Loading...
HomeMy WebLinkAboutNCC230550_ESC Approval Submitted_20230302Date: 212812023 Iredell County Planning & Development Erosion Control Section 349 North Center Street P.O. Box 788 Statesville, NC 28687 LETTER OF APPROVAL WITH MODIFICATIONS Eric Nixon PCL Construction Services, Inc. 6700 Forum Dr. #100 Orlando, FL 32821 RE: Project Name: Sidetracked Acres Approved: 32 Project ID: STVLE-2023-030 Project Location: PIN 4753493585.000 Submitted By: Bohler Engineering NC, PLLC Date Received: November 3'd 2022 Plan Type: New/Transfer of Financial Responsible Ownership Dear Mr. Scarpinato: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and herby issue this Letter of Approval with Modifications. Modifications must be received in this office no later than two weeks prior to the project start date. Failure to submit modified plans can result in a violation and fine under the Iredell County Land Development Code. The Modifications required for Approval are listed on the attached page. The Certificate of Approval issued by Iredell County must be posted at the job site. This plan approval shall expire three (3) years following the date of this approval as is required by Title 15A NCAC 413.0129 and Appendix H of the Iredell County Land Development Code. Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and. --'or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions andior penalties as indicated in the Iredell County Land Development Code. Also, this letter gives notice as required by G.S. i 13A-61.1(a) and Appendix H of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the Letter of Approval with Modifications Sidetracked 2/28'2023 Page 2 of 3 commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. It is the responsibility of the applicant to obtain all other required permits or approvals. As of May 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the NOI form to Annette Lucas at Annette. lucas ccncdenr.gov or Paul Clark at Paul.clark nedenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Failure to notify this office of the starting date may result in a Notice of Violation and civil penalty. Please notify us when you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Blake Jordan Erosion Control Inspector I mitchell.jordan@co.iredell.nc.us Enclosures: Modifications Fact Sheet on the New NCGOI Permit Letter of Approval with Modifications Sidetracked 2!28'2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Sidetracked Project ID: STVLE-2023-030 County: Iredell Reviewed by: Jonathan Williams Original Approval: November YJ 2022 Required changes are designated as "RC" under legal authority from NC General Statutes Chapter 113A Article 4 and the Iredell County Land Development Code. Suggested changes are designated as "SC" for improvement of the plan. l . Delineate required riser structure for Basins A & C on the plans and provide riser structure detail. - RC 2. Delineate areas requiring 401&404 permits on the plan and notate that these areas will not be disturbed until required permits have been obtained and copies have been provided to Iredell County Erosion Control. —RC 3. In Phase 2, notate that all perimeter slopes are to be matted and stabilized immediately upon completion. Provide matting detail. —RC 4. Delineate emergency spillway location for Basin B on the plans. -RC 5. Extend silt fence to protect entire undisturbed pocket at the head of the drainage area feeding the onsite intermittent stream. —RC 6. Use additional diversions to direct as much runoff as possible to the backside of Basin A furthest from the skimmer. —RC 7. Space out baffles as evenly as possible in Basin A while ensuring all runoff enters the basin behind the 3d baffle furthest from the skimmer. —RC 8. Ensure stockpile locations are 50 feet from diversions and basins... RC 9. Adjust Basin A skimmer orifice size to 3.5 inches to dewater the required volume in as close to 3 days' time possible. —RC 10. Adjust Basin B skimmer orifice size to 1.75 inches to dewater the required volume in as close to 3 days' time possible. —RC 1 l . Adjust Basin C skimmer orifice size to 2.75 inches to dewater the required volume in as close to 3 days' time possible. —RC