HomeMy WebLinkAbout20140896 Ver 1_USACE Permit_20141112o �4 oq,%
U.S. ARMY CORPS F ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW - 2014-00562 County. New Hanover State Permit#: 9393 =14
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Mr. Harry Hardy
North Carolina Division of Marine Fisheries
3441 Arendell Street
Morehead City, North Carolina 28557
Telephone Number:
Size (acres)
Nearest Waterway
Coordinates
Location description:
North Carolina.
5
Atlantic Ocean
Latitude: 34o 06.299'
Longitude: 77.44.928'
The project area is located in the Atlantic Ocean, off the coast of New Hanover County.
Description of projects area and activity: AR -372. This verification authorizes the discharge of rill material into
-5 acres of waters of the United States for the addition of material to an existing artificial reef site known as
AR -372.
Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344)
® Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Regional General Permit Number or Nationwide Permit Number: GP 194
SEE ATTACKED RGP or NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided It is accomplished in strict accordance with
the attached conditions and your submitted CAMA application and information dated August 1. 2014. Any
violation of the attached conditions or deviation from your submitted plans may subject the permittee to a
stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is
modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit
authorization is reissued and/or modified, this verification will remain valid until the expiration date identified
below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit
authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with
the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or
are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity
is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation,
unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the
authorization.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other
required Federal, State or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers
regulatory program, please contact Ronnie Smith at 910 - 251 -4829 or by email at
ronnie.d.smithAusace.armv.m it
Corps Regulatory Official: Ronnie Smith C TC=57— Date: November 12.2014
Expiration Date of Verification: December 31, 2016
SAW - 2014-00562
Determination of Jurisdiction:
A. ❑ Based on preliminary information, there appear to be waters of the US including wetlands within the above
described project area. This preliminary determination is not an appealable action under the Regulatory
Program Administrative Appeal Process ( Reference 33 CFR Part 331).
B. ® There are Navigable Waters of the United States within the above described project area subject to the
permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act.
Unless there is a change in the law or our published regulations, this determination may be relied upon for a
period not to exceed five years from the date of this notification.
C. ® There are waters of the US and/or wetlands within the above described project area subject to the permit
requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the
law or our published regulations, this determination may be relied upon for a period not to exceed five years
from the date of this notification.
D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action.
Please reference jurisdictional determination issued . Action ID: SAW -
Basis For Determination: The Atlantic Ocean is subject to the ebb and flow of the tide and is
used to transport interstate and foreign commerce and is a navigable water of the United States pursuant to
the policies and criteria found at 33 CFR 329. The Atlantic Ocean is also a water of the United States
pursuant to the policies and criteria set forth in 33 CFR 328.
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for
the particular site identified in this request. The delineation/determination may not be valid for the wetland
conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or
anticipate participation in USDA programs, you should request a certified wetland determination from the local
office of the Natural Resources Conservation Service, prior to starting work.
F. Appeals Information (This information applies only to approved jurisdictional determinations as
indicated In B and C above).
This correspondence constitutes an approved jurisdictional determination for the above described site. If you object
to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331.
Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you
request to appeal this determination you must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Jason Steele, Review Officer
60 Forsyth Street SW, Room IOM 15
Atlanta, Georgia 30303 -8801
Phone: (404) 562-5137
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the
criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of
SAW - 2014-00562
the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by January
12, 2014.
"It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this
correspondence.**
Corps Regulatory Official:
Ro Smith
Date of JD: November 12, 2014
Expiration Date of JD: November 12, 2019
The Wilmington District is committed to providing the highest level of support to the public. To help us
ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at
hgR:Hrepulatory.usacesurvey.com /.
Enclosures:
GP 291 Conditions
Project Drawings
Copy Furnished without Enclosures:
Mr. Jonathon Howell
North Carolina Department of
Environment and Natural Resources
Division of Coastal Management
400 Commerce Avenue
Morehead City, North Carolina 28557 -3421
Mr. Robb Mairs
North Carolina Department of
Environment and Natural Resources
Division of Coastal Management
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
Ms. Chad Coburn
North Carolina Department of
Environment and Natural Resources
Division of Water Resources
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
Mr. Fritz Rhode
SAW. 201400562
Mr. Fritz Rhode
National Marine Fisheries Service
Habitat Conservation Service
Pivers Island
Beaufort, North Carolina 28516
Mr. Pace Wilber
National Marine Fisheries Service
Habitat Conservation Division
219 Fort Johnson Road
Charleston, South Carolina 29412 -9110
Ms. Karen Higgins
Division of Water Quality
North Carolina Department of Environment
and Natural Resources
1650 Mail Service Center
Raleigh, North Carolina 27699 -1650
Mr. Pete Benjamin
U.S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh, North Carolina 27636 -3726
Mr. Todd Allen Bowers
US EPA Region 4 Life Scientist
Water Protection Division
61 Forsyth Street, SW
Atlanta, GA 30303 -8960
BOSN3 Mr. Scott McAloon
United States Coast Guard
Sector North Carolina Waterways Management
2301 E. Fort Macon Rd
Atlantic Beach, NC 28512
National Ocean Service
NOAA, Department of Commerce
3 Nautical Data Branch
N\CS26
1315 East -West Hwy
Silver Spring, Maryland 20910 -3282
National Geospatial- Intelligence Agency
7500 GEOINT Drive
Springfield, Virginia 22150
Assistant Secretary of the Army
Manpower and Reserve Affairs
ASA (II, &E)
110 Army Pentagon
Washington, D.C. 20310 -50110
Director
Southeast Region
National Marine Fisheries Service
263 13`h Avenue South
St. Petersburg, Florida 33701
National Marine Fisheries Service
1315 East -West Highway
Silver Spring, Maryland 20910
)ooIg0 �b
U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW- 2014 -00567 County: New Hanover State Permit#: 9393 =14
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Mr. Harry Hardy
North Carolina Division of Marine Fisheries
3441 Arendell Street
Morehead City, North Carolina 28557
Telephone Number:
Size (acres) z_5 =BUFFER
Nearest Waterway Atlantic Ocean
Coordinates Latitude: 34.24668 D
Longitude: - 77.71498 ; if PERMITr
Location description: The Proiect area is located in the Atlantic Ocean, off the coast of New Hanover County,
North Carolina. More specifically, the boundine coordinates for Artificial Reef 364 are as follows:
Existing Reef - N34-15.0761/77-42.753'
E 34. 14.893 / 77.42.550'
S 34. 14.558' / 77.42.997'
W 34= 14.7441/ 77.43.200'
Description of projects area and activity_AR -364. This verification authorizes the discharee of rill material into
—2.5 acres of waters of the United States for the addition of material to an existing artificial reef site known as
AR -364.
Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344)
® Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Regional General Permit Number or Nationwide Permit Number: GP 291
SEEATTACHED RGP or NRP GENERAL, REGIONAL AND SPECIAL CONDITIONS
Your work Is authorized by the above referenced permit provided it is accomplished in strict accordance with
the attached conditions and your submitted CAMA application and information dated August 1, 2014. Any
violation of the attached conditions or deviation from your submitted plans may subject the permittee to a
stop work order, a restoration order, a Class I administrative penalty, and /or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is
modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit
authorization is reissued and/or modified, this verification will remain valid until the expiration date identified
below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit
authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with
the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or
are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity
is completed within twelve months of the dare of the nationwide permit's expiration, modification or revocation,
unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the
authorization.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other
required Federal, State or local approvalstpermits
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers
regulatory program, please contact Ronnie Smith at 910 - 251 -4829 or by email at
ronnie.d.smithAusace.army.m it
Corps Regulatory Official: Ronnie Smith Date: November 12.2014
Expiration Date of Verification: December 31, 2016
SAW -2014 -00567
Determination of Jurisdiction:
A. ❑ Based on preliminary information, there appear to be waters of the US including wetlands within the above
described project area. This preliminary determination is not an appealable action under the Regulatory
Program Administrative Appeal Process ( Reference 33 CFR Part 331).
B. ® There are Navigable Waters of the United States within the above described project area subject to the
permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act.
Unless there is a change in the law or our published regulations, this determination may be relied upon for a
period not to exceed five years from the date of this notification.
C. ® There are waters of the US and/or wetlands within the above described project area subject to the permit
requirements of Section 404 of the Clean Water Act (C WA)(33 USC § 1344). Unless there is a change in the
law or our published regulations, this determination may be relied upon for a period not to exceed five years
from the date of this notification.
D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action.
Please reference jurisdictional determination issued . Action ID: SAW -
Basis For Determination: The Atlantic Ocean is subject to the ebb and flow of the tide and is
used to transport interstate and foreign commerce and is a navigable water of the United States pursuant to
the policies and criteria found at 33 CFR 329. The Atlantic Ocean is also a water of the United States
pursuant to the policies and criteria set forth in 33 CFR 328.
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for
the particular site identified in this request. The delineation/determination may not be valid for the wetland
conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or
anticipate participation in USDA programs, you should request a certified wetland determination from the local
office of the Natural Resources Conservation Service, prior to starting work.
F. Appeals Information (This information applies only to approved jurisdictional determinations as
indicated in B and C above).
This correspondence constitutes an approved jurisdictional determination for the above described site. If you object
to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331.
Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you
request to appeal this determination you must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Jason Steele, Review Officer
60 Forsyth Street SW, Room 1OM15
Atlanta, Georgia 30303 -8801
Phone: (404) 562-5137
SAW - 201400567
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the „a.. ,
criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of
the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by
September 1, 2014.
**It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this
correspondence.”
Corps Regulatory Official.
Rorm h
Date of JD: November 12, 2014
Expiration Date of JD: November 12, 2019
The Wilmington District is committed to providing the highest level of support to the public. To help us
ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at
htto: / / /re�latory.usacesurvey.com/.
Enclosures:
GP 291 Conditions
CAMA Permit
Project Drawings
Copy Furnished without Enclosures:
Mr. Jonathon Howell
North Carolina Department of
Environment and Natural Resources
Division of Coastal Management
400 Commerce Avenue
Morehead City, North Carolina 28557 -3421
Mr. Robb Mairs
North Carolina Department of
Environment and Natural Resources
Division of Coastal Management
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
Ms. Chad Coburn
North Carolina Department of
Environment and Natural Resources
Division of Water Resources
127 Cardinal Drive Extension
U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW - 2014 -00566 County: New Hanover State Permit#: 93=14
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Mr. Harry Hardy
North Carolina Division of Marine Fisheries
3441 Arendell Street
Morehead City, North Carolina 28557
Telephone Number:
Size (acres) 2.5 (385 total site)
Nearest Waterway Atlantic Ocean
Coordinates Latitude: 34.30663
Longitude: - 77.86093
Location description: The project area is located in the Atlantic Ocean, off the coast of New Hanover County,
North Carolina. More specifically, the bounding coordinates for Artificial Reef 378 are as follows:
Existing Reef - NE 34.02.193' / 77.51.676' Proposed Reef - NE 34o 02.355' / 77.51.595'
SE 34.01.754' / 77.51.902' SE 34.01.603' / 77x51.575'
SW 34a 01.8451/ 77- 52.198' SW 34.01.612' / 77o 52.555'
NW 34e 02.2981/ 77.51.940' NW 34= 02.364' / 77o 52.047'
Description of projects area and activity_AR -378. This verification authorizes the discharee of fill material into
—2.5 acres of waters of the United States for the addition of material to an existing artificial reef site known as
AR-378. AR -378 will also be expanded from 120 acres to 385 acres.
Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344)
® Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Regional General Permit Number or Nationwide Permit Number: GP 291
SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it Is accomplished in strict accordance with
the attached conditions and your submitted CAMA application and Information dated Aueust 1, 2014. Any
violation of the attached conditions or deviation from your submitted plans may subject the permittee to a
stop work order, a restoration order, a Class 1 administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is
modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit
authorization is reissued and/or modified, this verification will remain valid until the expiration date identified
below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit
authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with
the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or
are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity
is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation,
unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the
authorization.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other
required Federal, State or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers
regulatory program, please contact Ronnie Smith at 910-251 -4829 or by email at
ron n ie.d.sm ithQ u sace.a rmv. m i l
Corps Regulatory Official: Ronnie Smith \,_->' Date: November 12.2014
Expiration Date of Verification: December 31, 2016
SAW - 201400566
Determination of Jurisdiction:
A. ❑ Based on preliminary information, there appear to be waters of the US including wetlands within the above
described project area. This preliminary determination is not an appealable action under the Regulatory
Program Administrative Appeal Process ( Reference 33 CFR Part 331).
B. ® There are Navigable Waters of the United States within the above described project area subject to the
permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act.
Unless there is a change in the law or our published regulations, this determination may be relied upon for a
period not to exceed five years from the date of this notification.
C. ® There are waters of the US and/or wetlands within the above described project area subject to the permit
requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the
law or our published regulations, this determination may be relied upon for a period not to exceed five years
from the date of this notification.
D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action.
Please reference jurisdictional determination issued . Action ID: SAW -
Basis For Determination: The Atlantic Ocean Is subject to the ebb and flow of the tide and is
used to transport Interstate and foreign commerce and Is a navigable water of the United States pursuant to
the policies and criteria found at 33 CFR 329. The Atlantic Ocean is also a water of the United States
pursuant to the policies and criteria set forth in 33 CFR 328.
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for
the particular site identified in this request. The delineation/determination may not be valid for the wetland
conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or
anticipate participation in USDA programs, you should request a certified wetland determination from the local
office of the Natural Resources Conservation Service, prior to starting work.
F. Appeals Information (This information applies only to approved jurisdictional determinations as
indicated In B and C above).
This correspondence constitutes an approved jurisdictional determination for the above described site. If you object
to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331.
Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you
request to appeal this determination you must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Jason Steele, Review Officer
60 Forsyth Street SW, Room I OM 15
Atlanta, Georgia 30303 -8801
Phone: (404) 562-5137
SAW- 2014 -00566
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the
criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of
the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by January
12, 2014.
**It is not necessary to submit an RFA form Division ectf you do not object to the determination in this
correspondence."
Corps Regulatory Official:
Ronnie mr
Date of JD: November 12, 2014
Expiration Date of JD: November 12, 2019
The Wilmington District is committed to providing the highest level of support to the public. To help us
ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at
hnp:Hregulatory.usacesurvey.com/.
Enclosures:
GP 291 Conditions
CAMA Permit
Project Drawings
Copy Furnished without Enclosures:
Mr. Jonathon Howell
North Carolina Department of
Environment and Natural Resources
Division of Coastal Management
400 Commerce Avenue
Morehead City, North Carolina 28557 -3421
Mr. Robb Mairs
North Carolina Department of
Environment and Natural Resources
Division of Coastal Management
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
Ms. Chad Coburn
North Carolina Department of
Environment and Natural Resources
Division of Water Resources
127 Cardinal Drive Extension
snw- 2014405 "
Wilmington, North Carolina 28405
Mr. Fritz Rhode
National Marine Fisheries Service
Habitat Conservation Service
Pivers Island
Beaufort, North Carolina 28516
Mr. Pace Wilber
National Marine Fisheries Service
Habitat Conservation Division
219 Fort Johnson Road
Charleston, South Carolina 29412 -9110
Ms. Karen Higgins
Division of Water Quality
North Carolina Department of Environment
and Natural Resources
1650 Mail Service Center
Raleigh, North Carolina 27699 -1650
Mr. Pete Benjamin
U.S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh, North Carolina 27636 -3726
Mr. Todd Allen Bowers
US EPA Region 4 Life Scientist
Water Protection Division
61 Forsyth Street, SW
Atlanta, GA 30303 -8960
BOSN3 Mr. Scott McAloon
United States Coast Guard
Sector North Carolina Waterways Management
2301 E. Fort Macon Rd
Atlantic Beach, NC 28512
National Ocean Service
NOAA, Department of Commerce
3 Nautical Data Branch
N\CS26, Station 7316
4
1315 East -West Hwy., RM 7316
Silver Spring, Maryland 20910 -3282
National Geospatial- Intelligence Agency
7500 GEOINT Drive
Springfield, Virginia 22150
Assistant Secretary of the Army
Manpower and Reserve Affairs
ASA (FUE)
110 Army Pentagon
Washington, D.C. 20310 -50110
Director
Southeast Region
National Marine Fisheries Service
263 13a' Avenue South
St. Petersburg, Florida 33701
National Marine Fisheries Service
1315 East -West Highway
Silver Spring, Maryland 20910
a.o I�ko��b
U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW- 2014 -00561 County: New Hanover State Permit#: 9393 =14
GENERAL PERNHT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Mr. Harry Hardy
North Carolina Division of Marine Fisheries
3441 Arendell Street
Morehead City, North Carolina 28557
Telephone Number:
NOV 17 2014
Size (acres) 2.5 (600 total site
Nearest Waterway Atlantic Ocean DENR -WATER RESOL
Coordinates Latitude: 34.1781 401 8 BUFFER PE MI'
Longitude:- 77.745083
Location description: The project area Is located in the Atlantic Ocean, off the coast of New Hanover County,
North Carolina. More specifically, the boundine coordinates for Artificial Reef 370 are as follows:
Existing Reef - NE 34. 10.668' / 770 44.165'
SE 34. 10.248' / 77.44.477'
SW 34. 10.3751/ 77.44.739'
NW 34.10.809' / 77.44.425'
Proposed Reef - NE 34^ 10.830' / 77o 44.140
SE 34o 10.2221/ 77.44.149'
SW 34.10.239' / 77o 45.558'
NW 34.10.847' / 77o 45.549'
Description of projects area and activity: AR-370. This verification authorizes the discharee of rill material into
—2.5 acres of waters of the United States for the addition of material to an existinu artificial reef site known as
AR -370. AR -370 will also be expanded from 120 acres to 600 acres.
Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344)
® Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Regional General Permit Number or Nationwide Permit Number: GP 291
SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS
Your work Is authorized by the above referenced permit provided It is accomplished In strict accordance with
the attached conditions and your submitted CAMA application and information dated August 1. 2014. Any
violation of the attached conditions or deviation from your submitted plans may subject the permittee to a
stop work order, a restoration order, a Class I administrative penalty, and /or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is
modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit
authorization is reissued and/or modified, this verification will remain valid until the expiration date identified
below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit
authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with
the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or
are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity
is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation,
unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the
authorization.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other
required Federal, State or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers
regulatory program, please contact Ronnie Smith at 910-251 -4829 or by email at
ronn ie.d.sm it hA usace.a rmv. m I I
Corps Regulatory Official: Ronnie Smith Date: November 12.2014
Expiration Date of Verification: December 31, 2016
SAW - 201400567
Determination of Jurisdiction:
A. ❑ Based on preliminary information, there appear to be waters of the US including wetlands within the above
described project area. This preliminary determination is not an appealable action under the Regulatory
Program Administrative Appeal Process ( Reference 33 CFR Part 331).
B. ® There are Navigable Waters of the United States within the above described project area subject to the
permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act.
Unless there is a change in the law or our published regulations, this determination may be relied upon for a
period not to exceed five years from the date of this notification.
C. ® There are waters of the US and/or wetlands within the above described project area subject to the permit
requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the
law or our published regulations, this determination may be relied upon for a period not to exceed five years
from the date of this notification.
D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action.
Please reference jurisdictional determination issued . Action ID: SAW -
Basis For Determination: The Atlantic Ocean is subject to the ebb and flow of the tide and is
used to transport interstate and foreign commerce and is a navigable water of the United States pursuant to
the policies and criteria found at 33 CFR 329. The Atlantic Ocean is also a water of the United States
pursuant to the policies and criteria set forth in 33 CFR 328.
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for
the particular site identified in this request. The delineation/determination may not be valid for the wetland
conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or
anticipate participation in USDA programs, you should request a certified wetland determination from the local
office of the Natural Resources Conservation Service, prior to starting work.
F. Appeals Information (This information applies only to approved jurisdictional determinations as
indicated In B and C above).
This correspondence constitutes an approved jurisdictional determination for the above described site. If you object
to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331.
Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you
request to appeal this determination you must submit a completed RFA form to the following address-
US Army Corps of Engineers
South Atlantic Division
Attn: Jason Steele, Review Officer
60 Forsyth Street SW, Room IOM 15
Atlanta, Georgia 30303 -8801
Phone: (404) 562-5137
2
•r
SAW - 2014-00%7
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the
criteria for appeal under 33 CFR part 33 1.5, and that it has been received by the Division Office within 60 days of
the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by January
12,2014.
**It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this
correspondence."
Corps Regulatory Official:
Ronnie Sm
Date of JD: November 12, 2014
Expiration Date of JD: November 12, 2019
The Wilmington District is committed to providing the highest level of support to the public. To help us
ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at
htt Wregulatory.usacesurvey.com/.
Enclosures:
GP 291 Conditions
CAMA Permit
Project Drawings
Copy Furnished without Enclosures:
Mr. Jonathon Howell
North Carolina Department of
Environment and Natural Resources
Division of Coastal Management
400 Commerce Avenue
Morehead City, North Carolina 28557 -3421
Mr. Robb Mairs
North Carolina Department of
Environment and Natural Resources
Division of Coastal Management
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
Ms. Chad Coburn
North Carolina Department of
Environment and Natural Resources
Division of Water Resources
127 Cardinal Drive Extension
SAW - 201400567
Wilmington, North Carolina 28405
Mr. Fritz Rhode
National Marine Fisheries Service
Habitat Conservation Service
Pivers Island
Beaufort, North Carolina 28516
Mr. Pace Wilber
National Marine Fisheries Service
Habitat Conservation Division
219 Fort Johnson Road
Charleston, South Carolina 29412 -9110
Ms. Karen Higgins
Division of Water Quality
North Carolina Department of Environment
and Natural Resources
1650 Mail Service Center
Raleigh, North Carolina 27699 -1650
Mr. Pete Benjamin
U.S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh, North Carolina 27636 -3726
Mr. Todd Allen Bowers
US EPA Region 4 Life Scientist
Water Protection Division
61 Forsyth Street, SW
Atlanta, GA 30303 -8960
BOSN3 Mr. Scott McAloon
United States Coast Guard
Sector North Carolina Waterways Management
2301 E. Fort Macon Rd
Atlantic Beach, NC 28512
National Ocean Service
NOAA, Department of Commerce
3 Nautical Data Branch
N\CS26, Station 7316
11
1315 East -West Hwy., RM 7316
Silver Spring, Maryland 20910 -3282
National Geospatial - Intelligence Agency
7500 GEOINT Drive
Springfield, Virginia 22150
Assistant Secretary of the Army
Manpower and Reserve Affairs
ASA (IL&E)
110 Army Pentagon
Washington, D.C. 20310 -50110
Director
Southeast Region
National Marine Fisheries Service
263 13'h Avenue South
St. Petersburg, Florida 33701
National Marine Fisheries Service
1315 East -West Highway
Silver Spring, Maryland 20910
'r-
�-o1q 0g%9
U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW - 2014 -01530 County: New Hanover State Permit#: 93_14
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Mr. Harry Hardy
North Carolina Division of Marine Fisheries n r, �/]
3441 Arendell Street iU) i lJ t,/
M_ orehead City. North Carolina 28557 Ipppnlluu(
Telephone Number. NOV I S 2U14
Size (acres) 73
Nearest Waterway Atlantic Ocean DENR - WATER RESOUR
401 8 BUFFER P RMITT
Coordinates Latitude: 34.01422
Longitude: - 77.84628
Location description: The Protect area is 73 acres and is located in the Atlantic Ocean, off the coast of New
Hanover County, North Carolina. More specifically, the boundine coordinates for Artificial Reef 378b are as
follows:
NE 340 00.850'/ 77.50.492'
SE 34e 00.4861177- 50.497'
SW 34.00.490' / 77^ 50.782'
NW 34o 00.853' / 77a 50.777'
Description of projects area and activity: AR -378b. This verification authorizes the dischar2e of fill material
into approximately 0.258 acres for the establishment of a 73 acre artificial reef site known as AR-378b
Applicable law: ® Section 404 (Clean Water Act, 33 USC 1344)
® Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Regional General Permit Number or Nationwide Permit Number: GP 291
SEE ATTACIIED RGP or NR'P GENERAL, REGIONAL AND SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished In strict accordance with
the attached conditions and your submitted CAMA application and information dated Aueust 1. 2014. Any
violation of the attached conditions or deviation from your submitted plans may subject the permittee to a
stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is
modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit
authorization is reissued and/or modified, this verification will remain valid until the expiration date identified
below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit
authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with
the terns and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or
are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity
is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation,
unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the
authorization.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other
required Federal, State or local approvaLs/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers
regulatory program, please contact Ronnie Smith at 910.251 -4829 or by email at
ronnie.d.smlth6ilusace.armv.mil
Corps Regulatory Official: Ronnie Smith Date: November 12.2014
Expiration Date of Verification: December 31, 2016
SAW - 201401510
Determination of Jurisdiction:
A. ❑ Based on preliminary information, there appear to be waters of the US including wetlands within the above
described project area. This preliminary determination is not an appealable action under the Regulatory
Program Administrative Appeal Process ( Reference 33 CFR Part 331).
B. ® There are Navigable Waters of the United States within the above described project area subject to the
permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act.
Unless there is a change in the law or our published regulations, this determination may be relied upon for a
period not to exceed five years from the date of this notification.
C. ® There are waters of the US and/or wetlands within the above described project area subject to the permit
requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the
law or our published regulations, this determination may be relied upon for a period not to exceed five years
from the date of this notification.
D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action.
Please reference jurisdictional determination issued . Action ID: SAW -
Basis For Determination: The Atlantic Ocean is subject to the ebb and flow of the tide and is
used to transport interstate and foreign commerce and is a navigable water of the United States pursuant to
the policies and criteria found at 33 CFR 329. The Atlantic Ocean is also a water of the United States
pursuant to the policies and criteria set forth in 33 CFR 328.
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for
the particular site identified in this request. The delineation/determination may not be valid for the wetland
conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or
anticipate participation in USDA programs, you should request a certified wetland determination from the local
office of the Natural Resources Conservation Service, prior to starting work.
F. Appeals Information (This information applies only to approved jurisdictional determinations as
indicated in B and C above).
This correspondence constitutes an approved jurisdictional determination for the above described site. If you object
to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331.
Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you
request to appeal this determination you must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Jason Steele, Review Officer
60 Forsyth Street SW, Room 1OM15
Atlanta, Georgia 30303 -8801
Phone: (404) 562-5137
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the
criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of
SAW2014-0153
the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by January
12,2014.
**It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this
correspondence."
Corps Regulatory Official:
Ronnie Smith -
Date ofJD: November 12, 2014
Expiration Date of JD: November 12, 2019
The Wilmington District is committed to providing the highest level of support to the public. To help us
ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at
http: //re ugulatory.usacesurvev.com/.
Enclosures:
GP 291 Conditions
CAMA Permit
Copy Furnished without Enclosures:
Mr. Jonathon Howell
North Carolina Department of
Environment and Natural Resources
Division of Coastal Management
400 Commerce Avenue
Morehead City, North Carolina 28557 -3421
Mr. Robb Mairs
North Carolina Department of
Environment and Natural Resources
Division of Coastal Management
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
Mr. Chad Coburn
North Carolina Department of
Environment and Natural Resources
Division of Water Resources
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
SAW- 201E-01530
Mr. Fritz Rhode
National Marine Fisheries Service
Habitat Conservation Service
Pivers Island
Beaufort, North Carolina 28516
Mr. Pace Wilber
National Marine Fisheries Service
Habitat Conservation Division
219 Fort Johnson Road
Charleston, South Carolina 29412 -9110
Ms. Karen Higgins
Division of Water Quality
North Carolina Department of Environment
and Natural Resources
1650 Mail Service Center
Raleigh, North Carolina 27699 -1650
Mr. Pete Benjamin
U.S. Fish and Wildlife Service
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh, North Carolina 27636 -3726
Mr. Todd Allen Bowers
US EPA Region 4 Life Scientist
Water Protection Division
61 Forsyth Street, SW
Atlanta, GA 30303 -8960
BOSN3 Mr. Scott McAloon
United States Coast Guard
Sector North Carolina Waterways Management
2301 E. Fort Macon Rd
Atlantic Beach, NC 28512
National Ocean Service
NOAA, Department of Commerce
3 Nautical Data Branch
N\CS26, Station 7316
1315 East -West Hwy., RM 7316
Silver Spring, Maryland 20910 -3282
National Geospatial - Intelligence Agency
7500 GEOINT Drive
Springfield, Virginia 22150
Assistant Secretary of the Army
Manpower and Reserve Affairs
ASA (]].. &E)
110 Army Pentagon
Washington, D.C. 20310 -50110
Director
Southeast Region
National Marine Fisheries Service
263 13'h Avenue South
St. Petersburg, Florida 33701
National Marine Fisheries Service
1315 East -West Highway
Silver Spring, Maryland 20910
Action ID Number: SAW- 2014 -01530 County: New Hanover
Permittee: North Carolina Division of Marine Fisheries
Project Name: AR 378b
Date Verification Issued: November 12, 2014
Project Manager: Ronnie Smith
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINE.
WILMINGTON DISTRICT
Attn: Ronnie Smith
69 Darlington Avenue
Wilmington, North Carolina 28403
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee
Date