HomeMy WebLinkAboutNCG020167_Dormant Status Approval from ARO_20230223ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
DOUGLAS R. ANSEL
Interim Director
NORTH CAROLINA
Environmental Quality
February 23, 2023
O1dCastle Materials Inc., BDA APAC - Atlantic
Attn: Don Mason, Environmental Compliance
P.O. Box 444
Franklin, NC 28744
SUBJECT: Exemption from Monitoring During Dormant Status
Certificate of Coverage #NCG020167
Oldcastle Materials Inc. - Fletcher Quarry
Henderson County
Dear Mr. Mason:
A Compliance Evaluation Inspection performed at the Fletcher Quarry on June 16, 2022, by
personnel from this office verified that no industrial activity was taking place at the time of the
inspection. Your recent request to keep the NCG020167 permit, but to discontinue stormwater
monitoring is hereby approved based on the following conditions:
There shall be no industrial activities taking place, no stockpiles of raw materials (to
include chemical additives) stored on the site, or wastewater or stormwater industrial
discharges while the permittee is not monitoring.
No wastewater shall be generated and all wastewater treatment units, if any, shall be
cleaned and stabilized, and inactivated as to render them harmless to the environment
while the site is dormant.
Qualitative and analytical monitoring actions as described in Part III, Sections A, B, C,
D, and E do not have to be conducted — as long as the above conditions and all other
permit conditions and limitations are met, including:
o The annual permit fee must be paid. Failure to pay the annual permit fee will
be considered a violation of the subiect permit.
o The Stormwater Pollution Prevention Plan (SPPP) shall be kept updated to reflect
the status of the facility. Updates and conditions of the SPPP of note are:
The BMP Summary shall be reviewed and updated annually.
Training programs shall be developed, and training provided at least once a
year for facility personnel with responsibilities for: spill response and cleanup,
preventative maintenance activities, and for any of the facility's operations that
have the potential to contaminate stormwater runoff.
All aspects of the Stormwater Pollution Prevention Plan shall be reviewed and
updated on an annual basis. The annual update shall include an updated list of
significant spills or leaks of pollutants for the previous three years, or the
D_E North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
noa*� cw4a nac
�e.M.an r�w�meooi wam 828.298.4500
notation that no spills have occurred. The annual update shall include written
recertification that the stormwater outfalls have been evaluated for the presence
of non-stormwater discharges. (Should non-stormwater discharges be
discovered the permittee shall contact this office as soon as possible but in no
case greater than 24 hours or the next business day).
Inspections of the facility and all stormwater systems shall occur as part of the
Preventative Maintenance and Good Housekeeping Program at a minimum on
a semi-annual schedule.
• This office must be notified in writing and all components of the stormwater
permit requiring updates made at least 30 days prior to commencing any
industrial activity on the site, even if they are temporary.
• A copy of this letter must be maintained with the facility permit and associated
plans and records for the life of the permit.
Should you have any questions, please contact Shawna Riddle at (919) 302-5311 or me at 828-
296-4500.
Sincerely,
Stanley E. Aiken, PE
Regional Engineer
Land Quality Section
Enclosure: Inspection Report
ec: Bethany Georgoulias, Environmental Engineer, (bethany.geor og uliasgncdenr.gov)
D_I Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
oam c
ano�mm c,.n��mo.•im 828296.4500
Compliance Inspection Report
Permit: NCG020167 Effective: 07/01/21 Expiration: 06/30/25 Owner: Oldcastle Materials
SOC: Effective: Expiration: Facility: Oldcastle Materials
County: Henderson 639 Fanning Bridge Rd
Region: Asheville
Fletcher NC 28732
Contact Person: Donna Allison Title: Phone: 828-684-6701
Directions to Facility:
System Classifications: SWNC,
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 06/16/2022
Primary Inspector: Shawna Riddle
Secondary Inspector(s):
Certification:
Phone:
Entry Time 11:15AM Exit Time: 12:OOPM
Phone: 919-302-5311
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Mining Activities Stormwater Discharge COC
Facility Status: 0 Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG020167 Owner- Facility: Oldcastle Materials
Inspection Date: 06/16/2022 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Met with Don Mason for the inspection. Mine is not active and in compliance. Suggested mine request dormancy status
based on this inspection.
Page 2 of 3
Permit: NCG020167 Owner- Facility: Oldcastle Materials
Inspection Date: 06/16/2022 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
E ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
0 ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices'?
E ❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
N ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
E ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0 ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0 ❑ ❑ ❑
# Does the Plan include a BMP summary?
0 ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
E ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
N ❑ ❑ ❑
# Does the facility provide and document Employee Training?
0 ❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
0 ❑ ❑ ❑
# Is the Plan reviewed and updated annually?
E ❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
0 ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
N ❑ ❑ ❑
Comment
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring? E ❑ ❑ ❑
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? N ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑
Comment:
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? E ❑ ❑ ❑
# Were all outfalls observed during the inspection? N ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ E ❑
# Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑
Comment:
Page 3 of 3