Loading...
HomeMy WebLinkAboutNC0066516_Pretreatment_Annual_Report_20230228February 28, 2023 NCDENR, Division of Water Resources PERCS Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: Town of Fuquay-Varina NCO066516 2022 PAR Narrative General Program Information • Pretreatment Program Info Sheet submitted with original submission of 2022 PAR dated February 27,2023. • Remove James Jordan from info database • Add Jonathan Joyner as wastewater collections supervisor • Change mailing address to 134 N Main St. Fuquay-Varina, NC 27526 General Permit Information No permit expired or was renewed during 2022. SIU Information • John Deere Turf Care (IUP # 003) • No change to SIU information Pretreatment Program Info Database printed on: 1 /19/2023 for Program Name Fuquay-Varina WWTP Name Terrible Creek Program Approval Date 06/03/1985 Pretreatment Status Full Region RRO W C % at 7Q10 100.00 7010 Frow cfs /mgd 0 / 0.00 1 Q10 Flow cfs / mgd 0.00 / 0.00 Stream Classification c-nsw Basin Number neu03 County Wake Receiving Stream Name terrible creek NPDES Number NC0066516 NPDES Effective Date 07/01/2021 Last PAR Rec 02/24/2022 PAR Due Date 0310112023 mercury 1631 NPDES Expire Date 04/30/2026 Current Fiscal Year PClDone 05/2412019 required POTW is Primary WWTP TRUE Last Audit on 09/29/2021 Audit Year NeA25/26 es Design Flow mgd 3.0000 % Design mgd is SIU permitted F 0 67 Permitted SIU flow (mgd) [Pt_SIU) 02 WWTP SIU's Program S[Us 1 1 -- HWA LTMP0 IWS ' SUO ERP WWTP CIU's Program CIUs 1 date Inactive Date Next Due 108/31/2026 .!, E::::=__— Date Received by DWR 08/31/2026 Fo9/11/2022] 10/29/2021 ! 01/29/2014 06/10/2020 Date Approved 06/23/2022 f 05/09/2014 09/02/2020 Adopt Date Required Date Adopted 03/0412013 Mr. Chris Grimes Prim (919) 753-1013 919-552-7481 11 cgrimes@fuquay-varina.org Utility Operations Manager IF7526 ARF dues derder 919-552-7481 jjer�+ap(alfugwy % r �� Wastewater Collections Supervisor 484& 7526 Mc Adam Stephenson jPrim 919427-5358 1 1919-552-7481'11 1 11127/2015 astephenson@fuquay-varinaorg WWTP Supervisor/ORC'. 7526 Mr onakkan oyhctr q19-499-711s9 '`v her@ v+a - GtYt�h�t.oY 13q N MctlN St. DWR Central Office Contact JPretreatment Staff DWR Regional Contact Cheng Zhang Chapter 9, PAR Guidance Pretreatment Performance Summary (PPS) 1. Pretreatment Town Name: Fuquay-Varina 2. 'Primary" NPDES Number NC00 66516 or Non -Discharge Permit # if applicable => 3. PAR Begin Date, please enter 01/01/yyyy 4. PAR End Date, please enter 12/31/yyyy 5. Total number of SIUs, includes CIUs 6. Number of CIUs 7. Number of SIUs with no IUP, or with an expired IUP 8. Number of SIUs not inspected by POTW 9. Number of SIUs not sampled by POTW 10. Number of SIUs in SNC due to MP Limit violations it. Number of SIUs in SNC due to Reporting violations 12. Number of SIUs in SNC due to violation of a Compliance Schedule, CO, AO or similar 13, Number of CIUs in SNC 14. Number of SIUs included in Public Notice 15 Total number of SIUs on a compliance schedule, CO, AO or similar 16. Number ofNOVs, NNCs or similar assesed to SIUs 17. Number of Civil Penalties assessed to SIUs 18. Number of Criminal Penalties assessed to SIUs 19. Total Amount of Civil Penalties Collected 19. _> 20. Number of IUs from which penalties collected AO Administrative Order IUP Industrial User Pretreatment Permit CIO Categorical Industrial User NNC Notice of Non -Compliance CO Consent Order NOV Notice of Violation IU Industrial User PAR Pretreatment Annual Report 3.=> 1/1/2022 4.=> 12/31/2022 5. _> 1 6. => 1 7. _> 0 8. _> 0 9. => 0 10. _> 0 11. _> 0 12. => 0 13. _> 0 14. _> 0 15. _> 0 16. => 0 17. _> 0 18, _> 0 $ 0 20. => 0 POTW Publicly Owned Treatment Works SIU Significant Industrial User SNC Significan[Non-Compliance revised 1/2018: PAR PPS 2018 U C � ~ O - U1 Y d _N T O t- N O o c N m 0 T m J 0 v C O U N c F O N Y Q O T O_ F W K O O om 0 .y a T � J (O c � U C O V U C � ~ O - N - T O F- K N 3 O N O O O O T m a N N N u \� F W O N N O N ci 0 Yk O Y E 'E N O. . N J J Zad m .• u 2 E v w Cf > m LL. � V F �n o M cn N o n N ry m `� 1O vi b m lrl-tllr-Fzlr-w7 o a a N N N N N N N N N 0 0 0Co 0 N N N N N \ N \ d \ O \ a \ W I� O ci N O a { F- 0 0 0 m O o O O a O 0 O o O u O d T1C U K G F O N �+ Q O T O_ F � UD N K O W C Lq O �y N J C i N u c 0 V U C � ~ O 01 i+ p_ to T O k— ci N K C O O p O ♦+ O T � J f0 G O � C U U G � ~ O - N �+ Q O T O F > m 01 O O O a C O ri ci Y T @ J � U G O V �N-1 O O O O O O O 0 0 0 0 O O ci 0 0 0 i f 0 O O LI1 Ln N -LiT m m 0 0 0 0 O O O O O O O 0 0 O O O O O 0 0 i O O o O O o O O o O T] O o O O o O E. O a O 0 UI Q E t0 LD U K C F O � � 2 o F J � N K O N C O cj .Y � u � c 0 m 0 0 o N 0 o m o 0 0 0 0 O O O o O 0 0 O u c O w F-- � o a hT y 'm w 0 .y T � J Y \ u u V � c ~ O N m > O_ F- [C O p T � J y \ m c � � u c 0 u a N n .-t TT i m o n o 0 0 0 O 0 01 t!1 0 0 0 0 0 0 0 O O O i� O o 0 o a 0 w O c O O o O MA 0 0 0 0 O 0 0 0 0 O rcol O O 0 0 0 O o O Lr� u a � F- o v Y n 0_ @ o �n � m m O o 0 � U G O V U C � O W �@ n o t- v N oq O @ C � U C O U V K G F O N Y n O I- > m N O `y Y ci � J Y \ I C I V C O V n m FxTti C m m C- o o 0 0 0 o No E O W N N O 0 O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 O 0 0 0 u O o O 0 0 0 0' O o O r 76 :2 .0 6 O 0 w E 61 L6. 0 u -44i _F7 -1:1N -;:T F-w 0 ■ 11 I IF n to Lq a U � C ~ O - N y Q m ), O F eo v c 0 T � J Y \ Q C U C O U c v o .� n � F- m T o r m v 0 T m J - y \ N C � U G O U V � c ~ O _ W Y p_ @ T o t- m 0 T � J Y \ l0 C o � E C O U U � c ~ O � Y N T o F- m io c N LQ p N to a=i N N .J y \ t C I V G O V C C C C: C 0 0 0 0 SIU INSPECTION FORM Name Of Industry: Thh _becr'�- IUP # Oc)('3 Address Of Industry: IITP Expiration Date: 3-3i-2y Industry Representatives: Title .I anitl "$udrea�. Env t✓tigtwu.r PO/T�� Representatives: Title i n f3 bRc- Date O Inspection: I Z-- Ito - 2 2- Time Of Inspection: Z : 3 o am/ m Purpose of Inspection: Annual ✓ Other (Describe POTW to which III discharges 1 erriht-e CNPDES 4 1VC-00(P(0Sf G Is SIU currently in SNC? 00 If yes, for what? PART I - INITIAL INTERVIEW Has anything changed since the last inspection or IUP application in the following: COMMENTS Product YES / ZQ Raw materials used YES/5 Manufacturing processes YES / Categorical, if applicable YES / )0 Production rate YES / W Number of employees YES / tQ Number of shifts YES &Ib Comments: PART II - PLANT TOUR - Visit all areas where wastewater is generated or where there are drains to the POTW. Plant Tour Section A - PRODUCTION AND STORAGE AREAS 1. Are there floor drains in the production area? IYEV NO Where do they go? SLAmr> 4-h-4- Ve4-krn S '(v 'EY'l.-%h.eH Pwc.95 S 2. Are production areas diked, comPfty,or otherwise constructed in such a way as to prevent harm to the W WTP, especially from spills or slugs? 6�ES,7 NO Comments: 3. Are there floor drains in the storage area? 6541NO Where do they go? SL4 ep 4. Are storage tanks and areas diked, contain r otherwise constructed in such a way as to prevent harm to the WWTP, especially from spills or slugs? XE>VNO Comments: 5. Are process and storage tanks and pipes labeled? -YE9/ NO 6. How are off -spec raw materials, and products dispose of? W ASk ) n dR f'/P>'e S 7. When is the production area cleaned? Qj 11" 4t, d 8. Is the wastewater from cleaning the production area discharged to the POTW? YES / O 9. What non -process wastewaters are discharged to POTW? bafbn w. S' Commend1s: /- C M��v r— Gs v;Wrsre-c.s+� l t'1(Inr-Y1cS Flow t^Aorf And 2--7-27 2-9-z2 Title: SIU Inpsection Forth File name: COMP.INSP App 7-1) Revision data: August 1, 1994 Page I SIU INSPECTION FORM PART II - Plant Tour Section B - PRETREATMENT SYSTEM Ask the operator to describe pretreatment system. 1. Does operator seem knowledgable about the system? ES / NO Comments: 2. Are all units operational? �TS'/ NO 3. How often does operator/maintenance person check system? 3 1/7i* J A J/i�Ct 4. Is there an operator for each shift? j9/ NO 5. How and when is sludge disposed of? tn/ kJ/t Met^49e�^ li4e%%ll ti'I /t u �e� 6. Is there a schedule for preventative maintenance? Comments: PART II - Plant Tour Section C - SAMPLING POINTS) AND FLOW MEASUREMENT (Collect a sample if desired.) 1. Does an outside lab complete sampling? (YE / NO If yes, name of lab. Menkcx 2. If industry completes sampling, ask the industry representative to describe sampling procedures. Comments: 3. Is flow measurement equipment operational? 4. Is there a calibration log for the flow meter? Comments: NO Comments: NO Comments: PART III - EXIT INTERVIEW Review monitoring records and r SIII records required by IUP. 1. Are files well organized? 09/ NO Comments: 2. Are sample collection / cham-of-custody forms filled out properly? YF INO Comments: 3. Do results in files agree with reports sent to POTW? / NO Comments: 4. Who has authority to shut down production should a spill or slug discharge occur? S. How does SIU info in employees of whol to call at POTW in case of spill/slug? nos./t.at Ih M ✓ert l If slug/spill 15lan is already required by POT j3C review procedures. 6. Is SIU implementing slug/spill plan?i E NO Comments: Comments: INSPECTION RESULTS Slug/Spill Control Plan Needed? YES Comments, Required Or Recommended Actions: Signature OfInspector(s) Date: /2_—/6—Z2- Date: Title: SIU tnpseetion Fonn File name: COMP.INSP App 7-D Revision data: August 1, 1994 Page 2 John Deere Turf Care 6501 South NC 55 Highway Fuquay-Varina, NC 27526 U.S.A. Phone: 919-285-0341 Cell: 919-760-0050 E-mail: SundaresanSiva@JohnDeere.com Siva Sundaresan Factory Manager — Turf Care Agriculture & Turf Division June 6, 2022 Adam Stephenson Water and Sewer Departments Town of Fuquay-Varina 401 Old Honeycutt Road Fuquay-Varina, NC 27526 Subject: Total Toxic Organics (TTO) Certification Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit limitation for total toxic organics (TTO), I certify that, to the best of my knowledge, no dumping of concentrated toxic organics into the wastewaters has occurred since filing of the last monitoring report. I further certify that this facility is implementing the toxic organic management plan submitted to the Control Authority. If you have any questions or comments, please contact me at (919) 285-0341 at your convenience. Sincerely, Siva Sundaresan Factory Manager —Turf Care Public aJOHN DEERI December 2nd, 2022 Adam Stephenson Water and Sewer Departments Town of Fuquay-Varina 401 Old Honeycutt Road Fuquay-Varina, NC 27526 Subject: Total Toxic Organics (TTO) Certification John Deere Turf Care 6501 South NC 55 Highway Fuquay-Varina, NC 27526 U.S.A. Phone: 919-285-0341 Cell: 919-760-0050 E-mail: SundaresanSiva@JohnDeere.com Siva Sundaresan Factory Manager — Turf Care Agriculture & Turf Division Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit limitation for total toxic organics (TTO), I certify that, to the best of my knowledge, no dumping of concentrated toxic organics into the wastewaters has occurred since filing of the last monitoring report. I further certify that this facility is implementing the toxic organic management plan submitted to the Control Authority. If you have any questions or comments, please contact me at (919) 285-0341 at your convenience. Sincerely, V- Siva Sundaresan Factory Manager — Turf Care Public