Loading...
HomeMy WebLinkAbout20220398 Ver 3_Comment Response letter_20230301C-AD0� C Civil Design Concepts, PA February 28, 2023 Ms. Chonticha McDaniel NCDEQ - Division of Water Resources 401 and Buffer Branch 1617 Mail Service Center Raleigh, NC 27699-1612 Re: Mitchell County Middle School Project ID: DWR 223-0398 CDC Project No.: 12208 Dear Ms. McDaniel, On behalf of the Mitchell County Middle School, we are pleased to submit the requested additional information for NCDEQ review and approval. The comments from your email dated January 27, 2023, are summarized below along with the project's associated responses (in blue). 1. Please add planting plan for the vegetative shelf on plan sheet C942. CDC — Information has been added to C942. 2. We received the signed O&M agreement but no O&M Plan is provided. Please provide a complete O&M plan for the wet pond. CDC — An O&M Manual has been completed and is provided. 3. Please note that the Division's preferred method for dewatering the wet pond for maintenance is pump. However, if a gate valve and drainpipe at the bottom of the outlet structure are being proposed, we need to add extra measures to ensure proper water quality protection for downstream surface waters while also allowing operational functions of the stormwater treatment wet pond. Therefore, please either revise the dewatering method or provide an O&M plan that also includes the following: a) Please provide a locking system to restrict access to the handwheel located on the riser platform. This will ensure only authorized personnel can open/close the gate valve and such activities are recorded on the inspection/maintenance log. CDC — The valve has been removed from the detail. Mailing Address: P.O. Box 5432, Asheville, NC 28813 168 Patton Avenue Asheville, NC 28801 52 Walnut Street — Suite 9, Waynesville, NC 28786 Phone 828-252-5388 Fax 828-252-5365 Phone: 828-452-4410 Fax: 828-456-5455 Mitchell County Middle School February 28, 2023 Page 2 b) Please provide additional details on operation and maintenance of the gate valve such as maximum time or duration needed to perform valve testing or maintenance, how often valve testing/maintenance is required, how downstream outfalls will be monitored during the test to ensure no excessive amount of pond -bottom water and/or sediment being discharged to the downstream surface waters. CDC — The valve has been removed from the detail. A note has been added that any dewatering must be made by a pump with a floating inlet to minimize discharge of collected sediment. c) Please also include inspection activities, date of inspection, and name of personnel who perform the inspection to the record keeping section of the O&M plan. CDC — The inspection details have been outlined in the O&M Manual. Thank you for your assistance with this project. If you should have any questions or comments regarding this submittal, please do not hesitate to contact our office. Sincerely, Michael Cain, P E. Civil Design Concepts, P.A. mcain@cdcgo.com