Loading...
HomeMy WebLinkAboutFW_ _External_ US Army Corps of Engineers Public NoticeWanucha, Dave From: Euliss, Amy Sent: Wednesday, February 22, 2023 7:56 AM To: Wanucha, Dave Subject: FW: [External] US Army Corps of Engineers Public Notice Importance: High From: CESAW-PublicNoticeList <CESAW-PublicNoticeList@usace.army.mil> Sent: Wednesday, February 22, 2023 7:41 AM Subject: [External] US Army Corps of Engineers Public Notice Importance: High CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. As you requested, you are hereby notified that the Wilmington District, United States Corps of Engineers, has issued a Public Notice. The text of this document can be found on the Public Notices portion of the Regulatory Division Home Page. Each Public Notice is available in ADOBE ACROBAT (.pdf) format for viewing, printing or download at: https://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Public-Notices/ The current notice involves: SAW-2018-02113 (NCDOT/R 2577 ABC, US 158 improvements from US 421/1 40B to US 220 Stokesdale) Issue Date: February 21, 2023 Expiration Date: March 21, 2023 Point of Contact: Stephen Brumagin Email: Stephen.A.Brumagin@usace.army.mil Project Description: NCDOT has identified this project as TIP R-2577 A, B & C. Phase A will include construction of a 5.6-mile-long segment of US 158 from its intersection with Old Greensboro Road to its intersection with Belews Creek Road (SR 1965) in Forsyth County (anticipated contract let December 2023). Phase B will include construction of a 7.1-mile-long segment of US 158 from its intersection with Belews Creek Road in Forsyth County to its intersection with Anthony Road (SR 2034) in Guilford County. Phase C will include construction of a 6.1-mile- long segment of US 158 from its intersection with Anthony Road to the junction of US 158 and US 220 (1-73) in Stockdale. Phase C will include construction of new roadway on new alignment that will create a bypass section of existing US 158 through Stockdale. Project sections R-2577B and R-2577C are not due to let within the next 5 years. The proposed project includes the widening of the existing US 158 from a typical cross section of a two-lane highway with 12-foot-wide lanes with 2-foot-wide open shoulders to a typical cross section of US 158 will be a four -lane divided highway with two, 12-foot-wide lanes for each direction and 2.5-foot-wide curb and gutter on the outside lanes. This widening project will utilize either an approximately 30-foot-wide raised grass median with 1.5-foot-high curb and gutter or a depressed 34-foot- wide grass median with two-6-foot-wide shoulder with protected turn lanes constructed within the median at roadway intersections. NCDOT is requesting authorization for the impacts for all three phases of construction to include a total of 1.74 acres of permanent wetland impacts and 8,022 linear feet of permanent stream impact. For Phase A, NCDOT has completed final design and is requesting authorization to include 0.06 acre of permanent impacts to wetlands and 1,633 linear feet of permanent impacts to streams. For Phase B NCDOT has completed preliminary design and this phase will include 2,210 linear feet of stream impacts and 0.32-acre wetland impacts. In addition, for Phase C NCDOT has completed preliminary design and this phase will include 4,179 linear feet of stream impacts and 1.36-acre wetland impacts. Once final design is complete for Phase B and Phase C, NCDOT will be preparing and submitting a permit modification request (with mitigation) for these phases. Subscribe/Unsubscribe: This email was sent out as a result of subscribing to the Wilmington District regulatory program public notices. Please reply to this email with the subject or message "unsubscribe" to remove your address from future mailings. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.