Loading...
HomeMy WebLinkAbout20230301 Ver 1_Final Appendices_20230223APPENDICES 1. Impacts Map 2. Plans Set 3. NCHPO HPOWEB Map 4. Riparian Buffer Map S. IPAC Consultation Package/NCNHP Database Search 6. Preliminary Jurisdictional Determination (PJD) APPENDIX 1 Impacts Map Impacts Table Permanent Impact - wi 0.0501 (Wetland A) Acres Permanent Impact - S1 0.0025 (UT-1 To Acres Buffalo Creek) A-ze � V �e ..' . 0 Vio IV. Permanent Impact - W1 0.0501 Acres Permanent Impact - S1 0.0025 Acres r L Legend Limits of 4"'1 Disturbance Wetland Limits Stream Limits up Permanent Impacts xr "It X/ DATE PROJECT # FIGURE 2/6/2023 21.01721 HOLLYBROOK PARK 110 0 55 110 220 1240 19th Street Lane NW OFFICE MANAGER DESIGNER I I I I M gill Hickory, NC 28601 DC AL IIIIIIIIIIIIIL IMPACTS MAP 828.328.2024 TOWN OF WENDELL GRAPHIC SCALE ISIONVALUE 110FEET NC Firm License # C-0459 PROJECT MANAGER REVIEWER mcgillassociates.com MN is WAKE COUNTY, NORTH CAROLINA APPENDIX 2 Plans Set HOLLYBROOK PARK WAKE COUNTY, NORTH CAROLINA SCHEDULE OF DRAWINGS G-001 ..... COVER SHEET L-101 ..... LANDSCAPE PLAN - A S-801 ..... STRUCTURAL TYPICAL DETAILS G-002 ..... GENERAL NOTES AND LEGENDS L-102 ..... LANDSCAPE PLAN - B A-200 ..... FLOOR PLANS - RESTROOM BUILDING G-003 ..... EROSION CONTROL NOTES C-501 ..... DETAILS A-300 ..... BUILDING ELEVATIONS 00 CD-101 .... EXISTING CONDITIONS AND DEMOLITION C-502 ..... DETAILS A-301 ..... BUILDING SECTION C-101 ..... SITE PLAN - OVERALL C-503 ..... DETAILS A-400 ..... WALL TYPES 31 C-102 ..... SITE PLAN - A C-504 ..... DETAILS A-601 ..... OVERALL REFLECTED CEILING PLAN LEVEL 1 C-103 ..... SITE PLAN - B C-505 ..... DETAILS A-700 ..... GENERAL TYP. FIXTURE AND ACCESS. HEIGHTS AND LEGENDS (ADA) SITE C-104 ..... SITE PLAN - C C-506 ..... DETAILS A-701 ..... ACCESSORY FLOOR PLAN AND INTERIOR S HOL YBROOK RD C-201 ..... GRADING AND DRAINAGE - A C-507 ..... DETAILS ELEVATIONS 31 C-202 ..... GRADING AND DRAINAGE - B C-508 ..... DETAILS A-800 ..... SECTION DETAILS C-203 ..... GRADING AND DRAINAGE - C C-509 ..... DETAILS A-801 ..... PLAN DETAILS IZD C-204 ..... HOLLYBROOK ROAD CROSS SECTIONS C-510 ..... DETAILS A-900 ..... DOOR PANELS, FRAME TYPES & SCHEDULES N � r o C-205 ..... HOLLYBROOK ROAD CROSS SECTIONS AG-000 .... ARCHITECTURAL COVER H-000 ..... HVAC SYMBOLS LEGEND AND CONTRACTOR NOTES C-301 ..... EROSION CONTROL PLAN - PHASE 1 AG-101 .... NORTH CAROLINA - 2018 APPENDIX H-200 ..... LEVEL - 1 HVAC FLOOR PLAN B - BUILDING CODE SUMMARY VICINITY MAP NOT TO SCALE C-302 ..... EROSION CONTROL PLAN - PHASE 2 P-000 ..... PLUMBING LEGEND, NOTES, & SYSTEM DIAGRAMS AG-102 .... LIFE SAFETY C-303 ..... EROSION CONTROL PLAN - PHASE 3 P-200 ..... PLUMBING PLAN S-200 ..... FOUNDATION PLAN C-401 ..... UTILITY PLAN E-000 ..... ELECTRICAL SYMBOLS LEGEND, NOTES, & SYSTEM S-201 ..... ROOF FRAMING PLAN DIAGRAMS w S-800 ..... STRUCTURAL TYPICAL NOTES E-200 ..... ELECTRICAL PLANS 5400 Trinity Road ASEEIAL FINAL DRAWING Suite 107 � FOR REVIEW 1PURPOSES ONLY Raleigh, NC 27607 = �. o459 = 5os r: • 919.378.9111 - = NOT RELEASED �9��'�GINEF • ��\ FOR NC Firm License # C-0459 � ( CONSTRUCTION m cg i l l associ ates . co m FEBRUARY2023 GENERAL NOTES: 1. EXISTING CONDITIONS AND TOPOGRAPHIC INFORMATION PROVIDED BY SURVEY PROVIDED BY TAYLOR WISEMAN & TAYLOR, DATED JUNE 1, 2022 2. CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS TO EQUAL OR BETTER CONDITION THAN THE ORIGINAL SITE OR AS NOTED. 3. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. AT LEAST THREE DAYS PRIOR TO CONSTRUCTION CONTRACTOR MUST NOTIFY EXISTING UTILITY OWNERS. CALL BEFORE YOU DIG, NORTH CAROLINA ONE CALL (1-800-632-4949). 4. ALL WORK NEAR AND AROUND WATERWAYS MUST CONFORM TO THE RULES OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY. 5. CONTRACTOR MUST PROVIDE EROSION CONTROL DEVICES TO CONTROL RUNOFF FROM THE CONSTRUCTION SITE. CONTRACTOR WILL BE RESPONSIBLE FOR ANY FINES THAT MAY BE LEVIED DUE TO POLLUTION CREATED DURING CONSTRUCTION. 6. CONTRACTOR SHALL FOLLOW ALL FEDERAL, STATE, AND LOCAL REGULATIONS PERTAINING TO CONSTRUCTION OPERATIONS. 7. CONTRACTOR SHALL NOTIFY THE PROPER LOCAL AUTHORITIES 48 HOURS PRIOR TO ANY ROAD BEING CLOSED FOR CONSTRUCTION, INCLUDING BUT NOT LIMITED TO THE LOCAL NEWSPAPER, RADIO STATION, FIRE DEPARTMENT, COUNTY SHERIFF'S DEPARTMENT, AMBULANCE, AND THE COUNTY EMERGENCY MANAGEMENT AGENCY. ALL TRAFFIC CONTROL SHALL CONFORM TO THE REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. 8. ALL FENCES DAMAGED DURING CONSTRUCTION SHALL BE REPLACED WITH LIKE MATERIAL IN A WORKMANLIKE MANNER AND IN ACCORDANCE WITH STANDARD FENCE CONSTRUCTION PRACTICES AT THE CONTRACTOR'S EXPENSE. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING ROADS DURING CONSTRUCTION AND SHALL REPAIR ROADS PER REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. NO OPEN CUTS OF EXISTING ROADS SHALL BE ALLOWED EXCEPT WHERE INDICATED ON THE DRAWINGS OR WHERE SPECIFIC PERMISSION IS GRANTED BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. SAND OR A SIMILAR MATERIAL APPROVED BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION SHALL BE PLACED AS A PROTECTIVE BARRIER BETWEEN TRACK EQUIPMENT AND THE ROAD AND CLEANED UP PROPERLY AFTER CONSTRUCTION. 10. THE PROJECT SITE IS NOT IN A FLOOD ZONE. 11. ANY DISCREPANCIES FOUND IN THE FIELD SHALL BE CALLED TO THE ATTENTION OF THE OWNER/ENGINEER/DESIGNER PRIOR TO PROCEEDING WITH ANY WORK. 12. HATCHING OF HARD SURFACE MATERIALS SUCH AS CONCRETE ARE FOR GENERAL INFORMATION PURPOSES. IN NO INSTANCE IS A UTILITY LID, COVER OR ACCESS POINT TO BE COVERED OVER AND CONCEALED BY THE PROPOSED SURFACE MATERIAL. ANY HIDDEN UTILITY BOXES, COVERS, ETC DISCOVERED DURING CONSTRUCTION SHALL BE ADJUSTED TO MATCH PROPOSED GRADE ELEVATIONS. 13. THE ENGINEER MAY MAKE MINOR GRADE CHANGES AS REQUIRED IN THE FIELD WITHOUT EFFECTING THE LUMP SUM PRICE FOR UNCLASSIFIED EXCAVATION. 14. UNLESS OTHERWISE STATED, ALL FILL AREAS SHALL BE CONSTRUCTED IN LAYERS OF 8" MAXIMUM THICKNESS WITH WATER ADDED OR SOIL CONDITIONED TO THE OPTIMUM MOISTURE CONTENT AS DETERMINED BY THE ENGINEER AND COMPACTED WITH A SHEEP'S FOOT ROLLER TO A COMPACTION EQUAL TO OR GREATER THAN 95% OF THE DENSITY OBTAINED BY COMPACTING A SAMPLE OF THE MATERIAL IN ACCORDANCE WITH THE STANDARD PROCTOR METHOD OF MOISTURE DENSITY RELATIONSHIP TEST, ASTM D698 OR AASHTO-99 UNLESS SPECIFIED IN OTHER SPECIFICATIONS. 15. ENTIRE AREA TO BE GRADED SHALL BE CLEARED AND GRUBBED. NO FILL SHALL BE PLACED ON ANY AREA NOT CLEARED OR GRUBBED. 16. ALL SOIL EROSION CONTROL MEASURES REQUIRED BY THE GRADING PLAN SHALL BE INSTALLED PRIOR TO GRADING, CLEARING OR GRUBBING. ALL EROSION CONTROL DEVICES SUCH AS SILT FENCES, ETC., SHALL BE MAINTAINED IN WORKABLE CONDITION FOR THE LIFE OF THE PROJECT AND SHALL BE REMOVED AT THE COMPLETION OF THE PROJECT ONLY ON THE ENGINEER'S APPROVAL. PAYMENT SHALL BE CONSIDERED INCIDENTAL TO CLEARING AND GRUBBING, IF DURING THE LIFE OF THE PROJECT, A STORM CAUSES SOIL EROSION WHICH CHANGES FINISH GRADES OR CREATES "GULLIES" AND "WASHED AREAS". THESE SHALL BE REPAIRED AT NO ADDITIONAL COST AND ALL SILT WASHED OFF OF THE PROJECT SITE ONTO ADJACENT PROPERTY SHALL BE REMOVED AS DIRECTED BY THE ENGINEER AT NO EXTRA COST. THE CONTRACTOR SHALL ADHERE TO ANY APPROVED EROSION CONTROL PLANS WHETHER INDICATED IN THE CONSTRUCTION PLANS OR UNDER SEPARATE COVER. 17. DISPOSABLE MATERIAL A. CLEARING AND GRUBBING WASTES SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED OF BY THE CONTRACTOR AT HIS EXPENSE, UNLESS SPECIFIED OTHERWISE B. SOLID WASTES TO BE REMOVED, SUCH AS SIDEWALKS, CURBS, PAVEMENT, ETC., MUST BE DISPOSED OF OFF SITE AND IN A RESPONSIBLE MANNER AND IN ACCORDANCE WITH ALL APPLICABLE LAWS, BY THE CONTRACTOR. THE CONTRACTOR SHALL REMOVE THIS WASTE FROM THE SITE AND PROPERLY DISPOSE OF IT AT THEIR OWN EXPENSE. C. ABANDONED UTILITIES SUCH AS CULVERTS, WATER PIPE, HYDRANTS, CASTINGS, PIPE APPURTENANCES, UTILITY POLES, ETC., SHALL BE THE PROPERTY OF THE SPECIFIED UTILITY AGENCY, OR COMPANY HAVING JURISDICTION. BEFORE THE CONTRACTOR CAN REMOVE, DESTROY, SALVAGE, REUSE, SELL OR STORE FOR HIS OWN USE ANY ABANDONED UTILITY, HE MUST PRESENT TO THE OWNER WRITTEN PERMISSION FROM THE UTILITY INVOLVED. 5400 Trinity Road ® Suite 107 Raleigh, NC 27607 919.378.9111 Mcgill NC Firm License # C-0459 m cg i I lassociates. com eEAL 041598 - ;�. '.F I N �i�FIND.Io2� FINAL DRAWING FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION NO. I DATE I BY 18. IN THE EVENT EXCESSIVE GROUNDWATER OR SPRINGS ARE ENCOUNTERED WITHIN THE LIMITS OF CONSTRUCTION, THE CONTRACTOR SHALL INSTALL NECESSARY UNDER DRAINS AND STONE AS DIRECTED BY THE ENGINEER, ALL WORK SHALL BE PAID BASED UPON UNIT BIDS UNLESS SPECIFIED OTHERWISE. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ADJUSTMENT OF ALL UTILITY SURFACE ACCESSES WHETHER HE PERFORMS THE WORK OR A UTILITY COMPANY PERFORMS THE WORK. 19. THE CONTRACTOR SHALL CONTROL ALL "DUST" BY PERIODIC WATERING AND SHALL PROVIDE ACCESS AT ALL TIMES FOR PROPERTY OWNERS WITHIN THE PROJECT AREA AND FOR EMERGENCY VEHICLES. ALL OPEN DITCHES AND HAZARDOUS AREAS SHALL BE CLEARLY MARKED IN ACCORDANCE WITH THE SPECIFICATIONS. 20. ALL DISTURBED AREAS TO RECEIVE PERMANENT SEEDING. FINISHED SURFACES SHALL BE TO GRADE AND SMOOTH, FREE OF ALL ROCKS LARGER THAN 2", EQUIPMENT TRACKS, DIRT CLODS, BUMPS, RIDGES AND GOUGES PRIOR TO SEEDING. THE SURFACE SHALL BE LOOSENED TO A DEPTH OF t2"-3" TO ACCEPT SEED. THE CONTRACTOR SHALL NOT PROCEED WITH SEEDING OPERATIONS WITHOUT FIRST OBTAINING THE ENGINEER'S APPROVAL OF THE GRADED SURFACE. 21. ALL IMPROVEMENTS AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH NORTH CAROLINA STATE STANDARDS. ALL IMPROVEMENTS SHALL COMPLY WITH THE TOWN OF WENDELL DEVELOPMENT STANDARDS. 22. THE GENERAL CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, UTILITIES AND RIGHT OF WAYS, PUBLIC OR PRIVATE, PRIOR TO WORKING IN THESE AREAS. 23. ALL UTILITIES OR STRUCTURES NOT DESIGNATED FOR REMOVAL OR MODIFICATION ARE TO REMAIN AND SHALL BE PROTECTED BY THE CONTRACTOR DURING CONSTRUCTION AND REMAIN IN WORKING ORDER. 24. ALL DEMOLITION WORK SHALL BE PERFORMED WITH "DUE CARE AND DILIGENCE" SO AS TO PREVENT THE ARBITRARY DESTRUCTION OR INTERRUPTION OF CONCEALED UTILITIES WHICH ARE INTENDED TO REMAIN IN USE AND THE ROUTING OF WHICH COULD NOT BE DETERMINED UNTIL DEMOLITION WAS STARTED. ALL SUCH DISCOVERIES OF UTILITIES DURING THE DEMOLITION PROCESS WHICH ARE IN A LOCATION DIFFERENT FROM THAT INDICATED, OR ARE UNIDENTIFIED, SHALL BE REPORTED TO THE ENGINEER BEFORE REMOVAL. 25. ANY EXISTING ASPHALT, DESIGNATED TO REMAIN, THAT IS DAMAGED DURING DEMOLITION AND CONSTRUCTION SHALL BE REPAIRED AT NO COST TO THE OWNER. 26. ANY NOTE, OR REFERENCE TO AN ELEMENT, WHICH DOES NOT SPECIFY ACTION BY THE CONTRACTOR SHALL BE CONSTRUED AS INFORMATION ON LY. 27. THE GENERAL CONTRACTOR IS TO CONTACT AND COORDINATE WITH ALL APPROPRIATE PUBLIC AND PRIVATE UTILITY COMPANIES PRIOR TO ANY DEMOLITION OR RELOCATION OF EXISTING UTILITIES. IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ALL UTILITIES HAVE BEEN PROPERLY CAPPED OFF OR RELOCATED. 28. PROTECT ALL ADJACENT PROPERTIES, THE GENERAL PUBLIC, AND ALL THE OWNER'S FACILITIES FROM DAMAGE. THE CONTRACTOR SHALL REPAIR ANY DAMAGE IMMEDIATELY AND SHALL MAKE REPAIRS AT THE CONTRACTOR'S EXPENSE. 29. CONTRACTOR SHALL HOLD HARMLESS THE OWNER FOR DAMAGES OR OTHER ACCIDENTS WHICH OCCUR DURING THESE CONSTRUCTION ACTIVITIES. 30. TREES AND LANDSCAPING NOT DESIGNATED FOR REMOVAL SHALL BE PROTECTED DURING CONSTRUCTION. 31. CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING AND COORDINATION OF ALL ILLUSTRATED CONSTRUCTION ACTIVITIES AT THE JOB SITE. 32. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE RULES AND REGULATIONS GOVERNING THE CONSTRUCTION INDUSTRY, INCLUDING BUT NOT LIMITED TOO THOSE PERTAINING TO TRAVELING OPERATIONS AND OSHA. 33. CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ENGINEER PRIOR TO ANY LOCATION/ADJUSTMENTS OF EXISTING VAULTS (REGARDLESS OF FUNCTION), METER BOXES, FIRE HYDRANTS, CLEAN OUTS, MANHOLES, ETC. 34. UNDER ABSOLUTELY NO CIRCUMSTANCES SHALL ANY UNMANNED EXCAVATION BE LEFT OPEN OR UNPROTECTED DURING NON -WORKING HOURS. UTILIZE SIGNS, BARRICADES, ETC. TO ENSURE THE SAFETY OF THE GENERAL PUBLIC. 35. THE CONTRACTOR SHALL PREPARE TEMPORARY TRAFFIC CONTROL PLANS FOR WORK ALONG HOLLYBROOK ROAD MEETING MUTCD REQUIREMENTS FOR APPROVAL BY NCDOT. AT LEAST ONE LANE OF HOLLYBROOK ROAD SHALL REMAIN OPEN TO TRAFFIC AT ALL TIMES DURING CONSTRUCTION. NO WORK SHALL OCCUR ALONG HOLLYBROOK ROAD PRIOR TO OBTAINING TRAFFIC CONTROL PLAN APPROVAL FROM NCDOT AND INSTALLATION OF TEMPORARY TRAFFIC CONTROL MEASURES. 36. ALL WORK IN THE STREAM SHALL BE PERFORMED IN DRY CONDITIONS. THE CONTRACTOR SHALL PROVIDE ADEQUATE DIVERSION OR PUMP -AROUND TO MAINTAIN A DRY WORK AREA. DESCRIPTION HOLLYBROOK PARK TOWN OF WENDELL WAKE COUNTY, NORTH CAROLINA HATCH LEGEND CONCRETE PAVEMENT o�. GRAVEL BUILDING NOT TO SCALE OFFICE MANAGER DESIGNER D. CHAPMAN K. DURRANT PROJECT MANAGER REVIEWER M. NORRIS J. HERMAN DATE SYMBOL LEGEND • PROPERTY CORNER FOUND A COMPUTED POINT (NO IRON FOUND) (� DATUM CONTROL POINT SIGN ® GRATED INLET CURB INLET X LIGHT POLE 90, UTILITY POLE `Z, UTILITY POLE WITH DROP UTILITY POLE WITH LIGHT GUY WIRE / ANCHOR SD SEWER MANHOLE TELEPHONE PEDESTAL ❑T TELEPHONE HANDHOLE FIBEROPTIC HANDHOLE FIRE HYDRANT OW WATER MANHOLE e WATER VALVE EVERGREEN TREE 0 DECIDUOUS TREE ® FWAMILBOX LINE LEGEND PROPERTY LINE (PL) - - - - - - PL NOT SURVEYED - - - - - - - - - - - - EASEMENT ...... ...... ­- - - SETBACK/ BUFFER LINE - - - - - - - - - - - - EDGE OF GRAVEL EDGE OF RIPRAP CURB & GUTTER CREEK CENTERLINE TREE LINE CHAIN -LINK FENCE -x x x x x- WIRE FENCE WOOD FENCE WALL OVERHEAD UTILITY WIRES STORM DRAINAGE PIPE SS_SS_ ss GRAVITY SEWER r r r U/G TELEPHONE Fo Fo Fo U/G FIBER OPTIC ---W----- W----- W--- U/G WATER LINE (DATUR) CONTOUR MAJOR CONTOUR MINOR ---1B-----re----- 1B--- TOP OF BANK GENERAL NOTES AND LEGENDS FEBRUARY 2023 PROJECT # 21.01721 FUNDING # SHEET G=002 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HOW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HOW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. ONSITE CONCRETE WASHOUT STRUCTURE NTH LINER A iaT Y�mN1r0c IM� "MUM fA•ao� 00 A rTr 1. N.MYN. 101'J11YN KIIYYY N 1!Y i YN NON01L Mmr NYYCY 2 Y NI NB W U00 NN tlN •GOO 7S Q , 01YICYIYN eLfim aYYrwIN NIYINR YfYNMN N®I W Yc aEW MMM NM SK4W NNNI KMM BELOW GRADE WASHOUT STRUCTURE CONCRETE WASHOUTS LIIY & UWAIM YFlYY® N Yp7Np -UEAKY V K LMM WqR OYNNIT YYIxY IN" a YNNTN01 nm M OF NNAY Im CAPUrn, 10 P 01I"IK TL HM�MAR NCM0 NF IBs01M • 0MY �i 3ADNWM UNNUT ImeYrc Noma O[YTCYYY® TOM MU ARO%E GRADE WASHOUT STRUCTURE 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlets) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground NC GO 1 GROUND STABILIZATION AND MATERIALS HANDLING NORTH CAROLINA LAND QUALITY SECTION EROSION CONTROL NOTES CONSTRUCTION SEQUENCE: GENERAL: ALL EROSION CONTROL MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH REQUIREMENTS OF THE NORTH CAROLINA DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES (NCDEMLR). THE FOLLOWING CONSTRUCTION SEQUENCE SHALL BE COMPLIED WITH FOR ALL WORK. 1. PRIOR TO BEGINNING WORK ON THE PROJECT, THE CONTRACTOR SHALL OBTAIN FROM THE OWNER AND KEEP AT THE JOB SITE THE FOLLOWING: A. A POSTED COPY OF THE "EROSION AND SEDIMENT CONTROL APPROVAL" ISSUED BY NCDEQ DEMLR. B. A COPY OF THE APPROVED PLANS. THE APPROVAL NOTICES MUST BE AVAILABLE ON -SITE DURING ALL GRADING AND CONSTRUCTION ACTIVIITES. 2. CONTACT NCDEQ DEMLR REGIONAL OFFICE AT LEAST 48 HOURS PRIOR TO COMMENCING THE LAND DISTURBING ACTIVITY. 3. CONTRACTOR SHALL ATTEND THE PRE -CONSTRUCTION MEETING WITH THE CIVIL ENGINEER (OR LOCAL JURISDICTION) PRIOR TO BEGINNING CONSTRUCTION. 4. FLAG WORK LIMITS BEFORE CONSTRUCTION ACTIVITY BEGINS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ALL RECORDS REQUIRED BY NCDEQ DEMLR FOR THE INSTALLATION AND MAINTENANCE OF THE SITE EROSION CONTROL. 6. INSTALL TEMPORARY CONSTRUCTION ENTRANCE. 7. INSTALL SILT FENCE AS SHOWN ON PLANS FOR THE ENTIRE SITE, CLEARING ONLY WHAT IS NECESSARY TO INSTALL THE SILT FENCE. 8. STOCKPILE CLEAN TOPSOIL FOR REDISTRIBUTION IN LANDSCAPE AREAS. PROVIDE SILT FENCE AROUND LOW SIDE OF STOCKPILE. 9. INSTALL ALL EROSION CONTROL MEASURES AS SHOWN ON SHEETS C-301 TO C-303 AND AS REQUIRED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY, DIVISION OF ENERGY, MINERAL AND LAND RESOURCES, LAND QUALITY SECTION. FOR THE ASPHALT TRAIL WHERE THERE IS NO OTHER ACTIVE CONSTRUCTION THE CONTRACTOR MAY INSTALL SILT FENCE AND WATTLE AT TIME OF INSTALLATION. NO CLEARING AND GRUBBING ALONG TRAIL SEGMENTS WITHOUT EROSION MEASURES BEING IN PLACE IS ALLOWED. 10. ALL EROSION CONTROL DEVICES ARE TO BE MAINTAINED IN WORKING ORDER UNTIL SITE IS STABILIZED. 11. PROCEED WITH GRADING, CLEARING AND GRUBBING. DIRECT RUNOFF TO APPROPRIATE DEVICE. NOTE: NO OFF SITE DISPOSAL OF MATERIAL IS ALLOWED UNLESS THE DISPOSAL SITE HAS AN APPROVED EROSION CONTROL PLAN. EFFECTIVE: 04/01/19 12. SEED/GRASS WITHIN 7 CALENDAR DAYS AFTER FINAL GRADE IS ACHIEVED. 13. INSTALL STORM DRAINAGE PIPES, INLETS AND INLET PROTECTION. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall he recorded as "zero." The permittee may use another rain -monitoring device approved by the Division (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event> 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall he made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction a offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. 14. SEED AND PLACE EROSION CONTROL MATTING AS NOTED ON CUT AND FILL SLOPES UPON COMPLETION OF ACTIVE GRADING. 15. ONCE SUBGRADE IS REACHED ON THE AREAS TO BE PAVED, PLACE GRAVEL BASE COURSE IMMEDIATELY FOR STABILIZATION. 16. UPON SITE STABILIZATION, THE CONTRACTOR SHALL NOTIFY THE NCDEQ AND ENGINEER FOR INSPECTION AND COORDINATION OF THE REMOVAL OF EROSION CONTROL MEASURES. ALL AREAS WHERE EROSION CONTROL MEASURE ARE REMOVED SHALL BE WORKED TO FINISH GRADE AND STABILIZED. 17. AFTER APPROVAL FROM THE NCDEQ INSPECTOR, CONTRACTOR TO CLEAN OUT SEDIMENT TRAPS AND BASINS AND COMPACT FILL TO 85% STANDARD PROCTOR IN AREAS TO REMAIN NATURAL VEGETATION. MAINTENANCE PLAN: 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE NOT LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SILT FENCE WHEN IT BECOMES ABOUT 0.5' DEEP AT THE SILT FENCE. THE SILT FENCE SHALL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 3. ALL SEEDED AREAS SHALL BE FERTILIZED, RESEEDED, AND STRAW APPLIED IN ACCORDING THE SPECIFICATIONS TO MAINTAIN A STABLE AND DENSE VEGETATIVE COVER. 4. MAINTAIN ALL MATTING THAT HAS BEEN PLACED. CHECK FOR GOOD GROUND CONTACT AND FOR THE OCCURRENCE OF ANY EROSION UNDER THE MATTING. MONITOR, REPAIR AND REPLACE AS NECESSARY. 5. CONTRACTOR SHALL MAINTAIN SELF INSPECTION REPORTS AS REQUIRED BY NCDEQ. 6. SEDIMENT SHALL BE REMOVED FROM THE TEMPORARY SEDIMENT BASINS AND SKIMMERS WHEN SEDIMENT ACCUMULATED TO ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. CLEAN OUT AND RESHAPE BACK TO THE ORIGINAL DIMENSIONS. REPAIR ANY DAMAGED BAFFLES. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC Plan or complete, date and sign an inspection Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC Measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC Measures. Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a • Within 7calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/191 BORROW OR WASTE MATERIAL ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN. A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER TEMPORARY SEEDING SPECIFICATION RESOURCES RULES TEMPORARY SEEDING AND REGULATIONS. (PER NC 15A NCAC SPECIFICATION 046.0110). TEMPORARY SEEDING SPECIFICATION FOR LATE WINTER AND EARLY SPRING SEEDING MIXTURE: FOR SUMMER: SEEDING MIXTURE: FOR FALL: SEEDING MIXTURE: SPECIES RATE (Ib/acre) SPECIES RATE (Ib/acre) SPECIES RATE (Ib/acre) RYE (grain) 120 GERMAN MILLET 40 RYE (GRAIN) ANNUAL LESPEDEZA (KOBE 50 IN PIEDOMONT AND COASTAL IN THE PIEDMONT AND MOUNTAINS, A SMALL STEMMED SEEDING DATES: PLAIN, KOREAN IN SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 MOUNTAINS) LB/ACRE. MOUNTAINS: AUGUST 15 TO DECEMBER 15 PIEDMONT: AUGUST 15 TO DECEMBER 30 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY SEEDING DATES: COASTAL PLAIN: AUGUST 15 TO DECEMBER 30 COVER IS NOT TO EXTEND BEYOND JUNE. MOUNTAINS. MAY 15 TO AUGUST 15 PIEDMONT: MAY 1 TO AUGUST 15 SEEDING DATES: COASTAL PLAIN: APRIL 15 TO AUGUST 15 MOUNTAINS - ABOVE 2,500 FEET: FEB-15 TO MAY 15 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS BELOW 2,500 FEET: FEB 1 TO MAY 1 OR APPLY 2000 Ib/ac GROUND AGRICULTURAL LIMESTONE AND PIEDMONT - JAN 1 TO MAY 1 750 Ib/ac 10-10-10 FERTILIZER. COASTAL PLAIN - DEC 1 TO APRIL 15 MULCH: APPLY 4000lb/ac STRAW. ANCHOR STRAW BY TACKING w/ ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS w/ BLADES SER NEARLY STRAIGHT CAN BE USED AS A MULCH OR APPLY 2000 Ib/ac GROUND AGRICULTURAL LIMESTONE AND ANCHORING TOOL. 750 Ib/ac 10-10-10 FERTILIZER. MAINTENANCE: RE -FERTILIZE IF GROWTH IS NOT FULLY MULCH: APPLY 4000lb/ac STRAW. ANCHOR STRAW BY TACKING ADEQUATE, RE -SEED, RE -FERTILIZE AND MULCH IMMEDIATELY w/ ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK FOLLOWING EROSION OR OTHER DAMAGE. w/ BLADES SER NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE, RE -SEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. PERMANENT SEEDING SITE SEEDING: 7 LBS/1000 SF FESCUE BLEND MIN. OF 2 (FALCON, REBEL, JAGUAR) SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2000 Ib/ac GROUND AGRICULTURAL LIMESTONE AND 750 Ib/ac 10-10-10 FERTILIZER. MULCH: APPLY 4000lb/ac STRAW. ANCHOR STRAW BY TACKING w/ ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK w/ BLADES SER NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RE -SEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE (PIEDMONT AND COASTAL PLAIN) OR KOREAN (MOUNTAINS) LESPEDEA IN LATE FEBRUARY OR EARLY MARCH. PECE FINAL DRAWING SHEET HOLLYBROOK PARKNOT TO SCALE5400 Trinity Road .� FOR REVIEW EROSION CONTROL NOTES Suite 107 _ A L 041598 PURPOSES ONLY Raleigh, NC 27607 '. .'� NOT RELEASED TOWN OF WENDELLOFFICE MANAGER DESIGNER - cglll 919.378.9111 GIN��_. ���� D. CHAPMAN C. BROWN J l G003 NC Firm License #_ '%,TtiFW p pE ��` FOR /i�j1a�2� CONSTRUCTION WAKE COUNTY, NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# m cg i I lassociates. com NO. DATE BY DESCRIPTION M. NORRIS J. HERMAN FEBRUARY 2023 21.01721 GENERAL NOTES: 1. EXISTING CONDITIONS AND TOPOGRAPHIC INFORMATION PROVIDED BY SURVEY PROVIDED BY TAYLOR WISEMAN & TAYLOR, DATED JUNE 1, 2022. \ \ \ \\\ \ 2. ALL UTILITIES OR STRUCTURES NOT DESIGNATED FOR REMOVAL OR MODIFICATION ARE TO REMAIN. ALL STRUCTURES/UTILITIES TO REMAIN OR FOR MODIFICATION SHALL BE PROTECTED BY THE CONTRACTOR DURING 285—�� CONSTRUCTION AND REMAIN IN WORKING ORDER. 284 — / I I N n1 N N N n ff 3. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE SO AS TO PREVENT THE ARBITRARY \ \ / - DESTRUCTION OR INTERRUPTION OF CONCEALED UTILITIES WHICH ARE INTENDED TO REMAIN IN USE AND THE ROUTING OF --283 / / J I I 1 1 IIII I / \ �� \ WHICH COULD NOT BE DETERMINED UNTIL DEMOLITION WAS STARTED. ALL SUCH DISCOVERIES OF UTILITIES DURING THE .% DEMOLITION PROCESS WHICH ARE IN A LOCATION DIFFERENT FROM THAT INDICATED, OR ARE UNIDENTIFIED, SHALL BE / I I I \ _ \ \. REPORTED TO THE ENGINEER BEFORE REMOVAL. 28,-� / I I I I I I 4. ANY EXISTING ASPHALT, DESIGNATED TO REMAIN THAT IS DAMAGED DURING DEMOLITION AND CONSTRUCTION SHALL BE / l I I I REPAIRED AT NO COST TO THE OWNER. \ - / 50,p�'QGRpV '� I // tiro 1g'/' // // I I I \\\�� \ \\/ I \\\\�\\ 5. ANY NOTE, OR REFERENCE TO AN ELEMENT, WHICH DOES NOT SPECIFY ACTION BY THE CONTRACTOR SHALL BE B�2p 8p �Ty,4'q/< I II �1 / I I I\ \\ \\ ( \�� 50I \\� m \ c� CONSTRUED AS INFORMATION ONLY. 6. THE GENERAL CONTRACTOR IS TO CONTACT AND COORDINATE WITH ALL APPROPRIATE PUBLIC AND PRIVATE UTILITY n� I / / / ti h / I \ \ I I \ ��\ 1�\ \,� \\� \. COMPANIES PRIOR TO ANY DEMOLITION OR RELOCATION OF EXISTING UTILITIES. IT IS THE GENERAL CONTRACTOR'S \ I \\� \� \ RESPONSIBILITY TO ENSURE THAT ALL UTILITIES HAVE BEEN PROPERLY CAPPED OFF OR RELOCATED. r / • II I ^� / / / / / \ �9�\ \ \\\ \ 7. PROTECT ALL ADJACENT PROPERTIES, THE GENERAL PUBLIC, AND ALL THE OWNER'S FACILITIES FROM DAMAGE. THE CONTRACTOR SHALL REPAIR ANY DAMAGE IMMEDIATELY AND SHALL MAKE REPAIRS AT THE CONTRACTOR'S EXPENSE. / � I B \ / s /Z Ica I N 8. CONTRACTOR SHALL HOLD HARMLESS THE OWNER FOR DAMAGES OR OTHER ACCIDENTS WHICH OCCUR DURING THESE I CONSTRUCTION ACTIVITIES. e'�i?o� �,�A�c ► - , it ti � r / // / / // // / ��g � / ,� I I I���II I 9. TREES AND LANDSCAPING NOT DESIGNATED FOR REMOVAL SHALL BE PROTECTED DURING CONSTRUCTION. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING AND COORDINATION OF ALL ILLUSTRATED CONSTRUCTION ACTIVITIES AT THE JOB SITE. 11. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE RULES AND REGULATIONS GOVERNING THE CONSTRUCTION INDUSTRY, INCLUDING BUT NOT LIMITED TO THOSE PERTAINING TO TRAVELING OPERATIONS AND OSHA. 12. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATION/ADJUSTMENTS OF ALL EXISTING VAULTS (REGARDLESS OF FUNCTION), I I I I /I // // ✓ �1 �1ti 1/ // // // - -/ - =• /// _ / METER BOXES, FIRE HYDRANTS, CLEAN OUTS, MANHOLES, ETC. TO MATCH FINISHED GRADES AND SITE PLAN. I / •1 / `ti 13. UNDER ABSOLUTELY NO CIRCUMSTANCES SHALL ANY UNMANNED EXCAVATION BE LEFT OPEN OR UNPROTECTED DURING _ / -WORKING HOURS. UTILIZE SIGNS, BARRICADES, ETC. TO ENSURE THE SAFETY OF THE GENERAL PUBLIC. DUKE ENERGY POWER NON LINE EASEMENT (BM 200 P6 G 614) W 7� I II I I I ► \ 16 � — — �• � . / / ! ! // ll %�l l' l KEY NOTES: I I / / / / / --- // EXISTING UTILITY/STRUCTURE TO BE REMOVED. 10 11 12 13 14 15 I � �' � // / ,� l Jl / r/ ,/ •�.. -`l //� — — / EXISTING UTILITY STRUCTURE TO REMAIN AND BE PROTECTED. SAWCUT EXISTING PAVEMENT, CONCRETE, CURB AND GUTTER TO PROVIDE A STRAIGHT AND UNIFORM EDGE. I EXISTING TREE TO BE REMOVED, INCLUDING STUMPS AND ROOTS. 6'WOOD FENCE » » ENCROACHES 0.1'-0.2' _ - - - - �- - �- / / / / / MATCHLINE Ci / ----=--�—�/ _.=- 1•:� • L ) l /--- ---- -- ——L---�--- -- ------1-- — ----------- ---------------- -� -- - • �� •-�/.. \ / r ,� T T / / - /' / / o" / » OE TREE PROTECTION FENCING. SEE DETAIL SHEET C-504. MATCHLINE B . % / 283 _ �J' / O / // •�. / / / I I I I / zz�_—� I ,��^a / �� 11, #/ I / / I /I /' F EXISTING STONE DRIVEWAY TO BE REMOVED. 2g4E > > / ••� / // // // / I I I I I ( .y••„••"'/�"/ ,•� o " EXISTING SIGN TO BE REMOVED AND RETURNED TO OWNER. I / / I rl H EXISTING STONE HEADWALL TO BE REMOVED AND EXISTING PIPE TO BE EXTENDED. SEE GRADING SHEETS FOR PIPE EXTENSION. to /�; J/ / �� // \ \ \ I N� N I I , I I / / �i•___-- I \\ \ I I / / I //, OI EXISTING 10" PVC SEWER FORCE MAIN TO REMAIN AND BE PROTECTED All�, � `\ I I 1 I I I - �• ��� ---- � I \ II I I / ! / I >/� OJ EXISTING UTILITY/STRUCTURE/POLE TO BE RELOCATED BY UTILITY PROVIDER \ \\ II I I` \\ \\ \ \\ \\ I I\ \ \ ���.`•• \ \I \ \\ , I // / / ,,�/'r LEGEND ' / / 2g1 \ \ \ I 1 `\ \ \ \\ \1 \\ \\ I\ \ \\ \N Na i �.•— O N loo tz Lo to to 0 FIREWOOD ROOF OVERHANG & FENCE ENCROACHES 2.8' 1 STORY I WOOD SHED 0 Ee INV=281.24' 30"MAPLE INV=280.90' \2 \ \ \\ I\\ \\ \\ \\ \ \ \ \ \ \\ \ \\ ••�°••.-.._..�.• i N I ry I �/ / _.._.._.._ PROPERTY LINE /// / \ 1 \ \ \ ' \ \ \\ \ �� \ \ \ \\ \\ \ ■ / I I 11 \ \ \\ 1 - LIMITS OF DISTURBANCE EXISTING VEGETATION TO BE CLEARED AND GRUBBED. \\ \\ \ \\ \\ \\ \\ `'�'�\ \\ l\ \ / I I '1/ �/ 22 EXISTING ASPHALT CONCRETE CURB AND GUTTER TO BE DEMOLISHED AND REMOVED TO SUBGRADE. 0"-1.5" VARIABLE DEPTH ASPHALT MILL \ \ �FLSF 1.5 ASPHALT MILL / i I \ \ \ 1 �A \ \ \ \ \ \\ \ \ \ \ \ \ \ \ • \ \ \ \ I I\ I I I \\ RIPARIAN BUFF ER ■ / / a$i /ice -�\ �-- \ \' \ \ \ \ \ \ \ \ \ ` � \ \ \ \ I I \� I �\ , \\ \\\ \ E �/ STREAM FLOOR \ \ IS ROCK IN THIS AREA ED D I I I I I I I / �/ / // s0'/vF s. / 2 2 "PINE I I I I 38"GUM �/ PRESSURE TANK I I 28"PINE / 9° uM/� INE 2g3--\ \\ --_--/ / E I ^/ �/ / \ \ \ \ ' / / 1 24 PI1 E'PIN�ti�0 �� .I \ SPIGOT I' / / // // N I / , /� �I I� 20"PINE 3 F 2a2 \ \\------- —_I-- �J / / ' 10"PINE — 1 / / � 2s"PINE �� / // / / yeo / /, / // / / h / l / /' ��i� // LARGE / // /�0 / // IIII i �` 5o�y I I 1 13"PINE y / / m �/ o o -10"P NI v,- ,ROCK \ ��•' B-21"PIN Z�' 257 GRAVEL CHECK 4- DAMS WETLAND LMITSMD tio iH / M \ I I 1 28"GUM„PINE IE 26"PIN 26 / �•---y �..�.� ��..1. \I - I •o. l /� J / f j �- - \ ,� ,h6 / �1/ // / \ A 15"RCP FiVk -j'� - -�L ■`�%�f•�y. 59 \ 60% W1 'PUBLD AD -W — — — — — W — — \ \ BM2o2oPGs7 / J��-W-\--W-- INV=274.7T. N p \ \ \\ �\ \ _- _T - - -_----25a.81' �'�.,®• WATER MARKER aZ,N \ �3a 4 W. WU� / ¢jm I \\\\ C 1 / FINAL DRAWING 5400 Trinity Road �'•.� : FOR REVIEW ® Suite 107 _ SEAL _ PURPOSES ONLY Raleigh, NC 27607 ., 041598 NOT RELEASED 919.378.9111 4GINE�Q S_ FOR NC Firm License # C-0459 " " E jti /5I� iZ CONSTRUCTION m cg i I lassociates. com _12"PVC _ 60' PUBLIC WIDTH ( _ — — — _ \ x ` V� BM2020PG617 — W INV=270.80' ---- --- - -- _----------- - _ -W--= INV=271.30' ' I INV=251. 00(;\\\\ rCOLLAPSING \ STONE HEADWALL FLARED END SECTION _ ' O O INV=264.73' CURB INLI GRATE ELEV=269.: 60 0 30 60 120 HOLLYBROOK PARK GRAPHIC SCALE DIVISION VALUE = 60 FEET TOWN OF WENDELLOFFICE MANAGER DESIGNER D. CHAPMAN K. DURRANT WAKE COUNTY, NORTH CAROLINA PROJECT MANAGER REVIEWER NO. DATE BY DESCRIPTION M. NORRIS J. HERMAN EXISTING CONDITIONS AND DEMOLITION DATE PROJECT # FUNDING # FEBRUARY 2023 21.01721 SHEET CD=1 01 Ir Q 0 0 Ir m J J 0 J J W 0 z w LL 0 N 0 90 i I \ \ I \ \ \ \ / \ / .O I I rl--� \ \ I I I I I I I I LOT 61 LOT 60 LOT 62 LOT 95 I LOT C „ I I I LOT 97 I I I I I 10 11 12 13 I 14 15 O O I I II I I I I II 6'WOOD FENCE I ❑nironoruGc n �� n �� � _ _ O FIREWOOD ROOF OVERHANG & FENCE ENCROACHES 2.8' c 1 STORY WOOD ' SHED O I O h' �o 30"MAPLE T � BjCY 0 10' % Tq pNF F FR PROP. ASPHALT TRAIL PROP. (2) BASKETBALL COURTS NO LOT 98 PROP. (4) PICKLEBALL COURTS r = • Q�\AR� — L 0 2/3A=213'- a di T=100' r O QJ 9 00 / H- / O L0 Oi i C 11 / LOT 305 18 60,p�R G'QO pG4F j' y / ly - / 1 1 1 1 PROP. P 1 1 PROP. PAR COURSE GENERAL NOTES: 1. EXISTING CONDITIONS AND TOPOGRAPHIC INFORMATION PROVIDED BY SURVEY PROVIDED BY TAYLOR WISEMAN & TAYLOR, DATED JUNE 1, 2022. 2. ALL DEVELOPMENT SHALL CONFORM WITH THE TOWN OF WENDELL DEVELOPMENT ORDINANCE. 3. SITE SIGNAGE SHALL CONFORM WITH APPLICABLE CODES AND ORDINANCES. `%\ \ 4. ALL PAINT STRIPING, PAVEMENT MARKINGS, AND SIGNAGE SHALL CONFORM TO THE LATEST "MANUAL ON UNIFORM TRAFFIC \ \ ;e;�\` \.\ CONTROL DEVICES" AND NCDOT STANDARDS. \ \ \ 5. ALL DIMENSIONS ARE FACE OF CURB, EDGE OF PAVEMENT AND FACE OF WALL, UNLESS OTHERWISE NOTED. 6. THIS SITE IS NOT LOCATED IN ANY FLOOD ZONE. 22 \ 7. ALL IMPROVEMENTS AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH NORTH CAROLINA STATE STANDARDS. ALL 50 \ IMPROVEMENTS SHALL COMPLY WITH THE TOWN OF WENDELL STANDARDS FOR STORM DRAINAGE, SIGNAGE, LANDSCAPE, \\ PLANTING, UTILITY AND PARKING REQUIREMENTS. 8. ANY DISCREPANCIES FOUND IN THE FIELD SHALL BE CALLED TO THE ATTENTION OF THE OWNER/ENGINEER/DESIGNER PRIOR • \ v TO PROCEEDING WITH ANY WORK. 9. THE GENERAL CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, UTILITIES AND RIGHT OF WAYS, PUBLIC OR PRIVATE, PRIOR TO WORKING IN THESE AREAS. ®'•1i ���'\ ��\ 10. ALL PAVEMENT MARKINGS ARE TO BE PAINT IN COLOR AS SPECIFIED. 11. HATCHING OF HARD SURFACE MATERIALS SUCH AS BRICK AND CONCRETE ARE FOR GENERAL INFORMATION PURPOSES. IN • I NO INSTANCE IS A UTILITY LID, COVER OR ACCESS POINT TO BE COVERED OVER AND CONCEALED BY THE PROPOSED SURFACE MATERIAL. ANY HIDDEN UTILITY BOXES, COVERS, ETC DISCOVERED DURING CONSTRUCTION SHALL BE ADJUSTED TO MATCH PROPOSED GRADE ELEVATIONS. .` 12. PROVIDE CONSTRUCTION JOINTS AT ALL INTERFACES BETWEEN PROPOSED SURFACES/BUILDINGS. ALL CONSTRUCTION JOINTS I; ARE TO BE SEALED. / ADJOINING PROPERTIES: TOWN OF WENDELL MURIEL J BALDWIN PIN 1783-93-0137 REVOCABLE LIVING TRUST I I 100' DUKE ENERGY POWER LINE EASEMENT (BM 2006 PG 614) PIN 17$3-73-9$49 % �: / ZONE R4—CD O l ZONE RA ADKINS, VINCENT E PIN 1783-83-7217 JOSEPH SCHILLIZZI / ZONE RA AMY SCHILLIZZI / 10 PIN 1783-84-0024 REBECCA H & CURLIE B ZONE R3 MOZINGO PIN 1783-83-6226 LUIS GONZALO GUTIERREZ ZONE RA 11 LORENA TREVINO PIN 1783-84-0096 VANESSA V & PATRICK A ZONE R3 :::::::::< <:.. MA LINE »0. ,t , ,% O TOWELL -- �r. - - - -: r: — - -----------------------�;�/— ------ — — — — — — PIN 1783-83-4225 LOYOTA JONES 1000, :'''''''''''''''':. M LINE "B" '� ; / / ZONE RA 1 2 R PIN MELTON JR 068 /............................................... VANESSA V & PATRICK A ZONE R3 .:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.'*'*'*' TOWELL r PIN 1783-83-3301 JAMES HENRY CODY i^. -'-'-'-'-'-'-'-'-'-'-'-'-'-'-'' , ZONE RA O ETHEL CODY / / 13 PIN 1783-84-2037 HOWARD E JR & PHYLLIS ZONE R3 ..... " ' " " " " T EDWARDS PRO * ADVENTURE = ;O PIN 1783-83-0507 KELVIN HOLLOWAY P GROUND / J / ZONE RA O NATALIE HOLLOWAY / 14 PIN 1783-84-3005 FEDA & DAVID J VALLETTE ZONE R3 / m' / O PIN 1783-73-9750 I •�•.�. ; / ZONE RA TERESA TONYA WILLIAMS •� ..... ,:. :. ' I ( 15 GEORGE WILLIAMS JR RAY E & GRACE YOUNG O PIN 1783-84-3091 ARKING PIN 1783-73-9840 ZONE R3 ZONE RA PROP. SHELTER a :.::::;::::;:: PROP. PLAYGROUND...................................................... 2 2 ......:.... ?ii?: iiiFi:i i?:::: iri::................ l l 0 O 0) S.)0 !`-� 0 0 Q+;Q+ co- FINAL DRAWING 5400 Trinity Road �'•.� : FOR REVIEW ® Suite 107 _ SEAL _ PURPOSES ONLY Raleigh, NC 27607 041598 NOT RELEASED 919.378.9111 �?'9j4GINE�Q• S ��\� NC Firm License # C-0459 FOR '� 'S'F " " E ''ji��pZ'� m cg i I lassociates. com CONSTRUCTION 60 0 30 60 120 HOLLYBROOK PARK GRAPHIC SCALE DIVISION VALUE = 60 FEET TOWN OF WENDELLOFFICE MANAGER DESIGNER D. CHAPMAN K. DURRANT WAKE COUNTY, NORTH CAROLINA PROJECT MANAGER REVIEWER NO. DATE BY DESCRIPTION M. NORRIS J. HERMAN 16 RODNEY ANTHONY LEE PIN 1783-84-4085 ZONE R3 UNITED REALTY & CONSTRUCTION CO INC 17 PIN 1783-84-6171 ZONE R3 LEROY JUSTIN COBB NICOLE PATRICE KEARNEY 18 PIN 1783-84-7369 ZONE R3 JEFFREY B HOUCK 1 g SABINA MARIE LOPEZ PIN 1783-84-8534 ZONE R3 GEOFFREY K NGUMO 20 MARGARET W MWANGI PIN 1783-84-9523 ZONE R3 JONES, LUCIUS S 21 PIN 1783-95-8396 ZONE RA 22 SMITH EDWARDS LLC PIN 1793-04-0073 ZONE R4—CD SITE DATA PARCEL ID NO. 1783-83-7861 PARCEL ADDRESS: 1201 S. HOLLYBROOK ROAD WENDELL, NC 27591 OWNER TOWN OF WENDELL CURRENT ZONING RA (RURAL AGRICULTURAL) R4—CD (HIGH DENSITY RESIDENTIAL CONDITIONAL) PROPOSED USE: PUBLIC PARK TRACT ACREAGE t 19.0 ACRES SETBACKS (R4 ZONE): FRONT SIDE REAR MAX. BLDG. HEIGHT PARKING SPACES PROVIDED: 25 FEET 20% OF LOT WIDTH 20 FEET 3 STORIES STANDARD 97 ACCESSIBLE 2 VAN ACCESSIBLE 2 TOTAL 101 EXISTING IMPERVIOUS AREA 0 SF (0%) PROPOSED IMPERVIOUS AREA 107,500 SF (13%) FLOOD ZONE: ZONE X (OUTSIDE 0.2% ANNUAL CHANCE FLOODPLAIN) MAP NO. 3720178300L EFFECTIVE JULY 19, 2022 SHEET SITE PLAN - OVERALL DATE PROJECT # FUNDING # FEBRUARY 2023 21.01721 C=1 01 Q 0 0 m J J 0 J J w 0 z w 0 0 N 0 90 I I I 1 1 GAF h ENCROACHES FENCE ■ - ■ ®. ' ENCROACHES 0.1'-0.2' ® . ' ■ ® ®®� - ®■ ■ ■ ■ -,. C w w •711 ®•�®i ■ 1 icn w w • 161.7' Z 1 Z .�® Q J J Q = 1 = 0 � 1 � 1 ■ ■ 1 I B T 1 ■ 1■ R LO I 1 T ■ 1 1 ■ R135.0, 1 1 ■ 1 g 1 ♦ 1 FIREWOOD ROOF 1 OVERHANG &FENCE ^� ■ ENCROACHES 2.8' l/ ` ■ 1 1 ■ 1 STORY ■ J1 1 WOOD I 1 SHED ■ Q 1■ 1 ■ � 1 / 1 ■ 1 1 1 o I T 1 ■ 1 1 1 SHED 1 GATE 1 I I 1 ■ 1 I I 1 30"MAPLE F1 I I 1 I I G1 g I 1 M 1 / can 5. 0% R G I I o R I Ell a -- --- 5.0' Q Ell F • 107.0' o �- 5_0' R I 1 ♦ ' B R3.0 35.0' 26.8' 4.5' o - - - 5.0' - / \\ \\ \ • ♦ ■ A �,, 01 13.5' X' 65.0' S' \ , �, ■ 'o o. R o 115.3` \\\\\ 8 T 1 n GENERAL NOTES: 1. EXISTING CONDITIONS AND TOPOGRAPHIC INFORMATION PROVIDED BY SURVEY PROVIDED BY TAYLOR WISEMAN & TAYLOR, DATED JUNE 1, 2022. 2. ALL DEVELOPMENT SHALL CONFORM WITH THE TOWN OF WENDELL DEVELOPMENT ORDINANCE. 3. SITE SIGNAGE SHALL CONFORM WITH APPLICABLE CODES AND ORDINANCES. 4. ALL PAINT STRIPING, PAVEMENT MARKINGS, AND SIGNAGE SHALL CONFORM TO THE LATEST "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AND NCDOT STANDARDS. 5. ALL DIMENSIONS ARE FACE OF CURB, EDGE OF PAVEMENT AND FACE OF WALL, UNLESS OTHERWISE NOTED. 6. THIS SITE IS NOT LOCATED IN ANY FLOOD ZONE. 7. ALL IMPROVEMENTS AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH NORTH CAROLINA STATE STANDARDS. ALL IMPROVEMENTS SHALL COMPLY WITH THE TOWN OF WENDELL STANDARDS FOR STORM DRAINAGE, SIGNAGE, LANDSCAPE, PLANTING, UTILITY AND PARKING REQUIREMENTS. 8. ANY DISCREPANCIES FOUND IN THE FIELD SHALL BE CALLED TO THE ATTENTION OF THE OWNER/ENGINEER/DESIGNER PRIOR TO PROCEEDING WITH ANY WORK. 9. THE GENERAL CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, UTILITIES AND RIGHT OF WAYS, PUBLIC OR PRIVATE, PRIOR TO WORKING IN THESE AREAS. 10. ALL PAVEMENT MARKINGS ARE TO BE PAINT IN COLOR AS SPECIFIED. 11. HATCHING OF HARD SURFACE MATERIALS SUCH AS BRICK AND CONCRETE ARE FOR GENERAL INFORMATION PURPOSES. IN NO INSTANCE IS A UTILITY LID, COVER OR ACCESS POINT TO BE COVERED OVER AND CONCEALED BY THE PROPOSED SURFACE MATERIAL. ANY HIDDEN UTILITY BOXES, COVERS, ETC DISCOVERED DURING CONSTRUCTION SHALL BE ADJUSTED TO MATCH PROPOSED GRADE ELEVATIONS. 12. PROVIDE CONSTRUCTION JOINTS AT ALL INTERFACES BETWEEN PROPOSED SURFACES/BUILDINGS. ALL CONSTRUCTION JOINTS ARE TO BE SEALED. KEY NOTES LEGEND O 4" CONCRETE SIDEWALK (TYP). SEE DETAIL SHEET C-501.-••-••-••- PROPERTY LINE © ASPHALT TRAIL (TYP). SEE DETAIL SHEET C-501. ---- •--- LIMITS OF DISTURBANCE © NATURAL SURFACE TRAIL. TRAIL BY OTHERS. NOT IN CONTRACT. ASPHALT TRAIL PAVING © ASPHALT PARKING LOT. SEE DETAIL SHEET C-501. ASPHALT PARKING LOT PAVING O 2'-6" CONCRETE CURB AND GUTTER (TYP). SEE DETAIL SHEET C-501. NCDOT ROAD WIDENING FULL DEPTH OF CONCRETE FLOW THRU. SEE DETAIL SHEET C-505. VARIABLE DEPTH ASPHALT OVERLAY © HC PARKING SPACE (TYP) SEE DETAIL SHEET C-501 1.5" ASPHALT OVERLAY O HC PARKING SIGN. SEE DETAIL SHEET C-501. O DETECTABLE WARNING PLATE, BLACK POWDERCOAT FINISH. SEE DETAIL SHEET C-501. OJ HC RAMP. SEE DETAIL SHEET C-501. OK 4" WHITE PAINT STRIPE (TYP). © HI -VISIBILITY CROSSWALK. SEE DETAIL SHEET C-502. O MATCH EXISTING GRADE WITH SMOOTH TRANSITION. USE CONSTRUCTION JOINT AT INTERFACE OF EXISTING AND PROPOSED SURFACES. ON STOP SIGN. SEE DETAIL SHEET C-502. OO BIKE RACK. OWNER TO PROVIDE AND CONTRACTOR TO INSTALL. CONTRACTOR TO COORDINATE WITH OWNER. © PARK ENTRY SIGN. SEE DETAIL SHEET C-504. ® PARK BENCH (TYP). OWNER TO PROVIDE AND CONTRACTOR TO INSTALL. CONTRACTOR TO COORDINATE WITH OWNER. LOCATION OF FINAL PLACEMENT TO BE DETERMINED BY OWNER. ® TRASH RECEPTACLE (TYP). OWNER TO PROVIDE AND CONTRACTOR TO INSTALL. CONTRACTOR TO COORDINATE WITH OWNER. LOCATION OF FINAL PLACEMENT TO BE DETERMINED BY OWNER. O FLAG POLE. SEE DETAIL SHEET C-502. OT DOG WASTE STATION. WASTE STATION TO BE GREEN TERRABOUND DOG WASTE STATION WITH ONEPUL BAGS MODEL 44-DOGSTATION OR APPROVED EQUAL. LOCATION OF FINAL PLACEMENT TO BE DETERMINED BY OWNER. SEE DETAIL SHEET C-504. O DRINKING FOUNTAIN. SEE DETAIL SHEET C-504. OV HINGED BOLLARD. SEE DETAIL SHEET C-503. O PLAYGROUND AREA. EQUIPMENT BY OTHERS. NOT IN CONTRACT. O ADVENTURE PLAY AREA. PLAY AREA BY OTHERS. NOT IN CONTRACT. 0 8" 120 MIL YELLOW THERMOPLASTIC DIAGONAL PAVEMENT OY PICNIC SHELTER. SEE DETAIL SHEET C-504. STRIPING ON 35' SPACING. SEE DETAIL SHEET C-507. Z CONCRETE CORNHOLE. SEE DETAIL SHEET C-503. 04" 120 MIL WHITE THERMOPLASTIC PAVEMENT STRIPING. SEE DETAIL SHEET C-507. AD BOCCE COURT. SEE DETAIL SHEET C-503. © 4" 120 MIL WHITE THERMOPLASTIC 2'-6'/SP MINI -SKIP PICKLEBALL COURT. SEE DETAIL SHEET C-503. PAVEMENT STRIPING. SEE DETAIL SHEET C-507. V1 CURB RAMP WITH DETECTABLE WARNING DOMES PER NCDOT C1 BASKETBALL COURT. SEE DETAIL SHEET C-503. STANDARD DRAWING 848.05. 6' CHAINLINK FENCE. SEE DETAIL SHEET C-502. © WHITE PAINTED 24" STOP BAR E1 6' SINGLE CHAINLINK GATE. SEE DETAIL SHEET C-502 X1 4" DOUBLE YELLOW PAINT STRIPE F1 10' CHAINLINK FENCE. SEE DETAIL SHEET C-502. G1 10' SINGLE CHAINLINK GATE. SEE DETAIL C-502. © RESTROOM BUILDING. SEE ARCHITECTURAL SHEETS. 11 PROPOSED LIGHT FIXTURE. SEE ELECTRICAL SHEETS. J1 LANDSCAPE/GREEN AREA (TYP). ©1 FITNESS STATION AREA. EQUIPMENT BY OTHERS. NOT IN CONTRACT. L1 WHITE PAINTED NON -DOT TRAFFIC ARROWS AND SYMBOLS. SEE DETAIL SHEET C-505. © SPLIT RAIL FENCE. SEE DETAIL SHEET C-501. T © ASPHALT OVERLAY. SEE DETAIL SHEET C-507. FULL DEPTH ASPHALT. SEE DETAIL SHEET C-507. THERMOPLASTIC WHITE TRAFFIC ARROWS AND SYMBOLS. SEE DETAIL SHEET C-507. ® 4" 120 MIL DOUBLE YELLOW THERMOPLASTIC PAVEMENT STRIPING. SEE DETAIL SHEET C-507. 4" 120 MIL YELLOW THERMOPLASTIC PAVEMENT STRIPING. SEE DETAIL SHEET C-507. C'' 30 0 15 30 60 SHEET FINAL DRAWING 5400 Trinity Road _ CAL :� FOR REVIEW HOLLYBROOK PARK SITE PLAN - A ® Suite 107 = C. � _P ' _ GRAPHIC SCALE DIVISION VALUE = 30 FEET 041598 PURPOSES ONLY Raleigh, NC 27607 ��'. .'� \ NOT RELEASED TOWN OF WENDELLOFFICE MANAGER DESIGNER C=1 919.378.9111 :�9�JyNG�NE�`'��'�� FOR D. CHAPMAN K. DURRANT NC Firm License # C-0459 �,/ Fw'p ' o m cg i I lassociates. com //�1�2� CONSTRUCTION WAKE COUNTY, NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# NO. DATE BY DESCRIPTION M. NORRIS J. HERMAN FEBRUARY 2023 21.01721 T4W T--- i%++++++++++++++++++++++++++++ MAT H LI N E » C„ + ++ +� .+.+.+.+' /� `� ' SEE GENERAL NOTES ON SHEET C-102 r +++ ++++++++++++++++ M CHLINE "B" �. ♦♦ +•+ + + + + + + + + + + + + + + + + + + +++++++++++++++++++++++++++++++++++++++ C Q I +++++++++++++++++++++++++++++++++++++++++ / 1� KEY NOTES ♦ f + + + + + + + + + + + + + + + + + + + + + + + m I A 4" CONCRETE SIDEWALK TYP . SEE DETAIL SHEET C-501. O ADVENTURE PLAY AREA. PLAY AREA BY OTHERS. NOT IN CONTRACT. + + + + + + + + + + + + + + + + + + + + + + + + + Z Z w +++++++++++++++++++++++++++ Y PICNIC SHELTER. SEE DETAIL SHEET C-504. JJ / / - / , ■ ■ ®■ ■ ®■ 0000.+++++++++++++++++++++++++++++++++...................++++++++++ �/ �� ©ASPHALT TRAIL (TYP). SEE DETAIL SHEET C-5fl1. 0 = I = ■,.� + + +♦+ + + + + + + + + + + + + + + + + +O Z CONCRETE CORNHOLE. SEE DETAIL SHEET C-503. U� U + +,+ + + + + + + + + + + + + + + + + + + + + + + + + + + NATURAL SURFACE TRAIL. TRAIL BY OTHERS. NOT IN CONTRACT. + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ,` F- F- + + +♦ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + A BOCCE COURT. SEE DETAIL SHEET C-503. + +++++++++++++++++++++++++++ +++++ / / OD ASPHALT PARKING LOT.SEEDETAILSHEETC-501. 0 Q Q + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + / / + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + r++++++++++++++++++++++++++ +++++++++ PICKLEBALL COURT. SEE DETAIL SHEET C-503. p ++++++++++++++++++++++++++ +++++++++ O2'-6" CONCRETE CURB AND GUTTER (TYP).SEE DETAIL SHEET C-501. +++++++++++++++++++++++++ ++++++++++++ m C1 BASKETBALL COURT.SEEDETAILSHEETC-503. qy � • � t,, + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + / � / OF CONCRETE FLOW THRU. SEE DETAIL SHEET C-505. O cti + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + / o +++++++++++++++++++++++ +++++++++++++ ++++++++++++++++++++++ ++++++++++++++ I ©HCPARKING SPACE (TYP). SEE DETAIL SHEETC-501. �1 6 CHAINLINK FENCE. SEE DETAIL SHEET C-502. B t + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + T++++++++++++++++++++++ ++++++++++++++ / ` +++++++++++++++++++++ +++++++++++++++ E1 6'SINGLECHAINLINKGATE.SEEDETAILSHEETC-502 + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + m O HC PARKING SIGN. SEE DETAIL SHEET C-501. 0 ♦ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + / R++++++++++ +++++++++ +++++++++++++++++ m +++++ +++ + +++++++ +++ ++:+++++++++++ / F1 10' CHAINLINK FENCE. SEE DETAIL SHEET C-502. o ♦ +++ ++++++++ + +++ ++ +++++++++++++ / OI DETECTABLE WARNING PLATE, BLACKPOWDERCOATFINISH.SEEDETAILSHEET 0 + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + / / C- 501. +++++++++++++++++ + +++++ +++++++++++++ / / /©10'SINGLECHAINLINKGATE.SEEDETAILC-502. + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ♦ ++++++++++++++++++ +++++++++++++++++++ / / OJ HCRAMP.SEEDETAILSHEETC-501. + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++++++++++++++++ + ++++++++++++++++ / 43 BUILDING. SEE ARCHITECTURAL SHEETS. + + + + + + + + + + + + ....... + + + + + + + + + + + + + + + + + +++++++++++++++ +++++++++++++++...... / / 4" WHITE PAINT STRIPE(TYP). 11 PROPOSED LIGHT FIXTURE. SEE ELECTRICAL SHEETS. + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +++++++++++++ +++++++++++++++++ +++++++++++++ ++++++++++++++++++ I / / L WHITE PAINTED HI -VISIBILITY CROSSWALK.SEEDETAILSHEETC-502. + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ■ ■ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + / / J1 LANDSCAPE/GREEN AREA (TYP). ■ ■ - + ++++++++++++++++++++++++++++++++++++++++++++++++++++ m Jm 0 MATCH EXISTING GRADE WITH SMOOTH TRANSITION. USE CONSTRUCTION JOINT + + + + + + + o+ + + + + + + + + + + + + + + + + I ,- 1 AT INTERFACE OF EXISTING AND PROPOSED SURFACES. © FITNESS STATION AREA. EQUIPMENT BY OTHERS. NOT IN CONTRACT. J1 +++ +++++++++++++++ I 1 +++ + +++++++++++++++ + + + + + + + + + + + + \ O STOP SIGN. SEE DETAIL SHEET C-502. L1 WHITE PAINTED NON -DOT TRAFFIC ARROWS AND SYMBOLS. SEE DETAIL SHEET p 0 \\ C-505. BIKE RACK. OWNER TO PROVIDE AND CONTRACTOR TO INSTALL. CONTRACTOR TO COORDINATE WITH OWNER. © SPLIT RAIL FENCE. SEE DETAIL SHEET C-501. 90.0' 1 �p © PARK ENTRY SIGN. SEE DETAIL SHEET C-504. © ASPHALT OVERLAY. SEE DETAIL SHEET C-507. 10 / j Q PARK BENCH TYP . OWNER TO PROVIDE AND CONTRACTOR TO INSTALL. 0 FULL DEPTH ASPHALT. SEE DETAIL SHEET C-507. a. Q { ) 0 m CONTRACTOR TO COORDINATE WITH OWNER. LOCATION OF FINAL PLACEMENT TO BE DETERMINED BY OWNER. THERMOPLASTIC WHITE TRAFFIC ARROWS AND SYMBOLS. SEE DETAIL SHEET • / .......................................p / / C- 5 07. o. R ® TRASH RECEPTACLE (TYP). OWNER TO PROVIDE AND CONTRACTOR TO },q' ' ' ' ' ' ' ' ' ' ■ INSTALL. CONTRACTOR TO COORDINATE WITH OWNER. LOCATION OF FINAL ® 4" 120 MIL DOUBLE YELLOW THERMOPLASTIC PAVEMENT STRIPING. SEE DETAIL a .. ... i PLACEMENT TO BE DETERMINED BY OWNER. SHEET C-507. s.. ............ .......... \ \ �•1. a `ram s . "' \ S FLAG POLE. SEE DETAIL SHEET C-502. 1 4" 120 MIL YELLOW THERMOPLASTIC PAVEMENT STRIPING. SEE DETAIL SHEET O ® C-507. ■ a, M 1.3... E .. .. .. . \ a� 0 \ \ DOG WASTE STATION. WASTE STATION TO BE GREEN TERRABOUND DOG WASTE F. \ \ STATION WITH ONEPUL BAGS MODEL 44-DOGSTATION OR APPROVED EQUAL. SD 8" 120 MIL YELLOW THERMOPLASTIC DIAGONAL PAVEMENT STRIPING ON 35' �g �s 10 ■ \ \ LOCATION OF FINAL PLACEMENT TO BE DETERMINED BY OWNER. SEE DETAIL SPACING. SEE DETAIL SHEET C-507. Q... 10............... 14 0 ■ ��� SHEET C-504. s: t7) 0, 0 �, N T1 4" 120 MIL WHITE THERMOPLASTIC PAVEMENT STRIPING. SEE ETAIL SHEET 10.0' E / O DRINKING FOUNTAIN. SEE DETAIL SHEET C-504. C-507. ,a 15;0. 2.,0'......18. ' ■ O HINGED BOLLARD. SEE DETAIL SHEET C-503. 4" 120 MIL WHITE THERMOPLASTIC 2'-6'/SP MINI -SKIP PAVEMENT STRIPING. ' T © SEE DETAIL SHEET C-507. s .. . . 18..... 24.0' J. �g:0' �� �� s \�� O PLAYGROUND AREA. EQUIPMENT BY OTHERS. NOT IN CONTRACT. J1 •. �� ....... H ■ C �� :. '. :a1 0, • r1 ■ ®. V1 CURB RAMP WITH DETECTABLE WARNING DOMES PER NCDOT STANDARD ..... T8 DRAWING 848.05. K y ........ . �....... � � Te . g.•.� s ., .:� .rs..... r�� o..... A \� r-- ©WHITE PAINTED 24" STOP BAR o.: o ,o e - TS - p �. s �'.... o . J . ..� .. ®�� \� 4„ DOUBLE YELLOW PAINT STRIPE � � LOT 312 a M 40.9 10 \ O V IF I - Aw I ■ ■ I ■ ■ o I ■ ■ I 17 ■ ■ 1 LOT 313 U PLASTIC FENCE I'm n2l I • I 1 1 ` 1 1 m � m ~ � 1 1 1 • I � m • r i 1 1 • / 1 1 / l r 10V DUKE ENERGY POWER LINE EASEMENT (BM 2006 PG 614) m m / m / y m r W U ♦ / r / � yX 0 SILT FENCE r ENCROACHES + / + + + + + + UP TO 1.75 + + + + + + + + + + +++++++++++++ ++++++++++++++ + + + + + + + + + + + + + + + + +iwft 11"+"+"+ + + + + + + + + + + to +iwK +1"+ ■a �.•++ . +++++ +++++ 5400 Trinity Road ® Suite 107 Raleigh, NC 27607 919.378.9111 q1Cg I I INC Firm License # C-0459 m cg i I lassociates. com \� C I ( FINAL DRAWING .� FOR REVIEW SEAL �: = 041598 - PURPOSES ONLY NOT RELEASED 9�.�tiGiNFOR Ty�W .D , o� \ \� ; �Lr3,,a 2� CONSTRUCTION NO. I DATE I BY m C Q r 1 � 1 MAT HLINE M CH LI N E "B" '! / DESCRIPTION GENERAL NOTES: 1. EXISTING CONDITIONS AND TOPOGRAPHIC INFORMATION PROVIDED BY SURVEY PROVIDED BY TAYLOR WISEMAN & TAYLOR, DATED JUNE 1, 2022. 2. ALL DEVELOPMENT SHALL CONFORM WITH THE TOWN OF WENDELL DEVELOPMENT ORDINANCE. 3. SITE SIGNAGE SHALL CONFORM WITH APPLICABLE CODES AND ORDINANCES. 4. ALL PAINT STRIPING, PAVEMENT MARKINGS, AND SIGNAGE SHALL CONFORM TO THE LATEST "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AND NCDOT STANDARDS. 5. ALL DIMENSIONS ARE FACE OF CURB, EDGE OF PAVEMENT AND FACE OF WALL, UNLESS OTHERWISE NOTED. 6. THIS SITE IS NOT LOCATED IN ANY FLOOD ZONE. 7. ALL IMPROVEMENTS AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH NORTH CAROLINA STATE STANDARDS. ALL IMPROVEMENTS SHALL COMPLY WITH THE TOWN OF WENDELL STANDARDS FOR STORM DRAINAGE, SIGNAGE, LANDSCAPE, PLANTING, UTILITY AND PARKING REQUIREMENTS. 8. ANY DISCREPANCIES FOUND IN THE FIELD SHALL BE CALLED TO THE ATTENTION OF THE OWNER/ENGINEER/DESIGNER PRIOR TO PROCEEDING WITH ANY WORK. 9. THE GENERAL CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, UTILITIES AND RIGHT OF WAYS, PUBLIC OR PRIVATE, PRIOR TO WORKING IN THESE AREAS. 10. ALL PAVEMENT MARKINGS ARE TO BE PAINT IN COLOR AS SPECIFIED. 11. HATCHING OF HARD SURFACE MATERIALS SUCH AS BRICK AND CONCRETE ARE FOR GENERAL INFORMATION PURPOSES. IN NO INSTANCE IS A UTILITY LID, COVER OR ACCESS POINT TO BE COVERED OVER AND CONCEALED BY THE PROPOSED SURFACE MATERIAL. ANY HIDDEN UTILITY BOXES, COVERS, ETC DISCOVERED DURING CONSTRUCTION SHALL BE ADJUSTED TO MATCH PROPOSED GRADE ELEVATIONS. 12. PROVIDE CONSTRUCTION JOINTS AT ALL INTERFACES BETWEEN PROPOSED SURFACES/BUILDINGS. ALL CONSTRUCTION JOINTS ARE TO BE SEALED. KEY NOTES LEGEND 0 4" CONCRETE SIDEWALK (TYP). SEE DETAIL SHEET C-501.-••-••-••- PROPERTY LINE © ASPHALT TRAIL (TYP). SEE DETAIL SHEET C-501.LIMITS OF DISTURBANCE © NATURAL SURFACE TRAIL. TRAIL BY OTHERS. NOT IN CONTRACT. ASPHALT TRAIL PAVING O ASPHALT PARKING LOT. SEE DETAIL SHEET C-501. ASPHALT PARKING LOT PAVING 0 2'-6" CONCRETE CURB AND GUTTER (TYP). SEE DETAIL SHEET C-501. NCDOT ROAD WIDENING FULL DEPTH ' VARIABLE DEPTH ASPHALT OVERLAY O CONCRETE FLOW THRU. SEE DETAIL SHEET C-505. © HC PARKING SPACE (TYP) SEE DETAIL SHEET C-501 1.5" ASPHALT OVERLAY O HC PARKING SIGN. SEE DETAIL SHEET C-501. O DETECTABLE WARNING PLATE, BLACK POWDERCOAT FINISH. SEE DETAIL SHEET C-501. (D HC RAMP. SEE DETAIL SHEET C-501. OK 4" WHITE PAINT STRIPE (TYP). © HI -VISIBILITY CROSSWALK. SEE DETAIL SHEET C-502. O MATCH EXISTING GRADE WITH SMOOTH TRANSITION. USE CONSTRUCTION JOINT AT INTERFACE OF EXISTING AND PROPOSED SURFACES. ON STOP SIGN. SEE DETAIL SHEET C-502. O BIKE RACK. OWNER TO PROVIDE AND CONTRACTOR TO INSTALL. CONTRACTOR TO COORDINATE WITH OWNER. © PARK ENTRY SIGN. SEE DETAIL SHEET C-504. ® PARK BENCH (TYP). OWNER TO PROVIDE AND CONTRACTOR TO INSTALL. CONTRACTOR TO COORDINATE WITH OWNER. LOCATION OF FINAL PLACEMENT TO BE DETERMINED BY OWNER. ® TRASH RECEPTACLE (TYP). OWNER TO PROVIDE AND CONTRACTOR TO INSTALL. CONTRACTOR TO COORDINATE WITH OWNER. LOCATION OF FINAL PLACEMENT TO BE DETERMINED BY OWNER. OS FLAG POLE. SEE DETAIL SHEET C-502. O DOG WASTE STATION. WASTE STATION TO BE GREEN TERRABOUND DOG WASTE STATION WITH ONEPUL BAGS MODEL 44-DOGSTATION OR APPROVED EQUAL. LOCATION OF FINAL PLACEMENT TO BE DETERMINED BY OWNER. SEE DETAIL SHEET C-504. O DRINKING FOUNTAIN. SEE DETAIL SHEET C-504. OV HINGED BOLLARD. SEE DETAIL SHEET C-503. O PLAYGROUND AREA. EQUIPMENT BY OTHERS. NOT IN CONTRACT. O ADVENTURE PLAY AREA. PLAY AREA BY OTHERS. NOT IN CONTRACT. S1 8" 120 MIL YELLOW THERMOPLASTIC DIAGONAL PAVEMENT OY PICNIC SHELTER. SEE DETAIL SHEET C-504. STRIPING ON 35' SPACING. SEE DETAIL SHEET C-507. Z CONCRETE CORNHOLE. SEE DETAIL SHEET C-503. 0 T1 4" 120 MIL WHITE THERMOPLASTIC PAVEMENT STRIPING. SEE DETAIL SHEET C-507. AD BOCCE COURT. SEE DETAIL SHEET C-503. © 4" 120 MIL WHITE THERMOPLASTIC 2'-6'/SP MINI -SKIP ® PICKLEBALL COURT. SEE DETAIL SHEET C-503. PAVEMENT STRIPING. SEE DETAIL SHEET C-507. V1 CURB RAMP WITH DETECTABLE WARNING DOMES PER NCDOT C1 BASKETBALL COURT. SEE DETAIL SHEET C-503. STANDARD DRAWING 848.05. ® 6' CHAINLINK FENCE. SEE DETAIL SHEET C-502. © WHITE PAINTED 24" STOP BAR E1 6' SINGLE CHAINLINK GATE. SEE DETAIL SHEET C-502 X1 4" DOUBLE YELLOW PAINT STRIPE F1 10' CHAINLINK FENCE. SEE DETAIL SHEET C-502. © 10' SINGLE CHAINLINK GATE. SEE DETAIL C-502. ® RESTROOM BUILDING. SEE ARCHITECTURAL SHEETS. 11 PROPOSED LIGHT FIXTURE. SEE ELECTRICAL SHEETS. J1 LANDSCAPE/GREEN AREA (TYP). ® FITNESS STATION AREA. EQUIPMENT BY OTHERS. NOT IN CONTRACT. L1 WHITE PAINTED NON -DOT TRAFFIC ARROWS AND SYMBOLS. SEE DETAIL SHEET C-505. © SPLIT RAIL FENCE. SEE DETAIL SHEET C-501. r ® ASPHALT OVERLAY. SEE DETAIL SHEET C-507. 00 FULL DEPTH ASPHALT. SEE DETAIL SHEET C-507. ® THERMOPLASTIC WHITE TRAFFIC ARROWS AND SYMBOLS. SEE DETAIL SHEET C-507. ® 4" 120 MIL DOUBLE YELLOW THERMOPLASTIC PAVEMENT STRIPING. SEE DETAIL SHEET C-507. ® 4" 120 MIL YELLOW THERMOPLASTIC PAVEMENT STRIPING. SEE DETAIL SHEET C-507. HOLLYBROOK PARK TOWN OF WENDELL WAKE COUNTY, NORTH CAROLINA 30 0 15 30 60 GRAPHIC SCALE DIVISION VALUE = 30 FEET OFFICE MANAGER D.CHAPMAN PROJECT MANAGER M. NORRIS DESIGNER K. DURRANT REVIEWER J. HERMAN DATE FEBRUARY 2023 SITE PLAN - C PROJECT # 21.01721 FUNDING # SHEET C=1 04 I I I I I 6'WOOD FENCE ENCROACHES 0.1'-0.2' _ - 2g3 1 1 GENERAL NOTES: 1 1. EXISTING CONDITIONS AND TOPOGRAPHIC INFORMATION PROVIDED BY SURVEY PROVIDED BY TAYLOR WISEMAN & TAYLOR, DATED JUNE 1, 2022. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL STATE AND LOCAL CODES IN OBSERVING EROSION CONTROL MEASURES BOTH ON AND OFF SITE. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF ALL EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR AS DIRECTED BY LOCAL AUTHORITIES OR THE OWNER. 4. CONTRACTOR SHALL BE FINANCIALLY RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS OFF SITE. THIS RESPONSIBILITY SHALL INCLUDE ALL REQUIRED APPROVALS AND CONDITIONS DICTATED BY LOCAL OR STATE EROSION CONTROL AUTHORITIES. / \W Z W , Z' 5. THE CONTRACTOR SHALL ENGAGE AN INDEPENDENT TESTING LABRATORY (ITL) TO PROVIDE TESTING OPERATIONS ALL FILL MATERIALS SHALL BE APPROVED FOR SUITABILITY BY THE ITL OF EARTHEN MATERIALS DURING EXCAVATION AND FILL / __ 284� U 6. SEED ALL DISTURBED AREAS UTILIZING A FESCUE BLEND (MIN. 2 REBEL, JAGUAR, FALCON). APPLICATION RATE OF SEED PER AAN STANDARDS. ALL FERTILIZER AND LIME AS RECOMMENDED BY SOIL TEST. < 7. ALL SPOT ELEVATIONS AT CURB ARE AT TOP BACK OF CURB. ALL OTHER SPOT ELEVATIONS ARE AT SLAB GRADE OR AS INDICATED. I 8. ALL OPEN STORM DRAIN PIPES SHALL BE PROTECTED WITH STONE FILTER PROTECTION AFTER STOPPAGE OF WORK EACH DAY. SEE DETAILS SHEET C-505. 9. CONTRACTOR TO ENSURE POSITIVE DRAINAGE ON ALL SURFACES. NOTIFY ENGINEER/LANDSCAPE ARCHITECT PRIOR TO INSTALLATION OF ANY PAVING/SURFACES IF ON SITE CONDITIONS ARE FIELD DETERMINED NOT TO PROVIDE POSITIVE DRAINAGE. 10. CONTRACTOR TO INSTALL SILT SAK EROSION PROTECTION ON ANY STRUCTURE RECEIVING RUNOFF FROM THE ACTIVE CONSTRUCTION AREA, NOT ALREADY PROTECTED BY AN EROSION CONTROL DEVICE. UNDER NO CIRCUMSTANCE IS UNTREATED WATER TO BE RELEASED FROM THE WORK AREA WITHOUT PASSING THROUGH AN EROSION CONTROL DEVICE. / KEY NOTES: PROPOSED MANHOLE. SEE DETAIL SHEET C-509. \ \ \ \ © PROPOSED DROP INLET WITH FRAME AND GRATE. SEE DETAIL SHEET C-505. / FIREWOOD ROOF / \ I \ \ © PROPOSED FLARED END SECTION -MATERIAL TO MATCH PIPE. SEE DETAIL SHEET C-509. OVERHANG & FENCE / ENCROACHES 2.8' / \ PROPOSED CONCRETE CATCH BASIN WITH FRAME, GRATE, AND HOOD PER NCDOT STANDARD DRAWING 840.02 E PROPOSED ROCK DISSIPATER SEE DETAIL SHEET C 506 1 STORY WOOD SHED / SHED GATE P - / MATCH EXISTING GRADE WITH SMOOTH TRANSITION. CONCRETE PIPE COLLAR. SEE DETAIL SHEET C-XXX CUT AND REMOVE 11' OF EXISTING ARCH CMP AND EXTEND 26' USING 71"x47" ARCH CMP HAVING 2-2/3"x1/2" CORRUGATIONS AND A WALL THICKNESS / OF 0.138". MATCH SLOPE OF EXISTING ARCH CMP. ALL WORK IN THE STREAM SHALL 00 BE PERFORMED IN DRY CONDITIONS. THE CONTRACTOR SHALL PROVIDE ADEQUATE DIVERSION OR PUMP -AROUND TO MAINTAIN A DRY WORK AREA. SEE DETAIL SHEET C-507. Q PROVIDE FABRICATED JOINT TO CONNECT STORM DRAIN PIPE TO ARCH CMP. USE PIPE CONCRETE PIPE COLLAR TO CONNECT STORM DRAIN PIPE TO FABRICATED JOINT. J PROPOSED CLASS IV RCP STORM DRAIN PIPE PROPOSED HDPE STORM DRAIN PIPE _ 1 PROPOSED CONCRETE TRAFFIC BEARING JUNCTION BOX WITH MANHOLE FRAME AND COVER PER NCDOT STANDARD DRAWINGS 840.34 AND 840.46. 286 \ I / 284.53 I / 285 .30 284.53 \ 1 2800 3 / _ / N 0% SLOPE -1.07- SLOP 282.77 / 283 L0 I 1 INV=281.24' d / - N / I N \ I 283.50 / N \ 0 I\ 282.77 30"MAPLE CN / ap I 1.OE 1.0% 1 \ EX 282.88 SLOPE I INV=280.90' / 2-1 1 B / -0 \ I N r-j - I N \ / Za'284.53 � 285.30 \ - I- \ 282.52 / / - - _ 282.21 _ 28 3 I B N I \ I \ 282.01 � � 1 - - - 282.7 - _ I 281.88 - - - - o _ 282.77 J 283 xxxx 284 1-3 D J 281.71 / K 1-4 \\kP\ `.\.::::... 281.43 D 81.281.11 2a1� /Z28 282 1 D 280.94 280.77 280.60 J 1 K 280.4 280.26 280.01 \ J D 2so 2 �.... _ 2 J ...-...-..`.. [EX 284.20 .. ,�...-........... ...................... ....... . . ................ V i , , EX 283.97 ,Y ...................... - �.. EX 283.74 EX 283.62 / X 282.06 W W - _ _ - - .. .. ' �� ������ EX 283.52 \ iX283.28 �/- - -INV=274.77' EX 282.99 lEX 282.68 EX 282.36 EX 281.79 X 281.31 11-6 L r/ EX 281.03 EX 280 76 EX 280 47 Pipe Characteristics Upstream Structure ID Downstream Structure ID Upstream Structure Rim Elevation Length (FT) Inv. In Inv. Out Diameter (IN) FES 1-2 282.85 62 281.00 278.40 18 1-2 1-3 282.05 60 278.20 277.70 18 1-3 1-3A 281.50 46 277.50 277.10 18 1-3A 1-4 281.35 60 276.90 276.40 18 1-4 1-5 280.90 175 275.90 274.30 24 1-5 1-6 279.35 140 274.10 273.00 24 1-6 1-7 277.80 169 272.80 268.50 24 1-7 1-8 273.00 132 268.30 260.50 24 1-8 1-9 267.70 198 263.50 255.50 24 1-9 1-10 259.45 107 255.30 253.70 24 1-10 Arch CMP 257.90 5 253.50 253.40 24 2-1 1-4 282.50 69 279.50 278.15 12 3-1 1-5A 281.00 55 278.00 276.80 12 4-1 Arch CMP 257.90 5 254.50 254.40 15 5-1 1-8 272.90 46 269.00 264.25 15 6-1 FES 272.90 50 268.00 267.50 15 7-1 FES 275.50 40 271.50 271.00 15 8-1 FES 277.00 53 274.00 271.00 15 1-5A 1-5 279.35 6 276.60 276.50 12 1-6A 1-6 277.45 11 274.70 274.50 12 1-7A 1-7 273.00 11 270.25 270.10 12 1-8A 1 1-8 1 267.40 1 9 1 264.75 264.60 1 12 i 15 RCP � 0\ C I FINAL DRAWING 5400 Trinity Road 2•.� : FOR REVIEW HOLLYBROOK PARK Suite 107 _ SEAL ® - 041598 . - PURPOSES ONLY Raleigh, NC 27607 - = NOT RELEASED 919.378.9111 '� �'� TOWN OF WENDELL NC Firm License # C-0459 i, FW Io �oc\ FOR mcgillassociates.com�!��CONSTRUCTION 1 1/19/2023 COB REVISED PER NCDEQ EC COMMENTS WAKE COUNTY, NORTH CAROLINA NO. DATE BY DESCRIPTION 30 0 15 30 60 GRAPHIC SCALE DIVISION VALUE = 30 FEET GRADING AND DRAINAGE - A OFFICE MANAGER DESIGNER D. CHAPMAN M. OETTING PROJECT MANAGER REVIEWER DATE PROJECT # FUNDING # M. NORRIS J. HERMAN FEBRUARY 2023 21.01721 SHEET C=201 Y Q d Y O O Ir m J J O J J W 0 z W LL O O H N + + + + + + + + + + + + + ++ ++ ++ +X+ + + ++ ++ ++ ++ + +,�+++ + / / / MAT HLINE + + + + + + + + + + + + + + + + + h a » ++++++++++++++++++/+ / M CHLINE B /� / / ♦♦ +++ +++++I++++/+++++++ / w `_ / / / 1 2 + + + + + + + + + + + /+ + + + + + / + + + + / /++++++++ ++ +++++ +++++ryeI W / ♦ 40 + + + + + + + + + + + + + + + + + + + + + + + + / \ I q^ / + + + + + + + + + + + + + + + + + + + + + + + + U 1 U + + +♦ + + + + +o+ + + + + ..... + +Tf + + +�++++++++/++++++++++ + + + ++++++++++++++++ry+++++++++++++/+++++++++++++++++++++++ +++++++ +♦++++++++++++(�+++I+++++++ / +++++ N x + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + Q '+++++++++++++++fi+++�+++++++ / +++++++++++++++ ++++++++++ ++++++ I - + + + + + + + I / I C +++++++++++++++++++++++++ +++++++ + J = +++++++++++++++++�++ +++++ +++I+++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + 1 IY / ++++++++++++++++ I / / + + + + + + + + + + + + / ++++ ++++++�+++++� ++I�++++++++++++ -� + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + / +++�+++++++++++++++++ +++++I++++++++++ / 1 ++ +++++++++++�++++++ +++++++ + + + + + + + + / I \ +++++ +++ + ++ ++++ +I+++ ++++++++++I+ l 1 I +++ ++++++++ + ++�I +++++++++++++++++ I L ++++++++++ +++++++ \ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + / / 1 �, I I I I ♦ / ++++++++++ ++++++++++++++++++++++ + +++++++++ + + + + + + + + + + + + + + + + + + + + + + 1 co l I +++++++++++++, + ++++++++++++++++ 1 \N \ \ 01 z Q ry 0_ 0 Df Y n In N N 0 N a w 0 0 J 0 w W le ry le O O ry J J O N O W C7 >z_ 0_ w d O 0_ a Y Df Q d Y O O 0_ 00 J J O U Z J J W 0 z w N N O 1 1 1 1 1 1 1 + +++++++++++++ +++V+++++++++++I ry + + + + + + + + + + + + + + + + + + + + + + + + + + + ...... /\ +++++++++++++ I++ ++ ++++ +++++++/� ■■ ++++++++++++++++�++++++ +++++++++++ +++++++I+++++++++�+++++ I / // 11 1s +++++++++++++++++1+++++ ++++�++++ +++++++0 +++++++/�++++�/ I / �/ % KEY NOTES: \ + ■ ♦ �� + + + + + + + ++. + + + N + + + + + � + + +a+ + I �� O PROPOSED MANHOLE. SEE DETAIL SHEET C-509. + + + + •+ + + +1 + + + + + + + +� + + 1 I + ++++++ +++ +++++ ++++++ ++++ +++ / " �\ \ �� © PROPOSED DROP INLET WITH FRAME AND GRATE. SEE DETAIL SHEET C-505. + + + + + + GENERAL NOTES: 1. EXISTING CONDITIONS AND TOPOGRAPHIC INFORMATION PROVIDED BY SURVEY PROVIDED BY TAYLOR WISEMAN & TAYLOR, DATED JUNE 1, 2022. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL STATE AND LOCAL CODES IN OBSERVING EROSION CONTROL MEASURES BOTH ON AND OFF SITE. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF ALL EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR AS DIRECTED BY LOCAL AUTHORITIES OR THE OWNER. 4. CONTRACTOR SHALL BE FINANCIALLY RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS OFF SITE. THIS RESPONSIBILITY SHALL INCLUDE ALL REQUIRED APPROVALS AND CONDITIONS DICTATED BY LOCAL OR STATE EROSION CONTROL AUTHORITIES. 5. THE CONTRACTOR SHALL ENGAGE AN INDEPENDENT TESTING LABRATORY (ITL) TO PROVIDE TESTING OF EARTHEN MATERIALS DURING EXCAVATION AND FILL OPERATIONS. ALL FILL MATERIALS SHALL BE APPROVED FOR SUITABILITY BY THE ITL. 6. SEED ALL DISTURBED AREAS UTILIZING A FESCUE BLEND (MIN. 2 REBEL, JAGUAR, FALCON). APPLICATION RATE OF SEED PER AAN STANDARDS. ALL FERTILIZER AND LIME AS RECOMMENDED BY SOIL TEST. 7. ALL SPOT ELEVATIONS AT CURB ARE AT TOP BACK OF CURB. ALL OTHER SPOT ELEVATIONS ARE AT SLAB GRADE OR AS INDICATED. 8. ALL OPEN STORM DRAIN PIPES SHALL BE PROTECTED WITH STONE FILTER PROTECTION AFTER STOPPAGE OF WORK EACH DAY. SEE DETAILS SHEET C-505. 9. CONTRACTOR TO ENSURE POSITIVE DRAINAGE ON ALL SURFACES. NOTIFY ENGINEER/LANDSCAPE ARCHITECT PRIOR TO INSTALLATION OF ANY PAVING/SURFACES IF ON SITE CONDITIONS ARE FIELD DETERMINED NOT TO PROVIDE POSITIVE DRAINAGE. 10. CONTRACTOR TO INSTALL SILT SAK EROSION PROTECTION ON ANY STRUCTURE RECEIVING RUNOFF FROM THE ACTIVE CONSTRUCTION AREA, NOT ALREADY PROTECTED BY AN EROSION CONTROL DEVICE. UNDER NO CIRCUMSTANCE IS UNTREATED WATER TO BE RELEASED FROM THE WORK AREA WITHOUT PASSING THROUGH AN EROSION CONTROL DEVICE. \ �� 8 \ 279 \ \ • ...... \ \ \ 280 .. ............... .. \ \ .. ....... \ .. . ��� \ \ \ \ \ \ •^ Q ''''''' . '''''' ..'.�........'..... \ D d. . ... .. ......... ............. . W...... 1\' \ . �..... .. ........ �� .\...... \. \ \.......... \ ... ' 3%....\ .... . \ .� '..�.' '° .�..�'... �.d .' ...\... ...... ........... ...�........ ..... ........ .......... ... \ d•. e. . \ ...... ......... ................... . ......... °e1° 1 7 •,eye °.P .............. ................ \ . ....... �... \ ........ C'j \ \ \ \ .... ..... .......... .... .'\.'.'.'.'.' ' d • \ \ s' fa \, \ .S ... ..\.......... \.. .... ..\.............. ..... ........ ... ......... .............. ........ \ .............. '.d.' '.• ' .. \. �.. � �'.... d. a .... ............\ .... ... .... .......\.. .... . ... ........ ........ .. ........... .... .... . ........ .... \ .. . \ • e'1 1 1 ......... PROPOSED FLARED END SECTION -MATERIAL TO MATCH PIPE. SEE DETAIL SHEET C-509. ■ qo C I ■ / / 1 \ \� OD PROPOSED CONCRETE CATCH BASIN WITH FRAME, GRATE, AND HOOD PER NCDOT STANDARD DRAWING 840.02 K I I I I \ \ �� �� EO PROPOSED ROCK DISSIPATER. SEE DETAIL SHEET C-506. MATCH EXISTING GRADE WITH SMOOTH TRANSITION. CONCRETE PIPE COLLAR. SEE DETAIL SHEET C-XXX CUT AND REMOVE 11' OF EXISTING ARCH CMP AND EXTEND 26' USING d \ \ \ \ \ \ \\\ \\ 71 "x47" ARCH CMP HAVING 2-2/3"x1 /2" CORRUGATIONS AND A WALL THICKNESS OF 0.138". MATCH SLOPE OF EXISTING ARCH CMP. ALL WORK IN THE STREAM SHALL i \ ♦ `� BE PERFORMED IN DRY CONDITIONS. THE CONTRACTOR SHALL PROVIDE ADEQUATE \ \ \ \ \ \ \\ \\\\ DIVERSION OR PUMP -AROUND TO MAINTAIN A DRY WORK AREA. SEE DETAIL SHEET C-507. PROVIDE FABRICATED JOINT TO CONNECT STORM DRAIN PIPE TO ARCH CMP. USE •40 \ I I 1 \ \ PIPE CONCRETE PIPE COLLAR TO CONNECT STORM DRAIN PIPE TO FABRICATED JOINT. PROPOSED CLASS IV RCP STORM DRAIN PIPE PROPOSED HDPE STORM DRAIN PIPE \ \ \ \ \ I I\ \ \ \ © PROPOSED CONCRETE TRAFFIC BEARING JUNCTION BOX WITH MANHOLE FRAME AND COVER PER NCDOT STANDARD DRAWINGS 840.34 AND 840.46. _j /LARGE ROCK Pipe Characteristics Upstream Structure ID Downstream Structure ID Upstrea m Structure Rim Elevation Length (FT) Inv. In Inv. Out Diameter (IN) FES 1-2 282.85 62 281.00 278.40 18 1-2 1-3 282.05 60 278.20 277.70 18 1-3 1-3A 281.50 46 277.50 277.10 18 1-3A 1-4 281.35 60 276.90 276-40 18 1-4 1-5 280.90 175 275.90 274.30 24 1-5 1-6 279.35 140 274.10 273.00 24 1-6 1-7 277.80 169 272.80 268- 50 24 1-7 1-8 273.00 132 268-30 260-50 24 1-8 1-9 267.70 198 263.50 255.50 24 1-9 1-10 259.45 107 255.30 253.70 24 1-10 Arch CMP 257.90 5 253.50 253.40 24 2-1 1-4 282.50 69 279.50 278.15 12 3-1 1-5A 281.00 55 278.00 276.80 12 4-1 Arch CMP 257.90 5 254.50 254.40 15 5-1 1-8 272.90 46 269-00 264-25 15 6-1 FE5 272.90 50 268.00 267.50 15 7-1 FES 275.50 40 271.50 271-00 15 8-1 FES 277.00 53 274.00 271.00 15 1-5A 1-5 279.35 6 276.60 276.50 12 1-6A 1-6 277.45 11 274.70 274.50 12 1-7A 1-7 273.00 11 270.25 270.10 12 1-8A 1-8 267.40 1 9 1 264.75 264.60 12 / J / 13 cc, i m.co \ I \ I�, �-�50-�� I � m GRAVEL 1 CHECK DAMS ............................... VV ............................ r � 5 - \ R \ / ■ \ \ / 1 INV=270.80' _ _ - --ARCH-CARP -0- 1.%- INV=271.30' \\\\ It/ FINAL DRAWING 5400 Trinity Road FOR REVIEW ® Suite 107 _ LEAI_ _ PURPOSES ONLY Raleigh, NC 27607 = 041598 _ NOT RELEASED 919.378.9111 �9�`�4G/NE�e FOR NC Firm License #_ '%;S"F►%v'o.`��. CONSTRUCTION mcgillassociates.com -� L • a d . - 1 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\ Z 30 0 15 30 60 HOLLYBROOK PARK 111111 GRADING AND DRAINAGE - B GRAPHIC SCALE DIVISION VALUE = 30 FEET ' e T I V.d e . d �`X�NN �1U TOWN OF WENDELLOFFICE MANAGER DESIGNER D. CHAPMAN M. OETTING 1 1 1/19/2023 COB REVISED PER NCDEQ EC COMMENTS WAKE COUNTY, NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# NO. DATE BY DESCRIPTION M. NORRIS J. HERMAN FEBRUARY 2023 21.01721 SHEET C=202 a / / LOT 312 LOT 313 / I \ / I \ 21 19 20 6' PLASTIC FENCE \�� \ _ 284 / \ \ / 283 LOT 305 co 100' DUKE ENERGY POWER LINE EASEMENT (BM 2006 6 PG 614 / � 1 I / ry ry�� / / / '� U / Y LL SILT FENCE ENCROACHES / + + UP TO 1.75 + + + + + + + + + + +� + + + + ... .... � + + + + + + + + + + + + + + + GENERAL NOTES: 1. EXISTING CONDITIONS AND TOPOGRAPHIC INFORMATION PROVIDED BY SURVEY PROVIDED BY TAYLOR WISEMAN & TAYLOR, DATED JUNE 1, 2022. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL STATE AND LOCAL CODES IN OBSERVING EROSION CONTROL MEASURES BOTH ON AND OFF SITE. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF ALL EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR AS DIRECTED BY LOCAL AUTHORITIES OR THE OWNER. 4. CONTRACTOR SHALL BE FINANCIALLY RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS OFF SITE. THIS RESPONSIBILITY SHALL INCLUDE ALL REQUIRED APPROVALS AND CONDITIONS DICTATED BY LOCAL OR STATE EROSION CONTROL AUTHORITIES. 5. THE CONTRACTOR SHALL ENGAGE AN INDEPENDENT TESTING LABRATORY (ITL) TO PROVIDE TESTING OF EARTHEN MATERIALS DURING EXCAVATION AND FILL OPERATIONS. ALL FILL MATERIALS SHALL BE APPROVED FOR SUITABILITY BY THE ITL. 6. SEED ALL DISTURBED AREAS UTILIZING A FESCUE BLEND (MIN. 2 REBEL, JAGUAR, FALCON). APPLICATION RATE OF SEED PER AAN STANDARDS. ALL FERTILIZER AND LIME AS RECOMMENDED BY SOIL TEST. 7. ALL SPOT ELEVATIONS AT CURB ARE AT TOP BACK OF CURB. ALL OTHER SPOT ELEVATIONS ARE AT SLAB GRADE OR AS INDICATED. 8. ALL OPEN STORM DRAIN PIPES SHALL BE PROTECTED WITH STONE FILTER PROTECTION AFTER STOPPAGE OF WORK EACH DAY. SEE DETAILS SHEET C-505. 9. CONTRACTOR TO ENSURE POSITIVE DRAINAGE ON ALL SURFACES. NOTIFY ENGINEER/LANDSCAPE ARCHITECT PRIOR TO INSTALLATION OF ANY PAVING/SURFACES IF ON SITE CONDITIONS ARE FIELD DETERMINED NOT TO PROVIDE POSITIVE DRAINAGE. 10. CONTRACTOR TO INSTALL SILT SAK EROSION PROTECTION ON ANY STRUCTURE RECEIVING RUNOFF FROM THE ACTIVE CONSTRUCTION AREA, NOT ALREADY PROTECTED BY AN EROSION CONTROL DEVICE. UNDER NO CIRCUMSTANCE IS UNTREATED WATER TO BE RELEASED FROM THE WORK AREA WITHOUT PASSING THROUGH AN EROSION CONTROL DEVICE. KEY NOTES: O PROPOSED MANHOLE. SEE DETAIL SHEET C-509. © PROPOSED DROP INLET WITH FRAME AND GRATE. SEE DETAIL SHEET C-505. © PROPOSED FLARED END SECTION —MATERIAL TO MATCH PIPE. SEE DETAIL SHEET C-509. DO PROPOSED CONCRETE CATCH BASIN WITH FRAME, GRATE, AND HOOD PER NCDOT STANDARD DRAWING 840.02 EO PROPOSED ROCK DISSIPATER. SEE DETAIL SHEET C-506. FO MATCH EXISTING GRADE WITH SMOOTH TRANSITION. © CONCRETE PIPE COLLAR. SEE DETAIL SHEET C—XXX HO CUT AND REMOVE 11' OF EXISTING ARCH CMP AND EXTEND 26' USING 71"x47" ARCH CMP HAVING 2-2/3"x1/2" CORRUGATIONS AND A WALL THICKNESS OF 0.138". MATCH SLOPE OF EXISTING ARCH CMP. ALL WORK IN THE STREAM SHALL BE PERFORMED IN DRY CONDITIONS. THE CONTRACTOR SHALL PROVIDE ADEQUATE DIVERSION OR PUMP —AROUND TO MAINTAIN A DRY WORK AREA. SEE DETAIL SHEET C-507. ID PROVIDE FABRICATED JOINT TO CONNECT STORM DRAIN PIPE TO ARCH CMP. USE PIPE CONCRETE PIPE COLLAR TO CONNECT STORM DRAIN PIPE TO FABRICATED JOINT. JO PROPOSED CLASS IV RCP STORM DRAIN PIPE KO PROPOSED HDPE STORM DRAIN PIPE © PROPOSED CONCRETE TRAFFIC BEARING JUNCTION BOX WITH MANHOLE FRAME AND COVER PER NCDOT STANDARD DRAWINGS 840.34 AND 840.46. + + + + + + + + + + + + + / ++++++++++++ / i MAT HLINE ++++++ +++++ +++ % / / /� / �,�,, ++++++++++++++++++++ / ry N " M CHLINE "B" +++++++++++++++++ +++ / +++ +++++1++++/+++ +++ / ++++++++++++ ++ ++ 30 0 15 30 60 c1/ SHEET FINAL DRAWING 5400 Trinity Road _ �''.� : FOR REVIEW H O LLYB ROO K PARK GRAPHIC SCALE DIVISION VALUE = 30 FEET GRADING AND DRAINAGE - C ® Suite 107 _ 4 041598 19 _ PURPOSES ONLY Raleigh, NC 27607 = �?�'. ; NOT RELEASED TOWN OF WENDELL OFFICE MANAGER DESIGNER 919.378.9111 :�9�jyNcirvE�.�'\� C=203 FOR D. CHAPMAN M. OETTING NC Firm License # C-0459 FW'p0, \ mcgillassociates.com ��4 CONSTRUCTION 1 1/19/2023 COB REVISED PER NCDEQ EC COMMENTS WAKE COUNTY, NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# NO. DATE BY DESCRIPTION M. NORRIS J. HERMAN FEBRUARY 2023 21.01721 Y fY Q 11 Y 0 0 IY Ib J J 0 J J W 0 z W U_ 0 0 N Y Q d Y O O Ir m J J O J J W 0 Z W 16+75 17+00 17+25 17+50 17+75 0 288 288 288 288 284 284 284 284 284 284 � O 284 284 284 284 280 280 280 280 280 280 280 \ 280 280 280 276 0'7% 276 276 — 276 276 _ 2 0% 2.2% 276 " 276 Z.U° — — 276 276 2.0% 276 272 272 272 \ 272 272 — — — — — 272 272 272 272 272 268 268 268 268 268 1 1 1268 268 40 20 0 20 40 268 268 40 20 0 20 40 268 264 40 20 0 20 40 264 264 40 20 0 20 40 I I I Er=1264 264 40 20 0 20 40 264 15+50 15+75 16+00 16+25 16+50 288 288 288 288 288 288 288 288 288 288 284 284 284 284 284 284 284 284 284 284 — 280 \ 0 280 280 \ 2.0% �_ 280 280----, 2.0% 280 280 \ 1.5% 280 280 280 2.0% 1.3% 276 276 276 276 276 — 276 276 --- — 276 276 — --- — — 276 272 272 272 272 272 272 272 272 272 272 268 40 20 0 20 40 268 268 40 20 0 20 40 268 268 40 20 0 20 40 268 268 40 20 0 20 40 268 268 40 20 0 20 40 268 14+25 14+50 14+75 15+00 15+25 288 288 288 288 288 288 288 288 288 288 284 284 284 284 284 284 284 284 284 284 2.0° 1.2% — — — — — — 1.3 280 — \ 280 280 --- _ 280 280 2'0 _1_2% _ 280 280 _1_1% 280 280 -- % 280 276 276 276 \ 276 276 276 276 276 276 276 272 272 272 272 272 272 272 272 272 272 268 40 20 0 20 40 268 268 40 20 0 20 40 268 268 40 20 0 20 40 268 268 40 20 0 20 40 268 268 40 20 0 20 40 268 13+50 13+75 14+00 13+00 13+25 288 288 288 288 288 288 288 288 288 288 284 284 284 284 284 284 4.5 3.3% ° f- 284 ° 284 284 5.11% 284 280 _ 280 280--- — _ — --- 280 280 — — --- 280 280 280 280------ 280 276 276 276 276 276 276 276 276 276 276 272 272 272 272 272 272 272 40 20 0 20 40 272 272 40 20 0 20 40 272 268 40 20 0 20 40 268 268 40 20 0 20 40 268 268 268 40 20 0 20 40 11 +75 292 292 12+00 12+25 12+50 12+75 288 288 288 288 288 288 288 288 288 288 284-----6.a% — — 7.3% — _ — _ — 284 284 — ° 284 284 — 4% 284 284 .4% — — — _ 284 284 .5� ° — 284 280 280 280 280 280 280 280 _ 280 280 280 276 276 276 276 276 276 276 276 276 276 272 40 20 0 20 40 272 272140 20 0 20 40 272 272140 20 0 20 40 272 272 40 20 0 20 40 272 272 40 20 0 20 40 272 10+75 11 +00 11 +25 11 +50 10+ 45 292 292 292 292 292 292 292 292 292 292 288 288 288 288 288 288 288 288 288 288 284 4% 1� — 284 284 ' — — 284 284 a.1 ° — — — 284 284 — 6_4% - 284 284 35% — 284 280 280 280 280 280 280 280 280 280 280 276 276 276 276 276 276 276 276 276 40 20 0 20 40 276 272 40 20 0 20 40 272 272 40 20 0 20 40 272 272 40 20 0 20 40 272 272 272 40 20 0 20 40 C20 0 10 20 40 SHEET FINAL DRAWING 5400 Trinity Road �'.� FOR REVIEW HOLLYBROOK PARK HOLLYBROOK ROAD Suite 107 c F y • GRAPHIC SCALE DIVISION VALUE = 20 FEET 04EAL PURPOSES ONLY CROSS SECTIONS R OFFICE MANAGER DESIGNER Raleigh, NC 27607 ��. �, NOT RELEASEDTOWN OF WENDELLM III919.378.9111 �9� •' GiNEF� ���� D. CHAPMAN M. OETTING C=204 NC Firm License # C-0459 %,tiFw p pE��` F R �,�2�C9 CONSTRUCTION WAKE COUNTY, NORTH CARO LI NA PROJECT MANAGER REVIEWER DATE PROJECT # FUNDING # m cg i I lassociates. com NO. DATE BY DESCRIPTION M. NORRIS J. HERMAN FEBRUARY 2023 21.01721 Y Q d Y O O Ir m J J O 24+25 24+75 w 0 z Uj 268 268 24+50 272 272 25+13.13 � O 264 264 268 268 268 268 272 272 � 0 260 260 264 264 264 __ 264 268 268 256 — 256 260 , 260 260 _ 260 264 264 " 252 252 256 256 256 256 260 260 248 40 20 0 20 40 248 252 40 20 0 20 40 252 252 40 20 0 20 40 252 256 40 20 0 20 40 256 23+75 24+00 23+00 23+25 23+50 268 268 268 268 264 264 264 264 264 264 264 264 264 264 260 260 260 260 260 260 260 ---1 1260 260 --- --- 260 256 256 256 256 256 256 256 256 256 256 252 252 252 252 252 252 252 252 252 252 E1 248 40 20 0 20 40 248 248 40 20 0 20 40 248 248 40 20 0 20 40 248 248 40 20 0 20 40 248 248 248 40 20 0 20 40 22+25 22+50 22+75 21 +75 22+00 264 264 264 264 264 264 264 264 264 264 260 260 260 260 260 260 260 260 260 260 256 _ , 256 256 _ 256 256 256 256 — 256 256 256 252 252 252 252 252 252 252 252 252 252 248 248 248 248 248 248 248 40 20 0 20 40 248 248 40 20 0 20 40 248 244 40 20 0 20 40 244 244 40 20 0 20 40 244 244 244 40 20 0 20 40 20+50 20+75 21 +00 268 268 268 268 268 268 21 +25 21 +50 264 264 264 264 264 264 264 264 264 264 260 _ _ — 260 260 --- --- 260 260 260 260 260 260 260 256 256 256 \ 256 256 — 256 256 256 256 — 256 252 252 252 252 252 252 252 252 252 252 248 40 20 0 20 40 248 248 40 20 0 20 40 248 248 40 20 0 20 40 248 248 40 20 0 20 40 248 2248 48 40 20 0 20 40 19+25 19+50 19+75 20+00 276 276 276 276 276 276 272 272 20+ 25 272 272 272 272 272 272 268 268 268 268 268 _--1 1268 268 1268 26811, 1 1 1 1268 264 264 264 - _ 264 264 264 264 264 264 — ff - 264 260 \ 260 260 260 260 260 260 260 260 260 256 256 256 256 256 256 256 256 256 256 252 252 252 252 252 248 40 20 0 20 40 252 252 40 20 0 20 40 252 252 40 20 0 20 40 252 248 40 20 0 20 40 248 248 40 20 0 20 40 18+25 18+50 18+75 19+00 18+ 00 280 280 280 280 280 280 276 276 280 280 276 276 276 276 276 276 272 272 276 _ 276 272 — 272 272 272 272 272 268 - 268 272 - --- _ 272 268 268 268 — 268 268 - - _ 268 264 264 268 268 264 264 264 264 264 264 260 260 E] 264 40 20 0 20 40 264 260 40 20 0 20 40 260 260 40 20 0 20 40 260 260 40 20 0 20 40 260 256 40 20 0 20 40 256 OSEAL '20 0 10 20 40 SHEET FINAL DRAWING5400 Trinity Road � FOR REVIEW HOLLYBROOK PARK HOLLYBROOK ROAD Suite 107 y •GRAPHICSCALE DIVISIONVALUE = 20 FEET 04PURPOSES ONLY CROSS SECTIONS R OFFICE MANAGER DESIGNER Raleigh, NC 27607 ��. �, NOT RELEASEDTOWN OF WENDELL919.378.9111 �9�''GiNEF� ���� D. CHAPMAN M. OETTING C=205 NC Firm License # C-0459 %,tiFw p pE��` F R //�,�2�C9 CONSTRUCTION WAKE COUNTY, NORTH CARO LI NA PROJECT MANAGER REVIEWER DATE PROJECT # FUNDING # m cg i I lassociates. com NO. DATE BY DESCRIPTION M. NORRIS J. HERMAN FEBRUARY 2023 21.01721 I / - 285 — \ / / \ --254- \ / I I N NNNNNNNN N — \ � --2ss — LOT 305 _282- `QC, 22 50' \ N� ao 810 OT Rq/� I II / / /\'/ 50' \\\�\ \\ \ v� / / �.•®• \ II I ry „; / // / / \\ If '-vim\ \\ \\\ \ \ NNC9 I \ / / I i ti CIAI / / / J 1 / ti 9 L60 V1 EROSION CONTROL LEGEND / _ / / I %/� / ■������ PROJECT LIMITS LOT 61 . 100 DUKE ENERGY POWER LINE EASEMENT (BM 200 P6 G 614) / LOT 60 LOT 62 LOT 95 1 LOT 96 LOT 98 1 % I / / I�/ // ti �� / //------- LIMITS OF DISTURBANCE (11.1 ACRES) p •.. / • / / / / i ti° _ / ////, / SEDIMENT WATTLE 16 SILT FENCE 10 11 12 13 I 14 15 \ I � j // /// :� � / �/ � // /// � • /• J a /� l /i/� — — � SILT FENCE OUTLET INLET PROTECTION TEMPORARY CONSTRUCTION ENTRANCE 6'WOODFENCE ENCROACHES 0.1'-0.2' / // •/ r _ �! 1 •..L..^l,•` \� j// S75BN EROSION MATTING -' / RIP RAP OUTLET PROTECTION wow 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF PRODUCING RAINFALL BUT IN CO CASE NOT LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SILT FENCE WHEN IT BECOMES APPROX. 0.5 FEET DEEP AT THE SILT FENCE. THE SILT FENCE SHALL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 3. ALL SEEDED AREA SHALL BE FERTILIZED, RESEED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE SEEDING SPECIFICATION TO MAINTAIN A VIGOROUS AND DENSE VEGETATIVE COVER. 4. MAINTAIN ALL MATTING THAT HAS BEEN PLACE ON SLOPES AND IN DITCHES. CHECK FOR GOOD GROUND CONTACT AND FOR THE OCCURRENCE OF ANY EROSION UNDER THE MATTING. MONITOR AND REPAIR OR REPLACE AS NECESSARY. 5. THE CONTRACTOR SHALL MAINTAIN SELF INSPECTION REPORTS AS REQUIRED BY NCDEQ AND THE NPDES CONSTRUCTION STORMWATER PERMIT. SELF INSPECTIONS ARE TO BE CONDUCTED AFTER EACH PHASE OF THE PROJECT FOR THE RECORD OF THE INSTALLATION AND MAINTENANCE OF THE EROSION CONTROL MEASURERS. 6. SEDIMENT SHALL BE REMOVED FROM THE TEMPORARY SKIMMER AND SEDIMENT BASINS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. CLEAN OUT AND RESHAPE BASIN BACK TO THEIR ORIGINAL DIMENSIONS. SKIMMERS SHALL BE CHECK FOR CLOGGING AND CLEANED OUT. REPAIR OR REPLACE ANY DAMAGED BAFFLES. EC MAINTENANCE PLAN 45 UPDATED MARCH, 2017 N O FIREWOOD ROOF OVERHANG & FENCE ENCROACHES 2.8' 1 STORYI WOOD SHED 0 Ee -284 / TEMPORARY DIVERSION DITCH TEMPORARY SLOPE DRAIN r400011/ �'��''' // \ �� I \ \\ \\ \\ \ 1\ l I � I \ �'• \\ \\ \ �\ I / ./ / ` /�% / / PIPE INLET PROTECTION . 9�� / \ `\� I \ \ \ \ \ Leo `�� \\ \�\ \ / 2 \ -- ,0\\RIPq 9 � \\ RIANgUFFER STREAM FLOOR ROCK IN THIS \ �� �� ,/ i� �\ \ I \ I \ �� \\ I �\\ \ \ • \ \ \ \\ \ \ \\\ \ �• i I '��\\' --�-AREA SHED �' i� 2a6/ / \\ \--- —,i�\ \ \_ \ ' \� \ \ \ \ \ \ \ I\• \ \ n / �y\ - - \ s0'NF S 2 "PINE 38"GUM 9" UM / 2 1NE 024"PI E SPIGOT J INV=281.24' \ A / 30"MAPLE / \\ \\ // I J/ 11 // /) N i // / \ 11 1� // \ L / • INV=280.90' / / / / 20"PINE / 3 UM. 28"PINE 10"PINE // LARGE 15' E PINE / �� // ROCK • \ / / \ \ - I / _ - 13"/ , ' TWCFO �.• / \ --_ `I/ \ / / i �- -i \-21"PIN-10"PINEi \\ \ MARKER \ / / \ --�C X X / 0 _ - //,/// ' ! / // / / / 57' / /. \'lli // \ I n> \ \\ h \ \ \ \ \ Fi/ X X / % / / - - 18"PIN 16"GUM .' l / ////. / / / / 2 / I GRAVEL \ I N / - 2 // . / / / / / �, /� i / / i CHECK % O ��- //// /'h/ / / // // !,i' DAMS I I r - - - A / 7 -��� 10 // // / � `L WETLAND LIMITS / 1 28"GUM '� i- / ! in _ MARKER-280—/i---- ibi _ - - _ J � 2 E26 j=/ ji/ j �69.,//�/ /.J SS/�.. / / / J /� /-�'�\�_ '� I yh6/ _ - _ _ _ _ _ _ F _ MARKER •�..o SSFM SSMH w �_ M.Atk�R'�•. ��, I / I 2 pVC -•• �h RIM ELEV=270.00' s HOLLYB _ w -� �„ _ --� 28p� o \ \ AT&T -F� - INV IN (N)=263.48' i ROOK ROAD (SR2357)-� --�+�- _ - \ _ 15"RCP / - _ - - ---- - - - - - - - - - - - - - - - - - - •� U) WID�. NITQ$Y�ORCEMAINTOBE 8, 2j 2j z FM - \ - i =251.81'-------------� / \ 60"BM2020PG69 / W---�- - co - 2> > s NV=271.00 N \ 2� \ \ \ \ \ \ \ M \iyl�'.. N TWC FO W--CONSTRUCTED (PER Sl"/�K717%-EVMTNQE} INV-274.7T N \ \ _ -F{� -- - - - \ / MARK CONSTRUCTED --1lLC - �_ •- _ INV=270.10' 260. _ - - - _ _ - - ®`•�•. \ NEAR DITCH CENTERLINE - - _ _ _ MARKER l — _ _ — -- — — — _ _ _ — QRIIF� �� / -/ / �� i, J I ■ 12"PVC \ I / -COLLAPSING - - - - - FM�' \A INV=274.70' 15'RCP - S' a�R AT&T— / PSG ��969 WATER MARKER / I � I INV=�---- / INV=251.00'( - COLLAPSING \ 2TF w U I O \ STONE HEADWALL / \ w h I FLARED END SECTION j m 2 1 INV=264.73' / a CURB INLET GRATE ELEV=269.39' INSTALLATION PHASING OF THE EROSION AND SEDIMENT CONTROL MEASURES PHASE 1. FLAG WORK AREA. 2. LOCATE ALL EXISTING UTILITIES WITHIN THE PROJECT AREA. 3. CLEAR ONLY THE AREAS NECESSARY TO INSTALL PERIMETER EROSION CONTROL MEASURES SUCH AS THOSE LISTED IN #4 AND #5. 4. INSTALL CONSTRUCTION ENTRANCE. 5. INSTALL TREE PROTECTION, FENCING, PROTECTION FOR EXISTING INLETS, SILT FENCING AND SILT FENCE OUTLETS AS SHOW ON PLANS. ADD OR ADJUST SILT FENCE OUTLET LOCATIONS AS DICTATED PER FIELD CONDITIONS. 6. INSTALL SKIMMER BASINS, RELATED DIVERSION DITCHES, AND WATTLES. 7. SEED ALL AREAS DISTURBED BY THE INSTALLATION OF THESE DEVICES IMMEDIATELY. 8. CLEAR, GRUB AND PROCEED WITH DEMOLITION WORK. 9. KEEP NPDES SELF -INSPECTION AND SELF -MONITORING RECORDS ON SITE AT THE CONTRACTOR'S FIELD OFFICE. FORMS CAN BE DOWNLOADED FROM NCDEQ WEBSITE: https:Hdeg. nc.gov/about/divisions/energy-mineral-land-resources/erosion-sediment- control/forms 66 \ C I/ / 60 0 30 60 120 SHEET FINAL DRAWING 5400 Trinity Road _ 2•.� : FOR REVIEW HOLLYBROOK PARK EROSION CONTROL PLAN Suite 107 SEAL �: = GRAPHIC SCALE DIVISION VALUE = 60 FEET Raleigh, NC 27607 = 041598 PURPOSES ONLY PHASE 1 NOT RELEASED TOWN OF WENDELLOFFICE MANAGER DESIGNER C=301 919.378.9111 �?'9j�`�N�INE�? ��'\ D. CHAPMAN C. BROWN NC Firm License # C-0459 %,yFW'p ' p� \ FOR 2 1/31/2023 COB REVISED PER NCDEQ EC COMMENTS (1/26/23) m cg i I lassociates. com tiS vc CONSTRUCTION 1 1/19/2023 COB REVISED PER NCDEQ EC COMMENTS WAKE COUNTY, NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# NO. DATE BY DESCRIPTION M. NORRIS J. HERMAN FEBRUARY 2023 21.01721 \ Sod Ue GROV14 FT ce83�v I I / / / � 11, / / I I I \ I \ Ir \.�� 50 \�\\\� � \'\� oz \ �\ ��\\\ \� EROSION CONTROL LEGEND \ / \ ~I •�`•�• / I I I / I \ \\ LI LI \ �cN�\I \\ \�\\ \\\� \ ■������ PROJECT LIMITS LIMITS OF DISTURBANCE (11.1 ACRES) \ / / ®�•1' \\ II " " ^ti // / / I\ I �O \ \ \\ \�\ \ SEDIMENT WATTLE / / ( I \ \. ll I SILT FENCE soA�a� / e� � � �,�A \ I L / • / / / l / / �^ o q� SILT FENCE OUTLET INLET PROTECTION /ti / 1 // // / IIII. TEMPORARY CONSTRUCTION ENTRANCE / I / / /`• / / / / / / / / ��6 / I Ilj I I LPNE S75BN EROSION MATTING RENIIDTN RIB RIP RAP OUTLET PROTECTION IG pG52 \ — lob I ( I ( I — / // // // ; /�� ��� � // // / // // _ . _ • • _/ _ _ �/j/�/ — /• TEMPORARY DIVERSION DITCH o / // // \�j/;///,� / TEMPORARY SLOPE DRAIN I / / • 100' DUKE ENERGY POWER LINE EASEMENT / / ✓I / / / • ICl/ / o / (BM 200 P6 G 614) / /i� / PIPE INLET PROTECTION O OqDO 12 1 / I INSTALLATION PHASING 6'WooD FENCE — / % / / / / TF/7­7 // / //� / / / / / / // / / / / I // I OF THE EROSION AND SEDIMENT CONTROL MEASURES ENCROACHES 0.1'-0.2' — i ✓ ® • s� '®..L..�l,• \� /l ' / I // PHASE II / / / �% •- • ® — / ®•• / / / \ I / / / / : / / ;, I / / / / /�/ �/ / 1. PROCEED WITH GRADING WORK. ALL HAULING AND STORAGE OF SOIL MATERIAL SHALL / ��•���\ \ \I . / ti I BE KEPT WITHIN THE DISTURBED LIMITS. MATERIAL STOCKPILES SHALL BE PLACED UP SLOPE OF PREVIOUSLY INSTALLED EC MEASURES. HAVE EROSION AND SEDIMENT _284 �.�/ / / ( I '�•• •. ^ •�.--+`■ �•/ ••® / : ^� /ti/ l I / ,j%� CONTROL MEASURES PREVIOUSLY INSTALLED FOR PROTECTION. 2. INSTALL SLOPE DRAINS AND RIP -RAP DISSIPATORS TO CONTROL DISCHARGE VELOCITIES. SLOPES / ''- — I ® C I I \ I I I / 3. CONTRACTOR SHALL PLAN ACCORDINGLY FOR CONTROLLED RUNOFF ON DISTURBED \ \ I / — ®\ �•'�/ I I \\ ( I / / AREAS (SUCH AS LIMITING SIZE OF CLEARED AREAS, KEEPING EROSION CONTROL / 1 r / / / / / ���/ / / \ \ \\ \ \ N j �I L \ ®••y '-_ = J \ \ \ MEASURES MAINTAINED, CONSTRUCTION TRAFFIC PLANNING AND PROTECTING ■ / / / \ \ ( I / — _ — — — — _ _ — \ I \ I ( I / I �/ / SLOPES). / / / ti�9 / \ \ I I �, \ \ �• _ I \ I I I / / I �/ 4. DURING INSTALLATION OF UTILITIES AND STORM DRAINAGE, INLET PROTECTION SHALL 400'/ \ N \ \ \ I I V .� \ \ I I / I/ / / BE INSTALLED AROUND NEW CATCH BASINS AND DROP INLETS IMMEDIATELY. ALL DRAINAGE SHALL BE DIRECTED TO THE SKIMMER BASINS. // / // \ ��� I I \ \ \ \ \\ I •� \I \\ 1 \ I / / / `�j�// / 5. STABILIZE GRADED AREAS ACCORDING TO THE STABILIZATION TIMEFRAMES OF THE // \ \\ I I I` \ \ \ \ \\ `.♦ ^ \ \ \ \ I / / / / / / NPDES CONSTRUCTION STORMWATER PERMIT (NCG01). PROVIDE SLOPE MATTING AS 29` ` �\\ I I \ \\ \\ \ \ \ \ :�■.—• \ O \ I ) / I / �/. / / SHOWN ON PLAN. / / 1 ` \ \ \ \ \ \ \ \ •�•• N N N �a I / / 6. ANY DEBRIS OR SEDIMENT DEPOSITED ON ADJACENT ROADWAYS SHALL BE CLEANED ■ _ / \ \ \ \ \ ^ \ \ •�•...�.'�. I ry N ( IMMEDIATELY BY SWEEPING, WASHING OR OTHER METHOD. 7. STABILIZE PARKING AREAS WITH STONE BASE AS SOON AS POSSIBLE UPON REACHING FINISH GRADES. FIREWOOD ROOF / \ ■ I I 8. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED AT LEAST ONCE OVERHANG & FENCE O \ � I \ \ 1 \ \ \ \ I II I 1 \ \ � \\ 1 WEEKLY, AND AFTER EACH RAINFALL OF 1 INCH OR MORE INSPECT WITHIN 24 HOURS. ENCROACHES 2.' \ I \ 79 I \ \ \ ) \ — 8' CLEAN OUT AND REBUILD ANY MEASURES AS REQUIRED, ACCORDING TO THEIR 1 STORY I /. I 22 MAINTENANCE PLAN. WOOD SHED \\ s O / 2 \ \ \\ \ \ \ \\lit ��Fvs / �2a9 i L \ \ \ \ \ \ \ \ \ \ \ \ \ \ • \ \ \ I I \ I I I `�\ \\` �F RIPARIAN gUF FEIR N \ \ \ \ \ \ \ \ \ \ I\ \ \ \ \ / /// ��i / //\ \\— V \ \ \ \ \ �\ \ \\ •\\\ \ \ \ \ \ I \� \\� I \� O �� STREAM FLOOR \. /� /�/ // // \ -- I ( \ \ \ \ _ \ • \\ \ \ \\\ \ \ \ \\ ( I � �� \\ \ __ ISROCK INTHIS �. // 6�/ 85 \ \\--- \ \ \ • \` \ \ \ \ \ \ \ \ \\ I \ �re�0 AREA SHED � � � x—x_x_x _x_ \ 8g � I \ \ \ \ • \ \ S�• // � /��' \\ �I \\ I // � \ I i •( I I I I j � 111/ /�/ //l // // s�F 38"G {� 1/ I I I / / / R/p' O �I I 1 1 84 / (D) / / / I I I / / / r / / / / gRjq 1L L ` �e�'�FF/�- . \ / s ' \ x x I — — — — /I ^� / `/ //ry ���Olbry^ \ I NV=281 .24' / / / ICIO 00 30"MAPLE s. INV=280.90' — \ \ \ \ • \ \ \ / / / x x� \ x—x— x—x—ao`x� :\\\\ �� \ \ \ �, \ •. / / // \ \L—x—\x \ � /•� // //// //// / W,`i / / / / / L� �ti �� / / / I L I I L L�I I 02sIII50' -- -i LARGEx—x—x—x— ROCK' \ I I I L 84 1 1 X / — 57 — ; / / //. / i I / / �/ i GRAVEL \ I / / / / /O / /0% / / i CHECK % ti5 hh // WETLAND LIMITS / MS I _ TWC F KROgO SR ' .�.J. . ■ f ■ \ / / / /f0-- \ 1 G IV • • 60'PUBGIC 2351 _ - - - - _ y(. . ■ �■ I - ■ ■ l / �/ I / -� V --_ •• eMz0z0PUbf> — MARKER _ — _ 12 -- — — / — LL Sao TWC�� FO.-w O -W — --TN----W--- - - INV=274.77 s \ — ' ■■� MARK��LSOUTH— -----_---- _ _—-- LL - __ \ cr \ ----_ -- _ •• ■ BELW----- _ _ ►■ Q00� J —� -- _=- MARKER �+ '�-- - �• 6 / _ _ _ 'FM 15"RCP — J S — < �.15� — — — = % - - - - °ROLLY6R°°Kwo °rsRz35, — — 2 0� — O .. INV=274.70' \ 2 <. r — —O — —'12"PVC _ 60'eMz6z°P°6, 6 / AT&T i / WATER I INV=270.80' —-------------------- -------- —W—=- I — —--1------ — —W—=�--=-W- _� vd—— — \ \ O I ( ----- MARKER INV=271.30'__ vv­-- INV=251.00'_\�\ I �C \\\� STONE COLLAPSING WHEADWALL \ \ \ / 3m / O zmm O I n I ni FLARED END SECTION O I i I NV=264.73' C1I' 50 0 25 50 100 SHEET FINAL DRAWING 5400 Trinity Road _ �•.� : FOR REVIEW HOLLYBROOK PARK EROSION CONTROL PLAN Suite 107 SEAL �: = GRAPHIC SCALE DIVISION VALUE = 50 FEET Raleigh, NC 27607 = 041598 PURPOSES ONLY PHASE 2 NOT RELEASED TOWN OF WENDELLOFFICE MANAGER DESIGNER C=302 919.378.9111 �?'9 �NGINE�Q ��\ D. CHAPMAN C. BROWN NC Firm License # C-0459 %,yFW p •off FOR 2 1/31/2023 cob REVISED PER NCDEQ EC COMMENTS (1/26/23) //���� CONSTRUCTION 1 1/19/2023 COB REVISED PER NCDEQ EC COMMENTS WAKE COUNTY, NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# m cg i I lassociates. com NO. DATE BY DESCRIPTION M. NORRIS J. HERMAN FEBRUARY 2023 21.01721 Ail \ \ SO�UBGROVFT �20,-,& G 683 V`� EROSION CONTROL LEGEND \ / \ •� •�•• / I I / I \ \ II II \ ��N�\I \\ \�\\ \\\� \ ■���� PROJECT LIMITS LIMITS OF DISTURBANCE (11.1 ACRES) \ / / 1�■ ®�•� \\ \ l ry ti / / / \ I \ \\\ \�\ SEDIMENT WATTLE co / / I00 \. 11 I SILT FENCE SILT FENCE OUTLET INLET PROTECTION / .ti TEMPORARY CONSTRUCTION ENTRANCE /`. / / / / / / / / ��6 / Ilj I I S75BN EROSION MATTING RENIIDTN RIB RIP RAP OUTLET PROTECTION IC 5214 \ — / / / ti� : / / / / / — • • _ _ ,//./�/ —� —% lob TEMPORARY DIVERSION DITCH ■ / • / / TEMPORARY SLOPE DRAIN / / • 100' DUKE ENERGY POWER LINE EASEMENT (BM / 2006 PG 614) INLET PROTECTION I � OPIPE I/ /: ti p / G O O O I / 6'WOOD FENCE ENCROACHES 0.1'-0.2' / �/ I INSTALLATION PHASING / / / // / ��/ ■: , ® ® — �'•� / / ■®� L"�••®�• / / % �\ I/ // // // / % ry^� / I / // // ry ti ti / �� / OF THE EROSION AND SEDIMENT CONTROL MEASURES 283 �. �, PHASE III —2/ / �• I I \S� 44 ` — �i ^L.. /�� //•.® �� 2�•' I / /% / / li / g4 '• / I ' I \�■ �" ' �/ / / I j/� 1. PROCEED WITH GRADING WORK AND SITE STABILIZATION. O /i• $6� // / \ I I I \ Cry I <\ / / I / j / 2. BUILDING CONSTRUCTION MAY BEGIN UPON COMPLETION OF THE BUILDING PAD. U �� �' / / / / / \ \ I \ \ / / / — ®• I I ( J r I % 3. RECONSTRUCT OUTLET DISSIPATORS TO FINAL SIZES. / / / // // / \ \\ \ I N �.•� I I ` I I / / l I �� / 4. ONCE SWALE A IS GRADED, MAT WITH STRAW -COCONUT EROSION CONTROL MATTING. 5. ONCE SITE IS STABILIZED THE CONTRACTOR SHALL CONTACT THE ENGINEER AND NCDEQ FOR THE REMOVAL OF THE SKIMMER BASINS. KEEP SILT FENCE IN PLACE UNTIL THESE AREAS ARE STABILIZED. 400'/ I I ^\•• I I / 6. AFTER PROPER STABILIZATION THE EROSION CONTROL MEASURES SHALL ALL BE \\ N \ \ \ \ I I \�• \\ \ I\ / I ,�/�/ / REMOVED. BLEND GRADING AND VEGETATE ALL AREAS DISTURBED BY REMOVAL OF EROSION CONTROL MEASURES. X.A. FIREWOOD ROOF OVERHANG & FENCE r(� • \ \ \ 1 \ \ I II I \ \ n \\ I� ENCROACHES 2.8' 1 STORY 1 / / \ \ �' 80 \ \ ` \ I I ll: III 2 2 \ l \ o \ \ \ \ �• \ \ \ l Sccp 00 50, RIPgRIAN gUF ■ / /// ��i / �/\ \\— \ \ \ \ \\ \ •\ �\ \ \ \ \ \ I \� \\� \� \ ��� STREAM FLOOR \. ISROCK INTHIS \. AREA SHED NFL /7'� INV=281.24' , / \------- —� sa / l �� //�/ti �� �6/ 30"MAPLE �s INV=280.90' \ LARGE o \\ n \ — — , / 259 / / , l l I / GRAVEL \ 4, \� 2a1 — — — — �� / / //// , I / —\ I / DAMS I WETLAND LIMITS TWC F 60'PUBUC _ MARKER 12P ��• --__ — --_ � 8p ---- — - --- —_ — -- ' .1.-- -- �,.� %�.r/ l � ■mil■■�■ ■® / / -, ���/O� / /r` — I /�// �h h'I/ // / IV TWC2�s. /�f '� •• • N MARK \ �cr \ �------_-_ -- — _• ■ BELLSOUTH— w-- _ •►■ � Q0 0� � < J ' —j — — _ _ �-_ �-__ _ _ _= MAR KE R — — — � '� - - - � � ■ - - -_ - - \ — \ rn \ \ — — - - - - --_-_ I / — INV=274.70' 15"RCP \ — S �� `— �L—'` YS '12"PVC -- _ — aL,G R235, ♦/ - - W 8M 2020 PG 69) y -----------W- =$-Ow= -yy- _ / WATER INV=270.80' ---- _ —------------------- --- �_ / MARKER I --- / INV=271.30'---------- —� - - - - / \ O I INV=251.00"(�� r — \ /— — _ \_\ \ \ \ �/----- \ I I �( \\\� COLLAPSING w3a HEADWALL \ \ \ / 4 whm 3 / O zmm O I 2 ni FLARED END SECTION INV-264.73' C1'' 50 0 25 50 100 SHEET FINAL DRAWING 5400 Trinity Road _ �•.� : FOR REVIEW HOLLYBROOK PARK EROSION CONTROL PLAN Suite 107 C E A L 041598 = GRAPHIC SCALE DIVISION VALUE = 50 FEET ` PURPOSES ONLY PHASE 3 R r Raleigh, NC 27607 �. NOT RELEASED TOWN OF WENDELLOFFICE MANAGER DESIGNER C=303 919.378.9111 �9JT!NG�NE�Q �\� D. CHAPMAN C. BROWN NC Firm License # C-0459 %,yFW D o� �� FOR 2 1/31/2023 cob REVISED PER NCDEQ EC COMMENTS (1/26/23) m cg i I lassociates. com tiS vc CONSTRUCTION 1 1/19/2023 COB REVISED PER NCDEQ EC COMMENTS WAKE COUNTY, NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# NO. DATE BY DESCRIPTION M. NORRIS J. HERMAN FEBRUARY 2023 21.01721 90 GENERAL NOTES: / / • / / / / / /i� Jl 1. EXISTING CONDITIONS AND TOPOGRAPHIC INFORMATION PROVIDED BY SURVEY PROVIDED BY TAYLOR WISEMAN & TAYLOR, 1 / • / • / / / // /� DATED JUNE 1, 2022. MAT HLINE »C» ��/ // I 2. EXISTING UTILITIES SHOWN ARE FOR REFERENCE ONLY. REFER TO THE GRADING, DRAINAGE, AND EROSION CONTROL PLANS r������� ������������� �� �E"�� ���■������������������ / �������► FOR STORM DRAINAGE INFORMATION. % M CHLINE »B» / � / I / / / / 3. ALL WORK SHALL BE IN COMPLIANCE WITH LOCAL AND STATE STANDARDS. Q m — / \ / / • / / / I/� /� / 4. ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING ANY CONSTRUCTION ON ANY SANITARY SEWER SYSTEM ■- ■• \\ \ \I / / / •• / I / / // EXTENSIONS OR MODIFICATIONS, SHALL BE LICENSED BY THE STATE OF NORTH CAROLINA. LLI LL / �� I► / Z Z \ `�.� / ■ / / / —. , I / / �A, �/ 5. THE SITE UTILITY CONTRACTOR SHALL BE RESPONSIBLE FOR SITE UTILITY INSTALLATION TO A POINT 5.0 OUTSIDE THE _ _ ■ w ■ ■ ■ •i � ■ ■ ' � I I //� ( BUILDING. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL SEWER CLEANOUTS WITH THE MEP PLANS. C) C) 6. ALL PIPE LENGTHS ARE APPROXIMATE. CONTRACTOR SHALL PROVIDE ALL THE MATERIALS AND APPURTENANCES NECESSARY FOR THE COMPLETE INSTALLATION OF THE WATER AND SEWER SYSTEMS. ALL PIPE, FITTINGS, AND APPURTENANCES SHALL BE INSPECTED BY THE UTILITY INSPECTOR PRIOR TO BEING COVERED. PIPE BEDDING SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATION OR GUILFORD COUNTY STANDARDS, WHICHEVER IS MORE 1 ` J / ••� I I /// STRINGENT. 1 / I 271 y�''—�' 7. THE CONTRACTOR SHALL MAINTAIN A SET OF "REDLINE", "RECORD," OR AS —BUILT DRAWINGS DURING CONSTRUCTION, AND • — — — — \ 11 I �/ PROVIDE THEM TO THE ENGINEER UPON CONSTRUCTION COMPLETION. SANITARY SEWER AS—BUILTS SHALL CONTAIN 1 I \ \\ — I INVERTS, BOX LOCATIONS, AND LATERAL LOCATIONS AS APPLICABLE. WATER AS—BUILTS SHALL CONTAIN PIPE LOCATIONS AND DISTANCES, METERS, AND BACKFLOW TYPES AND LOCATIONS. Ip 1 I I I I I I / I / / 8. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF FINAL TESTING OF ALL LINES INACCORDANCE WITH STATE AND • I LOCAL STANDARDS. ANY DEFICIENCIES NOTED SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL PROVIDE CERTIFICATIONS OF ALL PRESSURE, LEAKAGE, AND CHLORINATION TESTS. 1 I I \ I • 1 I / / �/� /, 9. SITE IS UNCLASSIFIED. \ Cal \ \ \ N/F 1 \ \ \ \ \ \ \ 1 SMITH EDWARDS LLC PIN 1793-04-0073 ZONE R4-CD \ \ \ 0 I ■ / ' \ \ 1 1 DB 12538 PG 1623 MB 2021 PG 365 \ 279 I \ II \ 22 00 CN I DRINKING FOUNTAIN CONNECTION. SEE \ \ \ • \ \ \ \ I \ \ �� \� T�� \ \I DETAIL SHEET C-504 I ■ \ �� CO 1/ cuM I - WATERUNE 1 NIE CDI L 4%i ISANITARY SEWER CONNECTION. SEE v CD 1 ARCH. DRAWINGS WATER NE CONNEC N. SEE / / AR DRAWL / / / � / / Ss I i PROP. GRINDER / �A�` / PUMP STATION SANITARY R LINE co ■ / // / / I I I / \ I \ 2�8 1 / 2"► j 2 FM F / /// / PROP. 2" PVC (SCH 40) W ETER // � // PRESSURE SEWER — / \ SERVICE LINE -1 1 / \ / �:_ TB �x / / / / <EXIST. SEWER M.H. — — ■ ■/ ■ T_ ■ ■ ■ ■ ( - ■ �I■ ■ % //� WETLAND LIMITS �B / / TOP = 272.50 — _ — 1 FM l �' ■ ■ ■ ■ - - / / ! �/ I / CONNECT PRESSURE SEWER INV. IN = 264.85 _1 — _ — — _ _ -- ■ / _ SERVICE LINE TO EXIST. M.H. _ _i 7■■�■■ ��'//� — I / INV. OUT =263.12 N / . . . . . . . . ■ ■ - 1 \ \ PROP. 2" WATER \ — — /� T ■ .� ■ �� ■ ■ c1� SERVICE LINE — — — — — 01 ■ • ■ / — — W! ■ ■ - PROP. 2" WATER TAP \ \ \ 6) \ — — — — — — _ _ — — — — _ / I ■ S 15"RCP = % ■ ■ ■ ■� S_ HOLLYBROOKROAD (SR 2357) j _-� J-■ ■ - 60' PUBLIC . C r 1�"PVC / / -� IA/ BM 2020 PG 617 / `V C'' 30 0 15 30 60 SHEET FINAL DRAWING 5400 Trinity Road - �:_ " FOR REVIEW HOLLYBROOK PARK UTILITY PLAN EEAL ® Suite 107 - 98 = PURPOSES ONLY GRAPHIC SCALE DIVISION VALUE = 30 FEET Raleigh, NC 27607 = 0415 �?�'. ; NOT RELEASED TOWN OF WENDELLOFFICE MANAGER DESIGNERC=401 919.378.9111 :�9�jyNcIN' O-O � FOR D. CHAPMAN M. GETTING NC Firm License # C-0459 %, Fw'o.��.�� mcgillassociates.com CONSTRUCTION WAKE COUNTY, NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT # FUNDING # ��)i NO. DATE BY DESCRIPTION M. NORRIS J. HERMAN FEBRUARY 2023 21.01721 Q 0 0 m J J 0 J J w 0 z w 0 0 N 0 90 N/F I JOSEPH SCHILLIZZI LUIS GONZALO GUTIERREZ N/F LOTOYA JONES I JAMES HENRY CODY AMY SCHILLIZZI I LORENA TREVINO ROBERT MELTON JR ETHEL CODY PIN 1783-84-0024 PIN 1783-84-0096 I PIN 1783-84-1068 PIN 1783-84-2037 ZONE R3 ZONE R3 DB PG 23 ZONE R3 17227 PG 504 ZONE R3 BM2014 PG 5 DB 16735 PG 839 B2 M2014PG52 DB 16712 PG 2530 BM2014PG52 BM2014PG52 6'WOOD FENCE ENCROACHES 0.1'-0.2' — (4) EB 15' O.C. / ♦� " (42) IV 4' O.C. ® / (4) EB 15' O.C. MURIEL J BALDWIN • / / / REVOCABLE LIVING TRUST PIN 1783-73-9849 ZONE RA / DB 15290 PG 2362 / RAY E & GRACE YOUNG PIN 1783-73-9840 / ZONE RA / DB 12376 PG 1833 / / / FIREWOOD ROOF ^ OVERHANG &FENCE l� mil( ■ ENCROACHES 2.8' ■ I ■ 1 STORY ■ / WOOD I / SHED / \ ZONE R3 0 LOT 97 DB 16593 PG1026 N/F BM 2014 PG 52 ' GENERAL NOTES: KELVIN HOLLOWAY TERESA TONYA WILLIAMS GEORGE WILLIAMS JR NATALIE HOLLOWAY 1. LANDSCAPE CONTRACTOR TO VISIT THE SITE AND ACCEPT THE CONDITIONS PRIOR TO BIDDING AND PLANT MATERIAL INSTALLATION. PIN 1783-84-3005 PIN 1783-84-3091 ZONE ' ZONE DB 16697 PGG 2783 2. LANDSCAPE CONTRACTOR TO VERIFY ALL UNDERGROUND UTILITIES PRIOR TO INSTALLATION OF ANY PLANT MATERIAL. UTILITY LINES SHOWN ON DRAWINGS ARE DB 16712 PGG 1572 BM 2014 PG 52 BM 2014 PG 52 ���� ' FOR GENERAL REFERENCE AND MAY NOT BE ALL INCLUSIVE. 3. LANDSCAPE CONTRACTOR TO PROTECT ALL EXISTING STRUCTURES DURING INSTALLATION OF PLANT MATERIAL. ® ®� so -on ■ ■ ® ■ ® 0 ■ L ■ ■ ww0ft / \� / / 4. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR ALL FINE GRADING OF LAWN AND PLANTING AREAS DISTURBED DURING CONSTRUCTION. REMOVE ALL TEMPORARY �' �•' ®� • SEEDING/STABILIZATION, STONES, GRAVEL, AND ALL EXTRANEOUS DEBRIS INCLUDING ROOTS AND LIMBS. / ♦`� Q ' 3 5. ALL PLANT BEDS TO BE TILLED AND AMENDED TO A DEPTH OF 12". THE ENTIRE AREA IS TO BE COVERED WITH 3" CLEAN TRIPLE SHRED HARDWOOD MULCH ®: ■ a'n^ IMMEDIATELY AFTER PLANTING. w LL / Z Z - 6. ALL BEDS TO CONSIST OF 1 PART EXISTING SOIL, 1 PART FRIABLE SOIL, AND 1 PART SOIL CONDITIONER. ALL PLANT BEDS SHOULD BE TILLED IN THEIR I J J ENTIRETY. NO PIT PLANTING OF BEDS WILL BE ACCEPTED. I U ' U 7. LANDSCAPE CONTRACTOR SHALL FURNISH ALL QUANTITIES NECESSARY TO COMPLETE PLANTINGS AS SHOWN/LOCATED ON DRAWINGS. QUANTITIES SHOWN ON I PLANT LIST ARE FOR CONVENIENCE OF CONTRACTORS AND ARE BELIEVED TO BE SUBSTANTIALLY CORRECT, BUT ACCURACY OF QUANTITIES IN LIST IS NOT GUARANTEED. 8. LANDSCAPE CONTRACTOR TO GUARANTEE ALL PLANT MATERIAL AND WORK FOR A PERIOD OF ONE YEAR FROM ACCEPTANCE OF WORK BY OWNER. ` I I 9. ANY PLANT MATERIAL SUBSTITUTIONS OR ADJUSTMENTS ARE TO BE REQUESTED IN WRITING TO THE OWNER. NO SUBSTITUTIONS WILL BE PERMITTED WITHOUT \ \ \ I WRITTEN NOTICE BY THE OWNER. 10. ALL PLANT MATERIAL TO CONFORM TO THE CURRENT EDITION OF "AMERICAN STANDARD FOR NURSERY STOCK". 11. ALL TREES PLANTED IN GRASS AREAS SHALL HAVE A 4' DIAMETER MULCH RING. 12. ALL GRASS TO PLANT BED BORDERS ARE TO BE NEATLY EDGED WITH A VERTICAL EDGE. 13. ALL TREES SHALL BE SPECIMEN QUALITY AND WELL SHAPED. I I \ \ 14. ALL TREES OF THE SAME VARIETY SHALL MATCH IN SHAPE, FORM, AND SIZE WHERE THEY ARE TO BE INSTALLED IN GROUPS, ROWS, OR AS STREET TREES. 15. MINOR SHIFTING AND ADJUSTING OF PROPOSED TREE LOCATIONS MAY BE REQUIRED DUE TO EXACT LOCATION OF UNDERGROUND UTILITIES. LANDSCAPE I CONTRACTOR TO CONTACT LANDSCAPE ARCHITECT PRIOR TO RELOCATION. \ \ \ \ 16. PRIOR TO SEEDING, LANDSCAPE CONTRACTOR IS TO CONTACT GENERAL CONTRACTOR FOR VERIFICATION THAT ALL LAND DISTURBING ACTIVITY HAS BEEN \ \ COMPLETED. 17. LANDSCAPE CONTRACTOR TO SEED ALL AREAS PER SPECIFICATIONS. ADD FERTILIZER AND LIME AS RECOMMENDED BY SOIL TEST. ALL NEWLY SEEDED AREAS SHOULD BE STAKED OFF FROM PEDESTRIANS AND VEHICLES FOR A PERIOD OF THREE WEEKS. 18. LANDSCAPE CONTRACTOR TO OBTAIN GRADING PLAN FOR COORDINATION OF FINAL GRADES. (4) NOTE: r NOTES: II 1. ALL SHRUB BEDS SHALL BE RAISED 3" — 6" ABOVE ADJACENT GRADE AND TILLED WITH SOIL CONDITIONER. y� 1. REMOVE BURLAP FROM TOP OF ROOT \ BALL BEFORE BACKALLING AROUND I I \ II 2. "V"—CHANNEL EDGE TO BE LOCATED ALONG OUTER PERIMETER OF SHRUB PLANTING AREAS WHERE SHRUBS ARE Y BALL IS COMPLETED. I \ PLANTED ADJACENT TO TURF AREAS. 2. TOP OF ROOT BALL SHALL BE 2" \ ABOVE FINISHED GRADE WHEN TYPICAL "V"—CHANNEL EDGE FOR ALL �>~ PLANTED. MULCHED PLANTING AREAS ■ � / / � \ \ O o ovo o ` ■-� / N/F I \ ' N FINISHED LAWN SHRUB PLANTING BED TOWN OF WENDELL PIN 1783-83-7861 u 3" MULCH c� "1rr _rr r rrrrr r rrr rrrrrr ZONE R4-CD rrr ICI a " UNDISTURBED SOIL ■ DB 18131 PG 285 � I 1 i iii. I _iii Iil .II .II„i li- / BM 2020 PG 617 N/F / / / / _III II II I�Fllk 3' MULCH FEDA & DAVID J 4" WATER DETENTION VALLETTE / / / — — — — SAUCER AROUND TREE PIN 1783-73-9750 � ■ / / �� � �� ZONE RA TYP. V-CHANNEL EDGE DETAIL , `, ., I FINISHED GRADE DB 12355 PG 1759 / / / COMPACTED TOPSOIL BACKFILL ■ / / NOTES: PRUNE PROPORTIONATELY I UNDISTURBED SOIL / 1. ALL SHRUB BEDS SHALL BE RAISED REDUCTION of ROOTS TYP. TREE PLANTING DETAIL / / - — — yl TO COMPENSATE FOR 285 \ \ \ \ 6" — 8" ABOVE ADJACENT GRADE, _ - -',i AND TO PROMOTE NATURAL AND TILLED WITH SOIL CONDITIONER. 1J CHARACTER OF GROWTH NOT TO SCALE SHED / / \ I 2. ALL SHRUB BEDS IN PARKING 3" MULCH 286 cb� ISLANDS ONLY SHALL BE RAISED 12" r " R & GATE / / / \ ABOVE ADJACENT GRADE AND TILLED r 4 WATER DETENTION ARDS WITH SOIL CONDITIONER SAUCER AROUND SHRUB PLANTING REQUIREMENTS: 507 FINISHED GRADE a \ COMPACTED TOPSOIL 1,190 LINEAR FEET TYPE B BUFFER YARD: 60 TREES 199 SHRUBS 92 • / REQUIRED; 1,017 LINEAR FEET WITH EXISTING WOODLAND COVER, 9 TREES • / , I �— I BACKFILL � 42 SHRUBS PROVIDED I � I I 8,3 28� ' UNDISTURBED SOIL STREET TREE PLANTINGS: 14 CANOPY TREES PROVIDED ■ (11) CC 85' O.C. CO TYP. SHRUB PLANTING DETAIL 2B3 / NOT TO SCALE 98 SPACE PARKING LOT LANDSCAPING: 9 TREES, 33 SHRUBS REQUIRED; I _ 10 TREES 49 SHRUBS PROVIDED N , 00 I 30"MAPLE -�0fjI I I -9— • (1) NS I.......... I — \ CO Tw i� G �� _ — (3) N \ RKER, (10) NS 40' O.C. \ \ I^' — Vv \ \ TWC FO a ' — — ��\ MARKER— Al-- y�BMW— _-- �. \ — — _ _ _ ■ \ \ \ SANITARY FORCE MAIN TO BE — — � �V — \ I / — — — W — — — W — — — _ �Lf jD P_ ER SC�TAKING EVIDENCE) \ — — — — — — TWC FO -- w — N A 0rrT wEggI ■ ■ \ MARKER BELLSOUTH" VV— W= = V/1_-- — VVLBELLSOUTH — — — O — \ / MARKER — -- — — — 11 PLANTING SCHEDULE SYM.IQTY.1 BOTANICAL NAME ICOMMON NAME I SIZE J*CALIPERI HEIGHT ISPREAD I NOTES TREES CC 15 Cercis conadensis Eastern Redbud B&B 2" MIN. 8' Min. 4' Min. -- EB 8 Ilex x 'Emily Bruner' Emily Bruner Holly B&B -- 10' Min. 5' Min. -- GB 4 Ginkgo biloba Maidenhair Tree B&B 2" MIN. 10' Min. 6' Min. Matching NS 15 Nyssa sylvatica 'Wildfire' Wildfire Black Gum B&B 2" MIN. 10' Min. 6' Min. -- PH 1 Cercis conadensis 'Pink Heartbreaker' Pink Heartbreaker Redbud 20 Gal. 1" MIN. 5' Min. 30" Mind Specimen ecimen UAP 8 Ulmus americans 'Princeton' jPrinceton Elm B&B 1 2" MIN. 10' Min. 4' Min. -- SHRUBS AF 10 Cornus stolonifera 'Arctic Fire' Arctic Fire Redtwig Dogwood 3 Gal. -- 24" Min. 12" Min. -- CA 3 Clethra alnifolia 'Sixteen Candles' Sixteen Candles Clethra 3 Gal. -- 18" Min. 10" Min. -- IV 42 Itea virginica 'Henry's Garnet' Henry's Garnet Sweetspire 3 Gal. -- 18" Min. 10" Min. -- ND 36 Nandina domestica 'Flirt' Flirt Nandina 1 Gal. -- 8" Min. 8" Min. -- VD 49 Viburnum davidii jDavid Viburnum 3 Gal. -- 24" Min. 10" Min. -- ORNAMENTAL GRASSES PERENNIALS DL 71 Hemorocallis 'Pardon Me' Pardon Me Daylily 1 Gal. -- -- -- MC 12 Muhlenbergia capillaris Pink Muhly Gross 1 Gal. -- -- -- -- PV 49 Panicum virgatum 'Shenandoah' Shenandoah Switchgrass 1 Gal. -- -- -- -- RB 125 Rudbeckia 'Little Goldstar' Little Goldstar Blackeyed Susan 4" -- -- -- -- SS 40 Schizachyrium scoparium 'Prairie Blues' Prairie Blues Switchgrass 1 Gal. -- -- -- -- GROUNDCOVERS HC 1 10 Hypericum calycinum Aaron's Beard 4" -- -- -- -- FINAL DRAWING 5400 Trinity Road FOR REVIEW HOLLYBROOK PARK ® Suite 107 PURPOSES ONLY Raleigh, NC 27607 NOT RELEASED 919.378.9111 FOR TOWN OF WENDELL NC Firm License # C-0459 CONSTRUCTION mcgillassociates.com WAKE COUNTY, NORTH CAROLINA NO. DATE BY DESCRIPTION 30 0 15 30 60 GRAPHIC SCALE DIVISION VALUE = 30 FEET OFFICE MANAGER DESIGNER D. CHAPMAN K. DURRANT PROJECT MANAGER REVIEWER M. NORRIS J. HERMAN LANDSCAPE PLAN - A DATE PROJECT # FUNDING # FEBRUARY 2023 21.01721 SHEET L=1 01 Df Q a Y O O Df m J J O J J W 0 z w ILL O N 0 90 • / / �� �cb GENERAL NOTES: SILT FENCE , / / / / / r 1 ENCROACHES / � / � ( 1. LANDSCAPE CONTRACTOR TO VISIT THE SITE AND ACCEPT THE CONDITIONS PRIOR TO BIDDING AND PLANT MATERIAL INSTALLATION. UP TO 1.75 ♦ ♦ / // // 2. LANDSCAPE CONTRACTOR TO VERIFY ALL UNDERGROUND UTILITIES PRIOR TO INSTALLATION OF ANY PLANT MATERIAL. UTILITY LINES MAT H LI N E »C» ��/ �� I SHOWN ON DRAWINGS ARE FOR GENERAL REFERENCE AND MAY NOT BE ALL INCLUSIVE. /�♦ �� / , / / / M CHLINE »B» r� �� / 3. LANDSCAPE CONTRACTOR TO PROTECT ALL EXISTING STRUCTURES DURING INSTALLATION OF PLANT MATERIAL. Q / / ♦ J I 4. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR ALL FINE GRADING OF LAWN AND PLANTING AREAS DISTURBED DURING CONSTRUCTION. REMOVE ALL TEMPORARY SEEDING/STABILIZATION, STONES, GRAVEL, AND ALL EXTRANEOUS DEBRIS INCLUDING ROOTS AND LIMBS. Z Z _ t►\�\ — —� I / / ♦ J J� 5. ALL PLANT BEDS TO BE TILLED AND AMENDED TO A DEPTH OF 12". THE ENTIRE AREA IS TO BE COVERED WITH 3 CLEAN TRIPLE SHRED I �\ � J ♦ I � / � J , ��, �/ HARDWOOD MULCH IMMEDIATELY AFTER PLANTING. ♦ 2 1 = ■ ■ ■ ■ ♦ / /� �,� 6. ALL BEDS TO CONSIST OF 1 PART EXISTING SOIL, 1 PART FRIABLE SOIL, AND 1 PART SOIL CONDITIONER. ALL PLANT BEDS SHOULD BE CU CC) I — , `� //' TILLED IN THEIR ENTIRETY. NO PIT PLANTING OF BEDS WILL BE ACCEPTED. �■ 7. LANDSCAPE CONTRACTOR SHALL FURNISH ALL QUANTITIES NECESSARY TO COMPLETE PLANTINGS AS SHOWN/LOCATED ON DRAWINGS. QUANTITIES SHOWN ON PLANT LIST ARE FOR CONVENIENCE OF CONTRACTORS AND ARE BELIEVED TO BE SUBSTANTIALLY CORRECT, BUT ♦�� I I /// ACCURACY OF QUANTITIES IN LIST IS NOT GUARANTEED. 1 I I 271 �y�''—_ 1 i� 8. LANDSCAPE CONTRACTOR TO GUARANTEE ALL PLANT MATERIAL AND WORK FOR A PERIOD OF ONE YEAR FROM ACCEPTANCE OF WORK I � l _ �� • _ — — — — � I /�/ , /,� BY OWNER. 9. ANY PLANT MATERIAL SUBSTITUTIONS OR ADJUSTMENTS ARE TO BE REQUESTED IN WRITING TO THE OWNER. NO SUBSTITUTIONS WILL BE PERMITTED WITHOUT WRITTEN NOTICE BY THE OWNER. 1 I♦♦ I I I / / I / / / / 10. ALL PLANT MATERIAL TO CONFORM TO THE CURRENT EDITION OF "AMERICAN STANDARD FOR NURSERY STOCK". \ • �♦ \ �1 11. ALL TREES PLANTED IN GRASS AREAS SHALL HAVE A 4' DIAMETER MULCH RING. \ cA I (2) CC 85 O.C. ` I / / / / 12. ALL GRASS TO PLANT BED BORDERS ARE TO BE NEATLY EDGED WITH A VERTICAL EDGE. \ 1 \ l 6 ♦Now 13. ALL TREES SHALL BE SPECIMEN QUALITY AND WELL SHAPED. 14. ALL TREES OF THE SAME VARIETY SHALL MATCH IN SHAPE, FORM, AND SIZE WHERE THEY ARE TO BE INSTALLED IN GROUPS, ROWS, OR \ \ \ \ \ \ AS STREET TREES. 15. MINOR SHIFTING AND ADJUSTING OF PROPOSED TREE LOCATIONS MAY BE REQUIRED DUE TO EXACT LOCATION OF UNDERGROUND SMITH EDWARDS LLC UTILITIES. LANDSCAPE CONTRACTOR TO CONTACT LANDSCAPE ARCHITECT PRIOR TO RELOCATION. PIN 1793-04-0073 \ 16. PRIOR TO SEEDING, LANDSCAPE CONTRACTOR IS TO CONTACT GENERAL CONTRACTOR FOR VERIFICATION THAT ALL LAND DISTURBING \ ■ / ZONE R4-CD \ �o J �� \ 1 DB 12538 PG 1623 ACTIVITY HAS BEEN COMPLETED. MB 2021 PG 365 \ 1 17. LANDSCAPE CONTRACTOR TO SEED ALL AREAS PER SPECIFICATIONS. ADD FERTILIZER AND LIME AS RECOMMENDED BY SOIL TEST. ALL (4) GB 48' O.C. \ 279 \ 10 J I J \ �,���� ' NEWLY SEEDED AREAS SHOULD BE STAKED OFF FROM PEDESTRIANS AND VEHICLES FOR A PERIOD OF THREE WEEKS. II \ \ 280 \ (1) UAP,\ (1) UAP \ \ . I� 18. LANDSCAPE CONTRACTOR TO OBTAIN GRADING PLAN FOR COORDINATION OF FINAL GRADES. NOTE: NOTES: \ \ \ 1. ALL SHRUB BEDS SHALL BE RAISED 3" 6" ABOVE ADJACENT GRADE AND 1. REMOVE BURLAP FROM TOP i r \ TILLED WITH SOIL CONDITIONER. OF ROOT BALL BEFORE \ 1 O \ 2 \ I \ \ \ \ \ \ \ \ \ BACKFILLING AROUND BALL O i \ \ 2. "V"-CHANNEL EDGE TO BE LOCATED ALONG OUTER PERIMETER OF SHRUB IS COMPLETED. \ 13 \ • N \ ,� \ PLANTING AREAS WHERE SHRUBS ARE PLANTED ADJACENT TO TURF AREAS. 1 \ \ 2. TOP OF ROOT BALL SHALL � \ � (2) UAP 30 O.C. \ \ \ \ \ \ � \ \ \ '�� BE 2" ABOVE FINISHED N \ \ \ \ " / \ \ \ \ \ \\� \\ \ EDGE TYPICAL FOR ALL MULCHED o �\ GRADE WHEN PLANTED. \ \ \ 1 (24) VD 42 O.C. . \ o 24 PV 42 O.C. \ 0 1 O ( ) T ■ \ I \ I I \� \\\ \ PLANTING AREAS ..., o Q FINISHED LAWN o 0 o�`r �� �r� �� SHRUB PLANTING BED 3" MULCH \ \ \\ \ \ \ \ \ \ J \I \\ \N� rrrr r r rrrrrr r rrr r rrrr o r \�� h UNDISTURBED SOIL \ \ (34) SS 24" O.C. ' \ \ \ \ \ \ I\ \ \,\ 3" MULCH (21) DL 18 O.C. ■ \ \ \ \ \ \ I \ �\ �� T� 4" WATER DETENTION ■ (36) ND 18" O.C. ■ \ \ \ \ \ �\ „ �. SAUCER AROUND TREE 1 (10) AF 3' O.C. a • (1) UAP \ \ \ \� \ IS ROCK "''"''' "".'..'' \ \ \ \ \ \\ STREAM TYP. "V—CHANNEL EDGE DETAIL °'°'' °''""' %° ' ° FINISHED GRADE 2 CC \ \ \ \\ AREA NOT TO SCALE - COMPACTED TOPSOIL 1 \ \ \ 16' )O.C. ■ \ \ \ \ \ \ \ �Te�\ �B — — — — BACKFILL NOTES: PRUNE PROPORTIONATELY UNDISTURBED SOIL —�TB 1. ALL SHRUB BEDS SHALL BE RAISED TO ISATE FOR -� REDUCTION OF ROOTS TYP. TREE PLANTING DETAIL 6" - 8" ABOVE ADJACENT GRADE, _ �% AND TO PROMOTE NATURAL AND TILLED WITH SOIL CONDITIONER. i J CHARACTER OF GROWTH NOT TO SCALE \•' �� (5) HC 18" O.C. I I / 1 / � y \ � : ■ I 2. ALL SHRUB BEDS IN PARKING � 3" MULCH ■ I \ ISLANDS ONLY SHALL BE RAISED 12" (5) HC 18" O.C. I I I I J / / \I \ ABOVE ADJACENT GRADE AND TILLED r T4" WATER DETENTION 1 GUM 12AUCER AROUNDSHRUB MC 3' O.C.o.C. ' J WITH SOIL CONDITIONER PLANTING REQUIREMENTS: � '''''''''''''''''' FINISHED GRADE i J \ 11 _ 1,190 LINEAR FEET TYPE B BUFFER YARD: 60 " / % / / \ 1 COMPACTED TOPSOIL TREES 199 SHRUBS REQUIRED; 1,017 LINEAR FEET 1 (25) VD 42 O.C. / / / / /I / / / / / I I , BACKFILL ' (25) PV 42" O.C. / / WITH EXISTING WOODLAND COVER, 9 TREES 30 1 g 10 10 / / I SHRUBS PROVIDED �� O (� / / / UNDISTURBED SOIL STREET TREE PLANTINGS: 14 CANOPY TREES 280 i ,� �' TYP. SHRUB PLANTING DETAIL PROVIDED I 1 o I / (1) UAP / / / / ■ / / / / / / / / / / \ NOT To SCALE 98 SPACE PARKING LOT LANDSCAPING: 9 CANOPY 1 N / / / v / / / / / / / / / I TREES, 33 SHRUBS REQUIRED; 10 TREES 33 SHRUBS PROVIDED 1 _ (32) DL 18- O.C. I1 (1) PH N (76) RB 18" O.C. / (2) UAP I(3) SS 24" O.C. S 30' O.C. LARGE _ r 1 (3) CA 36" O.C. � � ( / / � ROCK (3) SS 24" O.C. - � A \ / / 1 / // (3) NS 40' O.C. �(49) RB 18" O.C. / ■ / + 30 —42 BOULDERS. CONTRACTOR �� / TO COORDINATE WITH OWNER FOR BOULDER SELECTION 1-------- / (18) DL 18" O.C. i p �� ♦ / // / / V 4 FM - - - /� '� E■ // ■ / ■ AA Ji SSFM ■ ■ ■ 1 / / 7-1 I —= / T_ / ��k ■■ I■■ ■■—■■— ssFM / \ ' — IVI i \ \ o T:. ---W---- Vp �— VV 112"PVC — — U FINAL DRAWING 5400 Trinity Road FOR REVIEW HOLLYBROOK PARK ® Suite 107 PURPOSES ONLY Raleigh, NC 27607 NOT RELEASED 919.378.9111 FOR TOWN OF WENDELL NC Firm License # C-0459 CONSTRUCTION mcgillassociates.com WAKE COUNTY, NORTH CAROLINA NO. DATE BY DESCRIPTION PLANTING SCHEDULE SYM.IQTY.1 BOTANICAL NAME ICOMMON NAME I SIZE I*CALIPERI HEIGHT ISPREAD I NOTES TREES CC 15 Cercis canadensis Eastern Redbud B&B 2" MIN. 8' Min. 4' Min. -- EB 8 Ilex x 'Emily Bruner' Emily Bruner Holly B&B -- 10' Min. 5' Min. -- GB 4 Ginkgo biloba Maidenhair Tree B&B 2" MIN. 10' Min. 6' Min. Matching NS 15 Nyssa sylvatica 'Wildfire' Wildfire Black Gum B&B 2" MIN. 10' Min. 6' Min. -- PH 1 Cercis canadensis 'Pink Heartbreaker' 1pink Heartbreaker Redbud 120 Gal. 1" MIN. 1 5' Min. 30" Min. S ecimen HAPI 8 Ulmus americana 'Princeton' jPrinceton Elm B&B 1 2" MIN. 10' Min. 4' Min. -- SHRUBS AF 10 Cornus stolonifera 'Arctic Fire' Arctic Fire Redtwig Dogwood 3 Gal. -- 24" Min. 12" Min. -- CA 3 Clethra alnifolia 'Sixteen Candles' Sixteen Candles Clethra 3 Gal. -- 18" Min. 10" Min. -- IV 42 Itea virginica 'Henry's Garnet' Henry's Garnet Sweetspire 3 Gal. -- 18" Min. 10" Min. -- ND 36 Nandina domestica 'Flirt' Flirt Nandina 1 Gal. -- 8" Min. 8" Min. -- VD 49 Viburnum davidii David Viburnum 3 Gal. -- 24" Min. 10" Min. -- ORNAMENTAL GRASSES PERENNIALS DL 71 Hemoracallis 'Pardon Me' Pardon Me Daylily 1 Gal. -- -- -- MC 12 Muhlenbergia capillaris Pink Muhly Grass 1 Gal. -- -- -- -- PV 49 Panicum virgatum 'Shenandoah' Shenandoah Switchgrass 1 Gal. -- -- -- -- RB 125 Rudbeckia 'Little Goldstar' Little Goldstar Blackeyed Susan 4" -- -- -- -- SS 40 Schizachyrium scoparium 'Prairie Blues' Prairie Blues Switchgrass 1 Gal. -- -- -- -- GROUNDCOVERS .HCj 10 1 Hypericum calycinum Aaron's Beard 4" -- -- -- -- 30 0 15 30 60 GRAPHIC SCALE DIVISION VALUE = 30 FEET OFFICE MANAGER DESIGNER D. CHAPMAN K. DURRANT PROJECT MANAGER REVIEWER M. NORRIS J. HERMAN LANDSCAPE PLAN - B DATE PROJECT # FUNDING # FEBRUARY 2023 21.01721 N SHEET L=1 02 Of Q O O Of m J J O J J W 0 z w ILL O N 0 90 PLAN BROOM FINISH SURFACE PERPENDICULAR TO DIRECTION OF TRAFFIC V-SHAPED TOOLED JOINT 1/8" TO 1/4" JOINT SEALER 1 /8" RADIUS 1 7. � •. tea.... .. i 1 /2" JOINT FILLER 1 /2" EXPANSION JOINTS ® SIDEWALK V-SHAPED 30' O.C. & ADJACENT TOOLED JOINTS SPACING TO ALL RIGID OBJECTS AT WIDTH OF SIDEWALK SECTION A -A WIDTH VARIES. SEE SITE PLAN 4" MIN. COMPACTED ABC SECTION B-B CONSTRUCTION NOTES: 1. SIDEWALK SHALL BE CONSTRUCTED WITH 4000 PSI CONCRETE. 2. SIDEWALK SURFACE SHALL BE GIVEN A LIGHT BROOM FINISH WITH THE BRUSH MARKS PERPENDICULAR TO THE TRAFFIC. CONCRETE SIDEWALK UPDATED MARCH, 2017 NOT TO SCALE 12" VAN ACCESSIBLE o SIGN R7-8P (AS REQUIRED) 0 RESERVED PARKING 0 ao 0 SIGN R7-8 r� R7-8 SIGN APPROVED FOR USE UNDER GENERAL STATUTES 20-37.6 AND 136-30 BOTTOM OF SIGNSA o SIGN o R7-8D COLORS: (ALL SIGNS) LEGEND AND BORDER - GREEN WHITE SYMBOL ON BLUE BACKGROUND I- BACKGROUND - WHITE O ARROW - GREEN m 18�� R = 1-1/2" w U) (TYPICAL) O Uj Q VAN ACCESSIBLE 3 8" Z (TYPICAL) z 3 8" cO a R7-8P (TYPICAL) 12" R = 1-1/2" (TYPICAL) 00 nNISHED GRADE Pi SLTY 3/8" (TYPICAL) 3 L8" R7-81D (TYPICAL) GENERAL NOTES: 1. REGARDLESS OF AGE, ALL ACCESSIBLE SPACES SHALL BE IDENTIFIED BY ABOVE -GROUND SIGNS ONLY. (SEE N.C.G.S.) SPACES SHALL NOT USE GROUND -PAINTED SYMBOLS. 2. SEE SIGN DETAIL ON SHEET C-502 FOR FOOTING INFORMATION. HANDICAP PARKING SIGNAGE UPDATED MARCH, 2017 NOT TO SCALE PROPOSED PAVEMENT 2'-6" 2'-0" 6" 1/2" RAD. FINISH GRADE 2" RAD. o 1 \i . • v .a v JOINT SEALE rA GUTTER SURFACE \\�\�\ \jy //.\/�\\\� TOOLED CONTRACTION JOINTS ®10' O.C. �/\\// 6" MIN. COMPACTED ABC 4" MIN. COMPACTED ABC COMPACTED SUBGRADE SECTION A -A ELEVATION DETAIL WITH PROPOSED PAVEMENT PROPOSED PAVEMENT 2'-6" REPLACEMENT 2'-0" 6" 1/2" RAD. SAW CUT EXISTING FINISH GRADE ASPHALT 2" RAD. EXISTING ASPHALT (0 O e � 1 FINISH GRADE \i 6" MIN. COMPACTED ABCJ 4" MIN. COMPACTED ABC COMPACTED SUBGRADE SECTION A -A 4'-0" MIN. TOP OF CURB COpE LOP GUTTER SECTION TAPER CURB WALK FLUSH IN 2.0 6" CONCRETE CURE FACE OF CURB/WALK 6'-0" TRUNCATED DOMES PER SITE LAYOUT SHEET. 1:12 SLOPE MIN. w JOINT SEALE rA GUTTER SURFACE TOOLED CONTRACTION JOINTS ® 10' O.C. L-► A ELEVATION DETAIL WITH EXISTING PAVEMENT 1 /8" RAD.--A FILLER I EXPANSION JOINTS ® 30' O.C. AND ADJACENT TO ALL RIGID OBJECTS 1 /8" RAD., FILLER 1/2 I EXPANSION JOINTS ® 30' O.C. AND ADJACENT TO ALL RIGID OBJECTS CONSTRUCTION NOTES: 1. CURB SHALL BE CONSTRUCTED WITH 4000 psi CONCRETE. 2. SURFACE SHALL BE GIVEN A LIGHT BROOM FINISH WITH THE BRUSH MARKS PARALLEL TO THE CURB. 3. FILL AND SEAL THE TOP 1/2" OF EXPANSION JOINTS AND TOP 1" OF CONTRACTION JOINTS WITH APPROVED JOINT SEALING COMPOUND. 4. REFERENCE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES, SECTION 846-3. CONCRETE CURB & GUTTER (21-611) UPDATED MARCH, 2017 NOT TO SCALE NOTE: 6" 1. ASPHALT TO MATCH TYP SURROUNDING GRADE TO FINISHED GRADE ALLOW SHEET FLOW OF y\/\y DRAINAGE AND PREVENT /\//\//\/ ANY PONDING. 10' 2" TYPE S9.5B ASPHALT SURFACE COURSE FINISHED GRADE COMPACTED SUBGRADE ASPHALT GREENWAY TRAIL 2" S9.5C ASPHALT SURFACE COURSE 8" COMPACTED AGGREGATE BASE COURSE 2'-0" SUBGRADE (COMPACTED 100% OF STANDARD PROCTOR IN 8" LIFTS) FOR VARIABLE DEPTH FILL AREAS IF NEEDED - 95% IN 8" LIFTS (COMPACTED TO 100% OF STANDARD PROCTOR IN 8" LIFTS) ORIGINAL GROUND AFTER CLEARING AND GRUBBING PARKING LOT ASPHALT PROFILE 4 UPDATED MARCH, 2017 NOT TO SCALE UPDATED MAY, 2018 NOT TO SCALE 4" WIDE WHITE PAINTED STRIPES \ HANDICAP PARKING SIGN (R7-8E) a J HC o HC ao Q I' 8' $' 'l 5' STANDARD 8' VAN NOTE: PARKING SPACE TO SLOPE MAXIMUM 2% IN ANY DIRECTION GENERAL NOTES: 1. WHERE ACCESSIBLE PARKING IS REQUIRED, THE NUMBER OF PARKING SPACES SHALL BE IN ACCORDANCE WITH THE CURRENT ADA STANDARDS. A MINIMUM OF 1 VAN ACCESSIBLE SPACE SHALL BE PROVIDED. 2. WHERE FEASIBLE, THE VAN ACCESSIBLE SPACES SHOULD BE PLACED ON THE LEFT SIDE OF THE ACCESS ISLE TO ACCOMMODATE SIDE ENTRY. 3. PARKING SPACE(S) AND ISLE(S) ARE TO SLOPE MAXIMUM 2% IN ANY DIRECTION. 4. DIMENSIONS SHOWN ARE MINIMUMS, LOCAL CODES MAY BE DIFFERENT. 5. ACCESSIBLE ISLES ARE TO BE STRIPED OFF TO PROHIBIT PARKING. BLUE STRIPING COLOR IS NOT REQUIRED. FOR NCDOT, STRIPING TO BE WHITE ON DARK PAVEMENT AND BLACK ON LIGHT PAVEMENT. 6. RAMP DIMENSIONS BASED ON 6" CURB HEIGHT. 7. DETECTIBLE WARNING PLATES ARE NOT REQUIRED UNLESS ISLES ARE PART OF A STREET CROSSING. ACCESSIBLE STRIPING K�� DETAIL 5 REVISED FOR THIS PROJECT NOT TO SCALE TRUNCATED DOMES PER SITE LAYOUT SHEET. 1" 2" 1" 30" CONCRETE 1�1 CURB AND GUTTER I I NOTES: 1:12 MAX ADJACENT SIDEWALK 1) ALL WOOD FOR SPLIT RAIL FENCE TO BE PRESSURE TREATED. SLOPE SEE SITE PLAN 2) END POST SHALL BE TERMINAL POST. 3) STAIN WITH ONE COAT OF TWP CALIFORNIA CEDAR. - - - - 4) FENCE LOCATIONS TO BE STAKED AND APPROVED BY ENGINEER PRIOR TO INSTALLATION. A 10 FOOT SECTION OF FENCE SHALL BE ERECTED FOR ENGINEERS APPROVAL PRIOR TO INSTALLATION. )NTROL JOINT )SED SIDEWALK J a NOTES 1/2" EXPANSION N 6'-0" 1. DETECTABLE WARNING DOMES WILL COVER 2'-0" LENGTH AND JOINT - TYPICAL FULL WIDTH OF THE RAMP FLOOR AS SHOWN ON THE PLANS. 2. DETECTABLE WARNING DOMES WILL CONTRAST VISIBILITY WITH ADJOINING SURFACE, EITHER LIGHT -ON -DARK OR DARK -ON -LIGHT SEQUENCE COVERING THE ENTIRE RAMP. 3. FOR ADDITIONAL NOTES AND INFORMATION, SEE NCDOT STD 848.05 CONTROL JOINT 4. DETECTABLE WARNING DOMES TO BE BLACK CAST -IN -PLACE TYP EACH SIDE PLAN TACTILE PANELS HANDICAP RAMP W/ TACITLE DOMES REVISED FOR THIS PROJECT NOT TO SCALE - ACCESSIBLE RAMP 1:12 MAX. SLOPE SECTION RAMP WIDTH - AREA VARIES 1.6" TO 2.4" Oo Oo 0 0 CV = I z ° io w J 0 0 0 0 N Oo ()()° WARNING DOME SPACING c00 0 0.9" R. o 1. 4" R. to ► WARNING DOME SECTION Q3OST END N 'OST I1 I�I 4.51RAIL 0 4 PERSPECTIVE VIEW of 10' x 3.5" x 1.5" RAILS WITH 6' �n4 5TAPERED TIPS TO MEET SLOTS 3.5" 10" 3'-10" "x4" POST (TYPICAL) W V. EXISTING GRADE EXISTING SOIL) CONCRETE FOOTING FRONT VIEW WOOD FENCE - SPLIT RAIL UPDATED MARCH, 2017 NOT TO SCALE �/� �• 1'-6" \\\�z�� yid �I 1'-3" I� cI/ SHEET FINAL DRAWING 5400 Trinity Road _ G 1%. : FOR REVIEW HOLLYBROOK PARK AS NOTED ® Suite 107 _ SEAL _ PURPOSES ONLY DETAILS Raleigh, NC 27607 = 041598 �?�'. 'Z NOT RELEASED TOWN OF WENDELLOFFICE MANAGER DESIGNERC=501 919.378.9111 :�9�jyNcirvE�.�'\� FOR D. CHAPMAN K. DURRANT NC Firm License # C-0459 // FW o. 0� • CONSTRUCTION m cg i I lassociates. com WAKE COUNTY, NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# NO. DATE BY DESCRIPTION M. NORRIS M. OETTING FEBRUARY 2023 21.01721 0 90 1 7/8" O.D. LINE POST I 10' M 10" MIN. (TYP.) 12" TERMINAL POST BALL CAP WITH SET SCREW OR SPOT WELDED (TYP.) KNUCKLED SELVAGE AT TOP, BOTTOM, AND EDGES (TYP.) 1-5/8" O.D. TOP RAIL CORNER POSTS 2 3/8" O.D. SCH. 40 PIPE. -NO. 9 CORE WIRE GAUGE CLASS 2B 2" MESH CHAINLINK TRUSS ROD WITH TURNBUCKLE AT LAST SECTION ONLY. TENSION BAR WITH BANDS/CLIPS 0 12'O.C. SLOPE TO DRAIN (TYP.) WL fJ:T2k12ff21i1fJ1 [el COMPACTED SUBGRADE 95% STD. PROCTOR (TYP.) NOTES: 1. POSTS, RAILS, MESH, AND FITTINGS SHALL BE BLACK VINYL COATED CLASS 2B THERMALLY FUSED AND BONDED. 2. SEE SPECIFICATIONS FOR FURTHER MATERIAL AND INSTALLATION REQUIREMENTS 6' CHAIN LINK FENCE w/3" TERMINAL POST TENSION BARS BRACE 1 J" WELDEI OUTER FE I s FORK LAT( o � I i� TENSION BA BANDS 18"O.C. NOT TO SCALE OPENING WIDTH MUST HAVE 4' CLEAN WHEN (IPFN TOP, MIDDLE & BOTTOM RAILS 1-5/8"O.D. SCH.40 STEEL PIPE J"Xj" DRAW BAR NO. 9 CORE WIRE GAUGE CLASS 2B 2" MESH CHAINLINK FABRIC TIES ® 12"O.C. TYP. GATE FRAME: 2" O.D. PIPE SOLID GATE FRAME HEAVY DUTY HINGE (TYP.) NOTES: 00 1. POSTS, RAILS, MESH, CONC. FOOTING AND FITTINGS SHALL v . : ► 3000 PSI BE BLACK VINYL COATED CLASS 2B ; ' ' : �.►• THERMALLY FUSED •tip AND BONDED COMPACTED SUBGRADE 2. GATE SHALL BE 95% STD. PROCTOR COMPLETE WITH BALL 16 16" AND SOCKET HINGES OR APPROVED EQUAL 3. ALL GATES SHALL BE DOUBLE ACTING 4. SEE SPECIFICATIONS FOR FURTHER 10' CHAIN LINK SINGLE GATE NS ARLI ATIOND REQUIREMENTS MODIFIED FOR THIS PROJECT NOT TO SCALE 1" BEVEL (TYP.) 2'-6" f •i a a O° < d ° 6'-0" DOME STYLE P( GATE POST' O.D. SCH. SURFACE SEE SITE I Tr.) I I J MIN. r 12" (TYP.) MIN. (TYP.) NOTES: 1. POSTS, RAILS, MESH, AND FITTINGS SHALL BE BLACK VINYL COATED CLASS 2B THERMALLY FUSED AND BONDED 2. GATE SHALL BE COMPLETE WITH BALL AND SOCKET HINGES OR APPROVED EQUAL 3. ALL GATES SHALL BE DOUBLE ACTING 4. SEE SPECIFICATIONS FOR FURTHER MATERIAL AND INSTALLATION REQUIREMENTS BALL CAP WI' SET SCREW 0 SPOT WELDED (TYP.) No.9 GAUGE CLASS 2B BL VINYL COATE[ MESH (TYP.) 1-5/8" O.D. INTERMEDIATE RAIL (TYP.) SLOPE TO DR 3000 PSI PRECAST CONCRETE d .e e Q d e Q d 'd "4 a d a °: d' i .a <.. a' � 'd a 18" LONG #14 REBAR FOR PINNING WHEEL STOP TO PAVEMENT CENTERED IN PARKING STALL WHEEL STOP DETAIL 7 REVISED FOR THIS PROJECT NOT TO SCALE 6' CHAIN LINK SINGLE GATE 2 MODIFIED FOR THIS PROJECT NOT TO SCALE MIN. (TYP.) (TYP.) NOTES: 1. BEYOND THE BOTTOM GRADE BREAK, A CLEAR SPACE OF 4'X4' MIN. SHALL BE PROVIDED WITHIN THE MARKINGS. Q (TYP.) NOTE: COUNTERWEIGHT CONTRACTOR TO PROVIDE DRAWINGS WHITE PVC OUTER SIGNED AND SEALED BY A NORTH SIGN TO MEET MUTCD REQUIREMENTS SLEEVE FILLED CAROLINA LICENSED STRUCTURAL SIGN TO MEET MUTCD ZINC PLATED WITH SAND BRASS SNAP HOOK ENGINEER. REQUIREMENTS n I n SADDLE AND BALL TOP BALL AND ROD TOP OF TRUCK INTERNAL HALYARD FIBREGLASS POLE TOP INTERNAL HALYARD DOOR FLASH COLLAR GROUND SLEEVE WHITE POWDER COATED DOOR UNIT ALUM. DOOR BRASS HALYARD / ,GUIDE SPRING LOADED — SNAP CLEAT H AL' BRACKET FG135 FG140 ABOVE GROUND HEIGHT (ft.) A 35 40 BUTT DIAMETER (INCHES) 7 7 TOP DIAMETER (INCHES) 3 3 WALL THICKNESS 1 /5" 1 /5" WEIGHT OF SHAFT ONLY Ibs 89 DIAMETER OF TOP BALL (INCHES) 6 GROUND COLLAR - DIAMETER (INCHES) 17.5FLAG R17.5 SIZE 6 x 10 FOOTING PER NOTE: STRUCTURAL ENGINEER 1. CONTRACTOR TO COORDINATE WITH CITY FOR FLAGS. 2. FLAG POLE STRUCTURES AND ELEMENTS SHALL BE DESIGNED ACCORDING TO 2018 NORTH CAROLINA BUILDING CODE REQUIREMENTS. 3. UNITED STATES FLAG TO USE 40' POLE. ALL OTHER FLAGS TO USE 35' POLE FLAG POLE DETAIL 3 MODIFIED FOR THIS PROJECT NOT TO SCALE 10' CHAIN LINK FENCE w/ 3" TERMINAL POST MODIFIED FOR THIS PROJECT NOT TO SCALE 24" MAX WIDTH 24" MAX WIDTH KNUCKLED SELVAGE TOP, BOTTOM, AND EDGES (TYP.) BALL CAP WITH SET SCREW OR SPOT WELDED (TYP.) 1-5/8" O.D. TOP RAIL CORNER POSTS 3" O.D. SCH. 40 STEEL PIPE. No.9 CORE WIRE GAUGE CLASS 2B BLACK VINYL COATED MESH CHAIN LINK FABRIC AS NOTED. TRUSS ROD WITH TURNBUCKLE AT LAST SECTION ONLY. TENSION BAR WITH BANDS/CLIPS ® 12-O.C. SLOPE TO DRAIN (TYP.) 1-5/8" O.D. BOTTOM RAIL (TYP.) COMPACTED SUBGRADE (TYP.) 6' MIN. WIDTH NOTES: 1. POSTS, RAILS, MESH, AND FITTINGS SHALL BE BLACK VINYL COATED CLASS 2B THERMALLY FUSED AND BONDED. 2. SEE SPECIFICATIONS FOR FURTHER MATERIAL AND INSTALLATION REQUIREMENTS HI -VISIBILITY CROSSWALK 8 NOT TO SCALE LANDSCAPE O'l —1 2"—j SIGN INSTALLATION 4 REVISED FOR THIS PROJECT NOT TO SCALE TREE PROTECTION FENCE (20'-0" FOR 20" DIA. TREE) L WOOD CHIP MULCH RADIUS=1 FOOT PER INCH (6" DEPTH) OF TRUNK DIAMETER *AS NEEDED TO PROVIDE NECESSARY WORK SPACE. IF LESS THAN 5', THEN ADD BOARDS STRAPPED TO TRUNK. CONSTRUCTION SPECIFICATIONS )UND SIGN POST. IE BLACK POWDER /ANIZED STEEL. PAVED SURFACE ;RETE FOOTING BUILDING WOOD CHIP MULCH AREA (4"-6" DEPTH) 1. PLACE BARRIERS TO PREVENT THE APPROACH OF EQUIPMENT WITHIN THE DRIP LINE OF TREES TO BE RETAINED. 2. DO NOT NAIL BOARDS TO TREES DURING BUILDING OPERATIONS. 3. DO NOT CUT TREE ROOTS INSIDE THE TREE DRIP LINE. 4. DO NOT PLACE EQUIPMENT, CONSTRUCTION MATERIALS, TOPSOIL, OR FILL DIRT WITHIN THE LIMIT OF THE DRIP LINE OF TREES TO BE SAVED. 5. IF A TREE MARKED FOR PRESERVATION IS DAMAGED, REMOVE IT AND REPLACE IT WITH A TREE OF THE SAME OR SIMILAR SPECIES, 2—INCH CALIPER OR LARGER, FROM BALLED AND BURLAPED NURSERY STOCK WHEN ACTIVITY IN THE AREA IS COMPLETE. 6. DURING FINAL SITE CLEANUP, REMOVE BARRIERS AROUND TREES. MAINTENANCE IN SPITE OF PRECAUTIONS, SOME DAMAGE TO PROTECTED TREES MAY OCCUR. IN SUCH CASES, REPAIR ANY DAMAGE TO THE CROWN, TRUNK, OR ROOT SYSTEM IMMEDIATELY. • REPAIR ROOTS BY CUTTING OFF THE DAMAGED AREAS AND PAINTING THEM WITH TREE PAINT. SPREAD PEAT MOSS OR MOIST TOPSOIL OVER EXPOSED ROOTS. • REPAIR DAMAGE TO BARK BY TRIMMING AROUND THE DAMAGED AREA, TAPER THE CUT TO PROVIDE DRAINAGE, AND PAINT WITH TREE PAINT. • CUT OFF ALL DAMAGED TREE LIMBS ABOVE THE TREE COLLAR AT THE TRUNK OR MAIN BRANCH. USE THREE SEPARATE CUTS TO AVOID PEELING BARK FROM HEALTHY AREAS OF THE TREE. TREE PROTECTION DETAIL MODIFIED FOR THIS PROJECT NOT TO SCALE CI I � • ''- FINAL DRAWING AS NOTED SHEET HOLLYBROOK PARK e 5400 Trinity Road _ �A�•.� _ FOR REVIEW DETAILS ® Suite 107 - L = PURPOSES ONLY Raleigh, NC27607 = 041598 _ OFFICE MANAGER DESIGNER 919.378.9111 NOT RELEASEDTOWN OF WENDELL D. CHAPMAN K. DURRANT mcgill /�� C=502 NC Firm License # C-0459 �,tiFw �p pE���FOR //�IIa�2� CONSTRUCTION WAKE COUNTY, NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# m cg i I lassociates. com NO. DATE BY DESCRIPTION M. NORRIS M. GETTING FEBRUARY 2023 21.01721 le ry Q 0 0 ry m r J J 0 J J w 0 z LL 0 0 N 0 90 ACRYLIC COURT SURFACE PAINT PER MANUFACTURERS SPECIFICATIONS. COLOR TO BE APPROVED BY OWNER 2" S9.5B ASPHALT SURFACE COURSE 6" COMPACTED AGGREGATE BASE COURSE 2'-0" SUBGRADE \/\ (COMPACTED 100% OF STANDARD / / PROCTOR IN 8" LIFTS) 8'-0" 15'-0" 7'-0" 7'-0" 15'-0" I'-o 0'-01. 6' BLACK VINYL COATED CHAIN —LINK FENCE. SEE DETAIL SHEET C-502 2" WHITE PAINTED LINES (T) STAINLESS STEEL NET POST WITH WINDER MECHANISM 0'-0" i 16'-0 4' SINGLE PEDESTRIAN GATE. SEE SITE PLAN FOR GATE LOCATIONS. SEE DETAIL SHEET C-508 42" HANDICAP ACCESS PICKLEBALL NET. his E WITH 2" BINDING. 1" MESH PICKLEBALL COURTS 1 NOT TO SCALE NET TENSIONER OUTDOOR PICKLEBALL NET 3" BLACK POWDER COATED STEEL PICKLEBALL POSTS STAINLESS STEEL SLEEVE 3000 PSI CONCRETE FOOTING 4' WIDE SINGLE PEDESTRIAN GATE. SEE SITE PLAN FOR GATE LOCATIONS. SEE DETAIL SHEET C-502 BALL HOLDER EA END, TYP. w z w CL w z J w J 0 N CD z w z o z o Ld 4" ASTM #57 STONE SUBGRADE: EXCAVATE UNSUITABLE SOILS AND REPLACE WITH SELECT FILL AS REQUIRED TO ACHIEVE MINIMUM DESIGN INFILTRATION RATE OF 2.11 IN/HR. FINISHED SURFACE VARIES. SEE SITE PLAN 4X4 PRESSUE TREATED POD BOARD'r6 BOARD SYNTHETIC SURFACE - XGRASS (PERFORATED PERFORMX PRO OR APPROVED EQUAL) Y" - 1" #89 STONE 10" ASTM #2 STONE COURT SURFACE 1X6 TRECK BOARD WEEP HOLE 0 8'OC.0 PERMEABLE SYNTHETIC 2X SURFACE SECTION Mcg 5400 Trinity Road ® Suite 107 11 Raleigh, NC 27607 919.378.9111 NC Firm License # C-0459 m cg i I lassociates. com HANDLE 1X6 TRECK BOARD 42" LONG HANDICAP ACCESS REMOVABLE BOARD ELEVATION ALL FASTENERS TO BE STAINLESS STEEL (TYP) 4X4 PRESSURE TREATED POSTS (TYP) BOCCE BALL COURT NOT TO SCALE OSEAL I1 FINAL DRAWING �FOR REVIEW - PURPOSES ONLY 041598 NOT RELEASED ��i9 • FN �Q' .• (D .clrvE .��z- FOR '''y�W °,°�Z� CONSTRUCTION 0 MI x 0 I N 1"0 STEEL POD HIN( 3/4"0 STEEL POD LOCI HOLE, DRILLED FOR PADI 1/ /-D38- BASE F RILLEDS ORLANCHOR a 4 a d d' n DIRECTION OF GREENWAY TRAFFIC IN WELDED CAP 2"x4"x1/4" CHAN F1 STEEL BOX (PAII HI -VISIBILITY YELL n� 2" 3/8.0 ANCHOR B( -D.12" CAST IN PLACE )NCRETE FOOTIP NOTES: 1. BOLLARD POST AT INTERSECTIONS TO BE REFLECTORIZED. 2. BOLLARD PLACEMENT OFFSET FROM INTERSECTIONS IS A MINIMUM OF 5'. 3. BOLLARDS AND SIGNS TO BE INSTALLED BY THE CONTRACTOR. 4. ALL METAL TO BE HOT DIPPED GALVANIZED STEEL. 5. PADLOCK SUPPLIED BY CONTRACTOR. NOTE: 1 /4" STEEL PLATE FOR ALL HINGE AND LOCK PIECES a � C:2o 1" S9.513 ASPHALT SURFACE COURSE 6" COMPACTED AGGREGATE BASE COURSE 2'-0" SUBGRADE (COMPACTED 100% OF STANDARD PROCTOR IN 8" LIFTS) BOLLARD - HINGED 2 UPDATED MARCH, 2017 NOT TO SCALE 4'-0" 2'-0" CORNHOLE PLAN BAG RETRIEVAL TO BE SLOPED. ENSURE SLOPE DOESN'T INTERFERE WITH BAGS ENTRANCE INTO HOLE SMOOTH CONCRETE TOP 4" BACK VIEW SIDE VIEW 0 CONCRETE PLATFORM 35' 4' 27' 4' z_ o PITCHER'S BOX c 3'-0" J r D r O z w m 33' O PRECAST CONCRETE 2'-0" CORNHOLE BOARD z O J C J r o M. z A A A 10' TALL CHAINLINK FENCE. SEE DETAIL SHEET C-502 4' WIDE SINGLE PEDESTRIAN GATE. SEE SITE PLAN FOR GATE LOCATIONS. SEE DETAIL SHEET C-502 BASKETBALL COURT NOT TO SCALE HOLLYBROOK PARK TOWN OF WENDELL WAKE COUNTY, NORTH CAROLINA DESCRIPTION ASPHALT COURT AS NOTED OFFICE MANAGER D.CHAPMAN PROJECT MANAGER M. NORRIS DESIGNER K. DURRANT REVIEWER M. OETTING COURT LAYOUT CORNHOLE COURT 3 NOT TO SCALE I� J L DIM.0 TOP VIEW FRONT MOUNT FRONT MOUNT GOAL MODEL DIM "A" FT. -IN. (METERS)FT.-IN. DIM "B" (METERS)FT.-IN. DIM "C" (METERS) GNA 60F 9'-6.5" (2.91M) 70.5" (1.79M) 5.56" (141MM) NOTES: 1. CORNHOLE BOARD TO BE DOTY & SONS CONCRETE PRODUCTS BY085531, KAY PARK CONCRETE CORNHOLE, OUTDOOR CREATIONS 1510 CORNHOLE, OR APPROVED EQUAL. GARED 9220 EAST 146TH ST, BLDG A NOBLESVILLE, IN 46060 TOLL FREE: 1-800-325-2682 PHONE: (317) 774-9840 FAX: (800) 757-6081 www.garedsports.com LDIM.B- 0 Cl �LL: rn w o � o M N Uj � �.� I ,''•y 3-0" (0.91M) MIN. REAR MOUNT Q 0 PLAYING SURFACE REAR MOUNT GOAL MODEL DIM "A" FT. -IN. (METERS)FT.-IN. DIM "B" (METERS)FT.-IN. DIM "C" (METERS) GNA 60R 9'-81/2" (2.96M) 70.5" (1.79M) 5.56" (141MM) MANUFACTURE NOTES: 1. DIMENSION "A" IS FROM THE UNDERSIDE OF THE POST ARM TO THE PLAYING SURFACE. 2. DIMENSION "B" FROM THE FACE OF THE MOUNTING PLATE TO THE EDGE OF THE POST. NOTES: 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 2. DO NOT SCALE DRAWING. 3. THIS DRAWING IS INTENDED FOR USE BY ARCHITECTS, ENGINEERS, CONTRACTORS, CONSULTANTS AND DESIGN PROFESSIONALS FOR PLANNING PURPOSES ONLY. THIS DRAWING MAY NOT BE USED FOR CONSTRUCTION. 4. ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE TIME OF DEVELOPMENT BUT MUST BE REVIEWED AND APPROVED BY THE PRODUCT MANUFACTURER TO BE CONSIDERED ACCURATE. 5. CONTRACTOR'S NOTE: FOR PRODUCT AND COMPANY INFORMATION VISIT www.CADdetails.com/info AND ENTER REFERENCE NUMBER 21.01721_Hollybrook Park details OUTDOOR UNITS GNA60: GOOSENECK SYSTEM WITHOUT BRACES 21.01721_Hollybrook Park details REVISION DATE PROTECTED BY COPYRIGHT ©2023 CADDETAILS.COM LTD. CAC SHEET DETAILS DATE PROJECT # FUNDING # FEBRUARY 2023 21.01721 C=503 le ry Q 0 0 m r J J 0 J J w 0 z w w 0 z 0 N 0 90 NO. DATE BY c� 0 J Q LU W Y Df Q d Y O O Df m r J J O _ I N O c� z Q Df W a- O Df a- Df Q a O O Df m J J O U z J J W 0 z W N r` N O a MOST DEPENDABLE FOUNTAINS, INC. 5705 COMMANDER DR. P.O. BOX 587 ARLINGTON, TN 38002-0587 EM)F PHONE: (901) 867-0039 5'-0" www. mostdepeInd able. Corn MOST DEPENDABLE FOUNTAIINS,INC. TOWN LOGO. GRAPHICS TO BE COORDINATED WITH OWNER REMOVABLE A A SS CAP V-6" PRODUCT ASSEMBLY INSTRUCT• D006/DO22 DOG WASTE STATIONPUSH BUTTON FOR 10" SS PIPE PET FOUNTAIN ON D006 A,DOG WASTE STATION ASSEMBLY ON REVERSE PARTS LIST: rreasecreanur _ • aheryourdoy I NUTS & BOLTS LIST: 3" Bolt (2) A OPPOSITE SIDE ADULT ARM �I BLUE BORDER STRIPE. SIZE AND SHADE TO BE APPROVED BY OWNER 8 • Can (1) ®� � ' 2" Bolt (3) � ADA ARM BY M.D.F 4" GREEN POWDER -Post(l) _ B �`�" -•'�' �- COAT STEEL POST HOLLYBROOK ' 1" Bolt (2) • Dispenser (1) C """"°"�"'"""•"'" SIGN(1) + BRACKET(1) • Sign/Sign Bracket (1) CAN (1) DISPENSER (1) HARDWARE (1) ' Flat Washers (6) ACCESS DOOR " GREEN POWDER COATED STEEL 6'-8" 3'-0" PARK • Dispenser Keys (2) i` f D BOLT IS CENTERED PET FOUNTAIN ON UNDER "ADA ARM" OPPOSITE SIDE SIGN. COLOR TO BE APPROVED Q � BY OWNER. THICKNESS OF STEEL • 600 Waste Bags 600 WASTE BAGS ' Split -Lock Washer (6) OPTIONAL TEMPLATE ANCHORED INSIDE PER STRUCTURAL ENGINEER PROVIDED BY SIGNAGE COMPANY • 50 Can Liners E OFPEDESTAL 1201 S. HOLLYBROOK RD, WENDELL, NC 27591 jb • Hardware Pack POST* (1) 'Hex Nuts (6) .. .'d : a, ° d : a° ° *2 Post Sections45" Each 50 CAN LINERS F IF TYING INTO A SANITARY SEWER, A P TRAP WILL °. RECOMMEND A 2" 3" VTEXT, BE NECESSARY OR 4" OPEN HUB DRAIN ITEM# D006 DOG WASTE STATION ASSEMBLY INSTRUCTIONS 72" *See REVERSE far Sign& FRONT VIEW 6 5/8" SLEEVE FONT, AND COLOR TO BE APPROVED BY OWNER 72" 1. ASSEMBLE POST: overlap post one tapered -end 6" onto the flat end of post two. Thread 2 bolts (C) with 2 flat washers (D) to connect. Tighten with nuts and lock washers (E, F). 0 62" 2. Mark Assembled Post 18" from tapered end: bury the post in concrete level to 18" mark. o SPACE 62" 58„ Bracket ) PET FOUNTAIN REMOVE DOG BOWL o o IN ORDER TO INSTALL BOLT IS CENTERED O 3RD TORX BOLT UNDER °ADA ARM" o o WATER V-6­' ®® PI..W.—P a y 58 3. ATTACH CAN: Install 6" above ground; thread the 2 bolts (A) with 2 flat washers (D) through the 0 40° \\ / can from the inside. Line up the bolts with holes in the post (6" above ground) and thread through. Tighten with nuts and lock washers (E, F). SPACE 30" Step 4: Attach Dispenser O / c thread 40 4. ATTACH DISPENSER: Open the DISPENSER. Align the SIGN BRACKET'S long slot with the top 2 holes s wo bolts z 2", 3" OR 4" OPEN HUB DRAIN ° �/ ° 30" of the dispenser and use 2 bolts (B) & flat washers (D) from the INSIDE of the dispenser to bolt thru o the bracket, thru the and secure in the back of the with lock washer (E) and nuts (F). BOTTLE FILLER \ \\\\\//\\\\\\\\\\\\\\\\\\\\\\ \\�/1 past post (see diagram) 8" � NOTES: TOP VIEW \ \ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ Use a third bolt (B), flat washer (D), &lock washer (E) &nut (F) at the bottom hole of the dispenser o Step 3: Attach Can 2. INSTALLATION TO ARCHITECT,OOCALE DRAWING N AUDTOCAD MODELIMANUFACTURER'S SPECIFICATIONS.//j //j //j //j //j //j //j //j //j / a t0 attach t0 post. 3. THIS DRAWING IS INTENDED FOR USE BY ARCHITECTS, ENGINEERS, CONTRACTORS, CONSULTANTS AND DESIGN PROFESSIONALS j�XKN/\\j/ j\\j/ B 18'of concrete FOR PLANNING PURPOSES ONLY. THIS DRAWING MAY NOT BE USED FOR CONSTRUCTION. j\j/\\j/\\ j\j/�\��\\j \j 5. ATTACH SIGN: Bolt sign to the top of the SIGN BRACKET and secure with washers, lock washerso a / 4. ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE TIME OF DEVELOPMENT BUT MUST BE REVIEWED AND APPROVED BY < and nuts. �IiorNo EVE ' THE PRODUCT MANUFACTURER TO BE CONSIDERED ACCURATE. 6. Fill Dispenser with bags, and Install Can finer. " 5. CONTRACTOR'S NOTE: FOR PRODUCT AND COMPANY INFORMATION VISIT www.CADdetails.com/info AND ENTER Step I: Assemble Post Step 2: Set Post in Concrete `� REFERENCE NUMBER 21.01721_Holl brook Park details y MODEL 10145 SM SHOWN W/ OPTIONAL PET FOUNTAIN ('100% NOTES: 1. ENTRY SIGN TO MATCH TOWN OF WENDELL SIGN DESIGN STANDARDS. CONTRACTOR TO FOOTING PER STRUCTURAL ENGINEER COORDINATE WITH OWNER FOR COLORS NOTE: AND GRAPHICS OF ENTRY SIGN. CONTRACTOR TO 21.01721_Hollybrook Park details CADdetailsPLUSTM REVISION DATE 03/02/2023 PROVIDE DRAWINGS PROTECTED BY COPYRIGHT ©2023 CADDETAILS.COM LTD. CADdetails.com SIGNED AND SEALED DOG WASTE STATION DRINKING FOUNTAIN BY A PARK ENTRY SIGN CAROLNAR LICENSED 1 2 STRUCTURAL ENGINEER 3 MODIFIED FOR PROJECT MODIFIED FOR PROJECT MODIFIED FOR PROJECT OBTAINED FROM SIGN NOT TO SCALE NOT TO SCALE NOT TO SCALE MANUFACTURER NOTES: 1. METAL ROOFING TO BE 24 GAUGE NOTE: GALVALUME COATED. CONTRACTOR TO PROVIDE DRAWINGS 2. METAL ROOFING TO BE KYNAR 500 TO COORDINATE SIGNED AND SEALED BY A NORTH WITH OWNER FOR COLOR. CAROLINA LICENSED STRUCTURAL ENGINEER. 3. POSTS TO HAVE POWDER COAT FINISH. CONTRACTOR TO COORDINATE WITH OWNER FOR COLOR. 360 ——————————————————————————————————————— ol 528 12 4 STOP H NOT FOR CONSTRUCTION 151 REF 90 CLEAR USE FOR PRELIMINARY PLANNING AND ESTIMATING ONLY \\--FINISH DRAWING: ARCHITECTURAL ELEVATIONS FINISH GRADE. MOUNTING VARIES BASED ON ENGINEERING GRADE. MOUNTING VARIES BASED ON ENGINEERING SCALE: REV LEVEL: 1:96 A O ( ) 3 SHEET www.poligon.com www.poligon.com PCOPYRIGHT2016 REQUIREMENTS. REQUIREMENTS. byPORTERoRP PATENTED OR PATENTS PENDING PORTERCORP 4240 N. 136th AVE HOLLAND, MI 49424 5400 Trinity Road � C _ PAL �•.� _ FINAL DRAWING FOR REVIEW HOLLYBROOK PARK AS NOTED DETAILS SHEET ® Suite 107 Raleigh, NC27607 - r : = = 041598 _ PURPOSES ONLY 919.378.9111 NC Firm License # C-0459 ' ' '!D �o' NOT RELEASED FOR TOWN OF WENDELLOFFICE D. MANAGER CHAPMAN DESIGNER K. DURRANT C=504 WAKE COUNTY, NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT # FUNDING # mcgillassociates.com CONSTRUCTION NO. DATE BY DESCRIPTION M. NORRIS M. OETTING FEBRUARY 2023 21.01721 INLET INSTALL 19C HARDWARE AND STONE NC DOT #5 Of WASHED STON 19 GA. HARDWARE CLOTH WITH Y4' MESH OPENINGS NOTE: MIN. 3000 PSI CONCRETE REQUIRED THROUGHOUT. DRAINAGE STRUCTURE TOP VARIES WITH APPLICATION, SEE CATCH BASIN SCHEDULE (VERIFY TRAFFIC LOAD REQUIREMENT FOR EACH TOP) JOINT SEALANT INTERIOR JOINTS PLASTERED WITH MORTAR CONCRETE CATCH BASIN EXTENSION RISER; LENGTH AND WIDTH TO MATCH BASIN, HEIGHT VARIES WITH PROPOSED GRADE (3) No. 4 RE[ KNOCKOUT P/ (TYP. EACH S INLET CONCRETE INVERT INSTAI AT A CONSTANT SLOPE FROM INLET TO OUTLET (SEE CATCH BASIN SCHEDULE) JOINT SEALANT INTERIOR JOINTS PLASTERED WITH MORTAR PRE —CAST CONCRETE CATCH BASIN; LENGTH, WIDTH AND HEIGHT VARIES BY MANUFACTURER AND APPLICATION; KNOCKOUT PANEL SEE CATCH BASIN SCHEDULE AND (TYP. EACH SIDE) VERIFY WITH SUPPLIER 5"-8" WALL THICKNESS WITH KNOCKOUT PANEL NO PORTION OF STRUCTURE SHALL BE REMOVED, DAMAGED OR OTHERWISE ALTERED EXCEPT THOSE AREAS DESIGNATED AS KNOCKOUT PANELS PLAN NOTES: 1. ATTACH HARDWARE TO OUTSIDE OF FENCE POSTS WITH APPROVED FASTENERS. 2. FILTERS SHALL BE INSPECTED WEEKLY AND AFTER EVERY RAIN AND REPAIRED AS REQUIRED. 3. SEDIMENT SHALL BE REMOVED AFTER DEPOSITS REACH HEIGHT OF BARRIER. 4. STEEL POSTS SHALL BE MINIMUM 1:25 POUND PER L.F. 5. REF: NCDENR 6.51. A PIPE TO BE FLUSH WITH INSIDE WALL OF BASIN AND GROUTED SMOOTH PROPOSED PIPE INVERT = BOTTOM OF PIPE AT FLOW LINE 6" VARIES 6" OUTLET SECTION A (PLAN I CATCH BASIN TOP (SEE SCHEDULE FOR TYPE) s- BASIN RISER HEIGHT VARIES '! �(2) No. 4 REBAR 1 CATCH BASIN HEIGHT APPROVED STEPS REQUIRED VARIES BY PIPE SIZE INLET FOR STRUCTURES OVER AND MANUFACTURER 3'-6" IN DEPTH, 12" O.C. No. 4 REBAR ® 6" O.C. EACH DIRECTION 0 o 3000 PSI CONCRETE TO FORM INVERT; PROVIDE CONSTANT SLOPE FROM ALL INLETS TO OUTLET (12" OF #57 SECTION B STONE MAY BE REQUIRED). FOR POOR SOIL AND/OR WET CONDITIONS; CONTRACTOR SHALL CONTACT THE ENGINEER BEFORE PLACING BOX PRE -CAST CATCH BASIN UPDATED MARCH, 2017 NOT TO SCALE 5' LONG HEAVY DUTY STEEL T—POSTS SET 24" MIN. INTO GROUND (MAX. 4' SPACING) �NO. 57 WASHED STONE AREA FOR SEDIMENT ,—GROUND/-EXCAVATED STORAGE 5't 32" INLET PROTECTION 4 UPDATED MARCH, 2017 NOT TO SCALE STEEL FENCE POST (t) POSTS TO HAVE PROD UPSTREAM END OF STORM DRAIN #57 WASHED STONE FILTER ACROSS PIPE INLET 6" CONCRETE TOP WITH GRATE AND FRAME CAST IN UNLESS NOTED OTHERWISE GRATE AND FRAME FOR THIS TOP TO BE 24"x24" ("NEENAH R3339A") OR ("U.S. FOUNDRY 4190-6259) OR APPROVED EQUAL; VERIFY TRAFFIC LOAD REQUIREMENTS ON ALL GRATE AND FRAME ASSEMBLIES GRATES PLACED IN PEDESTRIAN "FIC AREAS TO SHALL BE NTED WITH OPEN SLOTS VING PERPENDICULAR TO "FIC FLOW (TYP. ALL GRATES) FLAT CATCH BASIN TOP CATCH BASIN SCHEDULE SYMBOL—(FCB) RIM = TOP EDGE OF GRATE HEAVY P" ^ °T Ak— FRAME' UNLESS NOTED OTHERWISE GRATE AND FRAME ASSEMBLY FOR THIS TOP SHALL BE 24"x36" ("NEENAH R3233D") OR ("U.S. FOUNDRY 5181-6420") OR APPROVED EQUAL CONFORMING TO N.C.D.O.T. ROADWAY STANDARDS 840.03 WIRE" (14 GUAGE WITH MESH SPACING = 6") FILTER FABRIC )ecifications for requirements) NOTES: 1. ALL OPEN STORM DRAIN PIPES SHALL BE PROTECTED AFTER STOPPAGE OF WORK EACH DAY AS ILLUSTRATED. 2. ACCUMULATED SEDIMENT SHALL BE REMOVED AND PROPERLY DISPOSED OF AND THE TRENCH BOTTOM REGRADED AND COMPACTED IN ACCORDANCE w/ SPECIFICATIONS PRIOR TO CONTINUANCE OF LAYING PIPE. 3. ALL STAKES/POSTS TO HAVE PROTECTIVE CAPS. STONE FILTER INLET PROTECTION FOR STORM DRAIN UNDER CONSTRUCTION REVISED FOR THIS PROJECT NOT TO SCALE CURB INLET TOP CATCH BASIN SCHEDULE SYMBOL —(CI) RIM=TOP OF GRATE DIRECTLY UNDER HOOD OPENING CATCH BASIN TOP DETAILS OVERFLOW 1 /3 of PIPE DIAMETER UPDATED MARCH, 2017 NOT TO SCALE FINISH GRADE 3'-0" 6" 2'-0" 6" 3" RADIUS (TYP) VT L 4PSI C000 ONCRETE e f ',a u a °' t� t�7 TOOLED EDGE (TYP) o—FINISH GRADE 6" MIN. COMPACTED ABC` COMPACTED SUBGRADE CONCRETE FLOW THRU 6 UPDATED MARCH, 2017 NOT TO SCALE PAINTED SOLID Wf "-- NON -DOT TRAFFIC ARROWS UPDATED MARCH, 2017 NOT TO SCALE \�� 1 C I I SHEET AS NOTED FINAL DRAWING HOLLYBROOK PARK e 5400 Trinity Road _ �AL ��.� \ FOR REVIEW DETAILS ®Suite 107 - = PURPOSES ONLY Ord Raleigh, NC27607 = 041598 _ TOWN OF WENDELLOFFICE MANAGER DESIGNER NOT RELEASED D. CHAPMAN K. DURRANT 919.378.9111 �;� NC Firm License # C-0459� C=505 FOR //IIa2� CONSTRUCTION WAKE COUNTY, NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# C9 m cg i I lassociates. com NO. DATE BY DESCRIPTION M. NORRIS M. GETTING FEBRUARY 2023 21.01721 APPROVED WARNING TAPE 24" ABOVE PIPE BACKFILL MATERIAL x j COMPACTED IN 6" LIFTS 12" MAXI 12" MAX ��� / 6" MIN /�\ MIN BACKFILL MATERIAL / COMPACTED IN 3" LIFTS N o.12 COATED COPPER TRACING J WIRE J UNDISTURBED UNDISTURBED 6" EARTH NOTE: EARTH BELL HOLES NOT SHOWN BACKFILL MATERIAL - COMPACTED IN 6" LI 20 WWI - EXISTING ROAD APPROVED WARNING TAPE 24" ABOVE PIPE NOTES: 1. CONSTRUCTION OF TRENCHES SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL SAFETY AND HEALTH REGULATIONS WHICH HAVE JURISDICTION AT THE PROJECT SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH THE APPLICABLE REGULATIONS AND FOLLOW THEM ACCORDINGLY. 2. PAYMENT FOR ROCK EXCAVATION AND SELECT BACKFILL IN TRENCH SHALL BE FOR ACTUAL QUANTITIES AND SHALL NOT EXCEED THE WIDTH OF TRENCH SHOWN ON THIS DETAIL. STORM DRAIN TRENCH DETAIL UPDATED MARCH, 2017 NOT TO SCALE 10' 6" HUMP TO DIVERT RUNOFF FROM EXISTING ROAD APO G� *\CD 4' FILTER FABRIC 36' MIN. v M SEDIMENT STORAGE qOw FLOOD STORAGE ``0 PLAN VIEW STABILIZED GROUND RIP -RAP HEADWALL 1' MIN. SECTION VIEW PIPE INLET PROTECTION UPDATED MARCH, 2017 NOT TO SCALE PIPE OUTLET TO FLAT AREA - NO WELL DEFINED CHANNEL 8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE (MIN. 14 GAUGE 6"X6" WIRE) 6' MAX EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE 5' STEEL POST �X (MIN. 1.25 LB/LF) i6" 0 MAX. I WIRE - FENCE PLAN SYMBOL PIPE OUTLET TO WELL-DEFINED CHANNEL PLAN L a L a SO • 6" HUMP TO DIVERT RUNOFF FROM EXISTING ROAD 2"-3" COARSE AGGREGATE (RAILROAD BALLAST) �O FILTER FABRIC NOTES 1. A STABILIZED PAD OF CRUSHED STONE SHALL BE LOCATED WHERE TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR FROM AN EXISTING ROAD. 2. STONE TO BE 2 - 3 INCH WASHED STONE RAILROAD BALLAST. 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ALL SEDIMENT SPILLED DROPPED WASHED OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 5. WHEN NECESSARY WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET, WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN. 6. REFERENCE NCDEQ LAND QUALITY SECTION DESIGN MANUAL: 6.06. TEMPORARY CONSTRUCTION ENTRANCE UPDATED MARCH, 2017 NOT TO SCALE 6" MIN. INSTALL FILTER I INST FABRIC SECTION A -A FABRIC OR PLAN L Ia La INSTALL FILTER FABRIC INSTALI SECTION C-C FABRIC v-u NOTES 1. La IS THE LENGTH OF THE RIPRAP APRON 2. d= 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6. 3. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. 5. REFERENCE NCDEQ LAND QUALITY SECTION DESIGN MANUAL: 6.41. RIPRAP APRON SIZING OUTLET PIPE DIAMETER 3 x Do APRON LENGTH APRON WIDTH I RIPRAP SIZE No. (Do) (La) (W=Do+La) (d50xTHICKNESS) ALL PIPES x" x' x' x' x" PIPE OUTLET PROTECTION 6 UPDATED MARCH, 2017 NOT TO SCALE 04 a WIRE FENCE STEEL POST 04 N PLASTIC OR WIRE TIES EXISTING GRADE EXISTING GROUND �z= maw 3: co o SECTION VIEW w .�- FILTER FABRIC EXISTING GROUND BACKFILL TRENCH AND COMPACT / THOROUGHLY UpSLOPE z (DISTURBED DISTURBE AD REA) NOTES; 1. FILTER BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND DAILY DURING PROLONGED RAINFALL. REPAIR SHALL BE MADE AS NECESSARY. SLOPE SLOPE LENGTH(FT) MAXIMUM AREA(SQFT) <2% 100 10,000 2 TO 5% 75 7,500 5 TO 10% 50 5,000 10 TO 20% 25 2,500 >20% 15 1,500 2. FABRIC SHALL BE REPLACED PROMPTLY IF FOUND TO BE IN DISREPAIR. 3. SEDIMENT DEPOSITS SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN DEPOSITS REACH APPROXIMATELY 1/3 HEIGHT OF BARRIER. 4. REFERENCE NCDEQ LAND QUALITY SECTION DESIGN MANUAL: 6.62. SILT FENCE PLAN SYMBOL 3 UPDATED MARCH, 2017 NOT TO SCALE 2' WOODEN STAKES. MINIMUM OF 4 DOWNSTREAM STAKES AND 2 UPSTREAM STAKES COIR FIBER WATTLE, MIN. 12" DIA. INSTALL MATTING IN DITCH UNDER WATTLE. MIN. 6' UPSTREAM AND 2' DOWNSTREAM MATTING SHALL BE: NORTH AMERICAN GREEN C125, AMERICAN EXCELSIOR EROSION CONTROL BLANKET OR EQUAL. SEE OTHER DETAILS FOR MATTING. WATTLE SECTION INSTALL MATTING IN DITCH UNDER WATTLE. MIN. 6' UPSTREAM AND 2' DOWNSTREAM. SEE OTHER DETAILS FOR MATTING. J� wr �-.�wvvwvvv� UPDATED MARCH, 2017 NOT TO SCALE 2'X2"X2" WOODEN STAKES W/ MIN. OF 4 DOWNSTREAM STAKES AND 2 UPSTREAM STAKES ANGLED TO HOLE COIR LOG IN PLACE L� STAKE DETAILS MINIMUM OF 2 UPSTREAM STAKES EVENLY SPACED BETWEEN DOWNSTREAM STAKES MAT WITH DOUBLE NET STRAW COCONUT LINING 6'-0" MIN. MIN BOTTOM. PERMANENT DRAINAGE SWALE UPDATED MARCH, 2017 NOT TO SCALE 12" 1(7.5cm ) NOTES: 1. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP'S), INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECP'S IN A 6" DEEP X 6" WIDE TRENCH WITH APPROXIMATELY 12" OF RECP'S EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE RECP'S WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" PORTION OF RECP'S BACK OVER SEED AND COMPACTED SOIL. SECURE RECP'S OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" APART ACROSS THE WIDTH OF THE RECP'S. 3. ROLL THE RECP'S DOWN OR HORIZONTALLY ACROSS THE SLOPE. RECP'S WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECP'S MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING AND SPACING STAPLES/STAKES IN APPROPRIATE LOCATIONS PER MANUFACTURER RECOMMENDATIONS. 4. THE EDGES OF PARALLEL RECP'S MUST BE STAPLED WITH APPROXIMATELY 2"-5" OVERLAP DEPENDING ON RECP'S TYPE. 5. CONSECUTIVE RECP'S SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" APART ACROSS ENTIRE RECP'S WIDTH. 6. IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" MAY BE NECESSARY TO PROPERLY SECURE THE RECP'S. 7. INSTALLATION OF MATTING SHALL CONFORM TO MANUFACTURER'S REQUIREMENTS. 8. SEE GRADING PLAN FOR LOCATIONS 0 CUT AND FILL SLOPES. 9. MATTING SHALL BE : NORTH AMERICAN GREEN SC150, AMERICAN EXCELSIOR EROSION CONTROL BLANKET, OR EQUAL. INSTALL ON ALL DISTURBED SLOPES (CHOSEN PRODUCT MUST BE RATED FOR SLOPES OF 2:1 OR 1:1). SEE PLAN FOR PRODUCT TYPE THAT MAY BE SPECIFIED 10. ALLOW 3" MIN. OVERLAP BETWEEN PARALLEL STRIPS. 11. BURY THE TOP OF THE MAT IN A TRENCH 4" OR MORE IN DEPTH. TAMP THE TRENCH FULL SOIL. SECURE WITH ROW OF STAPLES, 10" SPACING, 4" DOWN FROM THE TRENCH. OVERLAP END OF TOP STRIP 4" AND STAPLE. ...........\ EROSION 10„ CONTROL \I� BLANKET ........... .,\ I1-1/2" �\\ .:::........... EXCAVATED CUT �W �W W W METAL STAPLE \\\ .... .. ......... \ SLOPE \ ..� ...................... . . EROSION CONTROL BLANKET ........... {............. COMPACTED FILL ...............\ I I SLOPE EROSION �/%/%\�/%/%\///%//\ CONTROL \///\\/%\/%\/%\/%\/%\/%\/%�/\\\/%\/%\/%\/%\/%\\Q�\//%\/%\/%\% .......... I ?•' BLANKET / \ 3 \ / \ M q 3 \ \ \ \ \ \ \ \ \ \ \ \ k S vo I I I \ SLOPE MATTING INSTALLATION UPDATED MARCH, 2017 NOT TO SCALE CII/ SHEET FINAL DRAWING 5400 Trinity Road _ :� : FOR REVIEW HOLLYBROOK PARK AS NOTED Suite 107 _ SEAL = DETAILS Raleigh, NC 27607 = 441598 _ PURPOSES ONLY OFFICE MANAGER DESIGNER .F �, NOT RELEASEDTOWN OF WENDELL919.378.9111 :,9��yNcrvE�.�'\� FOR D. CHAPMAN K. DURRANT NC Firm License # C-0459 FW'p''oE m cg i I lassociates. com /���1L� CONSTRUCTION WAKE COUNTY, NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# NO. DATE BY DESCRIPTION M. NORRIS M. OETTING FEBRUARY 2023 21.01721 le Ir < a- Y 0 0 tr m J J 0 J J w 0 z LL 0 0 N 90 INFLOW STRUCTURE RIPRAP SEED OR MAT SLOPES OF SKIMMER BASIN FOR STABILIZATION BAFFLES PLAN RIP RAP LEVELING PAD UNDER SKIMMER TURN SILT FENCE INTO DAM SECTION EMBANKMENT EXTEND SKIMMER OUTLET BEYOND OF SILT FENCE EMERGENCY SPILLW Y TO INCLUDE IMPER OUS LINER U 2 c� RIPRAP \ Q- IT ��m Q O J A" A,J O EMERGENCY SPILLWAY TO INCLUDE IMPERVIOUS LINER LINER TO EXTEND UP SIDES OF PROP DESIGN SURFACE AREA ELEV TO EXISTING GRADE WEIR MIN 12" - TYP. BOTH SIDES BAFFLES TO BE 6" EMBANKMENT fill MIN. FROM DEPTH INFLOW HIGHER THAN BASIN TO SPILLWAY WEIR MIN. 5' WIDE STRUCTURE DEPTH INDICATED PLAN ON 1' MIN. FREEBOARD ELEV. \ri\ WATER SURFACE Q R) WATER DEPTH \\ \\ F- J //\//j�j � ACROSS SPILLWAY CARDOWN TO //%\/%\/%\/ w =_ EXISTWGINER GRADE (EDGE OF DISTURBANCE) FILTER FABRIC \\\\\��\\��\//�/� SKIMMER TO EXIT AT POND SEDIMENT INVERT ELEVATION OR LOWER TURN EDGES OF STORAGE DE -WATERING IF POSSIBLE FABRIC DOWN MIN. 12" ZONE ZONE INTO GROUND - TAMP AND COMPACT NOTE: RIP RAP LEVELING PAD UNDER SKIMMER TO PREVENT ALL EMERGENCY SPILLWAYS SHALL BE SEE EROSION CONTROL GROUNDING OUT LINED IN ACCORDANCE W/ NCDEQ STDS. PLAN FOR DISCHARGE SECTION FABRIC SHALL BE TERRATEX GS -INSTALL PIPING SIZE & LENGTH PER MANUFACTURER'S RECOMMENDATIONS ARM ASSEMBLY TOP VIEW AFTER SKIMMER IS INSTALLED CONTRACTOR SHALL NOTE SKIMMER SIZE OF ORIFICE INSTALLED W/ A PERMANENT MARKER - NOTATION TO BE VISIBLE OUTSIDE OF BASIN L� o' "C" N ENCLOSURE WATER ENTRY UNIT n.in 111 elr Mnr en END VIEW FRONT VIEW TEMPORARY SKIMMER BASIN UPDATED MARCH, 2017 NOT TO SCALE 5400 Trinity Road ® Suite 107 Raleigh, NC 27607 919.378.9111 NC Firm License # C-0459 m cg i I lassociates. com C 1 i FINAL DRAWING 2'.� = FOR REVIEW ZEAL �; - 441598 PURPOSES ONLY _ N Iry ��. NOT RELEASED .� �`,�' FOR r/'/X, °t i ,° \, CONSTRUCTION 2' MIN. SEE LAYOUT PLAN 30" CONCRETE CURB & GUTTER L /�IJ 111\V JV UJVI\1 nVL ASPHALT REPAIR AND OVERLAY SECTION REVISED FOR THIS PROJECT NOT TO SCALE 9 GAUGE HIGH STRENGTH TENSION WIRE STRAND - SECURE TO EACH POST TEE POST SUPPORT OR 9 GAUGE WIRE STAKE TO TO SIDE OF BASIN - SECURE TO " SUPPORT WIRE VERTICAL POST 4'-0MAX. LLLL_ LLLLL_ LLLLLL LLLLL I _LLL LLLL ///. TOP OF FABRIC \\ \ \ SHOULD BE 6" \\\ L_LL_ LLLLL_ LLLLLL_ LLLLL_ 2-LLL LLL /j\\\\� HIGHER THAN LL LLLLL LLLLLL LLLLL = _LLL LI_ //��j SPILLWAY INVERT. L LLLLL LLLLLL LLLLL o_LLL L /N, 2'-0" TOP OF BAFFLES -LLLLL LLL\ LLLLL LLLLLL LLLLL L_LLL j\\\/ LOWERDTHAN2TOP / /I OF THE BERM. SUPPORT POSTS, 24" MIN. BURY INTO BOTTOM OR SIDE 700 g/m2 COIR MESH OR SIMILAR SECURE BOTTOM OF BAFFLE TO GROUND w/ 12" STAPLES ® 12" MAX. SPACING NOTES: 1. INLET ZONE (A) SHOULD HAVE 25% OF SURFACE AREA. FIRST CELL (B) SHOULD HAVE 25% OF SURFACE AREA, SECOND CELL (C) SHOULD HAVE 25% OF SURFACE AREA AND THE OUTLET ZONE (D) SHOULD HAVE 25% OF SURFACE AREA. 2. GRADE THE BASIN SO THAT THE BOTTOM IS LEVEL FRONT TO BACK AND SIDE TO SIDE. 3. STEEL POSTS SHOULD BE DRIVEN TO A DEPTH OF 24 INCHES, SPACED A MAXIMUM OF 4 FEET APART. 4. DO NOT SPLICE FABRIC. USE ONE CONTINUOUS PIECE ACROSS BASIN. 5. INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REPAIRS IMMEDIATELY. REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL. 6. REFERENCE NCDEQ LAND QUALITY SECTION DESIGN MANUAL: 6.65. BAFFLE r \j\\/\\/\ :• \\/\% v TYPICAL IX EARTHEN EMBANKMENT ZZ INLET ZONE 25% OF SURFACE AREA (A) // XN FIRST CHAMBER 25% OF SURFACE AREA (B) / /\/\/\/\ /\ SECOND CHAMBER CLASS TRIP -RAP % //\//\//\//\//\/\ /\//\//\//\//\//\/� 25% OF SURFACE OUTLET \\ / /\\/\\/\ /\\/\\/\\/\\/\\/\\% AREA C /( ) \\ \ \\ / \\/\\/ \\ \\ \\ \\ \\ \\ \\ \\ \\r NO OUTLET ZONE BAFFLE SPACING OF 25% �/j��/j\ /j\�/j�/jam/j�/j�/j 25% OF SURFACE EACH PER NEW NCDEQ AREA (D) RECOMMENDATIONS '\//\\/// ;S THAN 2 ' LONG REQUIRE I WO (2) COIR BAFFLES POROUS BAFFLE DETAIL 3. SEE PLANS FOR BAFFLE UPDATED MARCH, 2017 NOT TO SCALE SPACING HOLLYBROOK PARK TOWN OF WENDELL WAKE COUNTY, NORTH CAROLINA NO. DATE BY DESCRIPTION 20" z fVr T CD 14rr pp � 12" MERGE ARROW COMBINATION STRAIGHT AND LEFT OR RIGHT TURN ARROW 20" COMBINATION LEFT AND RIGHT TURN ARROW SAME DIMENSIONS APPLY AS FOR THE LEFT/RIGHT TURN ARROW COMBINATION LEFT AND STRAIGHT AND RIGHT TURN ARROW SAME DIMENSIONS APPLY AS FOR THE COMBINATION STRAIGHT AND LEFTIRIGHT TURN ARROW WRONG -WAY RAMP ARROW z oN H as H60U LLJH 0 0 N = LUaZUL.2 aU 0CD fAH�OJ 0 CO z °C CL LLJ In ❑ 10'_ LL. LU O N CRYSTALIRED 5' 0" N CCD PAVEMENT MARKER 8" Typ. Z :3 Q B" - H z N CM 2'-6ll ` — _ 3 M LU - — --- — -- — — --- '_' OQC on 2'-6" on 4 - " r 4 OF RAMP ❑ ❑ _ - ❑ Or Q 0 TYP. 2' 6"6Z z ❑ z 16'-8" 7'_1r1 LU Q C coW 100, > J RAMP ARROW k a m (� AT EXIT RAMP II • Q O C0 GENERAL NOTES: 1- USE THE COLOR WHITE FOR ALL PAVEMENT MARKING SYMBOLS. 2- DO NOT LOCATE PAVEMENT MARKING SYMBOLS AS TO ENCROACH INTO INTERSECTION AREAS. 3- DO NOT PLACE SYMBOLS ACROSS TRANSVERSE EXPANSION JOINTS ON PORTLAND CEMENT CONCRETE PAVEMENTS, UNLESS APPROVED BY THE ENGINEER. RAMP ARROW 4- CONFORM ALL SYMBOLS TO THE FHWA "STANDARD HIGHWAY SIGNS" MANUAL WHICH INCLUDES AT EXIT RAMP PAVEMENT MARKINGS AND STANDARD ALPHABETS (REFER TO SHEETS 6 THRU 9) DIMENSIONS NOTE: r00 CAN VARY AMONG MANUFACTURERS, THEREFORE SLIGHT VARIANCES ARE ACCEPTABLE. HOWEVER, ALL SYMBOLS ARE REQUIRED TO BE APPROVED BY THE DEPARTMENT. 1- WHEN INSTALLING COLD APPLIED PLASTIC ON CONCRETE IT IS RECOMMENDED SHEET 1 OF 9 TO USE COLD APPLIED PLASTIC WITH A BLACK CONTRASTING BOLDER. 11205 . 08 CONTINUOUS LINES 10'-30'/SP SKIP LINE 2'-6'/SP MINI -SKIP LINE a CO UNLESKIPSLANEHLINESEANDHSKIP CENTER,L LINES. SKIPS FOR UNLESS LINEHEXTENSIONS TTSHOWN, HROUGH INTERSECTIONS, EDGELINE FOR ¢ Q EXTENSIONS THROUGH INTERSECTIONS AND MINI -SKIPS ¢ 3 EDGE LINE 1 USED FOR BICYCLE LANE LINES. H � = O 4„16„ 10 30LL J d H Z YELLOW OR WHITE O 1= x = - O O 4"/fill 2' 6' LU H;5 a LL LL 2 YELLOW OR WHITE C9 LANE LINE 0 0�4"/6" F-H~ow 4"/8" YELLOW OR WHITE LL 0 Q WHITE Z H � 3'-3'/SP MINI -SKIP LINE 3'-9'/SP MINI -SKIP LINE I-" r W ❑ CENTER LINE UNLESS OTHERWISED SHOWN, USE 3'-3'/SP MINI -SKIPS FOR UNLESS oTHERWISED SHOWN, USE 3'-9'/SP MINI -SKIPS FOR r ❑ 4"I6„ THE WHITE EDGE LINE ENTENSIONS AT ROUNDABOUTS. MINI -SKIP LANE LINES AND LINE EXTENSIONS THROUGH TAPERS. YELLOW t 3' 3' 31 91 GORE LINE O O 4"/6" B rr112" gx11211 WHITE R=40"J L R=28" ELONGATED STRAIGHT ARROW 20" r 12" WHITE DIAGONAL LINE J 12" 45 MPH OR HIGHER YELLOW OR WHITE 8" LESS THAN 45 MPH WHITE CROSSWALK LINE 8" TRANSVERSE 24" LONGITUDINAL WHITE RxR LINE 16" WHITE STOP OR TRANSVERSE BA j GENERAL NOTES: 1- USE 6" LANE, EDGE, AND CENTER LINES ON ALL FULL CONTROL OF ACCESS FACILITIES AND OTHER ROUTES 24" AS DIRECTED BY THE ENGINEER. WHITE 2- LANE LINES INDICATED AS "WIDE" ON THE ROADWAY STANDARD DRAWINGS SHALL BE AT LEAST TWICE THE WIDTH OF THE NORMAL LINE 3- GORE LINES SHALL BE TWICE THE WIDTH OF THE NORMAL LINE. SEE LINE EDGE LINE OFFSET DETAIL OFFSETGDETAIL TWO-WAY UNDIVIDED ROADWAY �2" MAX., REFER ALSO TO TABLE 1 E.O.T. W �-� --�-- -- -- -- --- CENTER LINE OFFSET DETAIL rt— LANE LINE OFFSET DETAIL AS NOTED OFFICE MANAGER D.CHAPMAN PROJECT MANAGER M. NORRIS TABLE 1 EDGE LINE OFFSETS FOR 2-LANE, 2-WAY ROADWAYS WITH UN -PAVED SHOULDERS WIDTH (W) OF RAVEL PAVEMENT MAX. EDGE LINE OFFSET FROM E.O.T. MINIMUM LANE WIDTH W 18' - 18' 2" 8' - 9' 19, 4" 9' 20' fill 9.5' 21' ell10' 22' 10" 10' 23' loll 10.5' 24' 26' 2' ill 28' 2' 12' 30' 3' 12 32' 1 4' 1 12' 3rr 311 fill LEGEND W = WIDTH OF TRAVEL LANE E.O.T.= EDGE OF TRAVEL « DIRECTION OF 0 TRAFFIC FLOW 2" TOWARDS LEFT SIDE OF TRAVELWAY DESIGNER K. DURRANT REVIEWER M. OETTING w » SEE EDGE LINE SEE CENTER LINE OFFSET DETAIL OFFSET DETAIL SEE EDGE LINE -WAY UNDIVIDED ROADWAY OFFSET DETAIL WITH TWO-WAY LEFT TURN LANE SEE EDGE LINE OFFSET DETAIL SEE EDGE LINE OFFSET DETAIL W — w SEE EDGE LINE OFFSET DETAIL DETAILS or O ILL. N N H z 45 LU 2C co a~LL he LL C O a❑ a Q 0 CD zza W cn W ~ > LU a Z Q d J O 1205.01 z oo Q H = U LLJHZ O O fn 2 LU Z L.L. Cf)H ~ O LU OOU]¢ Z ,jCL H ,••, LU ❑ ONH �r LL — ------------ Z aF LU »-- cc 1••1 ILL LL O SEE CENTER LINE OFFSET DETAIL ❑ rc ❑ � Q CD QLU Z IL W N W ~ MULTI -LANE ROADWAY w z QJ CL DATE PROJECT # FUNDING # FEBRUARY 2023 21.01721 SEE LANE LINE OFFSET DETAIL SHEET 2 OF 2 1205.01 SHEET C=507 D' Q D- O O D m J J O = J J W z LU LL O N 0 90 NOTES: NCDEQ GENERAL CONSTRUCTION CONDITIONS ♦ �OOOOp�� � Sta ger pinta Install wattles snugly into trench. typical) Abut tightly to adjacent wattle, and to and, without overlapping the ends Existing ground g man \\\\\\ \\\\\\\\` ........... _ FLOW �/i m i n. o r a s .. specified In plans .O� / / / / N - / / / / o F FOUNDATION STONE FOR UNDERCUT »ri N EXCAVATION ONLY AS DIRECTED \ \ \ \ \ \ \ \ Sediment wattle \ \ \ \ \ \ \ BY THE ENGINEER /,/i,/i,/i, a /,/i,/i,/i„ 1 ri>»» PIPE BEDDING SHAPE WITH A TEMPLATE ' FIT BOTTOM OF AR( PIf FOUNDATION ST UNDERCUT EXCA 6" DEPTH INCF ONLY AS DIP BY THE ENC GEOTE)...__ ........ .. OF UNDERCUT EXCAVATIONONLY AS DIRECTED BY THE ENGINEER ARCH PIPE 1. STRUCTURAL BACKFILL SHALL BE COMPACTED #67 STONE OR COMPACTED NATIVE SOILS, NOT CONTAINING FROZEN LUMPS AND MEETING THE REQUIREMENTS OF SOIL GROUPS GW, GP, GM, SW, AND SP AS DESCRIBED IN ASTM METHOD D2487. STRUCTURAL BACKFILL SHALL BE PLACED IN LEVEL 6" LAYERS AND COMPACTED TO 95% STD. PROCTOR EQUALLY ON BOTH SIDES OF THE PIPE. 2. CRITICAL STRUCTURAL BACKFILL SHALL CONSIST OF COMPACTED NCDOT #67 STONE. 3. BEDDING SHALL CONSIST OF NCDOT #67 STONE OR APPROVED EQUAL 4. FOUNDATION STONE SHALL CONSIST OF NCDOT #57 OR #67 STONE. CMP PIPE INSTALLATION REVISED FOR THIS PROJECT NOT TO SCALE )N TH TEMPORARY BYPASS NOTES 1. Install all erosion control measures as shown on Erosion Control Plan and in this detail. 2. Construct impervious dike (recommend sand bags or other easily removable material) on upstream side TOP OF BANK of existing channel and install temporary bypass pump to divert water around construction area. All material must be completely removed following construction. 3. Construct impervious dike PROPOSED SILT m ro EXISTING STREAM (recommend sand bags or other easily FENCE removable material) on downstream side of existing channel to prevent backing up of stream water into the PROPOSED TEMPORARY WORK AREA construction area. PUMP AROUND X 4. Dewater the construction area using X another temporary pump and discharge water into a dewatering basin or I sediment bag until sediment has settled IMPERVIOUS DIKE and water can be discharged back into r TO BE INSTALLED stream. Dewatering basin must be IN CHANNEL outside of any restricted buffer areas, I use wattles instead of earth berm if reasonable. X 5. Begin construction of cross -culvert. shall inspect system daily IContractor PROPOSED SILT before beginning any construction. No _ .......... X FENCE construction shall continue if system is not fully operational. ............................ ........................... ..... ............ 6. Any wash material removed from bypass area should be stoned outside the flood zone or regulated buffer area ...................... .. .. .............................................. ........ until construction is complete. ................... .... .. . .. . .............................................. ....... 7. Upon completion of culvert ... .. .. .... ... .. ... .... construction, remove bypass system m YP Y within (2) two calendar days. PRQPOSEfl 8. Stabilize all areas disturbed during ...................... ... ................... .... ............. RQADWA.Y ........................ construction. Stream bed and banks ............. ... ............. .. ............................................... must be returned to pre -construction .. ..................... . ................. conditions. X 9. Contractor shall receive prior approval from engineer if choosing to ......................... X X X use another method in lieu of bypass X channel. PROPOSED PIPE I I PUMP INSTALL E THEN BERM TO PROTECT x STREAM IF DEVICE x WERE TO FAIL I DEWATERING DEVI GRAVITY -BASED x GEOTEXTILE FILT BAG PLACED ON NO. 57 STONE X PAD ENERGY DISSIPATOR k 18" THICK IMPERVIOUS CLASS B STONE I DIKE -SAND � BAGS 3' HEIG X g X PROPOSED SILT FENCE I I PROPOSED SILT FENCE TEMPORARY STREAM BYPASS 2 REVISED FOR THIS PROJECT NOT TO SCALE Install wattles Runoff from along contours disturbed areas PLAN INSTALLATION BEYOND TOE OF SLOPE Provide sufficient length to prevent water from slowing around the wattle ELEVATION INSTALLATION ALONG SLOPES NOTE : 1. Drive states at each end and at 4' spacing until wattle is secured to slope. Do not crush wattle while staking. Live stakes may be used for permanent installations. 2. Use drainage ditch installation only in low flow conditions. `Excavate trench 2" S. to 5" larger than wattle STEP 1: EXCAVATE TRENCH AND INSTALL WATTLES ackfilled and compacted soil to ground level ' lrection of runoff tD�bed areas STEP 2: BACKFILL SOIL AGAINST WATTLES PROPERLY STAKED AND ENTRENCHED WATTLE DRAINAGE DITCH INSTALLATION WATTLE INSTALLATION AND MAINTENANCE NOTES 1. STRAW ROLL INSTALLATION REQUIRES PLACEMENT AND SECURE STAKING OF THE ROLL ALONG THE CONTOUR. RUNOFF MUST NOT BE ALLOWED TO RUN UNDER OR AROUND THE ROLL. 2. IF WOODEN STAKES CAN NOT BE USED BECAUSE OF ROCK, THEN RE -BAR MAY BE USED. BE SURE TO REMOVED RE -BAR WHEN WATTLES ARE REMOVED. 3. ABUT ADJACENT ROLL TIGHTLY END TO END (DO NOT OVERLAP). 4. DO NOT CRUSH WATTLE WHILE STAKING. 5. REPLACE WATTLE ONCE SATURATED WITH SEDIMENT. CLASS A OR B EROSION CONTROL STONE 12" WASHED STONE FLOW PLAN P� STAKES REQUIRED Wattle length Stakes required ft. for each wattle 25 a 20 6 12 4 WATTLE SPACING Slope pacing ft. 1:4 of Hatt 40 1:3 30 1:2 20 1:1 10 U�1"X1" Wood stake WATTSTAKING DETAIL NOTE : DETAIL OBTAINED BY INTERNET U.S.D.O.T. SEDIMENT WATTLE DETAIL FILTER FABRIC' SECTION A- A FACE VIEW STONE CHECK DAM: UPDATED MARCH, 2017 NOT TO SCALE 24" MAX. AT CENTER STONE SHOULD BE PLACED OVER THE CHANNEL BANKS TO KEEP WATER FROM CUTTING AROUND THE DAM. L = THE DISTANCE SUCH THAT POINTS A AND B ARE OF EQUAL ELEVATION THE FOLLOWING CRITERIA SHOULD BE USED WHEN DESIGNING A CHECK DAM: - ENSURE THAT THE DRAINAGE AREA ABOVE THE CHECK DAM DOES NOT EXCEED 2 ACRES. - KEEP THE MAXIMUM HEIGHT AT 2 FT AT THE CENTER OF THE DAM. - KEEP THE CENTER OF THE CHECK DAM AT LEAST 9 INCHES LOWER THAN THE OUTER EDGES AT NATURAL GROUND ELEVATION. - KEEP THE SIDE SLOPES OF THE DAM AT 2:1 OR FLATTER. - STABILIZE OVERFLOW AREAS ALONG THE CHANNEL TO RESIST EROSION CAUSED BY CHECK DAMS. RIP RAP CHECK DAM UPDATED MARCH, 2017 NOT TO SCALE 1. THE CONTRACTOR SHALL MINIMIZE CLEARING WITHIN WETLANDS AND ACROSS STREAMS TO THE GREATEST EXTENT PRACTICABLE AND SHALL NOT EXCEED 50' WIDE FOR GAS UTILITY LINES AND 40' WIDE FOR ALL OTHER UTILITY LINES. EXCEPTIONS TO THIS CONDITION WILL REQUIRE WRITTEN APPROVAL FROM THE PROJECT ENGINEER. FOR CONSTRUCTION CORRIDORS IN WETLANDS AND ACROSS STREAM CHANNELS, STUMPS SHALL BE GRUBBED ONLY AS NEEDED TO INSTALL THE UTILITY AND REMAINING STUMPS SHALL BE CUT OFF AT GRADE LEVEL. THE GENERAL STRIPPING OF TOPSOIL WITHIN WETLANDS ALONG THE CONSTRUCTION CORRIDOR IS NOT PERMITTED. 2. PERMANENT MAINTAINED ACCESS CORRIDORS IN WETLANDS AND ACROSS STREAM CHANNELS SHALL BE RESTRICTED TO THE MINIMUM WIDTH PRACTICABLE AND SHALL NOT EXCEED 30' WIDE FOR GAS UTILITY LINES AND 20' WIDE FOR ALL OTHER UTILITY LINES EXCEPT AT MANHOLE LOCATIONS. 15' X 15' PERPENDICULAR VEHICLE TURN-AROUNDS ARE ALLOWED IN ACCESS CORRIDORS BUT MUST BE SPACED AT LEAST 500' APART. EXCEPTIONS TO THIS CONDITION REQUIRE WRITTEN APPROVAL FROM THE PROJECT ENGINEER. 3. THE CONTRACTOR SHALL HAVE A SPECIFIC PLAN FOR RESTORING WETLAND CONTOURS. ANY EXCESS MATERIAL SHALL BE REMOVED TO A HIGH GROUND DISPOSAL AREA. THE MIXING OF TOPSOIL AND SUBSOILS WITHIN WETLANDS ALONG UTILITY CORRIDORS SHALL BE MINIMIZED TO THE GREATEST EXTENT PRACTICABLE DURING EXCAVATION. THE SOILS SHALL BE PLACED ON FABRIC TO MINIMIZE IMPACTS WHENEVER POSSIBLE. TOPSOIL EXCAVATED FROM UTILITY TRENCHES SHALL BE PILED SEPARATELY FROM SUBSOILS AND BACKFILLED INTO THE TRENCH ONLY AFTER THE SUBSOILS HAVE BEEN PLACED AND COMPACTED. 4. NO WASTE, SPOIL, SOLIDS, OR FILL OF ANY KIND CAN OCCUR IN WETLANDS OR WATERS BEYOND THE FOOTPRINT OF THE IMPACT AREA (INCLUDING TEMPORARY IMPACTS) OR BEYOND THE PERMITTED THRESHOLDS WITHOUT WRITTEN AUTHORIZATION FROM THE PROJECT ENGINEER. NO REMOVAL OF VEGETATION OR OTHER IMPACTS OF ANY KIND CAN OCCUR TO STATE REGULATED RIPARIAN BUFFERS BEYOND THE FOOTPRINT OF IMPACTS APPROVED IN A BUFFER AUTHORIZATION OR VARIANCE OR AS LISTED AS AN EXEMPT ACTIVITY IN THE APPLICABLE RIPARIAN BUFFER RULES. 5. ALL EROSION CONTROL DEVICES SHALL BE MAINTAINED ON ALL CONSTRUCTION SITES, BORROW SITES, AND WASTE PILE (SPOIL) SITES, INCLUDING CONTRACTOR OWNED OR LEASED BORROW PITS ASSOCIATED WITH THE PROJECT. SUFFICIENT MATERIALS REQUIRED FOR STABILIZATION AND/OR REPAIR OF EROSION CONTROL MEASURES AND STORMWATER ROUTING AND TREATMENT SHALL BE ON -SITE AT ALL TIMES. 6. SEDIMENT AND EROSION CONTROL MEASURES SHALL NOT BE PLACED IN WETLANDS OR WATERS EXCEPT WITHIN THE FOOTPRINT OF TEMPORARY OR PERMANENT IMPACTS AUTHORIZED UNDER THE PERMITS. EXCEPTIONS TO THIS CONDITION REQUIRE WRITTEN APPROVAL FROM THE PROJECT ENGINEER. 7. EROSION CONTROL MATTING THAT INCORPORATES PLASTIC MESH AND/OR PLASTIC TWINE SHALL NOT BE USED ALONG STREAMBANKS OR WITHIN WETLANDS. EXCEPTIONS TO THIS CONDITION REQUIRE WRITTEN APPROVAL FROM THE PROJECT ENGINEER. 8. AN NPDES CONSTRUCTION STORMWATER PERMIT (NCGO10000) IS REQUIRED FOR CONSTRUCTION PROJECTS THAT DISTURB ONE OR MORE ACRES OF LAND. THE NCGO10000 PERMIT ALLOWS STORMWATER TO BE DISCHARGED DURING LAND DISTURBING CONSTRUCTION ACTIVITIES AS STIPULATED IN THE CONDITIONS OF THE PERMIT. IF THE PROJECT IS COVERED BY THE PERMITS, FULL COMPLIANCE WITH PERMIT CONDITIONS INCLUDING THE EROSION AND SEDIMENTATION CONTROL PLAN, INSPECTIONS AND MAINTENANCE, SELF -MONITORING, RECORD KEEPING AND REPORTING REQUIREMENTS IS REQUIRED. 9. ALL WORK IN OR ADJACENT TO STREAMS SHALL BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA. APPROVED BEST MANAGEMENT PRACTICES FROM THE MOST CURRENT VERSION OF THE NC SEDIMENT AND EROSION CONTROL MANUAL, OR THE NC REGULATION SIZED MAILBOX PAINTED, STENCII SELF-ADHESIVE (MIN. 3" HEIGHT) METAL STRAP (2 REQUIRED) ATTACH TO PROJECT SIGN POST 'AINTED, STENCILED OR ;ELF -ADHESIVE LETTERS MIN. 3" HEIGHT) PROJECT SIGN POST (SEE DETAIL) PERMIT BOX, MINIMUM SIZE 21"x27"x4" (DOC-BOX® OR APPROVED EQUAL) PAINTED, STENCILED OR SELF-ADHESIVE LETTERS - (MIN. 3" HEIGHT) I POST THREADED WATERTIGHT CAP - 8"0 PVC SOLID CAP GLUED IN PLACE DETAIL DOC - BOX° D.E.Q. WARNING LOT I JOB D.E.Q. SELF -INSPECTION REPORT BOX UPDATED MARCH, 2017 NOT TO SCALE DOT CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL, SUCH AS SANDBAGS, ROCK BERMS, COFFERDAMS, AND OTHER DIVERSION STRUCTURES SHALL BE USED TO MINIMIZE EXCAVATION IN FLOWING WATER. EXCEPTIONS TO THIS CONDITION REQUIRE WRITTEN APPROVAL FROM THE PROJECT ENGINEER. 10. CULVERTS SHALL BE INSTALLED IN SUCH A MANNER THAT THE ORIGINAL STREAM PROFILES ARE NOT ALTERED AND ALLOW FOR AQUATIC LIFE MOVEMENT DURING LOW FLOWS. THE DIMENSION, PATTERN, AND PROFILE OF THE STREAM ABOVE AND BELOW A PIPE OR CULVERT SHALL NOT BE MODIFIED BY WIDENING THE STREAM CHANNEL OR BY REDUCING THE DEPTH OF THE STREAM IN CONNECTION WITH THE CONSTRUCTION ACTIVITY. 11. APPLICATION OF FERTILIZER TO ESTABLISH PLANTED SEEDED VEGETATION WITHIN DISTURBED RIPARIAN AREAS SHALL COMPLY WITH ALL OTHER FEDERAL, STATE AND LOCAL REGULATIONS. FERTILIZER APPLICATION SHALL BE ACCOMPLISHED IN A MANNER THAT MINIMIZES THE RISK OF CONTACT BETWEEN THE FERTILIZER AND SURFACE WATERS. 12. IF CONCRETE IS USED DURING CONSTRUCTION, THEN ALL NECESSARY MEASURES SHALL BE TAKEN TO PREVENT DIRECT CONTACT BETWEEN UNCURED OR CURING CONCRETE AND WATERS OF THE US. WATER THAT INADVERTENTLY CONTACTS UNCURED CONCRETE SHALL NOT BE DISCHARGED TO WATERS OF THE US. 13. ALL PROPOSED AND APPROVED TEMPORARY FILL AND CULVERTS SHALL BE REMOVED AND THE IMPACTED AREA RETURNED TO NATURAL CONDITIONS WITHIN 60 CALENDAR DAYS AFTER THE TEMPORARY IMPACT IS NO LONGER NECESSARY. THE IMPACTED AREAS SHALL BE RETURNED TO ORIGINAL GRADE, INCLUDING EACH STREAM'S ORIGINAL CROSS SECTIONAL DIMENSIONS, PLANFORM PATTERN, AND LONGITUDINAL BED PROFILE. ALL TEMPORARY IMPACTS SHALL BE RESTORED AND STABILIZED WITH NATIVE VEGETATION. 14. ALL PROPOSED AND APPROVED TEMPORARY PIPES/CULVERTS/RIP-RAP PADS ETC. IN STREAMS SHALL BE INSTALLED AS OUTLINED IN THE MOST RECENT EDITION OF THE NC SEDIMENT AND EROSION CONTROL PLANNING AND DESIGN MANUAL OR THE NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES SO AS NOT TO RESTRICT STREAM FLOW OR CAUSE DIS-EQUILIBRIUM DURING USE OF THIS CERTIFICATION. 15. ANY RIP -RAP REQUIRED FOR PROPER CULVERT PLACEMENT, STREAM STABILIZATION, OR RESTORATION OF TEMPORARILY DISTURBED AREAS SHALL BE RESTRICTED TO THE AREA DIRECTLY IMPACTED BY THE APPROVED CONSTRUCTION ACTIVITY. ALL RIP -RAP SHALL BE PLACED SUCH THAT THE ORIGINAL STREAM ELEVATION AND STREAM BANK CONTOURS ARE RESTORED AND MAINTAINED, NOT RESULT IN THE DE -STABILIZATION OF STREAM BED OR BANKS UPSTREAM OR DOWNSTREAM OF THE AREA, AND NOT RESTRICT AQUATIC LIFE PASSAGE. 16. ANY RIP -RAP USED FOR STREAM OR SHORELINE STABILIZATION SHALL BE OF SIZE AND DENSITY TO PREVENT MOVEMENT BY WAVE, CURRENT, OR STREAM FLOWS, AND WILL CONSIST OF CLEAN ROCK OR MASONRY MATERIAL. RIP -RAP SHALL NOT BE INSTALLED IN THE STREAMBED EXCEPT IN SPECIFIC AREAS REQUIRED FOR VELOCITY CONTROL AND TO ENSURE STRUCTURAL INTEGRITY OF BANK STABILIZATION MEASURES. 17. ALL MECHANIZED EQUIPMENT OPERATED NEAR SURFACE WATERS SHALL BE INSPECTED, FUELED, LUBRICATED, AND MAINTAINED REGULARLY AND MAINTENANCE PERFORMED IN A MANNER TO PREVENT CONTAMINATION OF STREAM WATER FROM FUELS, LUBRICANTS, HYDRAULIC FLUIDS, OR OTHER TOXIC MATERIALS. 18. HEAVY EQUIPMENT WORKING IN WETLANDS SHALL BE PLACED ON MATS OR OTHER MEASURES TAKEN TO MINIMIZE SOIL DISTURBANCE. 19. THE CONTRACTOR OR OTHER RESPONSIBLE ENTITY SHALL REPORT ANY PETROLEUM SPILL OF 25 GALLONS OR MORE; ANY SPILL REGARDLESS OF AMOUNT THAT CAUSES A SHEEN ON SURFACE WATERS; ANY PETROLEUM SPILL REGARDLESS OF SIZE THAT OCCURS WITHIN 100-FEET OF SURFACE WATER; AND ANY PETROLEUM SPILL LESS THAN 25 GALLONS THAT CANNOT BE CLEANED UP WITHIN 24 HOURS. C I I SHEET AS NOTED FINAL DRAWING HOLLYBROOK PARK 5400 Trinity Road _ e�AL ��.� _ FOR REVIEW DETAILS ® Suite 107 - = PURPOSES ONLY Raleigh, NC27607 : 041598 _ OFFICE MANAGER DESIGNER NOT RELEASED D. CHAPMAN K. DURRANT C=508 919.378.9111 � ����'� ���I tiG NC Firm License #_ /,tiFw.D pE�\\`� TOWN OF WENDELL FOR //�j1�CONSTRUCTION 1 1/19/2023 COB REVISED PER NCDEQ EC COMMENTS WAKE COUNTYNORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# m cg i I lassociates. com , NO. DATE BY DESCRIPTION M. NORRIS M. GETTING FEBRUARY 2023 21.01721 5 1 1 /4 ELEVATION CONCRETE ANCHOR BOLTS (4) IN NON — ROADWAY LOCATIONS BITUMINOUS GASKET - (BOLT DOWN ONLY) Ic w m J J a � X En a Z x wUj o U I t U z w It = I w a RUBBER a BOOT W/ S.S. CLAM c I END 2'-10" DIA. STANDARD STORM DRAINAGE TOP AS NOTED ON DRAWINGS (SEE SD2_CATCH BASIN TOP FOR DETAILS) 2'-0" DIA. FLAT STR) CONNECT[ �ONNMANHO ES SET IN ROADS —SHRINK GROUT WITHIN " 12" MAX. CONSTRUCT CONCRETE BRICK RISERS AS NECESSARY TO BRING TOP OF RIM AND COVER C*4 Q TO GRADE OR USE PRECAST CONCRETE RINGS. GROUT ALL JOINTS AND PLASTER INSIDE AND OUTSIDE OF RISERS MINIMUM 1/2" THICK. U U d ECCENTRIC CONE SECTION MAY VARY IN C° VERTICAL HEIGHT WITH SUPPLIER BUT SHALL BE 2'-8" MIN. AND 4'-0" MAX. LIFTING HOLES SHALL BE FILLED AND PLASTERED ON BOTH EXTERIOR AND INTERIOR WALLS WITH MORTAR. WIDTH VARIES STEPS FULL DEPTH OF MANHOLE TO BE INSTALLED IN VERTICAL ALIGNMENT ON STRAIGHT1. SIDE OF MANHOLE. (USE STANDARD STEPS AS 5" SHOWN THIS SHEET.) EXTEND PIPE MIN. 1-1/2" INTO MANHOLE oo WATERTIGHT SEAL WITH APPROVED a. MATERIAL WATERTIGHT SEAL WITH 9• APPROVED MATERIAL RUBBER BOOT WITH STAINLESS STEEL CLAMP MANHOLE BASE SHALL BASE FOUNDATION TO BE CONSTRUCTED LEVEL BE PRECAST. WITH EXISTING MATERIAL OR CONDITIONED WITH STONE AS REQUIRED BY SPECIFICATIONS ELEVATION VIEW PRECAST MANHOLE NOTES: 1. ALL PRECAST MANHOLE COMPONENTS SHALL MEET REQUIREMENTS OF ASTM C-478, LATEST REVISION AND ASTM C-890. 2. ALL MANHOLES SHALL BE CONSTRUCTED PLUMB 3. THE PRECAST SUPPLIER SHALL BE RESPONSIBLE FOR THE STRUCTURAL DESIGN OF THE STRUCTURE AND, WHEN REQUESTED BY THE ENGINEER, SHALL SUBMIT SHOP DRAWINGS AND DESIGN CALCULATIONS WHICH HAVE BEEN SIGNED AND SEALED BY A REGISTERED STRUCTURAL ENGINEER. 4. ALL MANHOLE GRADES SHOWN ON THE PLANS ARE FOR THE INVERT OF THE MANHOLE CENTER. 5. IF MANHOLE IS SET IN LOCATION OF HIGH WATER TABLE OR UNDERGROUND WATER IS ENCOUNTERED, THE CONTRACTOR SHALL INSTALL UNDERDRAINS AND STONE AS DIRECTED IN THE FIELD BY THE ENGINEER. 6. STEPS SHALL BE INSTALLED ON STRAIGHT SIDE OF MANHOLE. PRECAST CONCRETE MANHOLE 5/ 3/4" 4'-0" VERTICAL PRECAST MANHOLE COMPONENTS MAY VARY IN VERTICAL HEIGHT WITH SUPPLIER BUT SHALL BE 1'-4" MIN. AND 4'-0" MAX. ALL JOINTS BETWEEN PRECAST SECTIONS SHALL BE SEALED WITH A DOUBLE ROW OF AN APPROVED BITUMINOUS SEALANT OR GASKET. INTERIOR JOINTS PLASTERED WITH MORTAR. CONSTRUCT SMOOTH FLOW INVERT BETWEEN PIPES. FORM TO MATCH 2/3 DIAMETER OF OUTLET PIPE. SEE INVERT DETAIL RUBBER BOOT W/ S.S. CLAMP A.'-n" RAIN PRECAST BASE EXTEND PIPE MIN. 1-1/2" INTO MANHOLE SECTION .° RUBBER BOOT SMOOTH FLOW <. W/ S.S. CLAMP INVERT 2/3 PIPE DIAMETER 4" MIN. 1 /4" m a: /4" SECTION A -A 1 /4" ALL PIPES SET SO THAT CENTERLINE A�OF PIPE IS RADIAL TO MANHOLE CENTER. SIDE ELEVATION POLYPROPYLENE PLASTIC #4 DEFORMED STEEL ROD SECTION A -A CONSTRUCTION NOTES 1. ALL STEPS SHALL PROTRUDE A MINIMUM OF 5" AND A MAXIMUM OF 7" FROM INSIDE FACE OF STRUCTURE WALL. 2. STEPS DIFFERING IN DIMENSIONS, CONFIGURATION, OR MATERIALS FROM THOSE SHOWN MAY ALSO BE USED PROVIDED THE CONTRACTOR HAS FURNISHED THE ENGINEER WITH DETAILS OF THE PROPOSED STEPS AND HAS RECEIVED PRIOR WRITTEN APPROVAL FROM THE ENGINEER FOR THE USE OF SAID STEPS. MANHOLE STEPS EXTEND PIPE MIN. 1-1/2" INTO MANHOLE A FLOW HORIZONTAL AND VERTICAL LOCATION FOR MANHOLE AS SHOWN ON PLANS IS FOR CENTERLINE OF MANHOLE AND ALL INTERSECTING PIPES. CONSTRUCT SMOOTH FLOW INVERT PLAN 1 /2" MIN. A FLOW NOTE: MANHOLES ON PLANS NOTED AS HIGH VELOCITY MANHOLES SHALL RECEIVE TWO COATS OF SIKAGARD 62, HIGH —BUILD, EPDXY RESIN COATING OR APPROVED EQUAL ON INVERT CHANNEL. MANHOLE INVERTS PRECAST CONCRETE MANHOLE UPDATED MARCH, 2017 NOT TO SCALE STRAP BOLT PARTIAL PLAN 12" THRU 24" ALUMINUM DIMENSIONS PIPE DIA. THICKNESS A B H L W 12" 0.060 6" 6" 6" 21 " 24" 15" 0.060 7" 8" 6" 26" 30" 18" 0.060 8" 10" 6" 31 " 36" 24" 0.075 10" 13" 6" 41 " 48" 30" 0.075 12" 16" 8" 51" 60" 36" 0.105 14" 19" 9" 60" 72" 42" 0.105 16" 22" 11 " 69" 84" 48" 0.105 18" 27" 12" 78" 90" STEEL DIMENSIONS PIPE DIA. THICKNESS A B H L W 12" 0.064 6" 6" 6" 21 " 24" 15" 0.064 7" 8" 6" 26" 30" 18" 0.064 8" 10" 6" 31 " 36" 24" 0.064 10" 13" 6" 41 " 48" 30" 0.079 12" 16" 8" 51" 60" 36" 0.079 14" 19" 9" 60" 72" 42" 0.109 16" 22" 11" 69" 84" 48" 0.109 18" 27" 12" 78" 90" 2'-6" CURB AND GUTTER SEALED CONSTRUCTION JOINT 5' WIDE CONCRETE SIDEWALK (WHERE SHOWN ON PLAN) 2% CROSS SLOPE END OF f THREADE1 ROD .L PIPE TO WHI_" END SECTIOIN IS ATTACHE[ THREADED ROD PARTIAL PLAN 30" AND 36" GALVANIZED S R ALUMINUM ROLLED ED ELEVATION UGGER JOINT ONNECTOR EE NOTE FOR DINING END ECTI ON PARTIAL PLAN 42" AND 48" B I— A -I— -j— A -1 LAN J NOTES: 1. CORRUGATED STEEL AND CORRUGATED ALUMINUM ALLOY FLARED END SECTION SHALL MEET THE REQUIREMENTS OF THIS DETAIL SHEET OR AN EQUIVALENT DESIGN APPROVED BY THE ENGINEER. 2. THE SKIRT SECTION OF THE FLARED END SECTION FOR 12" THROUGH 24" PIPE SHALL BE JOINED BY RIVETING, BOLTING, WELDING OR WITH ROD AND LUG BAND CONNECTOR. 3. THE SKIRT SECTION OF THE FLARED END SECTION FOR 30" AND 36" PIPE SHALL BE JOINED BY RIVETING, BOLTING, WELDING OR WITH THREADED ROD CONNECTOR. 4. THE SKIRT SECTION OF THE FLARED END SECTION FOR 42" AND 48" PIPE SHALL BE JOINED BY RIVETING, BOLTING, OR WELDING WITH A HUGGER JOINT CONNECTOR. 5. CORRUGATED STEEL FLARED END SECTION — THE ENTIRE ASSEMBLY SHALL BE FABRICATED FROM GALVANIZED STEEL MEETING THE SAME REQUIREMENTS AS THE PIPE MATERIALS. WHERE THE FLARED END SECTION IS TO BE CONNECTED TO BITUMINOUS COATED PIPE, THE BITUMINOUS COATING ON THE PIPE PORTION OF THE FLARED END SECTION SHALL MEET THE SAME COATING REQUIREMENTS AS THE PIPE TO WHICH IT IS CONNECTED. 6. CORRUGATED ALUMINUM ALLOY FLARED END SECTIONS — THE ENTIRE ASSEMBLY SHALL BE FABRICATED OF THE SAME MATERIAL REQUIRED FOR THE PIPE. 7. FLARED END SECTIONS ARE NORMALLY USED ON PIPE WITH SKEW ANGLES BETWEEN 75' AND 105'. 3" S9.5C ASPHALT SURFACE COURSE (2 LIFTS 1.5' ) 3" 119.00 ASPHALT INTERMEDIATE COURSE 5" B25.00 BASE COURSE 2'—O" SUBGRADE COMPACTED 100% OF STANDARD PROCTOR IN 6" LIFTS OR VARIABLE DEPTH FILL AREAS IF NEEDED —100% TP IN 8" LIFTS ORIGINAL GROUND N '�§� 'g AFTER CLEARING AND GRUBBING FULL DEPTH PAVING SECTION METAL FLARED END SECTION UPDATED MARCH, 2017 NOT TO SCALE EXISTING PAVEMENT CENTERLINE VARIABLE DEPTH MILL (0"-1.5") AND OVERLAY W/ S9.5C ASPHALT IN 1.5"-2" LIFTS TO DEVELOP PROPOSED CROSS SLOPES. NCDOT ROAD WIDENING 3 UPDATED MARCH, 2017 NOT TO SCALE MILL 1.5" AND OVERLAY W/ S9.5C ASPHALT SURFACE EX. 10' WESTBOUND TRAFFIC LANE MAINTAIN EXIST. CROSS SLOPE /W — 20' EXISTING ASPHALT PAVEMENT (UNKNOWN DEPTH) NOTES: 1. REFER TO SPOT ELEVATIONS AND CROSS SECTIONS FOR CROSS SLOPE INFORMATION THROUGH SUPERELEVATED CURVE CI I FINAL DRAWING AS NOTED SHEET HOLLYBROOK PARK e 5400 Trinity Road _ �AL F. _ = FOR REVIEW DETAILS Fri® Suite 107 - PURPOSES ONLY Raleigh, NC27607 = 041598 _ TOWN OF WENDELLOFFICE MANAGER DESIGNER . NOT RELEASED D. CHAPMAN K. DURRANT 919.378.9111 %� �� �;����'— �� tiG I N E �� C=509 Icg I NC Firm License # C-0459 �,tiFw p pE�� FOR vi � �/L �IIa�2� CONSTRUCTION WAKE COUNTY, NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# m cg i I lassociates. com NO. DATE BY DESCRIPTION M. NORRIS M. GETTING FEBRUARY 2023 21.01721 Q a 0 0 m J J 0 J J W 0 z w LL 0 0 N r 0 90 TEMPORARY BYPASS NOTES TOP OF SLOPE PROPOSED SILT FENCE PROPOSED TEMPORARY PUMP AROUND PROPOSED PIPE ENERGY DISSIPATOR 18" THICK CLASS B STONE PROPOSED SILT FENCE FOUNDATION STONE FOR UNDERC EXCAVATION ONLY AS DIRECTE[ BY THE ENGINEER PIPE BEDDING SHAPE WITH A TEMPLATE 1 FIT BOTTOM OF AR( PIF FOUNDATION ST UNDERCUT EXCA 6" DEPTH INCF ONLY AS DIR BY HE E G BID ITEM Q1 GEOTEX. - . ,....... ,.. .. ,.. ,... OF UNDERCUT EXCAVATION ONLY T ENGINEER (BID ITEM #3) 0 TOP OF BANK EXISTING STREAM WORK AREA IMPERVIOUS DIKE TO BE INSTALLED IN CHANNEL 1. Install all erosion control measures as shown on Erosion Control Plan and in this detail. 2. Construct impervious dike (recommend sand bags or other easily removable material) on upstream side of existing channel and install temporary bypass pump to divert water around construction area. All material must be completely removed following construction. 3. Construct impervious dike (recommend sand bags or other easily removable material) on downstream side of existing channel to prevent backing up of stream water into the construction area. 4. Dewater the construction area using another temporary pump and discharge water into a dewatering basin or sediment bag until sediment has settled and water can be discharged back into stream. Dewatering basin must be outside of any restricted buffer areas, use wattles instead of earth berm if reasonable. 5. Begin construction of cross —culvert. Contractor shall inspect system daily before beginning any construction. No construction shall continue if system is not fully operational. 6. Any wash material removed from bypass area should be stoned outside the flood zone or regulated buffer area until construction is complete. 7. Upon completion of culvert construction, remove bypass system within (2) two calendar days. 8. Stabilize all areas disturbed during construction. Stream bed and banks must be returned to pre —construction conditions. 9. Contractor shall receive prior approval from engineer if choosing to use another method in lieu of bypass channel. PUMP INSTALL E THEN BERM TO PROTECT STREAM IF DEVICE WERE TO FAIL DEWATERING DEVI GRAVITY —BASED GEOTEXTILE ALT BAG PLACED ON NO. 57 STONE PAD IMPERVIOUS DIKE — SAND BAGS 3' HEIG PROPOSED SILT FENCE M TEMPORARY STREAM BYPASS 77 UPDATED MARCH, 2017 NOT TO SCALE ARCH PIPE CMP PIPE INSTALLATION NOT TO SCALE NOTES 1. STRUCTURAL BACKFILL SHALL BE COMPACTED #67 STONE OR COMPACTED NATIVE SOILS, NOT CONTAINING FROZEN LUMPS AND MEETING THE REQUIREMENTS OF SOIL GROUPS GW, GP, GM, SW, AND SP AS DESCRIBED IN ASTM METHOD D2487. STRUCTURAL BACKFILL SHALL BE PLACED IN LEVEL 6" LAYERS AND COMPACTED TO 95% STD. PROCTOR EQUALLY ON BOTH SIDES OF THE PIPE. 2. CRITICAL STRUCTURAL BACKFILL SHALL CONSIST OF COMPACTED NCDOT #67 STONE. 3. BEDDING SHALL CONSIST OF NCDOT #67 STONE OR APPROVED EQUAL 4. FOUNDATION STONE SHALL CONSIST OF NCDOT #57 OR #67 STONE. CI I 5400 Trinity Road . rim® Suite 107 _ S E A L F Raleigh, INC 27607 041 598 919.378.9111 Mcg �9� /PG I N EF ���� INC Firm License #_ '�,tiFw D of `�, mcgillassociates.com ��131� 2< )N rH FINAL DRAWING FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION LONG—TERM FULLY BIODEGRADABLE DOUBLE COCONUT BLANKET MATTING SEEDED WITH NATIVE NC RIPARIAN SEED MIX. NORMAL WATER SURFACE ELEVATION v SECTION VIEW NOTES: 1. ALL DISTURBED STREAM BED AND BANKS TO BE RETURNED TO ORIGINAL CONTOURS AND ELEVATIONS. 2. DISTURBED STREAM BEDS TO BE BACKFILLED USING ORIGINAL MATERIAL. 3. DISTURBED STREAM BANKS TO BE STABILIZED WITH COIR MATTING AND NATIVE SEEDING. 4. INSTALL FULLY BIODEGRADEABLE COIR MATTING (NO BACKING) ON ALL DISTURBED AREAS OF CREEK SIDE SLOPES, OVERLAP MATTING MIN. OF 2' TO ADJACENT NON —DISTURBED AREAS. DO NOT MAT CREEK BOTTOM. STREAM BANK STABILIZATION NOT TO SCALE NATIVE PLANT SEEDING MIX FOR STREAMBANK STABILIZATION SEEDING FOR STREAM OR RIVERBANK STABILIZATION SHALL BE A MIXTURE OF NATIVE GRASSES, NATIVE WETLAND GRASSES, PLANTS AND TREES. NATIVE PLANT MIX SHALL INCLUDE THE FOLLOWIING: GRASSES - BIG BLUESTEM (ANDROPOGAN GERARDII), INDIAN GRASS (SORGASTRUM NUTANS), LITTLE BLUESTEM (SCHIZACHYRIUM SCOPARIUM), SWITCHGRASS (PANICUM VIRGATUM). 15 LBS/ACRE EACH AUGUST THRU MAY - GREENRYE (SECALE CEREALE) 25 LBS/ACRE EACH MAY 1 THRU AUGUST - MILLET (PENNISETUM GLLAUCUM) 25 LBS/ACRE EACH WETLAND GRASSES - HOP SEDGE (CARER LUPULINA), BLUNT BROOM SEDGE (CAREX SCOPARIA), FOX SEDGE (CAREX VULPINOIDEA), DEERTONGE (PANICUM CLANDESTINUM), EASTERN BUR REED (SPARGANIUM AMERICANUM), SOFT RUSH (JUNCUS EFFUSUS). TREES - SILKY DOGWOOD (CORNUS AMONUM), SILKY WILLOW (SALIX SERICEA), HAZEL ALDER (ALMUS SERRULATA) AND ELDERBERRY (SAMBUEUS CANADENSIS) NATIVE PLANT MIX VARIATIONS SHALL BE APPROVED BY ENGINEER NOTE: NO FERTILIZER SHALL BE USED WITHIN 10' OF TOP OF STREAM OR RIVER BANK. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. REQUEST FINAL APPROVAL BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY, DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES, LAND QUALITY SECTION. REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS. NO. 1 DATE I BY DESCRIPTION STONE RIP - RAP ON FILTER F UPSTREAM C TOE WALL HOLLYBROOK PARK TOWN OF WENDELL WAKE COUNTY, NORTH CAROLINA JE RIP- 1LTER FABRIC OF SLOPE PLANS (BOTH WAYS) ON 18" CENTERS UP -STREAM CROSS STONE RIP —RAP TO .._....._. ..... _...._ EARTH AS NOTED OFFICE MANAGER D.CHAPMAN PROJECT MANAGER M. NORRIS SECTION pRn�ii f= CONCRETE TOE WALL NOT TO SCALE NOTES: 1. TOE WALLS SHALL BE CONSTRUCTED WITH 3000 PSI CONCRETE. 2. ALL EXPOSED CONCRETE EDGES SHALL BE CHAMFERED 3/4". 3. REINFORCING STEEL SHALL BE GRADE 60 DEFORMED BILLET STEEL BARS CONFORMING TO AASHTO M 31. THE MINIMUM CONCRETE COVER TO THE FACE OF ANY BAR IS 2 INCHES. 4. THE MINIMUM TOE WALL DEPTH SHOWN MAY BE REDUCED IN SOLID ROCK, PROVIDED THE WALL IS KEYED INTO THE ROCK AT LEAST 12 INCHES. 5. ANCHOR BOLTS SHALL BE 3/4" GALVANIZED BOLTS AT LEAST 12 INCHES LONG AND HAVING AT LEAST 2-1/2" OF THREAD. ANCHOR BOLTS SHALL CONFORM TO ASTM A307-04 AND BE GALVANIZED IN ACCORDANCE WITH ASTM A153. 6. EPDXY SHALL BE HILTI HY-200 OR EQUAL AS APPROVED BY ENGINEER. DESIGNER K. DURRANT REVIEWER M. OETTING 3/4" FLAT WASHER NZ i� N z r a4 � a a CHOR BOLT DETAILS 2-3/4" NUTS DATE PROJECT # FUNDING # FEBRUARY 2023 21.01721 SHEET C=51 0 APPENDIX 3 NCHPO HPOWEB Map NCHPO HPOWEB MAP "Cheri C, WAKE S H0FjYbF()0k fRd 2/1/2023, 8:52:05AM 1:9,028 0 0.05 0.1 0.2 mi LimitsofDisturbancePoly 0 Counties (outline) 0 0.1 0.2 0.4 km Surveyed Only individual resources & centerpoints Town of Cary, Johnston County, State of North Carolina DOT, Esri, HERE, Garmin, INCREMENT P, Intermap, NGA, USGS Surveyed Only Gone , North Carolina State Historic Preservation Office Town of Cary, Johnston County, State of North Carolina DOT, Esri, HERE, Garmin, INCREMENT P, Intermap, NGA, USGS I NC OneMap, NC Center for Geographic Information and Analysis, NC 911 Board I NC Center for Geographic Information and Analysis APPENDIX 4 Riparian Buffer Map Buffer Impacts Table Zone 1 - 1,489 . Impacts SF are OaCe�Ce Zone 2 - 3,331 Impacts SF r T Ii ere A mom WAt—Ins—et-1 '9q I riparian nurrer cone c -,du yy . Legend �� h Limits ofr Disturbance Wetland Limits Stream Limits Riparian Buffer Zone 1 - 30' ' Y Riparian Buffer - Zone 1 - 30'` Riparian Buffers Zone 2 - 20' . id Zone 1 -Impacts S Hollybrook Road e a Zone 2 -Impacts maim `e71 ,�e ProUA60L�- Inset 1 DATE PROJECT # FIGURE 2/6/2023 21.01721 HOLLYBROOK PARK 110 0 55 110 220 1240 19th Street Lane NW OFFICE MANAGER DESIGNER me 'II Hickory, NC28601 DC AL RIPARIAN BUFFER MAP 1 828.328.2024 TOWN OF WENDELL GRAPHIC SCALE DIVISIONVALUE = 110FEET NC Firm License # C-0459 PROJECT MANAGER REVIEWER mc9illassociates.com MN is WAKE COUNTY, NORTH CAROLINA APPENDIX 5 IPAC Consultation Package/NCNHP Database Search United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh Ecological Services Field Office Post Office Box 33726 Raleigh, NC 27636-3726 Phone: (919) 856-4520 Fax: (919) 856-4556 In Reply Refer To: Project Code: 2023-0035563 Project Name: Hollybrook Park Property January 19, 2023 Subject: List of threatened and endangered species that may occur in your proposed project location or may be affected by your proposed project To Whom It May Concern: The enclosed species list identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). If your project area contains suitable habitat for any of the federally -listed species on this species list, the proposed action has the potential to adversely affect those species. If suitable habitat is present, surveys should be conducted to determine the species' presence or absence within the project area. The use of this species list and/or North Carolina Natural Heritage program data should not be substituted for actual field surveys. New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Please feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the ECOS-IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the ECOS-IPaC system by completing the same process used to receive the enclosed list. The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to utilize their authorities to carry out programs for the conservation of threatened and endangered 01/19/2023 species and to determine whether projects may affect threatened and endangered species and/or designated critical habitat. A Biological Assessment is required for construction projects (or other undertakings having similar physical impacts) that are major Federal actions significantly affecting the quality of the human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2) (c)). For projects other than major construction activities, the Service suggests that a biological evaluation similar to a Biological Assessment be prepared to determine whether the project may affect listed or proposed species and/or designated or proposed critical habitat. Recommended contents of a Biological Assessment are described at 50 CFR 402.12. If a Federal agency determines, based on the Biological Assessment or biological evaluation, that listed species and/or designated critical habitat may be affected by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service recommends that candidate species, proposed species and proposed critical habitat be addressed within the consultation. More information on the regulations and procedures for section 7 consultation, including the role of permit or license applicants, can be found in the "Endangered Species Consultation Handbook" at: http://www.fws.gov/endangered/esa-library/pdf/TOC-GLOS.PDF Migratory Birds: In addition to responsibilities to protect threatened and endangered species under the Endangered Species Act (ESA), there are additional responsibilities under the Migratory Bird Treaty Act (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA) to protect native birds from project -related impacts. Any activity, intentional or unintentional, resulting in take of migratory birds, including eagles, is prohibited unless otherwise permitted by the U.S. Fish and Wildlife Service (50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)). For more information regarding these Acts see https://www.fws.gov/birds/policies-and-regulations.php. The MBTA has no provision for allowing take of migratory birds that may be unintentionally killed or injured by otherwise lawful activities. It is the responsibility of the project proponent to comply with these Acts by identifying potential impacts to migratory birds and eagles within applicable NEPA documents (when there is a federal nexus) or a Bird/Eagle Conservation Plan (when there is no federal nexus). Proponents should implement conservation measures to avoid or minimize the production of project -related stressors or minimize the exposure of birds and their resources to the project -related stressors. For more information on avian stressors and recommended conservation measures see https://www.fws.gov/birds/bird-enthusiasts/threats-to- birds.php. In addition to MBTA and BGEPA, Executive Order 13186: Responsibilities of Federal Agencies to Protect Migratory Birds, obligates all Federal agencies that engage in or authorize activities that might affect migratory birds, to minimize those effects and encourage conservation measures that will improve bird populations. Executive Order 13186 provides for the protection of both migratory birds and migratory bird habitat. For information regarding the implementation of Executive Order 13186, please visit https://www.fws.gov/birds/policies-and-regulations/ executive-orders/e0-13186. php. 01/19/2023 3 We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Code in the header of this letter with any request for consultation or correspondence about your project that you submit to our office. Attachment(s): • Official Species List • Migratory Birds 01/19/2023 Official Species List This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action". This species list is provided by: Raleigh Ecological Services Field Office Post Office Box 33726 Raleigh, NC 27636-3726 (919) 856-4520 01/19/2023 Project Summary Project Code: 2023-0035563 Project Name: Hollybrook Park Property Project Type: New Constr - Above Ground Project Description: Wendell, NC proposed park site Project Location: Approximate location of the project can be viewed in Google Maps: https: www. google.com/maps/(a)35.764649899999995,-78.36486242821923,14z Counties: Wake County, North Carolina 01/19/2023 3 Endangered Species Act Species There is a total of 10 threatened, endangered, or candidate species on this species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheriesi, as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. 1. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. Mammals NAME STATUS Tricolored Bat Perimyotis subflavus Proposed No critical habitat has been designated for this species. Endangered Species profile: https:Hecos.fws.gov/ecp/species/10515 NAME STATUS Red -cockaded Woodpecker Picoides borealis Endangered No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/7614 Amphibians NA MF STATUS Neuse River Waterdog Necturus lewisi Threatened There is final critical habitat for this species. Your location does not overlap the critical habitat. Species profile: https:Hecos.fws.gov/ecp/species/6772 Fishes NAME STATUS Carolina Madtom Noturus furiosus Endangered There is final critical habitat for this species. Your location does not overlap the critical habitat. Species profile: https:Hecos.fws.gov/ecp/species/528 01/19/2023 4 Clams NAME STATUS Atlantic Pigtoe Fusconaia masoni Threatened There is final critical habitat for this species. Your location does not overlap the critical habitat. Species profile: https:Hecos.fws.gov/ecp/species/5164 Dwarf Wedgemussel Alasmidonta heterodon Endangered No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/784 Tar River Spinymussel Parvaspina steinstansana Endangered No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/1392 Yellow Lance Elliptio lanceolata Threatened There is final critical habitat for this species. Your location does not overlap the critical habitat. Species profile: https:Hecos.fws.gov/ecp/species/4511 Insects NAME STATUS Monarch Butterfly Danaus plexippus Candidate No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/9743 Flowering Plants NAME STATUS Michaux's Sumac Rhus michauxii No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/5217 Endangered Critical habitats THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S JURISDICTION. 01/19/2023 Migratory Birds Certain birds are protected under the Migratory Bird Treaty Act! and the Bald and Golden Eagle Protection Actz. Any person or organization who plans or conducts activities that may result in impacts to migratory birds, eagles, and their habitats should follow appropriate regulations and consider implementing appropriate conservation measures, as described below. 1. The Migratory Birds Treat. Act of 1918. 2. The Bald and Golden Eagle Protection Act of 1940. 3. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) The birds listed below are birds of particular concern either because they occur on the USFWS Birds of Conservation Concern (BCC) list or warrant special attention in your project location. To learn more about the levels of concern for birds on your list and how this list is generated, see the FAQ below. This is not a list of every bird you may find in this location, nor a guarantee that every bird on this list will be found in your project area. To see exact locations of where birders and the general public have sighted birds in and around your project area, visit the E-bird data mapping tool (Tip: enter your location, desired date range and a species on your list). For projects that occur off the Atlantic Coast, additional maps and models detailing the relative occurrence and abundance of bird species on your list are available. Links to additional information about Atlantic Coast birds, and other important information about your migratory bird list, including how to properly interpret and use your migratory bird report, can be found below. For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, click on the PROBABILITY OF PRESENCE SUMMARY at the top of your list to see when these birds are most likely to be present and breeding in your project area. BREEDING NAME SEASON Bald Eagle Haliaeetus leucocephalus Breeds Sep 1 to This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention Jul 31 because of the Eagle Act or for potential susceptibilities in offshore areas from certain types of development or activities. Chimney Swift Chaetura pelagica Breeds Mar 15 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA t0 Aug 25 and Alaska. Prairie Warbler Dendroica discolor Breeds May 1 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Jul 31 and Alaska. 01/19/2023 BREEDING NAME SEASON Prothonotary Warbler Protonotaria citrea Breeds Apr 1 to This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA Jul 31 and Alaska. Red-headed Woodpecker Melanerpes erythrocephalus Breeds May 10 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Sep 10 and Alaska. Rusty Blackbird Euphagus carolinus Breeds This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions elsewhere (BCRs) in the continental USA Wood Thrush Hylocichla mustelina Breeds May 10 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 31 and Alaska. Probability Of Presence Summary The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to birds. Please make sure you read and understand the FAQ "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret this report. Probability of Presence (■) Each green bar represents the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during a particular week of the year. (A year is represented as 12 4-week months.) A taller bar indicates a higher probability of species presence. The survey effort (see below) can be used to establish a level of confidence in the presence score. One can have higher confidence in the presence score if the corresponding survey effort is also high. How is the probability of presence score calculated? The calculation is done in three steps: The probability of presence for each week is calculated as the number of survey events in the week where the species was detected divided by the total number of survey events for that week. For example, if in week 12 there were 20 survey events and the Spotted Towhee was found in 5 of them, the probability of presence of the Spotted Towhee in week 12 is 0.25. 2. To properly present the pattern of presence across the year, the relative probability of presence is calculated. This is the probability of presence divided by the maximum probability of presence across all weeks. For example, imagine the probability of presence in week 20 for the Spotted Towhee is 0.05, and that the probability of presence at week 12 (0.25) is the maximum of any week of the year. The relative probability of presence on week 12 is 0.25/0.25 = 1; at week 20 it is 0.05/0.25 = 0.2. 01/19/2023 3 3. The relative probability of presence calculated in the previous step undergoes a statistical conversion so that all possible values fall between 0 and 10, inclusive. This is the probability of presence score. Breeding Season( ) Yellow bars denote a very liberal estimate of the time -frame inside which the bird breeds across its entire range. If there are no yellow bars shown for a bird, it does not breed in your project area. Survey Effort (1) Vertical black lines superimposed on probability of presence bars indicate the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. The number of surveys is expressed as a range, for example, 33 to 64 surveys. No Data (—) A week is marked as having no data if there were no survey events for that week. Survey Timeframe Surveys from only the last 10 years are used in order to ensure delivery of currently relevant information. The exception to this is areas off the Atlantic coast, where bird returns are based on all years of available data, since data in these areas is currently much more sparse. probability of presence breeding season I survey effort — no data SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Bald Non -BCC No im im i��"��� III 1111 rt+ —1111111111111111 Vulnerable Chimney Swift BCC Rangewide —+++ ++++ + Jilliiii lim-07' -- —'-- —++— ---- (CON) Prairie Warbler BCC Rangewide +++ ++++ ++�+ ++"'= J"""'l +-- —V —+-- —++— (CON) 1111!11 IIII ���� Prothonotary Warbler —++— BCC Rangewide (CON) Red-headed W odpeker ��� ���� 11111111 IF— +++ ++++ ++—+ +—+ + +-- —++— BCC Rangewide (CON) Rusty Blackbird —+++ ++++ +'—+ ++—+ ++—+ ++++ ++-- —+-- —+-- —+-- —++— BCC-BCR 01/19/2023 4 Wood Thrush —+++ ++++ ++—+ ++—"+—+ ++++'4 - -+-- -+-- -+-- -++- BCC Rangewide (CON) Additional information can be found using the following links: • Birds of Conservation Concern https://www.fws.gov/program/migratory-birds/species • Measures for avoiding and minimizing impacts to birds https://www.fws.gov/library collections/avoidinv--and-minimizinp--incidental-take-mip-ratorv-birds • Nationwide conservation measures for birds https://www.fws.gov/sites/default/files/ documents/nationwide-standard-conservation-measures.Ddf Migratory Birds FAQ Tell me more about conservation measures I can implement to avoid or minimize impacts to migratory birds. Nationwide Conservation Measures describes measures that can help avoid and minimize impacts to all birds at any location year round. Implementation of these measures is particularly important when birds are most likely to occur in the project area. When birds may be breeding in the area, identifying the locations of any active nests and avoiding their destruction is a very helpful impact minimization measure. To see when birds are most likely to occur and be breeding in your project area, view the Probability of Presence Summary. Additional measures or permits may be advisable depending on the type of activity you are conducting and the type of infrastructure or bird species present on your project site. What does IPaC use to generate the list of migratory birds that potentially occur in my specified location? The Migratory Bird Resource List is comprised of USFWS Birds of Conservation Concern (BCQ and other species that may warrant special attention in your project location. The migratory bird list generated for your project is derived from data provided by the Avian Knowledge Network (AKN). The AKN data is based on a growing collection of survey, bandim and citizen science datasets and is queried and filtered to return a list of those birds reported as occurring in the 10km grid cell(s) which your project intersects, and that have been identified as warranting special attention because they are a BCC species in that area, an eagle (Eagle Act requirements may apply), or a species that has a particular vulnerability to offshore activities or development. Again, the Migratory Bird Resource list includes only a subset of birds that may occur in your project area. It is not representative of all birds that may occur in your project area. To get a list of all birds potentially present in your project area, please visit the Rapid Avian Information Locator (RAIL) Tool. What does IPaC use to generate the probability of presence graphs for the migratory birds potentially occurring in my specified location? 01/19/2023 5 The probability of presence graphs associated with your migratory bird list are based on data provided by the Avian Knowledge Network (AKN). This data is derived from a growing collection of survey, banding, and citizen science datasets. Probability of presence data is continuously being updated as new and better information becomes available. To learn more about how the probability of presence graphs are produced and how to interpret them, go the Probability of Presence Summary and then click on the "Tell me about these graphs" link. How do I know if a bird is breeding, wintering or migrating in my area? To see what part of a particular bird's range your project area falls within (i.e. breeding, wintering, migrating or year-round), you may query your location using the RAIL Tool and look at the range maps provided for birds in your area at the bottom of the profiles provided for each bird in your results. If a bird on your migratory bird species list has a breeding season associated with it, if that bird does occur in your project area, there may be nests present at some point within the timeframe specified. If "Breeds elsewhere" is indicated, then the bird likely does not breed in your project area. What are the levels of concern for migratory birds? Migratory birds delivered through IPaC fall into the following distinct categories of concern: 1. "BCC Rangewide" birds are Birds of Conservation Concern (BCC) that are of concern throughout their range anywhere within the USA (including Hawaii, the Pacific Islands, Puerto Rico, and the Virgin Islands); 2. "BCC - BCR" birds are BCCs that are of concern only in particular Bird Conservation Regions (BCRs) in the continental USA; and 3. "Non -BCC - Vulnerable" birds are not BCC species in your project area, but appear on your list either because of the Eagle Act requirements (for eagles) or (for non -eagles) potential susceptibilities in offshore areas from certain types of development or activities (e.g. offshore energy development or longline fishing). Although it is important to try to avoid and minimize impacts to all birds, efforts should be made, in particular, to avoid and minimize impacts to the birds on this list, especially eagles and BCC species of rangewide concern. For more information on conservation measures you can implement to help avoid and minimize migratory bird impacts and requirements for eagles, please see the FAQs for these topics. Details about birds that are potentially affected by offshore projects For additional details about the relative occurrence and abundance of both individual bird species and groups of bird species within your project area off the Atlantic Coast, please visit the Northeast Ocean Data Portal. The Portal also offers data and information about other taxa besides birds that may be helpful to you in your project review. Alternately, you may download the bird model results files underlying the portal maps through the NOAA NCCOS Integrative Statistical Modeling and Predictive Mapping of Marine Bird Distributions and Abundance on the Atlantic Outer Continental Shelf project webpage. 01/19/2023 6 Bird tracking data can also provide additional details about occurrence and habitat use throughout the year, including migration. Models relying on survey data may not include this information. For additional information on marine bird tracking data, see the Diving Bird Study and the nanotag studies or contact Caleb Spiegel or Pam Lorin. What if I have eagles on my list? If your project has the potential to disturb or kill eagles, you may need to obtain a permit to avoid violating the Eagle Act should such impacts occur. Proper Interpretation and Use of Your Migratory Bird Report The migratory bird list generated is not a list of all birds in your project area, only a subset of birds of priority concern. To learn more about how your list is generated, and see options for identifying what other birds may be in your project area, please see the FAQ "What does IPaC use to generate the migratory birds potentially occurring in my specified location". Please be aware this report provides the "probability of presence" of birds within the 10 km grid cell(s) that overlap your project; not your exact project footprint. On the graphs provided, please also look carefully at the survey effort (indicated by the black vertical bar) and for the existence of the "no data" indicator (a red horizontal bar). A high survey effort is the key component. If the survey effort is high, then the probability of presence score can be viewed as more dependable. In contrast, a low survey effort bar or no data bar means a lack of data and, therefore, a lack of certainty about presence of the species. This list is not perfect; it is simply a starting point for identifying what birds of concern have the potential to be in your project area, when they might be there, and if they might be breeding (which means nests might be present). The list helps you know what to look for to confirm presence, and helps guide you in knowing when to implement conservation measures to avoid or minimize potential impacts from your project activities, should presence be confirmed. To learn more about conservation measures, visit the FAQ "Tell me about conservation measures I can implement to avoid or minimize impacts to migratory birds" at the bottom of your migratory bird trust resources page. 01/19/2023 IPaC User Contact Information Agency: McGill Associates, P.A. Name: Alex Lowdermilk Address: 1240 19th Street Lane NW City: Hickory State: NC Zip: 28601 Email alex.lwdermilk@mcgillassociates.com Phone: 8285140345 Roy Cooper, Governor 0■0■0 INC DEPARTMENT OF ■■0■o NATURAL AND CULTURAL RESOURCES ■ ■■■ January 19, 2023 Alex Lowdermilk McGill Associates, P.A. 1240 19th Street Lane NW Hickory, NC 28601 RE. Hollybrook Park Project, 21.01721 Dear Alex Lowdermilk: D_ Reid Wilson, Secretary Misty Buchanan Deputy Director, Natural Heritage Program NCNHDE-20579 The North Carolina Natural Heritage Program (NCNHP) appreciates the opportunity to provide information about natural heritage resources for the project referenced above. Based on the project area mapped with your request, a query of the NCNHP database indicates that there are no records for rare species, important natural communities, natural areas, and/or conservation/managed areas within the proposed project boundary. Please note that although there may be no documentation of natural heritage elements within the project boundary, it does not imply or confirm their absence, the area may not have been surveyed. The results of this query should not be substituted for field surveys where suitable habitat exists. In the event that rare species are found within the project area, please contact the NCNHP so that we may update our records. The attached `Potential Occurrences' table summarizes rare species and natural communities that have been documented within a one -mile radius of the property boundary. The proximity of these records suggests that these natural heritage elements may potentially be present in the project area if suitable habitat exists. Tables of natural areas and conservation/managed areas within a one -mile radius of the project area, if any, are also included in this report. If a Federally -listed species is found within the project area or is indicated within a one -mile radius of the project area, the NCNHP recommends contacting the US Fish and Wildlife Service (USFWS) for guidance. Contact information for USFWS offices in North Carolina is found here. httl2s //www.fws.gov/offices/Directory/ListOffices.cfm?statecode=37. Please note that natural heritage element data are maintained for the purposes of conservation planning, project review, and scientific research, and are not intended for use as the primary criteria for regulatory decisions. Information provided by the NCNHP database may not be published without prior written notification to the NCNHP, and the NCNHP must be credited as an information source in these publications. Maps of NCNHP data may not be redistributed without permission. The NC Natural Heritage Program may follow this letter with additional correspondence if a Dedicated Nature Preserve, Registered Heritage Area, Land and Water Fund easement, or Federally - listed species are documented near the project area. If you have questions regarding the information provided in this letter or need additional assistance, please contact Rodney A. Butler at rod ney.butlerLncdcr.gov or 919-707-8603. Sincerely, NC Natural Heritage Program DEPAR71MENT OF NATURAL AND CULTURAL RESOVRCES Q 121 W. JONES STREET. RALEIGH. NC 27603 • 1651 MAIL SERVICE CENTER. RALEIGH. NC 27699 OFC 918.707.9120 • FAX 919.707.9121 Natural Heritage Element Occurrences, Natural Areas, and Managed Areas Within a One -mile Radius of the Project Area Hollybrook Park Project Project No. 21.01721 January 19, 2023 NCNHDE-20579 Element Occurrences Documented Within a One -mile Radius of the Project Area Taxonomic EO ID 1[cientific Name Common Name Group Observation Date dhM Dragonfly or 32043 Coryphaeschna ingens Regal Darner 2004-Pre Damselfly Dragonfly or 33753 Somatochlora Coppery Emerald 2004-Pre Damselfly georgiana No Natural Areas are Documented Within a One -mile Radius of the Project Area Managed Areas Documented Within a One -mile Radius of the Project Area Managed Area Nam Owner Town of Wendell Open Space Town of Wendell Town of Wendell Open Space Town of Wendell Element Accuracy Federal State Occurrence Status Status Rank I M i H? 5-Very --- Significantly Low Ra re H? 5-Very --- Significantly Low Ra re Owner Type Local Government Local Government Global State Rank Rank M G5 S2? G3G4 S1? Definitions and an explanation of status designations and codes can be found at httr)s://ncnhde.natureserve.org/helr). Data query generated on January 19, 2023; source: NCNHP, Q3, October 2022. Please resubmit your information request if more than one year elapses before project initiation as new information is continually added to the NCNHP database. Page 2 of 3 Wendell Falls PkWy Wendell Country Club Old Nowell Rd rn 0 0 F 4 N W+E January 19, 2023 Managed Area (MAREA) Q Buffered Project Boundary Q Project Boundary a c� a�a NCNHDE-20579: Hollybrook Park Project Forest Ln a ® N pQ- ® m ions C y o• / / / / / / vQ / o / / F / I / / / 52R �a / ce / r 352 ft / Q�z / / PQ / 3 / a / Mill Rd 0 0.25 0.5 1 Miles So uross. Fsh, Airbus DS. USGS. NGA. NASA, CGIAR. N Robinson. NCFAS. NLS. OS, NMA. Geodatastyrelsen, Rijkswaterstaat GSA, Geoland, FFMA, It-mapand the GIS user community Sources. Esri, HERE. Garm in. FAO. NOAA, USGS. © OpenStreetMap contributors, and the GIS User in, Page 3 of 3 APPENDIX 6 Preliminary Jurisdictional Determination (PJD) rA Shaping Communities Together meJ ill February 1, 2023 US Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 RE: Hollybrook Park Jurisdictional Determination Wake County, North Carolina To Whom It May Concern: This letter is to request confirmation of a Preliminary Jurisdictional Determination on the referenced site. The request is based on data, site observations, and a site visit on January 25, 2023. We are requesting confirmation of the jurisdictional limits of S1 (UT-1 To Buffalo Creek) and Wetland A on the attached Delineation Map. Included in this letter are the following: • Agent Authorization Form • PJD Request Forms • Location Map • USGS Topographic Map • Delineation Map • Soils Map • Photo Sheets • Stream ID Sheet • Wetland Data Sheets Please include McGill Associates on the copy list of all correspondence for this project. If you have any questions regarding this information, please contact me at 828-328-2024. Sincerely, MCGILL ASSOCIATES, PA ALEX LOWDERMILK Environmental Services Technician / Environmental Services P:\2021\21.01721-WendellNC-Hollybrook Park Property MCGILL ASSOCIATES 1240 19`h STREET LANE NW. HICKORY. NC 28601 / 828.328.2024 / MCGILLASSOCIATES.COM 10 � � I Shaping Communities Together mc J AGENT AUTHORIZATION FORM PROJECT NAME: Holl brook Park PROPERTY LEGAL DESCRIPTION: DB: 018131 PG: 00285 PIN: 1783837861 STREET ADDRESS: 1217 S Holl brook Road Wendell North Carolina 27591 Property Owner / Representative: Town of Wendell / Marvin E. Collins (If Representative) Title: Town Manager The undersigned do hereby authorize: Alex Lowdermilk of McGill Associates P.A. (Contractor / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Representative's Address (if different than property above): 15 E Fourth Street Wendell, North Carolina 27591 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authorized Signature Date: Z! -� 1202—'--�) - MCGILL ASSOCIATES 1240 191" Street Lane NW, Hickory, NC 28601 1828.328.2024 / MCGILLASSOCiATES COM urisdictional Determination Reauest US Army Corps of Engineers. Wilmington District This form is intended for use by anyone requesting a jurisdictional determination (JD) from the U.S. Army Corps of Engineers, Wilmington District (Corps). Please include all supporting information, as described within each category, with your request. You may submit your request via mail, electronic mail, or facsimile. Requests should be sent to the appropriate project manager of the county in which the property is located. A current list of project managers by assigned counties can be found on-line at: http://www.saw.usace.aimy.mil/Missions/Re ul�atoiyPermitProi4ram/Contact/CountyLocator.aspx, by calling 910-251-4633, or by contacting any of the field offices listed below. Once your request is received you will be contacted by a Corps project manager. ASHEVILLE & CHARLOTTE REGULATORY FIELD OFFICES US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 General Number: (828) 271-7980 Fax Number: (828) 281-8120 RALEIGH REGULATORY FIELD OFFICE US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 General Number: (919) 554-4884 Fax Number: (919) 562-0421 INSTRUCTIONS: WASHINGTON REGULATORY FIELD OFFICE US Army Corps of Engineers 2407 West Fifth Street Washington, North Carolina 27889 General Number: (910) 251-4610 Fax Number: (252) 975-1399 WILMINGTON REGULATORY FIELD OFFICE US Army Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403 General Number: 910-251-4633 Fax Number: (910) 251-4025 All requestors must complete Parts A, B, C, D, E, F and G. NOTE TO CONSULTANTS AND AGENCIES: If you are requesting a JD on behalf of a paying client or your agency, please note the specific submittal requirements in Part H. NOTE ON PART D — PROPERTY OWNER AUTHORIZATION: Please be aware that all JD requests must include the current property owner authorization for the Corps to proceed with the determination, which may include inspection of the property when necessary. This form must be signed by the current property owner(s) or the owner(s) authorized agent to be considered a complete request. NOTE ON PART D - NCDOT REQUESTS: Property owner authorization/notification for JD requests associated with North Carolina Department of Transportation (NCDOT) projects will be conducted according to the current NCDOT/USACE protocols. NOTE TO USDA PROGRAM PARTICIPANTS: A Corps approved or preliminary JD may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should also request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. Version: May 2017 Page 1 Jurisdictional Determination Request A. PARCEL INFORMATION Street Address: 1217 S Hollybrook Road City, State: Wendell, North Carolina 27591 County: Wake Parcel Index Number(s) (PIN): 1783837861 B. REQUESTOR INFORMATION Name: Alex Lowdermilk Mailing Address: 1240 19th Street Lane NW Hickory, NC 28601 Telephone Number: 828-328-2024 Electronic Mail Address: alex.lowdermilk@mcgillassociates.com Select one: ❑ I am the current property owner. ❑ I am an Authorized Agent or Environmental Consultanti ❑ Interested Buyer or Under Contract to Purchase ❑ Other, please explain. C. PROPERTY OWNER INFORMATION Name: Town of Wendell - Town Manager (Marvin E. Collins) Mailing Address: 15 E Fourth Street Wendell, North Carolina 27591 Telephone Number: (919) 365-4450 Electronic Mail Address: mcollins@townofwendellnc.gov 1 Must provide completed Agent Authorization Fonn/Letter. 2 Documentation of ownership also needs to be provided with request (copy of Deed, County GIS/Parcel/Tax Record). Version: May 2017 Page 2 Jurisdictional Determination Request D. PROPERTY ACCESS CERTIFICATION',4 By signing below, I authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) to enter upon the property herein described for the purpose of conducting on - site investigations, if necessary, and issuing a jurisdictional determination pursuant to Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. I, the undersigned, am either a duly authorized owner of record of the property identified herein, or acting as the duly authorized agent of the owner of record of the property. Alex Lowdermilk Print Name Capacity: ❑ Owner Z Authorized Agent' 2/1 /2023 Date Signature E. REASON FOR JD REQUEST: (Check as many as applicable) ❑ I intend to construct/develop a projector perform activities on this parcel which would be designed to avoid all aquatic resources. ❑ I intend to construct/develop a projector perform activities on this parcel which would be designed to avoid all jurisdictional aquatic resources under Corps authority. I intend to construct/develop a projector perform activities on this parcel which may require authorization from the Corps, and the JD would be used to avoid and minimize impacts to jurisdictional aquatic resources and as an initial step in a future permitting process. ❑✓ I intend to construct/develop a projector perform activities on this parcel which may require authorization from the Corps; this request is accompanied by my permit application and the JD is to be used in the permitting process. ❑ I intend to construct/develop a project or perform activities in a navigable water of the U.S. which is included on the district Section 10 list and/or is subject to the ebb and flow of the tide. ❑ A Corps JD is required in order obtain my local/state authorization. ❑ I intend to contest jurisdiction over a particular aquatic resource and request the Corps confirm that jurisdiction does/does not exist over the aquatic resource on the parcel. ❑ I believe that the site may be comprised entirely of dry land. ❑ Other: ' For NCDOT requests following the current NCDOT/USAGE protocols, skip to Part E. a If there are multiple parcels owned by different parties, please provide the following for each additional parcel on a continuation sheet. s Must provide agent authorization form/letter signed by owner(s). Version: May 2017 Page 3 Jurisdictional Determination Request F. JURISDICTIONAL DETERNIINATION (JD) TYPE (Select One) 7 I am requesting that the Corps provide a preliminM JD for the property identified herein. A Preliminary Jurisdictional Determination (PJD) provides an indication that there may be "waters of the United States" or "navigable waters of the United States"on a property. PJDs are sufficient as the basis for permit decisions. For the purposes of permitting, all waters and wetlands on the property will be treated as if they are jurisdictional "waters of the United States". PJDs cannot be appealed (33 C.F.R. 331.2); however, a PJD is "preliminary" in the sense that an approved JD can be requested at any time. PJDs do not expire. ❑ I am requesting that the Corps provide an approved JD for the property identified herein. An Approved Jurisdictional Determination (AJD) is a determination that jurisdictional "waters of the United States" or "navigable waters of the United States" are either present or absent on a site. An approved JD identifies the limits of waters on a site determined to be jurisdictional under the Clean Water Act and/or Rivers and Harbors Act. Approved JDs are sufficient as the basis for permit decisions. AJDs are appealable (33 C.F.R. 331.2). The results of the AJD will be posted on the Corps website. A landowner, permit applicant, or other "affected party" (33 C.F.R. 331.2) who receives an AJD may rely upon the AJD for five years (subject to certain limited exceptions explained in Regulatory Guidance Letter 05- 02). ❑ I am unclear as to which JD I would like to request and require additional information to inform my decision. G. ALL REQUESTS Map of Property or Project Area. This Map must clearly depict the boundaries of the review area. ✓❑ Size of Property or Review Area 11.10 acres. ❑ The property boundary (or review area boundary) is clearly physically marked on the site. Version: May 2017 Page 4 Jurisdictional Determination Request H. REQUESTS FROM CONSULTANTS Project Coordinates (Decimal Degrees): Latitude: 35.763773 Longitude: -78.363745 A legible delineation map depicting the aquatic resources and the property/review area. Delineation maps must be no larger than 1 Ix 17 and should contain the following: (Corps signature of submitted survey plats will occur after the submitted delineation map has been reviewed and approved).6 ■ North Arrow ■ Graphical Scale ■ Boundary of Review Area ■ Date ■ Location of data points for each Wetland Determination Data Form or tributary assessment reach. For Approved Jurisdictional Determinations: ■ Jurisdictional wetland features should be labeled as Wetland Waters of the US, 404 wetlands, etc. Please include the acreage of these features. ■ Jurisdictional non -wetland features (i.e. tidal/navigable waters, tributaries, impoundments) should be labeled as Non -Wetland Waters of the US, stream, tributary, open water, relatively permanent water, pond, etc. Please include the acreage or linear length of each of these features as appropriate. ■ Isolated waters, waters that lack a significant nexus to navigable waters, or non - jurisdictional upland features should be identified as Non -Jurisdictional. Please include a justification in the label regarding why the feature is non jurisdictional (i.e. "Isolated", "No Significant Nexus", or "Upland Feature"). Please include the acreage or linear length of these features as appropriate. For Preliminary Jurisdictional Determinations: Wetland and non -wetland features should not be identified as Jurisdictional, 404, Waters of the United States, or anything that implies jurisdiction. These features can be identified as Potential Waters of the United States, Potential Non -wetland Waters of the United States, wetland, stream, open water, etc. Please include the acreage and linear length of these features as appropriate. Completed Wetland Determination Data Forms for appropriate region (at least one wetland and one upland form needs to be completed for each wetland type) 6 Please refer to the guidance document titled "Survey Standards for Jurisdictional Determinations" to ensure that the supplied map meets the necessary mapping standards. hM2://www.saw.usace.4rmy.mil/Missions/Regulatoly-Permit- Pro gram/Jurisdiction/ Version: May 2017 Page 5 Jurisdictional Determination Request F4Completed appropriate Jurisdictional Determination form • PJDs, please complete a Preliminary Jurisdictional Determination Form' and include the Aquatic Resource Table • AJDS• please complete an Approved Jurisdictional Determination Form'. Vicinity Map Aerial Photograph USGS Topographic Map Soil Survey Map Other Maps, as appropriate (e.g. National Wetland Inventory Map, Proposed Site Plan, previous delineation maps, LIDAR maps, FEMA floodplain maps) Landscape Photos (if taken) NCSAM and/or NCWAM Assessment Forms and Rating Sheets NC Division of Water Resources Stream Identification Forms hJ Other Assessment Forms ' www.saw.usace.4rmy.mil/Portals/59/docs/regulatory/readocs/JD/RGL 08-02_App A Prelim _JD_Form fillable.pdf 8 Please see hM2://www.saw.usace.4M.mil/Missions/Regulatory-Permit-Program/Jurisdiction/ Principal Purpose: The information that you provide will be used in evaluating your request to determine whether there are any aquatic resources within the project area subject to federaljurisdiction under the regulatory authorities referenced above. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public, and may be made available as part of a public notice as required by federal law. Your name and property location where federal jurisdiction is to be determined will be included in the approved jurisdictional determination (AJD), which will be made available to the public on the District's website and on the Headquarters USAGE website. Disclosure: Submission of requested information is voluntary; however, if information is not provided, the request for an AJD cannot be evaluated nor can an AJD be issued. Version: May 2017 Page 6 Preliminary ORM Data Entry Fields for New Actions ACTION ID 9: SAW - Prepare file folder ❑ 1. Project Name [PCN Form A2a]: Hollybrook Park Begin Date (Date Received): Assign Action ID Number in ORM ❑ 2. Work Type: ❑Private ❑Institutional ❑✓ Government ❑ Commercial 3. Project Description / Purpose [PCN Form B3d and B3e]: The proposed project is located at 1217 S Hollybrook Road. All proposed work will be conducted within the town owned parcel. Adjoining areas consist of residential properties and undeveloped land. 4. Property Owner / Applicant [PCN Form A3 or A4]: Town of Wendell -Town Manager (Marvin E. Collins) 5. Agent / Consultant [PNC Form A5 — or ORM Consultant ID Number]: Alex Lowdermilk, McGill Associates, P.A. 6. Related Action ID Number(s) [PCN Form B5b]: 7. Project Location —Coordinates, Street Address, and/or Location Description [PCN Form Blb]: 35.763773,-78.363745 8. Project Location —Tax Parcel ID [PCN Form Bla]: 1783837861 9. Project Location — County [PCN Form A2b]: Wake 10. Project Location — Nearest Municipality or Town [PCN Form A2c]: Wendell, North Carolina 11. Project Information —Nearest Waterbody [PCN Form 132a]: Buffalo Creek 12. Watershed / 8-Digit Hydrologic Unit Code [PCN Form 132c]: 03020201 Authorization: Section 10 ❑ Section 404 ✓❑ Regulatory Action Type: ❑ Standard Permit ✓ Nationwide Permit 9 Regional General Permit 9 Jurisdictional Determination Request Section 10 and 404 ❑ ❑ Pre -Application Request ::]Unauthorized Activity ❑ Compliance ❑ No Permit Required Revised 20150602 Appendix 2 - PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: 2/1 /2023 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Alex Lowdermilk, McGill Associates P.A., 124019th Street Lane NW Hickory,NC28601 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County/parish/borough: Wake City: Wendell Center coordinates of site (lat/long in degree decimal format): Lat.: 35.763773 Long.:-78.363745 Universal Transverse Mercator: 738332.84, 3960953.78, 17S Name of nearest waterbody: Buffalo Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ■❑ Office (Desk) Determination. Date: 2/1 /2023 ■❑ Field Determination. Date(s): 1/25/2023 TABLE OF AQUATIC RESOURCES IN REVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Site number Latitude (decimal degrees) Longitude (decimal degrees) Estimated amount of aquatic resource in review area (acreage and linear feet, if applicable) Type of aquatic resource (i.e., wetland vs. non -wetland waters) Geographic authority to which the aquatic resource "may be" subject (i.e., Section 404 or Section 10/404) S1 (UT-1 To Buffalo Creek) 35.763468 -78.362267 0.0025 Acres Non -Wetland Waters 404 Wetland A 35.763468 -78.362101 0.0501 Acres Wetland Waters 404 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre - construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ■❑ Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map:Location, Soil, USGS, Delineation ❑ Data sheets prepared/submitted by or on behalf of the PJD requestor. ❑ Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ■❑ U.S. Geological Survey map(s). Cite scale & quad name: Zebulon, NC 1=500' 0 Natural Resources Conservation Service Soil Survey. Citation: ❑ National wetlands inventory map(s). Cite name: ❑ State/local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100-year Floodplain Elevation is: .(National Geodetic Vertical Datum of 1929) ■❑ Photographs: ■❑ Aerial (Name & Date): 1/1/2021 - NC OneMap or ■❑ Other (Name & Date): 1/25/2023 ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. 2/1 /2023 Signature and date of Signature and date of Regulatory staff member person requesting PJD completing PJD (REQUIRED, unless obtaining the signature is impracticable)' 1 Districts may establish timeframes for requestor to return signed PJD forms. If the requestor does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. INS- b 41 {5 DIDgwood Trail aft.; rxl{wy � a-. lu ti FAR Ln ra {j 3t N -R2rN5 St zr J-11e +errs}� Le, Boxle'yr Dr 0 Hal ly Lakes Cx NQrva !Rd v SPP 50 o $1 �atitr�� Rd (Id•NoweA Rd E� CID( '' Wythe Lin An 41n Ad VI, C DPerFreld Rd L ioi Iss' tlub Rd Legend 5%-0 Limits of Disturbance © 2023 Microsoft Corporation © 2022 TornTom DATE PROJECT # FIGURE 2/1/2023 21.01721 HOLLYBROOK PARK 1000 0 500 1000 2000 mcgill 1240 19th Street Lane NW Hickory, 28601 szs.3zs.20zoz4 OFFICE MANAGER DC DESIGNER AL TOWN OF WE N D E LL GRAPHIC SCALE DIVISION VALUE =1000 FEET LOCATION MAP 1 NC Firm License # C-0459 mcgillassociates.com PROJECT MANAGER MN REVIEWER is WAKE COUNTY, NORTH CAROLINA 3Q61 I Legend � Limits of Disturbance 1240 19th Street Lane NW mcgill NC FirHickory, 28601 8.202024 NC Firm License # C-0459 mcg i I I associ ates. co m i OF 1"; IMIL oil a to/I fl i ' i DATE PROJECT # 2/1 /2023 21.01721 OFFICE MANAGER DESIGNER DC AL PROJECT MANAGER REVIEWER MN JS u 0 i f � I r•-y } t I.F r 1 I f 1 5 r Si '�.Ooe: zz ti r HOLLYBROOK PARK 500 0 250 500 1000 TOWN OF WENDELL GRAPHIC SCALE DIVISIONVALUE = 500 FEET WAKE COUNTY, NORTH CAROLINA r USGS MAP #r •„-i ,1 . i. Iy ■ r� _f FIGURE 2 Stream & Wetland Table Wetland A 0.0501 Acres S1 (UT-1 0.0025 To Buffalo Creek) Acres � M PCp. Legend � Limits of � � �Y , -:�f' , : •• ` �� , �.� .� Disturbance . wr Wetland ' v S Hollybrook Road Limits- 2 Stream Limits +; Data Point /'JSv 4Ilk „' WA -OUT o Potential Wetland Waters of the US - Wetland A i WA -I N Potential Non -Wetland Waters of the US - S1 (UT-1 To Buffalo Creek) JURISDICTIONAL STREAMS AND WETLANDS IDENTIFIED ON THIS MAP HAVE BEEN LOCATED WITHIN SUB —METER ACCURACY UTILIZING AN ARROW 100w GLOBAL POSITIONING SYSTEM (GPS) AND THE,y+ SUBSEQUENT DIFFERENTIAL CORRECTION OF THAT DATA, GPS POINTS MAY DEMONSTRATE UNCORRECTABLE ERRORS DUE TO TOPOGRAPHY, VEGETATIVE COVER, AND/OR MULTIPATH SIGNAL ERROR. NOTE: THE ILLUSTRATED STREAM AND WETLAND LOCATIONS ARE APPROXIMATE. THESE AREAS HAVE NOT BEEN FLAGGED IN THE FIELD AND HAVE NOT BEEN SURVEYED. ALTHOUGH MCGILL ASSOCIATES, P.A. (MCGILL) IS CONFIDENT IN OUR ASSESSMENT, THE US ARMY CORPS OF ENGINEERS IS THE ONLY AGENCY THAT CAN MAKE FINAL DECISIONS REGARDING JURISDICTIONAL WETLAND AND WATERS OF THE US DELINEATIONS. 4 THIS MAP WAS PREPARED BY MCGILL USING THE BEST INFORMATION AVAILABLE TO MCGILL AT THE TIME OF PRODUCTION. THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY AND SHOULD NOT BE USED TO DETERMINE PRECISE BOUNDARIES, ROADWAYS, PROPERTY BOUNDARY LINES, NOR. LEGAL DESCRIPTIONS. THIS MAP SHALL NOT BE CONSTRUED TO BE AN OFFICIAL SURVEY OF ANY DATA DEPICTED. SOURCE DATA: WAKE COUNTY GIS. IL W Inset 1 1240 19th Street Lane NW 828.828.2024 M gill Hickory, NC28601 NC Firm License # C-0459 mc9illassociates.com DATE PROJECT# zizizozs 21.01721 HOLLYBROOK PARK TOWN OF WENDELL 110 0 55 110 220 DELINEATION MAP FIGURE 3 OFFICE MANAGER DESIGNER DC AL 1 GRAPHIC SCALE DIVISIONVALUE = 110FEET PROJECT MANAGER REVIEWER MN is WAKE COUNTY, NORTH CAROLINA o 738070 35o 45' 58" N 35o 45' 46" N Soil Map —Wake County, North Carolina (LimitsofDisturbancePoly) 738130 738190 738250 738310 738370 738070 738130 738190 738250 738310 738370 b Map Scale: 1:2,580 if printed on A landscape (11" x 8.5") sheet. Meters N 0 35 70 140 210 Feet 0 100 200 400 E00 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: UTM Zone 17N WGS84 usoA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 7384W 738490 738550 7384W 738490 738550 738610 35o 45' 58" N 35o 45' 46" N 738610 2/1 /2023 Page 1 of 3 MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils 0 Soil Map Unit Polygons ,N Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit �i Gravelly Spot 0 Landfill A. Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip o Sodic Spot Soil Map —Wake County, North Carolina (LimitsofDisturbancePoly) MAP INFORMATION Spoil Area The soil surveys that comprise your AOI were mapped at 1:24,000. Stony Spot Very Stony Spot Warning: Soil Map may not be valid at this scale. Wet Spot Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil 4� Other line placement. The maps do not show the small areas of Special Line Features contrasting soils that could have been shown at a more detailed scale. Water Features Streams and Canals Please rely on the bar scale on each map sheet for map measurements. Transportation Rails Source of Map: Natural Resources Conservation Service Web Soil Survey URL: . 0 Interstate Highways Coordinate System: Web Mercator (EPSG:3857) US Routes Maps from the Web Soil Survey are based on the Web Mercator Major Roads projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Local Roads Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. Background Aerial Photography This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Wake County, North Carolina Survey Area Data: Version 23, Sep 12, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 24, 2022—May 9, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 2/1/2023 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map —Wake County, North Carolina Lim itsofDisturbancePoly Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI ChA Chewacla and Wehadkee soils, 0 to 2 percent slopes, frequently flooded 0.5 4.9% RgC Rawlings -Rion complex, 6 to 10 percent slopes 6.1 54.6% RgD Rawlings -Rion complex, 10 to 15 percent slopes 0.5 4.1 % WfB Wedowee -Saw complex, 2 to 6 percent slopes 4.0 36.4% Totals for Area of Interest 11.1 100.0% USDA Natural Resources Web Soil Survey 2/1/2023 Conservation Service National Cooperative Soil Survey Page 3 of 3 � � 4 6 � f Photo Five: View looking upstream at S1 within Photo Six: View looking upstream at S1 within the Limits of Disturbance. the Limits of Disturbance. � � V A ! AIL7ltt Y ��i�j Y°:�� W �M'h'✓M k �{yy b ,'t ' f� j it tT 3T„ Photo Seven: View looking downstream at S1 with S Hollybrook Road in the background within the Limits of Disturbance. DATE 2/1/2023 HOLLYBROOK PARK SHEET 121/1/11 Street Lane NW Hickory, NC 28601 TOWN F WENDELL PHOTOSHEET PROJECT # 21.01721 NC Finn License#C-0459 1'Y1C NC mcgillassociates.com PROJECT MANAGER MN 2 WAKE COUNTY, NORTH CAROLINA Date: Project/Site Latitude 1/25/2023 Hollybrook Park 35.763468 Evaluator: County: Longitude: Alex Lowdermilk/Jon Swaim Wake -78.362267 Stream Determination Other Total Points: 33.50 PERENNIAL S1 (UT-1 To Buffalo Creek) A. Geomorphology Subtotal = 19.00 Absent Weak Moderate Strong 1. Continuity of bed and bank ----- ----- 2 ----- 2. Sinuosity of Channel Along Thalweg ----- ----- 2 ----- 3. In -channel structure: ex. Riffle -pool, step -pool, ripple-pool sequence ----- ----- 4. Particle size of stream substrate ----- 1 ----- ----- 5. Active/relic floodplain ----- ----- ----- 3 6. Depositional bars or benches ----- ----- 2 ----- 7. Recent alluvial deposits ----- ----- 2 ----- 8. Headcuts ----- 1 ----- 9. Grade Control ----- 0.5 ----- ----- 10. Natural Valley ----- ----- ----- 1.5 11. Second or greater order channel No= ----- Yes= 3 B. Hydrology Subtotal= 9.00 12. Presence of Baseflow ----- ----- 2 ----- 13. Iron oxidizing bacteria ----- 1 ----- ----- 14. Leaf litter ----- 1 ----- ----- 15. Sediment on plants or debris ----- ----- 1 16. Organic debris lines or piles ----- 1 17. Soil -based evidence of high water table? No= ----- Yes= 3 C. Biology Subtotal= 5.50 18. Fiborous roots in streambed ----- 2 ----- ----- 19. Rooted upland plants in streambed ----- 2 ----- ----- 20. Macrobenthos (note diversity and abundance) 0 ----- ----- ----- 21. Aquatic mollusks 0 ----- ----- ----- 2 2. Fish 0 ----- ----- ----- 23. Crayfish ----- 0.5 ----- ----- 24. Amphibians ----- 0.5 ----- ----- 25. Algae ----- 0.5 ----- ----- 26. Wetland plants in streambed I FACW= ------1 OBL= ---- Other= 0 *perennial streams may also be identified using other methods. See p. 35 of manual. Notes: Note: Sheet sourced from NCDWQ Stream ID Form U.S. Army Corps of Engineers OMB Control #: 0710-xxxx, Exp: Pending WETLAND DETERMINATION DATA SHEET — Atlantic and Gulf Coastal Plain Region Requirement Control Symbol EXEMPT: See ERDC/EL TR-07-24; the proponent agency is CECW-CO-R (Authority: AR 335-15, paragraph 5-2a) Project/Site: Hollybrook Park City/County: Wake Sampling Date: 1/25/2023 Applicant/Owner: Town of Wendell State: NC Sampling Point: WA -IN Investigator(s): Alex Lowdermilk/Jon Swaim Section, Township, Range: Landform (hillside, terrace, etc.): Local relief (concave, convex, none): Concave Slope (%): 0-1 Subregion (LRR or MLRA): LRR P Lat: 35.763468 Long:-78.362101 Datum: WGS84 Soil Map Unit Name: Chewacla and Wehadkee soils, 0 to 2 percent slopes, frequently flooded NWI classification: Are climatic / hydrologic conditions on the site typical for this time of year? Yes X No (If no, explain in Remarks.) Are Vegetation Soil or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS — Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes X No Is the Sampled Area Hydric Soil Present? Yes X No within a Wetland? Yes X No Wetland Hydrology Present? Yes X No Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required: check all that apply) —Surface Soil Cracks (136) X Surface Water (Al) _Aquatic Fauna (1313) _Sparsely Vegetated Concave Surface (138) X High Water Table (A2) _ Marl Deposits (B15) (LRR U) X Drainage Patterns (1310) X Saturation (A3) —Hydrogen Sulfide Odor (Cl) —Moss Trim Lines (1316) —Water Marks (131) —Oxidized Rhizospheres on Living Roots (C3) _ Dry -Season Water Table (C2) —Sediment Deposits (132) —Presence of Reduced Iron (C4) —Crayfish Burrows (C8) _ Drift Deposits (133) —Recent Iron Reduction in Tilled Soils (C6) —Saturation Visible on Aerial Imagery (C9) _Algal Mat or Crust (134) _Thin Muck Surface (C7) _Geomorphic Position (D2) _Iron Deposits (135) _Other (Explain in Remarks) _ShallowAquitard (D3) —Inundation Visible on Aerial Imagery (137) _ FAC-Neutral Test (D5) X Water -Stained Leaves (139) Sphagnum Moss (D8) (LRR T, U) Field Observations: Surface Water Present? Yes X No Depth (inches): 1 Water Table Present? Yes X No Depth (inches): 0 Saturation Present? Yes X No Depth (inches): 0 Wetland Hydrology Present? Yes X No (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: ENG FORM 6116-2-SG, JUL 2018 Atlantic and Gulf Coastal Plain —Version 2.0 VEGETATION (Four Strata) - Use scientific names of plants. Sampling Point: WA -IN Absolute Dominant Indicator Tree Stratum (Plot size: 30 ) % Cover Species? Status Dominance Test worksheet: 1. Liquidambarstyraciflua 20 Yes FAC Number of Dominant Species 2. Liriodendron tulipifera 20 Yes FACU That Are OBL, FACW, or FAC: 10 (A) 3. Acerrubrum 30 Yes FAC Total Number of Dominant 4. Species Across All Strata: 11 (B) 5. Percent of Dominant Species 6. That Are OBL, FACW, or FAC: 90.9% (A/B) 7. Prevalence Index worksheet: 8. Total % Cover of: Multiply by: 70 =Total Cover OBL species 0 x 1 = 0 50% of total cover: 35 20% of total cover: 14 FACW species 70 x 2 = 140 Sapling/Shrub Stratum (Plot size: 15 ) FAC species 145 x 3 = 435 1. Carpinus caroliniana 20 Yes FAC FACU species 20 x 4 = 80 2. Ligustrum sinense 25 Yes FAC UPL species 0 x 5 = 0 3. Sambucus nigra 15 Yes FACW Column Totals: 235 (A) 655 (B) 4. Alnus serrulata 10 No FACW Prevalence Index = B/A = 2.79 5. Hydrophytic Vegetation Indicators: 6. _ 1 - Rapid Test for Hydrophytic Vegetation 7. X 2 - Dominance Test is >50% 8. X 3 - Prevalence Index is !2.0' 70 =Total Cover -Problematic Hydrophytic Vegetation' (Explain) 50% of total cover: 35 20% of total cover: 14 Herb Stratum (Plot size: 5 ) 1. Arundinaria gigantea 30 Yes FACW Indicators of hydric soil and wetland hydrology must be 2. Microstegium vimineum 30 Yes FAC present, unless disturbed or problematic. Definitions of Four Vegetation Strata: 3. Sedge Spp. 15 Yes FACW 4. Tree - Woody plants, excluding vines, 3 in. (7.6 cm) or 5. more in diameter at breast height (DBH), regardless of 6 height. 7. Sapling/Shrub - Woody plants, excluding vines, less 8. than 3 in. DBH and greater than 3.28 ft (1 m) tall. 9. 10. Herb - All herbaceous (non -woody) plants, regardless 11. of size, and woody plants less than 3.28 ft tall. 12. 75 =Total Cover Woody Vine - All woody vines greater than 3.28 ft in 50% of total cover: 38 20% of total cover: 15 height. Woody Vine Stratum (Plot size: 5 ) 1. Rubus arvensis 10 Yes FAC 2. Smilax rotundifolia 10 Yes FAC 3. 4. 5. Hydrophytic 20 =Total Cover Vegetation 50% of total cover: 10 20% of total cover: 4 Present? Yes X No Remarks: (If observed, list morphological adaptations below.) ENG FORM 6116-2-SG, JUL 2018 Atlantic and Gulf Coastal Plain - Version 2.0 SOIL Sampling Point: WA -IN Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Types Loc2 Texture Remarks 0-3 10YR 4/1 100 Loamy/Clayey 3-12 10YR 5/1 92 7.5YR 5/6 8 Loamy/Clayey Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. 2Location: PL=Pore Lining, M=Matrix. Hydric Soil Indicators: (Applicable to all LRRs, unless otherwise noted.) Indicators for Problematic Hydric Soils3: _ Histosol (Al) —Thin Dark Surface (S9) (LRR S, T, U) _ 1 cm Muck (A9) (LRR O) _ Histic Epipedon (A2) —Barrier Islands 1 cm Muck (S12) _2 cm Muck (A10) (LRR S) —Black Histic (A3) (MLRA 15313, 153D) —Coast Prairie Redox (A16) —Hydrogen Sulfide (A4) —Loamy Mucky Mineral (F1) (LRR O) (outside MLRA 150A) —Stratified Layers (A5) —Loamy Gleyed Matrix (F2) _ Reduced Vertic (F18) —Organic Bodies (A6) (LRR P, T, U) X Depleted Matrix (F3) (outside MLRA 150A, 15013) _ 5 cm Mucky Mineral (A7) (LRR P, T, U) _ Redox Dark Surface (F6) —Piedmont Floodplain Soils (F19) (LRR P, T) —Muck Presence (A8) (LRR U) _ Depleted Dark Surface (F7) _Anomalous Bright Floodplain Soils (F20) _ 1 cm Muck (A9) (LRR P, T) _ Redox Depressions (F8) (MLRA 15313) _ Depleted Below Dark Surface (Al 1) —Marl (F10) (LRR U) —Red Parent Material (F21) _Thick Dark Surface (Al2) _Depleted Ochric (F11) (MLRA 151) _Very Shallow Dark Surface (F22) _Coast Prairie Redox (A16) (MLRA 150A)_Iron-Manganese Masses (F12) (LRR O, P, T) (outside MLRA 138, 152A in FL, 154) Sandy Mucky Mineral (S1) (LRR O, S) _ Umbric Surface (F13) (LRR P, T, U) —Barrier Islands Low Chroma Matrix (TS7) —Sandy Gleyed Matrix (S4) —Delta Ochric (F17) (MLRA 151) (MLRA 15313, 153D) _Sandy Redox (S5) Reduced Vertic (F18) (MLRA 150A, 15013) _Other (Explain in Remarks) —Stripped Matrix (S6) —Piedmont Floodplain Soils (F19) (MLRA 149A) Dark Surface (S7) (LRR P, S, T, U) Bright Floodplain Soils (F20) _ _ Polyvalue Below Surface (S8) _Anomalous (MLRA 149A, 153C, 153D) 3Indicators of hydrophytic vegetation and (LRR S, T, U) _Very Shallow Dark Surface (F22) wetland hydrology must be present, (MLRA 138, 152A in FL, 154) unless disturbed or problematic. Restrictive Layer (if observed): Type: Depth (inches): Hydric Soil Present? Yes X No Remarks ENG FORM 6116-2-SG, JUL 2018 Atlantic and Gulf Coastal Plain —Version 2.0 U.S. Army Corps of Engineers OMB Control #: 0710-xxxx, Exp: Pending WETLAND DETERMINATION DATA SHEET — Atlantic and Gulf Coastal Plain Region Requirement Control Symbol EXEMPT: See ERDC/EL TR-07-24; the proponent agency is CECW-CO-R (Authority: AR 335-15, paragraph 5-2a) Project/Site: Hollybrook Park City/County: Wake Sampling Date: 1/25/2023 Applicant/Owner: Town of Wendell State: NC Sampling Point: WA -OUT Investigator(s): Alex Lowdermilk/Jon Swaim Section, Township, Range: Landform (hillside, terrace, etc.): Local relief (concave, convex, none): Slope (%): 0-1 Subregion (LRR or MLRA): LRR P Lat: 35.763462 Long:-78.362363 Datum: WGS84 Soil Map Unit Name: Chewacla and Wehadkee soils, 0 to 2 percent slopes, frequently flooded NWI classification: Are climatic / hydrologic conditions on the site typical for this time of year? Yes X No (If no, explain in Remarks.) Are Vegetation Soil or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS — Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes X No Is the Sampled Area Hydric Soil Present? Yes No X within a Wetland? Yes No X Wetland Hydrology Present? Yes No X Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required: check all that apply) —Surface Soil Cracks (136) _Surface Water (Al) _Aquatic Fauna (1313) _Sparsely Vegetated Concave Surface (138) _ High Water Table (A2) _ Marl Deposits (B15) (LRR U) —Drainage Patterns (1310) _Saturation (A3) _Hydrogen Sulfide Odor (Cl) _Moss Trim Lines (1316) —Water Marks (131) —Oxidized Rhizospheres on Living Roots (C3) _ Dry -Season Water Table (C2) —Sediment Deposits (132) —Presence of Reduced Iron (C4) —Crayfish Burrows (C8) _ Drift Deposits (133) —Recent Iron Reduction in Tilled Soils (C6) —Saturation Visible on Aerial Imagery (C9) _Algal Mat or Crust (134) _Thin Muck Surface (C7) _Geomorphic Position (D2) _Iron Deposits (135) _Other (Explain in Remarks) _ShallowAquitard (D3) —Inundation Visible on Aerial Imagery (137) _ FAC-Neutral Test (D5) Water -Stained Leaves (139) Sphagnum Moss (D8) (LRR T, U) Field Observations: Surface Water Present? Yes No X Depth (inches): Water Table Present? Yes No X Depth (inches): Saturation Present? Yes No X Depth (inches): Wetland Hydrology Present? Yes No X (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: ENG FORM 6116-2-SG, JUL 2018 Atlantic and Gulf Coastal Plain —Version 2.0 VEGETATION (Four Strata) - Use scientific names of plants. Sampling Point: WA -OUT Absolute Dominant Indicator Tree Stratum (Plot size: 30 ) % Cover Species? Status Dominance Test worksheet: 1. Liquidambarstyraciflua 10 No FAC Number of Dominant Species 2. Liriodendron tulipifera 25 Yes FACU That Are OBL, FACW, or FAC: 5 (A) 3. Pinus taeda 25 Yes FAC Total Number of Dominant 4. Species Across All Strata: 6 (B) 5. Percent of Dominant Species 6. That Are OBL, FACW, or FAC: 83.3% (A/B) 7. Prevalence Index worksheet: 8. Total % Cover of: Multiply by: 60 =Total Cover OBL species 0 x 1 = 0 50% of total cover: 30 20% of total cover: 12 FACW species 0 x 2 = 0 Sapling/Shrub Stratum (Plot size: 15 ) FAC species 100 x 3 = 300 1. FACU species 25 x 4 = 100 2. Ligustrum sinense 25 Yes FAC UPL species 0 x 5 = 0 3. Column Totals: 125 (A) 400 (B) 4. Prevalence Index = B/A = 3.20 5. Hydrophytic Vegetation Indicators: 6. _ 1 - Rapid Test for Hydrophytic Vegetation 7. X 2 - Dominance Test is >50% 8. 3 - Prevalence Index is !2.0' 25 =Total Cover -Problematic Hydrophytic Vegetation' (Explain) 50% of total cover: 13 20% of total cover: 5 Herb Stratum (Plot size: 5 ) 1. 'Indicators of hydric soil and wetland hydrology must be 2. Microstegium vimineum 20 Yes FAC present, unless disturbed or problematic. Definitions of Four Vegetation Strata: 3. 4. Tree - Woody plants, excluding vines, 3 in. (7.6 cm) or 5. more in diameter at breast height (DBH), regardless of 6 height. 7. Sapling/Shrub - Woody plants, excluding vines, less 8. than 3 in. DBH and greater than 3.28 ft (1 m) tall. 9. 10. Herb - All herbaceous (non -woody) plants, regardless 11. of size, and woody plants less than 3.28 ft tall. 12. 20 =Total Cover Woody Vine - All woody vines greater than 3.28 ft in 50% of total cover: 10 20% of total cover: 4 height. Woody Vine Stratum (Plot size: 5 ) 1. Rubus arvensis 10 Yes FAC 2. Smilax rotundifolia 10 Yes FAC 3. 4. 5. Hydrophytic 20 =Total Cover Vegetation 50% of total cover: 10 20% of total cover: 4 Present? Yes X No Remarks: (If observed, list morphological adaptations below.) ENG FORM 6116-2-SG, JUL 2018 Atlantic and Gulf Coastal Plain - Version 2.0 SOIL Sampling Point: WA -OUT Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Types Loc2 Texture Remarks 0-8 10YR 4/2 100 Loamy/Clayey 8-12 10YR 5/3 50 Loamy/Clayey 10YR 5/6 50% Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. 2Location: PL=Pore Lining, M=Matrix. Hydric Soil Indicators: (Applicable to all LRRs, unless otherwise noted.) Indicators for Problematic Hydric Soils3: _ Histosol (Al) —Thin Dark Surface (S9) (LRR S, T, U) _ 1 cm Muck (A9) (LRR O) _ Histic Epipedon (A2) —Barrier Islands 1 cm Muck (S12) _2 cm Muck (A10) (LRR S) —Black Histic (A3) (MLRA 15313, 153D) —Coast Prairie Redox (A16) —Hydrogen Sulfide (A4) —Loamy Mucky Mineral (F1) (LRR O) (outside MLRA 150A) —Stratified Layers (A5) —Loamy Gleyed Matrix (F2) _ Reduced Vertic (F18) —Organic Bodies (A6) (LRR P, T, U) _ Depleted Matrix (F3) (outside MLRA 150A, 15013) _ 5 cm Mucky Mineral (A7) (LRR P, T, U) _ Redox Dark Surface (F6) —Piedmont Floodplain Soils (F19) (LRR P, T) —Muck Presence (A8) (LRR U) _ Depleted Dark Surface (F7) _Anomalous Bright Floodplain Soils (F20) _ 1 cm Muck (A9) (LRR P, T) _ Redox Depressions (F8) (MLRA 15313) _ Depleted Below Dark Surface (Al 1) —Marl (F10) (LRR U) —Red Parent Material (F21) _Thick Dark Surface (Al2) _Depleted Ochric (F11) (MLRA 151) _Very Shallow Dark Surface (F22) _Coast Prairie Redox (A16) (MLRA 150A)_Iron-Manganese Masses (F12) (LRR O, P, T) (outside MLRA 138, 152A in FL, 154) Sandy Mucky Mineral (S1) (LRR O, S) _ Umbric Surface (F13) (LRR P, T, U) —Barrier Islands Low Chroma Matrix (TS7) —Sandy Gleyed Matrix (S4) —Delta Ochric (F17) (MLRA 151) (MLRA 15313, 153D) _Sandy Redox (S5) Reduced Vertic (F18) (MLRA 150A, 15013) _Other (Explain in Remarks) —Stripped Matrix (S6) —Piedmont Floodplain Soils (F19) (MLRA 149A) Dark Surface (S7) (LRR P, S, T, U) Bright Floodplain Soils (F20) _ _ Polyvalue Below Surface (S8) _Anomalous (MLRA 149A, 153C, 153D) 3Indicators of hydrophytic vegetation and (LRR S, T, U) _Very Shallow Dark Surface (F22) wetland hydrology must be present, (MLRA 138, 152A in FL, 154) unless disturbed or problematic. Restrictive Layer (if observed): Type: Depth (inches): Hydric Soil Present? Yes No X Remarks ENG FORM 6116-2-SG, JUL 2018 Atlantic and Gulf Coastal Plain —Version 2.0