HomeMy WebLinkAbout20221790 Ver 1_ut thompson plans 021723_20230217LIST OF SHEETS CONSTRUCTION PLANS UT TO THOMPSON RIVER RESTORATION WACHHUND PROPERTY TRANSYLVANIA COUNTY, NORTH CAROLINA VICINITY MAP NTS PROJECT SITE PREPARED FOR: PRELIMINARY PLANS NOT FOR CONSTRUCTION 1 TITLE WACHHUND LAND CO., LLC 2 NOTES & LEGEND 36 FAIRSTED DRIVE 3 PROJECT OVERVIEW ASHEVILLE, NC 28803 4 - 5 PLAN AND PROFILE 6 - 8 TYPICAL SECTIONS & DETAILS i PRELIMINARY PLANS NOT FOR CONSTRUCTION J GENERAL NOTES: 1. TOPOGRAPHY AND IMAGERY GENERATED DURING SEPTEMBER 2022 AERIAL SURVEY. 2. EROSION AND SEDIMENT CONTROL PRACTICES MUST BE INSTALLED, INSPECTED AND MAINTAINED IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS. 3. ALL EQUIPMENT MUST BE CLEANED REGULARLY AND MAINTAINED TO BE FREE OF FUEL, OIL AND LUBRICANT LEAKS. 4. FUELING SHALL BE PERFORMED AT LEAST 100 FEET FROM FLOWING WATER. 5. EQUIPMENT SHALL OPERATE FROM THE TOP OF BANK AS MUCH AS PRACTICAL AND SHALL TAKE PRECAUTIONS TO LIMIT DOWNSTREAM SEDIMENT MIGRATION. 6. BASE FLOW SHALL DIVERTED AROUND IN -STREAM WORK AREAS USING A PUMP -AROUND SYSTEM. WORK SHALL BE SCHEDULED DURING PERIODS OF LOW FLOW. 7. WORK SHALL BE STAGED SUCH THAT NO MORE STREAM BANK IS DISTURBED THAN CAN BE STABILIZED WITH SEED, MULCH AND MATTING AT THE END OF EACH WORKDAY. 8. DISTURBED UPLAND AREAS MUST BE STABILIZED WITH SEED AND MULCH WITHIN 7 DAYS OF REACHING FINAL GRADES. 9. SILT FENCE SHALL BE INSTALLED ON THE STREAM SIDE OF ANY STOCKPILES. 10. PLANT MATERIALS SHALL BE INSTALLED DURING THE DORMANT SEASON, GENERALLY DECEMBER THROUGH MARCH. CONSTRUCTION STORMWATER INSPECTIONS: 1. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING DAILY RECORDS OF RAINFALL EVENTS IN AN ON -SITE PERMIT BOX. 2. EROSION AND SEDIMENT CONTROL PRACTICES MUST BE INSPECTED AT LEAST ONCE PER 7 CALENDAR DAYS AND WITHIN 24 HOURS OF ALL RAIN EVENTS MORE THAN 0.5-INCH/24 HOUR PERIOD. 3. NECESSARY MAINTENANCE OR REPAIRS MUST BE COMPLETED IMMEDIATELY UPON IDENTIFICATION OF THE PROBLEM. 4. EROSION AND SEDIMENT CONTROL CONTACTS DURING CONSTRUCTION: ; ANDREW BICK, HEADWATERS ENG. 828.606.0306 LEGEND EXISTING PROPOSED CONTOUR (1') INDEX CONTOUR (5') STORM DRAIN OR CULVERT MASONRY WALL WETLAND BOUNDARY GROUND SURFACE AT DESIGN c 3200 STREAM CENTERLINE TOP OF BANK FLOODPLAIN GRADING CONSTRUCTED RIFFLE BOULDER STEP SUGGESTED PLANTED BUFFER LIMITS SILT FENCE laa.tea.l — SF — SF — SF — a_ LiJ 0 0 z w w J DESCRIPTION 0 REVISIONS E O U O) C 0 0 co 0 0 '- z w �000 0 a U Z Z J LI < Z Q U U < Q DATE: FEB. 2023 SCALE: AS SHOWN NOTES & LEGEND SHEET 2 OF 8 T APPROX. EL. 3171 +/- NC. PAD L 3165.8' WETLAND MITIGATION AREA; MIN. 0.04 AC CONFORM TO THOMPS RIVER THALWEG AN LEFT BANK 36" HDPE TO BE REPLACED WITH 15' MIN. CLEAR SPAN STRUCTURE PRELIMINARY PLANS NOT FOR CONSTRUCTION REVISIONS d 0 w 0 DESCRIPTION m 0 i N cc 0 LL1 2 H Q w w z az LL1w T O Z W 10 aa0 C) u)a0Z • Z m > W = Q Z CC 0 U < Q F- 0 0 0 O z U J (/) J w m U z DATE: FEB. 2023 SCALE: AS SHOWN OVERVIEW SHEET 3 OF 8 ' PRELIMFAIARI'f T FOR CoNSTR 4.5' ' E CON5,9AD APPROX. L.3165.8' SPILLWAY NOTCH APPROX EL. 3171' +/- LDER STEP TO 'TT AGAINST ONC. PAD 60' 90' REPL ED WIT 'MIN. •I■� CL 2+00 .��UCTU�`11A1►`` ` '� 4.5' WIDE CONC. PAD APPROX. EL. 3165.8' 3175 3170 3165 3160 3155 150 0+00 0+50 1+00 1+50 2+00 2+50 3+00 1- w w Ln w w w z J 1n • U a_ LiJ 0 z 0 0 0 0 0 i LJZ i w w Z <2 w w 0 0 1 0 O z U_ J J w m 0 z CAMP BUC ROAD TRANSYLVANIA CO., NC DATE: FEB. 2023 SCALE: AS SHOWN PLAN & PROFILE SHEET 4 OF 8 as 41 O O N FLOODPL IN G WETLAND MITIGA SOFT RUSH AN AND SHRUB SP ING F • ' MIN. 0.04 AC LANT IXES CONFORM NEW HANNEL BANKS TO EXISTING S-6 CHANNEL `SLOPE AND BENCaAS EER in 3+ 00 3+50 MATCI I —AIL or RIFF' LC TO 4+00 4+50 5+00 5+50 6+00 3175 3170 3165 3160 3155 3150 6+50 m m 0 LiJ 0 REVISIONS i CAMP BUC ROAD TRANSYLVANIA CO., NC DATE: FEB. 2023 SCALE: AS SHOWN PLAN & PROFILE SHEET 5 OF 8 SEE NOTE 3. SEE NOTE 3. 18" LAYER OF NCDOT CLASS 1 STONE LEGEND EXISTING PROPOSED _I1 2.5 (TYP) 1 TYPICAL SECTION �6 RIFFLE 12.8' 1.8' 10 --- _I 1 2 F 2.0' 2 TYPICAL SECTION 6 POOL 0 5 20' +/- - 3.0' +/- 4---- — .0' 10 _I1 3 (TYP) 15 TYPICAL SECTION NOTES: 1. TYPICAL SECTION DRAWN LOOKING DOWNSTREAM. 2. BANKS AND GRADED SLOPES SHALL BE ROUGHENED PERPENDICULAR TO SLOPE, COVERED WITH 3" LAYER OF TOPSOIL, SEEDED, MULCHED AND MATTED WITH 780 G/M2 COIR FIBER MATTING. 3. EXCAVATE BANKFULL BENCH WHERE DEPTH TO THALWEG EXCEEDS 2' IN POOLS AND 1.3' IN RIFFLES. 4. BANKS SHALL BE LIVE -STAKED AT 3' O.C. DURING THE DORMANT SEASON FOLLOWING GRADING. 5. PLANT SHRUBS IN BUFFERS ALONG TOP OF BOTH BANKS. SEE PLAN & PROFILE SHEETS FOR BUFFER LIMITS. TOE OF BANK (TYP) TOP OF BANK (TYP) 6' +/ ELEV. AT TIE -IN APPROX. 1' HIGHER THAN INVERT ELEV. NOTES: 1. BOULDERS SHALL BE DURABLE STONE, MIN. 2'X3'X3' AND RELATIVELY FLAT. 2. DIMENSIONS AND NUMBER OF BOULDERS MAY BE ADJUSTED BASED ON FIELD CONDITIONS. TOE OF BANK; RIFFLE EXTENDS 1' BEYOND TOE SEE PLAN FOR RIFFLE LENGTH A 1' (TYP) FLOW V I I I I H-5'—I II PRELIMINARY PLANS NOT FOR CONSTRUCTION J NON -WOVEN FILTER FABRIC ON UPSTREAM SIDE OF BOULDER STEP; BACKFILL W/ CLASS A STONE ANCHOR 3' INTO BANK HEADER FOOTER BURIED BELOW BED EXCAVATED II SCOUR POOL PLAN 4 \ BOULDER STEP _6j NTS PLAN G ELEVATION POINT ON PROFILE 5� CONSTRUCTED RIFFLE 6 NTS A' MIX OF NCDOT CLASS B AND 1 STONE 18" MIN. SECTION A -A' SCARIFY SUBGRADE PRIOR TO STONE PLACEMENT w U z W DESCRIPTION m 0 REVISIONS „ uIh,i,,,,,, 10� i Z ›- 0 Z rz W ix0 aa0 0 c)a0Z Z m > W = Q z a 0 0 < Q DATE: FEB. 2023 SCALE: AS SHOWN TYPICAL SECTIONS & STRUCTURES SHEET 6 OF 8 0 RIPARIAN SEED MIX -APPLIED TO STREAM BANKS AND BUFFERS Seeding Rate = 20 lb/acre Mulchingwheat or oat straw mulch applied at 2 tons/acre Common Name Scientific Name Percentage Indiangrass Sorghastrum nutans 20 Big Bluestem Andropogon gerardi 20 Virginia Wildrye Elymus virginicus 20 Soft Rush Juncus effusus 20 Beaked Panicgrass Panicum anceps 10 Fox Sedge Carex vulpinoidea 10 DISTURBED FIELD AREAS BEYOND BUFFERS: Tall Fescue Mix at 25 lb/acre Mulched at same rate as other areas TEMPORARY SEED MIX Application Dates Common Name Scientific Name Rate (lb/acre) Applied Separately Rate (lb/acre) Applied w/ Riparian Mix August 15 to May 1 Rye Grain Secale cereale 120 60 May 1 to August 15 Browntop Millet Panicum ramosum 40 20 SEED MIXES AND BUFFER PLANTING BUFFER PLANTING (BARE ROOT OR 1 GAL) COMMON NAME SCIENTIFIC NAME SPACING (FEET) Virginia sweetspire Itea virginica 8-12 Spicebush Lindera benzoin 8-12 Tag Alder Alnus serrulata 8-12 Ninebark Physocarpus opulifolius 8-12 Witch -hazel Hamamelis virginiana 8-12 Sweet pepper bush Clethra alnifolia 4-6 Yellowroot Xanthorhiza simplicissima 4-6 111-I 1 1=III: MIN. 2 NODES ABOVE GRADE LIVE STAKE 3' IN DIAMOND PATTERN HARD SOIL OR STONE MAY BE PRESENT SEE NOTE 1 2' TO FIRST ROW BASEFLOW W.S. 111=► =1 I I-1 11-1 11-1 =1 III—III- 1I�IIII�II11-1IIffiIIII�,III='' —, 3 NODES MIN. SECTION 2� LIVE STAKING NTS 18" MIN. TOP CUT AT 15° AFTER INSTALLATION 1/2" TO 2" BASE CUT AT 45 DEG. LIVE STAKE DETAIL LIVE STAKE NOTES: 1. FORM PILOT HOLE THROUGH HARD SOIL OR STONE TO PREVENT DAMAGE TO STAKE. 2. LIVE STAKE MIX TO INCLUDE AT LEAST TWO OF THE FOLLOWING SPECIES: SILKY DOGWOOD, SILKY WILLOW, ELDERBERRY, NINEBARK, BUTTONBUSH. 3. LIVE STAKING SHALL BE DONE DURING THE DORMANT SEASON. MATTING SHALL BE 780 G/M2 COIR REMOVE ALL DEBRIS, SCARIFY SURFACE, PLACE TOPSOIL AND SEED/MULCH BEFORE PLACING MATTING MATTING PLACED FLUSH WITH BANK SURFACE, LAP OVER DOWN STREAM / DOWN SLOPE SEAMS 12" WOOD STAKE PLACED IN 3' O.C. DIAMOND PATTERN MATTING ANCHORED 1' BELOW STREAM BED EROSION CONTROL MATTING NTS STEEL T-POST FILTER FABRIC WITH WIRE BACKING COMPACTED BACKFILL PRELIMINARY PLANS NOT FOR CONSTRUCTION RUNOFF „ CREEK SIDE IIII 24" MIN. SECTION SILT FENCE NTS 8' MAX. STEEL T-POST 18" MIN. II FILTER FABRIC WITH WIRE BACKING PROFILE INSTALLATION AND MAINTENANCE NOTES: 1. SILT FENCE SHALL BE PLACED ON STREAM SIDE OF ALL STOCKPILES. 2. SILT FENCE SHALL BE REMOVED UPON COMPLETION OF EARTHWORK. 3. REMOVE ACCUMULATED SEDIMENT BEFORE HALF OF THE SILT FENCE CAPACITY IS REACHED. w Q DESCRIPTION m 0 REVISIONS E 0 U a? to a) n3 a) 0 0 0 z 0 J rn J w U z O Z W • 0 a0 OEQ c)a0Z • Z m > W = Q z a 0 0 < Q F— DATE: FEB. 2023 SCALE: AS SHOWN E&S AND PLANTING DETAILS SHEET 7 OF 8 COFFER DAM; JERSEY BARRIERS OR SIMILAR PRELIMINARY PLANS NOT FOR CONSTRUCTION DEWATERING PUMP MIN. 6'X6' SILT BAG ON AS NEEDED STONE PAD OR PALLET A WORK AREA* TOE OF BANK (TYP) TOP OF BANK (TYP) VARIES DIVERSION PUMP SIZED FOR BASE FLOW + 30% PROTECT EXIST. BANK VEGETATION --) c FOR ADD'L FILTER DISCHARGE TO STABLE STREAM BED AREA *NOTE: WORK AREA SHALL BE STABILIZED BY THE END OF EACH WORK DAY. PUMP -AROUND INSTALLATION AND MAINTENANCE NOTES: 1. WORKING FROM THE TOP OF BANK, INSTALL COFFER DAMS, DIVERSION PUMP, AND SUCTION AND DISCHARGE HOSES. RUN THE DIVERSION PUMP AND INSPECT WORK AREA FOR COFFER DAM LEAKS. 2. INSTALL DEWATERING PUMP AND SILT BAG ONLY IF WATER IS ENTERING THE WORK AREA. 3. PUMP -AROUND SYSTEM SHALL NOT BE LEFT UNATTENDED FOR ANY LENGTH OF TIME DURING OPERATIONS. 4. PRIOR TO DAILY DISMANTLING OF THE PUMP -AROUND SYSTEM, STABILIZE THE STREAM BANKS AND BED WITHIN THE WORK AREA WITH SEED, MULCH, EROSION CONTROL MATTING AND IN -STREAM STRUCTURES. 5. REMOVE ACCUMULATED SEDIMENT FROM UPSTREAM SIDE OF DOWNSTREAM COFFER DAM AND ANY LOOSE SOIL FROM WITHIN THE WORK AREA. 6. REMOVE DEWATERING PUMP (IF USED). 7. PUMP -AROUND SHALL BE DISMANTLED AND DISTURBED AREAS PROTECTED WITH HDPE SHEETING OR EROSION CONTROL MATTING IN ADVANCE OF ANY RAIN EVENT THAT WOULD CAUSE STREAM FLOW TO EXCEED THE FLOW CAPACITY OF THE SYSTEM. 1 PUMP -AROUND SCHEMATIC 8 NTS w 0 DESCRIPTION 0 REVISIONS E 0 U 0) c 0 co 0 1 U 0 z U_ J J w U z Z >- 0 O z • W af2LQ O O a U Z Z J W = < Z Q U U < Q DATE: FEB. 2023 SCALE: AS SHOWN PUMP -AROUND DETAIL SHEET 8 OF 8