HomeMy WebLinkAboutSW1221002_Plansheet CL101A1.P2 - Proposed Conditions/Site Plan_20230223 m�� o UGr o LEGEND
Z ^ �h GT I
U��Q��N PROPERTY LINE
STORM STRUCTURE TO
EXISTING UTILITY DEMOLITION
-- — — — UGT _ GC BE REMOVED (TYP.) .^� CO
EXISTING BUILDING DEMOLITION Gresham Smith
// SHOWN FOR REFERENCE ONLY
— — — STOP SIGN TO REMAIN v, // / //
Nh � °
N
/ \ _ 0- u, N / I // /°/ U C) Q EXISTING PAVEMENT DEMOLITION
GS-NC P.C.
An Affiliate of Gresham Smith
EXISTING CONCRETE DEMOLITION
!✓ GF I �� �� I � �/ �/ � N CD<n
4U �' + + + + + +
.4N +++++++++++++ EXISTING STRIPING DEMOLITION
MISCELLANEOUS DEMOLITION 201 South College St.
�\
4 a W �� Suite 1950
X Charlotte, NC 28244
° W ° W EXISTING TREE DEMOLITION 704.944.7970
W W NOTES:
I �\
1. ALL EXISTING LANDSCAPING TO REMAIN
STORM PIPE TO BE REMOVED (TYP.) \ Q^CNN \ \ I� I UNLESS OTHERWISE NOTED.
/ �o�" Z \ I I§ \\ 2. SEE SITE ELECTRICAL PLANS FOR ALL POWER
z AND COMM. DEMOLITION AND RELOCATION.
3. ALL INTIAL E&SC MEASURES SHALL BE IN PLACE
PRIOR TO CONSTRUCTION.
SEE SITE ELECTRICAL / ` \• \\ �0I
Q W \� I \\ 4. SITE SIGNAGE TO BE SALVAGED AND
PLANS FOR ALL POWER / \
AND COMM. DEMOLITION 3 // `\ km
h� o`' = 1\\ \ �I°II `�
RETURNED TO OWNER
AND RELOCATION (TYP.) / \ m0 . Z
5. PROJECT IS TO BE COMPLETED IN MULTIPLE
\ \ z �o(b�� N \\ _ �cQ 4 �Ilol \\ PHASES. PROJECT IS TO ALWAYS MAINTAIN
/ ON ^�'boo Q \\ � N��;, � I�it ``
VEHICLE ACCESS TO PUBLIC SAFETY BUILDING
\ ov \ �. . " \° \\ AND SIDEWALK FROM PUBLIC SAFETY BUILDING Gresham
4 6 \ \\ TO TERMINAL. COORDINATE WITH
/ ��� \ z \ \\ N^ \° \ CONTRACTOR PHASING DRAWINGS. Smith
� 6. CONTRACTOR SHALL ENSURE ALL PROPOSED
b\ \\ PIPE CONNECTIONS ARE TIED INTO THE
\�°\ —— \\ —Foc———— EACH EXISTING INFRASTRUCTURE
AND PRIOR TO ANY RAIN E END EVENOF
T.
� \ OC-- —FOC---
ASPHALT PAVEMENT TO BE REMOVED (TYP.) \ \\ , \\\ Z Z \ O\ ® \ ——Foc__———Foc— FOC
x ® \\ \
\�o \ C)C)
PROJECT BOUNDARY \ / \\ I¢ STORM PIPE TO BE REMOVED (TYP.) �\°\
s eville
`\� REG IONAL AIRPORT
U
\�0
0 c � � �� Asheville Regional
\�° N Airport
X o m �
/ ° (20) \`\ PROJECT BOUNDARY \\\ \\ z���. Terminal
S" ° ° \ Modernization
3 ° \
UGT � \ \\\ \\\ \\
61 Terminal Drive Suite 1
CURB AND GUTTER TO BE REMOVED (TYP.) I / I
�\ \\ Gc � Fletcher, North Carolina 28732
02/16/2022
CONCRETE SIDEWALK / I I Z. .^� h �� \ GS Project#: 43483.02
ID
TO BE REMOVED (TYP.) a? O
�z Q a, ICl J O�• h NN R
Q N ^ Q UUQ
of °
/// II I coco °coJ iv _ "Z ° QO
"
—
c �`/ �I _=�Z���\:'��\� •CII IA•IIROUw) �
"
O / Q ^ " S S
Ux " O �
cnQ SEAL
m � O
STORM STRUCTURE TO BE REMOVED (TYP.) Q � N 053149
10/�2
•�/:/�4���/ii2
�
zU N _
Op > > > -- - _ CQ o
z -U � zzz wp USIGNREMOVAL (TYP.) Z� _ _ ________ � 9 FN �� ••�\
UG
/
\�\ ° ~ EXISTING UNDERGROUND DETENTION GGF =
� / SYSTEM AND CORRELATING MANHOLES TO
o / a \ / x \\ \\ \ \ BE MAINTAINED THROUGH CONSTRUCTION ¢ _ �� @ ° NATHAN HUDGENS, E
UGE X \ \ \� \ ° \ - �� �\`` -
N — NC 053149
N ��� \ \ \\ -__-
O / \ / / \ \ \\ \ \ ° — REVISION
N —x x \ �'�\ I SANITARY SEWER PIPE TO BE NO. DATE DESCRIPTION
\ 3 / \\ � GAS LINE TO BE ABANDONED IN PLACE
\ � + \ / %\ \\ �\ \ I REMOVED FOR SLOPE ADJUSTMENT 1 02/16/22 ISSUE FOR CONSTRUCTION
� GAS LINE TO BE REMOVED
\ 2 03/09/22 ADDENDUM 02
,o \ _ _ Q M •ry / \ \ \
p ASPHALT PAVEMENT \ \ / 15,
POST CURB TO BE 3 05/02/22 AGENCY COMMENTS
� TO BE REMOVED (TYP.) •\ I � � \ / ` ./' '—
� , II REMOVED (TYP.)\ •\• •�• •— — — •_•�,_,..�_ .—, 4 10/24/22 AS1006
I II UGE --- — / —S
\ j � /x/ \ —sue s---- —s— �' s � J SIGN TO BE
21
-6 m m ° WATER METER AND VALVE \ / / / / / O � \ °rn 4
• II REMOVED
TO BE RELOCATED TO `� \l ° \ x •—•—• x�—«—x sde S e ��. sV s ,
NORTH SIDE OF WATER LINE �I / / / / / / / / / / \ \ FIRE YDRAN
BE REMOVED
,
p ° // CONTRACTOR TO PLUG TEE AND / / / / / / / / / c� z _z"
O REMOVE VALVE ON WATERLINE +I
STORM PIPE TO BE REMOVED (TYP.) LIMITS OF WORK PACKAGE 1 DEMOLITION _ — —_— —�c - x-
11 , j = N M GAS LINE TO BE REMOVED CONCRETE SIDEWALK — —
Q) //�ml� z N I I' ° == z rn a a TO BE REMOVED (TYP.) x
(� / II _ _M "t ofI v C,� = N GAS LINE TO BE ABANDONED IN PLACE + x x x x
J / I U N N CN 0-1 c- c- U
Oo / Q aO z z z �w U O o CONTRACTOR TO FIELD VERIFY
WATER LINE TO BE
U ~ — — I z � � � LOCATION OF FIRE HYDRANT BEFORE x II REMOVED (TYP.)
Lu N RECONNECTING TO 8" WATER LINE
o z z Lu ASPHALT PAVEMENT TO BE REMOVED (TYP.) II
W I co M> I I
> � ih � °5 °5
Z z w N m c`•) I 20' 0 20' 40'
z N z LIMITS OF WORK PACKAGE 1 DEMOLITION I I 1
I' I O o- ` w 3on GRAPHIC SCALE
� Oz
M " DEMO PLAN
°p MAILBOX TO BE RELOCATED KEYPLAN
1*
LANDSCAPING TO BE — — x —
O
REMOVED (TYP.) ! I
O
GAZEBO TO BE SALVAGED AND RETURNED TO OWNER
CL101A1 . P2
_0
DEMOLITION PLAN 1 -
Al
O
SCALE: 1"=20'
CONSTRUCTION DOCUMENTS
I