HomeMy WebLinkAboutSW1221002_Plansheet CL501B2.P2 - Other_20230223 zzz
LEGEND
PROPERTY LINE
BUILDING LINE Gresham Smith
W WATER LINE (SIZE VARIES) GS-NC P.C.
W An Affiliate of Gresham Smith
J
o = _ _ _ _ _ = SANITARY SEWER
Z � N ;- N O
Q - CD 00 00
❑ N �M �N �N - - - - - -
M d C STORM SEWER
N
N N N N
ao > > > > UG-E UNDERGROUND ELECTRIC 201 South College St.
c� � zzzz
G NATURAL GAS Suite 1950
Charlotte, NC 28244
— — — — — — — UTILITY EASEMENT 704.944.7970
❑ — — — FIRE DEPARTMENT
— — — CONNECTION (FDC)
-- --------------------- _—_—_—__==—=--- ————— -- ————— FIRE HYDRANT
REDUCER
N WATER VALVE ,
REFER TO AIRSIDE CIVIL PLANS FOR PROPOSED
GRADING AND SURROUNDING IMPROVEMENTS. WATER TEE
(6) 2 PSI GAS METERS. SEE PLUMBING PLANS FOR DETAIL. 4
COORDINATE ALL FINAL PROPOSED DRAWINGS
PRIOR TO CONSTRUCTION. SANITARY ANGLE Gresham
SO ® SANITARY STRUCTURES Smith
OS SANITARY MANHOLE
® SANITARY CLEANOUT
APPROXIMATE GREASE w o � STRUCTURE A4 A5
INTERCEPTOR LOCATION SHOWN J Ch — co o o RIM:195.11 STRUCTURE LABEL /
FOR REFERENCE ONLY. Z
SEE PLUMBING PLANS FOR DETAIL. a N N N N N N
> eville
o0 > > > > >
REG IONAL AIRPORT
Asheville Regional
NOTE: Airport
1. CONTRACTOR TO COORDINATE Terminal
UNDERGROUND UTILITIES TO BE A MINIMUM OF
3 INCHES CLEAR BELOW THE BASE OF THE Modernization
GRADE BEAMS WHEN PASSING UNDERNEATH.
2. NO UTILITY LINES SHALL PENETRATE THE 61 Terminal Drive Suite 1
FOOTING AT THE CENTRAL ENERGY PLANT Fletcher, North Carolina 28732
EXCEPT FUEL LINES.
3. CONTRACTOR TO COORDINATE ALL
UNDERGROUND UTILITY ROUTINGS. UTILITIES 02/16/2022
SHALL BE KEPT A MINIMUM OF 12 INCHES
CLEAR FROM ALL FOUNDATIONS IN PLAN. GS Project#: 43483.02
4. SEE SITE ELECTRICAL PLANS FOR POWER,
COMMUNICATIONS, AND SITE LIGHTING.
REFER TO AIRSIDE CIVIL PLANS FOR
WORK TO BE COMPLETED IN THIS AREA
uNgiii
CARP %/x
PROJECT SEAL
'a
BOUNDARY = 053149 —
• 10/2'4/2f
.—.—.—.— ENE
— —.—.—.—.—.—.—.—.—.—.— —.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.—.— f�IDIIII��Hvo\\N
CY)
N NATHAN HUDGENS, PE
NC 053149
CV
CV
O REVISION
N
NO. DATE DESCRIPTION
1 02/16/22 ISSUE FOR CONSTRUCTION
(U 2 03/28/22 ADDENDUM 03
O 3 05/02/22 AGENCY COMMENTS
4 10/24/22 AS 1 006
N
U_
O
LO
U
CNI
O
CV)
00
1*
co
w
N
N
CL
J
O
O_
Q
U
O
i
20' 0 20' 40'
O
OGRAPHIC SCALE
co UTILITY PLAN
00 KEYPLAN
I
�I Al ' A2 ' A3
CL501 B2 . P2
�0 - - - - -i - - - - - i- - - - -
Q
UTILITY PLAN B1 � B2 � B3
B2
SCALE:
=20'1"
O
CONSTRUCTION DOCUMENTS
I