Loading...
HomeMy WebLinkAbout20120285_1_Vol1Cover&Abstract_20101222Gaston East-West Connector Administrative Action Draft Env ironmental Impact Statement April 2009 Gaston East-West Connector Administrative Action Draft Env ironmental Impact Statement April 2009 Gaston East-West Connector Administrative Action Draft Env ironmental Impact Statement April 2009 Gaston East-West Connector Administrative Action Draft Env ironmental Impact Statement April 2009 Gaston East-West Connector Administrative Action Draft Env ironmental Impact Statement April 2009 Gaston East-West Connector Administrative Action Draft Env ironmental Impact Statement April 2009 Gaston East-West Connector Administrative Action Draft Env ironmental Impact Statement April 2009 Submitted Pursuant to the National Environmental Policy Act 23 CFR 771.119 and 42 USC 4332(2)(c) Lead Agencies: US Department of Transportation Federal Highway Administration North Carolina Turnpike Authority North Carolina Department of Transportation Cooperating Agency: US Army Corps of Engineers Volume 1 Text and Figures DEISnewcoverGastonVol1.pdf 4/23/2009 2:15:03 PM Gaston East-West Connector Gaston and Mecklenburg Counties, North Carolina Federal Aid Project Number STP-1213(6) STIP Project U-3321 ABSTRACT The proposed action is the construction of a controlled-access toll road extending from I-85 west of Gastonia in Gaston County to I-485 in Mecklenburg County, a distance of approximately 22 miles. This report documents the need for transportation improvements within southern Gaston County and between southern Gaston County and western Mecklenburg County. This report describes the planning process, including public and agency coordination, leading to the selection of the Detailed Study Alternatives. Twelve Detailed Study Alternatives are being considered. A Recommended Alternative is identified. Existing and projected conditions in the project study area are described. The potential direct, indirect, and cumulative impacts of the Detailed Study Alternatives are assessed, including socioeconomics, community resources, cultural resources, natural resources, environmental quality, and costs. Comments on the Draft EIS are due by _____July 17, 2009_______ and should be sent to the NCTA at the contact below. Requests for project documentation may also be directed to the NCTA at the contact below. North Carolina Turnpike Authority (NCTA) Ms. Jennifer Harris, PE 5400 Glenwood Avenue, Suite 400 Raleigh, NC 27612 Email: gaston@ncturnpike.org Phone: 919-571-3000 DEISAbstractBackOfCover.pdf 4/23/2009 2:34:29 PM