Loading...
HomeMy WebLinkAbout20120285_Gaston_Updated_TrafForecast_Ops_PrefAlt_ 051010_201012222.0 Traffic Forecast Volumes For the purposes of this technical memorandum, the following 2035 Toll forecast scenario will be used: 2035 Toll without Bud Wilson interchange and Preferred Alternative Alignment This updated forecast scenario was developed by utilizing the previously approved 2035 Toll with US 29/74 interchange scenario, removing the Bud Wilson interchange, and redistributing and adjusting these forecasted volumes to account for the removal of the Bud Wilson interchange. An additional Metrolina Regional Model (MRM) run of the 2035 Toll without Bud Wilson interchange was also completed for comparative purposes to validate the adjusted volumes. The updated traffic forecast scenario figures are included in Appendix A and peak hour breakouts are included in Appendix B. 3.0 Interchange Analysis Analysis Approach The focus of the traffic capacity analysis was on the operations of the modified ramp terminals. Traffic capacity analysis was performed utilizing Synchro 7.0 software. NCDOT’s Congestion Management Section’s Capacity Analysis Guidelines were used in the analysis. The following preliminary interchange designs were revised and/or modified and the capacity analysis was conducted based on these preliminary designs. All capacity analyses utilize the updated 2035 Toll without Bud Wilson interchange traffic forecast. The results of the traffic capacity analysis are based on the level of service (LOS) and delay. Refer to Tables 1-4 for the overall LOS and delay during the AM and PM peak hour. Synchro output, including both LOS and delay results, is included in Appendix C. A. Robinson Road This traffic capacity analysis was based on the revised preliminary design that shifts the westbound ramp terminal southward to a “compressed” ramp termini location. The capacity analysis reveals that the westbound ramp is expected to operate at LOS E during the PM peak hour. This level of service is related to the removal of the Bud Wilson interchange and not a change in the Robinson Road interchange design. With the addition of a second right turn lane on the westbound ramp, the intersection is expected to improve to an overall LOS D. Table 1 – 2035 Build Toll Synchro Intersection Analysis Results Intersection Time Period 2035 Toll without Bud Wilson Interchange 2035 Toll without Bud Wilson Interchange with improvements LOS Delay (sec/veh) LOS Delay (sec/veh) Westbound Ramp AM D 37.4 C 29.9 PM E 63.2 D 36.7 Eastbound Ramp AM C 29.1 C 31.1 PM C 23.0 C 23.7 B. NC 274 This traffic capacity analysis was based on the revised preliminary design to a compressed “diamond” type interchange. The capacity analysis reveals that both ramp intersections are expected to operate at LOS C or better during the AM and PM peak hour. Table 2 – 2035 Build Toll Synchro Intersection Analysis Results Intersection Time Period 2035 Toll without Bud Wilson Interchange LOS Delay (sec/veh) Westbound Ramp AM B 15.5 PM B 19.7 Eastbound Ramp AM C 24.1 PM C 22.5 C. NC 273 This traffic capacity analysis was based on the preliminary design with the proposed diamond interchange by replacing the loop ramp in the northwest quadrant with a left turn at the westbound off ramp. To accommodate this design the westbound on ramp is shifted south to align with the westbound off ramp. The capacity analysis reveals that both ramp intersections are expected to operate at LOS C or better during the AM and PM peak hour. Table 3 – 2035 Build Toll Synchro Intersection Analysis Results Intersection Time Period 2035 Toll without Bud Wilson Interchange LOS Delay (sec/veh) Westbound Ramp AM C 24.8 PM C 30.8 Eastbound Ramp AM B 19.9 PM B 15.8 D. I-485 This traffic capacity analysis was based on the preliminary design with the removal of the “flyover” ramp for the southeast quadrant (WB to SB) to an at-grade ramp terminus. This analysis assumes dual westbound left turn lanes. The capacity analysis reveals that both ramp intersections are expected to operate at LOS A during both the AM and PM peak hour. Table 4 – 2035 Build Toll Synchro Intersection Analysis Results Intersection Time Period 2035 Toll without Bud Wilson Interchange LOS Delay (sec/veh) Southbound Ramp AM A 8.5 PM A 6.4 Gaston East-West Connector Main Line Analysis Traffic capacity analysis was performed utilizing Highway Capacity Software (HCS) 2000. NCDOT’s Congestion Management Section’s Capacity Analysis Guidelines were used in the analysis. Table 5 shows the mainline basic 4 lane freeway segment LOS for the 2035 Toll without Bud Wilson Road interchange scenario. Refer to Appendix D for basic freeway capacity analysis reports. Table 5 – Mainline Freeway 4-Lane Level of Service Segment 2035 Toll Traffic 4-Lane I-85 to US 29/74 B US 29/74 to Linwood Road B Linwood Road to US 321 B US 321 to Robinson Road C Robinson Road to NC 274 C NC 274 to NC 279 C NC 279 to NC 273 D NC 273 to Dixie River Road F Dixie River Road to I-485 E The capacity analysis revealed that the 4 lane freeway segment between NC 273 and Dixie River is expected to operate a LOS F in 2035. A failure year capacity analysis indicates that the 4 lane freeway between NC 273 and Dixie River Road is expected to operate at LOS D or better until 2028. In 2029 it is expected to operate at LOS E and will reach LOS F in 2033. If the forecasted traffic volumes develop, additional travel lanes on the Gaston East-West Connector will be needed from NC 273 eastward to I-485 to achieve acceptable LOS. These additional lanes can be developed from the interchange ramp and carried to/from NC 273 to I-485 as auxiliary lanes. The distance between the interchanges allows these to be considered as a freeway lane in the HCS analysis. The mainline basic freeway analysis indicates that a 6 lane facility for the 2035 Toll without the Bud Wilson interchange scenario is expected to operate at LOS C or better during the peak hours. 4.0 Summary and Recommendations In summary, this technical memorandum provides an updated 2035 Toll traffic forecast without the Bud Wilson Road Interchange and traffic capacity analysis associated with the revised preliminary design. The traffic capacity analysis utilizing the updated forecast indicates that the revised designs are expected to operate at acceptable LOS with one exception. The westbound ramp at Robinson Road is expected to operate at LOS E during the PM peak hour. With the improvement to westbound dual right turn lanes, the intersection is expected to operate at LOS D. A mainline basic freeway analysis was completed for a 4 lane facility. The capacity analysis indicates that the section between NC 273 and Dixie River Road is expected to operate a LOS F in 2035. A freeway mainline failure year analysis indicates the 4 lane facility is expected to operate at LOS D until 2028 and will reach LOS E in 2029 and LOS F by 2033. With the addition of “auxiliary lanes” from NC 273 to I-485, the mainline basic freeway analysis of a 6 lane facility indicates that the Gaston East-West Connector is expected to operate at LOS C or better in 2035. If you have any questions or additional information, please contact Mr. John Grant, P.E. at 919- 424-0467. Appendix A – Forecast Figures Gaston East-West Connector 85 321R-2608 32,00020,800 11,6004,800 10,400900 14,40060041,8004,800 5,0006,100 SR 1307 (Edgewood Rd) 158,100 PM 60 9 (4,15) 157,300 PM 60 9 (4,15) 134,000 PM 60 9 (4,20) 90,200 PM 60 9 (4,20) 168,200 PM 60 9 (4,14) 17,900 PM 10 55 (4,2) 20,800 PM 55 10 (4,4) 62,500 PM 55 10 (4,8) 27,000 PM 55 10 (4,5) 58,600 PM 60 10 (3,6) 28,400 PM 65 10 (4,3) 274 (Bessemer City Road)74 12,200 PM 55 10 (4,3) 29 74 15,900 PM 60 10 (4,3) 85 29 321SR 1307 (Edgewood Rd)274 (Bessemer City Road) Matchline AMatchline AMatchline A Matchline A Matchline A12,2009,100 3,7002,500 5,9009,400 160,400 PM 60 9 (4,15) 21,300 PM 60 10 (3,7) Matchline A 2035 Build Traffic Forecast I-485 to I-85 without Bud Wilson interchange Figure 1.1 = VPD - # of Vehicles per Day Average Annual Daily Traffic LEGEND ### DHV PM D (d,t) = PM Peak Period = Directional Split (%) = Design Hourly Volume = K30 K30 = 30th Highest Hourly Volume = Indicates Direction of D Reverse Flow for AM Peak = Duals, TT-ST’s (%) = Daily Turn Movements PM D (d,t) DHV = Existing Roadway = Future Roadway = Breakline N NTS Gaston East-West Connector PREPARED BY:HNTB North Carolina, P.C. 343 East Six Forks Rd Suite 200 Raleigh, North Carolina 27609 COUNTY: Gaston/Mecklenburg DIVISION: 12 / 10 STIP: U-3321 DATE: February 2010 SR 1131 (Linwood Rd) SR 1131 (Linwood Rd)13,700 PM 55 11 (3,2) PM 55 11 (3,2) 17,900 PM 10 55 (4,2) 6,000 PM 11 55 (4,3) 28,100 PM 65 10 (4,3) 3,300500 5,0005,000 12,200 PM 55 10 (4,3) 30,900 PM 65 10 (4,3) 4,3003,200 3,8002,100 26,100 PM 65 10 (4,3) 12,300 PM 10 55 (4,2) 4,1005,300 5,5004,400 23,400 PM 65 10 (4,3) 23,300 PM 65 10 (4,3) 7001,400 5008,800 10,700 PM 10 55 (4,2) 1,800 PM 55 9 (2,1) 14,800 PM 9 65 (4,2) 15,300 PM 10 65 (4,2) 29 74 SR 1136 (N. Myrtle School Rd) Arkray St M a t c h l i n e B Gaston East-West Connector2974SR 1307 (Edgewood Rd) 274 (Bessemer City Road) Matchline A Matchline A Matchline A Matchline A Gaston East-West Connector SR 1122 (Archie Whitesides Rd) 274 (Garrison Road) SR 1136 (S. Myrtle School Rd) 16,400 10,800 PM 55 10 (4,2) Matchline B Matchline B Matchline B3,8009,000 1,7004,000 21,300 PM 60 10 (3,7) 28,400 PM 60 10 (3,7) 2 3 , 5 0 0 P M 6 0 1 0 ( 3 , 8 ) 1,7002,000 5,8002,800 2035 Build Traffic Forecast I-485 to I-85 without Bud Wilson interchange Figure 1.2 = VPD - # of Vehicles per Day Average Annual Daily Traffic LEGEND ### DHV PM D (d,t) = PM Peak Period = Directional Split (%) = Design Hourly Volume = K30 K30 = 30th Highest Hourly Volume = Indicates Direction of D Reverse Flow for AM Peak = Duals, TT-ST’s (%) = Daily Turn Movements PM D (d,t) DHV = Existing Roadway = Future Roadway = Breakline N NTS Gaston East-West Connector PREPARED BY:HNTB North Carolina, P.C. 343 East Six Forks Rd Suite 200 Raleigh, North Carolina 27609 COUNTY: Gaston/Mecklenburg DIVISION: 12 / 10 STIP: U-3321 DATE: February 2010 321 274SR 2423 (Bud Wilson Rd) SR 2416 (Robinson Rd) SR 1103 (Crowder’s Creek Rd) SR 1136 (Stagecoach Rd) SR 2416 (Robinson Rd) SR 2413 (Old York Rd) SR 2667 (Telegraph Dr) 321 23,300 PM 55 11 (4,4) 3007,300 4003,100 19,200 PM 55 11 (4,4) 6004,100 9002,500 32,000 PM 11 55 (4,4) 18,100 PM 55 10 (3,2) PM 55 11 (3,2) 18,000 PM 55 11 (3,2) 14,500 PM 10 55 (3,2) PM 11 55 (3,2) SR 1201 (Superior Stainless Rd) 32,000 PM 11 55 (4,4) 700300 700300 6,800 PM 55 9 (4,2) 10,600 PM 55 9 (3,2) 900 SR 2420 (Forbes Rd)1,700 PM 65 10 (5,3) 900 PM 55 9 (7,7) 1,700 PM 60 9 (2,1) 3,5002,900 18,500 PM 55 11 (3,2) 17,900 PM 55 11 (3,2) 274 (Union Rd) (Union Rd) Gaston East-West Connector Matchline B Gaston East-West Connector Matchline C 17,900 PM 55 11 (4,4) 14,000 PM 11 55 (3,2) Matchline B 15,2004,900 5,5005,900 5,9006,800 10,1006,200 1,000 7,300 33,400 PM 60 10 (3,8) 36,400 PM 60 10 (2,7) 36,400 PM 60 10 (3,7) 37,200 PM 60 10 (3,7) 23,500 PM 60 10 (3,8) 5,700 3,400 Matchline A Matchline B 2035 Build Traffic Forecast I-485 to I-85 without Bud Wilson interchange Figure 1.3 = VPD - # of Vehicles per Day Average Annual Daily Traffic LEGEND ### DHV PM D (d,t) = PM Peak Period = Directional Split (%) = Design Hourly Volume = K30 K30 = 30th Highest Hourly Volume = Indicates Direction of D Reverse Flow for AM Peak = Duals, TT-ST’s (%) = Daily Turn Movements PM D (d,t) DHV = Existing Roadway = Future Roadway = Breakline N NTS Gaston East-West Connector PREPARED BY:HNTB North Carolina, P.C. 343 East Six Forks Rd Suite 200 Raleigh, North Carolina 27609 PM 10 55 (4,2) COUNTY: Gaston/Mecklenburg DIVISION: 12 / 10 STIP: U-3321 DATE: February 2010 6,400 6,400 Catawba River 279 273 279 273 SR 1155 (Dixie River Rd) SR 1155 (Dixie River Rd) 19,300 PM 55 10 (3,2) 12,100 PM 10 55 (3,2) 31,500 PM 55 11 (3,2) 24,800 PM 10 55 (3,2) 10,100 PM 10 60 (3,2) 10,200 PM 10 60 (3,2) (New Hope Rd)(Southpoint Rd) (New Hope Rd)(Southpoint Rd) Gaston East-West Connector Matchline D Matchline C Gaston East-West Connector 6,100800 12,7001,400 9,2002,200 13,3004,800 1,4003,800 1,2003,900 37,200 PM 60 10 (3,7) 53,800 PM 60 10 (2,6) 69,300 PM 60 10 (2,6) 64,200 PM 60 10 (2,6) Matchline D 2035 Build Traffic Forecast I-485 to I-85 without Bud Wilson interchange Figure 1.4 = VPD - # of Vehicles per Day Average Annual Daily Traffic LEGEND ### DHV PM D (d,t) = PM Peak Period = Directional Split (%) = Design Hourly Volume = K30 K30 = 30th Highest Hourly Volume = Indicates Direction of D Reverse Flow for AM Peak = Duals, TT-ST’s (%) = Daily Turn Movements PM D (d,t) DHV = Existing Roadway = Future Roadway = Breakline N NTS Gaston East-West Connector PREPARED BY:HNTB North Carolina, P.C. 343 East Six Forks Rd Suite 200 Raleigh, North Carolina 27609 Gaston County Mecklenburg County Catawba River COUNTY: Gaston/Mecklenburg DIVISION: 12 / 10 STIP: U-3321 DATE: February 2010 485 485 134,800 PM 11 55 (4,6) 115,000 PM 11 55 (4,6) 140,100 PM 11 55 (4,6) 4,0004,400 2,2001,900 45,900 PM 60 10 (4,3) 4,200 PM 65 9 (3,2) 8,500 PM 65 11 (4,3) 21,200 PM 65 11 (4,3) SR 1155 (Shopton Rd) PM 60 10 (4,3) 21,100 PM 65 11 (4,3) (Steele Creek Rd) West BlvdGaston East-West Connector Matchline D 11,70023,700 8,70021,400 10,00033,700 5,10018,800 64,200 PM 60 10 (2,6) 26,800 PM 60 10 (3,6) 41,000 SR 1155 (Dixie River Rd) Matchline D Steele Creek Rd Ext 10,4003,700 SR 1116 (W. Shopton Rd) 14,100 PM 60 10 (3,2) PM 60 10 (4,3) 34,300 Matchline E 2035 Build Traffic Forecast I-485 to I-85 without Bud Wilson interchange Figure 1.5 = VPD - # of Vehicles per Day Average Annual Daily Traffic LEGEND ### DHV PM D (d,t) = PM Peak Period = Directional Split (%) = Design Hourly Volume = K30 K30 = 30th Highest Hourly Volume = Indicates Direction of D Reverse Flow for AM Peak = Duals, TT-ST’s (%) = Daily Turn Movements PM D (d,t) DHV = Existing Roadway = Future Roadway = Breakline N NTS Gaston East-West Connector 160 (Steele Creek Rd) 160 7,5002,600 10,100 PM 60 10 (3,2) PREPARED BY:HNTB North Carolina, P.C. 343 East Six Forks Rd Suite 200 Raleigh, North Carolina 27609 COUNTY: Gaston/Mecklenburg DIVISION: 12 / 10 STIP: U-3321 DATE: February 2010 485 19,40030,500 13,40042,900 115,000 PM 11 55 (4,6) 107,700 PM 11 55 (4,6) 114,100 PM 11 60 (4,6) 85 85 29 74 29 7432,300 PM 60 11 (4,4) 31,000 PM 60 11 (4,4) 203,500 PM 60 9 (3,11) 162,900 PM 60 9 (3,11) Matchline B Matchline A 1,300 PM 60 10 (2,1) Fieldridge Rd 5,300 PM 10 60 (3,2) SR 1662 (Tuckaseegee Rd) 250 14,100 1,150 400 12,800 5,750 5,050 700 3,450 250 1,000 1,400 1,700 10,200 3,4002,150 150 3,250 400 150 100 100 12,750 3,300 9 ,2 0 0 9,200 5,550 5,550 485 Matchline E 2035 Build Traffic Forecast I-485 to I-85 without Bud Wilson interchange Figure 1.6 = VPD - # of Vehicles per Day Average Annual Daily Traffic LEGEND ### DHV PM D (d,t) = PM Peak Period = Directional Split (%) = Design Hourly Volume = K30 K30 = 30th Highest Hourly Volume = Indicates Direction of D Reverse Flow for AM Peak = Duals, TT-ST’s (%) = Daily Turn Movements PM D (d,t) DHV = Existing Roadway = Future Roadway = Breakline N NTS Gaston East-West Connector PREPARED BY:HNTB North Carolina, P.C. 343 East Six Forks Rd Suite 200 Raleigh, North Carolina 27609 COUNTY: Gaston/Mecklenburg DIVISION: 12 / 10 STIP: U-3321 DATE: February 2010 Appendix B – Peak Hour Breakouts 24HOUR right N left dhv dir 10 60 dhv 9 9 dhv right W E dir 60 60 dir left 10 60 dhv dir left S right N 0 0 0 0 0 right 0 right through left  through 5235  left 631   0 left   8003 through   left through right 627 right 1258 866 341 0 525 N 0 0 0 0 0 right 0 right through left  through 8003  left 525   0 left   5234 through   left through right 340 right 866 1258 626 0 632 AM peak hour inflow is 15362 vehicles. AM peak hour outflow is 15361 vehicles. 5866 8528 5575 8630 Ga r d e n P a r k w a y I-85 I-85 I-85 PM peak hour inflow is 15362 vehicles. PM peak hour outflow is 15362 vehicles. 8529 5867 8629 5575 Ga r d e n P a r k w a y AM PEAK R- 2 6 0 8 PMPEAK R- 2 6 0 8 I-85 0 0 0  15 7 3 0 0 INPUT 16 0 4 0 0  2035 Build w/o B.W. I-85 Ga r d e n P a r k w a y 9100 21300  12200 March-10 Peak Hour Volume Breakouts Report: I-85 - Garden ParkwayR- 2 6 0 8 Traffic Forecast Release Date: I-85 Traffic Data Year: Gaston E-W Connector (Garden Parkway) Project: 24HOUR right N left dhv dir 10 60 dhv 10 10 dhv right W E dir 65 65 dir left 10 60 dhv dir left S right N 182 973 113 1268 859 right 59 right through left  through 583  left 170   199 left   1219 through   left through right 575 right 1718 1127 325 601 201 N 199 601 59 859 1268 right 113 right through left  through 1219  left 201   182 left   583 through   left through right 325 right 1127 1718 575 973 170 AM peak hour inflow is 5201 vehicles. AM peak hour outflow is 5200 vehicles. 813 1533 1090 1993 Ga r d e n P k w y US 29/74 US 29/74 US 29/74 PM peak hour inflow is 5200 vehicles. PM peak hour outflow is 5201 vehicles. 1533 813 1993 1090 Ga r d e n P k w y AM PEAK Ga r d e n P k w y PMPEAK Ga r d e n P k w y US 29/74 4000 21300 1700  30 9 0 0 INPUT 23 4 0 0  2035 Build w/o B.W. US 29/74 Ga r d e n P k w y 9000 28400  3800 March-10 Peak Hour Volume Breakouts Report: Garden Parkway & US 29/74Ga r d e n P k w y Traffic Forecast Release Date: US 29/74 Traffic Data Year: Gaston E-W Connector (Garden Parkway) Project: 24HOUR right N left dhv dir 10 60 dhv 11 11 dhv right W E dir 55 55 dir left 10 60 dhv dir left S right N 145 1195 350 1690 1145 right 255 right through left  through 450  left 100   133 left   563 through   left through right 127 right 1421 933 88 758 87 N 133 758 255 1145 1690 right 350 right through left  through 563  left 87   145 left   450 through   left through right 88 right 933 1421 127 1195 100 AM peak hour inflow is 4250 vehicles. AM peak hour outflow is 4250 vehicles. 805 1000 684 822 Ga r d e n P k w y Linwood Linwood Linwood PM peak hour inflow is 4250 vehicles. PM peak hour outflow is 4250 vehicles. 1000 805 822 684 Ga r d e n P k w y AM PEAK Ga r d e n P k w y PMPEAK Ga r d e n P k w y Linwood 2800 28400 5800  13 7 0 0 INPUT 16 4 0 0  2035 Build w/o B.W. Linwood Ga r d e n P k w y 2000 23500  1700 March-10 Peak Hour Volume Breakouts Report: Garden Parkway & LinwoodGa r d e n P k w y Traffic Forecast Release Date: Linwood Traffic Data Year: Gaston E-W Connector (Garden Parkway) Project: 24HOUR right N left dhv dir 11 55 dhv 10 10 dhv right W E dir 60 60 dir left 11 55 dhv dir left S right N 293 720 349 1362 1195 right 214 right through left  through 438  left 639   315 left   766 through   left through right 282 right 1641 1871 243 666 962 N 315 666 214 1195 1362 right 349 right through left  through 766  left 962   293 left   438 through   left through right 243 right 1871 1641 282 720 639 AM peak hour inflow is 5887 vehicles. AM peak hour outflow is 5886 vehicles. 1291 2076 974 1363 US 3 2 1 Garden Pkwy Garden Pkwy Garden Pkwy PM peak hour inflow is 5886 vehicles. PM peak hour outflow is 5887 vehicles. 2076 1291 1363 974 US 3 2 1 AM PEAK US 3 2 1 PMPEAK US 3 2 1 Garden Pkwy 5900 23300 5500  23 5 0 0 INPUT 33 4 0 0  2035 Build w/o B.W. Garden Pkwy US 3 2 1 4900 32000  15200 March-10 Peak Hour Volume Breakouts Report: Garden Parkway & US 321US 3 2 1 Traffic Forecast Release Date: Garden Pkwy Traffic Data Year: Gaston E-W Connector (Garden Parkway) Project: 24HOUR right N left dhv dir 10 55 dhv 10 10 dhv right W E dir 60 60 dir left 10 55 dhv dir left S right N 283 87 600 970 836 right 416 right through left  through 767  left 235   327 left   1279 through   left through right 347 right 670 777 321 93 363 N 327 93 416 836 970 right 600 right through left  through 1279  left 363   283 left   767 through   left through right 321 right 777 670 347 87 235 AM peak hour inflow is 5119 vehicles. AM peak hour outflow is 5120 vehicles. 1419 2242 1372 1953 Ro b i n s o n Garden Pkwy Garden Pkwy Garden Pkwy PM peak hour inflow is 5120 vehicles. PM peak hour outflow is 5119 vehicles. 2242 1419 1953 1372 Ro b i n s o n AM PEAK Ro b i n s o n PMPEAK Ro b i n s o n Garden Pkwy 6200 18100 10100  33 4 0 0 INPUT 36 4 0 0  2035 Build w/o B.W. Garden Pkwy Ro b i n s o n 6800 14500  5900 March-10 Peak Hour Volume Breakouts Report: Garden Parkway & RobinsonRo b i n s o n Traffic Forecast Release Date: Garden Pkwy Traffic Data Year: Gaston E-W Connector (Garden Parkway) Project: 24HOUR right N left dhv dir 11 55 dhv 10 10 dhv right W E dir 60 60 dir left 11 55 dhv dir left S right N 390 428 239 1056 919 right 143 right through left  through 1063  left 237   374 left   1695 through   left through right 50 right 715 822 49 402 370 N 374 402 143 919 1056 right 239 right through left  through 1695  left 370   390 left   1063 through   left through right 49 right 822 715 50 428 237 AM peak hour inflow is 5440 vehicles. AM peak hour outflow is 5439 vehicles. 1443 2303 1502 2119 NC 2 7 4 Garden Pkwy Garden Pkwy Garden Pkwy PM peak hour inflow is 5439 vehicles. PM peak hour outflow is 5440 vehicles. 2303 1443 2119 1502 NC 2 7 4 AM PEAK NC 2 7 4 PMPEAK NC 2 7 4 Garden Pkwy 7300 18000 3400  36 4 0 0 INPUT 37 2 0 0  2035 Build w/o B.W. Garden Pkwy NC 2 7 4 1000 14000  5700 March-10 Peak Hour Volume Breakouts Report: Garden Parkway & NC 274NC 2 7 4 Traffic Forecast Release Date: Garden Pkwy Traffic Data Year: Gaston E-W Connector (Garden Parkway) Project: 24HOUR right N left dhv dir 10 55 dhv 10 10 dhv right W E dir 60 60 dir left 10 55 dhv dir left S right N 67 256 741 1063 867 right 528 right through left  through 1380  left 247   73 left   2121 through   left through right 41 right 544 666 39 266 361 N 73 266 528 867 1063 right 741 right through left  through 2121  left 361   67 left   1380 through   left through right 39 right 666 544 41 256 247 March-10 Peak Hour Volume Breakouts Report: Garden Parkway & NC 279NC 2 7 9 Traffic Forecast Release Date: Garden Pkwy Traffic Data Year: Gaston E-W Connector (Garden Parkway) Project: 2035 Build w/o B.W. Garden Pkwy NC 2 7 9 800 12100  6100 1400 19300 12700  37 2 0 0 INPUT 53 8 0 0  AM PEAK NC 2 7 9 PMPEAK NC 2 7 9 Garden Pkwy Garden Pkwy Garden Pkwy PM peak hour inflow is 6120 vehicles. PM peak hour outflow is 6119 vehicles. 3223 2155 2235 1486 NC 2 7 9 AM peak hour inflow is 6119 vehicles. AM peak hour outflow is 6120 vehicles. 2155 3223 1486 2235 NC 2 7 9 Garden Pkwy 24HOUR right N left dhv dir 11 55 dhv 10 10 dhv right W E dir 60 60 dir left 10 55 dhv dir left S right N 272 702 903 1877 1584 right 589 right through left  through 1811  left 330   274 left   2802 through   left through right 102 right 1134 1343 103 721 519 N 274 721 589 1584 1877 right 903 right through left  through 2802  left 519   272 left   1811 through   left through right 103 right 1343 1134 102 702 330 March-10 Peak Hour Volume Breakouts Report: Garden Parkway & NC 273NC 2 7 3 Traffic Forecast Release Date: Garden Pkwy Traffic Data Year: Gaston E-W Connector (Garden Parkway) Project: 2035 Build w/o B.W. Garden Pkwy NC 2 7 3 2200 24800  9200 4800 31500 13300  53 8 0 0 INPUT 69 3 0 0  AM PEAK NC 2 7 3 PMPEAK NC 2 7 3 Garden Pkwy Garden Pkwy Garden Pkwy PM peak hour inflow is 9128 vehicles. PM peak hour outflow is 9127 vehicles. 4224 2729 3178 2186 NC 2 7 3 AM peak hour inflow is 9127 vehicles. AM peak hour outflow is 9128 vehicles. 2729 4224 2186 3178 NC 2 7 3 Garden Pkwy 24HOUR right N left dhv dir 10 60 dhv 10 10 dhv right W E dir 60 60 dir left 10 60 dhv dir left S right N 155 187 60 401 610 right 59 right through left  through 2440  left 52   232 left   3727 through   left through right 172 right 411 608 197 320 91 N 231 320 59 610 401 right 60 right through left  through 3727  left 91   154 left   2440 through   left through right 196 right 608 411 172 187 52 AM peak hour inflow is 7689 vehicles. AM peak hour outflow is 7690 vehicles. 2550 3878 2791 4130 Di x i e R i v e r Garden Pkwy Garden Pkwy Garden Pkwy PM peak hour inflow is 7690 vehicles. PM peak hour outflow is 7690 vehicles. 3878 2551 4130 2791 Di x i e R i v e r AM PEAK Di x i e R i v e r PMPEAK Di x i e R i v e r Garden Pkwy 3900 10100 1200  69 3 0 0 INPUT 64 2 0 0  2035 Build w/o B.W. Garden Pkwy Di x i e R i v e r 3800 10200  1400 March-10 Peak Hour Volume Breakouts Report: Garden Parkway & Dixie RiverDi x i e R i v e r Traffic Forecast Release Date: Garden Pkwy Traffic Data Year: Gaston E-W Connector (Garden Parkway) Project: 24HOUR right N left dhv dir 11 55 dhv 10 10 dhv right W E dir 60 60 dir left 11 55 dhv dir left S right N 725 4540 281 5546 7146 right 235 right through left  through 385  left 425   1140 left   724 through   left through right 1889 right 6854 7946 1527 5772 647 N 1140 5772 235 7146 5546 right 281 right through left  through 724  left 647   725 left   385 through   left through right 1527 right 7946 6854 1889 4540 425 AM peak hour inflow is 18289 vehicles. AM peak hour outflow is 18290 vehicles. 1044 1652 2638 3753 I- 4 8 5 West Blvd Garden Parkway West Blvd PM peak hour inflow is 18290 vehicles. PM peak hour outflow is 18289 vehicles. 1652 1044 3753 2638 I- 4 8 5 AM PEAK I- 4 8 5 PMPEAK I- 4 8 5 Garden Parkway 18800 115000 5100  64 2 0 0 INPUT 26 8 0 0  2035 Build w/o B.W. Garden Parkway I- 4 8 5 33700 134800  10000 March-10 Peak Hour Volume Breakouts Report: I-485 - Garden Parkway I- 4 8 5 Traffic Forecast Release Date: West Blvd Traffic Data Year: Gaston E-W Connector (Garden Parkway) Project: Appendix C – Synchro Analysis Lanes, Volumes, Timings2035 AM without Bud Wilson 70: Gaston EB Ramp & Robinson 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 2 Lane GroupWBLWBRNBTNBRSBLSBT Lane Configurations Volume (vph)347327414363600322 Ideal Flow (vphpl)190019001900190019001900 Storage Length (ft)2500275375 Storage Lanes1111 Taper Length (ft)100100100100 Lane Util. Factor1.001.000.951.001.000.95 Frt0.8500.850 Flt Protected0.9500.950 Satd. Flow (prot)171915383438148216563438 Flt Permitted0.9500.950 Satd. Flow (perm)171915383438148216563438 Right Turn on RedNoNo Satd. Flow (RTOR) Link Speed (mph)354545 Link Distance (ft)4281449982 Travel Time (s)8.322.014.9 Peak Hour Factor0.900.900.900.900.900.90 Heavy Vehicles (%)5%5%5%9%9%5% Adj. Flow (vph)386363460403667358 Shared Lane Traffic (%) Lane Group Flow (vph)386363460403667358 Enter Blocked IntersectionNoNoNoNoNoNo Lane AlignmentLeftRightLeftRightLeftLeft Median Width(ft)121212 Link Offset(ft)000 Crosswalk Width(ft)161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.00 Turning Speed (mph)159915 Turn Typepm+ovpm+ovProt Protected Phases 812816 Permitted Phases82 Detector Phase 812816 Switch Phase Minimum Initial (s)7.07.012.07.07.012.0 Minimum Split (s)14.014.019.014.014.019.0 Total Split (s)27.043.020.027.043.063.0 Total Split (%)30.0%47.8%22.2%30.0%47.8%70.0% Maximum Green (s)20.036.013.020.036.056.0 Yellow Time (s)5.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.05.05.05.05.05.0 Lead/LagLeadLagLead Lead-Lag Optimize?YesYesYes Vehicle Extension (s)3.03.03.03.03.03.0 Recall ModeNoneNoneC-MinNoneNoneC-Min Act Effct Green (s)22.064.815.242.237.858.0 Lanes, Volumes, Timings2035 AM without Bud Wilson 70: Gaston EB Ramp & Robinson 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 3 Lane GroupWBLWBRNBTNBRSBLSBT Actuated g/C Ratio0.240.720.170.470.420.64 v/c Ratio0.920.330.790.580.960.16 Control Delay62.65.547.421.729.90.4 Queue Delay0.00.00.00.00.00.0 Total Delay62.65.547.421.729.90.4 LOSEADCCA Approach Delay35.035.419.6 Approach LOSCDB Queue Length 50th (ft)21463133162801 Queue Length 95th (ft)#38499#206256m#521m1 Internal Link Dist (ft)3481369902 Turn Bay Length (ft)250275375 Base Capacity (vph)42011115806956992216 Starvation Cap Reductn 000000 Spillback Cap Reductn 000000 Storage Cap Reductn 000000 Reduced v/c Ratio0.920.330.790.580.950.16 Intersection Summary Area Type:Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 37 (41%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.96 Intersection Signal Delay: 29.1Intersection LOS: C Intersection Capacity Utilization 82.5%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 70: Gaston EB Ramp & Robinson Lanes, Volumes, Timings2035 AM without Bud Wilson with Improvements 70: Gaston EB Ramp & Robinson 5/10/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 1 Lane GroupWBLWBRNBTNBRSBLSBT Lane Configurations Volume (vph)347327414363600322 Ideal Flow (vphpl)190019001900190019001900 Storage Length (ft)2500275375 Storage Lanes1111 Taper Length (ft)100100100100 Lane Util. Factor1.001.000.951.001.000.95 Frt0.8500.850 Flt Protected0.9500.950 Satd. Flow (prot)171915383438148216563438 Flt Permitted0.9500.950 Satd. Flow (perm)171915383438148216563438 Right Turn on RedNoNo Satd. Flow (RTOR) Link Speed (mph)354545 Link Distance (ft)4281449982 Travel Time (s)8.322.014.9 Peak Hour Factor0.900.900.900.900.900.90 Heavy Vehicles (%)5%5%5%9%9%5% Adj. Flow (vph)386363460403667358 Shared Lane Traffic (%) Lane Group Flow (vph)386363460403667358 Enter Blocked IntersectionNoNoNoNoNoNo Lane AlignmentLeftRightLeftRightLeftLeft Median Width(ft)121212 Link Offset(ft)000 Crosswalk Width(ft)161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.00 Turning Speed (mph)159915 Turn Typepm+ovpm+ovProt Protected Phases 812816 Permitted Phases82 Detector Phase 812816 Switch Phase Minimum Initial (s)7.07.012.07.07.012.0 Minimum Split (s)14.014.019.014.014.019.0 Total Split (s)27.043.020.027.043.063.0 Total Split (%)30.0%47.8%22.2%30.0%47.8%70.0% Maximum Green (s)20.036.013.020.036.056.0 Yellow Time (s)5.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.05.05.05.05.05.0 Lead/LagLeadLagLead Lead-Lag Optimize?YesYesYes Vehicle Extension (s)3.03.03.03.03.03.0 Recall ModeNoneNoneC-MinNoneNoneC-Min Act Effct Green (s)22.064.815.242.237.858.0 Lanes, Volumes, Timings2035 AM without Bud Wilson with Improvements 70: Gaston EB Ramp & Robinson 5/10/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 2 Lane GroupWBLWBRNBTNBRSBLSBT Actuated g/C Ratio0.240.720.170.470.420.64 v/c Ratio0.920.330.790.580.960.16 Control Delay62.65.547.421.737.01.8 Queue Delay0.00.00.00.00.00.0 Total Delay62.65.547.421.737.01.8 LOSEADCDA Approach Delay35.035.424.7 Approach LOSCDC Queue Length 50th (ft)214631331623330 Queue Length 95th (ft)#38499#206256#5660 Internal Link Dist (ft)3481369902 Turn Bay Length (ft)250275375 Base Capacity (vph)42011115806956992216 Starvation Cap Reductn 000000 Spillback Cap Reductn 000000 Storage Cap Reductn 000000 Reduced v/c Ratio0.920.330.790.580.950.16 Intersection Summary Area Type:Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 41 (46%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.96 Intersection Signal Delay: 31.1Intersection LOS: C Intersection Capacity Utilization 82.5%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 70: Gaston EB Ramp & Robinson Lanes, Volumes, Timings2035 AM without Bud Wilson 71: Gaston WB Ramp & Robinson 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 4 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)000235541632142000687283 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)00225030000100 Storage Lanes00201001 Taper Length (ft)100100100100100100100100 Lane Util. Factor1.001.001.000.971.001.001.000.951.001.000.951.00 Frt0.8520.850 Flt Protected0.9500.950 Satd. Flow (prot)000333515420162634380034381455 Flt Permitted0.9500.950 Satd. Flow (perm)000333515420162634380034381455 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)35354545 Link Distance (ft)136521949821113 Travel Time (s)26.642.714.916.9 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Heavy Vehicles (%)2%2%2%5%5%5%11%5%2%2%5%11% Adj. Flow (vph)000261646235746700763314 Shared Lane Traffic (%) Lane Group Flow (vph)000261468035746700763314 Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight Median Width(ft)24241212 Link Offset(ft)0000 Crosswalk Width(ft)16161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Turning Speed (mph)159159159159 Turn TypeProtProtPerm Protected Phases38526 Permitted Phases 6 Detector Phase385266 Switch Phase Minimum Initial (s)7.07.07.012.012.012.0 Minimum Split (s)14.014.014.019.019.019.0 Total Split (s)0.00.00.035.035.00.027.055.00.00.028.028.0 Total Split (%)0.0%0.0%0.0%38.9%38.9%0.0%30.0%61.1%0.0%0.0%31.1%31.1% Maximum Green (s)28.028.020.048.021.021.0 Yellow Time (s)5.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)2.02.02.05.05.02.05.05.02.02.05.05.0 Lead/LagLeadLagLag Lead-Lag Optimize?YesYesYes Vehicle Extension (s)3.03.03.03.03.03.0 Recall ModeNoneNoneNoneC-MinC-MinC-Min Act Effct Green (s)29.529.521.850.523.723.7 Lanes, Volumes, Timings2035 AM without Bud Wilson 71: Gaston WB Ramp & Robinson 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 5 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Actuated g/C Ratio0.330.330.240.560.260.26 v/c Ratio0.240.930.910.240.840.82 Control Delay22.656.346.04.441.750.6 Queue Delay0.00.00.00.00.00.0 Total Delay22.656.346.04.441.750.6 LOSCEDADD Approach Delay44.322.444.3 Approach LOSDCD Queue Length 50th (ft)542529827218170 Queue Length 95th (ft)84#439m#300m36#317#313 Internal Link Dist (ft)128521149021033 Turn Bay Length (ft)225300100 Base Capacity (vph)11125143971931907384 Starvation Cap Reductn000000 Spillback Cap Reductn000000 Storage Cap Reductn000000 Reduced v/c Ratio0.230.910.900.240.840.82 Intersection Summary Area Type:Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 72 (80%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.93 Intersection Signal Delay: 37.4Intersection LOS: D Intersection Capacity Utilization 79.5%ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 71: Gaston WB Ramp & Robinson Lanes, Volumes, Timings2035 AM without Bud Wilson with Improvements 71: Gaston WB Ramp & Robinson 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)000235541632142000687283 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0022525030000100 Storage Lanes00211001 Taper Length (ft)100100100100100100100100 Lane Util. Factor1.001.001.000.970.950.951.000.951.001.000.951.00 Frt0.8540.8500.850 Flt Protected0.9500.950 Satd. Flow (prot)000333514681461162634380034381455 Flt Permitted0.9500.950 Satd. Flow (perm)000333514681461162634380034381455 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)35354545 Link Distance (ft)136521949821113 Travel Time (s)26.642.714.916.9 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Heavy Vehicles (%)2%2%2%5%5%5%11%5%2%2%5%11% Adj. Flow (vph)000261646235746700763314 Shared Lane Traffic (%)49% Lane Group Flow (vph)00026123223635746700763314 Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight Median Width(ft)24241212 Link Offset(ft)0000 Crosswalk Width(ft)16161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Turning Speed (mph)159159159159 Turn TypeProtPermProtPerm Protected Phases38526 Permitted Phases86 Detector Phase 3885266 Switch Phase Minimum Initial (s)7.07.07.07.012.012.012.0 Minimum Split (s)14.014.014.014.019.019.019.0 Total Split (s)0.00.00.026.026.026.031.064.00.00.033.033.0 Total Split (%)0.0%0.0%0.0%28.9%28.9%28.9%34.4%71.1%0.0%0.0%36.7%36.7% Maximum Green (s)19.019.019.024.057.026.026.0 Yellow Time (s)5.05.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)2.02.02.05.05.05.05.05.02.02.05.05.0 Lead/LagLeadLagLag Lead-Lag Optimize?YesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneC-MinC-MinC-Min Act Effct Green (s)19.219.219.224.260.831.631.6 Lanes, Volumes, Timings2035 AM without Bud Wilson with Improvements 71: Gaston WB Ramp & Robinson 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Actuated g/C Ratio0.210.210.210.270.680.350.35 v/c Ratio0.370.740.760.820.200.630.62 Control Delay31.347.749.241.92.528.432.1 Queue Delay0.00.00.00.00.00.00.0 Total Delay31.347.749.241.92.528.432.1 LOSCDDDACC Approach Delay42.319.629.4 Approach LOSDBC Queue Length 50th (ft)631271299920200156 Queue Length 95th (ft)98#218#233m#174m26266252 Internal Link Dist (ft)128521149021033 Turn Bay Length (ft)225250300100 Base Capacity (vph)77834334147023211206510 Starvation Cap Reductn 0000000 Spillback Cap Reductn 0000000 Storage Cap Reductn 0000000 Reduced v/c Ratio0.340.680.690.760.200.630.62 Intersection Summary Area Type:Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 72 (80%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.82 Intersection Signal Delay: 29.9Intersection LOS: C Intersection Capacity Utilization 62.3%ICU Level of Service B Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 71: Gaston WB Ramp & Robinson Lanes, Volumes, Timings2035 PM without Bud Wilson 70: Gaston EB Ramp & Robinson 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 2 Lane GroupWBLWBRNBTNBRSBLSBT Lane Configurations Volume (vph)321283434235416456 Ideal Flow (vphpl)190019001900190019001900 Storage Length (ft)2500275375 Storage Lanes1111 Taper Length (ft)100100100100 Lane Util. Factor1.001.000.951.001.000.95 Frt0.8500.850 Flt Protected0.9500.950 Satd. Flow (prot)171915383438148216563438 Flt Permitted0.9500.950 Satd. Flow (perm)171915383438148216563438 Right Turn on RedNoNo Satd. Flow (RTOR) Link Speed (mph)354545 Link Distance (ft)4281449982 Travel Time (s)8.322.014.9 Peak Hour Factor0.900.900.900.900.900.90 Heavy Vehicles (%)5%5%5%9%9%5% Adj. Flow (vph)357314482261462507 Shared Lane Traffic (%) Lane Group Flow (vph)357314482261462507 Enter Blocked IntersectionNoNoNoNoNoNo Lane AlignmentLeftRightLeftRightLeftLeft Median Width(ft)121212 Link Offset(ft)000 Crosswalk Width(ft)161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.00 Turning Speed (mph)159915 Turn Typepm+ovpm+ovProt Protected Phases 812816 Permitted Phases82 Detector Phase 812816 Switch Phase Minimum Initial (s)7.07.012.07.07.012.0 Minimum Split (s)14.014.019.014.014.019.0 Total Split (s)33.042.025.033.042.067.0 Total Split (%)33.0%42.0%25.0%33.0%42.0%67.0% Maximum Green (s)26.035.018.026.035.060.0 Yellow Time (s)5.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.05.05.05.05.05.0 Lead/LagLeadLagLead Lead-Lag Optimize?YesYesYes Vehicle Extension (s)3.03.03.03.03.03.0 Recall ModeNoneNoneC-MinNoneNoneC-Min Act Effct Green (s)25.764.026.056.733.364.3 Lanes, Volumes, Timings2035 PM without Bud Wilson 70: Gaston EB Ramp & Robinson 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 3 Lane GroupWBLWBRNBTNBRSBLSBT Actuated g/C Ratio0.260.640.260.570.330.64 v/c Ratio0.810.320.540.310.840.23 Control Delay49.68.436.413.627.81.0 Queue Delay0.00.00.00.00.00.0 Total Delay49.68.436.413.627.81.0 LOSDADBCA Approach Delay30.328.413.8 Approach LOSCCB Queue Length 50th (ft)20770148872122 Queue Length 95th (ft)#3201032081452953 Internal Link Dist (ft)3481369902 Turn Bay Length (ft)250275375 Base Capacity (vph)48110418938736132211 Starvation Cap Reductn 000000 Spillback Cap Reductn 000000 Storage Cap Reductn 000000 Reduced v/c Ratio0.740.300.540.300.750.23 Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 60 (60%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 23.0Intersection LOS: C Intersection Capacity Utilization 70.8%ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 70: Gaston EB Ramp & Robinson Lanes, Volumes, Timings2035 PM without Bud Wilson with Improvements 70: Gaston EB Ramp & Robinson 5/10/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 1 Lane GroupWBLWBRNBTNBRSBLSBT Lane Configurations Volume (vph)321283434235416456 Ideal Flow (vphpl)190019001900190019001900 Storage Length (ft)2500275375 Storage Lanes1111 Taper Length (ft)100100100100 Lane Util. Factor1.001.000.951.001.000.95 Frt0.8500.850 Flt Protected0.9500.950 Satd. Flow (prot)171915383438148216563438 Flt Permitted0.9500.950 Satd. Flow (perm)171915383438148216563438 Right Turn on RedNoNo Satd. Flow (RTOR) Link Speed (mph)354545 Link Distance (ft)4281449982 Travel Time (s)8.322.014.9 Peak Hour Factor0.900.900.900.900.900.90 Heavy Vehicles (%)5%5%5%9%9%5% Adj. Flow (vph)357314482261462507 Shared Lane Traffic (%) Lane Group Flow (vph)357314482261462507 Enter Blocked IntersectionNoNoNoNoNoNo Lane AlignmentLeftRightLeftRightLeftLeft Median Width(ft)121212 Link Offset(ft)000 Crosswalk Width(ft)161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.00 Turning Speed (mph)159915 Turn Typepm+ovpm+ovProt Protected Phases 812816 Permitted Phases82 Detector Phase 812816 Switch Phase Minimum Initial (s)7.07.012.07.07.012.0 Minimum Split (s)14.014.019.014.014.019.0 Total Split (s)30.037.023.030.037.060.0 Total Split (%)33.3%41.1%25.6%33.3%41.1%66.7% Maximum Green (s)23.030.016.023.030.053.0 Yellow Time (s)5.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.05.05.05.05.05.0 Lead/LagLeadLagLead Lead-Lag Optimize?YesYesYes Vehicle Extension (s)3.03.03.03.03.03.0 Recall ModeNoneNoneC-MinNoneNoneC-Min Act Effct Green (s)23.258.022.050.329.756.8 Lanes, Volumes, Timings2035 PM without Bud Wilson with Improvements 70: Gaston EB Ramp & Robinson 5/10/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 2 Lane GroupWBLWBRNBTNBRSBLSBT Actuated g/C Ratio0.260.640.240.560.330.63 v/c Ratio0.800.320.570.320.840.23 Control Delay46.07.534.512.636.61.5 Queue Delay0.00.00.00.00.00.0 Total Delay46.07.534.512.636.61.5 LOSDACBDA Approach Delay28.026.818.3 Approach LOSCCB Queue Length 50th (ft)18560135792042 Queue Length 95th (ft)#31197189130#3391 Internal Link Dist (ft)3481369902 Turn Bay Length (ft)250275375 Base Capacity (vph)47810308428575892168 Starvation Cap Reductn 000000 Spillback Cap Reductn 000000 Storage Cap Reductn 000000 Reduced v/c Ratio0.750.300.570.300.780.23 Intersection Summary Area Type:Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 56 (62%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 23.7Intersection LOS: C Intersection Capacity Utilization 70.8%ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 70: Gaston EB Ramp & Robinson Lanes, Volumes, Timings2035 PM without Bud Wilson 71: Gaston WB Ramp & Robinson 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 4 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)000363560034737000509327 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)00225030000100 Storage Lanes00201001 Taper Length (ft)100100100100100100100100 Lane Util. Factor1.001.001.000.971.001.001.000.951.001.000.951.00 Frt0.8510.850 Flt Protected0.9500.950 Satd. Flow (prot)000333515400162634380034381455 Flt Permitted0.9500.950 Satd. Flow (perm)000333515400162634380034381455 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)35354545 Link Distance (ft)136521949821113 Travel Time (s)26.642.714.916.9 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Heavy Vehicles (%)2%2%2%5%5%5%11%5%2%2%5%11% Adj. Flow (vph)000403666738641100566363 Shared Lane Traffic (%) Lane Group Flow (vph)000403673038641100566363 Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight Median Width(ft)24241212 Link Offset(ft)0000 Crosswalk Width(ft)16161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Turning Speed (mph)159159159159 Turn TypeProtProtPerm Protected Phases38526 Permitted Phases 6 Detector Phase385266 Switch Phase Minimum Initial (s)7.07.07.012.012.012.0 Minimum Split (s)14.014.014.019.019.019.0 Total Split (s)0.00.00.045.045.00.027.055.00.00.028.028.0 Total Split (%)0.0%0.0%0.0%45.0%45.0%0.0%27.0%55.0%0.0%0.0%28.0%28.0% Maximum Green (s)38.038.020.048.021.021.0 Yellow Time (s)5.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)2.02.02.05.05.02.05.05.02.02.05.05.0 Lead/LagLeadLagLag Lead-Lag Optimize?YesYesYes Vehicle Extension (s)3.03.03.03.03.03.0 Recall ModeNoneNoneNoneC-MinC-MinC-Min Act Effct Green (s)40.040.022.050.023.023.0 Lanes, Volumes, Timings2035 PM without Bud Wilson 71: Gaston WB Ramp & Robinson 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 5 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Actuated g/C Ratio0.400.400.220.500.230.23 v/c Ratio0.301.091.080.240.721.08 Control Delay21.394.698.27.241.4111.5 Queue Delay0.00.00.00.00.00.0 Total Delay21.394.698.27.241.4111.5 LOSCFFADF Approach Delay67.151.368.8 Approach LOSEDE Queue Length 50th (ft)88~487~28227175~261 Queue Length 95th (ft)124#704#44637236#439 Internal Link Dist (ft)128521149021033 Turn Bay Length (ft)225300100 Base Capacity (vph)13346163581719791335 Starvation Cap Reductn000000 Spillback Cap Reductn000000 Storage Cap Reductn000000 Reduced v/c Ratio0.301.091.080.240.721.08 Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 120 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.09 Intersection Signal Delay: 63.2Intersection LOS: E Intersection Capacity Utilization 93.5%ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 71: Gaston WB Ramp & Robinson Lanes, Volumes, Timings2035 PM without Bud Wilson with Improvements 71: Gaston WB Ramp & Robinson 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)000363560034737000509327 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)0022525030000100 Storage Lanes00211001 Taper Length (ft)100100100100100100100100 Lane Util. Factor1.001.001.000.970.950.951.000.951.001.000.951.00 Frt0.8530.8500.850 Flt Protected0.9500.950 Satd. Flow (prot)000333514661461162634380034381455 Flt Permitted0.9500.950 Satd. Flow (perm)000333514661461162634380034381455 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)35354545 Link Distance (ft)136521949821113 Travel Time (s)26.642.714.916.9 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Heavy Vehicles (%)2%2%2%5%5%5%11%5%2%2%5%11% Adj. Flow (vph)000403666738641100566363 Shared Lane Traffic (%)50% Lane Group Flow (vph)00040334033338641100566363 Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight Median Width(ft)24241212 Link Offset(ft)0000 Crosswalk Width(ft)16161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Turning Speed (mph)159159159159 Turn TypeProtPermProtPerm Protected Phases38526 Permitted Phases86 Detector Phase 3885266 Switch Phase Minimum Initial (s)7.07.07.07.012.012.012.0 Minimum Split (s)14.014.014.014.019.019.019.0 Total Split (s)0.00.00.029.029.029.029.061.00.00.032.032.0 Total Split (%)0.0%0.0%0.0%32.2%32.2%32.2%32.2%67.8%0.0%0.0%35.6%35.6% Maximum Green (s)22.022.022.022.054.025.025.0 Yellow Time (s)5.05.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)2.02.02.05.05.05.05.05.02.02.05.05.0 Lead/LagLeadLagLag Lead-Lag Optimize?YesYesYes Vehicle Extension (s)3.03.03.03.03.03.03.0 Recall ModeNoneNoneNoneNoneC-MinC-MinC-Min Act Effct Green (s)23.423.423.423.656.628.028.0 Lanes, Volumes, Timings2035 PM without Bud Wilson with Improvements 71: Gaston WB Ramp & Robinson 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Actuated g/C Ratio0.260.260.260.260.630.310.31 v/c Ratio0.460.890.880.900.190.530.80 Control Delay29.959.256.948.12.828.144.4 Queue Delay0.00.00.00.00.00.00.0 Total Delay29.959.256.948.12.828.144.4 LOSCEEDACD Approach Delay47.524.834.5 Approach LOSDCC Queue Length 50th (ft)9819418910117141191 Queue Length 95th (ft)141#356#347#34724194#343 Internal Link Dist (ft)128521149021033 Turn Bay Length (ft)225250300100 Base Capacity (vph)88939139043421621069453 Starvation Cap Reductn 0000000 Spillback Cap Reductn 0000000 Storage Cap Reductn 0000000 Reduced v/c Ratio0.450.870.850.890.190.530.80 Intersection Summary Area Type:Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 88 (98%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.90 Intersection Signal Delay: 36.7Intersection LOS: D Intersection Capacity Utilization 68.8%ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 71: Gaston WB Ramp & Robinson Lanes, Volumes, Timings2035 AM without Bud Wilson 90: Gaston EB Ramp & NC 274 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)374550 00004513702396650 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)200000200100300550 Storage Lanes10001100 Taper Length (ft)1001001001001001000100 Lane Util. Factor1.001.001.001.001.001.001.000.911.000.970.951.00 Frt0.8650.850 Flt Protected0.9500.950 Satd. Flow (prot)17191570 0000049401583343334380 Flt Permitted0.9500.950 Satd. Flow (perm)17191570 0000049401583343334380 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)35454545 Link Distance (ft)888325823342 Travel Time (s)17.34.912.55.2 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Heavy Vehicles (%)5%2%5%2%2%2%10%5%2%2%5%10% Adj. Flow (vph)416656 00005014112667390 Shared Lane Traffic (%) Lane Group Flow (vph)41662 000005014112667390 Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight Median Width(ft)12122424 Link Offset(ft)0000 Crosswalk Width(ft)16161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Turning Speed (mph)159159159159 Turn TypeSplitPermProt Protected Phases44216 Permitted Phases 2 Detector Phase44 2216 Switch Phase Minimum Initial (s)7.07.012.012.07.012.0 Minimum Split (s)14.014.019.019.014.019.0 Total Split (s)35.035.00.00.00.00.00.040.040.015.055.00.0 Total Split (%)38.9%38.9%0.0%0.0%0.0%0.0%0.0%44.4%44.4%16.7%61.1%0.0% Maximum Green (s)28.028.033.033.08.048.0 Yellow Time (s)5.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.05.02.02.02.02.02.05.05.05.05.02.0 Lead/LagLeadLeadLag Lead-Lag Optimize?YesYesYes Vehicle Extension (s)3.03.03.03.03.03.0 Recall ModeNoneNoneC-MinC-MinNoneC-Min Act Effct Green (s)27.027.036.536.511.553.0 Lanes, Volumes, Timings2035 AM without Bud Wilson 90: Gaston EB Ramp & NC 274 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Actuated g/C Ratio0.300.300.410.410.130.59 v/c Ratio0.810.130.250.640.610.36 Control Delay41.922.418.727.942.78.8 Queue Delay0.00.00.00.00.00.2 Total Delay41.922.418.727.942.79.0 LOSDCBCDA Approach Delay39.322.817.9 Approach LOSDCB Queue Length 50th (ft)210257219971137 Queue Length 95th (ft)3165395295#12779 Internal Link Dist (ft)808245743262 Turn Bay Length (ft)200100300 Base Capacity (vph)57352320316514392025 Starvation Cap Reductn00000558 Spillback Cap Reductn00 0000 Storage Cap Reductn00 0000 Reduced v/c Ratio0.730.120.250.630.610.50 Intersection Summary Area Type:Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 65 (72%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 24.1Intersection LOS: C Intersection Capacity Utilization 68.1%ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 90: Gaston EB Ramp & NC 274 Lanes, Volumes, Timings2035 AM without Bud Wilson 91: Gaston WB Ramp & NC 274 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 3 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)00023751434977600667390 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)00200000200100 Storage Lanes00100021 Taper Length (ft)1001001001000100100100 Lane Util. Factor1.001.001.001.001.001.001.000.951.001.000.861.00 Frt0.8550.850 Flt Protected0.9500.950 Satd. Flow (prot)000177015930164134380062251468 Flt Permitted0.9500.950 Satd. Flow (perm)000177015930164134380062251468 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)35454545 Link Distance (ft)944651342719 Travel Time (s)18.49.95.210.9 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Heavy Vehicles (%)5%2%5%2%2%2%10%5%2%2%5%10% Adj. Flow (vph)00026361595486200741433 Shared Lane Traffic (%) Lane Group Flow (vph)00026316505486200741433 Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight Median Width(ft)12121212 Link Offset(ft)0000 Crosswalk Width(ft)16161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Turning Speed (mph)159159159159 Turn TypeProtProtPerm Protected Phases38526 Permitted Phases 6 Detector Phase385266 Switch Phase Minimum Initial (s)7.07.07.012.012.012.0 Minimum Split (s)14.019.014.019.019.019.0 Total Split (s)0.00.00.027.027.00.014.063.00.00.049.049.0 Total Split (%)0.0%0.0%0.0%30.0%30.0%0.0%15.6%70.0%0.0%0.0%54.4%54.4% Maximum Green (s)20.020.07.056.042.042.0 Yellow Time (s)5.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)2.02.02.05.05.02.05.05.02.02.05.05.0 Lead/LagLeadLagLag Lead-Lag Optimize?YesYesYes Vehicle Extension (s)3.03.03.03.03.03.0 Recall ModeNoneNoneNoneC-MinC-MinC-Min Act Effct Green (s)19.419.49.560.648.948.9 Lanes, Volumes, Timings2035 AM without Bud Wilson 91: Gaston WB Ramp & NC 274 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 4 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Actuated g/C Ratio0.220.220.110.670.540.54 v/c Ratio0.690.480.310.370.220.54 Control Delay41.935.146.92.812.118.7 Queue Delay0.00.00.00.20.00.0 Total Delay41.935.146.92.912.118.7 LOSDDDABB Approach Delay39.35.514.5 Approach LOSDAB Queue Length 50th (ft)1378125867170 Queue Length 95th (ft)215139m527887270 Internal Link Dist (ft)864571262639 Turn Bay Length (ft)200100 Base Capacity (vph)43739317323213410804 Starvation Cap Reductn00056400 Spillback Cap Reductn000000 Storage Cap Reductn000000 Reduced v/c Ratio0.600.420.310.490.220.54 Intersection Summary Area Type:Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 64 (71%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.69 Intersection Signal Delay: 15.5Intersection LOS: B Intersection Capacity Utilization 68.1%ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 91: Gaston WB Ramp & NC 274 Lanes, Volumes, Timings2035 PM without Bud Wilson 90: Gaston EB Ramp & NC 274 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)390549 00004782371437720 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)200000200100300550 Storage Lanes10001100 Taper Length (ft)1001001001001001000100 Lane Util. Factor1.001.001.001.001.001.001.000.911.000.970.951.00 Frt0.8650.850 Flt Protected0.9500.950 Satd. Flow (prot)17191570 0000049401583343334380 Flt Permitted0.9500.950 Satd. Flow (perm)17191570 0000049401583343334380 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)35454545 Link Distance (ft)888325823342 Travel Time (s)17.34.912.55.2 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Heavy Vehicles (%)5%2%5%2%2%2%10%5%2%2%5%10% Adj. Flow (vph)433654 00005312631598580 Shared Lane Traffic (%) Lane Group Flow (vph)43360 000005312631598580 Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight Median Width(ft)12122424 Link Offset(ft)0000 Crosswalk Width(ft)16161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Turning Speed (mph)159159159159 Turn TypePermPermProt Protected Phases4216 Permitted Phases42 Detector Phase44 2216 Switch Phase Minimum Initial (s)7.07.012.012.07.012.0 Minimum Split (s)14.014.019.019.014.019.0 Total Split (s)41.041.00.00.00.00.00.035.035.014.049.00.0 Total Split (%)45.6%45.6%0.0%0.0%0.0%0.0%0.0%38.9%38.9%15.6%54.4%0.0% Maximum Green (s)34.034.028.028.07.042.0 Yellow Time (s)5.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.05.02.02.02.02.02.05.05.05.05.02.0 Lead/LagLeadLeadLag Lead-Lag Optimize?YesYesYes Vehicle Extension (s)3.03.03.03.03.03.0 Recall ModeNoneNoneC-MinC-MinNoneC-Min Act Effct Green (s)29.629.634.934.910.550.4 Lanes, Volumes, Timings2035 PM without Bud Wilson 90: Gaston EB Ramp & NC 274 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Actuated g/C Ratio0.330.330.390.390.120.56 v/c Ratio0.770.120.280.430.400.45 Control Delay36.019.520.624.738.313.0 Queue Delay0.00.00.00.00.00.5 Total Delay36.019.520.624.738.313.5 LOSDBCCDB Approach Delay34.021.917.3 Approach LOSCCB Queue Length 50th (ft)217237611139167 Queue Length 95th (ft)29546110194m68249 Internal Link Dist (ft)808245743262 Turn Bay Length (ft)200100300 Base Capacity (vph)68862819336193991925 Starvation Cap Reductn00000575 Spillback Cap Reductn00 0000 Storage Cap Reductn00 0000 Reduced v/c Ratio0.630.100.270.420.400.64 Intersection Summary Area Type:Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 16 (18%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.77 Intersection Signal Delay: 22.5Intersection LOS: C Intersection Capacity Utilization 68.1%ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 90: Gaston EB Ramp & NC 274 Lanes, Volumes, Timings2035 PM without Bud Wilson 91: Gaston WB Ramp & NC 274 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 3 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)00037052395081800545374 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)00200000200100 Storage Lanes00100021 Taper Length (ft)1001001001000100100100 Lane Util. Factor1.001.001.001.001.001.001.000.951.001.000.861.00 Frt0.8530.850 Flt Protected0.9500.950 Satd. Flow (prot)000177015890164134380062251468 Flt Permitted0.9500.950 Satd. Flow (perm)000177015890164134380062251468 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)35454545 Link Distance (ft)944651342727 Travel Time (s)18.49.95.211.0 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Heavy Vehicles (%)5%2%5%2%2%2%10%5%2%2%5%10% Adj. Flow (vph)00041162665690900606416 Shared Lane Traffic (%) Lane Group Flow (vph)00041127205690900606416 Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight Median Width(ft)12121212 Link Offset(ft)0000 Crosswalk Width(ft)16161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Turning Speed (mph)159159159159 Turn TypeProtProtPerm Protected Phases38526 Permitted Phases 6 Detector Phase385266 Switch Phase Minimum Initial (s)7.07.07.012.012.012.0 Minimum Split (s)14.019.014.019.019.019.0 Total Split (s)0.00.00.034.034.00.014.056.00.00.042.042.0 Total Split (%)0.0%0.0%0.0%37.8%37.8%0.0%15.6%62.2%0.0%0.0%46.7%46.7% Maximum Green (s)27.027.07.049.035.035.0 Yellow Time (s)5.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)2.02.02.05.05.02.05.05.02.02.05.05.0 Lead/LagLeadLagLag Lead-Lag Optimize?YesYesYes Vehicle Extension (s)3.03.03.03.03.03.0 Recall ModeNoneNoneNoneC-MinC-MinC-Min Act Effct Green (s)26.126.19.353.942.442.4 Lanes, Volumes, Timings2035 PM without Bud Wilson 91: Gaston WB Ramp & NC 274 3/9/2010 Gaston E-W Connector Synchro 7 - Report HNTB North Carolina, PC Page 4 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Actuated g/C Ratio0.290.290.100.600.470.47 v/c Ratio0.800.590.330.440.210.60 Control Delay41.932.649.14.315.624.5 Queue Delay0.00.00.00.30.00.0 Total Delay41.932.649.14.515.624.5 LOSDCDABC Approach Delay38.27.119.2 Approach LOSDAB Queue Length 50th (ft)209128253164191 Queue Length 95th (ft)313204m574284300 Internal Link Dist (ft)864571262647 Turn Bay Length (ft)200100 Base Capacity (vph)57051217020592937693 Starvation Cap Reductn00047900 Spillback Cap Reductn0000700 Storage Cap Reductn000000 Reduced v/c Ratio0.720.530.330.580.210.60 Intersection Summary Area Type:Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 88 (98%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.80 Intersection Signal Delay: 19.7Intersection LOS: B Intersection Capacity Utilization 68.1%ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 91: Gaston WB Ramp & NC 274 Lanes, Volumes, Timings2035 AM without Bud Wilson - NC 273 Diamond 110: Gaston EB Ramp & NC 273 3/9/2010 Gaston E-W Connector 2/23/2010 2035 AM without Bud Wilson - NC 273 DiamondSynchro 7 - Report HNTB North Carolina, PC Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)2745102 000082451990310320 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)40000003504000 Storage Lanes10000120 Taper Length (ft)100100100100100100100100 Lane Util. Factor1.001.001.001.001.001.001.000.951.000.970.951.00 Frt0.8580.850 Flt Protected0.9500.950 Satd. Flow (prot)17701553 0000034381495324234380 Flt Permitted0.9500.950 Satd. Flow (perm)17701553 0000034381495324234380 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)35354545 Link Distance (ft)1907147810821189 Travel Time (s)37.128.816.418.0 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Heavy Vehicles (%)2%5%5%2%2%2%2%5%8%8%5%0% Adj. Flow (vph)3046113 0000916577100311470 Shared Lane Traffic (%) Lane Group Flow (vph)304119 00000916577100311470 Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight Median Width(ft)12122424 Link Offset(ft)0000 Crosswalk Width(ft)16161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Turning Speed (mph)159159159159 Turn TypePermFreeProt Protected Phases4216 Permitted Phases4Free Detector Phase44216 Switch Phase Minimum Initial (s)7.07.07.07.07.0 Minimum Split (s)19.019.019.014.019.0 Total Split (s)25.025.00.00.00.00.00.036.00.039.075.00.0 Total Split (%)25.0%25.0%0.0%0.0%0.0%0.0%0.0%36.0%0.0%39.0%75.0%0.0% Maximum Green (s)18.018.029.032.068.0 Yellow Time (s)5.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.00.0-2.00.0-2.00.0-2.0-2.00.0 Total Lost Time (s)5.05.02.02.04.02.04.05.04.05.05.04.0 Lead/LagLeadLag Lead-Lag Optimize?YesYes Vehicle Extension (s)3.03.03.03.03.0 Recall ModeNoneNoneC-MinNoneC-Min Act Effct Green (s)19.719.731.6100.033.770.3 Lanes, Volumes, Timings2035 AM without Bud Wilson - NC 273 Diamond 110: Gaston EB Ramp & NC 273 3/9/2010 Gaston E-W Connector 2/23/2010 2035 AM without Bud Wilson - NC 273 DiamondSynchro 7 - Report HNTB North Carolina, PC Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Actuated g/C Ratio0.200.200.321.000.340.70 v/c Ratio0.870.390.840.390.920.47 Control Delay64.739.140.70.816.42.1 Queue Delay0.00.00.00.00.00.0 Total Delay64.739.140.70.816.42.1 LOSEDDABA Approach Delay57.525.38.8 Approach LOSECA Queue Length 50th (ft)18966287023961 Queue Length 95th (ft)#335121#3940m238m64 Internal Link Dist (ft)1827139810021109 Turn Bay Length (ft)400350400 Base Capacity (vph)3543111086149511022417 Starvation Cap Reductn00 0000 Spillback Cap Reductn00 0000 Storage Cap Reductn00 0000 Reduced v/c Ratio0.860.380.840.390.910.47 Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 2 (2%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.92 Intersection Signal Delay: 19.9Intersection LOS: B Intersection Capacity Utilization 87.4%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 110: Gaston EB Ramp & NC 273 Lanes, Volumes, Timings2035 AM without Bud Wilson - NC 273 Diamond 111: Gaston WB Ramp & NC 273 3/9/2010 Gaston E-W Connector 2/23/2010 2035 AM without Bud Wilson - NC 273 DiamondSynchro 7 - Report HNTB North Carolina, PC Page 3 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)0003305589103995001605272 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)00325020000200 Storage Lanes00211001 Taper Length (ft)100100100100100100100100 Lane Util. Factor1.001.001.001.001.001.001.000.951.001.000.951.00 Frt0.8500.850 Flt Protected0.9530.950 Satd. Flow (prot)000017241538167134380034381495 Flt Permitted0.9530.950 Satd. Flow (perm)000017241538167134380034381495 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)35354545 Link Distance (ft)261331421189755 Travel Time (s)50.961.218.011.4 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Heavy Vehicles (%)2%2%2%5%5%5%8%5%0%0%5%8% Adj. Flow (vph)00036766541141106001783302 Shared Lane Traffic (%) Lane Group Flow (vph)00003736541141106001783302 Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight Median Width(ft)002424 Link Offset(ft)0000 Crosswalk Width(ft)16161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Turning Speed (mph)159159159159 Turn TypePermFreeProtPerm Protected Phases8526 Permitted Phases8Free6 Detector Phase885266 Switch Phase Minimum Initial (s)7.07.07.07.07.07.0 Minimum Split (s)19.019.014.019.019.019.0 Total Split (s)0.00.00.027.027.00.014.073.00.00.059.059.0 Total Split (%)0.0%0.0%0.0%27.0%27.0%0.0%14.0%73.0%0.0%0.0%59.0%59.0% Maximum Green (s)20.020.07.066.052.052.0 Yellow Time (s)5.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.0 Lost Time Adjust (s)0.00.00.0-2.0-2.00.0-2.0-2.00.00.0-2.0-2.0 Total Lost Time (s)4.04.04.05.05.04.05.05.04.04.05.05.0 Lead/LagLagLeadLead Lead-Lag Optimize?YesYesYes Vehicle Extension (s)3.03.03.03.03.03.0 Recall ModeNoneNoneNoneC-MinC-MinC-Min Act Effct Green (s)22.0100.09.068.054.054.0 Lanes, Volumes, Timings2035 AM without Bud Wilson - NC 273 Diamond 111: Gaston WB Ramp & NC 273 3/9/2010 Gaston E-W Connector 2/23/2010 2035 AM without Bud Wilson - NC 273 DiamondSynchro 7 - Report HNTB North Carolina, PC Page 4 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Actuated g/C Ratio0.221.000.090.680.540.54 v/c Ratio0.980.430.760.470.960.37 Control Delay82.80.948.31.136.215.0 Queue Delay0.00.00.00.00.00.0 Total Delay82.80.948.31.136.215.0 LOSFADADB Approach Delay30.65.533.1 Approach LOSCAC Queue Length 50th (ft)2380790542105 Queue Length 95th (ft)#4250m94m0#738166 Internal Link Dist (ft)253330621109675 Turn Bay Length (ft)200200 Base Capacity (vph)379153815023381857807 Starvation Cap Reductn 000000 Spillback Cap Reductn 000000 Storage Cap Reductn 000000 Reduced v/c Ratio0.980.430.760.470.960.37 Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.98 Intersection Signal Delay: 24.8Intersection LOS: C Intersection Capacity Utilization 87.4%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 111: Gaston WB Ramp & NC 273 Lanes, Volumes, Timings2035 PM without Bud Wilson - NC 273 Diamond 110: Gaston EB Ramp & NC 273 3/9/2010 Gaston E-W Connector 2/23/2010 2035 PM without Bud Wilson - NC 273 DiamondSynchro 7 - Report HNTB North Carolina, PC Page 1 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)2725103 000080433058912400 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)40000003504000 Storage Lanes10000120 Taper Length (ft)100100100100100100100100 Lane Util. Factor1.001.001.001.001.001.001.000.951.000.970.951.00 Frt0.8580.850 Flt Protected0.9500.950 Satd. Flow (prot)17701553 0000034381495324234380 Flt Permitted0.9500.950 Satd. Flow (perm)17701553 0000034381495324234380 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)35354545 Link Distance (ft)1907147810821189 Travel Time (s)37.128.816.418.0 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Heavy Vehicles (%)2%5%5%2%2%2%2%5%8%8%5%0% Adj. Flow (vph)3026114 000089336765413780 Shared Lane Traffic (%) Lane Group Flow (vph)302120 0000089336765413780 Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight Median Width(ft)12122424 Link Offset(ft)0000 Crosswalk Width(ft)16161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Turning Speed (mph)159159159159 Turn TypePermFreeProt Protected Phases4216 Permitted Phases4Free Detector Phase44216 Switch Phase Minimum Initial (s)7.07.07.07.07.0 Minimum Split (s)19.019.019.014.019.0 Total Split (s)30.030.00.00.00.00.00.039.00.031.070.00.0 Total Split (%)30.0%30.0%0.0%0.0%0.0%0.0%0.0%39.0%0.0%31.0%70.0%0.0% Maximum Green (s)23.023.032.024.063.0 Yellow Time (s)5.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.00.0-2.00.0-2.00.0-2.0-2.00.0 Total Lost Time (s)5.05.02.02.04.02.04.05.04.05.05.04.0 Lead/LagLeadLag Lead-Lag Optimize?YesYes Vehicle Extension (s)3.03.03.03.03.0 Recall ModeNoneNoneC-MinNoneC-Min Act Effct Green (s)22.422.437.8100.024.867.6 Lanes, Volumes, Timings2035 PM without Bud Wilson - NC 273 Diamond 110: Gaston EB Ramp & NC 273 3/9/2010 Gaston E-W Connector 2/23/2010 2035 PM without Bud Wilson - NC 273 DiamondSynchro 7 - Report HNTB North Carolina, PC Page 2 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Actuated g/C Ratio0.220.220.381.000.250.68 v/c Ratio0.760.340.690.250.810.59 Control Delay49.134.830.50.411.73.2 Queue Delay0.00.00.00.00.00.0 Total Delay49.134.830.50.411.73.2 LOSDCCABA Approach Delay45.121.86.0 Approach LOSDCA Queue Length 50th (ft)177632610113118 Queue Length 95th (ft)2701133400m115m130 Internal Link Dist (ft)1827139810021109 Turn Bay Length (ft)400350400 Base Capacity (vph)443388129814958442324 Starvation Cap Reductn00 0000 Spillback Cap Reductn00 0000 Storage Cap Reductn00 0000 Reduced v/c Ratio0.680.310.690.250.770.59 Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 96 (96%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 15.8Intersection LOS: B Intersection Capacity Utilization 89.7%ICU Level of Service E Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 110: Gaston EB Ramp & NC 273 Lanes, Volumes, Timings2035 PM without Bud Wilson - NC 273 Diamond 111: Gaston WB Ramp & NC 273 3/9/2010 Gaston E-W Connector 2/23/2010 2035 PM without Bud Wilson - NC 273 DiamondSynchro 7 - Report HNTB North Carolina, PC Page 3 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Volume (vph)0005195903102974001310274 Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Storage Length (ft)00325020000200 Storage Lanes00211001 Taper Length (ft)100100100100100100100100 Lane Util. Factor1.001.001.001.001.001.001.000.951.001.000.951.00 Frt0.8500.850 Flt Protected0.9530.950 Satd. Flow (prot)000017241538167134380034381495 Flt Permitted0.9530.950 Satd. Flow (perm)000017241538167134380034381495 Right Turn on RedNoNoNoNo Satd. Flow (RTOR) Link Speed (mph)35354545 Link Distance (ft)261331421189755 Travel Time (s)50.961.218.011.4 Peak Hour Factor0.900.900.900.900.900.900.900.900.900.900.900.90 Heavy Vehicles (%)2%2%2%5%5%5%8%5%0%0%5%8% Adj. Flow (vph)000577610031131082001456304 Shared Lane Traffic (%) Lane Group Flow (vph)000058310031131082001456304 Enter Blocked IntersectionNoNoNoNoNoNoNoNoNoNoNoNo Lane AlignmentLeftLeftRightLeftLeftRightLeftLeftRightLeftLeftRight Median Width(ft)002424 Link Offset(ft)0000 Crosswalk Width(ft)16161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.001.001.001.001.001.001.00 Turning Speed (mph)159159159159 Turn TypePermFreeProtPerm Protected Phases8526 Permitted Phases8Free6 Detector Phase885266 Switch Phase Minimum Initial (s)7.07.07.07.07.07.0 Minimum Split (s)19.019.014.019.019.019.0 Total Split (s)0.00.00.038.038.00.014.062.00.00.048.048.0 Total Split (%)0.0%0.0%0.0%38.0%38.0%0.0%14.0%62.0%0.0%0.0%48.0%48.0% Maximum Green (s)31.031.07.055.041.041.0 Yellow Time (s)5.05.05.05.05.05.0 All-Red Time (s)2.02.02.02.02.02.0 Lost Time Adjust (s)0.00.00.0-2.0-2.00.0-2.0-2.00.00.0-2.0-2.0 Total Lost Time (s)4.04.04.05.05.04.05.05.04.04.05.05.0 Lead/LagLagLeadLead Lead-Lag Optimize?YesYesYes Vehicle Extension (s)3.03.03.03.03.03.0 Recall ModeNoneNoneNoneC-MinC-MinC-Min Act Effct Green (s)33.0100.09.057.043.043.0 Lanes, Volumes, Timings2035 PM without Bud Wilson - NC 273 Diamond 111: Gaston WB Ramp & NC 273 3/9/2010 Gaston E-W Connector 2/23/2010 2035 PM without Bud Wilson - NC 273 DiamondSynchro 7 - Report HNTB North Carolina, PC Page 4 Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Actuated g/C Ratio0.331.000.090.570.430.43 v/c Ratio1.020.650.750.550.990.47 Control Delay78.72.250.96.849.223.5 Queue Delay0.00.00.00.00.00.0 Total Delay78.72.250.96.849.223.5 LOSEADADC Approach Delay30.310.944.7 Approach LOSCBD Queue Length 50th (ft)~398078103470135 Queue Length 95th (ft)#6060m#12389#639212 Internal Link Dist (ft)253330621109675 Turn Bay Length (ft)200200 Base Capacity (vph)569153815019601478643 Starvation Cap Reductn 000000 Spillback Cap Reductn 000000 Storage Cap Reductn 000000 Reduced v/c Ratio1.020.650.750.550.990.47 Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.02 Intersection Signal Delay: 30.8Intersection LOS: C Intersection Capacity Utilization 89.7%ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 111: Gaston WB Ramp & NC 273 Lanes, Volumes, Timings2035 AM Peak 139: Gaston EW & I-485 SB Ramp 3/9/2010 Gaston E-W Connector 11/17/2009 2035 AM PeakSynchro 7 - Report HNTB North Carolina, PC Page 1 Lane GroupEBTEBRWBLWBTNBLNBR Lane Configurations Volume (vph)724042538500 Ideal Flow (vphpl)190019001900190019001900 Storage Length (ft)025000 Storage Lanes0200 Taper Length (ft)100100100100 Lane Util. Factor0.951.000.970.951.001.00 Frt Flt Protected0.950 Satd. Flow (prot)353903433353900 Flt Permitted0.950 Satd. Flow (perm)353903433353900 Right Turn on RedNoNo Satd. Flow (RTOR) Link Speed (mph)555545 Link Distance (ft)207613781002 Travel Time (s)25.717.115.2 Peak Hour Factor0.900.900.900.900.900.90 Adj. Flow (vph)804047242800 Shared Lane Traffic (%) Lane Group Flow (vph)804047242800 Enter Blocked IntersectionNoNoNoNoNoNo Lane AlignmentLeftRightLeftLeftLeftRight Median Width(ft)24240 Link Offset(ft)000 Crosswalk Width(ft)161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.00 Turning Speed (mph)915159 Turn TypeProt Protected Phases438 Permitted Phases Detector Phase438 Switch Phase Minimum Initial (s)7.07.07.0 Minimum Split (s)19.014.019.0 Total Split (s)60.00.030.090.00.00.0 Total Split (%)66.7%0.0%33.3%100.0%0.0%0.0% Maximum Green (s)53.023.083.0 Yellow Time (s)5.05.05.0 All-Red Time (s)2.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.02.05.05.02.02.0 Lead/LagLagLead Lead-Lag Optimize?YesYes Vehicle Extension (s)3.03.03.0 Recall ModeNoneNoneNone Act Effct Green (s)18.813.342.3 Actuated g/C Ratio0.440.311.00 Lanes, Volumes, Timings2035 AM Peak 139: Gaston EW & I-485 SB Ramp 3/9/2010 Gaston E-W Connector 11/17/2009 2035 AM PeakSynchro 7 - Report HNTB North Carolina, PC Page 2 Lane GroupEBTEBRWBLWBTNBLNBR v/c Ratio0.510.440.12 Control Delay9.913.80.1 Queue Delay0.00.00.0 Total Delay9.913.80.1 LOSABA Approach Delay9.97.3 Approach LOSAA Queue Length 50th (ft)64430 Queue Length 95th (ft)117930 Internal Link Dist (ft)19961298922 Turn Bay Length (ft)250 Base Capacity (vph)353920803539 Starvation Cap Reductn000 Spillback Cap Reductn000 Storage Cap Reductn000 Reduced v/c Ratio0.230.230.12 Intersection Summary Area Type:Other Cycle Length: 90 Actuated Cycle Length: 42.3 Natural Cycle: 40 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.51 Intersection Signal Delay: 8.5Intersection LOS: A Intersection Capacity Utilization 43.2%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 139: Gaston EW & I-485 SB Ramp Lanes, Volumes, Timings2035 PM Peak 139: Gaston EW & I-485 SB Ramp 3/9/2010 Gaston E-W Connector 11/17/2009 2035 PM PeakSynchro 7 - Report HNTB North Carolina, PC Page 1 Lane GroupEBTEBRWBLWBTNBLNBR Lane Configurations Volume (vph)385064772400 Ideal Flow (vphpl)190019001900190019001900 Storage Length (ft)025000 Storage Lanes0200 Taper Length (ft)100100100100 Lane Util. Factor0.951.000.970.951.001.00 Frt Flt Protected0.950 Satd. Flow (prot)353903433353900 Flt Permitted0.950 Satd. Flow (perm)353903433353900 Right Turn on RedNoNo Satd. Flow (RTOR) Link Speed (mph)555545 Link Distance (ft)207613781002 Travel Time (s)25.717.115.2 Peak Hour Factor0.900.900.900.900.900.90 Adj. Flow (vph)428071980400 Shared Lane Traffic (%) Lane Group Flow (vph)428071980400 Enter Blocked IntersectionNoNoNoNoNoNo Lane AlignmentLeftRightLeftLeftLeftRight Median Width(ft)24240 Link Offset(ft)000 Crosswalk Width(ft)161616 Two way Left Turn Lane Headway Factor1.001.001.001.001.001.00 Turning Speed (mph)915159 Turn TypeProt Protected Phases438 Permitted Phases Detector Phase438 Switch Phase Minimum Initial (s)7.07.07.0 Minimum Split (s)19.014.019.0 Total Split (s)60.00.030.090.00.00.0 Total Split (%)66.7%0.0%33.3%100.0%0.0%0.0% Maximum Green (s)53.023.083.0 Yellow Time (s)5.05.05.0 All-Red Time (s)2.02.02.0 Lost Time Adjust (s)-2.0-2.0-2.0-2.0-2.0-2.0 Total Lost Time (s)5.02.05.05.02.02.0 Lead/LagLagLead Lead-Lag Optimize?YesYes Vehicle Extension (s)3.03.03.0 Recall ModeNoneNoneNone Act Effct Green (s)12.915.338.4 Actuated g/C Ratio0.340.401.00 Lanes, Volumes, Timings2035 PM Peak 139: Gaston EW & I-485 SB Ramp 3/9/2010 Gaston E-W Connector 11/17/2009 2035 PM PeakSynchro 7 - Report HNTB North Carolina, PC Page 2 Lane GroupEBTEBRWBLWBTNBLNBR v/c Ratio0.360.530.23 Control Delay11.010.60.1 Queue Delay0.00.00.0 Total Delay11.010.60.1 LOSBBA Approach Delay11.05.1 Approach LOSBA Queue Length 50th (ft)33550 Queue Length 95th (ft)701030 Internal Link Dist (ft)19961298922 Turn Bay Length (ft)250 Base Capacity (vph)353922733539 Starvation Cap Reductn000 Spillback Cap Reductn000 Storage Cap Reductn000 Reduced v/c Ratio0.120.320.23 Intersection Summary Area Type:Other Cycle Length: 90 Actuated Cycle Length: 38.4 Natural Cycle: 40 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.53 Intersection Signal Delay: 6.4Intersection LOS: A Intersection Capacity Utilization 40.2%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 139: Gaston EW & I-485 SB Ramp Appendix D – Highway Capacity Analysis BASIC FREEWAY SEGMENTS WORKSHEET General Information Site Information Analyst JHG Highway/Direction of Travel Gaston E-W Agency or Company HNTB North Carolina PC From/To West of US 29/74 Date Performed 3/2/2010 Jurisdiction Analysis Time Period Peak Hour Analysis Year 2035 Build without Bud Wilson Project Description Gaston East-West Connector Oper.(LOS)Des.(N)Planning Data  Flow Inputs Volume, V 1268 veh/hPeak-Hour Factor, PHF 0.90 AADTveh/day %Trucks and Buses, PT 5 Peak-Hr Prop. of AADT, K %RVs, PR 0 Peak-Hr Direction Prop, DGeneral Terrain:Rolling DDHV = AADT x K x D veh/hGrade % Length mi Driver type adjustment 1.00 Up/Down % Calculate Flow Adjustments fp 1.00 ER 2.0 ET 2.5 fHV = 1/[1+PT(ET - 1) + PR(ER - 1)]0.930 Speed Inputs Calc Speed Adj and FFS Lane Width 12.0 ft Rt-Shoulder Lat. Clearance 6.0 ft Interchange Density 0.50 I/mi Number of Lanes, N 2 FFS (measured)mi/h Base free-flow Speed, BFFS 70.0 mi/h fLW 0.0 mi/h fLC 0.0 mi/h fID 0.0 mi/h fN 4.5 mi/h FFS 65.5 mi/h LOS and Performance Measures Design (N) Operational (LOS) vp = (V or DDHV) / (PHF x N x fHV x fp)757 pc/h/ln S 65.5 mi/h D = vp / S 11.6 pc/mi/ln LOS B Design (N) Design LOS vp = (V or DDHV) / (PHF x N x fHV x fp)pc/h S mi/h D = vp / S pc/mi/ln Required Number of Lanes, N Glossary Factor Location N - Number of lanes S - Speed V - Hourly volume D - Density vp - Flow rate FFS - Free-flow speed LOS - Level of service BFFS - Base free-flow speed DDHV - Directional design hour volume ER - Exhibits23-8, 23-10 fLW - Exhibit 23-4 ET - Exhibits 23-8, 23-10, 23-11 fLC - Exhibit 23-5 fp - Page 23-12 fN - Exhibit 23-6 LOS, S, FFS, vp - Exhibits 23-2, 23-3 fID - Exhibit 23-7 Copyright © 2005 University of Florida, All Rights Reserved HCS+TM Version 5.21 Generated: 3/10/2010 2:14 PM 1 of 1 BASIC FREEWAY SEGMENTS WORKSHEET General Information Site Information Analyst JHG Highway/Direction of Travel Gaston E-W Agency or Company HNTB North Carolina PC From/To East of US 29/74 Date Performed 3/2/2010 Jurisdiction Gaston E-W - US 29/74 Analysis Time Period Peak Hour Analysis Year 2035 Build without Bud Wilson Project Description Gaston East-West Connector Oper.(LOS)Des.(N)Planning Data  Flow Inputs Volume, V 1718 veh/hPeak-Hour Factor, PHF 0.90 AADTveh/day %Trucks and Buses, PT 5 Peak-Hr Prop. of AADT, K %RVs, PR 0 Peak-Hr Direction Prop, DGeneral Terrain:Rolling DDHV = AADT x K x D veh/hGrade % Length mi Driver type adjustment 1.00 Up/Down % Calculate Flow Adjustments fp 1.00 ER 2.0 ET 2.5 fHV = 1/[1+PT(ET - 1) + PR(ER - 1)]0.930 Speed Inputs Calc Speed Adj and FFS Lane Width 12.0 ft Rt-Shoulder Lat. Clearance 6.0 ft Interchange Density 0.50 I/mi Number of Lanes, N 2 FFS (measured)mi/h Base free-flow Speed, BFFS 70.0 mi/h fLW 0.0 mi/h fLC 0.0 mi/h fID 0.0 mi/h fN 4.5 mi/h FFS 65.5 mi/h LOS and Performance Measures Design (N) Operational (LOS) vp = (V or DDHV) / (PHF x N x fHV x fp)1026 pc/h/ln S 65.5 mi/h D = vp / S 15.7 pc/mi/ln LOS B Design (N) Design LOS vp = (V or DDHV) / (PHF x N x fHV x fp)pc/h S mi/h D = vp / S pc/mi/ln Required Number of Lanes, N Glossary Factor Location N - Number of lanes S - Speed V - Hourly volume D - Density vp - Flow rate FFS - Free-flow speed LOS - Level of service BFFS - Base free-flow speed DDHV - Directional design hour volume ER - Exhibits23-8, 23-10 fLW - Exhibit 23-4 ET - Exhibits 23-8, 23-10, 23-11 fLC - Exhibit 23-5 fp - Page 23-12 fN - Exhibit 23-6 LOS, S, FFS, vp - Exhibits 23-2, 23-3 fID - Exhibit 23-7 Copyright © 2005 University of Florida, All Rights Reserved HCS+TM Version 5.21 Generated: 3/10/2010 2:16 PM 1 of 1 BASIC FREEWAY SEGMENTS WORKSHEET General Information Site Information Analyst BAR Highway/Direction of Travel Gaston E-W Agency or Company HNTB North Carolina PC From/To East of Linwood Date Performed 12/17/2009 Jurisdiction 504 - Gaston E-W -Linwood Analysis Time Period Peak Hour Analysis Year 2035 Build without Bud Wilson Project Description Gaston East-West Connector Oper.(LOS)Des.(N)Planning Data  Flow Inputs Volume, V 1422 veh/hPeak-Hour Factor, PHF 0.90 AADTveh/day %Trucks and Buses, PT 6 Peak-Hr Prop. of AADT, K %RVs, PR 0 Peak-Hr Direction Prop, DGeneral Terrain:Rolling DDHV = AADT x K x D veh/h Grade % Length mi Driver type adjustment 1.00 Up/Down % Calculate Flow Adjustments fp 1.00 ER 2.0 ET 2.5 fHV = 1/[1+PT(ET - 1) + PR(ER - 1)]0.917 Speed Inputs Calc Speed Adj and FFS Lane Width 12.0 ft Rt-Shoulder Lat. Clearance 6.0 ft Interchange Density 0.50 I/mi Number of Lanes, N 2 FFS (measured)mi/h Base free-flow Speed, BFFS 70.0 mi/h fLW 0.0 mi/h fLC 0.0 mi/h fID 0.0 mi/h fN 4.5 mi/h FFS 65.5 mi/h LOS and Performance Measures Design (N) Operational (LOS) vp = (V or DDHV) / (PHF x N x fHV x fp)861 pc/h/ln S 65.5 mi/h D = vp / S 13.1 pc/mi/ln LOS B Design (N) Design LOS vp = (V or DDHV) / (PHF x N x fHV x fp)pc/h S mi/h D = vp / S pc/mi/ln Required Number of Lanes, N Glossary Factor Location N - Number of lanes S - Speed V - Hourly volume D - Density vp - Flow rate FFS - Free-flow speed LOS - Level of service BFFS - Base free-flow speed DDHV - Directional design hour volume ER - Exhibits23-8, 23-10 fLW - Exhibit 23-4 ET - Exhibits 23-8, 23-10, 23-11 fLC - Exhibit 23-5 fp - Page 23-12 fN - Exhibit 23-6 LOS, S, FFS, vp - Exhibits 23-2, 23-3 fID - Exhibit 23-7 HCS2000TM Copyright © 2003 University of Florida, All Rights Reserved Version 4.1f 1 of 1 BASIC FREEWAY SEGMENTS WORKSHEET General Information Site Information Analyst BAR Highway/Direction of Travel Gaston E-W Agency or Company HNTB North Carolina PC From/To East of US 321 Date Performed 12/17/2009 Jurisdiction 604 - Gaston E-W -US 321 Analysis Time Period Peak Hour Analysis Year 2035 Build without Bud Wilson Project Description Gaston East-West Connector Oper.(LOS)Des.(N)Planning Data  Flow Inputs Volume, V 2077 veh/hPeak-Hour Factor, PHF 0.90 AADTveh/day %Trucks and Buses, PT 6 Peak-Hr Prop. of AADT, K %RVs, PR 0 Peak-Hr Direction Prop, DGeneral Terrain:Rolling DDHV = AADT x K x D veh/h Grade % Length mi Driver type adjustment 1.00 Up/Down % Calculate Flow Adjustments fp 1.00 ER 2.0 ET 2.5 fHV = 1/[1+PT(ET - 1) + PR(ER - 1)]0.917 Speed Inputs Calc Speed Adj and FFS Lane Width 12.0 ft Rt-Shoulder Lat. Clearance 6.0 ft Interchange Density 0.50 I/mi Number of Lanes, N 2 FFS (measured)mi/h Base free-flow Speed, BFFS 70.0 mi/h fLW 0.0 mi/h fLC 0.0 mi/h fID 0.0 mi/h fN 4.5 mi/h FFS 65.5 mi/h LOS and Performance Measures Design (N) Operational (LOS) vp = (V or DDHV) / (PHF x N x fHV x fp)1258 pc/h/ln S 65.5 mi/h D = vp / S 19.2 pc/mi/ln LOS C Design (N) Design LOS vp = (V or DDHV) / (PHF x N x fHV x fp)pc/h S mi/h D = vp / S pc/mi/ln Required Number of Lanes, N Glossary Factor Location N - Number of lanes S - Speed V - Hourly volume D - Density vp - Flow rate FFS - Free-flow speed LOS - Level of service BFFS - Base free-flow speed DDHV - Directional design hour volume ER - Exhibits23-8, 23-10 fLW - Exhibit 23-4 ET - Exhibits 23-8, 23-10, 23-11 fLC - Exhibit 23-5 fp - Page 23-12 fN - Exhibit 23-6 LOS, S, FFS, vp - Exhibits 23-2, 23-3 fID - Exhibit 23-7 HCS2000TM Copyright © 2003 University of Florida, All Rights Reserved Version 4.1f 1 of 1 BASIC FREEWAY SEGMENTS WORKSHEET General Information Site Information Analyst BAR Highway/Direction of Travel Gaston E-W Agency or Company HNTB North Carolina PC From/To East of Robinson Date Performed 12/17/2009 Jurisdiction 704 - Gaston E-W -Robinson Analysis Time Period Peak Hour Analysis Year 2035 Build without Bud Wilson Project Description Gaston East-West Connector Oper.(LOS)Des.(N)Planning Data  Flow Inputs Volume, V 2242 veh/hPeak-Hour Factor, PHF 0.90 AADTveh/day %Trucks and Buses, PT 5 Peak-Hr Prop. of AADT, K %RVs, PR 0 Peak-Hr Direction Prop, DGeneral Terrain:Rolling DDHV = AADT x K x D veh/h Grade % Length mi Driver type adjustment 1.00 Up/Down % Calculate Flow Adjustments fp 1.00 ER 2.0 ET 2.5 fHV = 1/[1+PT(ET - 1) + PR(ER - 1)]0.930 Speed Inputs Calc Speed Adj and FFS Lane Width 12.0 ft Rt-Shoulder Lat. Clearance 6.0 ft Interchange Density 0.50 I/mi Number of Lanes, N 2 FFS (measured)mi/h Base free-flow Speed, BFFS 70.0 mi/h fLW 0.0 mi/h fLC 0.0 mi/h fID 0.0 mi/h fN 4.5 mi/h FFS 65.5 mi/h LOS and Performance Measures Design (N) Operational (LOS) vp = (V or DDHV) / (PHF x N x fHV x fp)1339 pc/h/ln S 65.5 mi/h D = vp / S 20.4 pc/mi/ln LOS C Design (N) Design LOS vp = (V or DDHV) / (PHF x N x fHV x fp)pc/h S mi/h D = vp / S pc/mi/ln Required Number of Lanes, N Glossary Factor Location N - Number of lanes S - Speed V - Hourly volume D - Density vp - Flow rate FFS - Free-flow speed LOS - Level of service BFFS - Base free-flow speed DDHV - Directional design hour volume ER - Exhibits23-8, 23-10 fLW - Exhibit 23-4 ET - Exhibits 23-8, 23-10, 23-11 fLC - Exhibit 23-5 fp - Page 23-12 fN - Exhibit 23-6 LOS, S, FFS, vp - Exhibits 23-2, 23-3 fID - Exhibit 23-7 HCS2000TM Copyright © 2003 University of Florida, All Rights Reserved Version 4.1f 1 of 1 BASIC FREEWAY SEGMENTS WORKSHEET General Information Site Information Analyst BAR Highway/Direction of Travel Gaston E-W Agency or Company HNTB North Carolina PC From/To East of NC 274 Date Performed 12/17/2009 Jurisdiction 904 - Gaston E-W -NC 274 Analysis Time Period Peak Hour Analysis Year 2035 Build without Bud Wilson Project Description Gaston East-West Connector Oper.(LOS)Des.(N)Planning Data  Flow Inputs Volume, V 2304 veh/hPeak-Hour Factor, PHF 0.90 AADTveh/day %Trucks and Buses, PT 5 Peak-Hr Prop. of AADT, K %RVs, PR 0 Peak-Hr Direction Prop, DGeneral Terrain:Rolling DDHV = AADT x K x D veh/h Grade % Length mi Driver type adjustment 1.00 Up/Down % Calculate Flow Adjustments fp 1.00 ER 2.0 ET 2.5 fHV = 1/[1+PT(ET - 1) + PR(ER - 1)]0.930 Speed Inputs Calc Speed Adj and FFS Lane Width 12.0 ft Rt-Shoulder Lat. Clearance 6.0 ft Interchange Density 0.50 I/mi Number of Lanes, N 2 FFS (measured)mi/h Base free-flow Speed, BFFS 70.0 mi/h fLW 0.0 mi/h fLC 0.0 mi/h fID 0.0 mi/h fN 4.5 mi/h FFS 65.5 mi/h LOS and Performance Measures Design (N) Operational (LOS) vp = (V or DDHV) / (PHF x N x fHV x fp)1376 pc/h/ln S 65.5 mi/h D = vp / S 21.0 pc/mi/ln LOS C Design (N) Design LOS vp = (V or DDHV) / (PHF x N x fHV x fp)pc/h S mi/h D = vp / S pc/mi/ln Required Number of Lanes, N Glossary Factor Location N - Number of lanes S - Speed V - Hourly volume D - Density vp - Flow rate FFS - Free-flow speed LOS - Level of service BFFS - Base free-flow speed DDHV - Directional design hour volume ER - Exhibits23-8, 23-10 fLW - Exhibit 23-4 ET - Exhibits 23-8, 23-10, 23-11 fLC - Exhibit 23-5 fp - Page 23-12 fN - Exhibit 23-6 LOS, S, FFS, vp - Exhibits 23-2, 23-3 fID - Exhibit 23-7 HCS2000TM Copyright © 2003 University of Florida, All Rights Reserved Version 4.1f 1 of 1 BASIC FREEWAY SEGMENTS WORKSHEET General Information Site Information Analyst BAR Highway/Direction of Travel Gaston E-W Agency or Company HNTB North Carolina PC From/To East of NC 279 Date Performed 12/17/2009 Jurisdiction 1005 - Gaston E-W -NC 279 Analysis Time Period Peak Hour Analysis Year 2035 Build without Bud Wilson Project Description Gaston East-West Connector Oper.(LOS)Des.(N)Planning Data  Flow Inputs Volume, V 3223 veh/hPeak-Hour Factor, PHF 0.90 AADTveh/day %Trucks and Buses, PT 4 Peak-Hr Prop. of AADT, K %RVs, PR 0 Peak-Hr Direction Prop, DGeneral Terrain:Rolling DDHV = AADT x K x D veh/h Grade % Length mi Driver type adjustment 1.00 Up/Down % Calculate Flow Adjustments fp 1.00 ER 2.0 ET 2.5 fHV = 1/[1+PT(ET - 1) + PR(ER - 1)]0.943 Speed Inputs Calc Speed Adj and FFS Lane Width 12.0 ft Rt-Shoulder Lat. Clearance 6.0 ft Interchange Density 0.50 I/mi Number of Lanes, N 2 FFS (measured)mi/h Base free-flow Speed, BFFS 70.0 mi/h fLW 0.0 mi/h fLC 0.0 mi/h fID 0.0 mi/h fN 4.5 mi/h FFS 65.5 mi/h LOS and Performance Measures Design (N) Operational (LOS) vp = (V or DDHV) / (PHF x N x fHV x fp)1898 pc/h/ln S 63.3 mi/h D = vp / S 30.0 pc/mi/ln LOS D Design (N) Design LOS vp = (V or DDHV) / (PHF x N x fHV x fp)pc/h S mi/h D = vp / S pc/mi/ln Required Number of Lanes, N Glossary Factor Location N - Number of lanes S - Speed V - Hourly volume D - Density vp - Flow rate FFS - Free-flow speed LOS - Level of service BFFS - Base free-flow speed DDHV - Directional design hour volume ER - Exhibits23-8, 23-10 fLW - Exhibit 23-4 ET - Exhibits 23-8, 23-10, 23-11 fLC - Exhibit 23-5 fp - Page 23-12 fN - Exhibit 23-6 LOS, S, FFS, vp - Exhibits 23-2, 23-3 fID - Exhibit 23-7 HCS2000TM Copyright © 2003 University of Florida, All Rights Reserved Version 4.1f 1 of 1 BASIC FREEWAY SEGMENTS WORKSHEET General Information Site Information Analyst BAR Highway/Direction of Travel Gaston E-W Agency or Company HNTB North Carolina PC From/To East of NC 273 Date Performed 12/17/2009 Jurisdiction 1104 - Gaston E-W -NC 273 Analysis Time Period Peak Hour Analysis Year 2035 Build without Bud Wilson Project Description Gaston East-West Connector Oper.(LOS)Des.(N)Planning Data  Flow Inputs Volume, V 4224 veh/hPeak-Hour Factor, PHF 0.90 AADTveh/day %Trucks and Buses, PT 4 Peak-Hr Prop. of AADT, K %RVs, PR 0 Peak-Hr Direction Prop, DGeneral Terrain:Rolling DDHV = AADT x K x D veh/h Grade % Length mi Driver type adjustment 1.00 Up/Down % Calculate Flow Adjustments fp 1.00 ER 2.0 ET 2.5 fHV = 1/[1+PT(ET - 1) + PR(ER - 1)]0.943 Speed Inputs Calc Speed Adj and FFS Lane Width 12.0 ft Rt-Shoulder Lat. Clearance 6.0 ft Interchange Density 0.50 I/mi Number of Lanes, N 2 FFS (measured)mi/h Base free-flow Speed, BFFS 70.0 mi/h fLW 0.0 mi/h fLC 0.0 mi/h fID 0.0 mi/h fN 4.5 mi/h FFS 65.5 mi/h LOS and Performance Measures Design (N) Operational (LOS) vp = (V or DDHV) / (PHF x N x fHV x fp)2487 pc/h/ln S mi/h D = vp / S pc/mi/ln LOS F Design (N) Design LOS vp = (V or DDHV) / (PHF x N x fHV x fp)pc/h S mi/h D = vp / S pc/mi/ln Required Number of Lanes, N Glossary Factor Location N - Number of lanes S - Speed V - Hourly volume D - Density vp - Flow rate FFS - Free-flow speed LOS - Level of service BFFS - Base free-flow speed DDHV - Directional design hour volume ER - Exhibits23-8, 23-10 fLW - Exhibit 23-4 ET - Exhibits 23-8, 23-10, 23-11 fLC - Exhibit 23-5 fp - Page 23-12 fN - Exhibit 23-6 LOS, S, FFS, vp - Exhibits 23-2, 23-3 fID - Exhibit 23-7 HCS2000TM Copyright © 2003 University of Florida, All Rights Reserved Version 4.1f 1 of 1 BASIC FREEWAY SEGMENTS WORKSHEET General Information Site Information Analyst BAR Highway/Direction of Travel Gaston E-W Agency or Company HNTB North Carolina PC From/To East of Dixie River Date Performed Jurisdiction Gaston E-W - Dixie River Analysis Time Period Peak Hour Analysis Year 2035 Build without Bud Wilson Project Description Gaston East-West Connector Oper.(LOS)Des.(N)Planning Data  Flow Inputs Volume, V 3878 veh/hPeak-Hour Factor, PHF 0.90 AADTveh/day %Trucks and Buses, PT 4 Peak-Hr Prop. of AADT, K %RVs, PR 0 Peak-Hr Direction Prop, DGeneral Terrain:Rolling DDHV = AADT x K x D veh/hGrade % Length mi Driver type adjustment 1.00 Up/Down % Calculate Flow Adjustments fp 1.00 ER 2.0 ET 2.5 fHV = 1/[1+PT(ET - 1) + PR(ER - 1)]0.943 Speed Inputs Calc Speed Adj and FFS Lane Width 12.0 ft Rt-Shoulder Lat. Clearance 6.0 ft Interchange Density 0.50 I/mi Number of Lanes, N 2 FFS (measured)mi/h Base free-flow Speed, BFFS 70.0 mi/h fLW 0.0 mi/h fLC 0.0 mi/h fID 0.0 mi/h fN 4.5 mi/h FFS 65.5 mi/h LOS and Performance Measures Design (N) Operational (LOS) vp = (V or DDHV) / (PHF x N x fHV x fp)2284 pc/h/ln S 54.8 mi/h D = vp / S 41.7 pc/mi/ln LOS E Design (N) Design LOS vp = (V or DDHV) / (PHF x N x fHV x fp)pc/h S mi/h D = vp / S pc/mi/ln Required Number of Lanes, N Glossary Factor Location N - Number of lanes S - Speed V - Hourly volume D - Density vp - Flow rate FFS - Free-flow speed LOS - Level of service BFFS - Base free-flow speed DDHV - Directional design hour volume ER - Exhibits23-8, 23-10 fLW - Exhibit 23-4 ET - Exhibits 23-8, 23-10, 23-11 fLC - Exhibit 23-5 fp - Page 23-12 fN - Exhibit 23-6 LOS, S, FFS, vp - Exhibits 23-2, 23-3 fID - Exhibit 23-7 Copyright © 2005 University of Florida, All Rights Reserved HCS+TM Version 5.21 Generated: 3/10/2010 2:02 PM 1 of 1