Loading...
HomeMy WebLinkAboutNC0060755_Authorization to Construct_19980612State of North Carolina Department of Environment T and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director NCDENR June 12, 1998 Mr. Carl Daniel, Vice President Carolina Water Service, Inc of NC Post Office Drawer 240908 Charlotte, North Carolina 28224 Dear Mr. Daniel: Subject: Permit No. NCO060755 Authorization to Construct Project No. ACA060755 Saddlewood Subdivision Gaston County The Division received a letter of request for an Authorization to Construct April 1, 1998 and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of facilities at the Saddlewood Subdivision WWT`P with discharge into an unnamed tributary to Crowders Creek in the Catawba River Basin. Specifically, authorization is granted for the construction of- • a new chlorination unit, • a dechlorination unit, • a fine bubble diffuser in the dechlorination tank, and 0' all associated piping, controls, and appurtenances. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NCO060755 issued July 7, 1997, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NCO060755. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143- 215.1 and in a manner approved by the North Carolina Division of Water Quality. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action,. including those as may be required by this. Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Mooresville Regional Office, telephone number (704) 663-1699, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, acertification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the NPDES Unit, P.O. Box 29535, Raleigh, NC 27626-0535. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083/FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Permit No. NCO060755 Authorization to Construct Saddlewood Subdivision June 12, 1998 Page 2 Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8A, .0202. The ORC of the facility must visit each Class I facility at least weekly and each Class 11, 111, and IV facility at least daily, excluding weekends and holidays, and must properly manage and document daily operation and maintenance of the facility and must comply with all other conditions of Title 15A, Chapter 8A, .0202. Once the facility is classified, the Permittee must submit a letter to the Certification Commission which designates the operator in responsible charge within thirty days after the wastewater treatment facilities are 50% complete. A copy of the approved plans and specifications shall be maintained on file by the Permitteefor the life of the facility. The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143-215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complyingwith any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Ms. Mary Cabe, telephone number (919) 733-5083, extension 518. Sincerely, Preston Howard, Jr., P.E. cc: Central Files NPDES Unit, Permit File Mooresville Regional Office, Water Quality Technical Assistance and Certification Unit Mr. Herbert R. Moore, PE Moore Engineering Associates 313 North Main Street, Suite 200 Monroe, North Carolina 28112 To NOu4 lot", POINT SoUj�CE BRAIVC/q SOC PRIORITY PROJECT: Yes--- No_X_ Permits and Engineering Unit Water Quality Section Attention: Phyllis Cameron Date: May 1, 1998 AUTHORIZATION TO CONSTRUCT NPDES PERMIT REPORT AND RECOMMENDATIONS County: Gaston Permit No. ACA060755 MRO No. 98-030 PART I - GENERAL INFORMATION ICS-01 a L�n wa D MAY U 1 10L POINT SOURCE BRANCH NRecev'ej) fo "t f.. '- MAY 04 1998 By 1. Facility and Address: Saddlewood Subdivision WWTP Carolina Water Service, Inc. Post Office Drawer 240908 Charlotte, North Carolina 29224 2. Date of On -Site Investigation (if conducted): March 26, 1996 3. Report Prepared By: G. T. Chen 4. Persons Contacted and Telephone Number: Mr. Mike Davis, ORC, (704) 525-7990 (contacted on last investigation). 5. Verified Discharge Point(s). List for all discharge points: Latitude: 350 101 4211 Longitude: 810 101 5911 Attach a U.S.G.S. map extract and indicate treatment facility site and discharge point on map. Ensure discharge point(s) correspond to NPDES permitted discharge points. USGS Quad No.: G 14 NW USGS Quad Name: Gaston South, NCISC 6. Site size and expansion area consistent with application? Yes. 7. Topography (relationship to flood plain included): Plant is located on a small flat area near a stream; surrounding land is moderately sloping. Plant does not appear to be in a flood plain. 8. Location of nearest dwelling: Approximately 600 feet. PART II - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS 1. Existing treatment facility a. What is the current permitted capacity of the facility? 0.009 MGD. b. Date(s) and construction activities allowed by previous Authorizations to Construct issued in the previous two (2) years: None. c What is the actual treatment capacity of the current facility (design volume)? 0.009 MGD. d. Please provide a description of existing or substantially constructed wastewater treatment facilities: Existing facility is a 9,000 gpd extended aeration package plant consisting of a bar screen, aeration basin, clarifier, aerated sludge holding tank, tablet chlorinator with contact chamber and a 190 gallon post aeration tank. 2. Please provide a description of proposed wastewater treatment facilities: The proposed construction project will include partitioning of the existing chlorine contact chamber and installation of a new chlorinator and a new de -chlorinator. 3. Residuals handling and utilization/disposal scheme: a. If residuals are being land applied, please specify DWQ Permit No.: N/A. Residual Contractor: N/A. Telephone No.: N/A. b. Residuals stabilization: PSRP: N/A. PFRP: N/A. Other: N/A. C. Landfill: N/A. Authorization to Construct Staff Report Version 10192 Page 2 d. other disposal/utilization scheme (specify): Sludge is removed and transported by Liquid Wastes, Inc. to a CMUD facility for final disposal. 4. Treatment plant classification (attach completed rating sheet): Class II, see attached rating sheet. 5. SIC Code(s): 4952 Wastewater Code(s): Primary: 05 Secondary: Main Treatment Unit Code: 06007 6. Important SOC, JOC or Compliance Schedule dates: (please indicate) N/A. PART III - EVALUATION AND RECOMMENDATIONS Pending final review and approval by the SERG, it is recommended that an Authorization to Construct be issued to the applicant as requested. Please note, no aeration device is allowed in the chlorination unit. �;� 6-'Z� Signature Vf Report Preparer (7) Water Quality Date ional Supervisor Authorization to Construct Staff Report Version 10192 Page 3 NCO060755 Saddlewood Subdivision Gaston County 4/1/98 Received ATC request for the addition of dechlorination. Package acknowledged and SR requested. 5/4 SR received. GT Chen, MRO, recommends issuance. Facility wants to move the baffle in the existing chlorine contact chamber (volume will be increased), install new chlorinator and dechlorinator units, and improve post aeration. Chlorinator and dechlorinator — Eltech Model A200 or 1000 or equal. New diffuser in the dechlorination tank. Wilfley Weber fine bubble diffuser, capacity = 7 efin. Existing diffusers in the expanded chlorination tank will be removed. "Dispose of water according to DENR directions." - Item III. C. I of plans. Engineer, Herbert Moore, says that the contractor will talk with the RO prior to disposing of water. 5/28 Prepared package for issue 6/12/98. To DAG for review.