Loading...
HomeMy WebLinkAbout20221790 Ver 1_revised impacts table_20230123C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Buffers ❑ Open Waters ❑ Pond Construction X Wetlands X Streams — tributaries 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Excavation Unknown No DWQ 0.04 W2 T Excavation Unknown No DWQ 0.2 W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 0.24 2h. Comments: Permanent wetland impacts are based on an assumed average stream bed width of 3.5 feet multiplied by 418 LF. A previously permitted 20 LF wetland impact for a road culvert is included in this impact area. Temporary wetland impacts for construction of the restored stream are estimated to be 20 feet wide and 418 LF. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Stabilization UT to Thompson River PER DWQ 8 212 S2 - Choose one - - S3 - Choose one - - S4 - Choose one - - S5 - Choose one - - S6 - Choose one - - 3h. Total stream and tributary impacts 212 3i. Comments: Total proposed stream restoration length is 630 LF; stream impacts are reduced by the 418 LF of stream bed to be constructed within an existing wetland. Page 4 of 10 PCN Form — Version 1.4 January 2009