Loading...
HomeMy WebLinkAbout20120285_003_PC_DEISGaston_ChPC_ProjectCommits_20101222   APRIL 2009 GASTON EAST-WEST CONNECTOR DEIS PC-1 SPECIAL PROJECT COMMITMENTS During the National Environmental Policy Act (NEPA) process, commitments are made to avoid, minimize, or mitigate project impacts. Commitments result from public comment or through the requirements of, or agreements with, environmental resource and regulatory agencies. In addition to compliance with applicable federal and state requirements and regulations, such as; Section 404 Individual Permit Conditions, Nationwide Permit Conditions, Regional Conditions, and State Consistency Conditions; North Carolina Department of Transportation (NCDOT) Guidelines for Best Management Practices for the Protection of Surface Waters, General Certification Conditions, and Section 401 Conditions of Certification; and the Endangered Species Act. Table PC-1 lists special project commitments that have been agreed to by the North Carolina Turnpike Authority (NCTA). TABLE PC-1: Special Commitments and Coordination Required after the DEIS  Item Resource DEIS  Section  Applicable  DSAs Project Commitment Project Stage  1 Community  Resources 3.2.6.1 All DSAs NCTA will coordinate with Gaston County  Schools to share information and aid in  planning for new school sites, as well as to  minimize impacts to school bus routes.   Final Design  through  Construction  Management  2 Community  Resources 3.2.6.1 DSA 58, 64,  68  NCTA will coordinate with the Crowders  Mountain Volunteer Fire Department on  Bethany Road (SR 1112) to ensure the designs  would not impact operations, and to ensure  continuation of services during construction.  Final Design  through  Construction  Management  3 Community  Resources   and  Section 4(f)  Resources 3.2.6.1  and  5.4.3 All DSAs NCTA will coordinate with Mecklenburg  County Park and Recreation Department to  ensure that the Preferred Alternative’s right of  way and construction limits within the  Berewick District Park boundaries are  minimized as necessary to ensure that  significant activities, features, and attributes of  the proposed park are not adversely affected.    Final Design  through  Construction  Management  4 Community  Resources 3.2.6.1 4, 9, 22, 27,  58, 76, 81  NCTA will investigate measures to avoid or  further minimize impacts to the Duke Energy  Corporation’s recreational fields located on  Boat Club Road (SR 2528).  Final Design  5 Community  Resources 3.2.6.1 All DSAs NCTA will coordinate with the Gaston Urban  Area Metropolitan Planning Organization and  the Catawba Lands Conservancy to identify  needed accommodations for any existing and  funded greenways that cross the Preferred  Alternative  3.2.6.1 6 Noise 4.1.6 All DSAs A Design Noise Study will be prepared for the  Preferred Alternative to update the noise  analysis based upon updated traffic forecasts  and the final design.  Final Design  This “GREEN SHEET” identifies the special project commitments made to avoid, minimize, or mitigate project impacts  beyond those required to comply with applicable federal and state requirements and regulations.  SPECIAL PROJECT COMMITMENTS Chapter PC APRIL 2009 GASTON EAST-WEST CONNECTOR DEIS PC-2 TABLE PC-1: Special Commitments and Coordination Required after the DEIS  Item Resource DEIS  Section  Applicable  DSAs Project Commitment Project Stage  7 Air Quality 4.2.5.1 All DSAs NCTA will coordinate with Gaston Area Urban  MPO and the Mecklenburg‐Union MPO to  ensure the air quality conformity  determination for the region includes the  project’s design concept and scope consistent  with the Preferred Alternative.  Planning –  prior to  Record of  Decision  8 Utilities and  Infrastructure  – Railroads  4.4.2 4, 5, 9, 22,  23, 27  NCTA will coordinate with the NCDOT Rail  Division and Norfolk Southern during final  design for the project’s interchange at I‐85,  which would affect the east‐west rail mainline  through Gaston County.  Final Design  9 Utilities and  Infrastructure  – Railroads  4.4.2 4, 9, 22, 27,  58, 68, 76,  81  NCTA will coordinate with the NCDOT Rail  Division and Norfolk Southern during final  design of the crossing of the rail spur that  serves Duke Energy Corporation’s Allen Steam  Station.    Final Design  10 Utilities and  Infrastructure  – Railroads  4.4.2 All  DSAs NCTA will coordinate with the NCDOT Rail  Division and Norfolk Southern during final  design for the project’s interchange at US 321,  which would affect the Norfolk Southern  branch line that runs north‐south parallel to  the east side of US 321.  Final Design  11 Hazardous  Materials  4.6.3 All DSAs When the final proposed alignment is  established and right of way limits are  determined, a hazardous materials site  assessment will be performed to the degree  necessary to determine levels of  contamination at any potential hazardous  materials sites along the Preferred Alternative.  The assessment will be made prior to right‐of‐ way acquisition.    Final Design  and ROW  Acquisition  12 Historic  Architectural  Resources  5.2.2 58, 64, 68,  76, 77, 81  NCTA will incorporate measures into the  designs to minimize the construction footprint  on the Wolfe Family Dairy Farm site and  visually screen the project from the site.    Final Design  13 Historic  Architectural  Resources  5.2.2 64, 68 NCTA will ensure that full access is maintained  to the William Clarence Wilson House.  Final Design  14 Historic  Architectural  Resources  5.2.2 5, 9, 23, 27,  77, 81  NCTA will ensure that there is no taking of  property, either by fee simple or permanent  easement, from the JBF Riddle House.  Final Design  15 Historic  Architectural  Resources  5.2.2 5, 9, 23, 27,  64, 68, 77,  81  NCTA will ensure that full access is maintained  to the Harrison Family Dairy Farm.  Final Design  16 Historic  Architectural  Resources  5.2.2 4, 22, 58, 76 NCTA will avoid a drainage encroachment,  either by fee simple or permanent easement,  into the southeast corner of the Thomas  Allison House site.  Final Design  17 Archaeological  Resources  5.3.3 9, 27, 68, 81 NCTA will conduct additional assessments of  the Stowe Mill site, with an emphasis on  archival research, as recommended by the  Office of State Archaeology.  Final Design  SPECIAL PROJECT COMMITMENTS Chapter PC APRIL 2009 GASTON EAST-WEST CONNECTOR DEIS PC-3 TABLE PC-1: Special Commitments and Coordination Required after the DEIS  Item Resource DEIS  Section  Applicable  DSAs Project Commitment Project Stage  18 Archaeological  Resources  5.3.3 All DSAs NCTA will conduct an archaeological survey of  the Preferred Alternative corridor.  The results  of the survey will be presented in a report  transmitted to the HPO and OSA and  summarized in the FEIS.   Final Design  19 Archaeological  Resources  5.3.3 All DSAs Geotechnical studies and surveys conducted  by NCTA will include identification of  abandoned mines in the area.  Final Design  through  Construction  Management  20 Water  Resources  6.2.4 All DSAs NCTA will coordinate with Duke Energy  Corporation to obtain the necessary FERC  permit.  The process is expected to result in a  FERC license revision to allow the transfer of  land within the FERC project boundary to NCTA  to construct the Gaston East‐West Connector  including the bridges over Lake Wylie.  Final Design  21 Wildlife 6.3.6.2 All DSAs NCTA will coordinate with the US Fish and  Wildlife Service, US Environmental Protection  Agency, and the NC Wildlife Resources  Commission on the feasibility and the design  of a wildlife passage at Stream S156.  Stream  S156 is located between Forbes Road to the  west and Robinson Road to the east.   Final Design