalization tank with an 8.5 hour holding capacity,two(2) 1,700 gallon neutralization tanks,a 36,000 gallon off-spec tank, a 21,000 gallon surge/blend tank,and two (2) lamella clarifiers for solids separation. c. Actual treatment capacity of the current facility(design volume): See(a.)above. d. Description of existing or substantially constructed WWT facilities: The existing WWT facilities consist of a 21,000-gallon equalization tank followed by two off-spec tanks(36,000 and 21,000-gallon),two(2)Lamella clarifiers,a 60,000-gallon chloride stabilization tank,four(4) 1,600-gallon pH adjustment tanks, a 10,000-gallon softener regenerate tank, a neutralization transfer tank, 21,000-gallon surge/blend tank,three(3) sludge thickening tanks (575, 5000 and 10000-gallon),an effluent lift station, a 42,000- gallon process effluent tank(for storage of wastewater when quality does not meet permit limits) and flow measurement. 2. Type of Proposed Treatment Facility: The applicant proposes to construct additional WWT facilities consisting of a 60,000 gallon saleable acid tank, a 10,000 gallon reject acid tank,and assorted modifications to the existing process pumps and 3,000 gallon influent lift station. 3. Residuals Handling and Utilization/Disposal Scheme: Residuals disposal (when necessary)is accomplished by placing the residuals in metal containers and transporting them as non- hazardous waste to a private landfill owned by WTS Services in Michigan. 4. Treatment Plant Classification: Class II (based on existing treatment units) 5. SIC Code(s): 3229 Wastewater Code(s): 78 Main Treatment Unit Code: 51112 6. Important SOC/JOC or Compliance Schedule Dates: This facility is not currently operating under the terms of an SOC or Permit Compliance Schedule. Page Three PART III-EVALUATION AND RECOMMENDATIONS The applicant, Coming,Inc.,has applied for approval to construct the WWT facilities as noted in Part II,No. 2 above as part of an anticipated plant expansion. The components listed above are in addition to the existing WWTP components that are already in-place at the plant. Pending a technical review and approval of the above referenced WWTP additions by P&E,it is recommended that an ATC be issued. (- /&-le?, -)P6 #0/ Signature of Report Preparer Date eGL I ?fr/c.)/ Water Quali egional Supervisor Date h:\atc\atc0l\ccrning.atc Corning Incorporated Telecommunications Products Division P.O.Box 1700 Concord, North Carolina 28026-1700 704-569-6000 tt/fa, ? 1 1 s.. MD04 F ,2001 CORNING Mr.David A.Goodrich NCDENR-Division of Water Quality NPDES Unit 1617 Mail Service Center Raleigh,North Carolina 27699-1617 Re: Corning Incorporated-Midland Facility NPDES Permit Number 86169 Authorization to Construct Request Dear Mr.Goodrich: Enclosed are three(3)sets of design documents supporting our request for Authorization to Construct in association with the our December 20000 request for expansion at Coming's Midland,NC facility. As was summarized in our above referenced permit modification request(currently under review by Mr.Mike Myers of your office),Corning is proposing an expansion of the optical fiber manufacturing facility in Midland,Cabarrus County. Process effluent from the fiber optics manufacturing process will continue to consist primarily of blowdown from the air pollution control equipment. It is proposed that the facility will treat the new process effluent as it does the existing process effluent,through a fairly simple Pollution Abatement System consisting of lamella clarifiers for solids removal and neutralization for pH adjustment. The expansion of the Pollution Abatement System will consist of the following: • A 60,000 gallon Saleable Acid Tank; • A 10,000 gallon Reject Acid Tank; • Modifications to several of the existing process pumps;and • And modifications to an existing 3,000 gallon effluent lift station. This request for Authorization to Construct includes detailed plans and specifications signed and sealed by a Professional Engineer registered in the State of North Carolina and responses to all issues addressed in the NPDES Unit's Authorization to Construct Requirements guidance document. Any drawings or specifications that may change during the ongoing design effort and/or construction will be sent to DWQ with the engineer's certification. In an effort to begin construction as soon as possible,Corning respectfully requests that,if possible,the Authorization to Construct be issued concurrently with issuance of the pending permit modification. If any further information is required in order to expedite the approval process,please feel free to contact me at(704)569-6268. Sincerely, Corning Incorporated Christy L.Hannan (a S O 'I F F _ 791 Senior Environmental Con. • L ' O �J P� DENR`NATER QUALITY Enclosures: as noted Q��\�� '- POINTSOURCE PflANCH __— Corning Incorporated Telecommunications Products Division �j P.O.Box 1700 i+ 7� r l�\I r\.1 Concord, North Carolina 28026-1700 f 704-569-6000 1' 1 r May 8, 2001L1 d MAY 1 0 2001 DENR - WATER QUALITY CERTIFIED MAIL POINT SOURCE BRANCH RETURN RECEIPT REQUESTED CORNING Mr. Dave Goodrich North Carolina Department of Environment and Natural Resources Division of Water Quality, NPDES Permit Unit 1617 Mail Service Center Raleigh,North Carolina 27699-1617 RE: Corning Incorporated, Concord Facility NPDES Permit No. NC0086169 ATC,Engineer's Certification Dear Mr. Goodrich: Attached,please find the Engineer's Certification for Construction of Wastewater Treatment Facilities for subject ATC. As stated in the initial certification letter,the wastewater treatment facility system will be started sequentially to facilitate discharge of wastewater streams per the permit. Please refer to the attached description of the planned start-up. The enclosed certification is for Sequence 1A. This start-up sequence will treat the combined streams of 1)cooling tower blowdown from the Concord II HVAC cooling tower, 2) Neutralization System No. 1 effluent, and 3)cooling tower blowdown from the Concord I HVAC cooling tower. Prior to additional systems coming on line, an engineer's certification will be provided for them. Please feel free to contact me if you have any questions concerning the information contained in the documents. I can be reached at (704) 569-6268. Sincerely, Christy Hannan Environmental Control Engineer Concord Plant Corning, Inc. Enclosures Cc: Mooresville Regional Office, NCDENR Corning Incorporated Concord Facility Permit No. NC0086169 ENGINEER'S CERTIFICATION FOR CONSTRUCTION OF WASTEWATER TREATMENT FACILITIES 1, �. � h/�,� /% TGf�FLL , am a duly registered Professional Engineer (please print) in the State of North Carolina and have been authorized to observe (circle on . periodically weekly, full time) the construction of the subject project for the Permittee: Project No.: 086169ACB Project: Corning Incorporated Concord Facility Waste Abatement System Expansion The project consists of: �// • Construction of a 60.000 gallon chloride stabilization tank; /1/01 dowsere • Construction of a 21.000 gallon equalization tank; 4S C ,irr • Construction of two (2) 1.700 gallon neutralization tanks; ,i4r to•',PL,Ea • Construction of a 36.000 gallon off-spec tank; Ig7 GPM" 3 • Construction of a 21.000 gallon surge/blend tank; CD4I101iPL • • Construction of two (2) lamella clarifiers; and C MAkat • Installation of all piping, valves, and appurtenances as illustrated on the attached approved design documents. I hereby certify that I did regularly observe this project with due care and diligence and that the construction was completed in substantial conformance with the Authorization to Construct and with / the approved plans and specifications. SO 4774C/MOWT (4 f %) r•�c tes4C/0M41 o �reT/i/t41T"4' &VS do Signature Registration No. 02 44 14 Date 51'/�Agl ►t t t , ,•�� � ,R The Division of Water Quality hereby / - //� acknowledges receipt and acceptance of ilk 026634 # this Engineers Certification • %. , ' P•i v t ; �c`•••.Np I NEE••��i.' 1, R M . Upon completion of construction and prior to operation of the modified facility, the Permittee shall provide the Division with a certification from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct, and the approved plans and specifications. The Certification should be submitted to: NCDENR/DWQ,NPDES Unit, 1617 Mail Service Center,Raleigh,North Carolina 27699-1617 • Attachment to Engineer's Certification for Construction of Wastewater Treatment Facilities - Second Submittal Certification This Engineer's Certification for Construction of Wastewater Treatment Basis Facilities is for Project No. 086169ACB for Corning Incorporated, Concord Facility, Waste Abatement System Expansion. The wastewater generated by the different processes within the Concord Facility will be treated as they are generated. The facility processes will be started-up in an orderly sequence and each subsystem in the wastewater treatment area will be placed in operation as required to treat each type of wastewater as it is produced. The construction of the wastewater subsystems have been scheduled to correspond to the generation of process wastewater by the facility processes. Thus, the entire wastewater treatment system is not completed and ready for operation. We have concentrated our efforts to built and test the subsystems to meet a start-up schedule that parallels the start-up schedule of the facility process areas. To address the process start-up requirements the subsystems in the wastewater treatment area will be started in discrete parts we have termed Sequences. System As outlined in the first certification submittal, we have Update successfully completed the start-up of Sequence 1B—treatment of cooling tower blowdown from the Concord II HVAC cooling tower. Due to the mode of operation'of the cooling tower, we • have been treating the blowdown in a "batch" operation. We anticipate initiating a continuous mode of blowdown treatment the week of 5/7/2001. Corning Incorporated Concord Facility Page 1 of 4 Contract No.78600.001 May 7,2001 , Start-up This second certification submittal includes the wastewater treatment Activities subsystem start-up of Sequence 1A which will combine with the wastewater from Sequence 1B (this start-up has been successfully completed). In this start-up sequence we will be treating the combined streams of 1) cooling tower blowdown from the Concord II HVAC cooling tower, 2) Neutralization System No.1 effluent, and 3) cooling tower blowdown from the Concord I HVAC cooling. The combined streams will be treated with sodium bisulfite, as required for the removal of chlorine. The pH will be within acceptable values (6— 9 pH units) due to the HVAC cooling towers and Neutralization System No. 1 control range. The suspended solids level in the cooling tower blowdown should be low due to the HVAC cooling tower control range. If required, we have the capability of removing any suspended solids in the No. 3 lamella. The following paragraphs generally describe the components of the subsystem which will be required for Sequence 1A & 1B. These components are described in detail in ATC No. 086169ACB. We will be ready to accept the combined Neutralization System No. 1 and Cl& CII HVAC Cooling Tower Blowdown in Sequences 1A & 1B on Friday, May 11, 2001. As the remaining wastewater subsystems are built and tested, the corresponding Engineer's Certification will be submitted in accordance with the Division requirements prior to operation of those subsystems. Coming Incorporated Concord Facility Page 2 of 4 Contract No.78600.001 May 7,2001 System Solids Removal Unit (See Figure 3) Operation Overview The inlet header to the Surge/Blend Tank provides for premixing of non-contact cooling tower blowdown, treated effluent from Neutralization System No. 1, treated effluent from Neutralization No. 2, and softener regeneration wastewater prior to entering the tank. This provides for thorough mixing of the wastewater inlet flows and sodium bisulfite for chlorine removal in a static mixer. From the Surge/Blend Tank the blended wastewater is pumped to Lamella Separator No. 3 for removal of suspended solids and is then pumped to the existing Effluent Lift Station. Any off-spec (pH) wastewater is automatically diverted to an Off Spec Tank No. 2 and then pumped back to Equalization Tank No. 2 at a controlled rate for re-treatment. Other off-spec (turbidity or ORP) wastewater is automatically diverted back to the Surge/Blend Tank for re-processing through the chlorine removal and suspended solids removal unit operations. An existing Process Effluent Tank is located at the Effluent Lift Station for storage of wastewater during the times wastewater cannot be pumped to the river.Wastewater stored in the Process Effluent Tank is returned, by gravity, to the Effluent Lift station. Settled solids in the Lamella Separator are periodically pumped from the lamella to the Sludge Thickening Tank No. 3 and then from the tank to the existing Sludge Holding Tank for disposal. Coming Incorporated Concord Facility Page 3 of 4 Contract No.78600.001 May 7,2001 FIGURE 3 - SOLIDS REMOVAL UNIT From Neut. System No. 1 &Concord I Cooling Tower Blowdown ► From Softener Regeneration Tank From Lamella No. 3 Transfer Pumps ► From Concord II Cooling Tower Blowdown ► From Neutralization Transfer Pumps No. 3&4 Sodium Bisulfite (NaHSO3) ► Static Mixer XXXXXXX 14 • Flocculant ► Coagulant T Z T Surge/Blend Tank Lamella Separator Sludge 21,000 gallons - - ► No. 3 ► To Sludge Thickening Tank No. 2 T Lamella No. 3 To Effluent Lift Station Transfer Tank ► 800 gallons (or recycle to Surge/Blend Tank, if out of control range) Corning Incorporated Concord Facility Page 4 of 4 Contract No.78600.001 May 7,2001 :. ri-lei 0,,,,_ Corning Incorporated o� 4 Concord Facility ill, ,L17 ro) Permit No. NC0086169 ENGINEER'S CERTIFICATION FOR CONSTRUCTION OF WASTEWATER TREATMENT FACILITIES I, D, GLArmL/ Z•c414 44_ , am a duly registered Professional Engineer (please print) in the State of North Carolina and have been authorized to observe (circle one periodically weekly. full time) the construction of the subject project for the Permittee: Project No.: 086169ACB Project: Corning Incorporated Concord Facility Waste Abatement System Expansion The project consists of: • Construction of a 60.000 gallon chloride stabilization tank: 447-aorirsP4jfrE • Construction of a 21.000 gallon equalization tank: : "kr- .040,40/.4s • Construction of two (2) 1.700 gallon neutralization tanks:' day—a•osgtk. • -, • Construction of a 36.000 gallon off-spec tank: / A47- 410•V#04 0 • Construction of a 21.000 gallon surge/blend tank: ._..COs1P,Ldr,i . • Construction of two (2) latnella clarifiers( nd —.. cut/if(,)CO,r,pI z • Installation of all piping, valves, and appurtenances as illustrated on the attached approved design documents. I hereby certify that I did regularly observe this project with due care and diligence and that the construction was completed in substantial conformance with the Authorization to Construct and with the approved plans and specifications. ,56-.6. 44n-,,,,„ ,,,,vr e3 Ps s) At aisoe,e,Orm,✓ OF CI4er/f/lt77,414/ ,&QS/s Signature aS-135ii - _4:72(5 ,ZRegistration No. O.246 .34 Date 3//4/.2al/ 0,,,,,,,,, • P CAF 0 . �O,•o*ESS10 le to ti '// '4.4, 49 • <"'•�tiGINE.P%2/v . ... •G • ......,.I%` Upon completion of construction and prior to operation of the modified facility, the Permittee shall provide the Division with a certification from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct,and the approved plans and specifications. The Certification should be submitted to: NCDENR/DWQ, NPDES Unit, 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Attachment to Engineer's Certification for Construction of Wastewater Treatment Facilities Certification This Engineer's Certification for Construction of Wastewater Treatment Basis Facilities is for Project No. 086169ACB for Coming Incorporated, Concord Facility, Waste Abatement System Expansion. The wastewater generated by the different processes within the Concord Facility will be treated as they are generated. The facility processes will be started-up in an orderly sequence and each subsystem in the wastewater treatment area will be placed in operation as required to treat each type of wastewater as it is produced. The construction of the wastewater subsystems have been scheduled to correspond to the generation of process wastewater by the facility processes. Thus, the entire wastewater treatment system is not completed and ready for operation. We have concentrated our efforts to built and test the subsystems to meet a start-up schedule that parallels the start-up schedule of the facility process areas. To address the process start-up requirements the subsystems in the wastewater treatment area will be started in discrete parts we have termed Sequences. Our first wastewater treatment subsystem start-up will be Sequence 1B. In this start-up sequence we will be treating Cooling tower blowdown from the Concord II HVAC cooling tower. The cooling tower blowdown will be treated with sodium bisulfite, as required for the removal of chlorine. The pH will be within acceptable values (6—9 pH units) due to the HVAC cooling tower control range. The suspended solids level in the cooling tower blowdown should be low due to the HVAC cooling tower control range. If required, we have the capability of removing any suspended solids in the No. 3 lamella. The following paragraphs generally describe the components of the subsystem which will be required for Sequence 1 B. These components are described in detail in ATC No. 086169ACB. We will be ready to accept cooling tower blowdown in Sequence 1B on Wednesday, March 21, 2001. As the remaining wastewater subsystems are built and tested, the corresponding Engineer's Certification will be submitted in accordance with the Division requirements prior to operation of those subsystems. Corning Incorporated Concord Facility Page 1 of 3 Contract No.78600.001 March 14,2001 System Solids Removal Unit (See Figure 3) Operation Overview The inlet header to the Surge/Blend Tank provides for premixing of non-contact cooling tower blowdown, treated effluent from Neutralization System No. 1, treated effluent from Neutralization No. 2, and softener regeneration wastewater prior to entering the tank. This provides for thorough mixing of the wastewater inlet flows and sodium bisulfite for chlorine removal in a static mixer. From the Surge/Blend Tank the blended wastewater is pumped to Lamella Separator No. 3 for removal of suspended solids and is then pumped to the existing Effluent Lift Station. Any off-spec (pH) wastewater is automatically diverted to an Off Spec Tank No. 2 and then pumped back to Equalization Tank No. 2 at a controlled rate for re-treatment. The Lamella Head Tank, Lamella Separator No. 2, Equalization Tank No. 2, pH Adjustment Tanks, Neutralization Transfer Tank No. 2, and Off Spec Tank No. 2 are vented to the existing Miscellaneous Scrubbers for collection and treatment of any vent vapors. An existing . _Process Effluent Tank is located at the Effluent Lift Station for storage of wastewater during the times wastewater cannot be pumped to the river. Wastewater stored in the Process Effluent Tank is returned, by gravity, to the Effluent Lift station. Settled solids in the Lamella Separator are periodically pumped from the lamella to the Sludge Thickening Tank No. 3 and then from the tank to the existing Sludge Holding Tank for disposal. Corning Incorporated Concord Facility Page 2 of 3 Contract No.78600.001 March 14,2001 FIGURE 3 - SOLIDS REMOVAL UNIT From Neut. System No. 1 &Concord I Cooling Tower Blowdown ► From Softener Regeneration Tank From Lamella No. 3 Transfer Pumps ► From Concord II Cooling Tower Blowdown _ From Neutralization Transfer Pumps No. 3 &4 Sodium Bisulfite (NaHSO3) ' Static Mixer • •Abccularnt ► • Coagulant V V V Surge/Blend Tank Lamella Separator Sludge 21,000 gallons ► No. 3 ► To Sludge Thickening Tank No. 2 V Lamella No. 3 To Effluent Lift Station Transfer Tank ► 800 gallons (or recycle to Surge/Blend Tank, if out of control range) Corning Incorporated Concord Facility Page 3 of 3 Contract No.78600.001 March 14,2001 Corning Incorporated Telecommunications Products Division P.O. Box 1700 Concord, North Carolina 28026-1700 704-569-6000 March 16, 2001 CORNING CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Dave Goodrich North Carolina Department of Environment and Natural Resources Division of Water Quality, NPDES Permit Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 RE: Corning Incorporated, Concord Facility NPDES Permit No. NC0086169 ATC,Engineer's Certification Dear Mr. Goodrich: Attached, please find the Engineer's Certification for Construction of Wastewater tr. Treatment Facilities for subject ATC. The wastewater treatment.facility system will be started sequentially to facilitate discharge of wastewater streams per the permit. Please refer to the attached description of the planned start-up. The enclosed certification is for Sequence lb. This part of the system is required to start up prior to the remaining facility to accommodate the start up and discharge of non • - contact cooling tower blowdown per the subject permit. Prior to additional systems coming on line, an engineer's certification will be provided for them. Please feel free to contact me if you have any questions concerning the information contained in the documents. I can be reached at (704)569-6268. Sincerely, CL {LT Christy Hannan Environmental Control Engineer Concord Plant Corning, Inc. Enclosures Cc: Mooresville Regional Office, NCDENR a. v � State of North Carolina Department of Environment /IP"/IP ,( and Natural Resources . rani Division of Water Quality James B. Hunt, Jr., Governor 1\41CD Bill Holman, Secretary r NORTH CAROLINA DEPARTMENT OF Kerr T. Stevens, Director ENVIRONMENT AND NATURAL RESOURCES May 31, 2000 Ms. Christy L. Hannan Corning Incorporated Post Office Box 1700 Concord. North Carolina 28026 Subject: Authorization to Construct ATC No. 086169ACB shoe.No. NC $9 Concord Waveguide Plant Cabarrus County Dear Ms. Hannan: The Division of Water Quality's NPDES Unit has reviewed your request for an Authorization to Construct at the above referenced facility. The Division finds the proposed improvements to be satisfactory and hereby grants authorization for the following: • Construction of a 60,000 gallon chloride stabilization tank; • Construction of a 21,000 gallon equalization tank; • Construction of two (2) 1.700 gallon neutralization tanks: • Construction of a 36.000 gallon off-spec tank; • Construction of a 21.000 gallon surge/blend tank: • Construction of two(2) lamella clarifiers; and • Installation of all piping, valves, and appurtenances as illustrated on the attached approved design documents. This Authorization to Construct is issued in accordance with NPDES Permit No. NC0086169. issued on April 14, 2000, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the terms and conditions of the permit. The Permittee shall notify the Water Quality Supervisor of the Mooresville Regional Office, telephone number (704) 663-1699, at least forty-eight (48) hours prior to operation of the installed facilities, so that an in-place inspection can be made. Notification shall be made during the normal office hours of 8:00 a.m. until 5:00 p.m.. Monday through Friday. Engineers Certification Upon completion of construction and prior to operation of the modified facility, the Permittee shall provide the Division with a certification (copy enclosed) from a professional engineer registered in North Carolina certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct, and the approved plans and specifications. The Certification should be submitted to: NCDENR / DWQ, NPDES Unit, 1617 Mail Service Center. Raleigh, North Carolina 27699-1617. 1617 Mail Service Center,Raleigh,North Carolina 27699-1617 Telephone(919)733-5083 FAX(919)733-0719 An Equal Opportunity Affirmative Action Employer Internet:http://h2o.enr.state.nc.us/NPDES • Corning Inc.—Concord Facility NPDES Permit No.NC0086I69 ATC No.086169ACB Page 2 Requirements for Certified Operator The Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8G. .0200. The ORC of the facility must visit each Class I facility at least weekly and each Class II. Ill, and IV facility at least daily, excluding weekends and holidays: and must properly manage and document daily operation and maintenance of the facility and comply with all other conditions of Title 15A, Chapter 8G, .0200. Additional Requirements The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143-215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 145-215.6A to 145-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies(local, state, and federal) which have jurisdiction. The Permittee shall maintain a copy of the approved plans and specifications on file for the life of the facility. One (1) copy of the approved plans and specifications is enclosed for your records. If you have any questions about this Authorization to Construct, please contact Mark McIntire, at (919) 733-5083, extension 553. Sincerely, 75,4 afrerr T. Stevens Director Enclosures: Project Plans and Specifications (approved) Engineer's Certification Form cc: Mooresville Regional Office, Water Quality (letter only) Technical Assistance and Certification Unit (letter only) Central Files (letter only) NPDES Unit Files (letter and engineer's certification form) 4. State of North Carolina Department of Environment, • Health and Natural Resources A7A Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary p E H N F A. Preston Howard, Jr., P.E., Director November 14, 1997 Ms. Christy L. Hannan Corning Incorporated Telecommunications Products Division 14556 Highway 601 South Midland, North Carolina 28107 Subject: Permit No. NC0086169 Authorization to Construct Midland Fiber Facility Cabarrus County Dear Ms. Hannan: A letter of request for an Authorization to Construct was received August 20, 1997 by the Division and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for construction of facilities at the above referenced plant discharging treated effluent into the Rocky River in the Yadkin-Pee Dee River Basin. Specifically, this Authorization to Construct authorizes the construction of a 10,100 gallon flow equalization tank and a 21,000 gallon off-spec tank(also to be used for flow equalization purposes), a lamella clarifier for solids removal, two pH neutralization tanks, each with a volume of 1700 gallons, a 400 gallon neutralization transfer pump tank, a 42,000 gallon process effluent tank, a sludge thickening tank, and a 3,000 gallon effluent lift station. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0086169 issued October 27, 1997, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No.NC0086169. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality. • In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Mooreville Regional Office, telephone number(704) 663-1699, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an in-place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must he received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC 27626-0535. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/10%post-consumer paper S. Permit No. NC0086169 Authorization to Construct Midland Fiber Facility November 14, 1997 Page 2 must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8A, .0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II,III,and N facility at least daily,excluding weekends and holidays, and must properly manage and document daily operation and maintenance of the facility and must comply with all other conditions of Title 15A, Chapter 8A, .0202. Once the facility is classified, the Permittee must submit a letter to the Certification Commission which designates the operator in responsible charge within thirty days after the wastewater treatment facilities are 50%complete. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the faci;ity. The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143-215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143- 215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One(1)set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information,please contact Mr.Mark McIntire,telephone number(919)733-5083,extension 553. Sincerely, 4erk.iL, iu- . Preston Howard,Jr., P. . cc: Central Files NPDES Unit, Permit File Mooresville Regional Office,Water Quality Training and Certification Unit