Loading...
HomeMy WebLinkAbout20221135 Ver 2_TriWest Business Center Stormwater Report 2023.02.21_20230224OAK E N G I N E E R I N G STORMWATER MANAGEMENT DESIGN REPORT FOR TRIWEST BUSINESS CENTER DAVIE COUNTY, NORTH CAROLINA io •,�• SEAL • 045345 �. GAF •:cam I N���' ���� 2/21 /2023 OAK ENGINEERING 4929 MONROE RD CHARLOTTE, NC 28205 NC FIRM LICENSE: P-1742 OAK E N G I N E E R I N G TABLE OF CONTENTS I. NARRATIVE INTRODUCTION STORMWATER MANAGEMENT REQUIREMENTS EXISTING SITE CONDITIONS PROPOSED SITE CONDITIONS PROPOSED BMP DESIGN CONCLUSIONS II. MAPS AND FIGURES HYDROCAD MODEL ROUTING DIAGRAM USGS LOCATION MAP DRAINAGE AREA MAPS DAVIE COUNTY RAINFALL DATA SOILS MAP FEMA FIRM MAP III. HYDROCAD MODEL OUTPUT HYDROCAD: 1-INCH STORM EVENT HYDROCAD: IYR-24HR STORM EVENT HYDROCAD: 2YR-24HR STORM EVENT HYDROCAD: 1 OYR-24HR STORM EVENT HYDROCAD: 25YR-24HR STORM EVENT (PONDS ONLY) HYDROCAD: 50YR-24HR STORM (PONDS ONLY) HYDROCAD: 100YR-24HR STORM (PONDS ONLY) OAK E N G I N E E R I N G INTRODUCTION Mocksville Development Partners, LLC is proposing the construction of an industrial park in Davie County, North Carolina. The proposed improvements will include four (4) industrial buildings totaling approximately 1,895,360-sf with trailer parking and vehicular parking spaces. Davie County does not have any stormwater management requirements and the project is not in a designated Phase II area. However, because there are proposed wetland impacts requiring 4011404 permitting, the site is subject to State Stormwater permitting. The stormwater design will be phased with the development of the park. In this initial phase, two (2) wet ponds are proposed to meet the State Stormwater permitting requirements listed below. STORM WATER MANAGEMENT REQUIREMENTS Davie County Stormwater Management Requirements 1. None NCDEQ State Stormwater Management Requirements 1. Must provide 85% reduction (by weight) in the export of total suspended solids (TSS) on an average annual basis. 2. Must provide peak control for the 1 YR-24HR storm event. The NCDEQ Storm water Design Manua/was used as the basis for the water quality BMP design. Two (2) wet detention ponds were used to provide the required treatment for the proposed improvements. EXISTING SITE CONDITIONS The 201.14 acre site is primarily used for agricultural uses. The site has three (3) distinct outfalls that will be studied for pre/post detention. Soils on the site vary but are predominantly Hydrologic Soil Group C soils. See the Maps & Figures section of this report for Drainage Area and Soils Maps. OAK E N G I N E E R I N G PROPOSED SITE CONDITIONS As previously mentioned, the proposed improvements will include four (4) industrial buildings totaling approximately 1,895,360-sf with trailer parking and vehicular parking spaces. Phase 1 improvements will include one building, vehicle parking, a truck court and a public road totaling 615,292-sf of built -upon area. The Phase 1 impervious area will be treated by two wet ponds (Pond #2 and Pond #3). Three (3) outfalls will be studied for pre/post runoff control. PREDEVELOPMENT SUMMARY A. • (flows J CV J M J < < < w > O O O L ° ne ne V 0- 0- 1 " WQ 1 0.08 0.14 0.03 1 yr-24hr 30.23 43.88 10.46 2yr-24hr 47.44 67.67 16.42 10yr-24hr 101.03 140.95 34.97 25yr-24hr 136.02 188.46 47.08 50yr-24hr 165.22 227.99 57.19 100yr-24 h r 195.38 268.73 67.63 POST DEVELOPMENT A'(flows CV M w O O O V) V) V) ° O O O 1 " WQ 1.69 1.00 0.26 1 yr-24hr 19.08 5.57 3.15 2yr-24hr 27.83 8.62 4.37 10yr-24hr 75.87 40.69 9.64 25yr-24hr 106.71 76.54 24.25 50yr-24hr 164.14 101.65 35.56 100yr-24 h r 197.79 127.81 44.16 *PRE/POST QUANTITIES ARE FOR FULL BUILDOUT OF THE PARK OAK E N G I N E E R I N G MAPS & FIGURES HYDROCAD MODEL ROUTING DIAGRAM USGS LOCATION MAP DRAINAGE AREA MAPS DAVIE COUNTY RAINFALL DATA SOILS MAP FEMA FIRM MAP PRE (OUTFALL WEST) 12S POST T POND 1 13P 17S UNDET INED POST TO UTFALL 1 POND 18 POST - OUTFALL #1 PRE (OUTFALL #1) PRE (OUTFALL #2) 6S PRE (OUTFALL #3) 3S 7S 9S POST T POND 2 POST T POND 3 POST T POND 4 A 8P Aop POND 2 PO D 3 POND 4 11P � 19S POST - OUTFALL #2 UNDETAINED POST TO OUTFALL 2 Subcat Reach on Link 14S POST T POND 6 15P POST - OUTFA L #3 20S 7UN ETAINED POST TO OUTFALL 3 21P POST - OUTFALL #3 12 / W eat. ♦ / � IA \ � 1 v o \,/ i / D- % .. ........ IG \ -POND 1 -713 0�7 9 709 7 Y • \\ _ 7 \\ 73 -_- _ _ - 733 _ - --- f ■I // ' /J ./ 6 �I—� 73\ \ \ \ \ - / 1 �����' i' \'_ .�. / Now o Formerl - . . �j Clyde eats V �� - � � Deed . ti Boo 6 a e 9 k g \ v♦ \ vv A \ ll . �.. v r................................................................� v`�.��.vvv�� I I � , �` � ( \ v � � I I � l l ♦v / v vvv v v v v v v — — — — — � v v v ll � I 1�-:�V: : �I � v v v���,�� v:�� v �� AAVvv ♦ vv A I vA \ v V /> . POST TO POND 1 - _ f_ 36.37 ACRES -- CN: 90 J 0-SF PHASE I IMPERVIOUS / •"� ' 1,290,986-SF FUTURE IMPERVIOUSt.. / 1,290,986-SF TOTAL IMPERVIOUS / _ . -/ / / / 1':. Z'.'..'.'.'.... .'.'.'.'.... 44 POST TO POND 4 •�, i:.:.:.::: �a:...� :. �� . 10.55 ACRES -- CN: 87 L......j.. �... �. '. Deed Books 1 • h. •e _ �f� ( /-�kr�� \ A \V A /� 0-SF PHASE 1 IMPERVIOUS �...� I �......�......... v �� . !'�• I I — -?' I — � v � � \ V� I I � I � / 319,294-SF FUTURE IMPERVIOUS f .�- •_I I I I � I:'.'.'.'.'.':�'.�.'.'.'.'.'.'.'.'.'........... — �I •w_ �.I — �6, /� �/ /� �/ )I1� / �� 319,294-SF TOTAL IMPERVIOUS -I i.�. �� 5� l: .'�. / p _ CN: 87 rb / — Y........ / / A /�' / .l Q t / 7 1..'.'.'.'.'.'.'.'.:':':':':':':':':':':':I':'I \ / y v•� . / — �� ■ L....... �........... / r .I I � / / 11 III I ��_• � � / /� / � I / / v v —� I:_ ,. ! •VI /> ♦ �- v —•�� JI -s .. / , I I 727 j v a I' �- PRE (OUTFALL #1)/5ti� vI `-- ♦ v`:��= ::-:-:::::-,.� i l i �� /tip / I POND 4' •-:':':':':':':-:.....,63a>r- ;= ti l v �'.' o I I � � 43.13 ACRES `� v •�9.13 ACRES WOODS \ z / a / — _ 1 — ♦ /� , III ( w / ti ti� o b y a �; b �7 p �° v� b o o� od /� - V ev7 // I '�'��•':'I �•�•�y ��� _ I /��� ♦ V �T �: .. ti I I I \ � � �--- 1 � /� `i• I / � � - ` \ / / % \\ —bB5 685 � � / �� \ � - - .J•/• / \ �\... \............. �'•'•� \\ \ �T / .I IIII I �� �� ti :�%'' / �` €��____— 0� / I I I / — � � — � ' �— — _ — � / � V v � v ♦ / / j / � _ — � v v �` — — — ' v� ( 1 � I �' � �_' —��: j —.�.'� \Vvv `ICI 1 � I I I • � ' � /�i/// � �a I II}I � .i ..,:..'` _._'i- —� / / / � ♦ v� /� ---- // / ��v � — / � A�\ � 729 `•- - -1 •b.._: / l �l / I �•fL9_ �/ �__\ A — / / Y l / / b° vvv p9 / V ♦ A �.'.'.'.�..-�.�.'.'.1'.'.'.'. A A WET POND 2 //// �. )/ _ V /� i / / — — — a4 v `ass b / — 3 \ A ♦ \� I. I — ip l �i/ / /d . � � � :�. '� � : -�'�= ` _- — � /i • �'� �- A ` � X � � / `' / -690 ° � � 69 � V ♦ '!' : � � .<.' ��1v 1\ i----- a ........... \ III I / /M�il�' � l �' -i�� � i \ / / I I i�-��.� � � \ 1.—"%\•�. �, _Y"�.�� � OUTFACE 2 � � ♦ , I :'�.-:-:-:-..1-+ 1 /; I II I I 73l .. b \ - 7I0.5 iy � / w/ -� \ \ -705 \ \ \\ /� .� IT �� \� // // / / '--' _ .b .. i y.I�f! \ \ ♦ I•+�+•+•+•+•+•+•+•+•+•`+•+•+•+•+• I ///lI I I I I / � A-� � 715 � �1 �/ � \ 710 710 �\ V - � � A� � J�. .�/ � � 'g9iO � / � / / .�- .-/- _ \� \ \ ♦ � .1' . . . . . . . . 1 . . / �1/// (I I I I / / 1 ■ 7I5 /� - � \ \G9,--'�� `\ "la .C.. �r�-L�/Sy�� / -- �• i�__6 9. \ ��` ♦ \ �". �. '(L'. // 1 /(/` IIII \ ��b_ • \/ / R 70 'IS - -7I5 \ —`a4�� --- \ \ \ ,(�•.1 •.•/„ •// / \ _ % / _� 56 p\\ \ \ \ .y.'.'.'.'.'.'.'.'.r+.'.'.+ � �lI/ I i89�589 6 '/ •.b ..•y ..1 •. .. Lb _ \ \' \ \ \ �'.1 .'.'.'.'.'.'.'.'. /IIl 732 .. / 72i / / — �33 I � - _ / .�� POND 6I lv ♦ �; �,' I / •e.• � — — / / � v w ti v v V iiii � __ � �� \ \ / / � '♦ � � — � — � � > �<. �%.� �-=�3fI0 • — — = — — — �� a_..;,:,.: .I ;gab PRE v b � � /� .(OUTFALL #3� l � 14.93ACRES 3.19 ACRES WOODS / /j A — POST TO POND 2 I-- -- �—" y;�� } ,�.—� i / � , b..POST TO POND 6 19.79 ACRES -- CN: 88 — — >..w:>:.._- /, • V' / / ti I • 1.=.. i .I I c 734 \ • .-. 13.86 ACRES CN. 89 > V • 135,697-SF PHASE 1 IMPERVIOUS v �..� 7� n� iih / : / / / _ v /I / �w / nn! / 0-SF PHASE 1 IMPERVIOUS 504,274-SF FUTURE IMPERVIOUS v — £}.y:,:; " Dui lily / —.� AA / • •b — , v �, ( �I I 449,103-SF FUTURE IMPERVIOUS �.fi ,, ���� I� •F, 639,971-$F TOTAL IMPERVIOUS 449,103-SF TOTAL IMPERVIOUS I 733 Tao ,f 4 / � I I • � � vv _ — � � �v �\ '�}� �:�r:.>.�:: A I iiii III�N. i� � \ \ 1 .( 1 I — �' /I I I . �d,v� _ I I y����,}.�?.: �_ o I 11 '`.� � � I 1 i �I \• � 5� /� 732 I � � v v ��� � v �. �� 1 � 1 ♦ � w v _ ` + A •b � _ v 1 1 . 1 � �:a'a��'' \ V A `' iii �IIIv�'♦ - 5 1 1' � 1 I � \ 1 I V � 2'' — � � � "" / I 1 I � it V I i / �'_ A• � � � � •' . ,. � V A ;°c':;:,z.,.a:.:r\ i V `v��1 li� I; � / I V A � a � � ,,C-''� / I l� I • ,;. .. x'1:':. „ iii ��� � � � e '' / � � 1vA •. � � \ I 7 7 -.V '_ . •,, � — _ _ v \ \ \ ,;�:;:•�:;;':'t \ iin .v..v j �� ib o I / I\ V A / ... ce I \ �� ' / ' I / / /� l !�� \ v' / \ / i1'I�/ � �,. 1 AVv� �/� / A \ w�Iv WET /� -�• / / / / ,6 l i / A I V A\ VA / 4 POND 3 l d v A 731 7 7 7 _c•• �• �� V �=i'..;_s.. .� �jl /"o i �1'. .�0 / �/ / i i / / /t / L / / / \\ ��A�AIIA 1\1�V w — — PRE (OUTFALL #2) v -:;r: x �; i ,�.::: - - • — - v — — v 680 1 11j. ,,,.� v v � � � � / � — .� 6_ � � = � — 57.86 ACRES v v �t5:4'''*i'x v\ 'iiii \ iii/ � �l �:q...� � � , / � / / � � ♦ I �'�' � = � I / l V ( � — _ � — _ _ , � � � � � A I � vv i 1��1 v 10.20 ACRES WOODS �`;Y',..? \ V iiii 1 /fy/ / L� l .1' / / / ♦ l \ ` V A \ �v v i il. v � / � �'�'�'�' �b _�. � w � l � � � / �� _ � �,..��a`�;c�.., �' ti� iiii / � /�_..i/��%�•���'� / // // � � 1A l� ��� / /'i / I \v vv — v �—� vv A II l /7 / 41 / _-- b. ti PRE (WEST) ; ♦ •_d ,' o ti 25.88 ACRES 732_ 0.34 ACRES WOODS v �I� �/ vv vv" 90vV Ili ill — ----— — v i10�/ — — � � � \ �\I I �\ � it .y ✓ / j / / / / - I w �i i - A I \ �� i / 1 ♦ MFb7 / v _ v ��\lA\\ III / /ill I I 1 I // � — — / � � ♦� , � i�` � 0 / / — ��� • — — — � v A / / v v v \ A V A I I I I I 1 I l � I l ; I l o�z, i1'�. �ti� / — i r,«; / / / . �. ��'aykaer / / / - -. - /• v� b• _—_ ♦ w� /'" v � �� ___v vv A v V A v � lll� III I vv,I // � /� ��••_ � � � � Ia I I �I �I � j � / � // •;_3.:`.';�7i A —__—_— ��',— I � Vr /a• v —' �v.a vv v v v A A\ v 111\III\VA �, Av ' �O\ 733 - , �'•„11't ".x�i .�. - - _ _1 . b. _ v \ .`t ;i�;•a..�" v----- �� i /+�• v v\ \ V A V I V I I I III I I I I I� J V. ir Now or Formerly I Blau Gibson Mounts Deed Book 7702, Paqe 946 :,y. .x .; P ,lN 8500582z v v v v v— I III I A I v � v / titi \ \ \ v ti w v //' w "''� v V v � � v�♦ A — ' V I IIII III l �, —72 ' , _ _ \ �I 1 I -6 _ , I•/"P \ 690, 726 / / I Imo,-725 —724 / I I I I —733 I I I n i ifl+U I 1 1111 A I / A / I I I I I I I /I 734 735 I / / / y5 / ji / _ - -/ w al•/ O / l 735 40 / 736 740 795 `N J• 752 c G c---� c---c��—a_Ta ter— G - W M 2000 �- ----- ��--�-- � ---- � I / �/ � w � w '-w w nn�nn� (yL . X-154754%.260 Y=804975�720 �— — — — — /—a—nn—.n—u'—"n MnM1n Z-742.560/ - •M1_nn—'V•—nn— xn—,i,•_nn—nn—n"'_ nn—a"'_nn_ nn—a"_ nn— O NOAA Atlas 14, Volume 2, Version 3, Location name: Mocksville, North Carolina, USA" Latitude: 35.9565°, Longitude:-80.5232° Elevation: 719.2 ft"" *source: ESRI Maps (D ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 0.368 0.436 0.512 0.566 0.628 0.670 0.708 0.743 0.782 0.810 5-min (0.340-0.400) (0.404-0.475) (0.473-0.557) (0.520-0.614) (0.574-0.682) (0.608-0.729) (0.639-0.772) (0.665-0.813) (0.690-0.860) (0.706-0.895) 0.588 0.698 0.820 0.905 1.00 1.07 1.13 1.18 1.24 1.27 10-min (0.543-0.638) (0.645-0.759) (0.757-0.893) (0.831-0.983) (0.915-1.09) 1 (0.969-1.16) 11 (1.01-1.23) 1 (1.05-1.29) 1(1.09-1.36) (1.11-1.41) 0.735 0.877 1.04 1.14 1.27 F 1.42 1.49 1.56 1.60 15-min (0.679-0.798) (0.811-0.954) (0.957-1.13) 1 (1.05-1.24) 11 (1.16-1.38) 1 (1.28-1.55) 1 (1.33-1.63) 11 (1.37-1.71) 1 (1.40-1.77) 1.01 1.21 1.47 1.66 1.88 2.03 2.18 2.31 2.48 2.59 30-min (0.931-1.09) (1.12-1.32) (1.36-1.60) (1.52-1.80) (1.72-2.04) (1.85-2.21) (1.97-2.38) (2.07-2.53) (2.19-2.73) (2.26-2.87) 1.26 1.52 1.89 2.16 2.50 2.76 3.00 3.24 3.56 3.78 60-min (1.16-1.36) (1.41-1.65) 11 (1.74-2.06) (1.98-2.35) (2.29-2.72) (2.50-3.00) (2.71-3.27) (2.90-3.55) (3.14-3.91) (3.30-4.18) 1.48 1.79 2.24 2.58 3.02 3.37 3.70 4.04 4.49 4.83 2-hr (1.36-1.60) (1.65-1.95) 1 1 (2.37-2.80) (2.76-3.28) (3.05-3.66) (3.32-4.04) (3.59-4.42) (3.93-4.94) (4.17-5.34) 1.58 1.91 2.40 2.77 3.27 3.66 4.05 4.44 4.98 5.39 3-hr (1.46-1.72) (1.77-2.09) (2.22-2.62) (2.55-3.02) (2.98-3.56) (3.31-3.98) (3.63-4.42) (3.94-4.86) (4.34-5.48) (4.63-5.96) 1.93 2.33 2.92 3.39 4.00 4.50 5.00 5.50 6.20 6.74 6-hr (1.78-2.11) (2.15-2.55) (2.69-3.19) (3.10-3.69) (3.65-4.36) (4.06-4.89) (4.47-5.44) (4.87-6.00) (5.39-6.79) (5.78-7.41) 2.31 2.79 3.51 4.07 4.84 5.46 6.09 6.74 7.64 8.35 12-hr (2.13-2.52) (2.57-3.06) (3.23-3.83) (3.73-4.44) (4.40-5.26) (4.91-5.92) (5.43-6.61) (5.94-7.32) (6.62-8.30) (7.11-9.08) 3.27 3.95 4.92 5.68 6.71 7.52 8.34 9.19 10.3 11.2 2-day (3.04-3.52) (3.67-4.25) 11 (4.58-5.30) 1 (5.27-6.11) (6.20-7.21) (6.93-8.09) (7.67-8.98) (8.41-9.90) (9.42-11.2) 3.48 4.19 5.20 5.99 7.05 7.90 8.76 9.64 10.8 11.8 3-day (3.25-3.74) (3.91-4.50) (4.84-5.59) (5.57-6.43) (6.53-7.58) (7.30-8.49) (8.06-9.42) (8.84-10.4) (9.89-11.7) (10.7-12.8) 3.69 4.43 5.47 6.29 7.40 8.28 9.18 10.1 11.4 12.3 4-day (3.45-3.96) (4.14-4.76) (5.11-5.88) (5.87-6.75) (6.87-7.94) (7.66-8.89) (8.46-9.87) (9.27-10.9) 4.22 5.05 6.14 6.99 8.15 9.06 9.99 10.9 12.2 13.2 7-day (3.96-4.52) (4.73-5.40) (5.75-6.57) (6.54-7.48) (7.60-8.72) (8.43-9.70) (9.26-10.7) (10.1-11.7) 4.82 5.74 6.91 7.81 9.00 9.94 10.9 11.8 13.1 14.1 10-day (4.55-5.14) (5.42-6.11) 11 (6.51-7.35) (7.34-8.30) (8.45-9.57) (9.31-10.6) (10.2-11.6) (11.0-12.6) 6.49 7.67 9.06 10.2 11.6 12.8 13.9 15.1 16.6 17.8 20-day (6.15-6.86) (7.26-8.10) (8.57-9.58) (9.59-10.7) (10.9-12.3) (12.0-13.5) (13.0-14.7) (14.1-16.0) (15.4-17.7) (16.5-19.0) 8.04 9.45 10.9 12.1 13.6 14.7 15.8 16.9 18.3 19.4 30-day (7.66-8.44) (9.01-9.92) (10.4-11.5) (11.5-12.7) (12.9-14.2) (13.9-15.4) (14.9-16.6) (15.9-17.8) (17.2-19.3) (18.2-20.5) 10.1 11.8 13.5 14.7 16.3 17.6 18.7 19.9 21.4 22.5 45-day (9.69-10.6) (11.3-12.4) 11 (12.9-14.1) 1 (14.1-15.4) 11 (15.6-17.1) 1 (17.8-19.6) 1 (18.9-20.8) 12.1 14.1 15.9 17.2 18.9 20.2 21.5 22.7 24.2 25.3 60-day (11.6-12.6) (13.5-14.7) (15.2-16.5) (16.5-17.9) (18.1-19.7) (19.3-21.1) (20.5-22.4)j I (24.0-26.6) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical NOAA Atlas 14, Volume 2, Version 3, Location name: Mocksville, North Carolina, USA" Latitude: 35.9565°, Longitude:-80.5232° Elevation: 719.2 ft"" *source: ESRI Maps (D ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 4.42 (4.08-4.80) 5.23 (4.85-5.70) 6.14 (5.68-6.68) 7.54 (6.89-8.18) 8.04 (7.30-8.75) 8.50 (7.67-9.26) 8.92 (7.98-9.76) 9.38 (8.28-10.3) 9.72 (8.47-10.7) 3.53 4.19 4.92 5.43 6.00 6.40 6.75 7.07 7.42 7.65 10-min (3.26-3.83) (3.87-4.55) (4.54-5.36) (4.99-5.90) (5.49-6.52) (5.81-6.96) (6.09-7.36) (6.32-7.73) (6.55-8.17) (6.67-8.46) 2.94 3.51 4.15 4.58 5.07 5.40 5.69 5.94 6.23 6.40 15-min (2.72-3.19) (3.24-3.82) (3.83-4.52) (4.21-4.97) (4.64-5.51) (4.91-5.88) (5.13-6.20) (5.32-6.50) (5.50-6.85) (5.58-7.08) 2.02 2.42 2.95 3.32 3.76 4.07 4.36 4.63 4.96 5.18 30-min (1.86-2.19) (2.24-2.64) (2.72-3.21) (3.05-3.60) (3.44-4.08) (3.70-4.43) (3.93-4.75) (4.14-5.06) (4.37-5.45) (4.52-5.73) 1.26 1.52 1.89 2.16 2.50 2.76 3.00 3.24 3.56 3.78 60-min (1.16-1.36) (1.41-1.65) 11 (1.74-2.06) (1.98-2.35) (2.29-2.72) (2.50-3.00) (2.71-3.27) (2.90-3.55) (3.14-3.91) (3.30-4.18) 0.738 0.894 1.12 1.29 1.51 1.68 1.85 2.02 2.25 2.42 2-hr (0.680-0.800) (0.824-0.973)1 1 (1.18-1.40) 11 (1.38-1.64) 1 (1.52-1.83) 11 (1.66-2.02) (1.80-2.21) 0.526 0.637 0.800 0.924 1.09 F 1.35 1.48 1.66 1.79 3-hr (0.486-0.572) (0.589-0.696) (0.738-0.872) 1 (0.848-1.00) 11 (0.992-1.19) (1.10-1.33) (1.21-1.47) (1.31-1.62) (1.45-1.82) 0.322 0.389 0.488 0.565 0.669 0.751 0.834 0.919 1.04 1.13 6-hr (0.297-0.352) (0.360-0.425) (0.450-0.533) (0.518-0.615) (0.609-0.727) (0.679-0.817) (0.746-0.908) 1 (0.813-1.00) 11 (0.900-1.13) (0.965-1.24) 0.192 0.232 0.291 0.338 0.402 0.453 0.505 0.560 0.634 0.693 12-hr (0.177-0.209) (0.214-0.254) (0.268-0.318) (0.310-0.368) (0.365-0.437) (0.408-0.491) (0.451-0.548) (0.493-0.607) (0.549-0.689) (0.590-0.754) 0.117 0.141 0.178 0.207 0.246 0.277 0.310 0.343 0.389 0.425 24-hr (0.109-0.126) (0.131-0.153) (0.165-0.192) (0.191-0.223) (0.227-0.266) (0.255-0.300) (0.284-0.335) (0.313-0.371) (0.353-0.421) (0.384-0.461) 0.068 0.082 0.103 0.118 0.140 0.157 0.174 0.191 0.215 0.234 2-day (0.063-0.073) (0.076-0.089) (0.095-0.110) (0.110-0.127) (0.129-0.150) (0.144-0.168) (0.160-0.187) (0.175-0.206) (0.196-0.233) (0.213-0.253) 0.048 0.058 0.072 0.083 0.098 0.110 0.122 0.134 0.151 0.164 3-day (0.045-0.052) (0.054-0.063) (0.067-0.078) (0.077-0.089) (0.091-0.105) (0.101-0.118) (0.112-0.131) (0.123-0.144) (0.137-0.163) (0.149-0.177) 0.038 0.046 0.057 0.066 0.077 0.086 0.096 0.105 0.118 0.129 4-day (0.036-0.041) (0.043-0.050) (0.053-0.061) (0.061-0.070) (0.072-0.083) (0.080-0.093) (0.088-0.103) (0.097-0.113) (0.108-0.128) (0.117-0.139) 0.025 0.030 0.037 0.042 0.049 0.054 0.059 0.065 0.073 0.079 7-day (0.024-0.027) (0.028-0.032) (0.034-0.039) (0.039-0.045) (0.045-0.052) (0.050-0.058) (0.055-0.064) (0.060-0.070) (0.067-0.078) (0.072-0.085) 0.020 0.024 0.029 0.033 0.038 0.041 0.045 0.049 0.055 0.059 10-day (0.019-0.021) (0.023-0.025) (0.027-0.031) (0.031-0.035) (0.035-0.040) (0.039-0.044) (0.042-0.048) (0.046-0.053) (0.051-0.058) (0.054-0.063) 0.014 0.016 0.019 0.021 0.024 0.027 0.029 0.031 0.035 0.037 20-day (0.013-0.014) (0.015-0.017) (0.018-0.020) (0.020-0.022) (0.023-0.026) (0.025-0.028) (0.027-0.031) (0.029-0.033) (0.032-0.037) (0.034-0.040) 0.011 0.013 0.015 0.017 0.019 0.020 0.022 0.023 0.025 0.027 30-day (0.011-0.012) (0.013-0.014) (0.014-0.016) (0.016-0.018) (0.018-0.020) (0.019-0.021) (0.021-0.023) (0.022-0.025) (0.024-0.027) (0.025-0.028) 0.009 0.011 0.012 0.014 0.015 0.016 0.017 0.018 0.020 0.021 45-day (0.009-0.010) (0.010-0.011) (0.012-0.013) (0.013-0.014) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.019-0.021) (0.020-0.022) 0.008 0.010 0.011 0.012 0.013 0.014 0.015 0.016 0.017 0.018 60-day (0.008-0.009) (0.009-0.010) (0.011-0.011) (0.011-0.012) (0.013-0.014) (0.013-0.015) (0.014-0.016) (0.015-0.016) (0.016-0.018) (0.017-0.018) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical Hydrologic Soil Group —Davie County, North Carolina 542100 542200 542300 542400 542500 542600 542700 542800 542900 543000 543100 543200 543300 543400 543500 543600 35° 57'41"N r rn r r CAw`m r. a� Qom+ r d — � I - 9 � - 8 1 VM2 II o . - ' s 8 158 T Mm T'ry �R1 i - 4 8 Soil I MaN may not IOe Maliel at this scale. 35° 5T4"N I I I 542100 542200 542300 542400 542500 542600 542700 542800 542900 543000 543100 543200 543300 543400 543500 543600 Map Scale: 1:5,530 if printed on B landscape (17" x 11") sheet. $ Meters N 0 50 100 200 300 Feet 0 250 500 1000 1y00 Map projection: Web Mercator Comereoordinates: WGS84 Edge tics: UTM Zone 17N WGS84 uson Natural Resources Web Soil Survey islino Conservation Service National Cooperative Soil Survey W700 543800 5439M W700 543800 5439M o 544000 1 35° 5741" N 8 r 8 8 3 35° 574" N 544000 544100 M o 11 /2/2022 Page 1 of 4 Hydrologic Soil Group —Davie County, North Carolina MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background D6 Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Davie County, North Carolina Survey Area Data: Version 20, Sep 8, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 13, 2022—May 9, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 11/2/2022 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Davie County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CoA Codorus loam, 0 to 2 B/D 9.4 5.7% percent slopes, frequently flooded KnA Kinkora loam, 0 to 2 C/D 9.0 5.4% percent slopes, occasionally flooded MsB Mocksville sandy loam, B 5.1 3.1 % 2 to 8 percent slopes MsC Mocksville sandy loam, B 29.1 17.6% 8 to 15 percent slopes OkB2 Oak Level clay loam, 2 C 44.5 26.8% to 8 percent slopes, moderately eroded RaB Rasalo fine sandy loam, C 65.6 39.6% 2 to 8 percent slopes Ud Udorthents, loamy C 0.1 0.1 % W Water 3.0 1.8% Totals for Area of Interest 166.8 100.0% USDA Natural Resources Web Soil Survey 11/2/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 64TOJ 1 oI May 12, 2022 1:15,835 0 0.125 0.25 0.5 mi Parcels Stream 0 0.2 0.4 0.8 km 2 foot contours 5 foot contours Sources: Esn, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esn China (Hong Kong), Esn Korea, Esri (Thailand), NGCC, (c) Ope nSt re etM a p contributors, and th e G I S User Community 2022 Legend Panels 0 Political Areas Stream Centerline Cross Sections TTTTr Levee Flood Hazard Areas AE FIoodway (AE) 0.2 % Chance Annual Flood Hazard Future Conditions 1%Annual Chance Flood Hazard North Carolina Floodplain Mapping Program 'tea,. OAK E N G I N E E R I N G WET POND DESIGN Drainage Area = 19.79 ac 85 % % Impervious = 74.23 % Try Perm. Pool Depth = 5.0 SA/DA= Surface Area Req'd = 0.410 ac :. • sf Area Provided = 0.472 ac • . • sf at Elev = 710.50 VOL prov'd perm pool= 2.09 ac-ft (includes Forebay) Avg Depth = ft USE SIMPLE METHOD Rv=0.05+0.009(I) Rv= • :• IN/IN P= 1.0 IN VOLUME=DESIGN RAINFALL(Rv)DA VOLUME= = AC -FT VOLprov= AC -FT PRE -BAY VOL=20% OF PERM POOL VOLUME PRE -BAY VOLregd= 0.418 ac-ft PRE -BAY VOLprov.= 0.386 ac-ft Actual % Used = 1 185 1% 51,584 CF at elevation E 2 DAY DRAWDOWN Q2= • • cfs 5 DAY DRAWDOWN= Q5= cfs FROM ORIFICE CALC'S: USE IN DIA ORIFICE Approx Draw Down Time = �Z! days hours onnce Mountain & Piedmont Regions Table 10-1 SA/DA RATIO CHART (for 85% TSS removal) % imp cover avg. permanent pool depth (ft) 3 4 5 6 7 8 9 10 0.51 0.43 0.37 0.30 0.27 0.25 20 0.84 0.69 0.61 0.51 0.44 0.40 30 1.17 0.94 0.84 0.72 0.61 0.56 40 1.51 1 1.24 1.09 0.91 0.78 0.71 50 1.79 1.51 1.31 1.13 0.95 0.87 60 2.09 1.77 1.49 1.31 1.12 1.03 70 2.51 2.09 1.80 1.56 1.34 1.17 80 2.92 2.41 2.07 1.82 1.62 1.40 90 3.25 2.64 2.31 2.04 1.84 1.59 Coastal Region Table 10-3 SA/DA RATIO CHART (for 90% TSS removal) % imp cover avg. permanent pool depth (ft) 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.78 0.61 0.44 0.00 0.00 0.00 20 1.48 1.04 0.87 0.70 0.52 0.35 30 2.18 1.65 1.39 1.13 0.87 0.70 40 2.96 2.26 1.83 1.39 0.96 0.78 50 3.65 2.87 2.35 1.83 1.31 0.96 60 4.35 3.31 2.78 2.26 1.74 1.13 70 5.22 3.92 3.22 2.52 1.83 1.31 80 5.92 4.52 3.65 2.78 1.91 1.57 90 6.53 5.05 4.18 2.96 2.44174 a Q=cA(29h)^.5 w/ c=.6 DIA (in) 4.5 Inv = • • (cfs) Elev Q Top 1 " Stor = Perm. Pool = • • Head = • Avg Q = • cfs Page 1 of 1 Drainage Area = 15.26 ac 85 % % Impervious = 72.15 % Try Perm. Pool Depth = 3.0 SA/DA= Surface Area Req'd = 0.450 ac • • • sf Area Provided = 0.508 ac sf at Elev = 701.50 VOL prov'd perm pool= 1.51 ac-ft (includes Forebay) Avg Depth = ft USE SIMPLE METHOD Rv=0.05+0.009(I) Rv= • ••• IN/IN P= 1.0 IN VOLUME=DESIGN RAINFALL(Rv)DA VOLUME= • :: • AC -FT VOLprov= • •� AC -FT PRE -BAY VOL=20% OF PERM POOL VOLUME PRE -BAY VOLregd= • • ac-ft PRE -BAY VOLprov.= • • • ac-ft Actual % Used = % 38,740 CF at elevation E 2 DAY DRAWDOWN Q2= cfs 5 DAY DRAWDOWN= Q5= • • • cfs FROM ORIFICE CALC'S: USE IN DIA ORIFICE Approx Draw Down Time = �7■ days hours onnce Mountain & Piedmont Regions Table 10-1 SA/DA RATIO CHART (for 85% TSS removal) % imp cover avg. permanent pool depth (ft) 3 4 5 6 7 8 9 10 0.51 0.43 0.37 0.30 0.27 0.25 20 0.84 0.69 0.61 0.51 0.44 0.40 30 1.17 0.94 0.84 0.72 0.61 0.56 40 1.51 1 1.24 1.09 0.91 0.78 0.71 50 1.79 1.51 1.31 1.13 0.95 0.87 60 2.09 1.77 1.49 1.31 1.12 1.03 70 2.51 2.09 1.80 1.56 1.34 1.17 80 2.92 2.41 2.07 1.82 1.62 1.40 90 3.25 2.64 2.31 2.04 1.84 1.59 Coastal Region Table 10-3 SA/DA RATIO CHART (for 90% TSS removal) % imp cover avg. permanent pool depth (ft) 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.78 0.61 0.44 0.00 0.00 0.00 20 1.48 1.04 0.87 0.70 0.52 0.35 30 2.18 1.65 1.39 1.13 0.87 0.70 40 2.96 2.26 1.83 1.39 0.96 0.78 50 3.65 2.87 2.35 1.83 1.31 0.96 60 4.35 3.31 2.78 2.26 1.74 1.13 70 5.22 3.92 3.22 2.52 1.83 1.31 80 5.92 4.52 3.65 2.78 1.91 1.57 90 6.53 5.05 4.18 2.96 2.44174 a Q=cA(29h)^.5 w/ c=.6 DIA (in) 4.5 Inv = • • (cfs) Elev Q Top 1 " Stor = • • Perm. Pool = • • Head = • Avg Q = •®. cfs Page 1 of 1 OAK E N G I N E E R I N G HYDROCAD OUTPUT 1-INCH STORM EVENT TriWest Building 2 SWM (Wet Ponds) Type 1124-hr I" WQ Rainfall=1.00" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 1 Summary for Subcatchment 3S: POST TO POND 2 Runoff = 8.62 cfs @ 11.97 hrs, Volume= 0.417 af, Depth= 0.25" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1" WQ Rainfall=1.00" Area (ac) CN Description 14.690 98 Impervious 5.100 61 >75% Grass cover, Good, HSG B 19.790 88 Weighted Average 5.100 25.77% Pervious Area 14.690 74.23% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: POST TO POND 2 Hydrograph I I I I - I'-- I' --'---'---'---'---'-- I' --'---'---'---'---'---'-- I' --'---'---'---'---'-- ■Runoff 9 8162 Cfs -- - -- -- -- -- -- ----'ITypea12r- 8 -- - - I.17 VI Q Rainfa11T1.�00P'_ Runoff Arda=19.790 at R4 n Off''I VQ 14 m6=0.41 � cjf w Ru��noff �De-04-2-57 v 5 Tcm 4- 3- 2- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1"WQ Rainfall= 1. 00 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 2 Hydrograph for Subcatchment 3S: POST TO POND 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.01 0.00 0.00 2.00 0.02 0.00 0.00 3.00 0.03 0.00 0.00 4.00 0.05 0.00 0.00 5.00 0.06 0.00 0.00 6.00 0.08 0.00 0.00 7.00 0.10 0.00 0.00 8.00 0.12 0.00 0.00 9.00 0.15 0.00 0.00 10.00 0.18 0.00 0.00 11.00 0.24 0.00 0.00 12.00 0.66 0.09 8.04 13.00 0.77 0.13 0.60 14.00 0.82 0.16 0.38 15.00 0.85 0.17 0.31 16.00 0.88 0.19 0.24 17.00 0.90 0.20 0.22 18.00 0.92 0.21 0.20 19.00 0.94 0.22 0.17 20.00 0.95 0.23 0.15 21.00 0.96 0.23 0.14 22.00 0.98 0.24 0.14 23.00 0.99 0.25 0.13 24.00 1.00 0.25 0.13 25.00 1.00 0.25 0.00 26.00 1.00 0.25 0.00 27.00 1.00 0.25 0.00 28.00 1.00 0.25 0.00 29.00 1.00 0.25 0.00 30.00 1.00 0.25 0.00 31.00 1.00 0.25 0.00 32.00 1.00 0.25 0.00 33.00 1.00 0.25 0.00 34.00 1.00 0.25 0.00 35.00 1.00 0.25 0.00 36.00 1.00 0.25 0.00 37.00 1.00 0.25 0.00 38.00 1.00 0.25 0.00 39.00 1.00 0.25 0.00 40.00 1.00 0.25 0.00 41.00 1.00 0.25 0.00 42.00 1.00 0.25 0.00 43.00 1.00 0.25 0.00 44.00 1.00 0.25 0.00 45.00 1.00 0.25 0.00 46.00 1.00 0.25 0.00 47.00 1.00 0.25 0.00 48.00 1.00 0.25 0.00 49.00 1.00 0.25 0.00 50.00 1.00 0.25 0.00 51.00 1.00 0.25 0.00 52.00 1.00 0.25 0.00 53.00 1.00 0.25 0.00 54.00 1.00 0.25 0.00 55.00 1.00 0.25 0.00 56.00 1.00 0.25 0.00 57.00 1.00 0.25 0.00 58.00 1.00 0.25 0.00 59.00 1.00 0.25 0.00 60.00 1.00 0.25 0.00 61.00 1.00 0.25 0.00 62.00 1.00 0.25 0.00 63.00 1.00 0.25 0.00 64.00 1.00 0.25 0.00 65.00 1.00 0.25 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 1.00 0.25 0.00 67.00 1.00 0.25 0.00 68.00 1.00 0.25 0.00 69.00 1.00 0.25 0.00 70.00 1.00 0.25 0.00 71.00 1.00 0.25 0.00 72.00 1.00 0.25 0.00 73.00 1.00 0.25 0.00 74.00 1.00 0.25 0.00 75.00 1.00 0.25 0.00 76.00 1.00 0.25 0.00 77.00 1.00 0.25 0.00 78.00 1.00 0.25 0.00 79.00 1.00 0.25 0.00 80.00 1.00 0.25 0.00 81.00 1.00 0.25 0.00 82.00 1.00 0.25 0.00 83.00 1.00 0.25 0.00 84.00 1.00 0.25 0.00 85.00 1.00 0.25 0.00 86.00 1.00 0.25 0.00 87.00 1.00 0.25 0.00 88.00 1.00 0.25 0.00 89.00 1.00 0.25 0.00 90.00 1.00 0.25 0.00 91.00 1.00 0.25 0.00 92.00 1.00 0.25 0.00 93.00 1.00 0.25 0.00 94.00 1.00 0.25 0.00 95.00 1.00 0.25 0.00 96.00 1.00 0.25 0.00 97.00 1.00 0.25 0.00 98.00 1.00 0.25 0.00 99.00 1.00 0.25 0.00 100.00 1.00 0.25 0.00 101.00 1.00 0.25 0.00 102.00 1.00 0.25 0.00 103.00 1.00 0.25 0.00 104.00 1.00 0.25 0.00 105.00 1.00 0.25 0.00 106.00 1.00 0.25 0.00 107.00 1.00 0.25 0.00 108.00 1.00 0.25 0.00 109.00 1.00 0.25 0.00 110.00 1.00 0.25 0.00 111.00 1.00 0.25 0.00 112.00 1.00 0.25 0.00 113.00 1.00 0.25 0.00 114.00 1.00 0.25 0.00 115.00 1.00 0.25 0.00 116.00 1.00 0.25 0.00 117.00 1.00 0.25 0.00 118.00 1.00 0.25 0.00 119.00 1.00 0.25 0.00 120.00 1.00 0.25 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr I" WQ Rainfall=1.00" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 3 Summary for Subcatchment 7S: POST TO POND 3 Runoff = 6.65 cfs @ 11.97 hrs, Volume= 0.322 af, Depth= 0.25" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1" WQ Rainfall=1.00" Area (ac) CN Description 11.010 98 Impervious 4.250 61 >75% Grass cover, Good, HSG B 15.260 88 Weighted Average 4.250 27.85% Pervious Area 11.010 72.15% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 7S: POST TO POND 3 Hydrograph --I- I---I--+--+--+----------+--+--+--+--+--I--+--+--+--+--+--+-----I-- ■Runoff 7 6.65 Cfs 1--1--' J--1--1--L--T1gII2hr1_ '.1WQ RainfallT1.001 -- - -- -- -- -- -- -- -- Ru-hoff Arda:F5.2f0-a - 5 I I I I I R4npff'IVQI�m'1e=0.$2� �f ----,----T---------------+--r------------+--r-- ----- ---I-- 4 Runoff 'IDepthT0.25" LL --I'I-- --III-- -- -- --III---III---III-- -- -- -- --'-----I'I---I'I--,- TC#&'IO-Trffl7- 3 CAN=8$ z 'I 'I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1"WQ Rainfall= 1. 00 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 4 Hydrograph for Subcatchment 7S: POST TO POND 3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.01 0.00 0.00 2.00 0.02 0.00 0.00 3.00 0.03 0.00 0.00 4.00 0.05 0.00 0.00 5.00 0.06 0.00 0.00 6.00 0.08 0.00 0.00 7.00 0.10 0.00 0.00 8.00 0.12 0.00 0.00 9.00 0.15 0.00 0.00 10.00 0.18 0.00 0.00 11.00 0.24 0.00 0.00 12.00 0.66 0.09 6.20 13.00 0.77 0.13 0.46 14.00 0.82 0.16 0.29 15.00 0.85 0.17 0.24 16.00 0.88 0.19 0.19 17.00 0.90 0.20 0.17 18.00 0.92 0.21 0.15 19.00 0.94 0.22 0.13 20.00 0.95 0.23 0.11 21.00 0.96 0.23 0.11 22.00 0.98 0.24 0.10 23.00 0.99 0.25 0.10 24.00 1.00 0.25 0.10 25.00 1.00 0.25 0.00 26.00 1.00 0.25 0.00 27.00 1.00 0.25 0.00 28.00 1.00 0.25 0.00 29.00 1.00 0.25 0.00 30.00 1.00 0.25 0.00 31.00 1.00 0.25 0.00 32.00 1.00 0.25 0.00 33.00 1.00 0.25 0.00 34.00 1.00 0.25 0.00 35.00 1.00 0.25 0.00 36.00 1.00 0.25 0.00 37.00 1.00 0.25 0.00 38.00 1.00 0.25 0.00 39.00 1.00 0.25 0.00 40.00 1.00 0.25 0.00 41.00 1.00 0.25 0.00 42.00 1.00 0.25 0.00 43.00 1.00 0.25 0.00 44.00 1.00 0.25 0.00 45.00 1.00 0.25 0.00 46.00 1.00 0.25 0.00 47.00 1.00 0.25 0.00 48.00 1.00 0.25 0.00 49.00 1.00 0.25 0.00 50.00 1.00 0.25 0.00 51.00 1.00 0.25 0.00 52.00 1.00 0.25 0.00 53.00 1.00 0.25 0.00 54.00 1.00 0.25 0.00 55.00 1.00 0.25 0.00 56.00 1.00 0.25 0.00 57.00 1.00 0.25 0.00 58.00 1.00 0.25 0.00 59.00 1.00 0.25 0.00 60.00 1.00 0.25 0.00 61.00 1.00 0.25 0.00 62.00 1.00 0.25 0.00 63.00 1.00 0.25 0.00 64.00 1.00 0.25 0.00 65.00 1.00 0.25 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 1.00 0.25 0.00 67.00 1.00 0.25 0.00 68.00 1.00 0.25 0.00 69.00 1.00 0.25 0.00 70.00 1.00 0.25 0.00 71.00 1.00 0.25 0.00 72.00 1.00 0.25 0.00 73.00 1.00 0.25 0.00 74.00 1.00 0.25 0.00 75.00 1.00 0.25 0.00 76.00 1.00 0.25 0.00 77.00 1.00 0.25 0.00 78.00 1.00 0.25 0.00 79.00 1.00 0.25 0.00 80.00 1.00 0.25 0.00 81.00 1.00 0.25 0.00 82.00 1.00 0.25 0.00 83.00 1.00 0.25 0.00 84.00 1.00 0.25 0.00 85.00 1.00 0.25 0.00 86.00 1.00 0.25 0.00 87.00 1.00 0.25 0.00 88.00 1.00 0.25 0.00 89.00 1.00 0.25 0.00 90.00 1.00 0.25 0.00 91.00 1.00 0.25 0.00 92.00 1.00 0.25 0.00 93.00 1.00 0.25 0.00 94.00 1.00 0.25 0.00 95.00 1.00 0.25 0.00 96.00 1.00 0.25 0.00 97.00 1.00 0.25 0.00 98.00 1.00 0.25 0.00 99.00 1.00 0.25 0.00 100.00 1.00 0.25 0.00 101.00 1.00 0.25 0.00 102.00 1.00 0.25 0.00 103.00 1.00 0.25 0.00 104.00 1.00 0.25 0.00 105.00 1.00 0.25 0.00 106.00 1.00 0.25 0.00 107.00 1.00 0.25 0.00 108.00 1.00 0.25 0.00 109.00 1.00 0.25 0.00 110.00 1.00 0.25 0.00 111.00 1.00 0.25 0.00 112.00 1.00 0.25 0.00 113.00 1.00 0.25 0.00 114.00 1.00 0.25 0.00 115.00 1.00 0.25 0.00 116.00 1.00 0.25 0.00 117.00 1.00 0.25 0.00 118.00 1.00 0.25 0.00 119.00 1.00 0.25 0.00 120.00 1.00 0.25 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1"WQ Rainfall= 1. 00 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 5 Summary for Pond 2P: POND 2 Inflow Area = 19.790 ac, 74.23% Impervious, Inflow Depth = 0.25" for 1" WQ event Inflow = 8.62 cfs @ 11.97 hrs, Volume= 0.417 of Outflow = 0.27 cfs @ 15.55 hrs, Volume= 0.407 af, Atten= 97%, Lag= 214.5 min Primary = 0.27 cfs @ 15.55 hrs, Volume= 0.407 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 710.95' @ 15.55 hrs Surf.Area= 22,150 sf Storage= 9,697 cf Plug -Flow detention time= 672.7 min calculated for 0.407 of (98% of inflow) Center -of -Mass det. time= 661.2 min ( 1,534.3 - 873.1 ) Volume Invert Avail.Storage Storage Description #1 710.50' 290,610 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 710.50 20,568 0 0 711.00 22,310 10,720 10,720 712.00 24,113 23,212 33,931 713.00 25,975 25,044 58,975 714.00 27,897 26,936 85,911 715.00 29,879 28,888 114,799 716.00 31,920 30,900 145,699 717.00 34,021 32,971 178,669 718.00 36,183 35,102 213,771 719.00 38,404 37,294 251,065 720.00 40,686 39,545 290,610 Device Routing Invert Outlet Devices #1 Primary 709.39' 24.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 709.39' / 709.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 710.50' 4.5" Vert. 4.5" Orifice C= 0.600 #3 Device 1 715.00' 36.0" W x 6.0" H Vert. Slotted Weirs X 3.00 C= 0.600 #4 Device 1 718.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 718.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.27 cfs @ 15.55 hrs HW=710.95' TW=0.00' (Dynamic Tailwater) L1=Culvert (Passes 0.27 cfs of 9.08 cfs potential flow) 2=4.5" Orifice (Orifice Controls 0.27 cfs @ 2.49 fps) 3=Slotted Weirs ( Controls 0.00 cfs) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=710.50' TW=0.00' (Dynamic Tailwater) 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr I" WQ Rainfall=1.00" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 6 '0=6 1 q1 A1•]N•y% ..... -Inflow .0 • • .• ////////////////////// • • • '////// ,iiii� //////////////////////////////////////////////////////// ----- TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 © 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 2P: POND 2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 710.50 0.00 0.00 0.00 2.50 0.00 0 710.50 0.00 0.00 0.00 5.00 0.00 0 710.50 0.00 0.00 0.00 7.50 0.00 0 710.50 0.00 0.00 0.00 10.00 0.00 0 710.50 0.00 0.00 0.00 12.50 0.91 7,797 710.87 0.23 0.23 0.00 15.00 0.31 9,663 710.95 0.27 0.27 0.00 17.50 0.21 9,422 710.94 0.27 0.27 0.00 20.00 0.15 8,681 710.91 0.25 0.25 0.00 22.50 0.13 7,791 710.87 0.23 0.23 0.00 25.00 0.00 6,617 710.81 0.19 0.19 0.00 27.50 0.00 5,196 710.75 0.13 0.13 0.00 30.00 0.00 4,205 710.70 0.09 0.09 0.00 32.50 0.00 3,499 710.67 0.07 0.07 0.00 35.00 0.00 2,979 710.64 0.05 0.05 0.00 37.50 0.00 2,585 710.62 0.04 0.04 0.00 40.00 0.00 2,277 710.61 0.03 0.03 0.00 42.50 0.00 2,032 710.60 0.02 0.02 0.00 45.00 0.00 1,832 710.59 0.02 0.02 0.00 47.50 0.00 1,667 710.58 0.02 0.02 0.00 50.00 0.00 1,528 710.57 0.01 0.01 0.00 52.50 0.00 1,409 710.57 0.01 0.01 0.00 55.00 0.00 1,307 710.56 0.01 0.01 0.00 57.50 0.00 1,219 710.56 0.01 0.01 0.00 60.00 0.00 1,141 710.56 0.01 0.01 0.00 62.50 0.00 1,073 710.55 0.01 0.01 0.00 65.00 0.00 1,012 710.55 0.01 0.01 0.00 67.50 0.00 957 710.55 0.01 0.01 0.00 70.00 0.00 908 710.54 0.01 0.01 0.00 72.50 0.00 863 710.54 0.00 0.00 0.00 75.00 0.00 823 710.54 0.00 0.00 0.00 77.50 0.00 786 710.54 0.00 0.00 0.00 80.00 0.00 753 710.54 0.00 0.00 0.00 82.50 0.00 722 710.53 0.00 0.00 0.00 85.00 0.00 693 710.53 0.00 0.00 0.00 87.50 0.00 667 710.53 0.00 0.00 0.00 90.00 0.00 642 710.53 0.00 0.00 0.00 92.50 0.00 619 710.53 0.00 0.00 0.00 95.00 0.00 598 710.53 0.00 0.00 0.00 97.50 0.00 578 710.53 0.00 0.00 0.00 100.00 0.00 559 710.53 0.00 0.00 0.00 102.50 0.00 542 710.53 0.00 0.00 0.00 105.00 0.00 526 710.53 0.00 0.00 0.00 107.50 0.00 510 710.52 0.00 0.00 0.00 110.00 0.00 496 710.52 0.00 0.00 0.00 112.50 0.00 482 710.52 0.00 0.00 0.00 115.00 0.00 469 710.52 0.00 0.00 0.00 117.50 0.00 456 710.52 0.00 0.00 0.00 120.00 0.00 445 710.52 0.00 0.00 0.00 Type 1124-hr 1 " WQ Rainfall= 1. 00 " Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 © 2020 HvdroCAD Software Solutions LLC Stage -Discharge for Pond 2P: POND 2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 710.50 0.00 0.00 0.00 710.60 0.03 0.03 0.00 710.70 0.09 0.09 0.00 710.80 0.18 0.18 0.00 710.90 0.25 0.25 0.00 711.00 0.30 0.30 0.00 711.10 0.34 0.34 0.00 711.20 0.38 0.38 0.00 711.30 0.42 0.42 0.00 711.40 0.45 0.45 0.00 711.50 0.48 0.48 0.00 711.60 0.51 0.51 0.00 711.70 0.54 0.54 0.00 711.80 0.56 0.56 0.00 711.90 0.59 0.59 0.00 712.00 0.61 0.61 0.00 712.10 0.63 0.63 0.00 712.20 0.65 0.65 0.00 712.30 0.68 0.68 0.00 712.40 0.70 0.70 0.00 712.50 0.72 0.72 0.00 712.60 0.74 0.74 0.00 712.70 0.75 0.75 0.00 712.80 0.77 0.77 0.00 712.90 0.79 0.79 0.00 713.00 0.81 0.81 0.00 713.10 0.83 0.83 0.00 713.20 0.84 0.84 0.00 713.30 0.86 0.86 0.00 713.40 0.88 0.88 0.00 713.50 0.89 0.89 0.00 713.60 0.91 0.91 0.00 713.70 0.92 0.92 0.00 713.80 0.94 0.94 0.00 713.90 0.95 0.95 0.00 714.00 0.97 0.97 0.00 714.10 0.98 0.98 0.00 714.20 1.00 1.00 0.00 714.30 1.01 1.01 0.00 714.40 1.02 1.02 0.00 714.50 1.04 1.04 0.00 714.60 1.05 1.05 0.00 714.70 1.07 1.07 0.00 714.80 1.08 1.08 0.00 714.90 1.09 1.09 0.00 715.00 1.10 1.10 0.00 715.10 2.03 2.03 0.00 715.20 3.71 3.71 0.00 715.30 5.89 5.89 0.00 715.40 8.46 8.46 0.00 715.50 11.38 11.38 0.00 715.60 13.69 13.69 0.00 715.70 15.53 15.53 0.00 715.80 17.13 17.13 0.00 715.90 18.57 18.57 0.00 716.00 19.90 19.90 0.00 716.10 21.14 21.14 0.00 716.20 22.31 22.31 0.00 716.30 23.41 23.41 0.00 716.40 24.46 24.46 0.00 716.50 25.47 25.47 0.00 716.60 26.43 26.43 0.00 716.70 27.36 27.36 0.00 716.80 28.26 28.26 0.00 716.90 29.13 29.13 0.00 717.00 29.97 29.97 0.00 Type 1124-hr 1 " WQ Rainfall= 1. 00 " Printed 1/17/2023 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 717.10 30.80 30.80 0.00 717.20 31.59 31.59 0.00 717.30 32.37 32.37 0.00 717.40 33.13 33.13 0.00 717.50 33.87 33.87 0.00 717.60 34.60 34.60 0.00 717.70 35.31 35.31 0.00 717.80 36.00 36.00 0.00 717.90 36.69 36.69 0.00 718.00 37.36 37.36 0.00 718.10 39.67 39.67 0.00 718.20 42.27 42.27 0.00 718.30 42.54 42.54 0.00 718.40 42.81 42.81 0.00 718.50 43.08 43.08 0.00 718.60 44.13 43.34 0.79 718.70 45.83 43.61 2.23 718.80 48.02 43.87 4.15 718.90 50.60 44.13 6.48 719.00 53.68 44.39 9.30 719.10 57.19 44.64 12.55 719.20 60.68 44.90 15.78 719.30 64.40 45.15 19.25 719.40 68.33 45.41 22.92 719.50 72.46 45.66 26.80 719.60 76.88 45.91 30.98 719.70 81.52 46.16 35.36 719.80 86.13 46.40 39.72 719.90 90.88 46.65 44.23 720.00 95.67 46.89 48.78 TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 © 2020 HvdroCAD Software Solutions LLC Stage -Area -Storage for Pond 2P: POND 2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 710.50 20,568 0 710.60 20,916 2,074 710.70 21,265 4,183 710.80 21,613 6,327 710.90 21,962 8,506 711.00 22,310 10,720 711.10 22,490 12,960 711.20 22,671 15,218 711.30 22,851 17,494 711.40 23,031 19,788 711.50 23,212 22,100 711.60 23,392 24,430 711.70 23,572 26,778 711.80 23,752 29,144 711.90 23,933 31,529 712.00 24,113 33,931 712.10 24,299 36,352 712.20 24,485 38,791 712.30 24,672 41,249 712.40 24,858 43,725 712.50 25,044 46,220 712.60 25,230 48,734 712.70 25,416 51,266 712.80 25,603 53,817 712.90 25,789 56,387 713.00 25,975 58,975 713.10 26,167 61,582 713.20 26,359 64,208 713.30 26,552 66,854 713.40 26,744 69,519 713.50 26,936 72,203 713.60 27,128 74,906 713.70 27,320 77,628 713.80 27,513 80,370 713.90 27,705 83,131 714.00 27,897 85,911 714.10 28,095 88,711 714.20 28,293 91,530 714.30 28,492 94,369 714.40 28,690 97,228 714.50 28,888 100,107 714.60 29,086 103,006 714.70 29,284 105,924 714.80 29,483 108,863 714.90 29,681 111,821 715.00 29,879 114,799 715.10 30,083 117,797 715.20 30,287 120,816 715.30 30,491 123,855 715.40 30,695 126,914 715.50 30,900 129,994 715.60 31,104 133,094 715.70 31,308 136,214 715.80 31,512 139,355 715.90 31,716 142,517 716.00 31,920 145,699 716.10 32,130 148,901 716.20 32,340 152,125 716.30 32,550 155,369 716.40 32,760 158,635 716.50 32,971 161,921 716.60 33,181 165,229 716.70 33,391 168,557 716.80 33,601 171,907 716.90 33,811 175,277 717.00 34.021 178.669 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 717.10 34,237 182,082 717.20 34,453 185,516 717.30 34,670 188,973 717.40 34,886 192,450 717.50 35,102 195,950 717.60 35,318 199,471 717.70 35,534 203,013 717.80 35,751 206,578 717.90 35,967 210,164 718.00 36,183 213,771 718.10 36,405 217,400 718.20 36,627 221,052 718.30 36,849 224,726 718.40 37,071 228,422 718.50 37,294 232,140 718.60 37,516 235,881 718.70 37,738 239,643 718.80 37,960 243,428 718.90 38,182 247,235 719.00 38,404 251,065 719.10 38,632 254,916 719.20 38,860 258,791 719.30 39,089 262,688 719.40 39,317 266,609 719.50 39,545 270,552 719.60 39,773 274,518 719.70 40,001 278,506 719.80 40,230 282,518 719.90 40,458 286,552 720.00 40,686 290,610 Type 1124-hr 1 " WQ Rainfall= 1. 00 " Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1"WQ Rainfall= 1. 00 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 10 Summary for Pond 8P: POND 3 Inflow Area = 15.260 ac, 72.15% Impervious, Inflow Depth = 0.25" for 1" WQ event Inflow = 6.65 cfs @ 11.97 hrs, Volume= 0.322 of Outflow = 0.17 cfs @ 17.03 hrs, Volume= 0.309 af, Atten= 97%, Lag= 303.7 min Primary = 0.17 cfs @ 17.03 hrs, Volume= 0.309 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 701.79' @ 17.03 hrs Surf.Area= 34,713 sf Storage= 8,256 cf Plug -Flow detention time= 928.7 min calculated for 0.309 of (96% of inflow) Center -of -Mass det. time= 906.6 min ( 1,779.6 - 873.1 ) Volume Invert Avail.Storage Storage Description #1 701.50' 519,480 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 701.50 22,118 0 0 702.00 43,792 16,478 16,478 703.00 48,320 46,056 62,534 704.00 52,961 50,641 113,174 705.00 57,717 55,339 168,513 706.00 62,582 60,150 228,663 707.00 67,552 65,067 293,730 708.00 72,628 70,090 363,820 709.00 77,809 75,219 439,038 710.00 83,074 80,442 519,480 Device Routing Invert Outlet Devices #1 Primary 701.39' 24.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 701.39' / 701.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 701.50' 4.5" Vert. 4.5" Orifice C= 0.600 #3 Device 1 705.00' 36.0" W x 6.0" H Vert. Slotted Weirs X 2.00 C= 0.600 #4 Device 1 708.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 708.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.17 cfs @ 17.03 hrs HW=701.79' TW=0.00' (Dynamic Tailwater) L1=Culvert (Passes 0.17 cfs of 0.77 cfs potential flow) 2=4.5" Orifice (Orifice Controls 0.17 cfs @ 1.84 fps) 3=Slotted Weirs ( Controls 0.00 cfs) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=701.50' TW=0.00' (Dynamic Tailwater) T 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr I" WQ Rainfall=1.00" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 11 '0 iLM A1•R11111 3 ..... • 1 • • • i/ .�. //////////%///////////////////////////////111.-1 1 11 0ZrI TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 © 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 8P: POND 3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 701.50 0.00 0.00 0.00 2.50 0.00 0 701.50 0.00 0.00 0.00 5.00 0.00 0 701.50 0.00 0.00 0.00 7.50 0.00 0 701.50 0.00 0.00 0.00 10.00 0.00 0 701.50 0.00 0.00 0.00 12.50 0.70 6,122 701.73 0.11 0.11 0.00 15.00 0.24 8,050 701.78 0.16 0.16 0.00 17.50 0.16 8,249 701.79 0.17 0.17 0.00 20.00 0.11 7,988 701.78 0.16 0.16 0.00 22.50 0.10 7,547 701.77 0.15 0.15 0.00 25.00 0.00 6,824 701.75 0.13 0.13 0.00 27.50 0.00 5,770 701.72 0.10 0.10 0.00 30.00 0.00 4,938 701.69 0.08 0.08 0.00 32.50 0.00 4,276 701.67 0.07 0.07 0.00 35.00 0.00 3,745 701.65 0.05 0.05 0.00 37.50 0.00 3,314 701.63 0.04 0.04 0.00 40.00 0.00 2,959 701.62 0.04 0.04 0.00 42.50 0.00 2,664 701.61 0.03 0.03 0.00 45.00 0.00 2,417 701.60 0.03 0.03 0.00 47.50 0.00 2,207 701.59 0.02 0.02 0.00 50.00 0.00 2,028 701.58 0.02 0.02 0.00 52.50 0.00 1,872 701.58 0.02 0.02 0.00 55.00 0.00 1,737 701.57 0.01 0.01 0.00 57.50 0.00 1,619 701.57 0.01 0.01 0.00 60.00 0.00 1,515 701.56 0.01 0.01 0.00 62.50 0.00 1,422 701.56 0.01 0.01 0.00 65.00 0.00 1,339 701.56 0.01 0.01 0.00 67.50 0.00 1,265 701.55 0.01 0.01 0.00 70.00 0.00 1,198 701.55 0.01 0.01 0.00 72.50 0.00 1,137 701.55 0.01 0.01 0.00 75.00 0.00 1,082 701.55 0.01 0.01 0.00 77.50 0.00 1,032 701.54 0.01 0.01 0.00 80.00 0.00 985 701.54 0.00 0.00 0.00 82.50 0.00 943 701.54 0.00 0.00 0.00 85.00 0.00 904 701.54 0.00 0.00 0.00 87.50 0.00 868 701.54 0.00 0.00 0.00 90.00 0.00 835 701.54 0.00 0.00 0.00 92.50 0.00 803 701.54 0.00 0.00 0.00 95.00 0.00 775 701.53 0.00 0.00 0.00 97.50 0.00 748 701.53 0.00 0.00 0.00 100.00 0.00 722 701.53 0.00 0.00 0.00 102.50 0.00 699 701.53 0.00 0.00 0.00 105.00 0.00 676 701.53 0.00 0.00 0.00 107.50 0.00 655 701.53 0.00 0.00 0.00 110.00 0.00 636 701.53 0.00 0.00 0.00 112.50 0.00 617 701.53 0.00 0.00 0.00 115.00 0.00 600 701.53 0.00 0.00 0.00 117.50 0.00 583 701.53 0.00 0.00 0.00 120.00 0.00 567 701.53 0.00 0.00 0.00 Type 1124-hr 1 " WQ Rainfall= 1. 00 " Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 © 2020 HvdroCAD Software Solutions LLC Stage -Discharge for Pond 8P: POND 3 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 701.50 0.00 0.00 0.00 701.60 0.03 0.03 0.00 701.70 0.09 0.09 0.00 701.80 0.18 0.18 0.00 701.90 0.25 0.25 0.00 702.00 0.30 0.30 0.00 702.10 0.34 0.34 0.00 702.20 0.38 0.38 0.00 702.30 0.42 0.42 0.00 702.40 0.45 0.45 0.00 702.50 0.48 0.48 0.00 702.60 0.51 0.51 0.00 702.70 0.54 0.54 0.00 702.80 0.56 0.56 0.00 702.90 0.59 0.59 0.00 703.00 0.61 0.61 0.00 703.10 0.63 0.63 0.00 703.20 0.65 0.65 0.00 703.30 0.68 0.68 0.00 703.40 0.70 0.70 0.00 703.50 0.72 0.72 0.00 703.60 0.74 0.74 0.00 703.70 0.75 0.75 0.00 703.80 0.77 0.77 0.00 703.90 0.79 0.79 0.00 704.00 0.81 0.81 0.00 704.10 0.83 0.83 0.00 704.20 0.84 0.84 0.00 704.30 0.86 0.86 0.00 704.40 0.88 0.88 0.00 704.50 0.89 0.89 0.00 704.60 0.91 0.91 0.00 704.70 0.92 0.92 0.00 704.80 0.94 0.94 0.00 704.90 0.95 0.95 0.00 705.00 0.97 0.97 0.00 705.10 1.59 1.59 0.00 705.20 2.72 2.72 0.00 705.30 4.18 4.18 0.00 705.40 5.90 5.90 0.00 705.50 7.85 7.85 0.00 705.60 9.39 9.39 0.00 705.70 10.62 10.62 0.00 705.80 11.69 11.69 0.00 705.90 12.66 12.66 0.00 706.00 13.55 13.55 0.00 706.10 14.39 14.39 0.00 706.20 15.17 15.17 0.00 706.30 15.91 15.91 0.00 706.40 16.61 16.61 0.00 706.50 17.29 17.29 0.00 706.60 17.94 17.94 0.00 706.70 18.56 18.56 0.00 706.80 19.17 19.17 0.00 706.90 19.75 19.75 0.00 707.00 20.32 20.32 0.00 707.10 20.87 20.87 0.00 707.20 21.41 21.41 0.00 707.30 21.93 21.93 0.00 707.40 22.44 22.44 0.00 707.50 22.94 22.94 0.00 707.60 23.43 23.43 0.00 707.70 23.90 23.90 0.00 707.80 24.37 24.37 0.00 707.90 24.83 24.83 0.00 708.00 25.28 25.28 0.00 Type 1124-hr 1 " WQ Rainfall= 1. 00 " Printed 1/17/2023 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 708.10 27.38 27.38 0.00 708.20 30.84 30.84 0.00 708.30 35.18 35.18 0.00 708.40 37.08 37.08 0.00 708.50 37.39 37.39 0.00 708.60 38.48 37.70 0.79 708.70 40.22 38.00 2.23 708.80 42.45 38.30 4.15 708.90 45.07 38.60 6.48 709.00 48.19 38.89 9.30 709.10 51.73 39.18 12.55 709.20 55.26 39.47 15.78 709.30 59.01 39.76 19.25 709.40 62.97 40.05 22.92 709.50 67.13 40.33 26.80 709.60 71.59 40.62 30.98 709.70 76.26 40.90 35.36 709.80 80.90 41.18 39.72 709.90 85.68 41.45 44.23 710.00 90.50 41.73 48.78 TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 © 2020 HvdroCAD Software Solutions LLC Stage -Area -Storage for Pond 8P: POND 3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 701.50 22,118 0 701.60 26,453 2,429 701.70 30,788 5,291 701.80 35,122 8,586 701.90 39,457 12,315 702.00 43,792 16,478 702.10 44,245 20,879 702.20 44,698 25,326 702.30 45,150 29,819 702.40 45,603 34,357 702.50 46,056 38,940 702.60 46,509 43,568 702.70 46,962 48,241 702.80 47,414 52,960 702.90 47,867 57,724 703.00 48,320 62,534 703.10 48,784 67,389 703.20 49,248 72,290 703.30 49,712 77,238 703.40 50,176 82,233 703.50 50,641 87,274 703.60 51,105 92,361 703.70 51,569 97,495 703.80 52,033 102,675 703.90 52,497 107,901 704.00 52,961 113,174 704.10 53,437 118,494 704.20 53,912 123,861 704.30 54,388 129,276 704.40 54,863 134,739 704.50 55,339 140,249 704.60 55,815 145,807 704.70 56,290 151,412 704.80 56,766 157,065 704.90 57,241 162,765 705.00 57,717 168,513 705.10 58,204 174,309 705.20 58,690 180,154 705.30 59,176 186,047 705.40 59,663 191,989 705.50 60,150 197,980 705.60 60,636 204,019 705.70 61,123 210,107 705.80 61,609 216,243 705.90 62,095 222,429 706.00 62,582 228,663 706.10 63,079 234,946 706.20 63,576 241,278 706.30 64,073 247,661 706.40 64,570 254,093 706.50 65,067 260,575 706.60 65,564 267,106 706.70 66,061 273,688 706.80 66,558 280,318 706.90 67,055 286,999 707.00 67,552 293,730 707.10 68,060 300,510 707.20 68,567 307,341 707.30 69,075 314,224 707.40 69,582 321,156 707.50 70,090 328,140 707.60 70,598 335,174 707.70 71,105 342,260 707.80 71,613 349,395 707.90 72,120 356,582 708.00 72.628 363.820 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 708.10 73,146 371,108 708.20 73,664 378,449 708.30 74,182 385,841 708.40 74,700 393,285 708.50 75,219 400,781 708.60 75,737 408,329 708.70 76,255 415,928 708.80 76,773 423,580 708.90 77,291 431,283 709.00 77,809 439,038 709.10 78,336 446,845 709.20 78,862 454,705 709.30 79,388 462,618 709.40 79,915 470,583 709.50 80,442 478,601 709.60 80,968 486,671 709.70 81,495 494,794 709.80 82,021 502,970 709.90 82,547 511,198 710.00 83,074 519,480 Type 1124-hr 1 " WQ Rainfall= 1. 00 " Printed 1/17/2023 OAK E N G I N E E R I N G HYDROCAD OUTPUT 1-YEAR, 24-HOUR STORM EVENT TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 1 Summary for Subcatchment 3S: POST TO POND 2 Runoff = 58.05 cfs @ 11.96 hrs, Volume= 2.722 af, Depth= 1.65" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 14.690 98 Impervious 5.100 61 >75% Grass cover, Good, HSG B 19.790 88 Weighted Average 5.100 25.77% Pervious Area 14.690 74.23% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: POST TO POND 2 Hydrograph 65 -I T--r F ■ Runoff 60 58.05 cfs �--T--r--�-----I---I--�--�--�--T--r--I�--I---I--�-----I-- --I------7--7--7--7-----I---I--7--7--7--T--7--7-----IITj�1 HT24 55 I -- -- T--T- ---''I---'I----7--7-1�yrr2 50hr-RainfItT2.1'F- --I-- 7--r- ---Ruhoff Aroa=19.790 arc - 45 ---- 40 I I I Rp n Offl Vp 1 i m�Ie=2. 2 �f -- ---- -- - - ---I-- 7 -- -------- 35 Runoff I'IDupthT1.�55�" - --- E 30' ' ' Tc"5.0 M i n --I--I ,-7-7-�-� --II- - �-�-�-7-7-�-I---I- �-7-7-7-F 25 -- I I I I I I I I I I I I I I I I I I 20 15 ---- --- 10 --7- 7-- 7--i --i --7-------7-- 7-- 7--i --i --7-------7-- 7-- 7--i --i - - 5-/ 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 2 Hydrograph for Subcatchment 3S: POST TO POND 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.10 9.00 0.41 0.01 0.30 10.00 0.51 0.03 0.58 11.00 0.66 0.09 1.48 12.00 1.86 0.86 50.22 13.00 2.17 1.10 3.00 14.00 2.30 1.22 1.81 15.00 2.40 1.29 1.45 16.00 2.47 1.36 1.13 17.00 2.53 1.41 1.00 18.00 2.59 1.46 0.88 19.00 2.64 1.50 0.76 20.00 2.68 1.53 0.64 21.00 2.71 1.56 0.61 22.00 2.75 1.59 0.59 23.00 2.78 1.62 0.57 24.00 2.81 1.65 0.54 25.00 2.81 1.65 0.00 26.00 2.81 1.65 0.00 27.00 2.81 1.65 0.00 28.00 2.81 1.65 0.00 29.00 2.81 1.65 0.00 30.00 2.81 1.65 0.00 31.00 2.81 1.65 0.00 32.00 2.81 1.65 0.00 33.00 2.81 1.65 0.00 34.00 2.81 1.65 0.00 35.00 2.81 1.65 0.00 36.00 2.81 1.65 0.00 37.00 2.81 1.65 0.00 38.00 2.81 1.65 0.00 39.00 2.81 1.65 0.00 40.00 2.81 1.65 0.00 41.00 2.81 1.65 0.00 42.00 2.81 1.65 0.00 43.00 2.81 1.65 0.00 44.00 2.81 1.65 0.00 45.00 2.81 1.65 0.00 46.00 2.81 1.65 0.00 47.00 2.81 1.65 0.00 48.00 2.81 1.65 0.00 49.00 2.81 1.65 0.00 50.00 2.81 1.65 0.00 51.00 2.81 1.65 0.00 52.00 2.81 1.65 0.00 53.00 2.81 1.65 0.00 54.00 2.81 1.65 0.00 55.00 2.81 1.65 0.00 56.00 2.81 1.65 0.00 57.00 2.81 1.65 0.00 58.00 2.81 1.65 0.00 59.00 2.81 1.65 0.00 60.00 2.81 1.65 0.00 61.00 2.81 1.65 0.00 62.00 2.81 1.65 0.00 63.00 2.81 1.65 0.00 64.00 2.81 1.65 0.00 65.00 2.81 1.65 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 2.81 1.65 0.00 67.00 2.81 1.65 0.00 68.00 2.81 1.65 0.00 69.00 2.81 1.65 0.00 70.00 2.81 1.65 0.00 71.00 2.81 1.65 0.00 72.00 2.81 1.65 0.00 73.00 2.81 1.65 0.00 74.00 2.81 1.65 0.00 75.00 2.81 1.65 0.00 76.00 2.81 1.65 0.00 77.00 2.81 1.65 0.00 78.00 2.81 1.65 0.00 79.00 2.81 1.65 0.00 80.00 2.81 1.65 0.00 81.00 2.81 1.65 0.00 82.00 2.81 1.65 0.00 83.00 2.81 1.65 0.00 84.00 2.81 1.65 0.00 85.00 2.81 1.65 0.00 86.00 2.81 1.65 0.00 87.00 2.81 1.65 0.00 88.00 2.81 1.65 0.00 89.00 2.81 1.65 0.00 90.00 2.81 1.65 0.00 91.00 2.81 1.65 0.00 92.00 2.81 1.65 0.00 93.00 2.81 1.65 0.00 94.00 2.81 1.65 0.00 95.00 2.81 1.65 0.00 96.00 2.81 1.65 0.00 97.00 2.81 1.65 0.00 98.00 2.81 1.65 0.00 99.00 2.81 1.65 0.00 100.00 2.81 1.65 0.00 101.00 2.81 1.65 0.00 102.00 2.81 1.65 0.00 103.00 2.81 1.65 0.00 104.00 2.81 1.65 0.00 105.00 2.81 1.65 0.00 106.00 2.81 1.65 0.00 107.00 2.81 1.65 0.00 108.00 2.81 1.65 0.00 109.00 2.81 1.65 0.00 110.00 2.81 1.65 0.00 111.00 2.81 1.65 0.00 112.00 2.81 1.65 0.00 113.00 2.81 1.65 0.00 114.00 2.81 1.65 0.00 115.00 2.81 1.65 0.00 116.00 2.81 1.65 0.00 117.00 2.81 1.65 0.00 118.00 2.81 1.65 0.00 119.00 2.81 1.65 0.00 120.00 2.81 1.65 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 3 Summary for Subcatchment 4S: PRE (OUTFALL #1) Runoff = 30.23 cfs @ 12.17 hrs, Volume= 2.670 af, Depth= 0.74" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 9.130 55 Woods, Good, HSG B 34.000 78 Row crops, straight row, Good, HSG B 43.130 73 Weighted Average 43.130 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.1 30 0.0280 0.16 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 388 0.0620 1.74 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 15.1 744 0.0270 0.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.9 1,162 Total Subcatchment 4S: PRE (OUTFALL #1) Hydrograph ----------y--T--r--r--Ir-------y--rt--rt--+--r--Ir--Ir----y--- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 k 95 160 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 4 Hydrograph for Subcatchment 4S: PRE (OUTFALL #1) Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.00 9.00 0.41 0.00 0.00 10.00 0.51 0.00 0.00 11.00 0.66 0.00 0.00 12.00 1.86 0.26 14.20 13.00 2.17 0.40 4.77 14.00 2.30 0.47 2.68 15.00 2.40 0.51 2.05 16.00 2.47 0.55 1.65 17.00 2.53 0.59 1.42 18.00 2.59 0.62 1.27 19.00 2.64 0.64 1.12 20.00 2.68 0.66 0.96 21.00 2.71 0.69 0.89 22.00 2.75 0.71 0.86 23.00 2.78 0.72 0.83 24.00 2.81 0.74 0.80 25.00 2.81 0.74 0.00 26.00 2.81 0.74 0.00 27.00 2.81 0.74 0.00 28.00 2.81 0.74 0.00 29.00 2.81 0.74 0.00 30.00 2.81 0.74 0.00 31.00 2.81 0.74 0.00 32.00 2.81 0.74 0.00 33.00 2.81 0.74 0.00 34.00 2.81 0.74 0.00 35.00 2.81 0.74 0.00 36.00 2.81 0.74 0.00 37.00 2.81 0.74 0.00 38.00 2.81 0.74 0.00 39.00 2.81 0.74 0.00 40.00 2.81 0.74 0.00 41.00 2.81 0.74 0.00 42.00 2.81 0.74 0.00 43.00 2.81 0.74 0.00 44.00 2.81 0.74 0.00 45.00 2.81 0.74 0.00 46.00 2.81 0.74 0.00 47.00 2.81 0.74 0.00 48.00 2.81 0.74 0.00 49.00 2.81 0.74 0.00 50.00 2.81 0.74 0.00 51.00 2.81 0.74 0.00 52.00 2.81 0.74 0.00 53.00 2.81 0.74 0.00 54.00 2.81 0.74 0.00 55.00 2.81 0.74 0.00 56.00 2.81 0.74 0.00 57.00 2.81 0.74 0.00 58.00 2.81 0.74 0.00 59.00 2.81 0.74 0.00 60.00 2.81 0.74 0.00 61.00 2.81 0.74 0.00 62.00 2.81 0.74 0.00 63.00 2.81 0.74 0.00 64.00 2.81 0.74 0.00 65.00 2.81 0.74 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 2.81 0.74 0.00 67.00 2.81 0.74 0.00 68.00 2.81 0.74 0.00 69.00 2.81 0.74 0.00 70.00 2.81 0.74 0.00 71.00 2.81 0.74 0.00 72.00 2.81 0.74 0.00 73.00 2.81 0.74 0.00 74.00 2.81 0.74 0.00 75.00 2.81 0.74 0.00 76.00 2.81 0.74 0.00 77.00 2.81 0.74 0.00 78.00 2.81 0.74 0.00 79.00 2.81 0.74 0.00 80.00 2.81 0.74 0.00 81.00 2.81 0.74 0.00 82.00 2.81 0.74 0.00 83.00 2.81 0.74 0.00 84.00 2.81 0.74 0.00 85.00 2.81 0.74 0.00 86.00 2.81 0.74 0.00 87.00 2.81 0.74 0.00 88.00 2.81 0.74 0.00 89.00 2.81 0.74 0.00 90.00 2.81 0.74 0.00 91.00 2.81 0.74 0.00 92.00 2.81 0.74 0.00 93.00 2.81 0.74 0.00 94.00 2.81 0.74 0.00 95.00 2.81 0.74 0.00 96.00 2.81 0.74 0.00 97.00 2.81 0.74 0.00 98.00 2.81 0.74 0.00 99.00 2.81 0.74 0.00 100.00 2.81 0.74 0.00 101.00 2.81 0.74 0.00 102.00 2.81 0.74 0.00 103.00 2.81 0.74 0.00 104.00 2.81 0.74 0.00 105.00 2.81 0.74 0.00 106.00 2.81 0.74 0.00 107.00 2.81 0.74 0.00 108.00 2.81 0.74 0.00 109.00 2.81 0.74 0.00 110.00 2.81 0.74 0.00 111.00 2.81 0.74 0.00 112.00 2.81 0.74 0.00 113.00 2.81 0.74 0.00 114.00 2.81 0.74 0.00 115.00 2.81 0.74 0.00 116.00 2.81 0.74 0.00 117.00 2.81 0.74 0.00 118.00 2.81 0.74 0.00 119.00 2.81 0.74 0.00 120.00 2.81 0.74 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 5 Summary for Subcatchment 5S: PRE (OUTFALL #2) Runoff = 43.88 cfs @ 12.17 hrs, Volume= 3.809 af, Depth= 0.79" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 10.200 55 Woods, Good, HSG B 47.660 78 Row crops, straight row, Good, HSG B 57.860 74 Weighted Average 57.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.1 30 0.0280 0.16 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 388 0.0620 1.74 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 15.1 744 0.0270 0.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.9 1,162 Total Subcatchment 5S: PRE (OUTFALL #2) Hydrograph 48 46 --L--L-- cfs T--T--T--T----------T--T--T--T--T--T-----Tn-p--T--T---j'rr-- --1---1---1--J--1--L-- --L--L-------L----L--L--L-- ■Runoff 43.88 44 ----'---' --' --' --'--------'---' ---' --' --' --'-----T�i J-I -"r'-- ---- --+- 42 38- +--+--+--+--r--r-------+--+--+--+--r--+--+-ppl� P'"I 7_8 11 i 36 34 --�-- --'-- ----- -'----L--L-- T- - r- - r--+------- --1---1---1--J--1--L- -- -- *ice -Ru�aoffAr6&67-860ad, 30 ---- ---y--t--t-- r----------y- -I- -yam'# Y r��1�fi"fg=�'910 of w28 26 ---- --- --+-- -- -----; ---------- ----------- -- -- -- -- -- - -- -- - +-- -- -- Run6 'D�pt a 79"- 1 I FlbvV-L-d"#h='1-,'�62'-- 18 --i- ---T--T--T--T----------T--T--T--T--T--+-----'Tr,== 1-.I 16 14 --,- --'- -,--;--;--,---,---,---,---,---,--;-------------------------------- -'-- -- -- -- --------'-- -- -- -- -- -------'-- -- -��� - 12 10 --- --'- -----T--T--T-- -'----L--L--L--1---1---1--J--1--L--L--L--L-------L-- ------- ---T -T T --T ----------- T--T--r --F -- --L--L--L-- 8 6 -i- - -----7--r--r--r--r----------r--r--r-------7----7--r--r-- 4 -----T----------------+-----------+--+--�-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 k 95 160 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 6 Hydrograph for Subcatchment 5S: PRE (OUTFALL #2) Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.00 9.00 0.41 0.00 0.00 10.00 0.51 0.00 0.00 11.00 0.66 0.00 0.00 12.00 1.86 0.29 21.41 13.00 2.17 0.43 6.72 14.00 2.30 0.50 3.75 15.00 2.40 0.55 2.86 16.00 2.47 0.59 2.30 17.00 2.53 0.63 1.98 18.00 2.59 0.66 1.77 19.00 2.64 0.69 1.56 20.00 2.68 0.71 1.33 21.00 2.71 0.73 1.23 22.00 2.75 0.75 1.19 23.00 2.78 0.77 1.15 24.00 2.81 0.79 1.11 25.00 2.81 0.79 0.00 26.00 2.81 0.79 0.00 27.00 2.81 0.79 0.00 28.00 2.81 0.79 0.00 29.00 2.81 0.79 0.00 30.00 2.81 0.79 0.00 31.00 2.81 0.79 0.00 32.00 2.81 0.79 0.00 33.00 2.81 0.79 0.00 34.00 2.81 0.79 0.00 35.00 2.81 0.79 0.00 36.00 2.81 0.79 0.00 37.00 2.81 0.79 0.00 38.00 2.81 0.79 0.00 39.00 2.81 0.79 0.00 40.00 2.81 0.79 0.00 41.00 2.81 0.79 0.00 42.00 2.81 0.79 0.00 43.00 2.81 0.79 0.00 44.00 2.81 0.79 0.00 45.00 2.81 0.79 0.00 46.00 2.81 0.79 0.00 47.00 2.81 0.79 0.00 48.00 2.81 0.79 0.00 49.00 2.81 0.79 0.00 50.00 2.81 0.79 0.00 51.00 2.81 0.79 0.00 52.00 2.81 0.79 0.00 53.00 2.81 0.79 0.00 54.00 2.81 0.79 0.00 55.00 2.81 0.79 0.00 56.00 2.81 0.79 0.00 57.00 2.81 0.79 0.00 58.00 2.81 0.79 0.00 59.00 2.81 0.79 0.00 60.00 2.81 0.79 0.00 61.00 2.81 0.79 0.00 62.00 2.81 0.79 0.00 63.00 2.81 0.79 0.00 64.00 2.81 0.79 0.00 65.00 2.81 0.79 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 2.81 0.79 0.00 67.00 2.81 0.79 0.00 68.00 2.81 0.79 0.00 69.00 2.81 0.79 0.00 70.00 2.81 0.79 0.00 71.00 2.81 0.79 0.00 72.00 2.81 0.79 0.00 73.00 2.81 0.79 0.00 74.00 2.81 0.79 0.00 75.00 2.81 0.79 0.00 76.00 2.81 0.79 0.00 77.00 2.81 0.79 0.00 78.00 2.81 0.79 0.00 79.00 2.81 0.79 0.00 80.00 2.81 0.79 0.00 81.00 2.81 0.79 0.00 82.00 2.81 0.79 0.00 83.00 2.81 0.79 0.00 84.00 2.81 0.79 0.00 85.00 2.81 0.79 0.00 86.00 2.81 0.79 0.00 87.00 2.81 0.79 0.00 88.00 2.81 0.79 0.00 89.00 2.81 0.79 0.00 90.00 2.81 0.79 0.00 91.00 2.81 0.79 0.00 92.00 2.81 0.79 0.00 93.00 2.81 0.79 0.00 94.00 2.81 0.79 0.00 95.00 2.81 0.79 0.00 96.00 2.81 0.79 0.00 97.00 2.81 0.79 0.00 98.00 2.81 0.79 0.00 99.00 2.81 0.79 0.00 100.00 2.81 0.79 0.00 101.00 2.81 0.79 0.00 102.00 2.81 0.79 0.00 103.00 2.81 0.79 0.00 104.00 2.81 0.79 0.00 105.00 2.81 0.79 0.00 106.00 2.81 0.79 0.00 107.00 2.81 0.79 0.00 108.00 2.81 0.79 0.00 109.00 2.81 0.79 0.00 110.00 2.81 0.79 0.00 111.00 2.81 0.79 0.00 112.00 2.81 0.79 0.00 113.00 2.81 0.79 0.00 114.00 2.81 0.79 0.00 115.00 2.81 0.79 0.00 116.00 2.81 0.79 0.00 117.00 2.81 0.79 0.00 118.00 2.81 0.79 0.00 119.00 2.81 0.79 0.00 120.00 2.81 0.79 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 7 Summary for Subcatchment 6S: PRE (OUTFALL #3) Runoff = 10.46 cfs @ 12.17 hrs, Volume= 0.924 af, Depth= 0.74" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 3.190 55 Woods, Good, HSG B 11.740 78 Row crops, straight row, Good, HSG B 14.930 73 Weighted Average 14.930 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.1 30 0.0280 0.16 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 388 0.0620 1.74 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 15.1 744 0.0270 0.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.9 1,162 Total Subcatchment 6S: PRE (OUTFALL #3) Hydrograph ----------�--+--+--�--�---�---�--�--�--�--+--�--�--�---�--�--�--+--+--�-- ■Runoff 11 10.46 Cfs -------------------------------------------- 10 I YpQ- - _ hl Ir - -- - T--r- - ---1yrrUhr-RainfalrT2.81�F- -- --- -- --; --; --, - ------I- - 4 --4 -Runoff Ard&14.930 at - 7 1 i np f-VQIO*e=0: 4 � - w--',-- -'I-- -- -- --', --'I--'I---'1---', -- -- -- -- - - rt +F - 6 Runoff Depth4r74 LL -- -- -- --' ----------Ftbw!-tdn-0th--1-,462U- s 3 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 k 95 160 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 8 Hydrograph for Subcatchment 6S: PRE (OUTFALL #3) Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.00 9.00 0.41 0.00 0.00 10.00 0.51 0.00 0.00 11.00 0.66 0.00 0.00 12.00 1.86 0.26 4.91 13.00 2.17 0.40 1.65 14.00 2.30 0.47 0.93 15.00 2.40 0.51 0.71 16.00 2.47 0.55 0.57 17.00 2.53 0.59 0.49 18.00 2.59 0.62 0.44 19.00 2.64 0.64 0.39 20.00 2.68 0.66 0.33 21.00 2.71 0.69 0.31 22.00 2.75 0.71 0.30 23.00 2.78 0.72 0.29 24.00 2.81 0.74 0.28 25.00 2.81 0.74 0.00 26.00 2.81 0.74 0.00 27.00 2.81 0.74 0.00 28.00 2.81 0.74 0.00 29.00 2.81 0.74 0.00 30.00 2.81 0.74 0.00 31.00 2.81 0.74 0.00 32.00 2.81 0.74 0.00 33.00 2.81 0.74 0.00 34.00 2.81 0.74 0.00 35.00 2.81 0.74 0.00 36.00 2.81 0.74 0.00 37.00 2.81 0.74 0.00 38.00 2.81 0.74 0.00 39.00 2.81 0.74 0.00 40.00 2.81 0.74 0.00 41.00 2.81 0.74 0.00 42.00 2.81 0.74 0.00 43.00 2.81 0.74 0.00 44.00 2.81 0.74 0.00 45.00 2.81 0.74 0.00 46.00 2.81 0.74 0.00 47.00 2.81 0.74 0.00 48.00 2.81 0.74 0.00 49.00 2.81 0.74 0.00 50.00 2.81 0.74 0.00 51.00 2.81 0.74 0.00 52.00 2.81 0.74 0.00 53.00 2.81 0.74 0.00 54.00 2.81 0.74 0.00 55.00 2.81 0.74 0.00 56.00 2.81 0.74 0.00 57.00 2.81 0.74 0.00 58.00 2.81 0.74 0.00 59.00 2.81 0.74 0.00 60.00 2.81 0.74 0.00 61.00 2.81 0.74 0.00 62.00 2.81 0.74 0.00 63.00 2.81 0.74 0.00 64.00 2.81 0.74 0.00 65.00 2.81 0.74 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 2.81 0.74 0.00 67.00 2.81 0.74 0.00 68.00 2.81 0.74 0.00 69.00 2.81 0.74 0.00 70.00 2.81 0.74 0.00 71.00 2.81 0.74 0.00 72.00 2.81 0.74 0.00 73.00 2.81 0.74 0.00 74.00 2.81 0.74 0.00 75.00 2.81 0.74 0.00 76.00 2.81 0.74 0.00 77.00 2.81 0.74 0.00 78.00 2.81 0.74 0.00 79.00 2.81 0.74 0.00 80.00 2.81 0.74 0.00 81.00 2.81 0.74 0.00 82.00 2.81 0.74 0.00 83.00 2.81 0.74 0.00 84.00 2.81 0.74 0.00 85.00 2.81 0.74 0.00 86.00 2.81 0.74 0.00 87.00 2.81 0.74 0.00 88.00 2.81 0.74 0.00 89.00 2.81 0.74 0.00 90.00 2.81 0.74 0.00 91.00 2.81 0.74 0.00 92.00 2.81 0.74 0.00 93.00 2.81 0.74 0.00 94.00 2.81 0.74 0.00 95.00 2.81 0.74 0.00 96.00 2.81 0.74 0.00 97.00 2.81 0.74 0.00 98.00 2.81 0.74 0.00 99.00 2.81 0.74 0.00 100.00 2.81 0.74 0.00 101.00 2.81 0.74 0.00 102.00 2.81 0.74 0.00 103.00 2.81 0.74 0.00 104.00 2.81 0.74 0.00 105.00 2.81 0.74 0.00 106.00 2.81 0.74 0.00 107.00 2.81 0.74 0.00 108.00 2.81 0.74 0.00 109.00 2.81 0.74 0.00 110.00 2.81 0.74 0.00 111.00 2.81 0.74 0.00 112.00 2.81 0.74 0.00 113.00 2.81 0.74 0.00 114.00 2.81 0.74 0.00 115.00 2.81 0.74 0.00 116.00 2.81 0.74 0.00 117.00 2.81 0.74 0.00 118.00 2.81 0.74 0.00 119.00 2.81 0.74 0.00 120.00 2.81 0.74 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 9 Summary for Subcatchment 7S: POST TO POND 3 Runoff = 44.76 cfs @ 11.96 hrs, Volume= 2.099 af, Depth= 1.65" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 11.010 98 Impervious 4.250 61 >75% Grass cover, Good, HSG B 15.260 88 Weighted Average 4.250 27.85% Pervious Area 11.010 72.15% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 7S: POST TO POND 3 Hydrograph 44.76cfs T--�--�--�-----I---I--�--�--�--�--r--��--I---I--�--�--�--r--��-- ■ Runoff 4b----------i 44 ---- ----+--+--+--+----------+--+--+--+--+--+----- -- ------- -- ----- - -- -i-------_- - -- - -- ----- TylN124-h'-- " M 42 40 j --;-- --'-- --;--T--T--;---;---;---;---;--T--T--T-----------------I����-��-�-,,..�I��-----=-- ------1--L--r--------------�-�1 1 rT��Ra11111Q�IT�.�ln 38 36 r --'-- 1--r--r--r--r--r--1-- -----1 L L-- --1---1---1--J--1--L-Runoff 1--r--7--r-- -r--r--1---1- r--r--r--r--r-- T Aftatl5.260-at - 34 j --I-- ----r--r--r--r--------1--r-- 7-- - 7-- r-- r-- r--1--- I-- 7-- 7-- T-- r-- r32 11 Y LJ� 30 --1-- --1--+--+--+--+--1---1---1--+--+--+ 28 26 --;-- ---- --;--1--1--------;---;---;-----1--1-----l�iraQfl�e�p��5;,r_ ----+--+--+--+----------+--+--+--+-- 0 24 iL 22 ---- ---- 1-- 1--;---;---;-----------?--?--------------;-- +--L--r--I - - -- -r--------- c:i :510-ftlih-- 20 18 ---- --'-- ---- T-- --'----1--L--r--1---1---1--J--1--1-- 1 T --T -- --------- 1 -- -- --r--T--T------- -- -- N --L---------J--1- - 1 1 16 --1-- --1--,--r--r--r--1--- r--r--r--r--1--7--7--r--r--r-- 14 12 --'-- --r- --'--L--1--L--L--1---1---1--J--1--L--L--L--+-------J--L--1--L-- -1--r--r--r--r--r--1---1--r--r--r--r--r--r--r--1--r--r--r--r--r-- -- $ --1----1--+--+--r--r--1---1--------+--r--+--1---1---- --T--r--+-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 10 Hydrograph for Subcatchment 7S: POST TO POND 3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.08 9.00 0.41 0.01 0.23 10.00 0.51 0.03 0.44 11.00 0.66 0.09 1.14 12.00 1.86 0.86 38.73 13.00 2.17 1.10 2.32 14.00 2.30 1.22 1.40 15.00 2.40 1.29 1.12 16.00 2.47 1.36 0.87 17.00 2.53 1.41 0.77 18.00 2.59 1.46 0.68 19.00 2.64 1.50 0.59 20.00 2.68 1.53 0.50 21.00 2.71 1.56 0.47 22.00 2.75 1.59 0.45 23.00 2.78 1.62 0.44 24.00 2.81 1.65 0.42 25.00 2.81 1.65 0.00 26.00 2.81 1.65 0.00 27.00 2.81 1.65 0.00 28.00 2.81 1.65 0.00 29.00 2.81 1.65 0.00 30.00 2.81 1.65 0.00 31.00 2.81 1.65 0.00 32.00 2.81 1.65 0.00 33.00 2.81 1.65 0.00 34.00 2.81 1.65 0.00 35.00 2.81 1.65 0.00 36.00 2.81 1.65 0.00 37.00 2.81 1.65 0.00 38.00 2.81 1.65 0.00 39.00 2.81 1.65 0.00 40.00 2.81 1.65 0.00 41.00 2.81 1.65 0.00 42.00 2.81 1.65 0.00 43.00 2.81 1.65 0.00 44.00 2.81 1.65 0.00 45.00 2.81 1.65 0.00 46.00 2.81 1.65 0.00 47.00 2.81 1.65 0.00 48.00 2.81 1.65 0.00 49.00 2.81 1.65 0.00 50.00 2.81 1.65 0.00 51.00 2.81 1.65 0.00 52.00 2.81 1.65 0.00 53.00 2.81 1.65 0.00 54.00 2.81 1.65 0.00 55.00 2.81 1.65 0.00 56.00 2.81 1.65 0.00 57.00 2.81 1.65 0.00 58.00 2.81 1.65 0.00 59.00 2.81 1.65 0.00 60.00 2.81 1.65 0.00 61.00 2.81 1.65 0.00 62.00 2.81 1.65 0.00 63.00 2.81 1.65 0.00 64.00 2.81 1.65 0.00 65.00 2.81 1.65 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 2.81 1.65 0.00 67.00 2.81 1.65 0.00 68.00 2.81 1.65 0.00 69.00 2.81 1.65 0.00 70.00 2.81 1.65 0.00 71.00 2.81 1.65 0.00 72.00 2.81 1.65 0.00 73.00 2.81 1.65 0.00 74.00 2.81 1.65 0.00 75.00 2.81 1.65 0.00 76.00 2.81 1.65 0.00 77.00 2.81 1.65 0.00 78.00 2.81 1.65 0.00 79.00 2.81 1.65 0.00 80.00 2.81 1.65 0.00 81.00 2.81 1.65 0.00 82.00 2.81 1.65 0.00 83.00 2.81 1.65 0.00 84.00 2.81 1.65 0.00 85.00 2.81 1.65 0.00 86.00 2.81 1.65 0.00 87.00 2.81 1.65 0.00 88.00 2.81 1.65 0.00 89.00 2.81 1.65 0.00 90.00 2.81 1.65 0.00 91.00 2.81 1.65 0.00 92.00 2.81 1.65 0.00 93.00 2.81 1.65 0.00 94.00 2.81 1.65 0.00 95.00 2.81 1.65 0.00 96.00 2.81 1.65 0.00 97.00 2.81 1.65 0.00 98.00 2.81 1.65 0.00 99.00 2.81 1.65 0.00 100.00 2.81 1.65 0.00 101.00 2.81 1.65 0.00 102.00 2.81 1.65 0.00 103.00 2.81 1.65 0.00 104.00 2.81 1.65 0.00 105.00 2.81 1.65 0.00 106.00 2.81 1.65 0.00 107.00 2.81 1.65 0.00 108.00 2.81 1.65 0.00 109.00 2.81 1.65 0.00 110.00 2.81 1.65 0.00 111.00 2.81 1.65 0.00 112.00 2.81 1.65 0.00 113.00 2.81 1.65 0.00 114.00 2.81 1.65 0.00 115.00 2.81 1.65 0.00 116.00 2.81 1.65 0.00 117.00 2.81 1.65 0.00 118.00 2.81 1.65 0.00 119.00 2.81 1.65 0.00 120.00 2.81 1.65 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 11 Summary for Subcatchment 9S: POST TO POND 4 Runoff = 29.66 cfs @ 11.96 hrs, Volume= 1.384 af, Depth= 1.57" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 7.330 98 Impervious 3.220 61 >75% Grass cover, Good, HSG B 10.550 87 Weighted Average 3.220 30.52% Pervious Area 7.330 69.48% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: POST TO POND 4 Hydrograph 3229.66 CfS - -----------'I--- - -- -- -----------'I--- - -- --- ■Runoff 30 -I------+--+--+--r--r-------+--+--+--+--r--r--r--i• P e *24-hir - 28 --'-------1--L------'---'--------L---------------1--L--�-- 26 - -'- - -- - 'I_lyrrMr RainfaIIT2.,�8t --r- 24 ------Y--r--r------------rt--rt-Runoff Ar6&40.-550-at - 22 ------1--L----1---1---1--J--1-- --1 1 I- '--1-- 20 --I-- j1�i�npffl Vp1uirpe=1:go 0 I I I I I I I I I I I I I I I I I I I I I�� I u 1g Runoff Qepth:0- 711 - .- --I-- --I----+--+----------I-- -- -- --+-- j+ s O16 --�--------1--L--L--1---1---1--J--1--1----L--L--1---�- y��=}^ 14 I I I I I I I I I I I I I I I I I I I I I I 12 --r-----r--r--r--r--r-------r--r--r--r--r--r--r----r--r-- --r- r-- 10 --'-- --'----1--L--L--1---1---1--J--1--1--L--L--+-------J--1--1--L-- -- 8 6 j 4 --'-- -'----1--L--L--1---1---1--J--1--1--L--L--L--1---1--J----1--L--L-- 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 12 Hydrograph for Subcatchment 9S: POST TO POND 4 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.03 9.00 0.41 0.01 0.12 10.00 0.51 0.03 0.26 11.00 0.66 0.07 0.70 12.00 1.86 0.80 25.76 13.00 2.17 1.04 1.56 14.00 2.30 1.15 0.94 15.00 2.40 1.23 0.75 16.00 2.47 1.29 0.59 17.00 2.53 1.34 0.52 18.00 2.59 1.39 0.46 19.00 2.64 1.42 0.40 20.00 2.68 1.46 0.34 21.00 2.71 1.49 0.32 22.00 2.75 1.52 0.31 23.00 2.78 1.55 0.30 24.00 2.81 1.57 0.28 25.00 2.81 1.57 0.00 26.00 2.81 1.57 0.00 27.00 2.81 1.57 0.00 28.00 2.81 1.57 0.00 29.00 2.81 1.57 0.00 30.00 2.81 1.57 0.00 31.00 2.81 1.57 0.00 32.00 2.81 1.57 0.00 33.00 2.81 1.57 0.00 34.00 2.81 1.57 0.00 35.00 2.81 1.57 0.00 36.00 2.81 1.57 0.00 37.00 2.81 1.57 0.00 38.00 2.81 1.57 0.00 39.00 2.81 1.57 0.00 40.00 2.81 1.57 0.00 41.00 2.81 1.57 0.00 42.00 2.81 1.57 0.00 43.00 2.81 1.57 0.00 44.00 2.81 1.57 0.00 45.00 2.81 1.57 0.00 46.00 2.81 1.57 0.00 47.00 2.81 1.57 0.00 48.00 2.81 1.57 0.00 49.00 2.81 1.57 0.00 50.00 2.81 1.57 0.00 51.00 2.81 1.57 0.00 52.00 2.81 1.57 0.00 53.00 2.81 1.57 0.00 54.00 2.81 1.57 0.00 55.00 2.81 1.57 0.00 56.00 2.81 1.57 0.00 57.00 2.81 1.57 0.00 58.00 2.81 1.57 0.00 59.00 2.81 1.57 0.00 60.00 2.81 1.57 0.00 61.00 2.81 1.57 0.00 62.00 2.81 1.57 0.00 63.00 2.81 1.57 0.00 64.00 2.81 1.57 0.00 65.00 2.81 1.57 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 2.81 1.57 0.00 67.00 2.81 1.57 0.00 68.00 2.81 1.57 0.00 69.00 2.81 1.57 0.00 70.00 2.81 1.57 0.00 71.00 2.81 1.57 0.00 72.00 2.81 1.57 0.00 73.00 2.81 1.57 0.00 74.00 2.81 1.57 0.00 75.00 2.81 1.57 0.00 76.00 2.81 1.57 0.00 77.00 2.81 1.57 0.00 78.00 2.81 1.57 0.00 79.00 2.81 1.57 0.00 80.00 2.81 1.57 0.00 81.00 2.81 1.57 0.00 82.00 2.81 1.57 0.00 83.00 2.81 1.57 0.00 84.00 2.81 1.57 0.00 85.00 2.81 1.57 0.00 86.00 2.81 1.57 0.00 87.00 2.81 1.57 0.00 88.00 2.81 1.57 0.00 89.00 2.81 1.57 0.00 90.00 2.81 1.57 0.00 91.00 2.81 1.57 0.00 92.00 2.81 1.57 0.00 93.00 2.81 1.57 0.00 94.00 2.81 1.57 0.00 95.00 2.81 1.57 0.00 96.00 2.81 1.57 0.00 97.00 2.81 1.57 0.00 98.00 2.81 1.57 0.00 99.00 2.81 1.57 0.00 100.00 2.81 1.57 0.00 101.00 2.81 1.57 0.00 102.00 2.81 1.57 0.00 103.00 2.81 1.57 0.00 104.00 2.81 1.57 0.00 105.00 2.81 1.57 0.00 106.00 2.81 1.57 0.00 107.00 2.81 1.57 0.00 108.00 2.81 1.57 0.00 109.00 2.81 1.57 0.00 110.00 2.81 1.57 0.00 111.00 2.81 1.57 0.00 112.00 2.81 1.57 0.00 113.00 2.81 1.57 0.00 114.00 2.81 1.57 0.00 115.00 2.81 1.57 0.00 116.00 2.81 1.57 0.00 117.00 2.81 1.57 0.00 118.00 2.81 1.57 0.00 119.00 2.81 1.57 0.00 120.00 2.81 1.57 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 13 Summary for Subcatchment 12S: POST TO POND 1 Runoff = 120.03 cfs @ 11.95 hrs, Volume= 5.743 af, Depth= 1.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 29.640 98 Impervious 6.730 61 >75% Grass cover, Good, HSG B 36.370 91 Weighted Average 6.730 18.50% Pervious Area 29.640 81.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 12S: POST TO POND 1 Hydrograph --I---I--+--+--+-- --�----+----+--+--------I-- --+-- --------I-- --+- 130 1 1Runoff 120.03 cfs +--+--r--+--1--+--+--+--+--1---1---1--+--+--+--1---1---1--+-+..-- 120 1 1 - Ty;1po-1 �;124-1 � --r--r--T--r--r--r--1--r--r--r--r--r-A-1---1/-�-wry-.,r,-p�,��� M L=/4� 110 '1 I--11--I11--1r--Tr--1r--11---11--I11----r--1rolyrT 4ftrii1t:infed1Tt.181T, 100 r -11--T----------T- -T -- Ru off AT-1de�3-6.-37-0 ad- 90 --I-- --I-- -- - ------I-- -- - -- gnO#fVQ14m11c=1115. 4 f- 80 w - R--o-ff Depth=TII .8W - 70 3 --1� - J--1--1--L--L--1--J--1--1--L--1---1---1--�--�--�- 1---1--1--1--1-- Tcy5.�0 tnih LL 60 T 50 40 -I-- +--+--+--r--+--1--+--+--+--+--1---1---1--+--+--+--1---1---1--+--+-- 30 --1- r--T--r--r--r----r--r--r--r----------r--r--r----------T--r-- 20 --I-- -1 T--r--r--r--1--T--T--T--r--1------I--T--r--r-----1---1--7--T-- 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 14 Hydrograph for Subcatchment 12S: POST TO POND 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.08 7.00 0.28 0.01 0.28 8.00 0.34 0.02 0.51 9.00 0.41 0.04 1.02 10.00 0.51 0.07 1.65 11.00 0.66 0.15 3.73 12.00 1.86 1.04 102.60 13.00 2.17 1.31 5.95 14.00 2.30 1.43 3.56 15.00 2.40 1.52 2.84 16.00 2.47 1.59 2.20 17.00 2.53 1.64 1.94 18.00 2.59 1.69 1.71 19.00 2.64 1.73 1.48 20.00 2.68 1.77 1.25 21.00 2.71 1.80 1.19 22.00 2.75 1.84 1.14 23.00 2.78 1.87 1.10 24.00 2.81 1.89 1.05 25.00 2.81 1.89 0.00 26.00 2.81 1.89 0.00 27.00 2.81 1.89 0.00 28.00 2.81 1.89 0.00 29.00 2.81 1.89 0.00 30.00 2.81 1.89 0.00 31.00 2.81 1.89 0.00 32.00 2.81 1.89 0.00 33.00 2.81 1.89 0.00 34.00 2.81 1.89 0.00 35.00 2.81 1.89 0.00 36.00 2.81 1.89 0.00 37.00 2.81 1.89 0.00 38.00 2.81 1.89 0.00 39.00 2.81 1.89 0.00 40.00 2.81 1.89 0.00 41.00 2.81 1.89 0.00 42.00 2.81 1.89 0.00 43.00 2.81 1.89 0.00 44.00 2.81 1.89 0.00 45.00 2.81 1.89 0.00 46.00 2.81 1.89 0.00 47.00 2.81 1.89 0.00 48.00 2.81 1.89 0.00 49.00 2.81 1.89 0.00 50.00 2.81 1.89 0.00 51.00 2.81 1.89 0.00 52.00 2.81 1.89 0.00 53.00 2.81 1.89 0.00 54.00 2.81 1.89 0.00 55.00 2.81 1.89 0.00 56.00 2.81 1.89 0.00 57.00 2.81 1.89 0.00 58.00 2.81 1.89 0.00 59.00 2.81 1.89 0.00 60.00 2.81 1.89 0.00 61.00 2.81 1.89 0.00 62.00 2.81 1.89 0.00 63.00 2.81 1.89 0.00 64.00 2.81 1.89 0.00 65.00 2.81 1.89 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 2.81 1.89 0.00 67.00 2.81 1.89 0.00 68.00 2.81 1.89 0.00 69.00 2.81 1.89 0.00 70.00 2.81 1.89 0.00 71.00 2.81 1.89 0.00 72.00 2.81 1.89 0.00 73.00 2.81 1.89 0.00 74.00 2.81 1.89 0.00 75.00 2.81 1.89 0.00 76.00 2.81 1.89 0.00 77.00 2.81 1.89 0.00 78.00 2.81 1.89 0.00 79.00 2.81 1.89 0.00 80.00 2.81 1.89 0.00 81.00 2.81 1.89 0.00 82.00 2.81 1.89 0.00 83.00 2.81 1.89 0.00 84.00 2.81 1.89 0.00 85.00 2.81 1.89 0.00 86.00 2.81 1.89 0.00 87.00 2.81 1.89 0.00 88.00 2.81 1.89 0.00 89.00 2.81 1.89 0.00 90.00 2.81 1.89 0.00 91.00 2.81 1.89 0.00 92.00 2.81 1.89 0.00 93.00 2.81 1.89 0.00 94.00 2.81 1.89 0.00 95.00 2.81 1.89 0.00 96.00 2.81 1.89 0.00 97.00 2.81 1.89 0.00 98.00 2.81 1.89 0.00 99.00 2.81 1.89 0.00 100.00 2.81 1.89 0.00 101.00 2.81 1.89 0.00 102.00 2.81 1.89 0.00 103.00 2.81 1.89 0.00 104.00 2.81 1.89 0.00 105.00 2.81 1.89 0.00 106.00 2.81 1.89 0.00 107.00 2.81 1.89 0.00 108.00 2.81 1.89 0.00 109.00 2.81 1.89 0.00 110.00 2.81 1.89 0.00 111.00 2.81 1.89 0.00 112.00 2.81 1.89 0.00 113.00 2.81 1.89 0.00 114.00 2.81 1.89 0.00 115.00 2.81 1.89 0.00 116.00 2.81 1.89 0.00 117.00 2.81 1.89 0.00 118.00 2.81 1.89 0.00 119.00 2.81 1.89 0.00 120.00 2.81 1.89 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 15 Summary for Subcatchment 14S: POST TO POND 6 Runoff = 42.36 cfs @ 11.96 hrs, Volume= 1.997 af, Depth= 1.73" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 10.310 98 Impervious 3.550 61 >75% Grass cover, Good, HSG B 13.860 89 Weighted Average 3.550 25.61 % Pervious Area 10.310 74.39% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 14S: POST TO POND 6 Hydrograph 46 44 --r--I---I--r--r--r--r--r--I---I--r--r--r--r--r--r--r--I--r--r--r--r--r-- -- -- --I --I --I- --I -- cfs--+--L--------------1--1----L-----------1--T--L--�-- ■Runoff 42.36 42 ----,--T--r----------'-- -- ----r--r--------'I� 1pe-NT24-h�`r- --I-- 40 38 --�-- --'�-- --�-- -- -- ----------�---- -- -- -------1---I ------------r-----------1rr3h1` Ra--irir-f-r-f-rZ--.r-9-"�1r--- 36 34 --1-- --r--r--r--r-- -I --- I- - r-r -r ---I--- I I I I I I I - I I ---- ----�--�------------ -- -RunfAt&Ia860t- 32 30 j ---- --�� - ----+--+--+--+----------+--+--+--+--+--+-------+--+--+--+--+-- -----1 T--r--r--�1--------T--_T-- + I I rrOffl tfplt�mle 1: - f 28 w 26 ---- I --I-- ---- -- -- ----------I---I-- -- I I I I I I I I I I I I I I I I ------I----r--r--r--Ru'IDepth l.73�` _ --I----t--r--r--no#f 24 0 22 ME 20 20 --�-- --'-- --r- --�------------------�---- -- ----- I --'----+--L---------------------------'- y��=}^ --I--r--+--r--r--r--I---I--r--r--r--+--r--r--r--I--r--r--+--r--r-- 18 ---- ------ -------------------?--?------------------- {� "$- 16 ---- ---- --+-- ------------ -- -- -- -- --------- -- -�i� 14 --i-- --i----T--r--r--------i-- -- ----r--r--Ir-----1--7---t _r r--II- 12 j --'-- -----'---'-----------------'---' ---'-----------------'---' ---'-----'--- 10 ---- ---+--+--+--+----------+--+--+--+--+--+-------+--+--+--+--+-- 8 I I I 6 --'-- I ---!--! --! --!-----------'--! --! --! --!-----------'--! --! --! --'--- I I I I I I I I I I I I I I I I I I I I I 4 --�-- ---+--+--+--+----------+--+--+--+--+--+-------+--+--+--+--+-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 16 Hydrograph for Subcatchment 14S: POST TO POND 6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.03 8.00 0.34 0.01 0.11 9.00 0.41 0.02 0.26 10.00 0.51 0.05 0.47 11.00 0.66 0.10 1.16 12.00 1.86 0.92 36.50 13.00 2.17 1.17 2.16 14.00 2.30 1.28 1.30 15.00 2.40 1.37 1.04 16.00 2.47 1.43 0.81 17.00 2.53 1.48 0.71 18.00 2.59 1.53 0.63 19.00 2.64 1.57 0.54 20.00 2.68 1.61 0.46 21.00 2.71 1.64 0.44 22.00 2.75 1.67 0.42 23.00 2.78 1.70 0.40 24.00 2.81 1.73 0.39 25.00 2.81 1.73 0.00 26.00 2.81 1.73 0.00 27.00 2.81 1.73 0.00 28.00 2.81 1.73 0.00 29.00 2.81 1.73 0.00 30.00 2.81 1.73 0.00 31.00 2.81 1.73 0.00 32.00 2.81 1.73 0.00 33.00 2.81 1.73 0.00 34.00 2.81 1.73 0.00 35.00 2.81 1.73 0.00 36.00 2.81 1.73 0.00 37.00 2.81 1.73 0.00 38.00 2.81 1.73 0.00 39.00 2.81 1.73 0.00 40.00 2.81 1.73 0.00 41.00 2.81 1.73 0.00 42.00 2.81 1.73 0.00 43.00 2.81 1.73 0.00 44.00 2.81 1.73 0.00 45.00 2.81 1.73 0.00 46.00 2.81 1.73 0.00 47.00 2.81 1.73 0.00 48.00 2.81 1.73 0.00 49.00 2.81 1.73 0.00 50.00 2.81 1.73 0.00 51.00 2.81 1.73 0.00 52.00 2.81 1.73 0.00 53.00 2.81 1.73 0.00 54.00 2.81 1.73 0.00 55.00 2.81 1.73 0.00 56.00 2.81 1.73 0.00 57.00 2.81 1.73 0.00 58.00 2.81 1.73 0.00 59.00 2.81 1.73 0.00 60.00 2.81 1.73 0.00 61.00 2.81 1.73 0.00 62.00 2.81 1.73 0.00 63.00 2.81 1.73 0.00 64.00 2.81 1.73 0.00 65.00 2.81 1.73 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 2.81 1.73 0.00 67.00 2.81 1.73 0.00 68.00 2.81 1.73 0.00 69.00 2.81 1.73 0.00 70.00 2.81 1.73 0.00 71.00 2.81 1.73 0.00 72.00 2.81 1.73 0.00 73.00 2.81 1.73 0.00 74.00 2.81 1.73 0.00 75.00 2.81 1.73 0.00 76.00 2.81 1.73 0.00 77.00 2.81 1.73 0.00 78.00 2.81 1.73 0.00 79.00 2.81 1.73 0.00 80.00 2.81 1.73 0.00 81.00 2.81 1.73 0.00 82.00 2.81 1.73 0.00 83.00 2.81 1.73 0.00 84.00 2.81 1.73 0.00 85.00 2.81 1.73 0.00 86.00 2.81 1.73 0.00 87.00 2.81 1.73 0.00 88.00 2.81 1.73 0.00 89.00 2.81 1.73 0.00 90.00 2.81 1.73 0.00 91.00 2.81 1.73 0.00 92.00 2.81 1.73 0.00 93.00 2.81 1.73 0.00 94.00 2.81 1.73 0.00 95.00 2.81 1.73 0.00 96.00 2.81 1.73 0.00 97.00 2.81 1.73 0.00 98.00 2.81 1.73 0.00 99.00 2.81 1.73 0.00 100.00 2.81 1.73 0.00 101.00 2.81 1.73 0.00 102.00 2.81 1.73 0.00 103.00 2.81 1.73 0.00 104.00 2.81 1.73 0.00 105.00 2.81 1.73 0.00 106.00 2.81 1.73 0.00 107.00 2.81 1.73 0.00 108.00 2.81 1.73 0.00 109.00 2.81 1.73 0.00 110.00 2.81 1.73 0.00 111.00 2.81 1.73 0.00 112.00 2.81 1.73 0.00 113.00 2.81 1.73 0.00 114.00 2.81 1.73 0.00 115.00 2.81 1.73 0.00 116.00 2.81 1.73 0.00 117.00 2.81 1.73 0.00 118.00 2.81 1.73 0.00 119.00 2.81 1.73 0.00 120.00 2.81 1.73 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 17 Summary for Subcatchment 17S: UNDETAINED POST TO OUTFALL 1 Runoff = 14.83 cfs @ 11.97 hrs, Volume= 0.720 af, Depth= 0.70" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 3.800 98 Impervious 8.590 61 >75% Grass cover, Good, HSG B 12.390 72 Weighted Average 8.590 69.33% Pervious Area 3.800 30.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 17S: UNDETAINED POST TO OUTFALL 1 Hydrograph 16 14.83 CfS - -----------------'I-- -- -----------------'I-- - -----'I--- ■Runoff 15 I I I I I I I I I I I I I I u +-----+--+--+--r--r-------+--+--+--+--r--r----- iT-y" 24—hlr- -- - '.1�rr24hr Rai nfaIIT2.,�81�," 13 I I --i-- 12 --'I----r--r--r--------'I----r--r-Ruhioff Ar6a:�:12.-894-at - 11 10 --'I-- I�i�npff'I Vp1�m',e=0: 2�-� - - I I I I I I I I I I I I T F I I I I I I T I --+- -+--+--+--+--+--+--I__+--+--+--+--+-- Runoff-IDepth4_7ol• - o $ - -- ------1--L------------J--i--i-- --L--L-----1- c�=}^ 7- 6 I I I I I I I I I I I I I I I I I I I I I I -- - --�--!-r--r--r-- ��'--rt--rt--t r--�'r-- - 5 - -- -----i--L--------------i--i----L--L-----1--J--1--1--L-- -- 4 3 2 ---- -----1--L----1---1---1--J--1--1--i--L--L-------J----1--L--L-- 1 I I I I I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 18 Hydrograph for Subcatchment 17S: UNDETAINED POST TO OUTFALL 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.00 9.00 0.41 0.00 0.00 10.00 0.51 0.00 0.00 11.00 0.66 0.00 0.00 12.00 1.86 0.24 13.86 13.00 2.17 0.37 1.04 14.00 2.30 0.43 0.65 15.00 2.40 0.48 0.54 16.00 2.47 0.51 0.42 17.00 2.53 0.55 0.38 18.00 2.59 0.57 0.34 19.00 2.64 0.60 0.30 20.00 2.68 0.62 0.25 21.00 2.71 0.64 0.24 22.00 2.75 0.66 0.24 23.00 2.78 0.68 0.23 24.00 2.81 0.70 0.22 25.00 2.81 0.70 0.00 26.00 2.81 0.70 0.00 27.00 2.81 0.70 0.00 28.00 2.81 0.70 0.00 29.00 2.81 0.70 0.00 30.00 2.81 0.70 0.00 31.00 2.81 0.70 0.00 32.00 2.81 0.70 0.00 33.00 2.81 0.70 0.00 34.00 2.81 0.70 0.00 35.00 2.81 0.70 0.00 36.00 2.81 0.70 0.00 37.00 2.81 0.70 0.00 38.00 2.81 0.70 0.00 39.00 2.81 0.70 0.00 40.00 2.81 0.70 0.00 41.00 2.81 0.70 0.00 42.00 2.81 0.70 0.00 43.00 2.81 0.70 0.00 44.00 2.81 0.70 0.00 45.00 2.81 0.70 0.00 46.00 2.81 0.70 0.00 47.00 2.81 0.70 0.00 48.00 2.81 0.70 0.00 49.00 2.81 0.70 0.00 50.00 2.81 0.70 0.00 51.00 2.81 0.70 0.00 52.00 2.81 0.70 0.00 53.00 2.81 0.70 0.00 54.00 2.81 0.70 0.00 55.00 2.81 0.70 0.00 56.00 2.81 0.70 0.00 57.00 2.81 0.70 0.00 58.00 2.81 0.70 0.00 59.00 2.81 0.70 0.00 60.00 2.81 0.70 0.00 61.00 2.81 0.70 0.00 62.00 2.81 0.70 0.00 63.00 2.81 0.70 0.00 64.00 2.81 0.70 0.00 65.00 2.81 0.70 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 2.81 0.70 0.00 67.00 2.81 0.70 0.00 68.00 2.81 0.70 0.00 69.00 2.81 0.70 0.00 70.00 2.81 0.70 0.00 71.00 2.81 0.70 0.00 72.00 2.81 0.70 0.00 73.00 2.81 0.70 0.00 74.00 2.81 0.70 0.00 75.00 2.81 0.70 0.00 76.00 2.81 0.70 0.00 77.00 2.81 0.70 0.00 78.00 2.81 0.70 0.00 79.00 2.81 0.70 0.00 80.00 2.81 0.70 0.00 81.00 2.81 0.70 0.00 82.00 2.81 0.70 0.00 83.00 2.81 0.70 0.00 84.00 2.81 0.70 0.00 85.00 2.81 0.70 0.00 86.00 2.81 0.70 0.00 87.00 2.81 0.70 0.00 88.00 2.81 0.70 0.00 89.00 2.81 0.70 0.00 90.00 2.81 0.70 0.00 91.00 2.81 0.70 0.00 92.00 2.81 0.70 0.00 93.00 2.81 0.70 0.00 94.00 2.81 0.70 0.00 95.00 2.81 0.70 0.00 96.00 2.81 0.70 0.00 97.00 2.81 0.70 0.00 98.00 2.81 0.70 0.00 99.00 2.81 0.70 0.00 100.00 2.81 0.70 0.00 101.00 2.81 0.70 0.00 102.00 2.81 0.70 0.00 103.00 2.81 0.70 0.00 104.00 2.81 0.70 0.00 105.00 2.81 0.70 0.00 106.00 2.81 0.70 0.00 107.00 2.81 0.70 0.00 108.00 2.81 0.70 0.00 109.00 2.81 0.70 0.00 110.00 2.81 0.70 0.00 111.00 2.81 0.70 0.00 112.00 2.81 0.70 0.00 113.00 2.81 0.70 0.00 114.00 2.81 0.70 0.00 115.00 2.81 0.70 0.00 116.00 2.81 0.70 0.00 117.00 2.81 0.70 0.00 118.00 2.81 0.70 0.00 119.00 2.81 0.70 0.00 120.00 2.81 0.70 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 19 Summary for Subcatchment 19S: UNDETAINED POST TO OUTFALL 2 Runoff = 1.22 cfs @ 12.26 hrs, Volume= 0.265 af, Depth= 0.22" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 7.730 55 Woods, Good, HSG B 7.000 61 >75% Grass cover, Good, HSG B 14.730 58 Weighted Average 14.730 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.1 30 0.0280 0.16 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 388 0.0620 1.74 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 15.1 744 0.0270 0.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.9 1,162 Total Subcatchment 19S: UNDETAINED POST TO OUTFALL 2 Hydrograph � � � � � � �� �� � � � � �� �� �� �� �� �� � � � � � ❑Runoff 1.22 Cfs Type 11'; 24-h';r Runoff Arch=14.730 at R4npff';VQ10me=',0.26$ calf Runoff off ' D e pt h TO . 22';" 3 F16'� LOngth=1,16a' 0 W Tc=�1.',9 mip OWSIB 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 20 Hydrograph for Subcatchment 19S: UNDETAINED POST TO OUTFALL 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.00 9.00 0.41 0.00 0.00 10.00 0.51 0.00 0.00 11.00 0.66 0.00 0.00 12.00 1.86 0.02 0.11 13.00 2.17 0.07 0.54 14.00 2.30 0.09 0.35 15.00 2.40 0.11 0.29 16.00 2.47 0.13 0.24 17.00 2.53 0.14 0.21 18.00 2.59 0.15 0.20 19.00 2.64 0.17 0.18 20.00 2.68 0.18 0.15 21.00 2.71 0.19 0.14 22.00 2.75 0.20 0.14 23.00 2.78 0.21 0.14 24.00 2.81 0.22 0.14 25.00 2.81 0.22 0.00 26.00 2.81 0.22 0.00 27.00 2.81 0.22 0.00 28.00 2.81 0.22 0.00 29.00 2.81 0.22 0.00 30.00 2.81 0.22 0.00 31.00 2.81 0.22 0.00 32.00 2.81 0.22 0.00 33.00 2.81 0.22 0.00 34.00 2.81 0.22 0.00 35.00 2.81 0.22 0.00 36.00 2.81 0.22 0.00 37.00 2.81 0.22 0.00 38.00 2.81 0.22 0.00 39.00 2.81 0.22 0.00 40.00 2.81 0.22 0.00 41.00 2.81 0.22 0.00 42.00 2.81 0.22 0.00 43.00 2.81 0.22 0.00 44.00 2.81 0.22 0.00 45.00 2.81 0.22 0.00 46.00 2.81 0.22 0.00 47.00 2.81 0.22 0.00 48.00 2.81 0.22 0.00 49.00 2.81 0.22 0.00 50.00 2.81 0.22 0.00 51.00 2.81 0.22 0.00 52.00 2.81 0.22 0.00 53.00 2.81 0.22 0.00 54.00 2.81 0.22 0.00 55.00 2.81 0.22 0.00 56.00 2.81 0.22 0.00 57.00 2.81 0.22 0.00 58.00 2.81 0.22 0.00 59.00 2.81 0.22 0.00 60.00 2.81 0.22 0.00 61.00 2.81 0.22 0.00 62.00 2.81 0.22 0.00 63.00 2.81 0.22 0.00 64.00 2.81 0.22 0.00 65.00 2.81 0.22 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 2.81 0.22 0.00 67.00 2.81 0.22 0.00 68.00 2.81 0.22 0.00 69.00 2.81 0.22 0.00 70.00 2.81 0.22 0.00 71.00 2.81 0.22 0.00 72.00 2.81 0.22 0.00 73.00 2.81 0.22 0.00 74.00 2.81 0.22 0.00 75.00 2.81 0.22 0.00 76.00 2.81 0.22 0.00 77.00 2.81 0.22 0.00 78.00 2.81 0.22 0.00 79.00 2.81 0.22 0.00 80.00 2.81 0.22 0.00 81.00 2.81 0.22 0.00 82.00 2.81 0.22 0.00 83.00 2.81 0.22 0.00 84.00 2.81 0.22 0.00 85.00 2.81 0.22 0.00 86.00 2.81 0.22 0.00 87.00 2.81 0.22 0.00 88.00 2.81 0.22 0.00 89.00 2.81 0.22 0.00 90.00 2.81 0.22 0.00 91.00 2.81 0.22 0.00 92.00 2.81 0.22 0.00 93.00 2.81 0.22 0.00 94.00 2.81 0.22 0.00 95.00 2.81 0.22 0.00 96.00 2.81 0.22 0.00 97.00 2.81 0.22 0.00 98.00 2.81 0.22 0.00 99.00 2.81 0.22 0.00 100.00 2.81 0.22 0.00 101.00 2.81 0.22 0.00 102.00 2.81 0.22 0.00 103.00 2.81 0.22 0.00 104.00 2.81 0.22 0.00 105.00 2.81 0.22 0.00 106.00 2.81 0.22 0.00 107.00 2.81 0.22 0.00 108.00 2.81 0.22 0.00 109.00 2.81 0.22 0.00 110.00 2.81 0.22 0.00 111.00 2.81 0.22 0.00 112.00 2.81 0.22 0.00 113.00 2.81 0.22 0.00 114.00 2.81 0.22 0.00 115.00 2.81 0.22 0.00 116.00 2.81 0.22 0.00 117.00 2.81 0.22 0.00 118.00 2.81 0.22 0.00 119.00 2.81 0.22 0.00 120.00 2.81 0.22 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 21 Summary for Subcatchment 20S: UNDETAINED POST TO OUTFALL 3 Runoff = 0.40 cfs @ 12.25 hrs, Volume= 0.076 af, Depth= 0.24" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr-24hr Rainfall=2.81" Area (ac) CN Description 3.190 55 Woods, Good, HSG B 0.580 78 Row crops, straight row, Good, HSG B 3.770 59 Weighted Average 3.770 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.1 30 0.0280 0.16 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 388 0.0620 1.74 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 15.1 744 0.0270 0.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.9 1,162 Total Subcatchment 20S: UNDETAINED POST TO OUTFALL 3 Hydrograph -------;---------- --;--------;-- ----------- --------- 0.44-L--L-------J--L--L--L-----'-- --L--L----------L--L--L--'-- 0.42 0.40 -- -----I-- -- --+--+-----I-- -- ----------I----+--r--I-- 0.4 -- - - --,------- -,-- -- +--,-----,-- -- +--, --, __Ty���1 24-- r 0.38--'---- --'-----'---- --' --'-----'---- --' --'--- �/ - 0.36 --'----L--L--'---'-- -- --+----'---'lyr;24ir_Rairtfa1 2.917- 0.32 --,-- -------------li-- ----------li-- R1.1�f /'AI�i�3./'�V �It 0.3 j ---- -- --------- -- --L-------'--L-+--L--------'--���--L--L--I-{- 0.28 --�-- +--+--+-------+--+--+--+---- "Y•• [qme 0.-0 cjI 0.26 ---- +--+--r--r--i--+--+--+--r--r--i--+--+--r--r--i---i--+--+--r--r- u 0.24 --; - -- ; --; --; ---- -- -- ; --; --; ---- ' --Run D pth=� 4 - 3 0.22 --'----L--L--'---'------L--L--'-------L--L------------L--L--'-- F]A6W� L4n#0th_11t6T O 0.18 -- - -1 _F F 1--7--+--r--I---1---1--+--r-- ---- -r---- 0.16 --,-- ---------------- ------------ ----------�Tlp=�-.9�111- 0.14 --'----L--L-------J--L--L--L-----'----L--L-----'---'--L- L ' - 0.12 ��- 0.1 - -i 0.08 --'-- --'--'---'---'---'---'--'---'---'---'---'---'--'---'---'---'---'--'---'---'-- 0.06 --'-- - -L--1---1--J--1--1--L--1---'--L--+--L----------L--+--L--'-- 0.04 - --- -+- r--r--+-+--+--+--r--r--i--+--+--r--r--+--i--+--+--r--r- 0.02 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) ■ Runoff TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 22 Hydrograph for Subcatchment 20S: UNDETAINED POST TO OUTFALL 3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 2.00 0.06 0.00 0.00 3.00 0.10 0.00 0.00 4.00 0.13 0.00 0.00 5.00 0.18 0.00 0.00 6.00 0.22 0.00 0.00 7.00 0.28 0.00 0.00 8.00 0.34 0.00 0.00 9.00 0.41 0.00 0.00 10.00 0.51 0.00 0.00 11.00 0.66 0.00 0.00 12.00 1.86 0.03 0.04 13.00 2.17 0.08 0.15 14.00 2.30 0.11 0.10 15.00 2.40 0.13 0.08 16.00 2.47 0.15 0.07 17.00 2.53 0.16 0.06 18.00 2.59 0.18 0.05 19.00 2.64 0.19 0.05 20.00 2.68 0.20 0.04 21.00 2.71 0.21 0.04 22.00 2.75 0.22 0.04 23.00 2.78 0.23 0.04 24.00 2.81 0.24 0.04 25.00 2.81 0.24 0.00 26.00 2.81 0.24 0.00 27.00 2.81 0.24 0.00 28.00 2.81 0.24 0.00 29.00 2.81 0.24 0.00 30.00 2.81 0.24 0.00 31.00 2.81 0.24 0.00 32.00 2.81 0.24 0.00 33.00 2.81 0.24 0.00 34.00 2.81 0.24 0.00 35.00 2.81 0.24 0.00 36.00 2.81 0.24 0.00 37.00 2.81 0.24 0.00 38.00 2.81 0.24 0.00 39.00 2.81 0.24 0.00 40.00 2.81 0.24 0.00 41.00 2.81 0.24 0.00 42.00 2.81 0.24 0.00 43.00 2.81 0.24 0.00 44.00 2.81 0.24 0.00 45.00 2.81 0.24 0.00 46.00 2.81 0.24 0.00 47.00 2.81 0.24 0.00 48.00 2.81 0.24 0.00 49.00 2.81 0.24 0.00 50.00 2.81 0.24 0.00 51.00 2.81 0.24 0.00 52.00 2.81 0.24 0.00 53.00 2.81 0.24 0.00 54.00 2.81 0.24 0.00 55.00 2.81 0.24 0.00 56.00 2.81 0.24 0.00 57.00 2.81 0.24 0.00 58.00 2.81 0.24 0.00 59.00 2.81 0.24 0.00 60.00 2.81 0.24 0.00 61.00 2.81 0.24 0.00 62.00 2.81 0.24 0.00 63.00 2.81 0.24 0.00 64.00 2.81 0.24 0.00 65.00 2.81 0.24 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 2.81 0.24 0.00 67.00 2.81 0.24 0.00 68.00 2.81 0.24 0.00 69.00 2.81 0.24 0.00 70.00 2.81 0.24 0.00 71.00 2.81 0.24 0.00 72.00 2.81 0.24 0.00 73.00 2.81 0.24 0.00 74.00 2.81 0.24 0.00 75.00 2.81 0.24 0.00 76.00 2.81 0.24 0.00 77.00 2.81 0.24 0.00 78.00 2.81 0.24 0.00 79.00 2.81 0.24 0.00 80.00 2.81 0.24 0.00 81.00 2.81 0.24 0.00 82.00 2.81 0.24 0.00 83.00 2.81 0.24 0.00 84.00 2.81 0.24 0.00 85.00 2.81 0.24 0.00 86.00 2.81 0.24 0.00 87.00 2.81 0.24 0.00 88.00 2.81 0.24 0.00 89.00 2.81 0.24 0.00 90.00 2.81 0.24 0.00 91.00 2.81 0.24 0.00 92.00 2.81 0.24 0.00 93.00 2.81 0.24 0.00 94.00 2.81 0.24 0.00 95.00 2.81 0.24 0.00 96.00 2.81 0.24 0.00 97.00 2.81 0.24 0.00 98.00 2.81 0.24 0.00 99.00 2.81 0.24 0.00 100.00 2.81 0.24 0.00 101.00 2.81 0.24 0.00 102.00 2.81 0.24 0.00 103.00 2.81 0.24 0.00 104.00 2.81 0.24 0.00 105.00 2.81 0.24 0.00 106.00 2.81 0.24 0.00 107.00 2.81 0.24 0.00 108.00 2.81 0.24 0.00 109.00 2.81 0.24 0.00 110.00 2.81 0.24 0.00 111.00 2.81 0.24 0.00 112.00 2.81 0.24 0.00 113.00 2.81 0.24 0.00 114.00 2.81 0.24 0.00 115.00 2.81 0.24 0.00 116.00 2.81 0.24 0.00 117.00 2.81 0.24 0.00 118.00 2.81 0.24 0.00 119.00 2.81 0.24 0.00 120.00 2.81 0.24 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 23 Summary for Pond 2P: POND 2 Inflow Area = 19.790 ac, 74.23% Impervious, Inflow Depth = 1.65" for lyr-24hr event Inflow = 58.05 cfs @ 11.96 hrs, Volume= 2.722 of Outflow = 0.95 cfs @ 17.37 hrs, Volume= 2.706 af, Atten= 98%, Lag= 325.1 min Primary = 0.95 cfs @ 17.37 hrs, Volume= 2.706 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 713.90' @ 17.37 hrs Surf.Area= 27,697 sf Storage= 83,018 cf Plug -Flow detention time= 1,117.2 min calculated for 2.706 of (99% of inflow) Center -of -Mass det. time= 1,113.6 min ( 1,930.1 - 816.5 ) Volume Invert Avail.Storage Storage Description #1 710.50' 290,610 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 710.50 20,568 0 0 711.00 22,310 10,720 10,720 712.00 24,113 23,212 33,931 713.00 25,975 25,044 58,975 714.00 27,897 26,936 85,911 715.00 29,879 28,888 114,799 716.00 31,920 30,900 145,699 717.00 34,021 32,971 178,669 718.00 36,183 35,102 213,771 719.00 38,404 37,294 251,065 720.00 40,686 39,545 290,610 Device Routing Invert Outlet Devices #1 Primary 709.39' 24.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 709.39' / 709.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 710.50' 4.5" Vert. 4.5" Orifice C= 0.600 #3 Device 1 715.00' 36.0" W x 6.0" H Vert. Slotted Weirs X 3.00 C= 0.600 #4 Device 1 718.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 718.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.95 cfs @ 17.37 hrs HW=713.90' TW=0.00' (Dynamic Tailwater) L1=Culvert (Passes 0.95 cfs of 28.09 cfs potential flow) 2=4.5" Orifice (Orifice Controls 0.95 cfs @ 8.62 fps) 3=Slotted Weirs ( Controls 0.00 cfs) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=710.50' TW=0.00' (Dynamic Tailwater) 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 24 ..... 1 I% M1111186IMM TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 C 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 2P: POND 2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 710.50 0.00 0.00 0.00 2.50 0.00 0 710.50 0.00 0.00 0.00 5.00 0.00 0 710.50 0.00 0.00 0.00 7.50 0.05 46 710.50 0.00 0.00 0.00 10.00 0.58 2,277 710.61 0.03 0.03 0.00 12.50 4.76 68,944 713.38 0.87 0.87 0.00 15.00 1.45 81,394 713.84 0.94 0.94 0.00 17.50 0.94 83,015 713.90 0.95 0.95 0.00 20.00 0.64 81,586 713.84 0.94 0.94 0.00 22.50 0.58 78,616 713.74 0.93 0.93 0.00 25.00 0.00 73,538 713.55 0.90 0.90 0.00 27.50 0.00 65,654 713.25 0.85 0.85 0.00 30.00 0.00 58,203 712.97 0.80 0.80 0.00 32.50 0.00 51,195 712.70 0.75 0.75 0.00 35.00 0.00 44,636 712.44 0.70 0.70 0.00 37.50 0.00 38,538 712.19 0.65 0.65 0.00 40.00 0.00 32,907 711.96 0.60 0.60 0.00 42.50 0.00 27,753 711.74 0.55 0.55 0.00 45.00 0.00 23,083 711.54 0.49 0.49 0.00 47.50 0.00 18,905 711.36 0.44 0.44 0.00 50.00 0.00 15,226 711.20 0.38 0.38 0.00 52.50 0.00 12,052 711.06 0.32 0.32 0.00 55.00 0.00 9,389 710.94 0.27 0.27 0.00 57.50 0.00 7,240 710.84 0.21 0.21 0.00 60.00 0.00 5,632 710.77 0.15 0.15 0.00 62.50 0.00 4,510 710.72 0.10 0.10 0.00 65.00 0.00 3,719 710.68 0.07 0.07 0.00 67.50 0.00 3,143 710.65 0.05 0.05 0.00 70.00 0.00 2,710 710.63 0.04 0.04 0.00 72.50 0.00 2,376 710.61 0.03 0.03 0.00 75.00 0.00 2,111 710.60 0.03 0.03 0.00 77.50 0.00 1,897 710.59 0.02 0.02 0.00 80.00 0.00 1,721 710.58 0.02 0.02 0.00 82.50 0.00 1,573 710.58 0.02 0.02 0.00 85.00 0.00 1,448 710.57 0.01 0.01 0.00 87.50 0.00 1,341 710.56 0.01 0.01 0.00 90.00 0.00 1,248 710.56 0.01 0.01 0.00 92.50 0.00 1,167 710.56 0.01 0.01 0.00 95.00 0.00 1,095 710.55 0.01 0.01 0.00 97.50 0.00 1,032 710.55 0.01 0.01 0.00 100.00 0.00 975 710.55 0.01 0.01 0.00 102.50 0.00 924 710.54 0.01 0.01 0.00 105.00 0.00 878 710.54 0.00 0.00 0.00 107.50 0.00 837 710.54 0.00 0.00 0.00 110.00 0.00 799 710.54 0.00 0.00 0.00 112.50 0.00 764 710.54 0.00 0.00 0.00 115.00 0.00 732 710.54 0.00 0.00 0.00 117.50 0.00 703 710.53 0.00 0.00 0.00 120.00 0.00 675 710.53 0.00 0.00 0.00 Type 1124-hr 1 yr-24hr Rainfall=2.81 " Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 26 Stage -Discharge for Pond 2P: POND 2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 710.50 0.00 0.00 0.00 710.60 0.03 0.03 0.00 710.70 0.09 0.09 0.00 710.80 0.18 0.18 0.00 710.90 0.25 0.25 0.00 711.00 0.30 0.30 0.00 711.10 0.34 0.34 0.00 711.20 0.38 0.38 0.00 711.30 0.42 0.42 0.00 711.40 0.45 0.45 0.00 711.50 0.48 0.48 0.00 711.60 0.51 0.51 0.00 711.70 0.54 0.54 0.00 711.80 0.56 0.56 0.00 711.90 0.59 0.59 0.00 712.00 0.61 0.61 0.00 712.10 0.63 0.63 0.00 712.20 0.65 0.65 0.00 712.30 0.68 0.68 0.00 712.40 0.70 0.70 0.00 712.50 0.72 0.72 0.00 712.60 0.74 0.74 0.00 712.70 0.75 0.75 0.00 712.80 0.77 0.77 0.00 712.90 0.79 0.79 0.00 713.00 0.81 0.81 0.00 713.10 0.83 0.83 0.00 713.20 0.84 0.84 0.00 713.30 0.86 0.86 0.00 713.40 0.88 0.88 0.00 713.50 0.89 0.89 0.00 713.60 0.91 0.91 0.00 713.70 0.92 0.92 0.00 713.80 0.94 0.94 0.00 713.90 0.95 0.95 0.00 714.00 0.97 0.97 0.00 714.10 0.98 0.98 0.00 714.20 1.00 1.00 0.00 714.30 1.01 1.01 0.00 714.40 1.02 1.02 0.00 714.50 1.04 1.04 0.00 714.60 1.05 1.05 0.00 714.70 1.07 1.07 0.00 714.80 1.08 1.08 0.00 714.90 1.09 1.09 0.00 715.00 1.10 1.10 0.00 715.10 2.03 2.03 0.00 715.20 3.71 3.71 0.00 715.30 5.89 5.89 0.00 715.40 8.46 8.46 0.00 715.50 11.38 11.38 0.00 715.60 13.69 13.69 0.00 715.70 15.53 15.53 0.00 715.80 17.13 17.13 0.00 715.90 18.57 18.57 0.00 716.00 19.90 19.90 0.00 716.10 21.14 21.14 0.00 716.20 22.31 22.31 0.00 716.30 23.41 23.41 0.00 716.40 24.46 24.46 0.00 716.50 25.47 25.47 0.00 716.60 26.43 26.43 0.00 716.70 27.36 27.36 0.00 716.80 28.26 28.26 0.00 716.90 29.13 29.13 0.00 717.00 29.97 29.97 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 717.10 30.80 30.80 0.00 717.20 31.59 31.59 0.00 717.30 32.37 32.37 0.00 717.40 33.13 33.13 0.00 717.50 33.87 33.87 0.00 717.60 34.60 34.60 0.00 717.70 35.31 35.31 0.00 717.80 36.00 36.00 0.00 717.90 36.69 36.69 0.00 718.00 37.36 37.36 0.00 718.10 39.67 39.67 0.00 718.20 42.27 42.27 0.00 718.30 42.54 42.54 0.00 718.40 42.81 42.81 0.00 718.50 43.08 43.08 0.00 718.60 44.13 43.34 0.79 718.70 45.83 43.61 2.23 718.80 48.02 43.87 4.15 718.90 50.60 44.13 6.48 719.00 53.68 44.39 9.30 719.10 57.19 44.64 12.55 719.20 60.68 44.90 15.78 719.30 64.40 45.15 19.25 719.40 68.33 45.41 22.92 719.50 72.46 45.66 26.80 719.60 76.88 45.91 30.98 719.70 81.52 46.16 35.36 719.80 86.13 46.40 39.72 719.90 90.88 46.65 44.23 720.00 95.67 46.89 48.78 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 27 Stage -Area -Storage for Pond 2P: POND 2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 710.50 20,568 0 710.60 20,916 2,074 710.70 21,265 4,183 710.80 21,613 6,327 710.90 21,962 8,506 711.00 22,310 10,720 711.10 22,490 12,960 711.20 22,671 15,218 711.30 22,851 17,494 711.40 23,031 19,788 711.50 23,212 22,100 711.60 23,392 24,430 711.70 23,572 26,778 711.80 23,752 29,144 711.90 23,933 31,529 712.00 24,113 33,931 712.10 24,299 36,352 712.20 24,485 38,791 712.30 24,672 41,249 712.40 24,858 43,725 712.50 25,044 46,220 712.60 25,230 48,734 712.70 25,416 51,266 712.80 25,603 53,817 712.90 25,789 56,387 713.00 25,975 58,975 713.10 26,167 61,582 713.20 26,359 64,208 713.30 26,552 66,854 713.40 26,744 69,519 713.50 26,936 72,203 713.60 27,128 74,906 713.70 27,320 77,628 713.80 27,513 80,370 713.90 27,705 83,131 714.00 27,897 85,911 714.10 28,095 88,711 714.20 28,293 91,530 714.30 28,492 94,369 714.40 28,690 97,228 714.50 28,888 100,107 714.60 29,086 103,006 714.70 29,284 105,924 714.80 29,483 108,863 714.90 29,681 111,821 715.00 29,879 114,799 715.10 30,083 117,797 715.20 30,287 120,816 715.30 30,491 123,855 715.40 30,695 126,914 715.50 30,900 129,994 715.60 31,104 133,094 715.70 31,308 136,214 715.80 31,512 139,355 715.90 31,716 142,517 716.00 31,920 145,699 716.10 32,130 148,901 716.20 32,340 152,125 716.30 32,550 155,369 716.40 32,760 158,635 716.50 32,971 161,921 716.60 33,181 165,229 716.70 33,391 168,557 716.80 33,601 171,907 716.90 33,811 175,277 717.00 34.021 178.669 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 717.10 34,237 182,082 717.20 34,453 185,516 717.30 34,670 188,973 717.40 34,886 192,450 717.50 35,102 195,950 717.60 35,318 199,471 717.70 35,534 203,013 717.80 35,751 206,578 717.90 35,967 210,164 718.00 36,183 213,771 718.10 36,405 217,400 718.20 36,627 221,052 718.30 36,849 224,726 718.40 37,071 228,422 718.50 37,294 232,140 718.60 37,516 235,881 718.70 37,738 239,643 718.80 37,960 243,428 718.90 38,182 247,235 719.00 38,404 251,065 719.10 38,632 254,916 719.20 38,860 258,791 719.30 39,089 262,688 719.40 39,317 266,609 719.50 39,545 270,552 719.60 39,773 274,518 719.70 40,001 278,506 719.80 40,230 282,518 719.90 40,458 286,552 720.00 40,686 290,610 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 28 Summary for Pond 8P: POND 3 Inflow Area = 15.260 ac, 72.15% Impervious, Inflow Depth = 1.65" for lyr-24hr event Inflow = 44.76 cfs @ 11.96 hrs, Volume= 2.099 of Outflow = 0.63 cfs @ 18.55 hrs, Volume= 2.076 af, Atten= 99%, Lag= 395.5 min Primary = 0.63 cfs @ 18.55 hrs, Volume= 2.076 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 703.09' @ 18.55 hrs Surf.Area= 48,715 sf Storage= 66,661 cf Plug -Flow detention time= 1,349.6 min calculated for 2.076 of (99% of inflow) Center -of -Mass det. time= 1,343.0 min ( 2,159.5 - 816.5 ) Volume Invert Avail.Storage Storage Description #1 701.50' 519,480 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 701.50 22,118 0 0 702.00 43,792 16,478 16,478 703.00 48,320 46,056 62,534 704.00 52,961 50,641 113,174 705.00 57,717 55,339 168,513 706.00 62,582 60,150 228,663 707.00 67,552 65,067 293,730 708.00 72,628 70,090 363,820 709.00 77,809 75,219 439,038 710.00 83,074 80,442 519,480 Device Routing Invert Outlet Devices #1 Primary 701.39' 24.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 701.39' / 701.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 701.50' 4.5" Vert. 4.5" Orifice C= 0.600 #3 Device 1 705.00' 36.0" W x 6.0" H Vert. Slotted Weirs X 2.00 C= 0.600 #4 Device 1 708.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 708.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.63 cfs @ 18.55 hrs HW=703.09' TW=0.00' (Dynamic Tailwater) L1=Culvert (Passes 0.63 cfs of 10.29 cfs potential flow) 2=4.5" Orifice (Orifice Controls 0.63 cfs @ 5.69 fps) 3=Slotted Weirs ( Controls 0.00 cfs) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=701.50' TW=0.00' (Dynamic Tailwater) T 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 29 '0=6 1 E:iAZORIII&I ..... • �1 • • .. .. 1101 • I/ 1 11 //// iiiiiiiiiio� ////////////////////////////////////////////////////////////////////////////////////////� TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 C 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 8P: POND 3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 701.50 0.00 0.00 0.00 2.50 0.00 0 701.50 0.00 0.00 0.00 5.00 0.00 0 701.50 0.00 0.00 0.00 7.50 0.04 35 701.50 0.00 0.00 0.00 10.00 0.44 1,772 701.57 0.01 0.01 0.00 12.50 3.67 53,659 702.81 0.56 0.56 0.00 15.00 1.12 64,253 703.04 0.62 0.62 0.00 17.50 0.72 66,481 703.08 0.63 0.63 0.00 20.00 0.50 66,317 703.08 0.63 0.63 0.00 22.50 0.45 64,913 703.05 0.62 0.62 0.00 25.00 0.00 61,826 702.99 0.61 0.61 0.00 27.50 0.00 56,492 702.87 0.58 0.58 0.00 30.00 0.00 51,399 702.77 0.55 0.55 0.00 32.50 0.00 46,547 702.66 0.53 0.53 0.00 35.00 0.00 41,941 702.56 0.50 0.50 0.00 37.50 0.00 37,581 702.47 0.47 0.47 0.00 40.00 0.00 33,471 702.38 0.44 0.44 0.00 42.50 0.00 29,613 702.30 0.41 0.41 0.00 45.00 0.00 26,009 702.22 0.39 0.39 0.00 47.50 0.00 22,660 702.14 0.36 0.36 0.00 50.00 0.00 19,569 702.07 0.33 0.33 0.00 52.50 0.00 16,738 702.01 0.30 0.30 0.00 55.00 0.00 14,170 701.95 0.27 0.27 0.00 57.50 0.00 11,878 701.89 0.24 0.24 0.00 60.00 0.00 9,871 701.84 0.21 0.21 0.00 62.50 0.00 8,195 701.79 0.17 0.17 0.00 65.00 0.00 6,852 701.75 0.13 0.13 0.00 67.50 0.00 5,792 701.72 0.10 0.10 0.00 70.00 0.00 4,956 701.69 0.08 0.08 0.00 72.50 0.00 4,290 701.67 0.07 0.07 0.00 75.00 0.00 3,756 701.65 0.05 0.05 0.00 77.50 0.00 3,323 701.63 0.04 0.04 0.00 80.00 0.00 2,967 701.62 0.04 0.04 0.00 82.50 0.00 2,671 701.61 0.03 0.03 0.00 85.00 0.00 2,423 701.60 0.03 0.03 0.00 87.50 0.00 2,212 701.59 0.02 0.02 0.00 90.00 0.00 2,032 701.58 0.02 0.02 0.00 92.50 0.00 1,876 701.58 0.02 0.02 0.00 95.00 0.00 1,740 701.57 0.01 0.01 0.00 97.50 0.00 1,622 701.57 0.01 0.01 0.00 100.00 0.00 1,517 701.56 0.01 0.01 0.00 102.50 0.00 1,424 701.56 0.01 0.01 0.00 105.00 0.00 1,341 701.56 0.01 0.01 0.00 107.50 0.00 1,266 701.55 0.01 0.01 0.00 110.00 0.00 1,199 701.55 0.01 0.01 0.00 112.50 0.00 1,138 701.55 0.01 0.01 0.00 115.00 0.00 1,083 701.55 0.01 0.01 0.00 117.50 0.00 1,033 701.54 0.01 0.01 0.00 120.00 0.00 987 701.54 0.00 0.00 0.00 Type 1124-hr 1 yr-24hr Rainfall=2.81 " Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 31 Stage -Discharge for Pond 8P: POND 3 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 701.50 0.00 0.00 0.00 701.60 0.03 0.03 0.00 701.70 0.09 0.09 0.00 701.80 0.18 0.18 0.00 701.90 0.25 0.25 0.00 702.00 0.30 0.30 0.00 702.10 0.34 0.34 0.00 702.20 0.38 0.38 0.00 702.30 0.42 0.42 0.00 702.40 0.45 0.45 0.00 702.50 0.48 0.48 0.00 702.60 0.51 0.51 0.00 702.70 0.54 0.54 0.00 702.80 0.56 0.56 0.00 702.90 0.59 0.59 0.00 703.00 0.61 0.61 0.00 703.10 0.63 0.63 0.00 703.20 0.65 0.65 0.00 703.30 0.68 0.68 0.00 703.40 0.70 0.70 0.00 703.50 0.72 0.72 0.00 703.60 0.74 0.74 0.00 703.70 0.75 0.75 0.00 703.80 0.77 0.77 0.00 703.90 0.79 0.79 0.00 704.00 0.81 0.81 0.00 704.10 0.83 0.83 0.00 704.20 0.84 0.84 0.00 704.30 0.86 0.86 0.00 704.40 0.88 0.88 0.00 704.50 0.89 0.89 0.00 704.60 0.91 0.91 0.00 704.70 0.92 0.92 0.00 704.80 0.94 0.94 0.00 704.90 0.95 0.95 0.00 705.00 0.97 0.97 0.00 705.10 1.59 1.59 0.00 705.20 2.72 2.72 0.00 705.30 4.18 4.18 0.00 705.40 5.90 5.90 0.00 705.50 7.85 7.85 0.00 705.60 9.39 9.39 0.00 705.70 10.62 10.62 0.00 705.80 11.69 11.69 0.00 705.90 12.66 12.66 0.00 706.00 13.55 13.55 0.00 706.10 14.39 14.39 0.00 706.20 15.17 15.17 0.00 706.30 15.91 15.91 0.00 706.40 16.61 16.61 0.00 706.50 17.29 17.29 0.00 706.60 17.94 17.94 0.00 706.70 18.56 18.56 0.00 706.80 19.17 19.17 0.00 706.90 19.75 19.75 0.00 707.00 20.32 20.32 0.00 707.10 20.87 20.87 0.00 707.20 21.41 21.41 0.00 707.30 21.93 21.93 0.00 707.40 22.44 22.44 0.00 707.50 22.94 22.94 0.00 707.60 23.43 23.43 0.00 707.70 23.90 23.90 0.00 707.80 24.37 24.37 0.00 707.90 24.83 24.83 0.00 708.00 25.28 25.28 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 708.10 27.38 27.38 0.00 708.20 30.84 30.84 0.00 708.30 35.18 35.18 0.00 708.40 37.08 37.08 0.00 708.50 37.39 37.39 0.00 708.60 38.48 37.70 0.79 708.70 40.22 38.00 2.23 708.80 42.45 38.30 4.15 708.90 45.07 38.60 6.48 709.00 48.19 38.89 9.30 709.10 51.73 39.18 12.55 709.20 55.26 39.47 15.78 709.30 59.01 39.76 19.25 709.40 62.97 40.05 22.92 709.50 67.13 40.33 26.80 709.60 71.59 40.62 30.98 709.70 76.26 40.90 35.36 709.80 80.90 41.18 39.72 709.90 85.68 41.45 44.23 710.00 90.50 41.73 48.78 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 32 Stage -Area -Storage for Pond 8P: POND 3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 701.50 22,118 0 701.60 26,453 2,429 701.70 30,788 5,291 701.80 35,122 8,586 701.90 39,457 12,315 702.00 43,792 16,478 702.10 44,245 20,879 702.20 44,698 25,326 702.30 45,150 29,819 702.40 45,603 34,357 702.50 46,056 38,940 702.60 46,509 43,568 702.70 46,962 48,241 702.80 47,414 52,960 702.90 47,867 57,724 703.00 48,320 62,534 703.10 48,784 67,389 703.20 49,248 72,290 703.30 49,712 77,238 703.40 50,176 82,233 703.50 50,641 87,274 703.60 51,105 92,361 703.70 51,569 97,495 703.80 52,033 102,675 703.90 52,497 107,901 704.00 52,961 113,174 704.10 53,437 118,494 704.20 53,912 123,861 704.30 54,388 129,276 704.40 54,863 134,739 704.50 55,339 140,249 704.60 55,815 145,807 704.70 56,290 151,412 704.80 56,766 157,065 704.90 57,241 162,765 705.00 57,717 168,513 705.10 58,204 174,309 705.20 58,690 180,154 705.30 59,176 186,047 705.40 59,663 191,989 705.50 60,150 197,980 705.60 60,636 204,019 705.70 61,123 210,107 705.80 61,609 216,243 705.90 62,095 222,429 706.00 62,582 228,663 706.10 63,079 234,946 706.20 63,576 241,278 706.30 64,073 247,661 706.40 64,570 254,093 706.50 65,067 260,575 706.60 65,564 267,106 706.70 66,061 273,688 706.80 66,558 280,318 706.90 67,055 286,999 707.00 67,552 293,730 707.10 68,060 300,510 707.20 68,567 307,341 707.30 69,075 314,224 707.40 69,582 321,156 707.50 70,090 328,140 707.60 70,598 335,174 707.70 71,105 342,260 707.80 71,613 349,395 707.90 72,120 356,582 708.00 72.628 363.820 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 708.10 73,146 371,108 708.20 73,664 378,449 708.30 74,182 385,841 708.40 74,700 393,285 708.50 75,219 400,781 708.60 75,737 408,329 708.70 76,255 415,928 708.80 76,773 423,580 708.90 77,291 431,283 709.00 77,809 439,038 709.10 78,336 446,845 709.20 78,862 454,705 709.30 79,388 462,618 709.40 79,915 470,583 709.50 80,442 478,601 709.60 80,968 486,671 709.70 81,495 494,794 709.80 82,021 502,970 709.90 82,547 511,198 710.00 83,074 519,480 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 33 Summary for Pond 10P: POND 4 Inflow Area = 10.550 ac, 69.48% Impervious, Inflow Depth = 1.57" for lyr-24hr event Inflow = 29.66 cfs @ 11.96 hrs, Volume= 1.384 of Outflow = 2.96 cfs @ 12.40 hrs, Volume= 1.384 af, Atten= 90%, Lag= 26.8 min Primary = 2.96 cfs @ 12.40 hrs, Volume= 1.384 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 680.44' @ 12.40 hrs Surf.Area= 12,174 sf Storage= 26,350 cf Plug -Flow detention time= 104.3 min calculated for 1.383 of (100% of inflow) Center -of -Mass det. time= 105.5 min ( 926.0 - 820.4 ) Volume Invert Avail.Storage Storage Description #1 677.00' 120,639 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 677.00 4,560 0 0 678.00 5,909 5,235 5,235 679.00 7,780 6,845 12,079 680.00 10,667 9,224 21,303 681.00 14,076 12,372 33,674 682.00 17,710 15,893 49,567 683.00 21,571 19,641 69,208 684.00 25,659 23,615 92,823 685.00 29,973 27,816 120,639 Device Routing Invert Outlet Devices #1 Primary 676.39' 24.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 676.39' / 676.00' S= 0.0050 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 677.00' 8.0" Vert. 8" Orifice C= 0.600 #3 Device 1 682.50' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #4 Secondary 683.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=2.96 cfs @ 12.40 hrs HW=680.44' TW=0.00' (Dynamic Tailwater) 1­1=Culvert (Passes 2.96 cfs of 25.80 cfs potential flow) 1 2=8" Orifice (Orifice Controls 2.96 cfs @ 8.49 fps) 3=Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=677.00' TW=0.00' (Dynamic Tailwater) 4=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 34 '0=6 1 gM1111 191MIX! ..... • .. N N Outflow �i • i 1 LInflow N Primary N Secondary 32 -. 1 ... 2. FL Time (hours) TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 C 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 10P: POND 4 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 677.00 0.00 0.00 0.00 2.50 0.00 0 677.00 0.00 0.00 0.00 5.00 0.00 0 677.00 0.00 0.00 0.00 7.50 0.00 0 677.00 0.00 0.00 0.00 10.00 0.26 751 677.16 0.09 0.09 0.00 12.50 2.46 26,264 680.43 2.96 2.96 0.00 15.00 0.75 13,038 679.12 2.25 2.25 0.00 17.50 0.49 3,508 677.70 1.01 1.01 0.00 20.00 0.34 1,740 677.36 0.40 0.40 0.00 22.50 0.30 1,512 677.32 0.31 0.31 0.00 25.00 0.00 849 677.18 0.11 0.11 0.00 27.50 0.00 379 677.08 0.02 0.02 0.00 30.00 0.00 240 677.05 0.01 0.01 0.00 32.50 0.00 175 677.04 0.01 0.01 0.00 35.00 0.00 137 677.03 0.00 0.00 0.00 37.50 0.00 113 677.02 0.00 0.00 0.00 40.00 0.00 96 677.02 0.00 0.00 0.00 42.50 0.00 83 677.02 0.00 0.00 0.00 45.00 0.00 74 677.02 0.00 0.00 0.00 47.50 0.00 66 677.01 0.00 0.00 0.00 50.00 0.00 60 677.01 0.00 0.00 0.00 52.50 0.00 54 677.01 0.00 0.00 0.00 55.00 0.00 50 677.01 0.00 0.00 0.00 57.50 0.00 46 677.01 0.00 0.00 0.00 60.00 0.00 43 677.01 0.00 0.00 0.00 62.50 0.00 40 677.01 0.00 0.00 0.00 65.00 0.00 38 677.01 0.00 0.00 0.00 67.50 0.00 36 677.01 0.00 0.00 0.00 70.00 0.00 34 677.01 0.00 0.00 0.00 72.50 0.00 32 677.01 0.00 0.00 0.00 75.00 0.00 31 677.01 0.00 0.00 0.00 77.50 0.00 29 677.01 0.00 0.00 0.00 80.00 0.00 28 677.01 0.00 0.00 0.00 82.50 0.00 27 677.01 0.00 0.00 0.00 85.00 0.00 26 677.01 0.00 0.00 0.00 87.50 0.00 25 677.01 0.00 0.00 0.00 90.00 0.00 24 677.01 0.00 0.00 0.00 92.50 0.00 23 677.00 0.00 0.00 0.00 95.00 0.00 22 677.00 0.00 0.00 0.00 97.50 0.00 21 677.00 0.00 0.00 0.00 100.00 0.00 21 677.00 0.00 0.00 0.00 102.50 0.00 20 677.00 0.00 0.00 0.00 105.00 0.00 19 677.00 0.00 0.00 0.00 107.50 0.00 19 677.00 0.00 0.00 0.00 110.00 0.00 18 677.00 0.00 0.00 0.00 112.50 0.00 18 677.00 0.00 0.00 0.00 115.00 0.00 17 677.00 0.00 0.00 0.00 117.50 0.00 17 677.00 0.00 0.00 0.00 120.00 0.00 16 677.00 0.00 0.00 0.00 Type 1124-hr 1 yr-24hr Rainfall=2.81 " Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 36 Stage -Discharge for Pond 10P: POND 4 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 677.00 0.00 0.00 0.00 677.10 0.04 0.04 0.00 677.20 0.13 0.13 0.00 677.30 0.28 0.28 0.00 677.40 0.47 0.47 0.00 677.50 0.68 0.68 0.00 677.60 0.87 0.87 0.00 677.70 1.02 1.02 0.00 677.80 1.15 1.15 0.00 677.90 1.27 1.27 0.00 678.00 1.37 1.37 0.00 678.10 1.47 1.47 0.00 678.20 1.56 1.56 0.00 678.30 1.65 1.65 0.00 678.40 1.74 1.74 0.00 678.50 1.82 1.82 0.00 678.60 1.89 1.89 0.00 678.70 1.96 1.96 0.00 678.80 2.04 2.04 0.00 678.90 2.10 2.10 0.00 679.00 2.17 2.17 0.00 679.10 2.23 2.23 0.00 679.20 2.30 2.30 0.00 679.30 2.36 2.36 0.00 679.40 2.42 2.42 0.00 679.50 2.47 2.47 0.00 679.60 2.53 2.53 0.00 679.70 2.59 2.59 0.00 679.80 2.64 2.64 0.00 679.90 2.69 2.69 0.00 680.00 2.74 2.74 0.00 680.10 2.80 2.80 0.00 680.20 2.85 2.85 0.00 680.30 2.89 2.89 0.00 680.40 2.94 2.94 0.00 680.50 2.99 2.99 0.00 680.60 3.04 3.04 0.00 680.70 3.08 3.08 0.00 680.80 3.13 3.13 0.00 680.90 3.17 3.17 0.00 681.00 3.22 3.22 0.00 681.10 3.26 3.26 0.00 681.20 3.30 3.30 0.00 681.30 3.35 3.35 0.00 681.40 3.39 3.39 0.00 681.50 3.43 3.43 0.00 681.60 3.47 3.47 0.00 681.70 3.51 3.51 0.00 681.80 3.55 3.55 0.00 681.90 3.59 3.59 0.00 682.00 3.63 3.63 0.00 682.10 3.67 3.67 0.00 682.20 3.71 3.71 0.00 682.30 3.75 3.75 0.00 682.40 3.78 3.78 0.00 682.50 3.82 3.82 0.00 682.60 5.51 5.51 0.00 682.70 8.57 8.57 0.00 682.80 12.53 12.53 0.00 682.90 17.20 17.20 0.00 683.00 22.50 22.50 0.00 683.10 28.35 28.35 0.00 683.20 34.71 34.71 0.00 683.30 36.77 36.77 0.00 683.40 37.08 37.08 0.00 683.50 37.39 37.39 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 683.60 38.48 37.70 0.79 683.70 40.22 38.00 2.23 683.80 42.45 38.30 4.15 683.90 45.07 38.60 6.48 684.00 48.19 38.89 9.30 684.10 51.73 39.18 12.55 684.20 55.26 39.47 15.78 684.30 59.01 39.76 19.25 684.40 62.97 40.05 22.92 684.50 67.13 40.33 26.80 684.60 71.59 40.62 30.98 684.70 76.26 40.90 35.36 684.80 80.90 41.18 39.72 684.90 85.68 41.45 44.23 685.00 90.50 41.73 48.78 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 37 Stage -Area -Storage for Pond 10P: POND 4 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 677.00 4,560 0 677.10 4,695 463 677.20 4,830 939 677.30 4,965 1,429 677.40 5,100 1,932 677.50 5,235 2,449 677.60 5,369 2,979 677.70 5,504 3,523 677.80 5,639 4,080 677.90 5,774 4,650 678.00 5,909 5,235 678.10 6,096 5,835 678.20 6,283 6,454 678.30 6,470 7,091 678.40 6,657 7,748 678.50 6,845 8,423 678.60 7,032 9,117 678.70 7,219 9,829 678.80 7,406 10,560 678.90 7,593 11,310 679.00 7,780 12,079 679.10 8,069 12,871 679.20 8,357 13,693 679.30 8,646 14,543 679.40 8,935 15,422 679.50 9,224 16,330 679.60 9,512 17,267 679.70 9,801 18,232 679.80 10,090 19,227 679.90 10,378 20,250 680.00 10,667 21,303 680.10 11,008 22,386 680.20 11,349 23,504 680.30 11,690 24,656 680.40 12,031 25,842 680.50 12,372 27,062 680.60 12,712 28,316 680.70 13,053 29,605 680.80 13,394 30,927 680.90 13,735 32,283 681.00 14,076 33,674 681.10 14,439 35,100 681.20 14,803 36,562 681.30 15,166 38,060 681.40 15,530 39,595 681.50 15,893 41,166 681.60 16,256 42,774 681.70 16,620 44,418 681.80 16,983 46,098 681.90 17,347 47,814 682.00 17,710 49,567 682.10 18,096 51,357 682.20 18,482 53,186 682.30 18,868 55,054 682.40 19,254 56,960 682.50 19,641 58,905 682.60 20,027 60,888 682.70 20,413 62,910 682.80 20,799 64,971 682.90 21,185 67,070 683.00 21,571 69,208 683.10 21,980 71,385 683.20 22,389 73,603 683.30 22,797 75,863 683.40 23,206 78,163 683.50 23.615 80.504 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 683.60 24,024 82,886 683.70 24,433 85,309 683.80 24,841 87,772 683.90 25,250 90,277 684.00 25,659 92,823 684.10 26,090 95,410 684.20 26,522 98,041 684.30 26,953 100,714 684.40 27,385 103,431 684.50 27,816 106,191 684.60 28,247 108,994 684.70 28,679 111,841 684.80 29,110 114,730 684.90 29,542 117,663 685.00 29,973 120,639 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HydroCAD®10.00-26 s/n 10066 ©2020 HydroCAD Software Solutions LLC Page 38 Summary for Pond 11 P: POST - OUTFALL #2 Inflow Area = 60.330 ac, 54.75% Impervious, Inflow Depth > 1.28" for 1yr-24hr event Inflow = 5.57 cfs @ 12.27 hrs, Volume= 6.430 of Primary = 5.57 cfs @ 12.27 hrs, Volume= 6.430 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Pond 11 P: POST - OUTFALL #2 Hydrograph ❑ Inflow 6 ❑ Primary 5.57 cfs ------- n I fl'o J4re - 0'3 0'a ------'-- -- -- --'---- ---------�-- --f-- 5 4 V I I I I I I I I I I I I I I I I I I I 3 3 0 LL 2 I I I I I I I I I I I I I I I 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 39 Hydrograph for Pond 11 P: POST - OUTFALL #2 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 1.00 0.00 0.00 2.00 0.00 0.00 3.00 0.00 0.00 4.00 0.00 0.00 5.00 0.00 0.00 6.00 0.00 0.00 7.00 0.00 0.00 8.00 0.00 0.00 9.00 0.02 0.02 10.00 0.13 0.13 11.00 0.56 0.56 12.00 4.04 4.04 13.00 4.91 4.91 14.00 4.51 4.51 15.00 4.10 4.10 16.00 3.60 3.60 17.00 3.06 3.06 18.00 2.56 2.56 19.00 2.26 2.26 20.00 2.12 2.12 21.00 2.05 2.05 22.00 2.02 2.02 23.00 1.99 1.99 24.00 1.96 1.96 25.00 1.62 1.62 26.00 1.53 1.53 27.00 1.48 1.48 28.00 1.44 1.44 29.00 1.40 1.40 30.00 1.37 1.37 31.00 1.33 1.33 32.00 1.30 1.30 33.00 1.27 1.27 34.00 1.24 1.24 35.00 1.20 1.20 36.00 1.17 1.17 37.00 1.14 1.14 38.00 1.11 1.11 39.00 1.08 1.08 40.00 1.04 1.04 41.00 1.01 1.01 42.00 0.98 0.98 43.00 0.95 0.95 44.00 0.91 0.91 45.00 0.88 0.88 46.00 0.85 0.85 47.00 0.81 0.81 48.00 0.78 0.78 49.00 0.74 0.74 50.00 0.71 0.71 51.00 0.68 0.68 52.00 0.64 0.64 53.00 0.61 0.61 54.00 0.57 0.57 55.00 0.54 0.54 56.00 0.50 0.50 57.00 0.47 0.47 58.00 0.43 0.43 59.00 0.39 0.39 60.00 0.35 0.35 61.00 0.32 0.32 62.00 0.29 0.29 63.00 0.26 0.26 64.00 0.23 0.23 65.00 0.21 0.21 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 66.00 0.19 0.19 67.00 0.17 0.17 68.00 0.15 0.15 69.00 0.14 0.14 70.00 0.12 0.12 71.00 0.11 0.11 72.00 0.10 0.10 73.00 0.09 0.09 74.00 0.09 0.09 75.00 0.08 0.08 76.00 0.07 0.07 77.00 0.07 0.07 78.00 0.06 0.06 79.00 0.06 0.06 80.00 0.05 0.05 81.00 0.05 0.05 82.00 0.05 0.05 83.00 0.04 0.04 84.00 0.04 0.04 85.00 0.04 0.04 86.00 0.04 0.04 87.00 0.03 0.03 88.00 0.03 0.03 89.00 0.03 0.03 90.00 0.03 0.03 91.00 0.03 0.03 92.00 0.03 0.03 93.00 0.02 0.02 94.00 0.02 0.02 95.00 0.02 0.02 96.00 0.02 0.02 97.00 0.02 0.02 98.00 0.02 0.02 99.00 0.02 0.02 100.00 0.02 0.02 101.00 0.02 0.02 102.00 0.02 0.02 103.00 0.01 0.01 104.00 0.01 0.01 105.00 0.01 0.01 106.00 0.01 0.01 107.00 0.01 0.01 108.00 0.01 0.01 109.00 0.01 0.01 110.00 0.01 0.01 111.00 0.01 0.01 112.00 0.01 0.01 113.00 0.01 0.01 114.00 0.01 0.01 115.00 0.01 0.01 116.00 0.01 0.01 117.00 0.01 0.01 118.00 0.01 0.01 119.00 0.01 0.01 120.00 0.01 0.01 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 40 Summary for Pond 13P: POND 1 Inflow Area = 36.370 ac, 81.50% Impervious, Inflow Depth = 1.89" for lyr-24hr event Inflow = 120.03 cfs @ 11.95 hrs, Volume= 5.743 of Outflow = 5.16 cfs @ 13.25 hrs, Volume= 5.734 af, Atten= 96%, Lag= 77.5 min Primary = 5.16 cfs @ 13.25 hrs, Volume= 5.734 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 705.28' @ 13.25 hrs Surf.Area= 40,935 sf Storage= 142,816 cf Plug -Flow detention time= 367.2 min calculated for 5.732 of (100% of inflow) Center -of -Mass det. time= 368.2 min ( 1,171.7 - 803.4 ) Volume Invert Avail.Storage Storage Description #1 701.00' 393,227 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 701.00 22,606 0 0 702.00 30,532 26,569 26,569 703.00 33,334 31,933 58,502 704.00 36,378 34,856 93,358 705.00 39,732 38,055 131,413 706.00 43,988 41,860 173,273 707.00 49,187 46,588 219,861 708.00 54,818 52,003 271,863 709.00 60,624 57,721 329,584 710.00 66,662 63,643 393,227 Device Routing Invert Outlet Devices #1 Primary 700.39' 36.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 700.39' / 700.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 7.07 sf #2 Device 1 701.00' 10.0" Vert. 8" Orifice C= 0.600 #3 Device 1 706.00' 36.0" W x 8.0" H Vert. Orifice/Grate X 3.00 C= 0.600 #4 Device 1 708.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 708.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=5.16 cfs @ 13.25 hrs HW=705.28' TW=0.00' (Dynamic Tailwater) 1­1=Culvert (Passes 5.16 cfs of 60.83 cfs potential flow) 2=8" Orifice (Orifice Controls 5.16 cfs @ 9.47 fps) 3=Orifice/Grate ( Controls 0.00 cfs) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=701.00' TW=0.00' (Dynamic Tailwater) T 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 41 '0=6 1 gM10 141ii Hydrograph 120.03 CfS ---------------------------'--'- -------c---------'- IN Inflow IN Outflow -�- �--r-�--r-�--r-�--r-�--r - � r Inflow At"=-36,37-0t a - IN Primary 130 1 1 11 Secondary r �` 1 110 Storage=' 142,-816 d 90 u 70 3 iO 60 - -,- -,--, - - J--L-J--L-1--L-J--L- --�,--, - �,--�,--�,--, - -,--,---,--, --'-- --�,--,--,--�,--�,--, - -,--�, --,-- -- - -- --'-- - -- - --L- -- 50 7--Ir---Ir---r---Ir---Ir-7--Ir---Ir--li--r---Ir---r-7-- 40 -�- 20 5.16 cfs 0.00 Cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 C 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 13P: POND 1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 701.00 0.00 0.00 0.00 2.50 0.00 0 701.00 0.00 0.00 0.00 5.00 0.00 0 701.00 0.00 0.00 0.00 7.50 0.39 1,304 701.06 0.01 0.01 0.00 10.00 1.65 8,083 701.34 0.41 0.41 0.00 12.50 9.47 138,747 705.18 5.10 5.10 0.00 15.00 2.84 133,641 705.06 5.01 5.01 0.00 17.50 1.83 110,275 704.46 4.58 4.58 0.00 20.00 1.25 85,297 703.78 4.03 4.03 0.00 22.50 1.12 62,333 703.11 3.42 3.42 0.00 25.00 0.00 40,699 702.45 2.67 2.67 0.00 27.50 0.00 21,122 701.82 1.67 1.67 0.00 30.00 0.00 10,958 701.45 0.68 0.68 0.00 32.50 0.00 6,812 701.29 0.30 0.30 0.00 35.00 0.00 4,813 701.21 0.16 0.16 0.00 37.50 0.00 3,680 701.16 0.10 0.10 0.00 40.00 0.00 2,963 701.13 0.06 0.06 0.00 42.50 0.00 2,472 701.11 0.05 0.05 0.00 45.00 0.00 2,116 701.09 0.03 0.03 0.00 47.50 0.00 1,848 701.08 0.03 0.03 0.00 50.00 0.00 1,639 701.07 0.02 0.02 0.00 52.50 0.00 1,471 701.06 0.02 0.02 0.00 55.00 0.00 1,334 701.06 0.01 0.01 0.00 57.50 0.00 1,220 701.05 0.01 0.01 0.00 60.00 0.00 1,124 701.05 0.01 0.01 0.00 62.50 0.00 1,041 701.05 0.01 0.01 0.00 65.00 0.00 970 701.04 0.01 0.01 0.00 67.50 0.00 907 701.04 0.01 0.01 0.00 70.00 0.00 852 701.04 0.01 0.01 0.00 72.50 0.00 804 701.04 0.01 0.01 0.00 75.00 0.00 760 701.03 0.00 0.00 0.00 77.50 0.00 721 701.03 0.00 0.00 0.00 80.00 0.00 686 701.03 0.00 0.00 0.00 82.50 0.00 654 701.03 0.00 0.00 0.00 85.00 0.00 625 701.03 0.00 0.00 0.00 87.50 0.00 598 701.03 0.00 0.00 0.00 90.00 0.00 573 701.03 0.00 0.00 0.00 92.50 0.00 551 701.02 0.00 0.00 0.00 95.00 0.00 530 701.02 0.00 0.00 0.00 97.50 0.00 510 701.02 0.00 0.00 0.00 100.00 0.00 492 701.02 0.00 0.00 0.00 102.50 0.00 475 701.02 0.00 0.00 0.00 105.00 0.00 460 701.02 0.00 0.00 0.00 107.50 0.00 445 701.02 0.00 0.00 0.00 110.00 0.00 431 701.02 0.00 0.00 0.00 112.50 0.00 418 701.02 0.00 0.00 0.00 115.00 0.00 406 701.02 0.00 0.00 0.00 117.50 0.00 394 701.02 0.00 0.00 0.00 120.00 0.00 384 701.02 0.00 0.00 0.00 Type 1124-hr 1 yr-24hr Rainfall=2.81 " Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 43 Stage -Discharge for Pond 13P: POND 1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 701.00 0.00 0.00 0.00 701.10 0.04 0.04 0.00 701.20 0.15 0.15 0.00 701.30 0.33 0.33 0.00 701.40 0.56 0.56 0.00 701.50 0.82 0.82 0.00 701.60 1.11 1.11 0.00 701.70 1.39 1.39 0.00 701.80 1.64 1.64 0.00 701.90 1.83 1.83 0.00 702.00 2.01 2.01 0.00 702.10 2.17 2.17 0.00 702.20 2.32 2.32 0.00 702.30 2.47 2.47 0.00 702.40 2.60 2.60 0.00 702.50 2.73 2.73 0.00 702.60 2.86 2.86 0.00 702.70 2.98 2.98 0.00 702.80 3.09 3.09 0.00 702.90 3.20 3.20 0.00 703.00 3.30 3.30 0.00 703.10 3.41 3.41 0.00 703.20 3.51 3.51 0.00 703.30 3.60 3.60 0.00 703.40 3.70 3.70 0.00 703.50 3.79 3.79 0.00 703.60 3.88 3.88 0.00 703.70 3.97 3.97 0.00 703.80 4.05 4.05 0.00 703.90 4.14 4.14 0.00 704.00 4.22 4.22 0.00 704.10 4.30 4.30 0.00 704.20 4.38 4.38 0.00 704.30 4.46 4.46 0.00 704.40 4.54 4.54 0.00 704.50 4.61 4.61 0.00 704.60 4.69 4.69 0.00 704.70 4.76 4.76 0.00 704.80 4.83 4.83 0.00 704.90 4.90 4.90 0.00 705.00 4.97 4.97 0.00 705.10 5.04 5.04 0.00 705.20 5.11 5.11 0.00 705.30 5.18 5.18 0.00 705.40 5.24 5.24 0.00 705.50 5.31 5.31 0.00 705.60 5.37 5.37 0.00 705.70 5.44 5.44 0.00 705.80 5.50 5.50 0.00 705.90 5.56 5.56 0.00 706.00 5.62 5.62 0.00 706.10 6.60 6.60 0.00 706.20 8.33 8.33 0.00 706.30 10.55 10.55 0.00 706.40 13.17 13.17 0.00 706.50 16.14 16.14 0.00 706.60 19.41 19.41 0.00 706.70 22.78 22.78 0.00 706.80 25.36 25.36 0.00 706.90 27.56 27.56 0.00 707.00 29.54 29.54 0.00 707.10 31.35 31.35 0.00 707.20 33.04 33.04 0.00 707.30 34.63 34.63 0.00 707.40 36.14 36.14 0.00 707.50 37.57 37.57 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 707.60 38.95 38.95 0.00 707.70 40.27 40.27 0.00 707.80 41.55 41.55 0.00 707.90 42.78 42.78 0.00 708.00 43.97 43.97 0.00 708.10 46.79 46.79 0.00 708.20 50.94 50.94 0.00 708.30 55.95 55.95 0.00 708.40 61.66 61.66 0.00 708.50 67.97 67.97 0.00 708.60 75.60 74.81 0.79 708.70 84.36 82.14 2.23 708.80 93.62 89.47 4.15 708.90 96.59 90.11 6.48 709.00 100.05 90.75 9.30 709.10 103.94 91.39 12.55 709.20 107.80 92.02 15.78 709.30 111.90 92.65 19.25 709.40 116.20 93.27 22.92 709.50 120.69 93.89 26.80 709.60 125.48 94.50 30.98 709.70 130.48 95.12 35.36 709.80 135.45 95.72 39.72 709.90 140.55 96.33 44.23 710.00 145.70 96.93 48.78 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 44 Stage -Area -Storage for Pond 13P: POND 1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 701.00 22,606 0 701.10 23,399 2,300 701.20 24,191 4,680 701.30 24,984 7,138 701.40 25,776 9,676 701.50 26,569 12,294 701.60 27,362 14,990 701.70 28,154 17,766 701.80 28,947 20,621 701.90 29,739 23,555 702.00 30,532 26,569 702.10 30,812 29,636 702.20 31,092 32,731 702.30 31,373 35,855 702.40 31,653 39,006 702.50 31,933 42,185 702.60 32,213 45,393 702.70 32,493 48,628 702.80 32,774 51,891 702.90 33,054 55,183 703.00 33,334 58,502 703.10 33,638 61,851 703.20 33,943 65,230 703.30 34,247 68,639 703.40 34,552 72,079 703.50 34,856 75,550 703.60 35,160 79,050 703.70 35,465 82,582 703.80 35,769 86,143 703.90 36,074 89,735 704.00 36,378 93,358 704.10 36,713 97,013 704.20 37,049 100,701 704.30 37,384 104,422 704.40 37,720 108,178 704.50 38,055 111,966 704.60 38,390 115,789 704.70 38,726 119,644 704.80 39,061 123,534 704.90 39,397 127,457 705.00 39,732 131,413 705.10 40,158 135,407 705.20 40,583 139,445 705.30 41,009 143,524 705.40 41,434 147,646 705.50 41,860 151,811 705.60 42,286 156,018 705.70 42,711 160,268 705.80 43,137 164,561 705.90 43,562 168,895 706.00 43,988 173,273 706.10 44,508 177,698 706.20 45,028 182,175 706.30 45,548 186,703 706.40 46,068 191,284 706.50 46,588 195,917 706.60 47,107 200,602 706.70 47,627 205,338 706.80 48,147 210,127 706.90 48,667 214,968 707.00 49,187 219,861 707.10 49,750 224,807 707.20 50,313 229,811 707.30 50,876 234,870 707.40 51,439 239,986 707.50 52.003 245.158 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 707.60 52,566 250,386 707.70 53,129 255,671 707.80 53,692 261,012 707.90 54,255 266,409 708.00 54,818 271,863 708.10 55,399 277,374 708.20 55,979 282,943 708.30 56,560 288,570 708.40 57,140 294,255 708.50 57,721 299,998 708.60 58,302 305,799 708.70 58,882 311,658 708.80 59,463 317,575 708.90 60,043 323,551 709.00 60,624 329,584 709.10 61,228 335,677 709.20 61,832 341,830 709.30 62,435 348,043 709.40 63,039 354,317 709.50 63,643 360,651 709.60 64,247 367,045 709.70 64,851 373,500 709.80 65,454 380,015 709.90 66,058 386,591 710.00 66,662 393,227 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 45 Summary for Pond 15P: POND 6 Inflow Area = 13.860 ac, 74.39% Impervious, Inflow Depth = 1.73" for lyr-24hr event Inflow = 42.36 cfs @ 11.96 hrs, Volume= 1.997 of Outflow = 2.81 cfs @ 12.62 hrs, Volume= 1.985 af, Atten= 93%, Lag= 40.2 min Primary = 2.81 cfs @ 12.62 hrs, Volume= 1.985 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 678.56' @ 12.62 hrs Surf.Area= 32,264 sf Storage= 46,575 cf Plug -Flow detention time= 311.4 min calculated for 1.984 of (99% of inflow) Center -of -Mass det. time= 309.8 min ( 1,122.2 - 812.4 ) Volume Invert Avail.Storage Storage Description #1 677.00' 270,951 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 677.00 27,493 0 0 678.00 30,495 28,994 28,994 679.00 33,652 32,074 61,068 680.00 36,914 35,283 96,351 681.00 40,232 38,573 134,924 682.00 43,608 41,920 176,844 683.00 47,039 45,324 222,167 684.00 50,528 48,784 270,951 Device Routing Invert Outlet Devices #1 Primary 676.39' 36.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 676.39' / 676.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 7.07 sf #2 Device 1 677.00' 10.0" Vert. 8" Orifice C= 0.600 #3 Device 1 680.00' 36.0" W x 8.0" H Vert. Orifice/Grate X 3.00 C= 0.600 #4 Device 1 682.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 682.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=2.81 cfs @ 12.62 hrs HW=678.56' TW=0.00' (Dynamic Tailwater) 1­1=Culvert (Passes 2.81 cfs of 21.72 cfs potential flow) 2=8" Orifice (Orifice Controls 2.81 cfs @ 5.15 fps) 3=Orifice/Grate ( Controls 0.00 cfs) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=677.00' TW=0.00' (Dynamic Tailwater) T 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD® 10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 46 '0=6 1 gMMR09]kiIIl ..... IN Inflow • • IN Outflow • • • IN Primary N Secondary •1 • C I _ 1 1 1 i ii ////////......... 15 10 15 20 25 30 35 41 45 50 55 .1 65 70 75 81 85 91 95 100 105 110 115 120 TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 C 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 15P: POND 6 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 677.00 0.00 0.00 0.00 2.50 0.00 0 677.00 0.00 0.00 0.00 5.00 0.00 0 677.00 0.00 0.00 0.00 7.50 0.07 119 677.00 0.00 0.00 0.00 10.00 0.47 2,112 677.08 0.02 0.02 0.00 12.50 3.43 46,461 678.56 2.80 2.80 0.00 15.00 1.04 37,366 678.27 2.43 2.43 0.00 17.50 0.67 25,566 677.89 1.80 1.80 0.00 20.00 0.46 17,374 677.61 1.14 1.14 0.00 22.50 0.41 13,120 677.47 0.73 0.73 0.00 25.00 0.00 9,946 677.35 0.45 0.45 0.00 27.50 0.00 7,002 677.25 0.24 0.24 0.00 30.00 0.00 5,348 677.19 0.14 0.14 0.00 32.50 0.00 4,305 677.16 0.09 0.09 0.00 35.00 0.00 3,593 677.13 0.07 0.07 0.00 37.50 0.00 3,078 677.11 0.05 0.05 0.00 40.00 0.00 2,690 677.10 0.04 0.04 0.00 42.50 0.00 2,387 677.09 0.03 0.03 0.00 45.00 0.00 2,144 677.08 0.02 0.02 0.00 47.50 0.00 1,945 677.07 0.02 0.02 0.00 50.00 0.00 1,780 677.06 0.02 0.02 0.00 52.50 0.00 1,640 677.06 0.01 0.01 0.00 55.00 0.00 1,520 677.06 0.01 0.01 0.00 57.50 0.00 1,417 677.05 0.01 0.01 0.00 60.00 0.00 1,326 677.05 0.01 0.01 0.00 62.50 0.00 1,246 677.05 0.01 0.01 0.00 65.00 0.00 1,176 677.04 0.01 0.01 0.00 67.50 0.00 1,112 677.04 0.01 0.01 0.00 70.00 0.00 1,055 677.04 0.01 0.01 0.00 72.50 0.00 1,004 677.04 0.01 0.01 0.00 75.00 0.00 957 677.03 0.00 0.00 0.00 77.50 0.00 915 677.03 0.00 0.00 0.00 80.00 0.00 876 677.03 0.00 0.00 0.00 82.50 0.00 840 677.03 0.00 0.00 0.00 85.00 0.00 807 677.03 0.00 0.00 0.00 87.50 0.00 777 677.03 0.00 0.00 0.00 90.00 0.00 748 677.03 0.00 0.00 0.00 92.50 0.00 722 677.03 0.00 0.00 0.00 95.00 0.00 698 677.03 0.00 0.00 0.00 97.50 0.00 675 677.02 0.00 0.00 0.00 100.00 0.00 653 677.02 0.00 0.00 0.00 102.50 0.00 633 677.02 0.00 0.00 0.00 105.00 0.00 614 677.02 0.00 0.00 0.00 107.50 0.00 596 677.02 0.00 0.00 0.00 110.00 0.00 579 677.02 0.00 0.00 0.00 112.50 0.00 563 677.02 0.00 0.00 0.00 115.00 0.00 548 677.02 0.00 0.00 0.00 117.50 0.00 534 677.02 0.00 0.00 0.00 120.00 0.00 520 677.02 0.00 0.00 0.00 Type 1124-hr 1 yr-24hr Rainfall=2.81 " Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 48 Stage -Discharge for Pond 15P: POND 6 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 677.00 0.00 0.00 0.00 677.10 0.04 0.04 0.00 677.20 0.15 0.15 0.00 677.30 0.33 0.33 0.00 677.40 0.56 0.56 0.00 677.50 0.82 0.82 0.00 677.60 1.11 1.11 0.00 677.70 1.39 1.39 0.00 677.80 1.64 1.64 0.00 677.90 1.83 1.83 0.00 678.00 2.01 2.01 0.00 678.10 2.17 2.17 0.00 678.20 2.32 2.32 0.00 678.30 2.47 2.47 0.00 678.40 2.60 2.60 0.00 678.50 2.73 2.73 0.00 678.60 2.86 2.86 0.00 678.70 2.98 2.98 0.00 678.80 3.09 3.09 0.00 678.90 3.20 3.20 0.00 679.00 3.30 3.30 0.00 679.10 3.41 3.41 0.00 679.20 3.51 3.51 0.00 679.30 3.60 3.60 0.00 679.40 3.70 3.70 0.00 679.50 3.79 3.79 0.00 679.60 3.88 3.88 0.00 679.70 3.97 3.97 0.00 679.80 4.05 4.05 0.00 679.90 4.14 4.14 0.00 680.00 4.22 4.22 0.00 680.10 5.22 5.22 0.00 680.20 6.97 6.97 0.00 680.30 9.21 9.21 0.00 680.40 11.84 11.84 0.00 680.50 14.83 14.83 0.00 680.60 18.11 18.11 0.00 680.70 21.50 21.50 0.00 680.80 24.10 24.10 0.00 680.90 26.31 26.31 0.00 681.00 28.30 28.30 0.00 681.10 30.13 30.13 0.00 681.20 31.83 31.83 0.00 681.30 33.44 33.44 0.00 681.40 34.95 34.95 0.00 681.50 36.40 36.40 0.00 681.60 37.79 37.79 0.00 681.70 39.12 39.12 0.00 681.80 40.41 40.41 0.00 681.90 41.65 41.65 0.00 682.00 42.86 42.86 0.00 682.10 45.68 45.68 0.00 682.20 49.84 49.84 0.00 682.30 54.87 54.87 0.00 682.40 60.59 60.59 0.00 682.50 66.90 66.90 0.00 682.60 74.54 73.75 0.79 682.70 76.87 74.64 2.23 682.80 79.57 75.42 4.15 682.90 82.66 76.18 6.48 683.00 86.24 76.94 9.30 683.10 90.23 77.69 12.55 683.20 94.21 78.43 15.78 683.30 98.41 79.16 19.25 683.40 102.82 79.89 22.92 683.50 107.41 80.61 26.80 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 683.60 112.31 81.33 30.98 683.70 117.40 82.04 35.36 683.80 122.46 82.74 39.72 683.90 127.67 83.44 44.23 684.00 132.90 84.13 48.78 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 49 Stage -Area -Storage for Pond 15P: POND 6 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 677.00 27,493 0 677.10 27,793 2,764 677.20 28,093 5,559 677.30 28,394 8,383 677.40 28,694 11,237 677.50 28,994 14,122 677.60 29,294 17,036 677.70 29,594 19,981 677.80 29,895 22,955 677.90 30,195 25,960 678.00 30,495 28,994 678.10 30,811 32,059 678.20 31,126 35,156 678.30 31,442 38,285 678.40 31,758 41,445 678.50 32,074 44,636 678.60 32,389 47,859 678.70 32,705 51,114 678.80 33,021 54,400 678.90 33,336 57,718 679.00 33,652 61,068 679.10 33,978 64,449 679.20 34,304 67,863 679.30 34,631 71,310 679.40 34,957 74,789 679.50 35,283 78,301 679.60 35,609 81,846 679.70 35,935 85,423 679.80 36,262 89,033 679.90 36,588 92,675 680.00 36,914 96,351 680.10 37,246 100,058 680.20 37,578 103,800 680.30 37,909 107,574 680.40 38,241 111,382 680.50 38,573 115,222 680.60 38,905 119,096 680.70 39,237 123,003 680.80 39,568 126,943 680.90 39,900 130,917 681.00 40,232 134,924 681.10 40,570 138,964 681.20 40,907 143,037 681.30 41,245 147,145 681.40 41,582 151,286 681.50 41,920 155,462 681.60 42,258 159,670 681.70 42,595 163,913 681.80 42,933 168,189 681.90 43,270 172,500 682.00 43,608 176,844 682.10 43,951 181,221 682.20 44,294 185,634 682.30 44,637 190,080 682.40 44,980 194,561 682.50 45,324 199,076 682.60 45,667 203,626 682.70 46,010 208,210 682.80 46,353 212,828 682.90 46,696 217,480 683.00 47,039 222,167 683.10 47,388 226,888 683.20 47,737 231,645 683.30 48,086 236,436 683.40 48,435 241,262 683.50 48.784 246.123 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 683.60 49,132 251,018 683.70 49,481 255,949 683.80 49,830 260,915 683.90 50,179 265,915 684.00 50,528 270,951 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HydroCAD®10.00-26 s/n 10066 ©2020 HydroCAD Software Solutions LLC Page 50 Summary for Pond 18P: POST - OUTFALL #1 Inflow Area = 48.760 ac, 68.58% Impervious, Inflow Depth = 1.59" for 1yr-24hr event Inflow = 19.08 cfs @ 11.97 hrs, Volume= 6.454 of Primary = 19.08 cfs @ 11.97 hrs, Volume= 6.454 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Pond 18P: POST - OUTFALL #1 Hydrograph ----------------------------------------------------------------- ------------------------------------------�-- ❑ Inflow 21 --,--r-----r--r-----r-----�----r-----r---r-----�---�--r---r-r �- ❑Primary 20 19.08cfsI I I I I I I - - - - ---- - --A0-a I 19 v - ------ 18 -- -+--+-------+--+-------+--+--+----+--+--+-------+--+--+---- 17 -- ---r---------r---------r--r------7--r---------r--r---- 16 -- -i--I -,- -,- ----,I -,-- --- -,I -,----; --,I -,----- ;--,I -,I -,-- - - - - - - - - - - 15 14 -- -+--+-------+--+-------+--+--+----+--+--+-------+--+--+---- 13 -- -rt--r--Ir--li----r--Ir--li----r--Ir--Ir- --7--r--li---li--rt--r--Ir--li-- w 12 - l l 11 -1--L--1---'--1--L--1---1--J--1--L--1--- --1--L--1--- '--1--L--+--'-- 0 10 -- - --------- --------- -- -- ---- --+--------- -- -- ---- LL 9 -- r--r--i---i--�--r--r--i--�--r--r--i--r--r--r--r--i--�--r--r--i-- 7 -- -L------- --L--1---1--J--1--L--1--J--1--L--1-----1--L--L---- 6 -- ------+--+-------+--+--+----+--+--+-------+--+--+---- 5 -- -------r---------r--r - -----7--r---------r--r---- 4 - - - - - - - - - - - - -- --- -------- --------- --------- --------- - --- 2 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 51 Hydrograph for Pond 18P: POST - OUTFALL #1 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 1.00 0.00 0.00 2.00 0.00 0.00 3.00 0.00 0.00 4.00 0.00 0.00 5.00 0.00 0.00 6.00 0.00 0.00 7.00 0.00 0.00 8.00 0.03 0.03 9.00 0.14 0.14 10.00 0.41 0.41 11.00 1.07 1.07 12.00 18.34 18.34 13.00 6.20 6.20 14.00 5.78 5.78 15.00 5.55 5.55 16.00 5.28 5.28 17.00 5.06 5.06 18.00 4.82 4.82 19.00 4.56 4.56 20.00 4.29 4.29 21.00 4.03 4.03 22.00 3.78 3.78 23.00 3.53 3.53 24.00 3.27 3.27 25.00 2.67 2.67 26.00 2.28 2.28 27.00 1.87 1.87 28.00 1.45 1.45 29.00 1.00 1.00 30.00 0.68 0.68 31.00 0.48 0.48 32.00 0.35 0.35 33.00 0.26 0.26 34.00 0.20 0.20 35.00 0.16 0.16 36.00 0.13 0.13 37.00 0.11 0.11 38.00 0.09 0.09 39.00 0.08 0.08 40.00 0.06 0.06 41.00 0.06 0.06 42.00 0.05 0.05 43.00 0.04 0.04 44.00 0.04 0.04 45.00 0.03 0.03 46.00 0.03 0.03 47.00 0.03 0.03 48.00 0.02 0.02 49.00 0.02 0.02 50.00 0.02 0.02 51.00 0.02 0.02 52.00 0.02 0.02 53.00 0.02 0.02 54.00 0.01 0.01 55.00 0.01 0.01 56.00 0.01 0.01 57.00 0.01 0.01 58.00 0.01 0.01 59.00 0.01 0.01 60.00 0.01 0.01 61.00 0.01 0.01 62.00 0.01 0.01 63.00 0.01 0.01 64.00 0.01 0.01 65.00 0.01 0.01 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 66.00 0.01 0.01 67.00 0.01 0.01 68.00 0.01 0.01 69.00 0.01 0.01 70.00 0.01 0.01 71.00 0.01 0.01 72.00 0.01 0.01 73.00 0.00 0.00 74.00 0.00 0.00 75.00 0.00 0.00 76.00 0.00 0.00 77.00 0.00 0.00 78.00 0.00 0.00 79.00 0.00 0.00 80.00 0.00 0.00 81.00 0.00 0.00 82.00 0.00 0.00 83.00 0.00 0.00 84.00 0.00 0.00 85.00 0.00 0.00 86.00 0.00 0.00 87.00 0.00 0.00 88.00 0.00 0.00 89.00 0.00 0.00 90.00 0.00 0.00 91.00 0.00 0.00 92.00 0.00 0.00 93.00 0.00 0.00 94.00 0.00 0.00 95.00 0.00 0.00 96.00 0.00 0.00 97.00 0.00 0.00 98.00 0.00 0.00 99.00 0.00 0.00 100.00 0.00 0.00 101.00 0.00 0.00 102.00 0.00 0.00 103.00 0.00 0.00 104.00 0.00 0.00 105.00 0.00 0.00 106.00 0.00 0.00 107.00 0.00 0.00 108.00 0.00 0.00 109.00 0.00 0.00 110.00 0.00 0.00 111.00 0.00 0.00 112.00 0.00 0.00 113.00 0.00 0.00 114.00 0.00 0.00 115.00 0.00 0.00 116.00 0.00 0.00 117.00 0.00 0.00 118.00 0.00 0.00 119.00 0.00 0.00 120.00 0.00 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1 yr-24hr Rainfall=2.81 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HydroCAD®10.00-26 s/n 10066 ©2020 HydroCAD Software Solutions LLC Page 52 Summary for Pond 21 P: POST - OUTFALL #3 Inflow Area = 17.630 ac, 58.48% Impervious, Inflow Depth > 1.40" for 1yr-24hr event Inflow = 3.15 cfs @ 12.28 hrs, Volume= 2.061 of Primary = 3.15 cfs @ 12.28 hrs, Volume= 2.061 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Pond 21 P: POST - OUTFALL #3 Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 1yr-24hrRainfall=2.81" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 53 Hydrograph for Pond 21 P: POST - OUTFALL #3 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 1.00 0.00 0.00 2.00 0.00 0.00 3.00 0.00 0.00 4.00 0.00 0.00 5.00 0.00 0.00 6.00 0.00 0.00 7.00 0.00 0.00 8.00 0.00 0.00 9.00 0.00 0.00 10.00 0.02 0.02 11.00 0.11 0.11 12.00 2.42 2.42 13.00 2.95 2.95 14.00 2.74 2.74 15.00 2.51 2.51 16.00 2.25 2.25 17.00 1.99 1.99 18.00 1.73 1.73 19.00 1.46 1.46 20.00 1.18 1.18 21.00 0.97 0.97 22.00 0.82 0.82 23.00 0.72 0.72 24.00 0.64 0.64 25.00 0.45 0.45 26.00 0.34 0.34 27.00 0.27 0.27 28.00 0.21 0.21 29.00 0.17 0.17 30.00 0.14 0.14 31.00 0.12 0.12 32.00 0.10 0.10 33.00 0.09 0.09 34.00 0.08 0.08 35.00 0.07 0.07 36.00 0.06 0.06 37.00 0.05 0.05 38.00 0.05 0.05 39.00 0.04 0.04 40.00 0.04 0.04 41.00 0.03 0.03 42.00 0.03 0.03 43.00 0.03 0.03 44.00 0.03 0.03 45.00 0.02 0.02 46.00 0.02 0.02 47.00 0.02 0.02 48.00 0.02 0.02 49.00 0.02 0.02 50.00 0.02 0.02 51.00 0.02 0.02 52.00 0.01 0.01 53.00 0.01 0.01 54.00 0.01 0.01 55.00 0.01 0.01 56.00 0.01 0.01 57.00 0.01 0.01 58.00 0.01 0.01 59.00 0.01 0.01 60.00 0.01 0.01 61.00 0.01 0.01 62.00 0.01 0.01 63.00 0.01 0.01 64.00 0.01 0.01 65.00 0.01 0.01 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 66.00 0.01 0.01 67.00 0.01 0.01 68.00 0.01 0.01 69.00 0.01 0.01 70.00 0.01 0.01 71.00 0.01 0.01 72.00 0.01 0.01 73.00 0.01 0.01 74.00 0.01 0.01 75.00 0.00 0.00 76.00 0.00 0.00 77.00 0.00 0.00 78.00 0.00 0.00 79.00 0.00 0.00 80.00 0.00 0.00 81.00 0.00 0.00 82.00 0.00 0.00 83.00 0.00 0.00 84.00 0.00 0.00 85.00 0.00 0.00 86.00 0.00 0.00 87.00 0.00 0.00 88.00 0.00 0.00 89.00 0.00 0.00 90.00 0.00 0.00 91.00 0.00 0.00 92.00 0.00 0.00 93.00 0.00 0.00 94.00 0.00 0.00 95.00 0.00 0.00 96.00 0.00 0.00 97.00 0.00 0.00 98.00 0.00 0.00 99.00 0.00 0.00 100.00 0.00 0.00 101.00 0.00 0.00 102.00 0.00 0.00 103.00 0.00 0.00 104.00 0.00 0.00 105.00 0.00 0.00 106.00 0.00 0.00 107.00 0.00 0.00 108.00 0.00 0.00 109.00 0.00 0.00 110.00 0.00 0.00 111.00 0.00 0.00 112.00 0.00 0.00 113.00 0.00 0.00 114.00 0.00 0.00 115.00 0.00 0.00 116.00 0.00 0.00 117.00 0.00 0.00 118.00 0.00 0.00 119.00 0.00 0.00 120.00 0.00 0.00 OAK E N G I N E E R I N G HYDROCAD OUTPUT 2-YEAR, 24-HOUR STORM EVENT TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 1 Summary for Subcatchment 3S: POST TO POND 2 Runoff = 75.44 cfs @ 11.95 hrs, Volume= 3.576 af, Depth= 2.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.39" Area (ac) CN Description 14.690 98 Impervious 5.100 61 >75% Grass cover, Good, HSG B 19.790 88 Weighted Average 5.100 25.77% Pervious Area 14.690 74.23% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: POST TO POND 2 Hydrograph - ------------r--r--r---- - -------r-- r--r-- r--r--I - - - -- ----r--r--r-- ■Runoff 80 75.44 Cfs �--I--�' I- -------- -- -- -- -- --------- -- -- -- -- -- 75 _ _ _ _ r _ _ _ _ _ _ r r _ - - - - - - - - - - - - Type-N 2 -fa� - 70 -- -- r--r--r----------r--r-Zyrr2 Cir-Rainfall-4139'- 65 60 ' --'-- --'- - -- -------------- - -Ruhoff Ar6a:�79-790at 55 ^ --r- --i--r--r--r--r--r--i---i--r--r--r--r--r--r--r--i--r--r--r--r--r-- 45 ' - 1--L-- J--1--1----Ru-noff Depth:�2.1717 .. 40 ---- ---- -- -- ------------ -- -- -- ------- LL 35 -i T - 1 i-' iQf� --r-- ---r--r--r--r--r--r----r--r--r--r--r--r--r----r--r-IY 8�B 30 ---- ---- --+-- ------------ -- -- -- -- --------------- -- -- 25 20 15 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 2 Hydrograph for Subcatchment 3S: POST TO POND 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.12 0.00 0.00 4.00 0.16 0.00 0.00 5.00 0.21 0.00 0.00 6.00 0.27 0.00 0.00 7.00 0.34 0.00 0.11 8.00 0.41 0.01 0.24 9.00 0.50 0.03 0.54 10.00 0.61 0.07 0.92 11.00 0.80 0.15 2.18 12.00 2.25 1.17 64.78 13.00 2.62 1.48 3.80 14.00 2.78 1.62 2.28 15.00 2.89 1.72 1.82 16.00 2.98 1.80 1.41 17.00 3.06 1.87 1.25 18.00 3.12 1.93 1.10 19.00 3.18 1.98 0.95 20.00 3.23 2.02 0.80 21.00 3.27 2.06 0.77 22.00 3.31 2.10 0.74 23.00 3.35 2.13 0.71 24.00 3.39 2.17 0.68 25.00 3.39 2.17 0.00 26.00 3.39 2.17 0.00 27.00 3.39 2.17 0.00 28.00 3.39 2.17 0.00 29.00 3.39 2.17 0.00 30.00 3.39 2.17 0.00 31.00 3.39 2.17 0.00 32.00 3.39 2.17 0.00 33.00 3.39 2.17 0.00 34.00 3.39 2.17 0.00 35.00 3.39 2.17 0.00 36.00 3.39 2.17 0.00 37.00 3.39 2.17 0.00 38.00 3.39 2.17 0.00 39.00 3.39 2.17 0.00 40.00 3.39 2.17 0.00 41.00 3.39 2.17 0.00 42.00 3.39 2.17 0.00 43.00 3.39 2.17 0.00 44.00 3.39 2.17 0.00 45.00 3.39 2.17 0.00 46.00 3.39 2.17 0.00 47.00 3.39 2.17 0.00 48.00 3.39 2.17 0.00 49.00 3.39 2.17 0.00 50.00 3.39 2.17 0.00 51.00 3.39 2.17 0.00 52.00 3.39 2.17 0.00 53.00 3.39 2.17 0.00 54.00 3.39 2.17 0.00 55.00 3.39 2.17 0.00 56.00 3.39 2.17 0.00 57.00 3.39 2.17 0.00 58.00 3.39 2.17 0.00 59.00 3.39 2.17 0.00 60.00 3.39 2.17 0.00 61.00 3.39 2.17 0.00 62.00 3.39 2.17 0.00 63.00 3.39 2.17 0.00 64.00 3.39 2.17 0.00 65.00 3.39 2.17 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 3.39 2.17 0.00 67.00 3.39 2.17 0.00 68.00 3.39 2.17 0.00 69.00 3.39 2.17 0.00 70.00 3.39 2.17 0.00 71.00 3.39 2.17 0.00 72.00 3.39 2.17 0.00 73.00 3.39 2.17 0.00 74.00 3.39 2.17 0.00 75.00 3.39 2.17 0.00 76.00 3.39 2.17 0.00 77.00 3.39 2.17 0.00 78.00 3.39 2.17 0.00 79.00 3.39 2.17 0.00 80.00 3.39 2.17 0.00 81.00 3.39 2.17 0.00 82.00 3.39 2.17 0.00 83.00 3.39 2.17 0.00 84.00 3.39 2.17 0.00 85.00 3.39 2.17 0.00 86.00 3.39 2.17 0.00 87.00 3.39 2.17 0.00 88.00 3.39 2.17 0.00 89.00 3.39 2.17 0.00 90.00 3.39 2.17 0.00 91.00 3.39 2.17 0.00 92.00 3.39 2.17 0.00 93.00 3.39 2.17 0.00 94.00 3.39 2.17 0.00 95.00 3.39 2.17 0.00 96.00 3.39 2.17 0.00 97.00 3.39 2.17 0.00 98.00 3.39 2.17 0.00 99.00 3.39 2.17 0.00 100.00 3.39 2.17 0.00 101.00 3.39 2.17 0.00 102.00 3.39 2.17 0.00 103.00 3.39 2.17 0.00 104.00 3.39 2.17 0.00 105.00 3.39 2.17 0.00 106.00 3.39 2.17 0.00 107.00 3.39 2.17 0.00 108.00 3.39 2.17 0.00 109.00 3.39 2.17 0.00 110.00 3.39 2.17 0.00 111.00 3.39 2.17 0.00 112.00 3.39 2.17 0.00 113.00 3.39 2.17 0.00 114.00 3.39 2.17 0.00 115.00 3.39 2.17 0.00 116.00 3.39 2.17 0.00 117.00 3.39 2.17 0.00 118.00 3.39 2.17 0.00 119.00 3.39 2.17 0.00 120.00 3.39 2.17 0.00 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 3 Summary for Subcatchment 4S: PRE (OUTFALL #1) Runoff = 47.44 cfs @ 12.16 hrs, Volume= 3.976 af, Depth= 1.11" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.39" Area (ac) CN Description 9.130 55 Woods, Good, HSG B 34.000 78 Row crops, straight row, Good, HSG B 43.130 73 Weighted Average 43.130 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.1 30 0.0280 0.16 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 388 0.0620 1.74 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 15.1 744 0.0270 0.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.9 1,162 Total Subcatchment 4S: PRE (OUTFALL #1) Hydrograph ----------+--+--+--+--+----+--+--+--+--+--+--+--+-+--+--+--+--+--+-- ■Runoff 50 47.44 Cfs 45-,--,--+--------,---,---,----- ----------------T-YIYQ-HTZ -h1r- 40 -- -- ----'+--' -- -- -RuhoffAr6a=4a.-0I-at- 35 -- -- --+-- -- - - -- -- -- nQ##I-V�I me-=1$7$ T Of - w 30 -- -- - - - -- -- --'+--Runoff'DupthT1.'+1-1"_ ° 25 FlOW Ldn-0th=1062'-- -------+--+- ------,--+- -----------+----- 15 OW-7 3 10 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 k 95 160 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 4 Hydrograph for Subcatchment 4S: PRE (OUTFALL #1) Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.12 0.00 0.00 4.00 0.16 0.00 0.00 5.00 0.21 0.00 0.00 6.00 0.27 0.00 0.00 7.00 0.34 0.00 0.00 8.00 0.41 0.00 0.00 9.00 0.50 0.00 0.00 10.00 0.61 0.00 0.00 11.00 0.80 0.00 0.02 12.00 2.25 0.44 24.97 13.00 2.62 0.63 6.78 14.00 2.78 0.73 3.74 15.00 2.89 0.79 2.84 16.00 2.98 0.85 2.28 17.00 3.06 0.89 1.95 18.00 3.12 0.93 1.74 19.00 3.18 0.97 1.53 20.00 3.23 1.00 1.31 21.00 3.27 1.03 1.21 22.00 3.31 1.06 1.17 23.00 3.35 1.08 1.13 24.00 3.39 1.11 1.09 25.00 3.39 1.11 0.00 26.00 3.39 1.11 0.00 27.00 3.39 1.11 0.00 28.00 3.39 1.11 0.00 29.00 3.39 1.11 0.00 30.00 3.39 1.11 0.00 31.00 3.39 1.11 0.00 32.00 3.39 1.11 0.00 33.00 3.39 1.11 0.00 34.00 3.39 1.11 0.00 35.00 3.39 1.11 0.00 36.00 3.39 1.11 0.00 37.00 3.39 1.11 0.00 38.00 3.39 1.11 0.00 39.00 3.39 1.11 0.00 40.00 3.39 1.11 0.00 41.00 3.39 1.11 0.00 42.00 3.39 1.11 0.00 43.00 3.39 1.11 0.00 44.00 3.39 1.11 0.00 45.00 3.39 1.11 0.00 46.00 3.39 1.11 0.00 47.00 3.39 1.11 0.00 48.00 3.39 1.11 0.00 49.00 3.39 1.11 0.00 50.00 3.39 1.11 0.00 51.00 3.39 1.11 0.00 52.00 3.39 1.11 0.00 53.00 3.39 1.11 0.00 54.00 3.39 1.11 0.00 55.00 3.39 1.11 0.00 56.00 3.39 1.11 0.00 57.00 3.39 1.11 0.00 58.00 3.39 1.11 0.00 59.00 3.39 1.11 0.00 60.00 3.39 1.11 0.00 61.00 3.39 1.11 0.00 62.00 3.39 1.11 0.00 63.00 3.39 1.11 0.00 64.00 3.39 1.11 0.00 65.00 3.39 1.11 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 3.39 1.11 0.00 67.00 3.39 1.11 0.00 68.00 3.39 1.11 0.00 69.00 3.39 1.11 0.00 70.00 3.39 1.11 0.00 71.00 3.39 1.11 0.00 72.00 3.39 1.11 0.00 73.00 3.39 1.11 0.00 74.00 3.39 1.11 0.00 75.00 3.39 1.11 0.00 76.00 3.39 1.11 0.00 77.00 3.39 1.11 0.00 78.00 3.39 1.11 0.00 79.00 3.39 1.11 0.00 80.00 3.39 1.11 0.00 81.00 3.39 1.11 0.00 82.00 3.39 1.11 0.00 83.00 3.39 1.11 0.00 84.00 3.39 1.11 0.00 85.00 3.39 1.11 0.00 86.00 3.39 1.11 0.00 87.00 3.39 1.11 0.00 88.00 3.39 1.11 0.00 89.00 3.39 1.11 0.00 90.00 3.39 1.11 0.00 91.00 3.39 1.11 0.00 92.00 3.39 1.11 0.00 93.00 3.39 1.11 0.00 94.00 3.39 1.11 0.00 95.00 3.39 1.11 0.00 96.00 3.39 1.11 0.00 97.00 3.39 1.11 0.00 98.00 3.39 1.11 0.00 99.00 3.39 1.11 0.00 100.00 3.39 1.11 0.00 101.00 3.39 1.11 0.00 102.00 3.39 1.11 0.00 103.00 3.39 1.11 0.00 104.00 3.39 1.11 0.00 105.00 3.39 1.11 0.00 106.00 3.39 1.11 0.00 107.00 3.39 1.11 0.00 108.00 3.39 1.11 0.00 109.00 3.39 1.11 0.00 110.00 3.39 1.11 0.00 111.00 3.39 1.11 0.00 112.00 3.39 1.11 0.00 113.00 3.39 1.11 0.00 114.00 3.39 1.11 0.00 115.00 3.39 1.11 0.00 116.00 3.39 1.11 0.00 117.00 3.39 1.11 0.00 118.00 3.39 1.11 0.00 119.00 3.39 1.11 0.00 120.00 3.39 1.11 0.00 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 5 Summary for Subcatchment 5S: PRE (OUTFALL #2) Runoff = 67.67 cfs @ 12.16 hrs, Volume= 5.615 af, Depth= 1.16" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.39" Area (ac) CN Description 10.200 55 Woods, Good, HSG B 47.660 78 Row crops, straight row, Good, HSG B 57.860 74 Weighted Average 57.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.1 30 0.0280 0.16 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 388 0.0620 1.74 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 15.1 744 0.0270 0.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.9 1,162 Total Subcatchment 5S: PRE (OUTFALL #2) Hydrograph 75 ■Runoff 70 67.67 cfs -1 T --T ------------ ----T--T--r--r--I------1 -1 T --T--F ---- 65 yM p_ r --r- -i--r--r--r--r--r--r--i--r--r--r--r--r--r--r--i--r--r--r--r--r-- 60------------------'___2vrr24hrRai_nfaIIT3.39 55 RLthoff Ar6ay67.864 -at 50 s�1/� -- - 1 Mnpff-Vol r1 a=5-00 '—T- - 45 ------------------4--r--�--I---I----------�-- w Runoff DepthT1.�16�" ---T--T--T--T--�-------T--T--T-- T--r-------�--T-T--T--T--T - - LL 35 Flb -Lin t = �1-62'-- -- - 1--L-----1---1-- 1--1-- -- - 30 T Q --r----r--r--r--r--r--r----r--r--r--r--r--r--r--i 1 q=�I iJ min-- 25 20 N=74 - 15 10 5 I I I 1 I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 6 Hydrograph for Subcatchment 5S: PRE (OUTFALL #2) Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.12 0.00 0.00 4.00 0.16 0.00 0.00 5.00 0.21 0.00 0.00 6.00 0.27 0.00 0.00 7.00 0.34 0.00 0.00 8.00 0.41 0.00 0.00 9.00 0.50 0.00 0.00 10.00 0.61 0.00 0.00 11.00 0.80 0.00 0.18 12.00 2.25 0.47 36.41 13.00 2.62 0.68 9.45 14.00 2.78 0.77 5.20 15.00 2.89 0.84 3.94 16.00 2.98 0.90 3.15 17.00 3.06 0.94 2.70 18.00 3.12 0.99 2.41 19.00 3.18 1.02 2.11 20.00 3.23 1.06 1.81 21.00 3.27 1.08 1.67 22.00 3.31 1.11 1.61 23.00 3.35 1.14 1.55 24.00 3.39 1.16 1.50 25.00 3.39 1.16 0.01 26.00 3.39 1.16 0.00 27.00 3.39 1.16 0.00 28.00 3.39 1.16 0.00 29.00 3.39 1.16 0.00 30.00 3.39 1.16 0.00 31.00 3.39 1.16 0.00 32.00 3.39 1.16 0.00 33.00 3.39 1.16 0.00 34.00 3.39 1.16 0.00 35.00 3.39 1.16 0.00 36.00 3.39 1.16 0.00 37.00 3.39 1.16 0.00 38.00 3.39 1.16 0.00 39.00 3.39 1.16 0.00 40.00 3.39 1.16 0.00 41.00 3.39 1.16 0.00 42.00 3.39 1.16 0.00 43.00 3.39 1.16 0.00 44.00 3.39 1.16 0.00 45.00 3.39 1.16 0.00 46.00 3.39 1.16 0.00 47.00 3.39 1.16 0.00 48.00 3.39 1.16 0.00 49.00 3.39 1.16 0.00 50.00 3.39 1.16 0.00 51.00 3.39 1.16 0.00 52.00 3.39 1.16 0.00 53.00 3.39 1.16 0.00 54.00 3.39 1.16 0.00 55.00 3.39 1.16 0.00 56.00 3.39 1.16 0.00 57.00 3.39 1.16 0.00 58.00 3.39 1.16 0.00 59.00 3.39 1.16 0.00 60.00 3.39 1.16 0.00 61.00 3.39 1.16 0.00 62.00 3.39 1.16 0.00 63.00 3.39 1.16 0.00 64.00 3.39 1.16 0.00 65.00 3.39 1.16 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 3.39 1.16 0.00 67.00 3.39 1.16 0.00 68.00 3.39 1.16 0.00 69.00 3.39 1.16 0.00 70.00 3.39 1.16 0.00 71.00 3.39 1.16 0.00 72.00 3.39 1.16 0.00 73.00 3.39 1.16 0.00 74.00 3.39 1.16 0.00 75.00 3.39 1.16 0.00 76.00 3.39 1.16 0.00 77.00 3.39 1.16 0.00 78.00 3.39 1.16 0.00 79.00 3.39 1.16 0.00 80.00 3.39 1.16 0.00 81.00 3.39 1.16 0.00 82.00 3.39 1.16 0.00 83.00 3.39 1.16 0.00 84.00 3.39 1.16 0.00 85.00 3.39 1.16 0.00 86.00 3.39 1.16 0.00 87.00 3.39 1.16 0.00 88.00 3.39 1.16 0.00 89.00 3.39 1.16 0.00 90.00 3.39 1.16 0.00 91.00 3.39 1.16 0.00 92.00 3.39 1.16 0.00 93.00 3.39 1.16 0.00 94.00 3.39 1.16 0.00 95.00 3.39 1.16 0.00 96.00 3.39 1.16 0.00 97.00 3.39 1.16 0.00 98.00 3.39 1.16 0.00 99.00 3.39 1.16 0.00 100.00 3.39 1.16 0.00 101.00 3.39 1.16 0.00 102.00 3.39 1.16 0.00 103.00 3.39 1.16 0.00 104.00 3.39 1.16 0.00 105.00 3.39 1.16 0.00 106.00 3.39 1.16 0.00 107.00 3.39 1.16 0.00 108.00 3.39 1.16 0.00 109.00 3.39 1.16 0.00 110.00 3.39 1.16 0.00 111.00 3.39 1.16 0.00 112.00 3.39 1.16 0.00 113.00 3.39 1.16 0.00 114.00 3.39 1.16 0.00 115.00 3.39 1.16 0.00 116.00 3.39 1.16 0.00 117.00 3.39 1.16 0.00 118.00 3.39 1.16 0.00 119.00 3.39 1.16 0.00 120.00 3.39 1.16 0.00 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 7 Summary for Subcatchment 6S: PRE (OUTFALL #3) Runoff = 16.42 cfs @ 12.16 hrs, Volume= 1.376 af, Depth= 1.11" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.39" Area (ac) CN Description 3.190 55 Woods, Good, HSG B 11.740 78 Row crops, straight row, Good, HSG B 14.930 73 Weighted Average 14.930 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.1 30 0.0280 0.16 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 388 0.0620 1.74 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 15.1 744 0.0270 0.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.9 1,162 Total Subcatchment 6S: PRE (OUTFALL #3) Hydrograph 18 ■Runoff 17 16.42 cfs--T --T --------------T-- T-- T - -T -----------T--T--T -- T-- 16 --i-- ti--y--+--r--r--r---------rt--rt--+--r--r--i---i 15 --'�-- --- -- -- ------------ -- -- -2,yrr24htRainfafha.391`- 14- Runnff �r�ay 1 #-.9�3II arc - 13 --'-- -'---L--L----1---1---1--J--1--L- r 1 1 1 1 12- -- -- -- -- - -- --1 unpff'-Vplurn,e=1.$7$- 1- 11 ---- ------------------------------------------------------------- ,o - _-Roma#'Depth1:'71"- 3 g --'i-- -'i----T--r--r--T-----i-- -- -- --r-- - - - - r- o , - _ F16W L6n�th=1_ 1-62 - - 8 - -- 7 - -- - -- -- -- --------I-- -- -- -- --r--'-----I��,'g-f- s--------+------��-------------+----��-------T--�------�-- 4N=73 4 --'-- -'----1--L--L--1---1---1--J--1--L--L--L--L-------L--L--L--L--L-- 3 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 k 95 160 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 8 Hydrograph for Subcatchment 6S: PRE (OUTFALL #3) Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.12 0.00 0.00 4.00 0.16 0.00 0.00 5.00 0.21 0.00 0.00 6.00 0.27 0.00 0.00 7.00 0.34 0.00 0.00 8.00 0.41 0.00 0.00 9.00 0.50 0.00 0.00 10.00 0.61 0.00 0.00 11.00 0.80 0.00 0.01 12.00 2.25 0.44 8.64 13.00 2.62 0.63 2.35 14.00 2.78 0.73 1.29 15.00 2.89 0.79 0.98 16.00 2.98 0.85 0.79 17.00 3.06 0.89 0.67 18.00 3.12 0.93 0.60 19.00 3.18 0.97 0.53 20.00 3.23 1.00 0.45 21.00 3.27 1.03 0.42 22.00 3.31 1.06 0.40 23.00 3.35 1.08 0.39 24.00 3.39 1.11 0.38 25.00 3.39 1.11 0.00 26.00 3.39 1.11 0.00 27.00 3.39 1.11 0.00 28.00 3.39 1.11 0.00 29.00 3.39 1.11 0.00 30.00 3.39 1.11 0.00 31.00 3.39 1.11 0.00 32.00 3.39 1.11 0.00 33.00 3.39 1.11 0.00 34.00 3.39 1.11 0.00 35.00 3.39 1.11 0.00 36.00 3.39 1.11 0.00 37.00 3.39 1.11 0.00 38.00 3.39 1.11 0.00 39.00 3.39 1.11 0.00 40.00 3.39 1.11 0.00 41.00 3.39 1.11 0.00 42.00 3.39 1.11 0.00 43.00 3.39 1.11 0.00 44.00 3.39 1.11 0.00 45.00 3.39 1.11 0.00 46.00 3.39 1.11 0.00 47.00 3.39 1.11 0.00 48.00 3.39 1.11 0.00 49.00 3.39 1.11 0.00 50.00 3.39 1.11 0.00 51.00 3.39 1.11 0.00 52.00 3.39 1.11 0.00 53.00 3.39 1.11 0.00 54.00 3.39 1.11 0.00 55.00 3.39 1.11 0.00 56.00 3.39 1.11 0.00 57.00 3.39 1.11 0.00 58.00 3.39 1.11 0.00 59.00 3.39 1.11 0.00 60.00 3.39 1.11 0.00 61.00 3.39 1.11 0.00 62.00 3.39 1.11 0.00 63.00 3.39 1.11 0.00 64.00 3.39 1.11 0.00 65.00 3.39 1.11 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 3.39 1.11 0.00 67.00 3.39 1.11 0.00 68.00 3.39 1.11 0.00 69.00 3.39 1.11 0.00 70.00 3.39 1.11 0.00 71.00 3.39 1.11 0.00 72.00 3.39 1.11 0.00 73.00 3.39 1.11 0.00 74.00 3.39 1.11 0.00 75.00 3.39 1.11 0.00 76.00 3.39 1.11 0.00 77.00 3.39 1.11 0.00 78.00 3.39 1.11 0.00 79.00 3.39 1.11 0.00 80.00 3.39 1.11 0.00 81.00 3.39 1.11 0.00 82.00 3.39 1.11 0.00 83.00 3.39 1.11 0.00 84.00 3.39 1.11 0.00 85.00 3.39 1.11 0.00 86.00 3.39 1.11 0.00 87.00 3.39 1.11 0.00 88.00 3.39 1.11 0.00 89.00 3.39 1.11 0.00 90.00 3.39 1.11 0.00 91.00 3.39 1.11 0.00 92.00 3.39 1.11 0.00 93.00 3.39 1.11 0.00 94.00 3.39 1.11 0.00 95.00 3.39 1.11 0.00 96.00 3.39 1.11 0.00 97.00 3.39 1.11 0.00 98.00 3.39 1.11 0.00 99.00 3.39 1.11 0.00 100.00 3.39 1.11 0.00 101.00 3.39 1.11 0.00 102.00 3.39 1.11 0.00 103.00 3.39 1.11 0.00 104.00 3.39 1.11 0.00 105.00 3.39 1.11 0.00 106.00 3.39 1.11 0.00 107.00 3.39 1.11 0.00 108.00 3.39 1.11 0.00 109.00 3.39 1.11 0.00 110.00 3.39 1.11 0.00 111.00 3.39 1.11 0.00 112.00 3.39 1.11 0.00 113.00 3.39 1.11 0.00 114.00 3.39 1.11 0.00 115.00 3.39 1.11 0.00 116.00 3.39 1.11 0.00 117.00 3.39 1.11 0.00 118.00 3.39 1.11 0.00 119.00 3.39 1.11 0.00 120.00 3.39 1.11 0.00 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 9 Summary for Subcatchment 7S: POST TO POND 3 Runoff = 58.17 cfs @ 11.95 hrs, Volume= 2.758 af, Depth= 2.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.39" Area (ac) CN Description 11.010 98 Impervious 4.250 61 >75% Grass cover, Good, HSG B 15.260 88 Weighted Average 4.250 27.85% Pervious Area 11.010 72.15% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 7S: POST TO POND 3 Hydrograph 65 Runoff 58.17 cfs-----r--r-------------------t--r-- r---------,--rt--r--r- 60I I I -I------,--7--r--r--------I--1--7--7--T--r--r--I---ITy1_N=hr - 55 -- -- so T--T --T- ------'I----T--T-4rr2�hr-RainfalrT3.39'F- I I I I I I I I I I I I ---- - - --I-- T --r --T T--T-Ruhoff Aroa=16.260 ad - 45 --r- ---- -- -- ------------ -- -- --T -- --------- -- -- -- -- -- 40 �R0 n Offl Vp 14 m�Ie=2. 5 Calf --I-- 35 Runoff IDcpthT2.1171" .... I I LL 3o Tc"5.0 M i n --I -- --I-- --I - - 25 I I 20 ---------- --r--i--------------- --r--i--------------- --r--i -- 15 10 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 10 Hydrograph for Subcatchment 7S: POST TO POND 3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.12 0.00 0.00 4.00 0.16 0.00 0.00 5.00 0.21 0.00 0.00 6.00 0.27 0.00 0.00 7.00 0.34 0.00 0.08 8.00 0.41 0.01 0.19 9.00 0.50 0.03 0.42 10.00 0.61 0.07 0.71 11.00 0.80 0.15 1.68 12.00 2.25 1.17 49.95 13.00 2.62 1.48 2.93 14.00 2.78 1.62 1.76 15.00 2.89 1.72 1.41 16.00 2.98 1.80 1.09 17.00 3.06 1.87 0.96 18.00 3.12 1.93 0.85 19.00 3.18 1.98 0.73 20.00 3.23 2.02 0.62 21.00 3.27 2.06 0.59 22.00 3.31 2.10 0.57 23.00 3.35 2.13 0.55 24.00 3.39 2.17 0.52 25.00 3.39 2.17 0.00 26.00 3.39 2.17 0.00 27.00 3.39 2.17 0.00 28.00 3.39 2.17 0.00 29.00 3.39 2.17 0.00 30.00 3.39 2.17 0.00 31.00 3.39 2.17 0.00 32.00 3.39 2.17 0.00 33.00 3.39 2.17 0.00 34.00 3.39 2.17 0.00 35.00 3.39 2.17 0.00 36.00 3.39 2.17 0.00 37.00 3.39 2.17 0.00 38.00 3.39 2.17 0.00 39.00 3.39 2.17 0.00 40.00 3.39 2.17 0.00 41.00 3.39 2.17 0.00 42.00 3.39 2.17 0.00 43.00 3.39 2.17 0.00 44.00 3.39 2.17 0.00 45.00 3.39 2.17 0.00 46.00 3.39 2.17 0.00 47.00 3.39 2.17 0.00 48.00 3.39 2.17 0.00 49.00 3.39 2.17 0.00 50.00 3.39 2.17 0.00 51.00 3.39 2.17 0.00 52.00 3.39 2.17 0.00 53.00 3.39 2.17 0.00 54.00 3.39 2.17 0.00 55.00 3.39 2.17 0.00 56.00 3.39 2.17 0.00 57.00 3.39 2.17 0.00 58.00 3.39 2.17 0.00 59.00 3.39 2.17 0.00 60.00 3.39 2.17 0.00 61.00 3.39 2.17 0.00 62.00 3.39 2.17 0.00 63.00 3.39 2.17 0.00 64.00 3.39 2.17 0.00 65.00 3.39 2.17 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 3.39 2.17 0.00 67.00 3.39 2.17 0.00 68.00 3.39 2.17 0.00 69.00 3.39 2.17 0.00 70.00 3.39 2.17 0.00 71.00 3.39 2.17 0.00 72.00 3.39 2.17 0.00 73.00 3.39 2.17 0.00 74.00 3.39 2.17 0.00 75.00 3.39 2.17 0.00 76.00 3.39 2.17 0.00 77.00 3.39 2.17 0.00 78.00 3.39 2.17 0.00 79.00 3.39 2.17 0.00 80.00 3.39 2.17 0.00 81.00 3.39 2.17 0.00 82.00 3.39 2.17 0.00 83.00 3.39 2.17 0.00 84.00 3.39 2.17 0.00 85.00 3.39 2.17 0.00 86.00 3.39 2.17 0.00 87.00 3.39 2.17 0.00 88.00 3.39 2.17 0.00 89.00 3.39 2.17 0.00 90.00 3.39 2.17 0.00 91.00 3.39 2.17 0.00 92.00 3.39 2.17 0.00 93.00 3.39 2.17 0.00 94.00 3.39 2.17 0.00 95.00 3.39 2.17 0.00 96.00 3.39 2.17 0.00 97.00 3.39 2.17 0.00 98.00 3.39 2.17 0.00 99.00 3.39 2.17 0.00 100.00 3.39 2.17 0.00 101.00 3.39 2.17 0.00 102.00 3.39 2.17 0.00 103.00 3.39 2.17 0.00 104.00 3.39 2.17 0.00 105.00 3.39 2.17 0.00 106.00 3.39 2.17 0.00 107.00 3.39 2.17 0.00 108.00 3.39 2.17 0.00 109.00 3.39 2.17 0.00 110.00 3.39 2.17 0.00 111.00 3.39 2.17 0.00 112.00 3.39 2.17 0.00 113.00 3.39 2.17 0.00 114.00 3.39 2.17 0.00 115.00 3.39 2.17 0.00 116.00 3.39 2.17 0.00 117.00 3.39 2.17 0.00 118.00 3.39 2.17 0.00 119.00 3.39 2.17 0.00 120.00 3.39 2.17 0.00 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 11 Summary for Subcatchment 9S: POST TO POND 4 Runoff = 38.86 cfs @ 11.96 hrs, Volume= 1.832 af, Depth= 2.08" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.39" Area (ac) CN Description 7.330 98 Impervious 3.220 61 >75% Grass cover, Good, HSG B 10.550 87 Weighted Average 3.220 30.52% Pervious Area 7.330 69.48% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: POST TO POND 4 Hydrograph 42+--+--+--r--r--i---i--�--�--�--+--r--r--r--i--+--�--+--r--+-- � Runoff 3886 cfs 40 . --,------- - - - - ---------------- - - - - ----,---- 38 --��-- ---- -- -- �� --�� --��---------- -- -- �� --�� --��----- �,TY;�le424-fa� - 36 --'-- --'----1--L--L--1---1---'--------L--L--L--1---1--J----1--L--r-- 2,Yrr24h-r Rainfalt;;3.391, 32 --Ir- --li----7--r--r--Ir--Ir--li-- -- -- - 30 - - -- -- -- - - -- -- _Ruioff-►ra�.v51 at - 28 ---- ---- -- -- --------------- - 26 --'-- --'----1--L------------J--1--1p1O*e=1: 3 - 24 - -- ----+--+-- -- -- ----+--Rtmoff�DethT2.8.. 22 --I------T-- T--r - -r - -I---------T--T--r--r--r--1---1--Tr �/+T-T--.r�,-,-F-- LL 20 --i-- --1 I -- I --i--------I -- -- -- I--i---i-- 1 \iT - lillfh-- I I I I I I I I I 18 ---- ---- -- -- --------------- -- --i 16 N=8 14 --r-----y--+--r--r--r-------y--rt--rt--+--r--r--r----y----+--r--r-- 12 �--T-- T-- r - -r--r --i---i--T--T--T--r--r--r--r--i--T--T--T--r--r-- 10 --i - -i---- --i --i-----i---- --i --i-----i-- --i --'-- -1--1--1--L--L--1---1---1--J--1--1--L--L--L--1---1--J--1--1--L--r-- 6 --i-- -i-- --+-- ----------i-- -- -- -- -- -------i-- -- --+-- -- -- 4 --r----r--r--r--r--r--r----r--r--r--r--r--r--r----r--r--r--r--r-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 12 Hydrograph for Subcatchment 9S: POST TO POND 4 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.12 0.00 0.00 4.00 0.16 0.00 0.00 5.00 0.21 0.00 0.00 6.00 0.27 0.00 0.00 7.00 0.34 0.00 0.03 8.00 0.41 0.01 0.10 9.00 0.50 0.02 0.24 10.00 0.61 0.05 0.43 11.00 0.80 0.12 1.06 12.00 2.25 1.10 33.49 13.00 2.62 1.41 1.98 14.00 2.78 1.55 1.19 15.00 2.89 1.65 0.95 16.00 2.98 1.72 0.74 17.00 3.06 1.79 0.65 18.00 3.12 1.85 0.58 19.00 3.18 1.90 0.50 20.00 3.23 1.94 0.42 21.00 3.27 1.98 0.40 22.00 3.31 2.01 0.39 23.00 3.35 2.05 0.37 24.00 3.39 2.08 0.35 25.00 3.39 2.08 0.00 26.00 3.39 2.08 0.00 27.00 3.39 2.08 0.00 28.00 3.39 2.08 0.00 29.00 3.39 2.08 0.00 30.00 3.39 2.08 0.00 31.00 3.39 2.08 0.00 32.00 3.39 2.08 0.00 33.00 3.39 2.08 0.00 34.00 3.39 2.08 0.00 35.00 3.39 2.08 0.00 36.00 3.39 2.08 0.00 37.00 3.39 2.08 0.00 38.00 3.39 2.08 0.00 39.00 3.39 2.08 0.00 40.00 3.39 2.08 0.00 41.00 3.39 2.08 0.00 42.00 3.39 2.08 0.00 43.00 3.39 2.08 0.00 44.00 3.39 2.08 0.00 45.00 3.39 2.08 0.00 46.00 3.39 2.08 0.00 47.00 3.39 2.08 0.00 48.00 3.39 2.08 0.00 49.00 3.39 2.08 0.00 50.00 3.39 2.08 0.00 51.00 3.39 2.08 0.00 52.00 3.39 2.08 0.00 53.00 3.39 2.08 0.00 54.00 3.39 2.08 0.00 55.00 3.39 2.08 0.00 56.00 3.39 2.08 0.00 57.00 3.39 2.08 0.00 58.00 3.39 2.08 0.00 59.00 3.39 2.08 0.00 60.00 3.39 2.08 0.00 61.00 3.39 2.08 0.00 62.00 3.39 2.08 0.00 63.00 3.39 2.08 0.00 64.00 3.39 2.08 0.00 65.00 3.39 2.08 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 3.39 2.08 0.00 67.00 3.39 2.08 0.00 68.00 3.39 2.08 0.00 69.00 3.39 2.08 0.00 70.00 3.39 2.08 0.00 71.00 3.39 2.08 0.00 72.00 3.39 2.08 0.00 73.00 3.39 2.08 0.00 74.00 3.39 2.08 0.00 75.00 3.39 2.08 0.00 76.00 3.39 2.08 0.00 77.00 3.39 2.08 0.00 78.00 3.39 2.08 0.00 79.00 3.39 2.08 0.00 80.00 3.39 2.08 0.00 81.00 3.39 2.08 0.00 82.00 3.39 2.08 0.00 83.00 3.39 2.08 0.00 84.00 3.39 2.08 0.00 85.00 3.39 2.08 0.00 86.00 3.39 2.08 0.00 87.00 3.39 2.08 0.00 88.00 3.39 2.08 0.00 89.00 3.39 2.08 0.00 90.00 3.39 2.08 0.00 91.00 3.39 2.08 0.00 92.00 3.39 2.08 0.00 93.00 3.39 2.08 0.00 94.00 3.39 2.08 0.00 95.00 3.39 2.08 0.00 96.00 3.39 2.08 0.00 97.00 3.39 2.08 0.00 98.00 3.39 2.08 0.00 99.00 3.39 2.08 0.00 100.00 3.39 2.08 0.00 101.00 3.39 2.08 0.00 102.00 3.39 2.08 0.00 103.00 3.39 2.08 0.00 104.00 3.39 2.08 0.00 105.00 3.39 2.08 0.00 106.00 3.39 2.08 0.00 107.00 3.39 2.08 0.00 108.00 3.39 2.08 0.00 109.00 3.39 2.08 0.00 110.00 3.39 2.08 0.00 111.00 3.39 2.08 0.00 112.00 3.39 2.08 0.00 113.00 3.39 2.08 0.00 114.00 3.39 2.08 0.00 115.00 3.39 2.08 0.00 116.00 3.39 2.08 0.00 117.00 3.39 2.08 0.00 118.00 3.39 2.08 0.00 119.00 3.39 2.08 0.00 120.00 3.39 2.08 0.00 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 13 Summary for Subcatchment 12S: POST TO POND 1 Runoff = 152.25 cfs @ 11.95 hrs, Volume= 7.387 af, Depth= 2.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.39" Area (ac) CN Description 29.640 98 Impervious 6.730 61 >75% Grass cover, Good, HSG B 36.370 91 Weighted Average 6.730 18.50% Pervious Area 29.640 81.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 12S: POST TO POND 1 Hydrograph 170------- -- -- -- -- ---- -- -- ------------ -- ------------ -- -- Runoff 160 152.25 cfs 140 --i-- 120 ' --'�- --'� --'�--------- --'� --'�---ftliLOff A_ r_da#36 370_at- 110 --r- -r--r--r--r--r----r--r--r--r-- 90 I- -111noff '�D_epth=�2.44LL .. 80 70 Q T _ �i 60 -- -- J--1--1--L--L----J----L--L---------- ----L-----I -- 50 40 -- -- -- -- ---- -- -- ------------ -- ------------ -- -- 30 --i- -- -- -- -- --i-- -- --+----------i-- -- ----------i-- --+-- 20 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 14 Hydrograph for Subcatchment 12S: POST TO POND 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.12 0.00 0.00 4.00 0.16 0.00 0.00 5.00 0.21 0.00 0.05 6.00 0.27 0.01 0.28 7.00 0.34 0.02 0.55 8.00 0.41 0.04 0.85 9.00 0.50 0.07 1.57 10.00 0.61 0.12 2.40 11.00 0.80 0.23 5.17 12.00 2.25 1.38 129.42 13.00 2.62 1.72 7.40 14.00 2.78 1.87 4.42 15.00 2.89 1.97 3.52 16.00 2.98 2.06 2.72 17.00 3.06 2.12 2.40 18.00 3.12 2.19 2.12 19.00 3.18 2.24 1.83 20.00 3.23 2.28 1.54 21.00 3.27 2.32 1.47 22.00 3.31 2.36 1.41 23.00 3.35 2.40 1.35 24.00 3.39 2.44 1.29 25.00 3.39 2.44 0.00 26.00 3.39 2.44 0.00 27.00 3.39 2.44 0.00 28.00 3.39 2.44 0.00 29.00 3.39 2.44 0.00 30.00 3.39 2.44 0.00 31.00 3.39 2.44 0.00 32.00 3.39 2.44 0.00 33.00 3.39 2.44 0.00 34.00 3.39 2.44 0.00 35.00 3.39 2.44 0.00 36.00 3.39 2.44 0.00 37.00 3.39 2.44 0.00 38.00 3.39 2.44 0.00 39.00 3.39 2.44 0.00 40.00 3.39 2.44 0.00 41.00 3.39 2.44 0.00 42.00 3.39 2.44 0.00 43.00 3.39 2.44 0.00 44.00 3.39 2.44 0.00 45.00 3.39 2.44 0.00 46.00 3.39 2.44 0.00 47.00 3.39 2.44 0.00 48.00 3.39 2.44 0.00 49.00 3.39 2.44 0.00 50.00 3.39 2.44 0.00 51.00 3.39 2.44 0.00 52.00 3.39 2.44 0.00 53.00 3.39 2.44 0.00 54.00 3.39 2.44 0.00 55.00 3.39 2.44 0.00 56.00 3.39 2.44 0.00 57.00 3.39 2.44 0.00 58.00 3.39 2.44 0.00 59.00 3.39 2.44 0.00 60.00 3.39 2.44 0.00 61.00 3.39 2.44 0.00 62.00 3.39 2.44 0.00 63.00 3.39 2.44 0.00 64.00 3.39 2.44 0.00 65.00 3.39 2.44 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 3.39 2.44 0.00 67.00 3.39 2.44 0.00 68.00 3.39 2.44 0.00 69.00 3.39 2.44 0.00 70.00 3.39 2.44 0.00 71.00 3.39 2.44 0.00 72.00 3.39 2.44 0.00 73.00 3.39 2.44 0.00 74.00 3.39 2.44 0.00 75.00 3.39 2.44 0.00 76.00 3.39 2.44 0.00 77.00 3.39 2.44 0.00 78.00 3.39 2.44 0.00 79.00 3.39 2.44 0.00 80.00 3.39 2.44 0.00 81.00 3.39 2.44 0.00 82.00 3.39 2.44 0.00 83.00 3.39 2.44 0.00 84.00 3.39 2.44 0.00 85.00 3.39 2.44 0.00 86.00 3.39 2.44 0.00 87.00 3.39 2.44 0.00 88.00 3.39 2.44 0.00 89.00 3.39 2.44 0.00 90.00 3.39 2.44 0.00 91.00 3.39 2.44 0.00 92.00 3.39 2.44 0.00 93.00 3.39 2.44 0.00 94.00 3.39 2.44 0.00 95.00 3.39 2.44 0.00 96.00 3.39 2.44 0.00 97.00 3.39 2.44 0.00 98.00 3.39 2.44 0.00 99.00 3.39 2.44 0.00 100.00 3.39 2.44 0.00 101.00 3.39 2.44 0.00 102.00 3.39 2.44 0.00 103.00 3.39 2.44 0.00 104.00 3.39 2.44 0.00 105.00 3.39 2.44 0.00 106.00 3.39 2.44 0.00 107.00 3.39 2.44 0.00 108.00 3.39 2.44 0.00 109.00 3.39 2.44 0.00 110.00 3.39 2.44 0.00 111.00 3.39 2.44 0.00 112.00 3.39 2.44 0.00 113.00 3.39 2.44 0.00 114.00 3.39 2.44 0.00 115.00 3.39 2.44 0.00 116.00 3.39 2.44 0.00 117.00 3.39 2.44 0.00 118.00 3.39 2.44 0.00 119.00 3.39 2.44 0.00 120.00 3.39 2.44 0.00 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 15 Summary for Subcatchment 14S: POST TO POND 6 Runoff = 54.59 cfs @ 11.95 hrs, Volume= 2.605 af, Depth= 2.26" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.39" Area (ac) CN Description 10.310 98 Impervious 3.550 61 >75% Grass cover, Good, HSG B 13.860 89 Weighted Average 3.550 25.61 % Pervious Area 10.310 74.39% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 14S: POST TO POND 6 Hydrograph 60 Runoff 54.59 cfs--- - - - I -- -- -- - - - I-- -- - -----'I--- ss T--T--T--r--r--I---I-uY�-b��' - 50 I 2,yrr24h-r Raanfalt;;3.391" 45 -- --'-- L--L-----1---1--J--1--L-Ruhaoff Ar6&13,864at, - 40 -I-- --I-- -- -- - - ------I-- --RpnQff,V-Q1p1me=12 p0 elf - H 35 1 1 w Run a#'1Depth=;2.26, 3 30 T--T--T--r--T--1-----�\/��.10-11 25 -1----1--r--Y--r--r--r--1---1--r--r--r--r--r--r--r--1--r--r- �f�=8- 20 --i-- --i-- -- -- ----------i-- -- -- -- -- -------i-- -- -- -- -- -- 15 --'-- -'----L--L--L--1---1---1--J--1--L--L--L--L-------L----L--L--L-- 10 s 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 16 Hydrograph for Subcatchment 14S: POST TO POND 6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.12 0.00 0.00 4.00 0.16 0.00 0.00 5.00 0.21 0.00 0.00 6.00 0.27 0.00 0.03 7.00 0.34 0.01 0.11 8.00 0.41 0.02 0.22 9.00 0.50 0.04 0.45 10.00 0.61 0.08 0.73 11.00 0.80 0.17 1.67 12.00 2.25 1.24 46.72 13.00 2.62 1.56 2.71 14.00 2.78 1.70 1.63 15.00 2.89 1.80 1.30 16.00 2.98 1.88 1.01 17.00 3.06 1.95 0.89 18.00 3.12 2.01 0.78 19.00 3.18 2.06 0.68 20.00 3.23 2.11 0.57 21.00 3.27 2.15 0.54 22.00 3.31 2.18 0.52 23.00 3.35 2.22 0.50 24.00 3.39 2.26 0.48 25.00 3.39 2.26 0.00 26.00 3.39 2.26 0.00 27.00 3.39 2.26 0.00 28.00 3.39 2.26 0.00 29.00 3.39 2.26 0.00 30.00 3.39 2.26 0.00 31.00 3.39 2.26 0.00 32.00 3.39 2.26 0.00 33.00 3.39 2.26 0.00 34.00 3.39 2.26 0.00 35.00 3.39 2.26 0.00 36.00 3.39 2.26 0.00 37.00 3.39 2.26 0.00 38.00 3.39 2.26 0.00 39.00 3.39 2.26 0.00 40.00 3.39 2.26 0.00 41.00 3.39 2.26 0.00 42.00 3.39 2.26 0.00 43.00 3.39 2.26 0.00 44.00 3.39 2.26 0.00 45.00 3.39 2.26 0.00 46.00 3.39 2.26 0.00 47.00 3.39 2.26 0.00 48.00 3.39 2.26 0.00 49.00 3.39 2.26 0.00 50.00 3.39 2.26 0.00 51.00 3.39 2.26 0.00 52.00 3.39 2.26 0.00 53.00 3.39 2.26 0.00 54.00 3.39 2.26 0.00 55.00 3.39 2.26 0.00 56.00 3.39 2.26 0.00 57.00 3.39 2.26 0.00 58.00 3.39 2.26 0.00 59.00 3.39 2.26 0.00 60.00 3.39 2.26 0.00 61.00 3.39 2.26 0.00 62.00 3.39 2.26 0.00 63.00 3.39 2.26 0.00 64.00 3.39 2.26 0.00 65.00 3.39 2.26 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 3.39 2.26 0.00 67.00 3.39 2.26 0.00 68.00 3.39 2.26 0.00 69.00 3.39 2.26 0.00 70.00 3.39 2.26 0.00 71.00 3.39 2.26 0.00 72.00 3.39 2.26 0.00 73.00 3.39 2.26 0.00 74.00 3.39 2.26 0.00 75.00 3.39 2.26 0.00 76.00 3.39 2.26 0.00 77.00 3.39 2.26 0.00 78.00 3.39 2.26 0.00 79.00 3.39 2.26 0.00 80.00 3.39 2.26 0.00 81.00 3.39 2.26 0.00 82.00 3.39 2.26 0.00 83.00 3.39 2.26 0.00 84.00 3.39 2.26 0.00 85.00 3.39 2.26 0.00 86.00 3.39 2.26 0.00 87.00 3.39 2.26 0.00 88.00 3.39 2.26 0.00 89.00 3.39 2.26 0.00 90.00 3.39 2.26 0.00 91.00 3.39 2.26 0.00 92.00 3.39 2.26 0.00 93.00 3.39 2.26 0.00 94.00 3.39 2.26 0.00 95.00 3.39 2.26 0.00 96.00 3.39 2.26 0.00 97.00 3.39 2.26 0.00 98.00 3.39 2.26 0.00 99.00 3.39 2.26 0.00 100.00 3.39 2.26 0.00 101.00 3.39 2.26 0.00 102.00 3.39 2.26 0.00 103.00 3.39 2.26 0.00 104.00 3.39 2.26 0.00 105.00 3.39 2.26 0.00 106.00 3.39 2.26 0.00 107.00 3.39 2.26 0.00 108.00 3.39 2.26 0.00 109.00 3.39 2.26 0.00 110.00 3.39 2.26 0.00 111.00 3.39 2.26 0.00 112.00 3.39 2.26 0.00 113.00 3.39 2.26 0.00 114.00 3.39 2.26 0.00 115.00 3.39 2.26 0.00 116.00 3.39 2.26 0.00 117.00 3.39 2.26 0.00 118.00 3.39 2.26 0.00 119.00 3.39 2.26 0.00 120.00 3.39 2.26 0.00 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 17 Summary for Subcatchment 17S: UNDETAINED POST TO OUTFALL 1 Runoff = 23.02 cfs @ 11.97 hrs, Volume= 1.084 af, Depth= 1.05" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.39" Area (ac) CN Description 3.800 98 Impervious 8.590 61 >75% Grass cover, Good, HSG B 12.390 72 Weighted Average 8.590 69.33% Pervious Area 3.800 30.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 17S: UNDETAINED POST TO OUTFALL 1 Hydrograph --r-------r--r--r--r--r--------1 -t r--r--r--r--r----r--r--r--r--r-- 25 24-- --'i --'i --'i--------'i-- -- --'i --'i --'i--------'i-- -- --'i --'i -- Runoff 23.02 Cfs--+--+------------ -- ----+--+---------+----+--+-- -- �/ p �j �j 22 --i------+--+--+--+----------+--+--+--+--r--+--i---i 21 ---- ------ --'i --'i --'i--------'-- -- _ rr 20 '--Z'YKrF24hfRc'fJ fat[#139;1 19 --'-- 18 RLthOff Ar6atl 2.390 -at - 17 --'-- --'-- -- -- ----------'---- - gip- {---+---------'-- ---Q- --� -- 16 --�------+--+--+--+----------+--+-- R"Yff �����@3� Y�4 w 14 --i-- --i-- -------------------'i-- -- -- i------------i--------------i--- ---- --+-----'--- -- -- +--Rtmgf�'�DpthT9:06 0 12 ---- ---- --+-- ------------ -- -- -- -- -- ------ -- �-� LL11 ------------------------------------------------- - -- - - ----- ---- 10 --i-- --i----+--+----------i-- -- -- --+-- ---------+-- - g --'----'----------------------?--?-----'---�-------- - - -��- 7 --�-- --�-- -- -- -------------- -- -- -- --i--------i-- -- -- --�i -- 6 --i-- -i-- --+-- ----------i-- -- -- -- -- -------i-- -- --+-- -- -- 5 --i --- -- -- -- - 4 --i-- -i--+--+--+--+--i---i---i--+--+--+--+--+--+--i---i--+--+--+--+--+-- 3 --�,-- ----- -- --�, --�,--------�,-- -- -- -- --�,--------�,-- -- -- --�, -- 2--------+-----------------------------------+----�-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 18 Hydrograph for Subcatchment 17S: UNDETAINED POST TO OUTFALL 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.12 0.00 0.00 4.00 0.16 0.00 0.00 5.00 0.21 0.00 0.00 6.00 0.27 0.00 0.00 7.00 0.34 0.00 0.00 8.00 0.41 0.00 0.00 9.00 0.50 0.00 0.00 10.00 0.61 0.00 0.00 11.00 0.80 0.00 0.01 12.00 2.25 0.40 21.07 13.00 2.62 0.59 1.48 14.00 2.78 0.68 0.92 15.00 2.89 0.75 0.75 16.00 2.98 0.80 0.59 17.00 3.06 0.84 0.53 18.00 3.12 0.88 0.47 19.00 3.18 0.92 0.41 20.00 3.23 0.95 0.35 21.00 3.27 0.97 0.33 22.00 3.31 1.00 0.32 23.00 3.35 1.03 0.31 24.00 3.39 1.05 0.30 25.00 3.39 1.05 0.00 26.00 3.39 1.05 0.00 27.00 3.39 1.05 0.00 28.00 3.39 1.05 0.00 29.00 3.39 1.05 0.00 30.00 3.39 1.05 0.00 31.00 3.39 1.05 0.00 32.00 3.39 1.05 0.00 33.00 3.39 1.05 0.00 34.00 3.39 1.05 0.00 35.00 3.39 1.05 0.00 36.00 3.39 1.05 0.00 37.00 3.39 1.05 0.00 38.00 3.39 1.05 0.00 39.00 3.39 1.05 0.00 40.00 3.39 1.05 0.00 41.00 3.39 1.05 0.00 42.00 3.39 1.05 0.00 43.00 3.39 1.05 0.00 44.00 3.39 1.05 0.00 45.00 3.39 1.05 0.00 46.00 3.39 1.05 0.00 47.00 3.39 1.05 0.00 48.00 3.39 1.05 0.00 49.00 3.39 1.05 0.00 50.00 3.39 1.05 0.00 51.00 3.39 1.05 0.00 52.00 3.39 1.05 0.00 53.00 3.39 1.05 0.00 54.00 3.39 1.05 0.00 55.00 3.39 1.05 0.00 56.00 3.39 1.05 0.00 57.00 3.39 1.05 0.00 58.00 3.39 1.05 0.00 59.00 3.39 1.05 0.00 60.00 3.39 1.05 0.00 61.00 3.39 1.05 0.00 62.00 3.39 1.05 0.00 63.00 3.39 1.05 0.00 64.00 3.39 1.05 0.00 65.00 3.39 1.05 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 3.39 1.05 0.00 67.00 3.39 1.05 0.00 68.00 3.39 1.05 0.00 69.00 3.39 1.05 0.00 70.00 3.39 1.05 0.00 71.00 3.39 1.05 0.00 72.00 3.39 1.05 0.00 73.00 3.39 1.05 0.00 74.00 3.39 1.05 0.00 75.00 3.39 1.05 0.00 76.00 3.39 1.05 0.00 77.00 3.39 1.05 0.00 78.00 3.39 1.05 0.00 79.00 3.39 1.05 0.00 80.00 3.39 1.05 0.00 81.00 3.39 1.05 0.00 82.00 3.39 1.05 0.00 83.00 3.39 1.05 0.00 84.00 3.39 1.05 0.00 85.00 3.39 1.05 0.00 86.00 3.39 1.05 0.00 87.00 3.39 1.05 0.00 88.00 3.39 1.05 0.00 89.00 3.39 1.05 0.00 90.00 3.39 1.05 0.00 91.00 3.39 1.05 0.00 92.00 3.39 1.05 0.00 93.00 3.39 1.05 0.00 94.00 3.39 1.05 0.00 95.00 3.39 1.05 0.00 96.00 3.39 1.05 0.00 97.00 3.39 1.05 0.00 98.00 3.39 1.05 0.00 99.00 3.39 1.05 0.00 100.00 3.39 1.05 0.00 101.00 3.39 1.05 0.00 102.00 3.39 1.05 0.00 103.00 3.39 1.05 0.00 104.00 3.39 1.05 0.00 105.00 3.39 1.05 0.00 106.00 3.39 1.05 0.00 107.00 3.39 1.05 0.00 108.00 3.39 1.05 0.00 109.00 3.39 1.05 0.00 110.00 3.39 1.05 0.00 111.00 3.39 1.05 0.00 112.00 3.39 1.05 0.00 113.00 3.39 1.05 0.00 114.00 3.39 1.05 0.00 115.00 3.39 1.05 0.00 116.00 3.39 1.05 0.00 117.00 3.39 1.05 0.00 118.00 3.39 1.05 0.00 119.00 3.39 1.05 0.00 120.00 3.39 1.05 0.00 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 19 Summary for Subcatchment 19S: UNDETAINED POST TO OUTFALL 2 Runoff = 3.74 cfs @ 12.22 hrs, Volume= 0.504 af, Depth= 0.41" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.39" Area (ac) CN Description 7.730 55 Woods, Good, HSG B 7.000 61 >75% Grass cover, Good, HSG B 14.730 58 Weighted Average 14.730 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.1 30 0.0280 0.16 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 388 0.0620 1.74 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 15.1 744 0.0270 0.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.9 1,162 Total Subcatchment 19S: UNDETAINED POST TO OUTFALL 2 Hydrograph ■ Runoff 4 3.74 Cfs Type 11'',24-h'',r 2vr+24hr RainfallT3.,39� 3 Ruhoff Arda=14.730 at R4npff'', VQIL;me=',0.$04 1 - --- ----+---------- ----+--+-- _Runoff DepthT0.417- 2- F16W'� Longth=1,16a' Tc=�1.'$ mill 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 20 Hydrograph for Subcatchment 19S: UNDETAINED POST TO OUTFALL 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.12 0.00 0.00 4.00 0.16 0.00 0.00 5.00 0.21 0.00 0.00 6.00 0.27 0.00 0.00 7.00 0.34 0.00 0.00 8.00 0.41 0.00 0.00 9.00 0.50 0.00 0.00 10.00 0.61 0.00 0.00 11.00 0.80 0.00 0.00 12.00 2.25 0.08 0.73 13.00 2.62 0.16 1.01 14.00 2.78 0.21 0.62 15.00 2.89 0.24 0.49 16.00 2.98 0.27 0.40 17.00 3.06 0.29 0.35 18.00 3.12 0.31 0.32 19.00 3.18 0.33 0.28 20.00 3.23 0.35 0.25 21.00 3.27 0.37 0.23 22.00 3.31 0.38 0.22 23.00 3.35 0.40 0.22 24.00 3.39 0.41 0.21 25.00 3.39 0.41 0.00 26.00 3.39 0.41 0.00 27.00 3.39 0.41 0.00 28.00 3.39 0.41 0.00 29.00 3.39 0.41 0.00 30.00 3.39 0.41 0.00 31.00 3.39 0.41 0.00 32.00 3.39 0.41 0.00 33.00 3.39 0.41 0.00 34.00 3.39 0.41 0.00 35.00 3.39 0.41 0.00 36.00 3.39 0.41 0.00 37.00 3.39 0.41 0.00 38.00 3.39 0.41 0.00 39.00 3.39 0.41 0.00 40.00 3.39 0.41 0.00 41.00 3.39 0.41 0.00 42.00 3.39 0.41 0.00 43.00 3.39 0.41 0.00 44.00 3.39 0.41 0.00 45.00 3.39 0.41 0.00 46.00 3.39 0.41 0.00 47.00 3.39 0.41 0.00 48.00 3.39 0.41 0.00 49.00 3.39 0.41 0.00 50.00 3.39 0.41 0.00 51.00 3.39 0.41 0.00 52.00 3.39 0.41 0.00 53.00 3.39 0.41 0.00 54.00 3.39 0.41 0.00 55.00 3.39 0.41 0.00 56.00 3.39 0.41 0.00 57.00 3.39 0.41 0.00 58.00 3.39 0.41 0.00 59.00 3.39 0.41 0.00 60.00 3.39 0.41 0.00 61.00 3.39 0.41 0.00 62.00 3.39 0.41 0.00 63.00 3.39 0.41 0.00 64.00 3.39 0.41 0.00 65.00 3.39 0.41 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 3.39 0.41 0.00 67.00 3.39 0.41 0.00 68.00 3.39 0.41 0.00 69.00 3.39 0.41 0.00 70.00 3.39 0.41 0.00 71.00 3.39 0.41 0.00 72.00 3.39 0.41 0.00 73.00 3.39 0.41 0.00 74.00 3.39 0.41 0.00 75.00 3.39 0.41 0.00 76.00 3.39 0.41 0.00 77.00 3.39 0.41 0.00 78.00 3.39 0.41 0.00 79.00 3.39 0.41 0.00 80.00 3.39 0.41 0.00 81.00 3.39 0.41 0.00 82.00 3.39 0.41 0.00 83.00 3.39 0.41 0.00 84.00 3.39 0.41 0.00 85.00 3.39 0.41 0.00 86.00 3.39 0.41 0.00 87.00 3.39 0.41 0.00 88.00 3.39 0.41 0.00 89.00 3.39 0.41 0.00 90.00 3.39 0.41 0.00 91.00 3.39 0.41 0.00 92.00 3.39 0.41 0.00 93.00 3.39 0.41 0.00 94.00 3.39 0.41 0.00 95.00 3.39 0.41 0.00 96.00 3.39 0.41 0.00 97.00 3.39 0.41 0.00 98.00 3.39 0.41 0.00 99.00 3.39 0.41 0.00 100.00 3.39 0.41 0.00 101.00 3.39 0.41 0.00 102.00 3.39 0.41 0.00 103.00 3.39 0.41 0.00 104.00 3.39 0.41 0.00 105.00 3.39 0.41 0.00 106.00 3.39 0.41 0.00 107.00 3.39 0.41 0.00 108.00 3.39 0.41 0.00 109.00 3.39 0.41 0.00 110.00 3.39 0.41 0.00 111.00 3.39 0.41 0.00 112.00 3.39 0.41 0.00 113.00 3.39 0.41 0.00 114.00 3.39 0.41 0.00 115.00 3.39 0.41 0.00 116.00 3.39 0.41 0.00 117.00 3.39 0.41 0.00 118.00 3.39 0.41 0.00 119.00 3.39 0.41 0.00 120.00 3.39 0.41 0.00 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 21 Summary for Subcatchment 20S: UNDETAINED POST TO OUTFALL 3 Runoff = 1.11 cfs @ 12.21 hrs, Volume= 0.140 af, Depth= 0.45" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr-24hr Rainfall=3.39" Area (ac) CN Description 3.190 55 Woods, Good, HSG B 0.580 78 Row crops, straight row, Good, HSG B 3.770 59 Weighted Average 3.770 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.1 30 0.0280 0.16 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 388 0.0620 1.74 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 15.1 744 0.0270 0.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.9 1,162 Total Subcatchment 20S: UNDETAINED POST TO OUTFALL 3 Hydrograph � � � � � � � �� � � � � �� �� �� �� �� �� � � � � � ■Runoff 1.11 Cfs II'24-h,r- 2yr+24hr RainfallT3.39,.. RUn6ffAiea=3.770 at R4nOff',VQ1gme=0.�,140 calf Runoff off ' D e pt h T0.45.. 3 ROW' Longth=1,162v 0 Tc=�1.',9 mill OW-59 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 11,0 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 22 Hydrograph for Subcatchment 20S: UNDETAINED POST TO OUTFALL 3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.04 0.00 0.00 2.00 0.07 0.00 0.00 3.00 0.12 0.00 0.00 4.00 0.16 0.00 0.00 5.00 0.21 0.00 0.00 6.00 0.27 0.00 0.00 7.00 0.34 0.00 0.00 8.00 0.41 0.00 0.00 9.00 0.50 0.00 0.00 10.00 0.61 0.00 0.00 11.00 0.80 0.00 0.00 12.00 2.25 0.09 0.25 13.00 2.62 0.18 0.28 14.00 2.78 0.23 0.17 15.00 2.89 0.27 0.13 16.00 2.98 0.30 0.11 17.00 3.06 0.32 0.10 18.00 3.12 0.35 0.09 19.00 3.18 0.37 0.08 20.00 3.23 0.38 0.07 21.00 3.27 0.40 0.06 22.00 3.31 0.42 0.06 23.00 3.35 0.43 0.06 24.00 3.39 0.45 0.06 25.00 3.39 0.45 0.00 26.00 3.39 0.45 0.00 27.00 3.39 0.45 0.00 28.00 3.39 0.45 0.00 29.00 3.39 0.45 0.00 30.00 3.39 0.45 0.00 31.00 3.39 0.45 0.00 32.00 3.39 0.45 0.00 33.00 3.39 0.45 0.00 34.00 3.39 0.45 0.00 35.00 3.39 0.45 0.00 36.00 3.39 0.45 0.00 37.00 3.39 0.45 0.00 38.00 3.39 0.45 0.00 39.00 3.39 0.45 0.00 40.00 3.39 0.45 0.00 41.00 3.39 0.45 0.00 42.00 3.39 0.45 0.00 43.00 3.39 0.45 0.00 44.00 3.39 0.45 0.00 45.00 3.39 0.45 0.00 46.00 3.39 0.45 0.00 47.00 3.39 0.45 0.00 48.00 3.39 0.45 0.00 49.00 3.39 0.45 0.00 50.00 3.39 0.45 0.00 51.00 3.39 0.45 0.00 52.00 3.39 0.45 0.00 53.00 3.39 0.45 0.00 54.00 3.39 0.45 0.00 55.00 3.39 0.45 0.00 56.00 3.39 0.45 0.00 57.00 3.39 0.45 0.00 58.00 3.39 0.45 0.00 59.00 3.39 0.45 0.00 60.00 3.39 0.45 0.00 61.00 3.39 0.45 0.00 62.00 3.39 0.45 0.00 63.00 3.39 0.45 0.00 64.00 3.39 0.45 0.00 65.00 3.39 0.45 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 3.39 0.45 0.00 67.00 3.39 0.45 0.00 68.00 3.39 0.45 0.00 69.00 3.39 0.45 0.00 70.00 3.39 0.45 0.00 71.00 3.39 0.45 0.00 72.00 3.39 0.45 0.00 73.00 3.39 0.45 0.00 74.00 3.39 0.45 0.00 75.00 3.39 0.45 0.00 76.00 3.39 0.45 0.00 77.00 3.39 0.45 0.00 78.00 3.39 0.45 0.00 79.00 3.39 0.45 0.00 80.00 3.39 0.45 0.00 81.00 3.39 0.45 0.00 82.00 3.39 0.45 0.00 83.00 3.39 0.45 0.00 84.00 3.39 0.45 0.00 85.00 3.39 0.45 0.00 86.00 3.39 0.45 0.00 87.00 3.39 0.45 0.00 88.00 3.39 0.45 0.00 89.00 3.39 0.45 0.00 90.00 3.39 0.45 0.00 91.00 3.39 0.45 0.00 92.00 3.39 0.45 0.00 93.00 3.39 0.45 0.00 94.00 3.39 0.45 0.00 95.00 3.39 0.45 0.00 96.00 3.39 0.45 0.00 97.00 3.39 0.45 0.00 98.00 3.39 0.45 0.00 99.00 3.39 0.45 0.00 100.00 3.39 0.45 0.00 101.00 3.39 0.45 0.00 102.00 3.39 0.45 0.00 103.00 3.39 0.45 0.00 104.00 3.39 0.45 0.00 105.00 3.39 0.45 0.00 106.00 3.39 0.45 0.00 107.00 3.39 0.45 0.00 108.00 3.39 0.45 0.00 109.00 3.39 0.45 0.00 110.00 3.39 0.45 0.00 111.00 3.39 0.45 0.00 112.00 3.39 0.45 0.00 113.00 3.39 0.45 0.00 114.00 3.39 0.45 0.00 115.00 3.39 0.45 0.00 116.00 3.39 0.45 0.00 117.00 3.39 0.45 0.00 118.00 3.39 0.45 0.00 119.00 3.39 0.45 0.00 120.00 3.39 0.45 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 23 Summary for Pond 2P: POND 2 Inflow Area = 19.790 ac, 74.23% Impervious, Inflow Depth = 2.17" for 2yr-24hr event Inflow = 75.44 cfs @ 11.95 hrs, Volume= 3.576 of Outflow = 1.10 cfs @ 18.04 hrs, Volume= 3.559 af, Atten= 99%, Lag= 365.2 min Primary = 1.10 cfs @ 18.04 hrs, Volume= 3.559 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 714.93' @ 18.04 hrs Surf.Area= 29,741 sf Storage= 112,722 cf Plug -Flow detention time= 1,278.2 min calculated for 3.557 of (99% of inflow) Center -of -Mass det. time= 1,276.9 min ( 2,085.6 - 808.7 ) Volume Invert Avail.Storage Storage Description #1 710.50' 290,610 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 710.50 20,568 0 0 711.00 22,310 10,720 10,720 712.00 24,113 23,212 33,931 713.00 25,975 25,044 58,975 714.00 27,897 26,936 85,911 715.00 29,879 28,888 114,799 716.00 31,920 30,900 145,699 717.00 34,021 32,971 178,669 718.00 36,183 35,102 213,771 719.00 38,404 37,294 251,065 720.00 40,686 39,545 290,610 Device Routing Invert Outlet Devices #1 Primary 709.39' 24.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 709.39' / 709.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 710.50' 4.5" Vert. 4.5" Orifice C= 0.600 #3 Device 1 715.00' 36.0" W x 6.0" H Vert. Slotted Weirs X 3.00 C= 0.600 #4 Device 1 718.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 718.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=1.10 cfs @ 18.04 hrs HW=714.93' TW=0.00' (Dynamic Tailwater) L1=Culvert (Passes 1.10 cfs of 32.23 cfs potential flow) 2=4.5" Orifice (Orifice Controls 1.10 cfs @ 9.92 fps) 3=Slotted Weirs ( Controls 0.00 cfs) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=710.50' TW=0.00' (Dynamic Tailwater) 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 24 '0 i glPAA14i Hydrograph 7544 Cfs I I I I I I I I I I I I I I I I I I I I IN Inflow . r--I--T--I--T--I--I--T-I----I--I--I--T____r____T----T__ IN Outflow - - ------I-- --I-- --I-- --I-- -Inflow Are9=19.790 ae - IN Primary I I I I I I I ■ Secondary 80 ,1, ,- - I---------------1,----1,----1,-- ---r--I--T--I--T--I--I--I-�--I - I-----1,---II--- - e 1=14. - -- I r r 70 ,1, - I--1,-----1,-- --1,-- --1,-- --1,-- --1,---Stlloraje=l -Z72 _ef_ 65 --I- -I--, --I---I --I---I --I-- --I--, --I--r --I--r --I--,--I---I--I---I - 60 -7---r----T----T----7--II -7--Ir-7--Ir-7--7--11--r----T----7-- 55 -I- -I--; ----T----T--I-- -I--; -I--; --I--; --I--;----T--I--T- 50 w - - 7--r----T----T----7--I I I I I I -7--Ir-7--Ir-7--r----r----T----7-- I I I I I I I I I I I I I I I I I u 45- I--T- -I--T--I - -- - -- - -- - -- --- -- --- r- ---r--I--T--I - -- -- 3 40 0 -,- r-- r--II-- T--II-- I 7--II-- 7----,--Ir- I I I I r--I r-r--r--11--r--II-- T----T-- I1 lL 35 -7- r-- r --I -- --I- T I-- --I ---r---r---r - --7 T 7 7r --1--r---T -----7-- 30 -,- r--r----T----T----7----,--Ir-r--Ir-r--r----r----T----r-- 2S -1-UL-r--I T Y T--I 1--r-1--r-1--1----r--I--T--I--Y-- 20 -1--r----T----T----1----1--r-1--r-1--1----r----T__I__Y__ 15 10 1.10 Cfs 0.00 Cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 C 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 2P: POND 2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 710.50 0.00 0.00 0.00 2.50 0.00 0 710.50 0.00 0.00 0.00 5.00 0.00 0 710.50 0.00 0.00 0.00 7.50 0.17 418 710.52 0.00 0.00 0.00 10.00 0.92 4,382 710.71 0.10 0.10 0.00 12.50 6.04 93,013 714.25 1.00 1.00 0.00 15.00 1.82 109,693 714.83 1.08 1.08 0.00 17.50 1.18 112,644 714.93 1.10 1.10 0.00 20.00 0.80 111,706 714.90 1.09 1.09 0.00 22.50 0.72 108,766 714.80 1.08 1.08 0.00 25.00 0.00 103,115 714.60 1.05 1.05 0.00 27.50 0.00 93,841 714.28 1.01 1.01 0.00 30.00 0.00 84,971 713.97 0.96 0.96 0.00 32.50 0.00 76,511 713.66 0.92 0.92 0.00 35.00 0.00 68,473 713.36 0.87 0.87 0.00 37.50 0.00 60,863 713.07 0.82 0.82 0.00 40.00 0.00 53,693 712.80 0.77 0.77 0.00 42.50 0.00 46,969 712.53 0.72 0.72 0.00 45.00 0.00 40,703 712.28 0.67 0.67 0.00 47.50 0.00 34,901 712.04 0.62 0.62 0.00 50.00 0.00 29,572 711.82 0.57 0.57 0.00 52.50 0.00 24,726 711.61 0.51 0.51 0.00 55.00 0.00 20,368 711.43 0.46 0.46 0.00 57.50 0.00 16,506 711.26 0.40 0.40 0.00 60.00 0.00 13,148 711.11 0.35 0.35 0.00 62.50 0.00 10,298 710.98 0.29 0.29 0.00 65.00 0.00 7,964 710.88 0.23 0.23 0.00 67.50 0.00 6,152 710.79 0.17 0.17 0.00 70.00 0.00 4,872 710.73 0.12 0.12 0.00 72.50 0.00 3,977 710.69 0.08 0.08 0.00 75.00 0.00 3,333 710.66 0.06 0.06 0.00 77.50 0.00 2,854 710.64 0.05 0.05 0.00 80.00 0.00 2,488 710.62 0.04 0.04 0.00 82.50 0.00 2,201 710.61 0.03 0.03 0.00 85.00 0.00 1,970 710.60 0.02 0.02 0.00 87.50 0.00 1,781 710.59 0.02 0.02 0.00 90.00 0.00 1,624 710.58 0.02 0.02 0.00 92.50 0.00 1,491 710.57 0.01 0.01 0.00 95.00 0.00 1,378 710.57 0.01 0.01 0.00 97.50 0.00 1,280 710.56 0.01 0.01 0.00 100.00 0.00 1,195 710.56 0.01 0.01 0.00 102.50 0.00 1,120 710.55 0.01 0.01 0.00 105.00 0.00 1,054 710.55 0.01 0.01 0.00 107.50 0.00 995 710.55 0.01 0.01 0.00 110.00 0.00 942 710.55 0.01 0.01 0.00 112.50 0.00 895 710.54 0.01 0.01 0.00 115.00 0.00 851 710.54 0.00 0.00 0.00 117.50 0.00 812 710.54 0.00 0.00 0.00 120.00 0.00 776 710.54 0.00 0.00 0.00 Type 1124-hr 2yr-24hr Rainfall=3.39" Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 26 Stage -Discharge for Pond 2P: POND 2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 710.50 0.00 0.00 0.00 710.60 0.03 0.03 0.00 710.70 0.09 0.09 0.00 710.80 0.18 0.18 0.00 710.90 0.25 0.25 0.00 711.00 0.30 0.30 0.00 711.10 0.34 0.34 0.00 711.20 0.38 0.38 0.00 711.30 0.42 0.42 0.00 711.40 0.45 0.45 0.00 711.50 0.48 0.48 0.00 711.60 0.51 0.51 0.00 711.70 0.54 0.54 0.00 711.80 0.56 0.56 0.00 711.90 0.59 0.59 0.00 712.00 0.61 0.61 0.00 712.10 0.63 0.63 0.00 712.20 0.65 0.65 0.00 712.30 0.68 0.68 0.00 712.40 0.70 0.70 0.00 712.50 0.72 0.72 0.00 712.60 0.74 0.74 0.00 712.70 0.75 0.75 0.00 712.80 0.77 0.77 0.00 712.90 0.79 0.79 0.00 713.00 0.81 0.81 0.00 713.10 0.83 0.83 0.00 713.20 0.84 0.84 0.00 713.30 0.86 0.86 0.00 713.40 0.88 0.88 0.00 713.50 0.89 0.89 0.00 713.60 0.91 0.91 0.00 713.70 0.92 0.92 0.00 713.80 0.94 0.94 0.00 713.90 0.95 0.95 0.00 714.00 0.97 0.97 0.00 714.10 0.98 0.98 0.00 714.20 1.00 1.00 0.00 714.30 1.01 1.01 0.00 714.40 1.02 1.02 0.00 714.50 1.04 1.04 0.00 714.60 1.05 1.05 0.00 714.70 1.07 1.07 0.00 714.80 1.08 1.08 0.00 714.90 1.09 1.09 0.00 715.00 1.10 1.10 0.00 715.10 2.03 2.03 0.00 715.20 3.71 3.71 0.00 715.30 5.89 5.89 0.00 715.40 8.46 8.46 0.00 715.50 11.38 11.38 0.00 715.60 13.69 13.69 0.00 715.70 15.53 15.53 0.00 715.80 17.13 17.13 0.00 715.90 18.57 18.57 0.00 716.00 19.90 19.90 0.00 716.10 21.14 21.14 0.00 716.20 22.31 22.31 0.00 716.30 23.41 23.41 0.00 716.40 24.46 24.46 0.00 716.50 25.47 25.47 0.00 716.60 26.43 26.43 0.00 716.70 27.36 27.36 0.00 716.80 28.26 28.26 0.00 716.90 29.13 29.13 0.00 717.00 29.97 29.97 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 717.10 30.80 30.80 0.00 717.20 31.59 31.59 0.00 717.30 32.37 32.37 0.00 717.40 33.13 33.13 0.00 717.50 33.87 33.87 0.00 717.60 34.60 34.60 0.00 717.70 35.31 35.31 0.00 717.80 36.00 36.00 0.00 717.90 36.69 36.69 0.00 718.00 37.36 37.36 0.00 718.10 39.67 39.67 0.00 718.20 42.27 42.27 0.00 718.30 42.54 42.54 0.00 718.40 42.81 42.81 0.00 718.50 43.08 43.08 0.00 718.60 44.13 43.34 0.79 718.70 45.83 43.61 2.23 718.80 48.02 43.87 4.15 718.90 50.60 44.13 6.48 719.00 53.68 44.39 9.30 719.10 57.19 44.64 12.55 719.20 60.68 44.90 15.78 719.30 64.40 45.15 19.25 719.40 68.33 45.41 22.92 719.50 72.46 45.66 26.80 719.60 76.88 45.91 30.98 719.70 81.52 46.16 35.36 719.80 86.13 46.40 39.72 719.90 90.88 46.65 44.23 720.00 95.67 46.89 48.78 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 27 Stage -Area -Storage for Pond 2P: POND 2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 710.50 20,568 0 710.60 20,916 2,074 710.70 21,265 4,183 710.80 21,613 6,327 710.90 21,962 8,506 711.00 22,310 10,720 711.10 22,490 12,960 711.20 22,671 15,218 711.30 22,851 17,494 711.40 23,031 19,788 711.50 23,212 22,100 711.60 23,392 24,430 711.70 23,572 26,778 711.80 23,752 29,144 711.90 23,933 31,529 712.00 24,113 33,931 712.10 24,299 36,352 712.20 24,485 38,791 712.30 24,672 41,249 712.40 24,858 43,725 712.50 25,044 46,220 712.60 25,230 48,734 712.70 25,416 51,266 712.80 25,603 53,817 712.90 25,789 56,387 713.00 25,975 58,975 713.10 26,167 61,582 713.20 26,359 64,208 713.30 26,552 66,854 713.40 26,744 69,519 713.50 26,936 72,203 713.60 27,128 74,906 713.70 27,320 77,628 713.80 27,513 80,370 713.90 27,705 83,131 714.00 27,897 85,911 714.10 28,095 88,711 714.20 28,293 91,530 714.30 28,492 94,369 714.40 28,690 97,228 714.50 28,888 100,107 714.60 29,086 103,006 714.70 29,284 105,924 714.80 29,483 108,863 714.90 29,681 111,821 715.00 29,879 114,799 715.10 30,083 117,797 715.20 30,287 120,816 715.30 30,491 123,855 715.40 30,695 126,914 715.50 30,900 129,994 715.60 31,104 133,094 715.70 31,308 136,214 715.80 31,512 139,355 715.90 31,716 142,517 716.00 31,920 145,699 716.10 32,130 148,901 716.20 32,340 152,125 716.30 32,550 155,369 716.40 32,760 158,635 716.50 32,971 161,921 716.60 33,181 165,229 716.70 33,391 168,557 716.80 33,601 171,907 716.90 33,811 175,277 717.00 34.021 178.669 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 717.10 34,237 182,082 717.20 34,453 185,516 717.30 34,670 188,973 717.40 34,886 192,450 717.50 35,102 195,950 717.60 35,318 199,471 717.70 35,534 203,013 717.80 35,751 206,578 717.90 35,967 210,164 718.00 36,183 213,771 718.10 36,405 217,400 718.20 36,627 221,052 718.30 36,849 224,726 718.40 37,071 228,422 718.50 37,294 232,140 718.60 37,516 235,881 718.70 37,738 239,643 718.80 37,960 243,428 718.90 38,182 247,235 719.00 38,404 251,065 719.10 38,632 254,916 719.20 38,860 258,791 719.30 39,089 262,688 719.40 39,317 266,609 719.50 39,545 270,552 719.60 39,773 274,518 719.70 40,001 278,506 719.80 40,230 282,518 719.90 40,458 286,552 720.00 40,686 290,610 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 28 Summary for Pond 8P: POND 3 Inflow Area = 15.260 ac, 72.15% Impervious, Inflow Depth = 2.17" for 2yr-24hr event Inflow = 58.17 cfs @ 11.95 hrs, Volume= 2.758 of Outflow = 0.73 cfs @ 19.07 hrs, Volume= 2.730 af, Atten= 99%, Lag= 426.7 min Primary = 0.73 cfs @ 19.07 hrs, Volume= 2.730 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 703.56' @ 19.07 hrs Surf.Area= 50,911 sf Storage= 90,231 cf Plug -Flow detention time= 1,531.0 min calculated for 2.729 of (99% of inflow) Center -of -Mass det. time= 1,526.6 min ( 2,335.3 - 808.7 ) Volume Invert Avail.Storage Storage Description #1 701.50' 519,480 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 701.50 22,118 0 0 702.00 43,792 16,478 16,478 703.00 48,320 46,056 62,534 704.00 52,961 50,641 113,174 705.00 57,717 55,339 168,513 706.00 62,582 60,150 228,663 707.00 67,552 65,067 293,730 708.00 72,628 70,090 363,820 709.00 77,809 75,219 439,038 710.00 83,074 80,442 519,480 Device Routing Invert Outlet Devices #1 Primary 701.39' 24.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 701.39' / 701.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 701.50' 4.5" Vert. 4.5" Orifice C= 0.600 #3 Device 1 705.00' 36.0" W x 6.0" H Vert. Slotted Weirs X 2.00 C= 0.600 #4 Device 1 708.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 708.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.73 cfs @ 19.07 hrs HW=703.56' TW=0.00' (Dynamic Tailwater) 1­1=Culvert (Passes 0.73 cfs of 14.49 cfs potential flow) 2=4.5" Orifice (Orifice Controls 0.73 cfs @ 6.59 fps) 3=Slotted Weirs ( Controls 0.00 cfs) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=701.50' TW=0.00' (Dynamic Tailwater) T 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 29 '1.71 E:iA19]isIll r - -I - - r - Hydrograph -I- - Y - -I- - r - - I- - r - - r - r - - r - r - - r - -I - - r - -I - - r - -I- - r - - --I---I -----II ---------------I--I_ - - _ ■Inflow IN Outflow 58.17 CfS +--+----+----+----+----+-r�11VYY /`11 GQ� 16 L�V �W IN Primary 65 + ■ Secondary 60 -7- 7--T----T----T----7--II -7--IF--1 T -T-- -I- -P�ekl EIeW=713.6�` 55 -�- J--L--1--1--1--1--I--1--I--�--L-1--L} -'L--1p--L--1-��1�--1-^1;�- 50 40 w u 35 ' �I -7- 7--r----T----T--Ir--T -7--Ir--7--I - --r----r----T----7-- 3 30 0 LL 25 -1---+----T----T--------1--r---r---r----+----+----+-- I I I I I I I I I I I I I I I I I I I I I I 20 - - -I-- II --I-- --I-- --I-- --II - --II - --II --I-- II --I-- II --I-- --I-- -- 15 -�- J--L--1--1--I--1--I--1--I--�--L-1--L-J--L--1--L--1--1--1--1- 10 0.73 cfs 0.00 Cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 C 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 8P: POND 3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 701.50 0.00 0.00 0.00 2.50 0.00 0 701.50 0.00 0.00 0.00 5.00 0.00 0 701.50 0.00 0.00 0.00 7.50 0.13 323 701.51 0.00 0.00 0.00 10.00 0.71 3,454 701.64 0.05 0.05 0.00 12.50 4.65 72,400 703.20 0.65 0.65 0.00 15.00 1.41 86,360 703.48 0.71 0.71 0.00 17.50 0.91 89,722 703.55 0.73 0.73 0.00 20.00 0.62 90,050 703.55 0.73 0.73 0.00 22.50 0.56 88,791 703.53 0.72 0.72 0.00 25.00 0.00 85,393 703.46 0.71 0.71 0.00 27.50 0.00 79,129 703.34 0.68 0.68 0.00 30.00 0.00 73,096 703.22 0.66 0.66 0.00 32.50 0.00 67,294 703.10 0.63 0.63 0.00 35.00 0.00 61,728 702.98 0.61 0.61 0.00 37.50 0.00 56,399 702.87 0.58 0.58 0.00 40.00 0.00 51,309 702.77 0.55 0.55 0.00 42.50 0.00 46,463 702.66 0.52 0.52 0.00 45.00 0.00 41,860 702.56 0.50 0.50 0.00 47.50 0.00 37,506 702.47 0.47 0.47 0.00 50.00 0.00 33,400 702.38 0.44 0.44 0.00 52.50 0.00 29,546 702.29 0.41 0.41 0.00 55.00 0.00 25,946 702.21 0.39 0.39 0.00 57.50 0.00 22,602 702.14 0.36 0.36 0.00 60.00 0.00 19,516 702.07 0.33 0.33 0.00 62.50 0.00 16,689 702.00 0.30 0.30 0.00 65.00 0.00 14,126 701.94 0.27 0.27 0.00 67.50 0.00 11,839 701.89 0.24 0.24 0.00 70.00 0.00 9,838 701.83 0.21 0.21 0.00 72.50 0.00 8,168 701.79 0.17 0.17 0.00 75.00 0.00 6,831 701.75 0.13 0.13 0.00 77.50 0.00 5,776 701.72 0.10 0.10 0.00 80.00 0.00 4,942 701.69 0.08 0.08 0.00 82.50 0.00 4,280 701.67 0.07 0.07 0.00 85.00 0.00 3,748 701.65 0.05 0.05 0.00 87.50 0.00 3,316 701.63 0.04 0.04 0.00 90.00 0.00 2,961 701.62 0.04 0.04 0.00 92.50 0.00 2,666 701.61 0.03 0.03 0.00 95.00 0.00 2,418 701.60 0.03 0.03 0.00 97.50 0.00 2,208 701.59 0.02 0.02 0.00 100.00 0.00 2,029 701.58 0.02 0.02 0.00 102.50 0.00 1,873 701.58 0.02 0.02 0.00 105.00 0.00 1,738 701.57 0.01 0.01 0.00 107.50 0.00 1,620 701.57 0.01 0.01 0.00 110.00 0.00 1,515 701.56 0.01 0.01 0.00 112.50 0.00 1,422 701.56 0.01 0.01 0.00 115.00 0.00 1,339 701.56 0.01 0.01 0.00 117.50 0.00 1,265 701.55 0.01 0.01 0.00 120.00 0.00 1,198 701.55 0.01 0.01 0.00 Type 1124-hr 2yr-24hr Rainfall=3.39" Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 31 Stage -Discharge for Pond 8P: POND 3 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 701.50 0.00 0.00 0.00 701.60 0.03 0.03 0.00 701.70 0.09 0.09 0.00 701.80 0.18 0.18 0.00 701.90 0.25 0.25 0.00 702.00 0.30 0.30 0.00 702.10 0.34 0.34 0.00 702.20 0.38 0.38 0.00 702.30 0.42 0.42 0.00 702.40 0.45 0.45 0.00 702.50 0.48 0.48 0.00 702.60 0.51 0.51 0.00 702.70 0.54 0.54 0.00 702.80 0.56 0.56 0.00 702.90 0.59 0.59 0.00 703.00 0.61 0.61 0.00 703.10 0.63 0.63 0.00 703.20 0.65 0.65 0.00 703.30 0.68 0.68 0.00 703.40 0.70 0.70 0.00 703.50 0.72 0.72 0.00 703.60 0.74 0.74 0.00 703.70 0.75 0.75 0.00 703.80 0.77 0.77 0.00 703.90 0.79 0.79 0.00 704.00 0.81 0.81 0.00 704.10 0.83 0.83 0.00 704.20 0.84 0.84 0.00 704.30 0.86 0.86 0.00 704.40 0.88 0.88 0.00 704.50 0.89 0.89 0.00 704.60 0.91 0.91 0.00 704.70 0.92 0.92 0.00 704.80 0.94 0.94 0.00 704.90 0.95 0.95 0.00 705.00 0.97 0.97 0.00 705.10 1.59 1.59 0.00 705.20 2.72 2.72 0.00 705.30 4.18 4.18 0.00 705.40 5.90 5.90 0.00 705.50 7.85 7.85 0.00 705.60 9.39 9.39 0.00 705.70 10.62 10.62 0.00 705.80 11.69 11.69 0.00 705.90 12.66 12.66 0.00 706.00 13.55 13.55 0.00 706.10 14.39 14.39 0.00 706.20 15.17 15.17 0.00 706.30 15.91 15.91 0.00 706.40 16.61 16.61 0.00 706.50 17.29 17.29 0.00 706.60 17.94 17.94 0.00 706.70 18.56 18.56 0.00 706.80 19.17 19.17 0.00 706.90 19.75 19.75 0.00 707.00 20.32 20.32 0.00 707.10 20.87 20.87 0.00 707.20 21.41 21.41 0.00 707.30 21.93 21.93 0.00 707.40 22.44 22.44 0.00 707.50 22.94 22.94 0.00 707.60 23.43 23.43 0.00 707.70 23.90 23.90 0.00 707.80 24.37 24.37 0.00 707.90 24.83 24.83 0.00 708.00 25.28 25.28 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 708.10 27.38 27.38 0.00 708.20 30.84 30.84 0.00 708.30 35.18 35.18 0.00 708.40 37.08 37.08 0.00 708.50 37.39 37.39 0.00 708.60 38.48 37.70 0.79 708.70 40.22 38.00 2.23 708.80 42.45 38.30 4.15 708.90 45.07 38.60 6.48 709.00 48.19 38.89 9.30 709.10 51.73 39.18 12.55 709.20 55.26 39.47 15.78 709.30 59.01 39.76 19.25 709.40 62.97 40.05 22.92 709.50 67.13 40.33 26.80 709.60 71.59 40.62 30.98 709.70 76.26 40.90 35.36 709.80 80.90 41.18 39.72 709.90 85.68 41.45 44.23 710.00 90.50 41.73 48.78 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 32 Stage -Area -Storage for Pond 8P: POND 3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 701.50 22,118 0 701.60 26,453 2,429 701.70 30,788 5,291 701.80 35,122 8,586 701.90 39,457 12,315 702.00 43,792 16,478 702.10 44,245 20,879 702.20 44,698 25,326 702.30 45,150 29,819 702.40 45,603 34,357 702.50 46,056 38,940 702.60 46,509 43,568 702.70 46,962 48,241 702.80 47,414 52,960 702.90 47,867 57,724 703.00 48,320 62,534 703.10 48,784 67,389 703.20 49,248 72,290 703.30 49,712 77,238 703.40 50,176 82,233 703.50 50,641 87,274 703.60 51,105 92,361 703.70 51,569 97,495 703.80 52,033 102,675 703.90 52,497 107,901 704.00 52,961 113,174 704.10 53,437 118,494 704.20 53,912 123,861 704.30 54,388 129,276 704.40 54,863 134,739 704.50 55,339 140,249 704.60 55,815 145,807 704.70 56,290 151,412 704.80 56,766 157,065 704.90 57,241 162,765 705.00 57,717 168,513 705.10 58,204 174,309 705.20 58,690 180,154 705.30 59,176 186,047 705.40 59,663 191,989 705.50 60,150 197,980 705.60 60,636 204,019 705.70 61,123 210,107 705.80 61,609 216,243 705.90 62,095 222,429 706.00 62,582 228,663 706.10 63,079 234,946 706.20 63,576 241,278 706.30 64,073 247,661 706.40 64,570 254,093 706.50 65,067 260,575 706.60 65,564 267,106 706.70 66,061 273,688 706.80 66,558 280,318 706.90 67,055 286,999 707.00 67,552 293,730 707.10 68,060 300,510 707.20 68,567 307,341 707.30 69,075 314,224 707.40 69,582 321,156 707.50 70,090 328,140 707.60 70,598 335,174 707.70 71,105 342,260 707.80 71,613 349,395 707.90 72,120 356,582 708.00 72.628 363.820 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 708.10 73,146 371,108 708.20 73,664 378,449 708.30 74,182 385,841 708.40 74,700 393,285 708.50 75,219 400,781 708.60 75,737 408,329 708.70 76,255 415,928 708.80 76,773 423,580 708.90 77,291 431,283 709.00 77,809 439,038 709.10 78,336 446,845 709.20 78,862 454,705 709.30 79,388 462,618 709.40 79,915 470,583 709.50 80,442 478,601 709.60 80,968 486,671 709.70 81,495 494,794 709.80 82,021 502,970 709.90 82,547 511,198 710.00 83,074 519,480 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 33 Summary for Pond 10P: POND 4 Inflow Area = 10.550 ac, 69.48% Impervious, Inflow Depth = 2.08" for 2yr-24hr event Inflow = 38.86 cfs @ 11.96 hrs, Volume= 1.832 of Outflow = 3.30 cfs @ 12.48 hrs, Volume= 1.832 af, Atten= 92%, Lag= 31.3 min Primary = 3.30 cfs @ 12.48 hrs, Volume= 1.832 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 681.19' @ 12.48 hrs Surf.Area= 14,763 sf Storage= 36,402 cf Plug -Flow detention time= 122.0 min calculated for 1.831 of (100% of inflow) Center -of -Mass det. time= 123.1 min ( 935.6 - 812.5 ) Volume Invert Avail.Storage Storage Description #1 677.00' 120,639 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 677.00 4,560 0 0 678.00 5,909 5,235 5,235 679.00 7,780 6,845 12,079 680.00 10,667 9,224 21,303 681.00 14,076 12,372 33,674 682.00 17,710 15,893 49,567 683.00 21,571 19,641 69,208 684.00 25,659 23,615 92,823 685.00 29,973 27,816 120,639 Device Routing Invert Outlet Devices #1 Primary 676.39' 24.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 676.39' / 676.00' S= 0.0050 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 677.00' 8.0" Vert. 8" Orifice C= 0.600 #3 Device 1 682.50' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #4 Secondary 683.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=3.30 cfs @ 12.48 hrs HW=681.19' TW=0.00' (Dynamic Tailwater) 1­1=Culvert (Passes 3.30 cfs of 29.48 cfs potential flow) 1 2=8" Orifice (Orifice Controls 3.30 cfs @ 9.45 fps) 3=Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=677.00' TW=0.00' (Dynamic Tailwater) 4=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 34 '0 i gM111]A191MIZ! Hydrograph i -r--r-r--r----t--I--t--I--r--I--r--r-r--r-r--r--I--r--I--t--I--r-- 38.86 CfS I----?----?--II--?--II-- I --II-- I--II---II--I---II-----II---I --II---II -- ■ In +----+----+----+----+--+-+--+-+--+----+----+----+-- 1 A 1 ��lO_ A .rr�-1= 1 0.550-ae V ■Outflow ■ Primary 42 -+- +--+--I--+--I--+--I--+--I--+--+-+--+-+--+--I--+--I--+--I--+-- G v J ■Secondary 40 I-----+--�r����.I�� - 36 -y- y--r----+----+----rt--Ir-y--Ir- -L--I--! -I--! -I--! -I--! -�- L-1-------1-- -�-}� r - 2cfI - - 34 'I --- I ------------------------------$tQr_a9_� I I I I I I I I I I I Z-IJ� -- I I I I I I I I I I 32 -+- +--+----+----+----+----+--+-+--+-+--+- --+----+----+-- 30 -j- --- j----j ----j ----j- -- I--I -j-- I--I--I --I --I I--j--I--j-- 28 - - J--L--1--1----1----L--I-- --L-L--L-J--L----L----1----L-- 26 - - --r----T----T--I-- --I - --I - --I - --r----r----T----7-- w24 � - - J--L--1--1----1----L--I-- --L-L--L-J--L----L----1----L-- 22 -r- r--r----t--I--t--I--r--r-r--r-r--r-r--r--I--r--I--t--I--r-- I 0 20 _ I_ _I-- - - -- - -I- - - -I- - - - - - - - - -- -I - - -I - -I -- - -I- - - -I- - -- LL 18 -1- --+----+----+--I-- ----1--+- --r- --r----+----+----+-- 16 - -I-- --I-- --I-- --I-- - - --I--; --I-- --I-- --I-- 14 - - -- --I-- --I-- --I-- --I-- --L-I--L- -- --I-- --I-- --I-- -- 12 - - --r----T----T--I-- --I - --I - --I ---r----r----T--I-- -- 10 8 ��3.30 cfs --L--1--1--1--L----L--I-- --L- --L-L--L----L----L----L-- 6 0.00 cfs WNW 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 C 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 10P: POND 4 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 677.00 0.00 0.00 0.00 2.50 0.00 0 677.00 0.00 0.00 0.00 5.00 0.00 0 677.00 0.00 0.00 0.00 7.50 0.06 106 677.02 0.00 0.00 0.00 10.00 0.43 1,296 677.27 0.24 0.24 0.00 12.50 3.14 36,395 681.19 3.30 3.30 0.00 15.00 0.95 22,217 680.08 2.79 2.79 0.00 17.50 0.62 8,024 678.44 1.77 1.77 0.00 20.00 0.42 2,294 677.47 0.61 0.61 0.00 22.50 0.38 1,736 677.36 0.40 0.40 0.00 25.00 0.00 924 677.20 0.13 0.13 0.00 27.50 0.00 394 677.09 0.03 0.03 0.00 30.00 0.00 246 677.05 0.01 0.01 0.00 32.50 0.00 178 677.04 0.01 0.01 0.00 35.00 0.00 139 677.03 0.00 0.00 0.00 37.50 0.00 114 677.02 0.00 0.00 0.00 40.00 0.00 97 677.02 0.00 0.00 0.00 42.50 0.00 84 677.02 0.00 0.00 0.00 45.00 0.00 74 677.02 0.00 0.00 0.00 47.50 0.00 66 677.01 0.00 0.00 0.00 50.00 0.00 60 677.01 0.00 0.00 0.00 52.50 0.00 55 677.01 0.00 0.00 0.00 55.00 0.00 50 677.01 0.00 0.00 0.00 57.50 0.00 47 677.01 0.00 0.00 0.00 60.00 0.00 43 677.01 0.00 0.00 0.00 62.50 0.00 41 677.01 0.00 0.00 0.00 65.00 0.00 38 677.01 0.00 0.00 0.00 67.50 0.00 36 677.01 0.00 0.00 0.00 70.00 0.00 34 677.01 0.00 0.00 0.00 72.50 0.00 32 677.01 0.00 0.00 0.00 75.00 0.00 31 677.01 0.00 0.00 0.00 77.50 0.00 29 677.01 0.00 0.00 0.00 80.00 0.00 28 677.01 0.00 0.00 0.00 82.50 0.00 27 677.01 0.00 0.00 0.00 85.00 0.00 26 677.01 0.00 0.00 0.00 87.50 0.00 25 677.01 0.00 0.00 0.00 90.00 0.00 24 677.01 0.00 0.00 0.00 92.50 0.00 23 677.01 0.00 0.00 0.00 95.00 0.00 22 677.00 0.00 0.00 0.00 97.50 0.00 21 677.00 0.00 0.00 0.00 100.00 0.00 21 677.00 0.00 0.00 0.00 102.50 0.00 20 677.00 0.00 0.00 0.00 105.00 0.00 19 677.00 0.00 0.00 0.00 107.50 0.00 19 677.00 0.00 0.00 0.00 110.00 0.00 18 677.00 0.00 0.00 0.00 112.50 0.00 18 677.00 0.00 0.00 0.00 115.00 0.00 17 677.00 0.00 0.00 0.00 117.50 0.00 17 677.00 0.00 0.00 0.00 120.00 0.00 16 677.00 0.00 0.00 0.00 Type 1124-hr 2yr-24hr Rainfall=3.39" Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 36 Stage -Discharge for Pond 10P: POND 4 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 677.00 0.00 0.00 0.00 677.10 0.04 0.04 0.00 677.20 0.13 0.13 0.00 677.30 0.28 0.28 0.00 677.40 0.47 0.47 0.00 677.50 0.68 0.68 0.00 677.60 0.87 0.87 0.00 677.70 1.02 1.02 0.00 677.80 1.15 1.15 0.00 677.90 1.27 1.27 0.00 678.00 1.37 1.37 0.00 678.10 1.47 1.47 0.00 678.20 1.56 1.56 0.00 678.30 1.65 1.65 0.00 678.40 1.74 1.74 0.00 678.50 1.82 1.82 0.00 678.60 1.89 1.89 0.00 678.70 1.96 1.96 0.00 678.80 2.04 2.04 0.00 678.90 2.10 2.10 0.00 679.00 2.17 2.17 0.00 679.10 2.23 2.23 0.00 679.20 2.30 2.30 0.00 679.30 2.36 2.36 0.00 679.40 2.42 2.42 0.00 679.50 2.47 2.47 0.00 679.60 2.53 2.53 0.00 679.70 2.59 2.59 0.00 679.80 2.64 2.64 0.00 679.90 2.69 2.69 0.00 680.00 2.74 2.74 0.00 680.10 2.80 2.80 0.00 680.20 2.85 2.85 0.00 680.30 2.89 2.89 0.00 680.40 2.94 2.94 0.00 680.50 2.99 2.99 0.00 680.60 3.04 3.04 0.00 680.70 3.08 3.08 0.00 680.80 3.13 3.13 0.00 680.90 3.17 3.17 0.00 681.00 3.22 3.22 0.00 681.10 3.26 3.26 0.00 681.20 3.30 3.30 0.00 681.30 3.35 3.35 0.00 681.40 3.39 3.39 0.00 681.50 3.43 3.43 0.00 681.60 3.47 3.47 0.00 681.70 3.51 3.51 0.00 681.80 3.55 3.55 0.00 681.90 3.59 3.59 0.00 682.00 3.63 3.63 0.00 682.10 3.67 3.67 0.00 682.20 3.71 3.71 0.00 682.30 3.75 3.75 0.00 682.40 3.78 3.78 0.00 682.50 3.82 3.82 0.00 682.60 5.51 5.51 0.00 682.70 8.57 8.57 0.00 682.80 12.53 12.53 0.00 682.90 17.20 17.20 0.00 683.00 22.50 22.50 0.00 683.10 28.35 28.35 0.00 683.20 34.71 34.71 0.00 683.30 36.77 36.77 0.00 683.40 37.08 37.08 0.00 683.50 37.39 37.39 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 683.60 38.48 37.70 0.79 683.70 40.22 38.00 2.23 683.80 42.45 38.30 4.15 683.90 45.07 38.60 6.48 684.00 48.19 38.89 9.30 684.10 51.73 39.18 12.55 684.20 55.26 39.47 15.78 684.30 59.01 39.76 19.25 684.40 62.97 40.05 22.92 684.50 67.13 40.33 26.80 684.60 71.59 40.62 30.98 684.70 76.26 40.90 35.36 684.80 80.90 41.18 39.72 684.90 85.68 41.45 44.23 685.00 90.50 41.73 48.78 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 37 Stage -Area -Storage for Pond 10P: POND 4 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 677.00 4,560 0 677.10 4,695 463 677.20 4,830 939 677.30 4,965 1,429 677.40 5,100 1,932 677.50 5,235 2,449 677.60 5,369 2,979 677.70 5,504 3,523 677.80 5,639 4,080 677.90 5,774 4,650 678.00 5,909 5,235 678.10 6,096 5,835 678.20 6,283 6,454 678.30 6,470 7,091 678.40 6,657 7,748 678.50 6,845 8,423 678.60 7,032 9,117 678.70 7,219 9,829 678.80 7,406 10,560 678.90 7,593 11,310 679.00 7,780 12,079 679.10 8,069 12,871 679.20 8,357 13,693 679.30 8,646 14,543 679.40 8,935 15,422 679.50 9,224 16,330 679.60 9,512 17,267 679.70 9,801 18,232 679.80 10,090 19,227 679.90 10,378 20,250 680.00 10,667 21,303 680.10 11,008 22,386 680.20 11,349 23,504 680.30 11,690 24,656 680.40 12,031 25,842 680.50 12,372 27,062 680.60 12,712 28,316 680.70 13,053 29,605 680.80 13,394 30,927 680.90 13,735 32,283 681.00 14,076 33,674 681.10 14,439 35,100 681.20 14,803 36,562 681.30 15,166 38,060 681.40 15,530 39,595 681.50 15,893 41,166 681.60 16,256 42,774 681.70 16,620 44,418 681.80 16,983 46,098 681.90 17,347 47,814 682.00 17,710 49,567 682.10 18,096 51,357 682.20 18,482 53,186 682.30 18,868 55,054 682.40 19,254 56,960 682.50 19,641 58,905 682.60 20,027 60,888 682.70 20,413 62,910 682.80 20,799 64,971 682.90 21,185 67,070 683.00 21,571 69,208 683.10 21,980 71,385 683.20 22,389 73,603 683.30 22,797 75,863 683.40 23,206 78,163 683.50 23.615 80.504 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 683.60 24,024 82,886 683.70 24,433 85,309 683.80 24,841 87,772 683.90 25,250 90,277 684.00 25,659 92,823 684.10 26,090 95,410 684.20 26,522 98,041 684.30 26,953 100,714 684.40 27,385 103,431 684.50 27,816 106,191 684.60 28,247 108,994 684.70 28,679 111,841 684.80 29,110 114,730 684.90 29,542 117,663 685.00 29,973 120,639 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HydroCAD®10.00-26 s/n 10066 ©2020 HydroCAD Software Solutions LLC Page 38 Summary for Pond 11 P: POST - OUTFALL #2 Inflow Area = 60.330 ac, 54.75% Impervious, Inflow Depth > 1.72" for 2yr-24hr event Inflow = 8.62 cfs @ 12.22 hrs, Volume= 8.625 of Primary = 8.62 cfs @ 12.22 hrs, Volume= 8.625 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Pond 11 P: POST - OUTFALL #2 Hydrograph ------L--L--L--'-- ----L----L--L--L--'-- -----1--J--L-- ❑ Inflow ❑ Primary 9 $.62 cfs J14rej1=$0.330-'Iap-- IIIIIIIIIIIIIIIII�III 7- -1 --- I- t r -I- I t r -I- t r -I- I t r -I- t 6 �- 5 I I I I I I I I I I I I I I I I I I I I 3 p -- -------------------------------------------------------- I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I LL 4 3 --' --J--L--L--'----L--L--'--J--L--L--'----L--------L-- 2 - - ---L--'-- -- -- --'-- -- -- --'-- -- - 1 I I I I I I I I I I I I 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 39 Hydrograph for Pond 11 P: POST - OUTFALL #2 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 1.00 0.00 0.00 2.00 0.00 0.00 3.00 0.00 0.00 4.00 0.00 0.00 5.00 0.00 0.00 6.00 0.00 0.00 7.00 0.00 0.00 8.00 0.02 0.02 9.00 0.12 0.12 10.00 0.38 0.38 11.00 1.03 1.03 12.00 5.19 5.19 13.00 5.98 5.98 14.00 5.44 5.44 15.00 5.07 5.07 16.00 4.65 4.65 17.00 4.18 4.18 18.00 3.66 3.66 19.00 3.12 3.12 20.00 2.68 2.68 21.00 2.50 2.50 22.00 2.44 2.44 23.00 2.40 2.40 24.00 2.37 2.37 25.00 1.89 1.89 26.00 1.79 1.79 27.00 1.74 1.74 28.00 1.70 1.70 29.00 1.66 1.66 30.00 1.63 1.63 31.00 1.60 1.60 32.00 1.57 1.57 33.00 1.54 1.54 34.00 1.51 1.51 35.00 1.48 1.48 36.00 1.45 1.45 37.00 1.42 1.42 38.00 1.39 1.39 39.00 1.36 1.36 40.00 1.33 1.33 41.00 1.29 1.29 42.00 1.26 1.26 43.00 1.23 1.23 44.00 1.20 1.20 45.00 1.17 1.17 46.00 1.14 1.14 47.00 1.11 1.11 48.00 1.07 1.07 49.00 1.04 1.04 50.00 1.01 1.01 51.00 0.98 0.98 52.00 0.94 0.94 53.00 0.91 0.91 54.00 0.88 0.88 55.00 0.84 0.84 56.00 0.81 0.81 57.00 0.78 0.78 58.00 0.74 0.74 59.00 0.71 0.71 60.00 0.67 0.67 61.00 0.64 0.64 62.00 0.61 0.61 63.00 0.57 0.57 64.00 0.54 0.54 65.00 0.50 0.50 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 66.00 0.47 0.47 67.00 0.43 0.43 68.00 0.39 0.39 69.00 0.36 0.36 70.00 0.32 0.32 71.00 0.29 0.29 72.00 0.26 0.26 73.00 0.24 0.24 74.00 0.21 0.21 75.00 0.19 0.19 76.00 0.17 0.17 77.00 0.16 0.16 78.00 0.14 0.14 79.00 0.13 0.13 80.00 0.12 0.12 81.00 0.11 0.11 82.00 0.10 0.10 83.00 0.09 0.09 84.00 0.08 0.08 85.00 0.08 0.08 86.00 0.07 0.07 87.00 0.06 0.06 88.00 0.06 0.06 89.00 0.06 0.06 90.00 0.05 0.05 91.00 0.05 0.05 92.00 0.05 0.05 93.00 0.04 0.04 94.00 0.04 0.04 95.00 0.04 0.04 96.00 0.03 0.03 97.00 0.03 0.03 98.00 0.03 0.03 99.00 0.03 0.03 100.00 0.03 0.03 101.00 0.03 0.03 102.00 0.02 0.02 103.00 0.02 0.02 104.00 0.02 0.02 105.00 0.02 0.02 106.00 0.02 0.02 107.00 0.02 0.02 108.00 0.02 0.02 109.00 0.02 0.02 110.00 0.02 0.02 111.00 0.02 0.02 112.00 0.02 0.02 113.00 0.01 0.01 114.00 0.01 0.01 115.00 0.01 0.01 116.00 0.01 0.01 117.00 0.01 0.01 118.00 0.01 0.01 119.00 0.01 0.01 120.00 0.01 0.01 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 40 Summary for Pond 13P: POND 1 Inflow Area = 36.370 ac, 81.50% Impervious, Inflow Depth = 2.44" for 2yr-24hr event Inflow = 152.25 cfs @ 11.95 hrs, Volume= 7.387 of Outflow = 8.42 cfs @ 12.82 hrs, Volume= 7.378 af, Atten= 94%, Lag= 52.3 min Primary = 8.42 cfs @ 12.82 hrs, Volume= 7.378 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 706.20' @ 12.82 hrs Surf.Area= 45,050 sf Storage= 182,371 cf Plug -Flow detention time= 390.9 min calculated for 7.374 of (100% of inflow) Center -of -Mass det. time= 392.0 min ( 1,188.3 - 796.3 ) Volume Invert Avail.Storage Storage Description #1 701.00' 393,227 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 701.00 22,606 0 0 702.00 30,532 26,569 26,569 703.00 33,334 31,933 58,502 704.00 36,378 34,856 93,358 705.00 39,732 38,055 131,413 706.00 43,988 41,860 173,273 707.00 49,187 46,588 219,861 708.00 54,818 52,003 271,863 709.00 60,624 57,721 329,584 710.00 66,662 63,643 393,227 Device Routing Invert Outlet Devices #1 Primary 700.39' 36.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 700.39' / 700.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 7.07 sf #2 Device 1 701.00' 10.0" Vert. 8" Orifice C= 0.600 #3 Device 1 706.00' 36.0" W x 8.0" H Vert. Orifice/Grate X 3.00 C= 0.600 #4 Device 1 708.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 708.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=8.41 cfs @ 12.82 hrs HW=706.20' TW=0.00' (Dynamic Tailwater) 1­1=Culvert (Passes 8.41 cfs of 70.69 cfs potential flow) 2=8" Orifice (Orifice Controls 5.75 cfs @ 10.54 fps) 3=Orifice/Grate (Orifice Controls 2.67 cfs @ 1.45 fps) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=701.00' TW=0.00' (Dynamic Tailwater) T 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 41 '0=6 1 gM10 141ii Hydrograph -r--r-r--r-r--r-r--r-r--r-r--r-r--r-r--r-r--r-r--r-r--r-r-- 152.25 Cfs r- r--r-r--r- r--r- r--r-r--r- r--r-r-- r- r--r- r- -r-r-- IN Inflow -�- y__r-�--r-�--r-�--r-�--r r---r-r- -r- --r- --r---r- --r--r-r--r---r-�-- -aafIowAt"=-39,37-Dt a- IN Outflow IN Primary 170 � r. r Secondary -r- r--r-r--r-r--r-r--r-r--r-r--r�r--r----r-r--.fir-Syr--,fir-ram-- - Peak ]=-]eV-7'06-. 20 150 140 -,- --r- --r-r--r- --r-r--r- 130 -r- r--r-r--r-r--r-r--r-r--r-r--r-r--r--i--r-r--r-r--r-r-- 120 - - r--r- --r- --r- --r- --r-r--r- --r--li--r- --r---r-r-- 110 - - --r- --r- --r- --r- --r- --r- --r--li--r- --r- --r- -- 100 w -,- --r- --r- --r- --r-r--r- --r- --r----r---r-,--r- -- v 90 - - --r- --r- --r- --r- --r- --r- --r--li--r- --r- --r- -- 0 80 -r- r--r -r-- r -r--r -r--r -r-- r-r-- r-r--r-r--r-r--r-r--r-r-- LL 70-I--I- - r - - r - r - - 60 -,- -- r- r--r - r--r - r--r -r--r- --r- -- r - ---r---r-,--r-r-- 50 - - r--r- --r- --r- --r- --r-r--r- --r--li--r- --r---r-r-- 40 - - r--r- --r- --r- --r-r--r-r--r- --r----r---r-,--r-r-- 30 8.42 Cfs 20 0.00 Cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 C 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 13P: POND 1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 701.00 0.00 0.00 0.00 2.50 0.00 0 701.00 0.00 0.00 0.00 5.00 0.05 19 701.00 0.00 0.00 0.00 7.50 0.69 3,053 701.13 0.07 0.07 0.00 10.00 2.40 12,326 701.50 0.83 0.83 0.00 12.50 11.81 180,760 706.17 7.72 7.72 0.00 15.00 3.52 169,950 705.92 5.58 5.58 0.00 17.50 2.26 145,889 705.36 5.21 5.21 0.00 20.00 1.54 118,164 704.66 4.73 4.73 0.00 22.50 1.38 91,156 703.94 4.17 4.17 0.00 25.00 0.00 64,007 703.16 3.47 3.47 0.00 27.50 0.00 37,001 702.34 2.52 2.52 0.00 30.00 0.00 18,861 701.74 1.50 1.50 0.00 32.50 0.00 10,049 701.41 0.59 0.59 0.00 35.00 0.00 6,403 701.27 0.27 0.27 0.00 37.50 0.00 4,593 701.20 0.15 0.15 0.00 40.00 0.00 3,546 701.15 0.09 0.09 0.00 42.50 0.00 2,873 701.12 0.06 0.06 0.00 45.00 0.00 2,408 701.10 0.04 0.04 0.00 47.50 0.00 2,069 701.09 0.03 0.03 0.00 50.00 0.00 1,812 701.08 0.03 0.03 0.00 52.50 0.00 1,610 701.07 0.02 0.02 0.00 55.00 0.00 1,448 701.06 0.02 0.02 0.00 57.50 0.00 1,315 701.06 0.01 0.01 0.00 60.00 0.00 1,204 701.05 0.01 0.01 0.00 62.50 0.00 1,110 701.05 0.01 0.01 0.00 65.00 0.00 1,029 701.05 0.01 0.01 0.00 67.50 0.00 959 701.04 0.01 0.01 0.00 70.00 0.00 898 701.04 0.01 0.01 0.00 72.50 0.00 844 701.04 0.01 0.01 0.00 75.00 0.00 797 701.04 0.01 0.01 0.00 77.50 0.00 754 701.03 0.00 0.00 0.00 80.00 0.00 715 701.03 0.00 0.00 0.00 82.50 0.00 681 701.03 0.00 0.00 0.00 85.00 0.00 649 701.03 0.00 0.00 0.00 87.50 0.00 620 701.03 0.00 0.00 0.00 90.00 0.00 594 701.03 0.00 0.00 0.00 92.50 0.00 570 701.03 0.00 0.00 0.00 95.00 0.00 547 701.02 0.00 0.00 0.00 97.50 0.00 527 701.02 0.00 0.00 0.00 100.00 0.00 507 701.02 0.00 0.00 0.00 102.50 0.00 490 701.02 0.00 0.00 0.00 105.00 0.00 473 701.02 0.00 0.00 0.00 107.50 0.00 457 701.02 0.00 0.00 0.00 110.00 0.00 443 701.02 0.00 0.00 0.00 112.50 0.00 429 701.02 0.00 0.00 0.00 115.00 0.00 416 701.02 0.00 0.00 0.00 117.50 0.00 404 701.02 0.00 0.00 0.00 120.00 0.00 393 701.02 0.00 0.00 0.00 Type 1124-hr 2yr-24hr Rainfall=3.39" Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 43 Stage -Discharge for Pond 13P: POND 1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 701.00 0.00 0.00 0.00 701.10 0.04 0.04 0.00 701.20 0.15 0.15 0.00 701.30 0.33 0.33 0.00 701.40 0.56 0.56 0.00 701.50 0.82 0.82 0.00 701.60 1.11 1.11 0.00 701.70 1.39 1.39 0.00 701.80 1.64 1.64 0.00 701.90 1.83 1.83 0.00 702.00 2.01 2.01 0.00 702.10 2.17 2.17 0.00 702.20 2.32 2.32 0.00 702.30 2.47 2.47 0.00 702.40 2.60 2.60 0.00 702.50 2.73 2.73 0.00 702.60 2.86 2.86 0.00 702.70 2.98 2.98 0.00 702.80 3.09 3.09 0.00 702.90 3.20 3.20 0.00 703.00 3.30 3.30 0.00 703.10 3.41 3.41 0.00 703.20 3.51 3.51 0.00 703.30 3.60 3.60 0.00 703.40 3.70 3.70 0.00 703.50 3.79 3.79 0.00 703.60 3.88 3.88 0.00 703.70 3.97 3.97 0.00 703.80 4.05 4.05 0.00 703.90 4.14 4.14 0.00 704.00 4.22 4.22 0.00 704.10 4.30 4.30 0.00 704.20 4.38 4.38 0.00 704.30 4.46 4.46 0.00 704.40 4.54 4.54 0.00 704.50 4.61 4.61 0.00 704.60 4.69 4.69 0.00 704.70 4.76 4.76 0.00 704.80 4.83 4.83 0.00 704.90 4.90 4.90 0.00 705.00 4.97 4.97 0.00 705.10 5.04 5.04 0.00 705.20 5.11 5.11 0.00 705.30 5.18 5.18 0.00 705.40 5.24 5.24 0.00 705.50 5.31 5.31 0.00 705.60 5.37 5.37 0.00 705.70 5.44 5.44 0.00 705.80 5.50 5.50 0.00 705.90 5.56 5.56 0.00 706.00 5.62 5.62 0.00 706.10 6.60 6.60 0.00 706.20 8.33 8.33 0.00 706.30 10.55 10.55 0.00 706.40 13.17 13.17 0.00 706.50 16.14 16.14 0.00 706.60 19.41 19.41 0.00 706.70 22.78 22.78 0.00 706.80 25.36 25.36 0.00 706.90 27.56 27.56 0.00 707.00 29.54 29.54 0.00 707.10 31.35 31.35 0.00 707.20 33.04 33.04 0.00 707.30 34.63 34.63 0.00 707.40 36.14 36.14 0.00 707.50 37.57 37.57 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 707.60 38.95 38.95 0.00 707.70 40.27 40.27 0.00 707.80 41.55 41.55 0.00 707.90 42.78 42.78 0.00 708.00 43.97 43.97 0.00 708.10 46.79 46.79 0.00 708.20 50.94 50.94 0.00 708.30 55.95 55.95 0.00 708.40 61.66 61.66 0.00 708.50 67.97 67.97 0.00 708.60 75.60 74.81 0.79 708.70 84.36 82.14 2.23 708.80 93.62 89.47 4.15 708.90 96.59 90.11 6.48 709.00 100.05 90.75 9.30 709.10 103.94 91.39 12.55 709.20 107.80 92.02 15.78 709.30 111.90 92.65 19.25 709.40 116.20 93.27 22.92 709.50 120.69 93.89 26.80 709.60 125.48 94.50 30.98 709.70 130.48 95.12 35.36 709.80 135.45 95.72 39.72 709.90 140.55 96.33 44.23 710.00 145.70 96.93 48.78 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 44 Stage -Area -Storage for Pond 13P: POND 1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 701.00 22,606 0 701.10 23,399 2,300 701.20 24,191 4,680 701.30 24,984 7,138 701.40 25,776 9,676 701.50 26,569 12,294 701.60 27,362 14,990 701.70 28,154 17,766 701.80 28,947 20,621 701.90 29,739 23,555 702.00 30,532 26,569 702.10 30,812 29,636 702.20 31,092 32,731 702.30 31,373 35,855 702.40 31,653 39,006 702.50 31,933 42,185 702.60 32,213 45,393 702.70 32,493 48,628 702.80 32,774 51,891 702.90 33,054 55,183 703.00 33,334 58,502 703.10 33,638 61,851 703.20 33,943 65,230 703.30 34,247 68,639 703.40 34,552 72,079 703.50 34,856 75,550 703.60 35,160 79,050 703.70 35,465 82,582 703.80 35,769 86,143 703.90 36,074 89,735 704.00 36,378 93,358 704.10 36,713 97,013 704.20 37,049 100,701 704.30 37,384 104,422 704.40 37,720 108,178 704.50 38,055 111,966 704.60 38,390 115,789 704.70 38,726 119,644 704.80 39,061 123,534 704.90 39,397 127,457 705.00 39,732 131,413 705.10 40,158 135,407 705.20 40,583 139,445 705.30 41,009 143,524 705.40 41,434 147,646 705.50 41,860 151,811 705.60 42,286 156,018 705.70 42,711 160,268 705.80 43,137 164,561 705.90 43,562 168,895 706.00 43,988 173,273 706.10 44,508 177,698 706.20 45,028 182,175 706.30 45,548 186,703 706.40 46,068 191,284 706.50 46,588 195,917 706.60 47,107 200,602 706.70 47,627 205,338 706.80 48,147 210,127 706.90 48,667 214,968 707.00 49,187 219,861 707.10 49,750 224,807 707.20 50,313 229,811 707.30 50,876 234,870 707.40 51,439 239,986 707.50 52.003 245.158 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 707.60 52,566 250,386 707.70 53,129 255,671 707.80 53,692 261,012 707.90 54,255 266,409 708.00 54,818 271,863 708.10 55,399 277,374 708.20 55,979 282,943 708.30 56,560 288,570 708.40 57,140 294,255 708.50 57,721 299,998 708.60 58,302 305,799 708.70 58,882 311,658 708.80 59,463 317,575 708.90 60,043 323,551 709.00 60,624 329,584 709.10 61,228 335,677 709.20 61,832 341,830 709.30 62,435 348,043 709.40 63,039 354,317 709.50 63,643 360,651 709.60 64,247 367,045 709.70 64,851 373,500 709.80 65,454 380,015 709.90 66,058 386,591 710.00 66,662 393,227 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 45 Summary for Pond 15P: POND 6 Inflow Area = 13.860 ac, 74.39% Impervious, Inflow Depth = 2.26" for 2yr-24hr event Inflow = 54.59 cfs @ 11.95 hrs, Volume= 2.605 of Outflow = 3.34 cfs @ 12.70 hrs, Volume= 2.593 af, Atten= 94%, Lag= 45.0 min Primary = 3.34 cfs @ 12.70 hrs, Volume= 2.593 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 679.04' @ 12.70 hrs Surf.Area= 33,770 sf Storage= 62,282 cf Plug -Flow detention time= 311.6 min calculated for 2.592 of (99% of inflow) Center -of -Mass det. time= 310.9 min ( 1,115.7 - 804.8 ) Volume Invert Avail.Storage Storage Description #1 677.00' 270,951 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 677.00 27,493 0 0 678.00 30,495 28,994 28,994 679.00 33,652 32,074 61,068 680.00 36,914 35,283 96,351 681.00 40,232 38,573 134,924 682.00 43,608 41,920 176,844 683.00 47,039 45,324 222,167 684.00 50,528 48,784 270,951 Device Routing Invert Outlet Devices #1 Primary 676.39' 36.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 676.39' / 676.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 7.07 sf #2 Device 1 677.00' 10.0" Vert. 8" Orifice C= 0.600 #3 Device 1 680.00' 36.0" W x 8.0" H Vert. Orifice/Grate X 3.00 C= 0.600 #4 Device 1 682.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 682.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=3.34 cfs @ 12.70 hrs HW=679.04' TW=0.00' (Dynamic Tailwater) 1­1=Culvert (Passes 3.34 cfs of 29.64 cfs potential flow) 2=8" Orifice (Orifice Controls 3.34 cfs @ 6.13 fps) 3=Orifice/Grate ( Controls 0.00 cfs) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=677.00' TW=0.00' (Dynamic Tailwater) T 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 46 '0=6 1 gmMR097ki1•I: ..... •.. ' 1 • •, • '///%//////%//////////////////////////////////////////////////////////////////////0 ///////////////////////////////////////////////////////////////////////// TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 C 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 15P: POND 6 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 677.00 0.00 0.00 0.00 2.50 0.00 0 677.00 0.00 0.00 0.00 5.00 0.00 0 677.00 0.00 0.00 0.00 7.50 0.16 513 677.02 0.00 0.00 0.00 10.00 0.73 3,811 677.14 0.07 0.07 0.00 12.50 4.32 62,023 679.03 3.33 3.33 0.00 15.00 1.30 51,766 678.72 3.00 3.00 0.00 17.50 0.84 36,539 678.24 2.39 2.39 0.00 20.00 0.57 24,345 677.85 1.72 1.72 0.00 22.50 0.51 16,706 677.59 1.08 1.08 0.00 25.00 0.00 11,816 677.42 0.61 0.61 0.00 27.50 0.00 7,953 677.28 0.30 0.30 0.00 30.00 0.00 5,907 677.21 0.17 0.17 0.00 32.50 0.00 4,669 677.17 0.11 0.11 0.00 35.00 0.00 3,847 677.14 0.08 0.08 0.00 37.50 0.00 3,265 677.12 0.06 0.06 0.00 40.00 0.00 2,832 677.10 0.04 0.04 0.00 42.50 0.00 2,499 677.09 0.03 0.03 0.00 45.00 0.00 2,234 677.08 0.03 0.03 0.00 47.50 0.00 2,020 677.07 0.02 0.02 0.00 50.00 0.00 1,842 677.07 0.02 0.02 0.00 52.50 0.00 1,693 677.06 0.02 0.02 0.00 55.00 0.00 1,566 677.06 0.01 0.01 0.00 57.50 0.00 1,456 677.05 0.01 0.01 0.00 60.00 0.00 1,361 677.05 0.01 0.01 0.00 62.50 0.00 1,277 677.05 0.01 0.01 0.00 65.00 0.00 1,203 677.04 0.01 0.01 0.00 67.50 0.00 1,137 677.04 0.01 0.01 0.00 70.00 0.00 1,077 677.04 0.01 0.01 0.00 72.50 0.00 1,024 677.04 0.01 0.01 0.00 75.00 0.00 975 677.04 0.01 0.01 0.00 77.50 0.00 931 677.03 0.00 0.00 0.00 80.00 0.00 891 677.03 0.00 0.00 0.00 82.50 0.00 854 677.03 0.00 0.00 0.00 85.00 0.00 820 677.03 0.00 0.00 0.00 87.50 0.00 789 677.03 0.00 0.00 0.00 90.00 0.00 759 677.03 0.00 0.00 0.00 92.50 0.00 732 677.03 0.00 0.00 0.00 95.00 0.00 707 677.03 0.00 0.00 0.00 97.50 0.00 683 677.02 0.00 0.00 0.00 100.00 0.00 661 677.02 0.00 0.00 0.00 102.50 0.00 641 677.02 0.00 0.00 0.00 105.00 0.00 621 677.02 0.00 0.00 0.00 107.50 0.00 603 677.02 0.00 0.00 0.00 110.00 0.00 586 677.02 0.00 0.00 0.00 112.50 0.00 569 677.02 0.00 0.00 0.00 115.00 0.00 554 677.02 0.00 0.00 0.00 117.50 0.00 539 677.02 0.00 0.00 0.00 120.00 0.00 526 677.02 0.00 0.00 0.00 Type 1124-hr 2yr-24hr Rainfall=3.39" Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 48 Stage -Discharge for Pond 15P: POND 6 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 677.00 0.00 0.00 0.00 677.10 0.04 0.04 0.00 677.20 0.15 0.15 0.00 677.30 0.33 0.33 0.00 677.40 0.56 0.56 0.00 677.50 0.82 0.82 0.00 677.60 1.11 1.11 0.00 677.70 1.39 1.39 0.00 677.80 1.64 1.64 0.00 677.90 1.83 1.83 0.00 678.00 2.01 2.01 0.00 678.10 2.17 2.17 0.00 678.20 2.32 2.32 0.00 678.30 2.47 2.47 0.00 678.40 2.60 2.60 0.00 678.50 2.73 2.73 0.00 678.60 2.86 2.86 0.00 678.70 2.98 2.98 0.00 678.80 3.09 3.09 0.00 678.90 3.20 3.20 0.00 679.00 3.30 3.30 0.00 679.10 3.41 3.41 0.00 679.20 3.51 3.51 0.00 679.30 3.60 3.60 0.00 679.40 3.70 3.70 0.00 679.50 3.79 3.79 0.00 679.60 3.88 3.88 0.00 679.70 3.97 3.97 0.00 679.80 4.05 4.05 0.00 679.90 4.14 4.14 0.00 680.00 4.22 4.22 0.00 680.10 5.22 5.22 0.00 680.20 6.97 6.97 0.00 680.30 9.21 9.21 0.00 680.40 11.84 11.84 0.00 680.50 14.83 14.83 0.00 680.60 18.11 18.11 0.00 680.70 21.50 21.50 0.00 680.80 24.10 24.10 0.00 680.90 26.31 26.31 0.00 681.00 28.30 28.30 0.00 681.10 30.13 30.13 0.00 681.20 31.83 31.83 0.00 681.30 33.44 33.44 0.00 681.40 34.95 34.95 0.00 681.50 36.40 36.40 0.00 681.60 37.79 37.79 0.00 681.70 39.12 39.12 0.00 681.80 40.41 40.41 0.00 681.90 41.65 41.65 0.00 682.00 42.86 42.86 0.00 682.10 45.68 45.68 0.00 682.20 49.84 49.84 0.00 682.30 54.87 54.87 0.00 682.40 60.59 60.59 0.00 682.50 66.90 66.90 0.00 682.60 74.54 73.75 0.79 682.70 76.87 74.64 2.23 682.80 79.57 75.42 4.15 682.90 82.66 76.18 6.48 683.00 86.24 76.94 9.30 683.10 90.23 77.69 12.55 683.20 94.21 78.43 15.78 683.30 98.41 79.16 19.25 683.40 102.82 79.89 22.92 683.50 107.41 80.61 26.80 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 683.60 112.31 81.33 30.98 683.70 117.40 82.04 35.36 683.80 122.46 82.74 39.72 683.90 127.67 83.44 44.23 684.00 132.90 84.13 48.78 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 49 Stage -Area -Storage for Pond 15P: POND 6 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 677.00 27,493 0 677.10 27,793 2,764 677.20 28,093 5,559 677.30 28,394 8,383 677.40 28,694 11,237 677.50 28,994 14,122 677.60 29,294 17,036 677.70 29,594 19,981 677.80 29,895 22,955 677.90 30,195 25,960 678.00 30,495 28,994 678.10 30,811 32,059 678.20 31,126 35,156 678.30 31,442 38,285 678.40 31,758 41,445 678.50 32,074 44,636 678.60 32,389 47,859 678.70 32,705 51,114 678.80 33,021 54,400 678.90 33,336 57,718 679.00 33,652 61,068 679.10 33,978 64,449 679.20 34,304 67,863 679.30 34,631 71,310 679.40 34,957 74,789 679.50 35,283 78,301 679.60 35,609 81,846 679.70 35,935 85,423 679.80 36,262 89,033 679.90 36,588 92,675 680.00 36,914 96,351 680.10 37,246 100,058 680.20 37,578 103,800 680.30 37,909 107,574 680.40 38,241 111,382 680.50 38,573 115,222 680.60 38,905 119,096 680.70 39,237 123,003 680.80 39,568 126,943 680.90 39,900 130,917 681.00 40,232 134,924 681.10 40,570 138,964 681.20 40,907 143,037 681.30 41,245 147,145 681.40 41,582 151,286 681.50 41,920 155,462 681.60 42,258 159,670 681.70 42,595 163,913 681.80 42,933 168,189 681.90 43,270 172,500 682.00 43,608 176,844 682.10 43,951 181,221 682.20 44,294 185,634 682.30 44,637 190,080 682.40 44,980 194,561 682.50 45,324 199,076 682.60 45,667 203,626 682.70 46,010 208,210 682.80 46,353 212,828 682.90 46,696 217,480 683.00 47,039 222,167 683.10 47,388 226,888 683.20 47,737 231,645 683.30 48,086 236,436 683.40 48,435 241,262 683.50 48.784 246.123 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 683.60 49,132 251,018 683.70 49,481 255,949 683.80 49,830 260,915 683.90 50,179 265,915 684.00 50,528 270,951 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HydroCAD®10.00-26 s/n 10066 ©2020 HydroCAD Software Solutions LLC Page 50 Summary for Pond 18P: POST - OUTFALL #1 Inflow Area = 48.760 ac, 68.58% Impervious, Inflow Depth = 2.08" for 2yr-24hr event Inflow = 27.83 cfs @ 11.97 hrs, Volume= 8.461 of Primary = 27.83 cfs @ 11.97 hrs, Volume= 8.461 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Pond 18P: POST - OUTFALL #1 Hydrograph ❑ Inflow 30 27.83 cfs --Y---------Y-------Y--Y-Irrfloy�r- 4r',e�=48 7-$ -af- ❑ Primary 28 26 ,I I I 1__ L--L_-I__ I I I I I I I I I I I I I I I I I I I I I 24 -- -7--r--r--I-- --r-- --I-- --r-- --r---T--r-----I-- --r-- --I-- 22 'I I I I I I I I I I I 20 y 18 U " 16 __ 1__L__I--- __ 1__L__I___I__1__L__L__I__ 0 14 LL 12 +__L-------L--L__-----J--L____----L--L-------L--L----I-- g 2 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 51 Hydrograph for Pond 18P: POST - OUTFALL #1 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 1.00 0.00 0.00 2.00 0.00 0.00 3.00 0.00 0.00 4.00 0.00 0.00 5.00 0.00 0.00 6.00 0.00 0.00 7.00 0.03 0.03 8.00 0.13 0.13 9.00 0.37 0.37 10.00 0.83 0.83 11.00 1.65 1.65 12.00 26.16 26.16 13.00 9.76 9.76 14.00 7.15 7.15 15.00 6.32 6.32 16.00 6.04 6.04 17.00 5.82 5.82 18.00 5.60 5.60 19.00 5.35 5.35 20.00 5.08 5.08 21.00 4.84 4.84 22.00 4.61 4.61 23.00 4.37 4.37 24.00 4.12 4.12 25.00 3.47 3.47 26.00 3.10 3.10 27.00 2.71 2.71 28.00 2.32 2.32 29.00 1.92 1.92 30.00 1.50 1.50 31.00 1.04 1.04 32.00 0.71 0.71 33.00 0.50 0.50 34.00 0.36 0.36 35.00 0.27 0.27 36.00 0.21 0.21 37.00 0.17 0.17 38.00 0.13 0.13 39.00 0.11 0.11 40.00 0.09 0.09 41.00 0.08 0.08 42.00 0.07 0.07 43.00 0.06 0.06 44.00 0.05 0.05 45.00 0.04 0.04 46.00 0.04 0.04 47.00 0.03 0.03 48.00 0.03 0.03 49.00 0.03 0.03 50.00 0.03 0.03 51.00 0.02 0.02 52.00 0.02 0.02 53.00 0.02 0.02 54.00 0.02 0.02 55.00 0.02 0.02 56.00 0.02 0.02 57.00 0.01 0.01 58.00 0.01 0.01 59.00 0.01 0.01 60.00 0.01 0.01 61.00 0.01 0.01 62.00 0.01 0.01 63.00 0.01 0.01 64.00 0.01 0.01 65.00 0.01 0.01 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 66.00 0.01 0.01 67.00 0.01 0.01 68.00 0.01 0.01 69.00 0.01 0.01 70.00 0.01 0.01 71.00 0.01 0.01 72.00 0.01 0.01 73.00 0.01 0.01 74.00 0.01 0.01 75.00 0.01 0.01 76.00 0.00 0.00 77.00 0.00 0.00 78.00 0.00 0.00 79.00 0.00 0.00 80.00 0.00 0.00 81.00 0.00 0.00 82.00 0.00 0.00 83.00 0.00 0.00 84.00 0.00 0.00 85.00 0.00 0.00 86.00 0.00 0.00 87.00 0.00 0.00 88.00 0.00 0.00 89.00 0.00 0.00 90.00 0.00 0.00 91.00 0.00 0.00 92.00 0.00 0.00 93.00 0.00 0.00 94.00 0.00 0.00 95.00 0.00 0.00 96.00 0.00 0.00 97.00 0.00 0.00 98.00 0.00 0.00 99.00 0.00 0.00 100.00 0.00 0.00 101.00 0.00 0.00 102.00 0.00 0.00 103.00 0.00 0.00 104.00 0.00 0.00 105.00 0.00 0.00 106.00 0.00 0.00 107.00 0.00 0.00 108.00 0.00 0.00 109.00 0.00 0.00 110.00 0.00 0.00 111.00 0.00 0.00 112.00 0.00 0.00 113.00 0.00 0.00 114.00 0.00 0.00 115.00 0.00 0.00 116.00 0.00 0.00 117.00 0.00 0.00 118.00 0.00 0.00 119.00 0.00 0.00 120.00 0.00 0.00 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 2yr-24hr Rainfall=3.39" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HydroCAD®10.00-26 s/n 10066 ©2020 HydroCAD Software Solutions LLC Page 52 Summary for Pond 21 P: POST - OUTFALL #3 Inflow Area = 17.630 ac, 58.48% Impervious, Inflow Depth > 1.86" for 2yr-24hr event Inflow = 4.37 cfs @ 12.22 hrs, Volume= 2.734 of Primary = 4.37 cfs @ 12.22 hrs, Volume= 2.734 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs w u 3 0 LL Pond 21 P: POST - OUTFALL #3 Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) ❑ Inflow ❑ Primary TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 2yr-24hr Rainfall=3.39 " Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 53 Hydrograph for Pond 21 P: POST - OUTFALL #3 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 1.00 0.00 0.00 2.00 0.00 0.00 3.00 0.00 0.00 4.00 0.00 0.00 5.00 0.00 0.00 6.00 0.00 0.00 7.00 0.00 0.00 8.00 0.00 0.00 9.00 0.02 0.02 10.00 0.07 0.07 11.00 0.26 0.26 12.00 3.13 3.13 13.00 3.61 3.61 14.00 3.37 3.37 15.00 3.13 3.13 16.00 2.88 2.88 17.00 2.61 2.61 18.00 2.35 2.35 19.00 2.07 2.07 20.00 1.79 1.79 21.00 1.51 1.51 22.00 1.24 1.24 23.00 1.04 1.04 24.00 0.89 0.89 25.00 0.61 0.61 26.00 0.45 0.45 27.00 0.34 0.34 28.00 0.27 0.27 29.00 0.21 0.21 30.00 0.17 0.17 31.00 0.14 0.14 32.00 0.12 0.12 33.00 0.10 0.10 34.00 0.09 0.09 35.00 0.08 0.08 36.00 0.07 0.07 37.00 0.06 0.06 38.00 0.05 0.05 39.00 0.05 0.05 40.00 0.04 0.04 41.00 0.04 0.04 42.00 0.03 0.03 43.00 0.03 0.03 44.00 0.03 0.03 45.00 0.03 0.03 46.00 0.02 0.02 47.00 0.02 0.02 48.00 0.02 0.02 49.00 0.02 0.02 50.00 0.02 0.02 51.00 0.02 0.02 52.00 0.02 0.02 53.00 0.01 0.01 54.00 0.01 0.01 55.00 0.01 0.01 56.00 0.01 0.01 57.00 0.01 0.01 58.00 0.01 0.01 59.00 0.01 0.01 60.00 0.01 0.01 61.00 0.01 0.01 62.00 0.01 0.01 63.00 0.01 0.01 64.00 0.01 0.01 65.00 0.01 0.01 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 66.00 0.01 0.01 67.00 0.01 0.01 68.00 0.01 0.01 69.00 0.01 0.01 70.00 0.01 0.01 71.00 0.01 0.01 72.00 0.01 0.01 73.00 0.01 0.01 74.00 0.01 0.01 75.00 0.01 0.01 76.00 0.00 0.00 77.00 0.00 0.00 78.00 0.00 0.00 79.00 0.00 0.00 80.00 0.00 0.00 81.00 0.00 0.00 82.00 0.00 0.00 83.00 0.00 0.00 84.00 0.00 0.00 85.00 0.00 0.00 86.00 0.00 0.00 87.00 0.00 0.00 88.00 0.00 0.00 89.00 0.00 0.00 90.00 0.00 0.00 91.00 0.00 0.00 92.00 0.00 0.00 93.00 0.00 0.00 94.00 0.00 0.00 95.00 0.00 0.00 96.00 0.00 0.00 97.00 0.00 0.00 98.00 0.00 0.00 99.00 0.00 0.00 100.00 0.00 0.00 101.00 0.00 0.00 102.00 0.00 0.00 103.00 0.00 0.00 104.00 0.00 0.00 105.00 0.00 0.00 106.00 0.00 0.00 107.00 0.00 0.00 108.00 0.00 0.00 109.00 0.00 0.00 110.00 0.00 0.00 111.00 0.00 0.00 112.00 0.00 0.00 113.00 0.00 0.00 114.00 0.00 0.00 115.00 0.00 0.00 116.00 0.00 0.00 117.00 0.00 0.00 118.00 0.00 0.00 119.00 0.00 0.00 120.00 0.00 0.00 OAK E N G I N E E R I N G HYDROCAD OUTPUT 10-YEAR, 24-HOUR STORM EVENT TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 1 Summary for Subcatchment 3S: POST TO POND 2 Runoff = 122.86 cfs @ 11.95 hrs, Volume= 5.988 af, Depth= 3.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=4.96" Area (ac) CN Description 14.690 98 Impervious 5.100 61 >75% Grass cover, Good, HSG B 19.790 88 Weighted Average 5.100 25.77% Pervious Area 14.690 74.23% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: POST TO POND 2 Hydrograph II --I - -- - t - - t - - t - - t - - + - - - - t - - - - t - - t - - - - - - - - - - t - - t - - t - - - - - - - - - - t - - t - - Runoff 130 122.86 Cfs --r--r--r----,-=,--r--r--I - r---;PQ11;24--120 h,r - 110 ' yrana�.91-- I 100 I I I I I I I I I I I I I I I I � 7V i11 90 w $070- I I I I I I I I I I I I I I I IthI S w --I----+--+--+--+----+----+--+-------Runoff �Dep�-6T1 I LL 60 - -----t--Ii-----i-- ---- --Ii-----i-- -- r----1�cT5:�0-�nii� - ------------------- 50 PN=88 40 30 -I-- +--+--+--r--+--I--+--+--+--+--I---I---I--+--+--+--I---I---I--+--+-- 20 --r �--�--r--r--r--I--r--�--r--r--r--I---I--�--r--r--r--r--I--�--r-- 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 2 Hydrograph for Subcatchment 3S: POST TO POND 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.24 0.00 0.00 5.00 0.31 0.00 0.07 6.00 0.40 0.01 0.27 7.00 0.49 0.03 0.49 8.00 0.60 0.06 0.73 9.00 0.73 0.11 1.33 10.00 0.90 0.20 2.01 11.00 1.17 0.35 4.27 12.00 3.29 2.08 104.27 13.00 3.83 2.57 5.94 14.00 4.07 2.79 3.55 15.00 4.23 2.95 2.82 16.00 4.36 3.07 2.18 17.00 4.47 3.17 1.92 18.00 4.57 3.26 1.70 19.00 4.65 3.34 1.47 20.00 4.72 3.41 1.23 21.00 4.79 3.47 1.17 22.00 4.85 3.52 1.13 23.00 4.90 3.58 1.08 24.00 4.96 3.63 1.03 25.00 4.96 3.63 0.00 26.00 4.96 3.63 0.00 27.00 4.96 3.63 0.00 28.00 4.96 3.63 0.00 29.00 4.96 3.63 0.00 30.00 4.96 3.63 0.00 31.00 4.96 3.63 0.00 32.00 4.96 3.63 0.00 33.00 4.96 3.63 0.00 34.00 4.96 3.63 0.00 35.00 4.96 3.63 0.00 36.00 4.96 3.63 0.00 37.00 4.96 3.63 0.00 38.00 4.96 3.63 0.00 39.00 4.96 3.63 0.00 40.00 4.96 3.63 0.00 41.00 4.96 3.63 0.00 42.00 4.96 3.63 0.00 43.00 4.96 3.63 0.00 44.00 4.96 3.63 0.00 45.00 4.96 3.63 0.00 46.00 4.96 3.63 0.00 47.00 4.96 3.63 0.00 48.00 4.96 3.63 0.00 49.00 4.96 3.63 0.00 50.00 4.96 3.63 0.00 51.00 4.96 3.63 0.00 52.00 4.96 3.63 0.00 53.00 4.96 3.63 0.00 54.00 4.96 3.63 0.00 55.00 4.96 3.63 0.00 56.00 4.96 3.63 0.00 57.00 4.96 3.63 0.00 58.00 4.96 3.63 0.00 59.00 4.96 3.63 0.00 60.00 4.96 3.63 0.00 61.00 4.96 3.63 0.00 62.00 4.96 3.63 0.00 63.00 4.96 3.63 0.00 64.00 4.96 3.63 0.00 65.00 4.96 3.63 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 4.96 3.63 0.00 67.00 4.96 3.63 0.00 68.00 4.96 3.63 0.00 69.00 4.96 3.63 0.00 70.00 4.96 3.63 0.00 71.00 4.96 3.63 0.00 72.00 4.96 3.63 0.00 73.00 4.96 3.63 0.00 74.00 4.96 3.63 0.00 75.00 4.96 3.63 0.00 76.00 4.96 3.63 0.00 77.00 4.96 3.63 0.00 78.00 4.96 3.63 0.00 79.00 4.96 3.63 0.00 80.00 4.96 3.63 0.00 81.00 4.96 3.63 0.00 82.00 4.96 3.63 0.00 83.00 4.96 3.63 0.00 84.00 4.96 3.63 0.00 85.00 4.96 3.63 0.00 86.00 4.96 3.63 0.00 87.00 4.96 3.63 0.00 88.00 4.96 3.63 0.00 89.00 4.96 3.63 0.00 90.00 4.96 3.63 0.00 91.00 4.96 3.63 0.00 92.00 4.96 3.63 0.00 93.00 4.96 3.63 0.00 94.00 4.96 3.63 0.00 95.00 4.96 3.63 0.00 96.00 4.96 3.63 0.00 97.00 4.96 3.63 0.00 98.00 4.96 3.63 0.00 99.00 4.96 3.63 0.00 100.00 4.96 3.63 0.00 101.00 4.96 3.63 0.00 102.00 4.96 3.63 0.00 103.00 4.96 3.63 0.00 104.00 4.96 3.63 0.00 105.00 4.96 3.63 0.00 106.00 4.96 3.63 0.00 107.00 4.96 3.63 0.00 108.00 4.96 3.63 0.00 109.00 4.96 3.63 0.00 110.00 4.96 3.63 0.00 111.00 4.96 3.63 0.00 112.00 4.96 3.63 0.00 113.00 4.96 3.63 0.00 114.00 4.96 3.63 0.00 115.00 4.96 3.63 0.00 116.00 4.96 3.63 0.00 117.00 4.96 3.63 0.00 118.00 4.96 3.63 0.00 119.00 4.96 3.63 0.00 120.00 4.96 3.63 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 3 Summary for Subcatchment 4S: PRE (OUTFALL #1) Runoff = 101.03 cfs @ 12.16 hrs, Volume= 8.084 af, Depth= 2.25" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=4.96" Area (ac) CN Description 9.130 55 Woods, Good, HSG B 34.000 78 Row crops, straight row, Good, HSG B 43.130 73 Weighted Average 43.130 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.1 30 0.0280 0.16 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 388 0.0620 1.74 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 15.1 744 0.0270 0.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.9 1,162 Total Subcatchment 4S: PRE (OUTFALL #1) Hydrograph - 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 4 Hydrograph for Subcatchment 4S: PRE (OUTFALL #1) Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.24 0.00 0.00 5.00 0.31 0.00 0.00 6.00 0.40 0.00 0.00 7.00 0.49 0.00 0.00 8.00 0.60 0.00 0.00 9.00 0.73 0.00 0.00 10.00 0.90 0.01 0.38 11.00 1.17 0.04 1.95 12.00 3.29 1.04 59.86 13.00 3.83 1.41 12.61 14.00 4.07 1.58 6.80 15.00 4.23 1.70 5.11 16.00 4.36 1.79 4.06 17.00 4.47 1.88 3.45 18.00 4.57 1.95 3.08 19.00 4.65 2.01 2.69 20.00 4.72 2.06 2.29 21.00 4.79 2.11 2.11 22.00 4.85 2.16 2.03 23.00 4.90 2.21 1.96 24.00 4.96 2.25 1.88 25.00 4.96 2.25 0.01 26.00 4.96 2.25 0.00 27.00 4.96 2.25 0.00 28.00 4.96 2.25 0.00 29.00 4.96 2.25 0.00 30.00 4.96 2.25 0.00 31.00 4.96 2.25 0.00 32.00 4.96 2.25 0.00 33.00 4.96 2.25 0.00 34.00 4.96 2.25 0.00 35.00 4.96 2.25 0.00 36.00 4.96 2.25 0.00 37.00 4.96 2.25 0.00 38.00 4.96 2.25 0.00 39.00 4.96 2.25 0.00 40.00 4.96 2.25 0.00 41.00 4.96 2.25 0.00 42.00 4.96 2.25 0.00 43.00 4.96 2.25 0.00 44.00 4.96 2.25 0.00 45.00 4.96 2.25 0.00 46.00 4.96 2.25 0.00 47.00 4.96 2.25 0.00 48.00 4.96 2.25 0.00 49.00 4.96 2.25 0.00 50.00 4.96 2.25 0.00 51.00 4.96 2.25 0.00 52.00 4.96 2.25 0.00 53.00 4.96 2.25 0.00 54.00 4.96 2.25 0.00 55.00 4.96 2.25 0.00 56.00 4.96 2.25 0.00 57.00 4.96 2.25 0.00 58.00 4.96 2.25 0.00 59.00 4.96 2.25 0.00 60.00 4.96 2.25 0.00 61.00 4.96 2.25 0.00 62.00 4.96 2.25 0.00 63.00 4.96 2.25 0.00 64.00 4.96 2.25 0.00 65.00 4.96 2.25 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 4.96 2.25 0.00 67.00 4.96 2.25 0.00 68.00 4.96 2.25 0.00 69.00 4.96 2.25 0.00 70.00 4.96 2.25 0.00 71.00 4.96 2.25 0.00 72.00 4.96 2.25 0.00 73.00 4.96 2.25 0.00 74.00 4.96 2.25 0.00 75.00 4.96 2.25 0.00 76.00 4.96 2.25 0.00 77.00 4.96 2.25 0.00 78.00 4.96 2.25 0.00 79.00 4.96 2.25 0.00 80.00 4.96 2.25 0.00 81.00 4.96 2.25 0.00 82.00 4.96 2.25 0.00 83.00 4.96 2.25 0.00 84.00 4.96 2.25 0.00 85.00 4.96 2.25 0.00 86.00 4.96 2.25 0.00 87.00 4.96 2.25 0.00 88.00 4.96 2.25 0.00 89.00 4.96 2.25 0.00 90.00 4.96 2.25 0.00 91.00 4.96 2.25 0.00 92.00 4.96 2.25 0.00 93.00 4.96 2.25 0.00 94.00 4.96 2.25 0.00 95.00 4.96 2.25 0.00 96.00 4.96 2.25 0.00 97.00 4.96 2.25 0.00 98.00 4.96 2.25 0.00 99.00 4.96 2.25 0.00 100.00 4.96 2.25 0.00 101.00 4.96 2.25 0.00 102.00 4.96 2.25 0.00 103.00 4.96 2.25 0.00 104.00 4.96 2.25 0.00 105.00 4.96 2.25 0.00 106.00 4.96 2.25 0.00 107.00 4.96 2.25 0.00 108.00 4.96 2.25 0.00 109.00 4.96 2.25 0.00 110.00 4.96 2.25 0.00 111.00 4.96 2.25 0.00 112.00 4.96 2.25 0.00 113.00 4.96 2.25 0.00 114.00 4.96 2.25 0.00 115.00 4.96 2.25 0.00 116.00 4.96 2.25 0.00 117.00 4.96 2.25 0.00 118.00 4.96 2.25 0.00 119.00 4.96 2.25 0.00 120.00 4.96 2.25 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 5 Summary for Subcatchment 5S: PRE (OUTFALL #2) Runoff = 140.95 cfs @ 12.15 hrs, Volume= 11.246 af, Depth= 2.33" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=4.96" Area (ac) CN Description 10.200 55 Woods, Good, HSG B 47.660 78 Row crops, straight row, Good, HSG B 57.860 74 Weighted Average 57.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.1 30 0.0280 0.16 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 388 0.0620 1.74 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 15.1 744 0.0270 0.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.9 1,162 Total Subcatchment 5S: PRE (OUTFALL #2) Hydrograph -----------,--,--,---------- -,---,-- ■Runoff 150140.95 cfs 1-------- -- -- -- ----------- -- ------------ -- -- 130 lbyj--2 F11;1 C�ir, f-aH-=4496" _ --I-- +--+--+--+--+----+--+--+--+--I- 120 - ------------------------------- 110 n d ��ear arc ------+--+ - - + - - I + - - I- - 4 - - + - - 1007 Ru'Indff Vdlufn6=111.246 elf w 90 --I----rt--t--r--'r--I-- ----t--r-----I-- r � r3'; N '��aff Dept-12:I�"- 3 80 -- - - - -- -- -- - - ---If �w �ePgth=1; F- LL 70 ---- PPYY11 P1 60--1--i--L--IL----J--1--1--L--------'-- --i-- ��- -� �� S!■��! - 50 � J y� --r- r- -r--r--r--r--i--r--r--r--r--r--r--i--r--r--r- -r--r- r=F7"F- 40 1 - - L - - L - -' - - L - - 1 - - 1 - - L - -'- - -'- - -' - - 1 - - 1 - - L - -'- - -'- - -' - - 1 - - 1 - - 30 - -r---T--r--r--+------T- -T--r T- -T- -r T--T-- 20 --I-- +--+--+--+--+--I--+--+--+--+--I---I---I--+--+--+--I---I---I--+--+-- 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 6 Hydrograph for Subcatchment 5S: PRE (OUTFALL #2) Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.24 0.00 0.00 5.00 0.31 0.00 0.00 6.00 0.40 0.00 0.00 7.00 0.49 0.00 0.00 8.00 0.60 0.00 0.00 9.00 0.73 0.00 0.00 10.00 0.90 0.01 0.73 11.00 1.17 0.05 3.01 12.00 3.29 1.10 84.41 13.00 3.83 1.47 17.35 14.00 4.07 1.65 9.33 15.00 4.23 1.77 7.00 16.00 4.36 1.87 5.56 17.00 4.47 1.95 4.73 18.00 4.57 2.02 4.21 19.00 4.65 2.09 3.67 20.00 4.72 2.14 3.13 21.00 4.79 2.19 2.88 22.00 4.85 2.24 2.78 23.00 4.90 2.29 2.67 24.00 4.96 2.33 2.57 25.00 4.96 2.33 0.01 26.00 4.96 2.33 0.00 27.00 4.96 2.33 0.00 28.00 4.96 2.33 0.00 29.00 4.96 2.33 0.00 30.00 4.96 2.33 0.00 31.00 4.96 2.33 0.00 32.00 4.96 2.33 0.00 33.00 4.96 2.33 0.00 34.00 4.96 2.33 0.00 35.00 4.96 2.33 0.00 36.00 4.96 2.33 0.00 37.00 4.96 2.33 0.00 38.00 4.96 2.33 0.00 39.00 4.96 2.33 0.00 40.00 4.96 2.33 0.00 41.00 4.96 2.33 0.00 42.00 4.96 2.33 0.00 43.00 4.96 2.33 0.00 44.00 4.96 2.33 0.00 45.00 4.96 2.33 0.00 46.00 4.96 2.33 0.00 47.00 4.96 2.33 0.00 48.00 4.96 2.33 0.00 49.00 4.96 2.33 0.00 50.00 4.96 2.33 0.00 51.00 4.96 2.33 0.00 52.00 4.96 2.33 0.00 53.00 4.96 2.33 0.00 54.00 4.96 2.33 0.00 55.00 4.96 2.33 0.00 56.00 4.96 2.33 0.00 57.00 4.96 2.33 0.00 58.00 4.96 2.33 0.00 59.00 4.96 2.33 0.00 60.00 4.96 2.33 0.00 61.00 4.96 2.33 0.00 62.00 4.96 2.33 0.00 63.00 4.96 2.33 0.00 64.00 4.96 2.33 0.00 65.00 4.96 2.33 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 4.96 2.33 0.00 67.00 4.96 2.33 0.00 68.00 4.96 2.33 0.00 69.00 4.96 2.33 0.00 70.00 4.96 2.33 0.00 71.00 4.96 2.33 0.00 72.00 4.96 2.33 0.00 73.00 4.96 2.33 0.00 74.00 4.96 2.33 0.00 75.00 4.96 2.33 0.00 76.00 4.96 2.33 0.00 77.00 4.96 2.33 0.00 78.00 4.96 2.33 0.00 79.00 4.96 2.33 0.00 80.00 4.96 2.33 0.00 81.00 4.96 2.33 0.00 82.00 4.96 2.33 0.00 83.00 4.96 2.33 0.00 84.00 4.96 2.33 0.00 85.00 4.96 2.33 0.00 86.00 4.96 2.33 0.00 87.00 4.96 2.33 0.00 88.00 4.96 2.33 0.00 89.00 4.96 2.33 0.00 90.00 4.96 2.33 0.00 91.00 4.96 2.33 0.00 92.00 4.96 2.33 0.00 93.00 4.96 2.33 0.00 94.00 4.96 2.33 0.00 95.00 4.96 2.33 0.00 96.00 4.96 2.33 0.00 97.00 4.96 2.33 0.00 98.00 4.96 2.33 0.00 99.00 4.96 2.33 0.00 100.00 4.96 2.33 0.00 101.00 4.96 2.33 0.00 102.00 4.96 2.33 0.00 103.00 4.96 2.33 0.00 104.00 4.96 2.33 0.00 105.00 4.96 2.33 0.00 106.00 4.96 2.33 0.00 107.00 4.96 2.33 0.00 108.00 4.96 2.33 0.00 109.00 4.96 2.33 0.00 110.00 4.96 2.33 0.00 111.00 4.96 2.33 0.00 112.00 4.96 2.33 0.00 113.00 4.96 2.33 0.00 114.00 4.96 2.33 0.00 115.00 4.96 2.33 0.00 116.00 4.96 2.33 0.00 117.00 4.96 2.33 0.00 118.00 4.96 2.33 0.00 119.00 4.96 2.33 0.00 120.00 4.96 2.33 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 7 Summary for Subcatchment 6S: PRE (OUTFALL #3) Runoff = 34.97 cfs @ 12.16 hrs, Volume= 2.798 af, Depth= 2.25" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=4.96" Area (ac) CN Description 3.190 55 Woods, Good, HSG B 11.740 78 Row crops, straight row, Good, HSG B 14.930 73 Weighted Average 14.930 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.1 30 0.0280 0.16 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 388 0.0620 1.74 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 15.1 744 0.0270 0.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.9 1,162 Total Subcatchment 6S: PRE (OUTFALL #3) Hydrograph 38 36 34 --I- I- --I--t--t--t--r--t-------t--t--t--t--t--r--t--I--t--t--t--t--r-- cfs --- t-- t--r--r-- --t--t--r--�---�---�--�--rt--rt--�--r--r--�---�--t--�--t--r--r-- t-------t--t--t--r--r--r--t----t--tt--7-- r-- ---,--7--r--r----------T--T--T--T--T--T----- �T�pO-�T���b�� - ■Runoff 34.97 ---- --��-- 32 30- --�-- --- ----T--T------------rt--'t0yrTlOrRai nfa ll--4.96�"' 28 ' ---- ---T--T--T--T------------T--T-RLthoff Ar6& 14.930-at - 26 24 ---- r r ---,--T--t--7-------I-- ----�nPff-VPI�-m'e=2. � -a�f-- w 22 -U 20 - --��-- ---- ---,--T--T--T----------------T-- �. ��4- Run�#�DupthT2.25� -- --T--t--7--7------- -- -- --t-FIbW 16 14 ---- -- -T-- T--T--T---------T--T--T--T--T�I--- 12 I I I I I I I I I I I I I I 1 -1 T - - T - - 7 - - � - - - - - - - 7 - - 7 - - 7 - - T - - 7 - - 7 - - I - - - - - 7 - - 7 - � N = 7 a - 10 --�-- -------� --�----------------� --� ------------------------ 8 ---- --- 6 ---- --- -- -- --------------- -- -- --------------- -- -- ----- 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 8 Hydrograph for Subcatchment 6S: PRE (OUTFALL #3) Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.24 0.00 0.00 5.00 0.31 0.00 0.00 6.00 0.40 0.00 0.00 7.00 0.49 0.00 0.00 8.00 0.60 0.00 0.00 9.00 0.73 0.00 0.00 10.00 0.90 0.01 0.13 11.00 1.17 0.04 0.68 12.00 3.29 1.04 20.72 13.00 3.83 1.41 4.37 14.00 4.07 1.58 2.35 15.00 4.23 1.70 1.77 16.00 4.36 1.79 1.41 17.00 4.47 1.88 1.20 18.00 4.57 1.95 1.06 19.00 4.65 2.01 0.93 20.00 4.72 2.06 0.79 21.00 4.79 2.11 0.73 22.00 4.85 2.16 0.70 23.00 4.90 2.21 0.68 24.00 4.96 2.25 0.65 25.00 4.96 2.25 0.00 26.00 4.96 2.25 0.00 27.00 4.96 2.25 0.00 28.00 4.96 2.25 0.00 29.00 4.96 2.25 0.00 30.00 4.96 2.25 0.00 31.00 4.96 2.25 0.00 32.00 4.96 2.25 0.00 33.00 4.96 2.25 0.00 34.00 4.96 2.25 0.00 35.00 4.96 2.25 0.00 36.00 4.96 2.25 0.00 37.00 4.96 2.25 0.00 38.00 4.96 2.25 0.00 39.00 4.96 2.25 0.00 40.00 4.96 2.25 0.00 41.00 4.96 2.25 0.00 42.00 4.96 2.25 0.00 43.00 4.96 2.25 0.00 44.00 4.96 2.25 0.00 45.00 4.96 2.25 0.00 46.00 4.96 2.25 0.00 47.00 4.96 2.25 0.00 48.00 4.96 2.25 0.00 49.00 4.96 2.25 0.00 50.00 4.96 2.25 0.00 51.00 4.96 2.25 0.00 52.00 4.96 2.25 0.00 53.00 4.96 2.25 0.00 54.00 4.96 2.25 0.00 55.00 4.96 2.25 0.00 56.00 4.96 2.25 0.00 57.00 4.96 2.25 0.00 58.00 4.96 2.25 0.00 59.00 4.96 2.25 0.00 60.00 4.96 2.25 0.00 61.00 4.96 2.25 0.00 62.00 4.96 2.25 0.00 63.00 4.96 2.25 0.00 64.00 4.96 2.25 0.00 65.00 4.96 2.25 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 4.96 2.25 0.00 67.00 4.96 2.25 0.00 68.00 4.96 2.25 0.00 69.00 4.96 2.25 0.00 70.00 4.96 2.25 0.00 71.00 4.96 2.25 0.00 72.00 4.96 2.25 0.00 73.00 4.96 2.25 0.00 74.00 4.96 2.25 0.00 75.00 4.96 2.25 0.00 76.00 4.96 2.25 0.00 77.00 4.96 2.25 0.00 78.00 4.96 2.25 0.00 79.00 4.96 2.25 0.00 80.00 4.96 2.25 0.00 81.00 4.96 2.25 0.00 82.00 4.96 2.25 0.00 83.00 4.96 2.25 0.00 84.00 4.96 2.25 0.00 85.00 4.96 2.25 0.00 86.00 4.96 2.25 0.00 87.00 4.96 2.25 0.00 88.00 4.96 2.25 0.00 89.00 4.96 2.25 0.00 90.00 4.96 2.25 0.00 91.00 4.96 2.25 0.00 92.00 4.96 2.25 0.00 93.00 4.96 2.25 0.00 94.00 4.96 2.25 0.00 95.00 4.96 2.25 0.00 96.00 4.96 2.25 0.00 97.00 4.96 2.25 0.00 98.00 4.96 2.25 0.00 99.00 4.96 2.25 0.00 100.00 4.96 2.25 0.00 101.00 4.96 2.25 0.00 102.00 4.96 2.25 0.00 103.00 4.96 2.25 0.00 104.00 4.96 2.25 0.00 105.00 4.96 2.25 0.00 106.00 4.96 2.25 0.00 107.00 4.96 2.25 0.00 108.00 4.96 2.25 0.00 109.00 4.96 2.25 0.00 110.00 4.96 2.25 0.00 111.00 4.96 2.25 0.00 112.00 4.96 2.25 0.00 113.00 4.96 2.25 0.00 114.00 4.96 2.25 0.00 115.00 4.96 2.25 0.00 116.00 4.96 2.25 0.00 117.00 4.96 2.25 0.00 118.00 4.96 2.25 0.00 119.00 4.96 2.25 0.00 120.00 4.96 2.25 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 9 Summary for Subcatchment 7S: POST TO POND 3 Runoff = 94.73 cfs @ 11.95 hrs, Volume= 4.617 af, Depth= 3.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=4.96" Area (ac) CN Description 11.010 98 Impervious 4.250 61 >75% Grass cover, Good, HSG B 15.260 88 Weighted Average 4.250 27.85% Pervious Area 11.010 72.15% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 7S: POST TO POND 3 Hydrograph 105 100 -------+--+--+--+--+----+--+--+--+----------+--+--+----------+--+-- cfs-rt--fi--r--'r--I-- ----t--r--------I-- --fi--r-------------t-- ■Runoff 94.73 95 YIP ----II----- 1 90 85 ---- --'-- ---- -- ------------ -- ------------ -- --I - --'- --' --'---------- --' --' A r 24 r Rainfall-4.9611- 80 75 - - - - - - - - - - - - - - - - - - - - - + - - - - - - - - - -I- - j - - T - - L - - - - -I- - -I- - 1 - - T - - Ru hoff 7fillIr-da-,6-1-5.-260 at - 65 --; - --- --; --;--Ir------ -- --r Llnp VQ1gme7-4 zkf - w 60 - ' J1---- -----1_-Runoff Dbh.-655 --1--L--L--1--1-- L 0 50 EL 45 ---- --r- -- -- -- -- ---- -- --+------------ y--rt--+--r--r----y-- --+--r--r-------y--+--r--r-------rt--+-- 40 --Ir---rt--r--r--Ir--------t--r--Ir--------r--r--Ir---�=8- 35 _ _ - - T - - T - - r - - - -I - - T - - - - T - - r - - I - - I - I - T - - r - - T - - - - - - T - - T - - 30 -_I-- -I-- -- --I--I_----_I---- -- --------I---- _I --------I-- -- -- I I I I I I I I I I I I I I I I I I I 25 --I-- -I--! --! --!----------!--! --!----------!--! --! --------I--! --! -- 20 --I-- -- -- --r-- --I-- ----+--r--------I-- ----r--------I-- --+-- 15 --+- +--+--+--+--+-+--+--+--+--+----------+--+--+-----+-+--+--+-- 10 �I --Ir ---7--r--r--r----7--------r--Ir--Ir-------r--r-Ir--Ir--Ii-- --rt-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 10 Hydrograph for Subcatchment 7S: POST TO POND 3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.24 0.00 0.00 5.00 0.31 0.00 0.06 6.00 0.40 0.01 0.21 7.00 0.49 0.03 0.38 8.00 0.60 0.06 0.57 9.00 0.73 0.11 1.03 10.00 0.90 0.20 1.55 11.00 1.17 0.35 3.29 12.00 3.29 2.08 80.40 13.00 3.83 2.57 4.58 14.00 4.07 2.79 2.73 15.00 4.23 2.95 2.18 16.00 4.36 3.07 1.68 17.00 4.47 3.17 1.48 18.00 4.57 3.26 1.31 19.00 4.65 3.34 1.13 20.00 4.72 3.41 0.95 21.00 4.79 3.47 0.91 22.00 4.85 3.52 0.87 23.00 4.90 3.58 0.83 24.00 4.96 3.63 0.80 25.00 4.96 3.63 0.00 26.00 4.96 3.63 0.00 27.00 4.96 3.63 0.00 28.00 4.96 3.63 0.00 29.00 4.96 3.63 0.00 30.00 4.96 3.63 0.00 31.00 4.96 3.63 0.00 32.00 4.96 3.63 0.00 33.00 4.96 3.63 0.00 34.00 4.96 3.63 0.00 35.00 4.96 3.63 0.00 36.00 4.96 3.63 0.00 37.00 4.96 3.63 0.00 38.00 4.96 3.63 0.00 39.00 4.96 3.63 0.00 40.00 4.96 3.63 0.00 41.00 4.96 3.63 0.00 42.00 4.96 3.63 0.00 43.00 4.96 3.63 0.00 44.00 4.96 3.63 0.00 45.00 4.96 3.63 0.00 46.00 4.96 3.63 0.00 47.00 4.96 3.63 0.00 48.00 4.96 3.63 0.00 49.00 4.96 3.63 0.00 50.00 4.96 3.63 0.00 51.00 4.96 3.63 0.00 52.00 4.96 3.63 0.00 53.00 4.96 3.63 0.00 54.00 4.96 3.63 0.00 55.00 4.96 3.63 0.00 56.00 4.96 3.63 0.00 57.00 4.96 3.63 0.00 58.00 4.96 3.63 0.00 59.00 4.96 3.63 0.00 60.00 4.96 3.63 0.00 61.00 4.96 3.63 0.00 62.00 4.96 3.63 0.00 63.00 4.96 3.63 0.00 64.00 4.96 3.63 0.00 65.00 4.96 3.63 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 4.96 3.63 0.00 67.00 4.96 3.63 0.00 68.00 4.96 3.63 0.00 69.00 4.96 3.63 0.00 70.00 4.96 3.63 0.00 71.00 4.96 3.63 0.00 72.00 4.96 3.63 0.00 73.00 4.96 3.63 0.00 74.00 4.96 3.63 0.00 75.00 4.96 3.63 0.00 76.00 4.96 3.63 0.00 77.00 4.96 3.63 0.00 78.00 4.96 3.63 0.00 79.00 4.96 3.63 0.00 80.00 4.96 3.63 0.00 81.00 4.96 3.63 0.00 82.00 4.96 3.63 0.00 83.00 4.96 3.63 0.00 84.00 4.96 3.63 0.00 85.00 4.96 3.63 0.00 86.00 4.96 3.63 0.00 87.00 4.96 3.63 0.00 88.00 4.96 3.63 0.00 89.00 4.96 3.63 0.00 90.00 4.96 3.63 0.00 91.00 4.96 3.63 0.00 92.00 4.96 3.63 0.00 93.00 4.96 3.63 0.00 94.00 4.96 3.63 0.00 95.00 4.96 3.63 0.00 96.00 4.96 3.63 0.00 97.00 4.96 3.63 0.00 98.00 4.96 3.63 0.00 99.00 4.96 3.63 0.00 100.00 4.96 3.63 0.00 101.00 4.96 3.63 0.00 102.00 4.96 3.63 0.00 103.00 4.96 3.63 0.00 104.00 4.96 3.63 0.00 105.00 4.96 3.63 0.00 106.00 4.96 3.63 0.00 107.00 4.96 3.63 0.00 108.00 4.96 3.63 0.00 109.00 4.96 3.63 0.00 110.00 4.96 3.63 0.00 111.00 4.96 3.63 0.00 112.00 4.96 3.63 0.00 113.00 4.96 3.63 0.00 114.00 4.96 3.63 0.00 115.00 4.96 3.63 0.00 116.00 4.96 3.63 0.00 117.00 4.96 3.63 0.00 118.00 4.96 3.63 0.00 119.00 4.96 3.63 0.00 120.00 4.96 3.63 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 11 Summary for Subcatchment 9S: POST TO POND 4 Runoff = 64.12 cfs @ 11.95 hrs, Volume= 3.103 af, Depth= 3.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=4.96" Area (ac) CN Description 7.330 98 Impervious 3.220 61 >75% Grass cover, Good, HSG B 10.550 87 Weighted Average 3.220 30.52% Pervious Area 7.330 69.48% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: POST TO POND 4 Hydrograph -------------7--r------------ -- ----T--r---------,--,--7--r-- -- 70 ❑Runoff 64.12 Cfs -- -- - -- -- ----- -- -- - - - 65 -- --+-- -- --' -- -- -- -- --' -- Type-N24-hr - ---------------- --- ------'tOrT2hR,ainfarh.96,'�- 55 --------------------- ------ - - - - -- ------------ 50 Runoff Arch=0. 155a arc --�----�--�--1--L--�--1---1---1--J--1--1--�--L--L--�---�--J--�--1--L--L-- 45 - 'RpnpffrVpl 1 e=3.1I Q$-1f - w 40 1 n T - -T -------- ----7--T--Runes# D�pt�a,531, 3 35 30 --i-- --i-- --+-- ----------i-- -- -- -- -- -------i-- -- - w' - 25 --r- ---- -- -- ------------ -- -- -- -- --------- -- -- -- -- -- 20 15 10 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 12 Hydrograph for Subcatchment 9S: POST TO POND 4 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.24 0.00 0.00 5.00 0.31 0.00 0.01 6.00 0.40 0.01 0.11 7.00 0.49 0.02 0.22 8.00 0.60 0.05 0.34 9.00 0.73 0.10 0.64 10.00 0.90 0.17 0.99 11.00 1.17 0.32 2.15 12.00 3.29 1.99 54.55 13.00 3.83 2.48 3.12 14.00 4.07 2.70 1.87 15.00 4.23 2.85 1.49 16.00 4.36 2.97 1.15 17.00 4.47 3.07 1.02 18.00 4.57 3.16 0.90 19.00 4.65 3.24 0.77 20.00 4.72 3.31 0.65 21.00 4.79 3.37 0.62 22.00 4.85 3.42 0.60 23.00 4.90 3.48 0.57 24.00 4.96 3.53 0.55 25.00 4.96 3.53 0.00 26.00 4.96 3.53 0.00 27.00 4.96 3.53 0.00 28.00 4.96 3.53 0.00 29.00 4.96 3.53 0.00 30.00 4.96 3.53 0.00 31.00 4.96 3.53 0.00 32.00 4.96 3.53 0.00 33.00 4.96 3.53 0.00 34.00 4.96 3.53 0.00 35.00 4.96 3.53 0.00 36.00 4.96 3.53 0.00 37.00 4.96 3.53 0.00 38.00 4.96 3.53 0.00 39.00 4.96 3.53 0.00 40.00 4.96 3.53 0.00 41.00 4.96 3.53 0.00 42.00 4.96 3.53 0.00 43.00 4.96 3.53 0.00 44.00 4.96 3.53 0.00 45.00 4.96 3.53 0.00 46.00 4.96 3.53 0.00 47.00 4.96 3.53 0.00 48.00 4.96 3.53 0.00 49.00 4.96 3.53 0.00 50.00 4.96 3.53 0.00 51.00 4.96 3.53 0.00 52.00 4.96 3.53 0.00 53.00 4.96 3.53 0.00 54.00 4.96 3.53 0.00 55.00 4.96 3.53 0.00 56.00 4.96 3.53 0.00 57.00 4.96 3.53 0.00 58.00 4.96 3.53 0.00 59.00 4.96 3.53 0.00 60.00 4.96 3.53 0.00 61.00 4.96 3.53 0.00 62.00 4.96 3.53 0.00 63.00 4.96 3.53 0.00 64.00 4.96 3.53 0.00 65.00 4.96 3.53 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 4.96 3.53 0.00 67.00 4.96 3.53 0.00 68.00 4.96 3.53 0.00 69.00 4.96 3.53 0.00 70.00 4.96 3.53 0.00 71.00 4.96 3.53 0.00 72.00 4.96 3.53 0.00 73.00 4.96 3.53 0.00 74.00 4.96 3.53 0.00 75.00 4.96 3.53 0.00 76.00 4.96 3.53 0.00 77.00 4.96 3.53 0.00 78.00 4.96 3.53 0.00 79.00 4.96 3.53 0.00 80.00 4.96 3.53 0.00 81.00 4.96 3.53 0.00 82.00 4.96 3.53 0.00 83.00 4.96 3.53 0.00 84.00 4.96 3.53 0.00 85.00 4.96 3.53 0.00 86.00 4.96 3.53 0.00 87.00 4.96 3.53 0.00 88.00 4.96 3.53 0.00 89.00 4.96 3.53 0.00 90.00 4.96 3.53 0.00 91.00 4.96 3.53 0.00 92.00 4.96 3.53 0.00 93.00 4.96 3.53 0.00 94.00 4.96 3.53 0.00 95.00 4.96 3.53 0.00 96.00 4.96 3.53 0.00 97.00 4.96 3.53 0.00 98.00 4.96 3.53 0.00 99.00 4.96 3.53 0.00 100.00 4.96 3.53 0.00 101.00 4.96 3.53 0.00 102.00 4.96 3.53 0.00 103.00 4.96 3.53 0.00 104.00 4.96 3.53 0.00 105.00 4.96 3.53 0.00 106.00 4.96 3.53 0.00 107.00 4.96 3.53 0.00 108.00 4.96 3.53 0.00 109.00 4.96 3.53 0.00 110.00 4.96 3.53 0.00 111.00 4.96 3.53 0.00 112.00 4.96 3.53 0.00 113.00 4.96 3.53 0.00 114.00 4.96 3.53 0.00 115.00 4.96 3.53 0.00 116.00 4.96 3.53 0.00 117.00 4.96 3.53 0.00 118.00 4.96 3.53 0.00 119.00 4.96 3.53 0.00 120.00 4.96 3.53 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 13 Summary for Subcatchment 12S: POST TO POND 1 Runoff = 238.99 cfs @ 11.95 hrs, Volume= 11.951 af, Depth= 3.94" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=4.96" Area (ac) CN Description 29.640 98 Impervious 6.730 61 >75% Grass cover, Good, HSG B 36.370 91 Weighted Average 6.730 18.50% Pervious Area 29.640 81.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 12S: POST TO POND 1 Hydrograph -----I-- r -- r -- r -- r --r --I-- r-- -- t -- r- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 14 Hydrograph for Subcatchment 12S: POST TO POND 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.24 0.00 0.17 5.00 0.31 0.01 0.54 6.00 0.40 0.03 0.97 7.00 0.49 0.07 1.44 8.00 0.60 0.11 1.93 9.00 0.73 0.19 3.24 10.00 0.90 0.29 4.59 11.00 1.17 0.48 9.24 12.00 3.29 2.34 201.43 13.00 3.83 2.85 11.28 14.00 4.07 3.08 6.72 15.00 4.23 3.24 5.34 16.00 4.36 3.37 4.12 17.00 4.47 3.47 3.63 18.00 4.57 3.56 3.20 19.00 4.65 3.64 2.76 20.00 4.72 3.71 2.32 21.00 4.79 3.77 2.21 22.00 4.85 3.83 2.12 23.00 4.90 3.89 2.04 24.00 4.96 3.94 1.94 25.00 4.96 3.94 0.00 26.00 4.96 3.94 0.00 27.00 4.96 3.94 0.00 28.00 4.96 3.94 0.00 29.00 4.96 3.94 0.00 30.00 4.96 3.94 0.00 31.00 4.96 3.94 0.00 32.00 4.96 3.94 0.00 33.00 4.96 3.94 0.00 34.00 4.96 3.94 0.00 35.00 4.96 3.94 0.00 36.00 4.96 3.94 0.00 37.00 4.96 3.94 0.00 38.00 4.96 3.94 0.00 39.00 4.96 3.94 0.00 40.00 4.96 3.94 0.00 41.00 4.96 3.94 0.00 42.00 4.96 3.94 0.00 43.00 4.96 3.94 0.00 44.00 4.96 3.94 0.00 45.00 4.96 3.94 0.00 46.00 4.96 3.94 0.00 47.00 4.96 3.94 0.00 48.00 4.96 3.94 0.00 49.00 4.96 3.94 0.00 50.00 4.96 3.94 0.00 51.00 4.96 3.94 0.00 52.00 4.96 3.94 0.00 53.00 4.96 3.94 0.00 54.00 4.96 3.94 0.00 55.00 4.96 3.94 0.00 56.00 4.96 3.94 0.00 57.00 4.96 3.94 0.00 58.00 4.96 3.94 0.00 59.00 4.96 3.94 0.00 60.00 4.96 3.94 0.00 61.00 4.96 3.94 0.00 62.00 4.96 3.94 0.00 63.00 4.96 3.94 0.00 64.00 4.96 3.94 0.00 65.00 4.96 3.94 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 4.96 3.94 0.00 67.00 4.96 3.94 0.00 68.00 4.96 3.94 0.00 69.00 4.96 3.94 0.00 70.00 4.96 3.94 0.00 71.00 4.96 3.94 0.00 72.00 4.96 3.94 0.00 73.00 4.96 3.94 0.00 74.00 4.96 3.94 0.00 75.00 4.96 3.94 0.00 76.00 4.96 3.94 0.00 77.00 4.96 3.94 0.00 78.00 4.96 3.94 0.00 79.00 4.96 3.94 0.00 80.00 4.96 3.94 0.00 81.00 4.96 3.94 0.00 82.00 4.96 3.94 0.00 83.00 4.96 3.94 0.00 84.00 4.96 3.94 0.00 85.00 4.96 3.94 0.00 86.00 4.96 3.94 0.00 87.00 4.96 3.94 0.00 88.00 4.96 3.94 0.00 89.00 4.96 3.94 0.00 90.00 4.96 3.94 0.00 91.00 4.96 3.94 0.00 92.00 4.96 3.94 0.00 93.00 4.96 3.94 0.00 94.00 4.96 3.94 0.00 95.00 4.96 3.94 0.00 96.00 4.96 3.94 0.00 97.00 4.96 3.94 0.00 98.00 4.96 3.94 0.00 99.00 4.96 3.94 0.00 100.00 4.96 3.94 0.00 101.00 4.96 3.94 0.00 102.00 4.96 3.94 0.00 103.00 4.96 3.94 0.00 104.00 4.96 3.94 0.00 105.00 4.96 3.94 0.00 106.00 4.96 3.94 0.00 107.00 4.96 3.94 0.00 108.00 4.96 3.94 0.00 109.00 4.96 3.94 0.00 110.00 4.96 3.94 0.00 111.00 4.96 3.94 0.00 112.00 4.96 3.94 0.00 113.00 4.96 3.94 0.00 114.00 4.96 3.94 0.00 115.00 4.96 3.94 0.00 116.00 4.96 3.94 0.00 117.00 4.96 3.94 0.00 118.00 4.96 3.94 0.00 119.00 4.96 3.94 0.00 120.00 4.96 3.94 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 15 Summary for Subcatchment 14S: POST TO POND 6 Runoff = 87.79 cfs @ 11.95 hrs, Volume= 4.312 af, Depth= 3.73" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=4.96" Area (ac) CN Description 10.310 98 Impervious 3.550 61 >75% Grass cover, Good, HSG B 13.860 89 Weighted Average 3.550 25.61 % Pervious Area 10.310 74.39% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 14S: POST TO POND 6 Hydrograph 95--+--r--r--r-------------+--r--r--r----r----+--r--r-- 90 Cfs ■Runoff 87.79 � ---- 85 � ---- --+-- ----�r------- -- -- --+-- -------I�T pe-��124-hr - 80 --'-- --'----+--+----Ir------------- -IRS-- 10 r l4h r- Rai nfa [[-- .9W 75 70 ' --Ir- --'-- - - ----y--+--r--r--r-------y--rt--- - i- A q /y --'-- --+--+-- --'II------'-- -- ---Ruhoff Ar6a=1a.g64-at - 65 60 ' --Ir- ---- ----y--T--r--r--Ir--Ir----y--rt--1--+--r--Ir--Ir----y-- -- - r-- ------T-- r-- r------------rt--�npfflrY-Q1µm,Ie=4, 1 0 w 55 50 --I-- --I--y--+--t--r--I---I---I--y--rt--rt- -+- - RunoffI a`pID thT 13'�I `- 3 45 --I-- --r- --I--r--r--r--r--r--I---I--r--r--r-- r-- r-- r-- I---I--rT r--r--r--r-- ----,--T--r--r--Ir------- -- ----r--r--Ir-------io5.�-�rl-- LL 40 35 ---- --Ir- w' ----r--r--r--r--r--I---I--r--r--r--r--r--r--I---I--r--r-�ly V$ - -- I--r--r--r-- r--I---I--- I-- r-- r-- r-- r-- r--r--r-- I--r--r-- r- 30 --� rrrr--r--r--I-- IrrrrrrI-Irrrr--r-- 25 ------ -- -- -- -- -- 20 IrrrrrI-rrr--r1510 Li-- TTrirTTTrrr-1 -1 TrrI I I I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 16 Hydrograph for Subcatchment 14S: POST TO POND 6 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.24 0.00 0.00 5.00 0.31 0.00 0.10 6.00 0.40 0.02 0.24 7.00 0.49 0.04 0.41 8.00 0.60 0.08 0.58 9.00 0.73 0.14 1.03 10.00 0.90 0.22 1.52 11.00 1.17 0.39 3.16 12.00 3.29 2.16 74.33 13.00 3.83 2.66 4.21 14.00 4.07 2.89 2.51 15.00 4.23 3.04 2.00 16.00 4.36 3.17 1.54 17.00 4.47 3.27 1.36 18.00 4.57 3.36 1.20 19.00 4.65 3.44 1.04 20.00 4.72 3.51 0.87 21.00 4.79 3.57 0.83 22.00 4.85 3.62 0.80 23.00 4.90 3.68 0.76 24.00 4.96 3.73 0.73 25.00 4.96 3.73 0.00 26.00 4.96 3.73 0.00 27.00 4.96 3.73 0.00 28.00 4.96 3.73 0.00 29.00 4.96 3.73 0.00 30.00 4.96 3.73 0.00 31.00 4.96 3.73 0.00 32.00 4.96 3.73 0.00 33.00 4.96 3.73 0.00 34.00 4.96 3.73 0.00 35.00 4.96 3.73 0.00 36.00 4.96 3.73 0.00 37.00 4.96 3.73 0.00 38.00 4.96 3.73 0.00 39.00 4.96 3.73 0.00 40.00 4.96 3.73 0.00 41.00 4.96 3.73 0.00 42.00 4.96 3.73 0.00 43.00 4.96 3.73 0.00 44.00 4.96 3.73 0.00 45.00 4.96 3.73 0.00 46.00 4.96 3.73 0.00 47.00 4.96 3.73 0.00 48.00 4.96 3.73 0.00 49.00 4.96 3.73 0.00 50.00 4.96 3.73 0.00 51.00 4.96 3.73 0.00 52.00 4.96 3.73 0.00 53.00 4.96 3.73 0.00 54.00 4.96 3.73 0.00 55.00 4.96 3.73 0.00 56.00 4.96 3.73 0.00 57.00 4.96 3.73 0.00 58.00 4.96 3.73 0.00 59.00 4.96 3.73 0.00 60.00 4.96 3.73 0.00 61.00 4.96 3.73 0.00 62.00 4.96 3.73 0.00 63.00 4.96 3.73 0.00 64.00 4.96 3.73 0.00 65.00 4.96 3.73 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 4.96 3.73 0.00 67.00 4.96 3.73 0.00 68.00 4.96 3.73 0.00 69.00 4.96 3.73 0.00 70.00 4.96 3.73 0.00 71.00 4.96 3.73 0.00 72.00 4.96 3.73 0.00 73.00 4.96 3.73 0.00 74.00 4.96 3.73 0.00 75.00 4.96 3.73 0.00 76.00 4.96 3.73 0.00 77.00 4.96 3.73 0.00 78.00 4.96 3.73 0.00 79.00 4.96 3.73 0.00 80.00 4.96 3.73 0.00 81.00 4.96 3.73 0.00 82.00 4.96 3.73 0.00 83.00 4.96 3.73 0.00 84.00 4.96 3.73 0.00 85.00 4.96 3.73 0.00 86.00 4.96 3.73 0.00 87.00 4.96 3.73 0.00 88.00 4.96 3.73 0.00 89.00 4.96 3.73 0.00 90.00 4.96 3.73 0.00 91.00 4.96 3.73 0.00 92.00 4.96 3.73 0.00 93.00 4.96 3.73 0.00 94.00 4.96 3.73 0.00 95.00 4.96 3.73 0.00 96.00 4.96 3.73 0.00 97.00 4.96 3.73 0.00 98.00 4.96 3.73 0.00 99.00 4.96 3.73 0.00 100.00 4.96 3.73 0.00 101.00 4.96 3.73 0.00 102.00 4.96 3.73 0.00 103.00 4.96 3.73 0.00 104.00 4.96 3.73 0.00 105.00 4.96 3.73 0.00 106.00 4.96 3.73 0.00 107.00 4.96 3.73 0.00 108.00 4.96 3.73 0.00 109.00 4.96 3.73 0.00 110.00 4.96 3.73 0.00 111.00 4.96 3.73 0.00 112.00 4.96 3.73 0.00 113.00 4.96 3.73 0.00 114.00 4.96 3.73 0.00 115.00 4.96 3.73 0.00 116.00 4.96 3.73 0.00 117.00 4.96 3.73 0.00 118.00 4.96 3.73 0.00 119.00 4.96 3.73 0.00 120.00 4.96 3.73 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 17 Summary for Subcatchment 17S: UNDETAINED POST TO OUTFALL 1 Runoff = 48.41 cfs @ 11.96 hrs, Volume= 2.238 af, Depth= 2.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=4.96" Area (ac) CN Description 3.800 98 Impervious 8.590 61 >75% Grass cover, Good, HSG B 12.390 72 Weighted Average 8.590 69.33% Pervious Area 3.800 30.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 17S: UNDETAINED POST TO OUTFALL 1 Hydrograph --7--r--r--Ir--Ir--li-----------r--r--Ir-- 50 48.41 cfs --- ',Type-N 24-h� - 45 -- ------t--t--r----- I --- _-----rtlO�KT24hr-Raaftfa[[�4.96''-- 40 1 - - - - - - 1 - - Ruhoff Ar6a=12-390 arc - 35 _ - -- -- -- --' -- -- Rqn( Vpl ime=2. 3$_4 - H 30 I Runoff IDupthT2.117" - 0 25 Tc"5.0 M i n LL I I I I I I I I I I I I I I I I I 20 PN=7� --r---I--y--t--L--r--r--I---I--y--rt--rt--L--r--r--r--I--y--�--t--r--r-- 15 10 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 18 Hydrograph for Subcatchment 17S: UNDETAINED POST TO OUTFALL 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.24 0.00 0.00 5.00 0.31 0.00 0.00 6.00 0.40 0.00 0.00 7.00 0.49 0.00 0.00 8.00 0.60 0.00 0.00 9.00 0.73 0.00 0.00 10.00 0.90 0.00 0.12 11.00 1.17 0.04 0.69 12.00 3.29 0.99 42.96 13.00 3.83 1.34 2.75 14.00 4.07 1.51 1.68 15.00 4.23 1.63 1.36 16.00 4.36 1.72 1.06 17.00 4.47 1.80 0.94 18.00 4.57 1.87 0.84 19.00 4.65 1.93 0.73 20.00 4.72 1.99 0.62 21.00 4.79 2.03 0.59 22.00 4.85 2.08 0.57 23.00 4.90 2.12 0.55 24.00 4.96 2.17 0.52 25.00 4.96 2.17 0.00 26.00 4.96 2.17 0.00 27.00 4.96 2.17 0.00 28.00 4.96 2.17 0.00 29.00 4.96 2.17 0.00 30.00 4.96 2.17 0.00 31.00 4.96 2.17 0.00 32.00 4.96 2.17 0.00 33.00 4.96 2.17 0.00 34.00 4.96 2.17 0.00 35.00 4.96 2.17 0.00 36.00 4.96 2.17 0.00 37.00 4.96 2.17 0.00 38.00 4.96 2.17 0.00 39.00 4.96 2.17 0.00 40.00 4.96 2.17 0.00 41.00 4.96 2.17 0.00 42.00 4.96 2.17 0.00 43.00 4.96 2.17 0.00 44.00 4.96 2.17 0.00 45.00 4.96 2.17 0.00 46.00 4.96 2.17 0.00 47.00 4.96 2.17 0.00 48.00 4.96 2.17 0.00 49.00 4.96 2.17 0.00 50.00 4.96 2.17 0.00 51.00 4.96 2.17 0.00 52.00 4.96 2.17 0.00 53.00 4.96 2.17 0.00 54.00 4.96 2.17 0.00 55.00 4.96 2.17 0.00 56.00 4.96 2.17 0.00 57.00 4.96 2.17 0.00 58.00 4.96 2.17 0.00 59.00 4.96 2.17 0.00 60.00 4.96 2.17 0.00 61.00 4.96 2.17 0.00 62.00 4.96 2.17 0.00 63.00 4.96 2.17 0.00 64.00 4.96 2.17 0.00 65.00 4.96 2.17 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 4.96 2.17 0.00 67.00 4.96 2.17 0.00 68.00 4.96 2.17 0.00 69.00 4.96 2.17 0.00 70.00 4.96 2.17 0.00 71.00 4.96 2.17 0.00 72.00 4.96 2.17 0.00 73.00 4.96 2.17 0.00 74.00 4.96 2.17 0.00 75.00 4.96 2.17 0.00 76.00 4.96 2.17 0.00 77.00 4.96 2.17 0.00 78.00 4.96 2.17 0.00 79.00 4.96 2.17 0.00 80.00 4.96 2.17 0.00 81.00 4.96 2.17 0.00 82.00 4.96 2.17 0.00 83.00 4.96 2.17 0.00 84.00 4.96 2.17 0.00 85.00 4.96 2.17 0.00 86.00 4.96 2.17 0.00 87.00 4.96 2.17 0.00 88.00 4.96 2.17 0.00 89.00 4.96 2.17 0.00 90.00 4.96 2.17 0.00 91.00 4.96 2.17 0.00 92.00 4.96 2.17 0.00 93.00 4.96 2.17 0.00 94.00 4.96 2.17 0.00 95.00 4.96 2.17 0.00 96.00 4.96 2.17 0.00 97.00 4.96 2.17 0.00 98.00 4.96 2.17 0.00 99.00 4.96 2.17 0.00 100.00 4.96 2.17 0.00 101.00 4.96 2.17 0.00 102.00 4.96 2.17 0.00 103.00 4.96 2.17 0.00 104.00 4.96 2.17 0.00 105.00 4.96 2.17 0.00 106.00 4.96 2.17 0.00 107.00 4.96 2.17 0.00 108.00 4.96 2.17 0.00 109.00 4.96 2.17 0.00 110.00 4.96 2.17 0.00 111.00 4.96 2.17 0.00 112.00 4.96 2.17 0.00 113.00 4.96 2.17 0.00 114.00 4.96 2.17 0.00 115.00 4.96 2.17 0.00 116.00 4.96 2.17 0.00 117.00 4.96 2.17 0.00 118.00 4.96 2.17 0.00 119.00 4.96 2.17 0.00 120.00 4.96 2.17 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 19 Summary for Subcatchment 19S: UNDETAINED POST TO OUTFALL 2 Runoff = 15.17 cfs @ 12.18 hrs, Volume= 1.408 af, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=4.96" Area (ac) CN Description 7.730 55 Woods, Good, HSG B 7.000 61 >75% Grass cover, Good, HSG B 14.730 58 Weighted Average 14.730 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.1 30 0.0280 0.16 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 388 0.0620 1.74 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 15.1 744 0.0270 0.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.9 1,162 Total Subcatchment 19S: UNDETAINED POST TO OUTFALL 2 Hydrograph ----------+--+--+--+--+--�--+--+--+--+--+--+--+--+-+--+--+--+--+--+-- ■Runoff 16 15.17 Cfs--i--L------------J--i--i-- --L--L-----1--J--1--1--L--L-- 15-- -- -- -- Ili -- Ili -----Type,?4-h - 14 13- 12- --------+--+-------------�--�- Ruhoff Ar6a:�14-730 at - 10 w--+-+--+--+--+--+--+-------+--+--+--+--r--+koi_ -+--+--+--+--+-- 9 - 1--L-- -- 1--1-- --Runoff De-p#h:;1J51L 7 --r----+--+--+--r--r-------+--+--+--+--r- _- - -i +- + r- r-- 6 -'- ----1--L--L--1---1---1--J--1--1--+--L----'---I q— �19-M'�-- s - - -- -- - - -- -- -- - - -- ---4�N=6&- 4 --r- --- -- -- ------------ -- -- -- -- --------- -- -- -- -- -- 3 ------+--+--+--+---------+--+--+--+--+--+-------+--+--+--+--+-- 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 20 Hydrograph for Subcatchment 19S: UNDETAINED POST TO OUTFALL 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.24 0.00 0.00 5.00 0.31 0.00 0.00 6.00 0.40 0.00 0.00 7.00 0.49 0.00 0.00 8.00 0.60 0.00 0.00 9.00 0.73 0.00 0.00 10.00 0.90 0.00 0.00 11.00 1.17 0.00 0.00 12.00 3.29 0.37 6.47 13.00 3.83 0.59 2.58 14.00 4.07 0.70 1.47 15.00 4.23 0.77 1.13 16.00 4.36 0.84 0.91 17.00 4.47 0.89 0.78 18.00 4.57 0.94 0.71 19.00 4.65 0.98 0.62 20.00 4.72 1.02 0.53 21.00 4.79 1.05 0.49 22.00 4.85 1.09 0.48 23.00 4.90 1.12 0.46 24.00 4.96 1.15 0.45 25.00 4.96 1.15 0.00 26.00 4.96 1.15 0.00 27.00 4.96 1.15 0.00 28.00 4.96 1.15 0.00 29.00 4.96 1.15 0.00 30.00 4.96 1.15 0.00 31.00 4.96 1.15 0.00 32.00 4.96 1.15 0.00 33.00 4.96 1.15 0.00 34.00 4.96 1.15 0.00 35.00 4.96 1.15 0.00 36.00 4.96 1.15 0.00 37.00 4.96 1.15 0.00 38.00 4.96 1.15 0.00 39.00 4.96 1.15 0.00 40.00 4.96 1.15 0.00 41.00 4.96 1.15 0.00 42.00 4.96 1.15 0.00 43.00 4.96 1.15 0.00 44.00 4.96 1.15 0.00 45.00 4.96 1.15 0.00 46.00 4.96 1.15 0.00 47.00 4.96 1.15 0.00 48.00 4.96 1.15 0.00 49.00 4.96 1.15 0.00 50.00 4.96 1.15 0.00 51.00 4.96 1.15 0.00 52.00 4.96 1.15 0.00 53.00 4.96 1.15 0.00 54.00 4.96 1.15 0.00 55.00 4.96 1.15 0.00 56.00 4.96 1.15 0.00 57.00 4.96 1.15 0.00 58.00 4.96 1.15 0.00 59.00 4.96 1.15 0.00 60.00 4.96 1.15 0.00 61.00 4.96 1.15 0.00 62.00 4.96 1.15 0.00 63.00 4.96 1.15 0.00 64.00 4.96 1.15 0.00 65.00 4.96 1.15 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 4.96 1.15 0.00 67.00 4.96 1.15 0.00 68.00 4.96 1.15 0.00 69.00 4.96 1.15 0.00 70.00 4.96 1.15 0.00 71.00 4.96 1.15 0.00 72.00 4.96 1.15 0.00 73.00 4.96 1.15 0.00 74.00 4.96 1.15 0.00 75.00 4.96 1.15 0.00 76.00 4.96 1.15 0.00 77.00 4.96 1.15 0.00 78.00 4.96 1.15 0.00 79.00 4.96 1.15 0.00 80.00 4.96 1.15 0.00 81.00 4.96 1.15 0.00 82.00 4.96 1.15 0.00 83.00 4.96 1.15 0.00 84.00 4.96 1.15 0.00 85.00 4.96 1.15 0.00 86.00 4.96 1.15 0.00 87.00 4.96 1.15 0.00 88.00 4.96 1.15 0.00 89.00 4.96 1.15 0.00 90.00 4.96 1.15 0.00 91.00 4.96 1.15 0.00 92.00 4.96 1.15 0.00 93.00 4.96 1.15 0.00 94.00 4.96 1.15 0.00 95.00 4.96 1.15 0.00 96.00 4.96 1.15 0.00 97.00 4.96 1.15 0.00 98.00 4.96 1.15 0.00 99.00 4.96 1.15 0.00 100.00 4.96 1.15 0.00 101.00 4.96 1.15 0.00 102.00 4.96 1.15 0.00 103.00 4.96 1.15 0.00 104.00 4.96 1.15 0.00 105.00 4.96 1.15 0.00 106.00 4.96 1.15 0.00 107.00 4.96 1.15 0.00 108.00 4.96 1.15 0.00 109.00 4.96 1.15 0.00 110.00 4.96 1.15 0.00 111.00 4.96 1.15 0.00 112.00 4.96 1.15 0.00 113.00 4.96 1.15 0.00 114.00 4.96 1.15 0.00 115.00 4.96 1.15 0.00 116.00 4.96 1.15 0.00 117.00 4.96 1.15 0.00 118.00 4.96 1.15 0.00 119.00 4.96 1.15 0.00 120.00 4.96 1.15 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 21 Summary for Subcatchment 20S: UNDETAINED POST TO OUTFALL 3 Runoff = 4.20 cfs @ 12.17 hrs, Volume= 0.381 af, Depth= 1.21" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr-24hr Rainfall=4.96" Area (ac) CN Description 3.190 55 Woods, Good, HSG B 0.580 78 Row crops, straight row, Good, HSG B 3.770 59 Weighted Average 3.770 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.1 30 0.0280 0.16 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 388 0.0620 1.74 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 15.1 744 0.0270 0.82 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.9 1,162 Total Subcatchment 20S: UNDETAINED POST TO OUTFALL 3 Hydrograph � � � � � � � �� � � � � �� �� �� �� �� �� � � � � � ■Runoff 4.20 Cfs ---- 10yr-r24hr R;ainfaill:;4.96'. RUn6ffAlrea=3.770 at --r -i--r--r--r--r--i---i--r--r--t--r--r--r--i---i--r--r--r--r--i---i-- 3 R4npff',VQ14m�e=0.$81 calf Ru��noff'DepthT1.21';.. LL --+-- --' -- ----------F16w't6in9th=�1;1ST- 0 2 Tq=�1.�9 mill ON=59 � LI I I I I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 22 Hydrograph for Subcatchment 20S: UNDETAINED POST TO OUTFALL 3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 1.00 0.05 0.00 0.00 2.00 0.11 0.00 0.00 3.00 0.17 0.00 0.00 4.00 0.24 0.00 0.00 5.00 0.31 0.00 0.00 6.00 0.40 0.00 0.00 7.00 0.49 0.00 0.00 8.00 0.60 0.00 0.00 9.00 0.73 0.00 0.00 10.00 0.90 0.00 0.00 11.00 1.17 0.00 0.00 12.00 3.29 0.41 1.87 13.00 3.83 0.63 0.69 14.00 4.07 0.74 0.39 15.00 4.23 0.83 0.30 16.00 4.36 0.89 0.24 17.00 4.47 0.95 0.21 18.00 4.57 1.00 0.19 19.00 4.65 1.04 0.16 20.00 4.72 1.08 0.14 21.00 4.79 1.11 0.13 22.00 4.85 1.15 0.13 23.00 4.90 1.18 0.12 24.00 4.96 1.21 0.12 25.00 4.96 1.21 0.00 26.00 4.96 1.21 0.00 27.00 4.96 1.21 0.00 28.00 4.96 1.21 0.00 29.00 4.96 1.21 0.00 30.00 4.96 1.21 0.00 31.00 4.96 1.21 0.00 32.00 4.96 1.21 0.00 33.00 4.96 1.21 0.00 34.00 4.96 1.21 0.00 35.00 4.96 1.21 0.00 36.00 4.96 1.21 0.00 37.00 4.96 1.21 0.00 38.00 4.96 1.21 0.00 39.00 4.96 1.21 0.00 40.00 4.96 1.21 0.00 41.00 4.96 1.21 0.00 42.00 4.96 1.21 0.00 43.00 4.96 1.21 0.00 44.00 4.96 1.21 0.00 45.00 4.96 1.21 0.00 46.00 4.96 1.21 0.00 47.00 4.96 1.21 0.00 48.00 4.96 1.21 0.00 49.00 4.96 1.21 0.00 50.00 4.96 1.21 0.00 51.00 4.96 1.21 0.00 52.00 4.96 1.21 0.00 53.00 4.96 1.21 0.00 54.00 4.96 1.21 0.00 55.00 4.96 1.21 0.00 56.00 4.96 1.21 0.00 57.00 4.96 1.21 0.00 58.00 4.96 1.21 0.00 59.00 4.96 1.21 0.00 60.00 4.96 1.21 0.00 61.00 4.96 1.21 0.00 62.00 4.96 1.21 0.00 63.00 4.96 1.21 0.00 64.00 4.96 1.21 0.00 65.00 4.96 1.21 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 66.00 4.96 1.21 0.00 67.00 4.96 1.21 0.00 68.00 4.96 1.21 0.00 69.00 4.96 1.21 0.00 70.00 4.96 1.21 0.00 71.00 4.96 1.21 0.00 72.00 4.96 1.21 0.00 73.00 4.96 1.21 0.00 74.00 4.96 1.21 0.00 75.00 4.96 1.21 0.00 76.00 4.96 1.21 0.00 77.00 4.96 1.21 0.00 78.00 4.96 1.21 0.00 79.00 4.96 1.21 0.00 80.00 4.96 1.21 0.00 81.00 4.96 1.21 0.00 82.00 4.96 1.21 0.00 83.00 4.96 1.21 0.00 84.00 4.96 1.21 0.00 85.00 4.96 1.21 0.00 86.00 4.96 1.21 0.00 87.00 4.96 1.21 0.00 88.00 4.96 1.21 0.00 89.00 4.96 1.21 0.00 90.00 4.96 1.21 0.00 91.00 4.96 1.21 0.00 92.00 4.96 1.21 0.00 93.00 4.96 1.21 0.00 94.00 4.96 1.21 0.00 95.00 4.96 1.21 0.00 96.00 4.96 1.21 0.00 97.00 4.96 1.21 0.00 98.00 4.96 1.21 0.00 99.00 4.96 1.21 0.00 100.00 4.96 1.21 0.00 101.00 4.96 1.21 0.00 102.00 4.96 1.21 0.00 103.00 4.96 1.21 0.00 104.00 4.96 1.21 0.00 105.00 4.96 1.21 0.00 106.00 4.96 1.21 0.00 107.00 4.96 1.21 0.00 108.00 4.96 1.21 0.00 109.00 4.96 1.21 0.00 110.00 4.96 1.21 0.00 111.00 4.96 1.21 0.00 112.00 4.96 1.21 0.00 113.00 4.96 1.21 0.00 114.00 4.96 1.21 0.00 115.00 4.96 1.21 0.00 116.00 4.96 1.21 0.00 117.00 4.96 1.21 0.00 118.00 4.96 1.21 0.00 119.00 4.96 1.21 0.00 120.00 4.96 1.21 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 23 Summary for Pond 2P: POND 2 Inflow Area = 19.790 ac, 74.23% Impervious, Inflow Depth = 3.63" for 10yr-24hr event Inflow = 122.86 cfs @ 11.95 hrs, Volume= 5.988 of Outflow = 17.52 cfs @ 12.17 hrs, Volume= 5.970 af, Atten= 86%, Lag= 13.2 min Primary = 17.52 cfs @ 12.17 hrs, Volume= 5.970 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 715.83' @ 12.17 hrs Surf.Area= 31,565 sf Storage= 140,177 cf Plug -Flow detention time= 854.6 min calculated for 5.967 of (100% of inflow) Center -of -Mass det. time= 854.6 min ( 1,648.7 - 794.1 ) Volume Invert Avail.Storage Storage Description #1 710.50' 290,610 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 710.50 20,568 0 0 711.00 22,310 10,720 10,720 712.00 24,113 23,212 33,931 713.00 25,975 25,044 58,975 714.00 27,897 26,936 85,911 715.00 29,879 28,888 114,799 716.00 31,920 30,900 145,699 717.00 34,021 32,971 178,669 718.00 36,183 35,102 213,771 719.00 38,404 37,294 251,065 720.00 40,686 39,545 290,610 Device Routing Invert Outlet Devices #1 Primary 709.39' 24.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 709.39' / 709.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 710.50' 4.5" Vert. 4.5" Orifice C= 0.600 #3 Device 1 715.00' 36.0" W x 6.0" H Vert. Slotted Weirs X 3.00 C= 0.600 #4 Device 1 718.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 718.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=17.46 cfs @ 12.17 hrs HW=715.82' TW=0.00' (Dynamic Tailwater) L1=Culvert (Passes 17.46 cfs of 35.26 cfs potential flow) 2=4.5" Orifice (Orifice Controls 1.21 cfs @ 10.91 fps) 3=Slotted Weirs (Orifice Controls 16.25 cfs @ 3.61 fps) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=710.50' TW=0.00' (Dynamic Tailwater) 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD® 10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 24 ..... Inflow1 ac � u � • o - 1 TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 © 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 2P: POND 2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 710.50 0.00 0.00 0.00 2.50 0.00 0 710.50 0.00 0.00 0.00 5.00 0.07 59 710.50 0.00 0.00 0.00 7.50 0.61 2,912 710.64 0.05 0.05 0.00 10.00 2.01 11,870 711.05 0.32 0.32 0.00 12.50 9.48 135,718 715.68 15.25 15.25 0.00 15.00 2.82 119,949 715.17 3.18 3.18 0.00 17.50 1.81 117,647 715.09 1.96 1.96 0.00 20.00 1.23 116,229 715.05 1.41 1.41 0.00 22.50 1.11 115,326 715.02 1.17 1.17 0.00 25.00 0.00 111,279 714.88 1.09 1.09 0.00 27.50 0.00 101,671 714.55 1.05 1.05 0.00 30.00 0.00 92,459 714.23 1.00 1.00 0.00 32.50 0.00 83,650 713.92 0.96 0.96 0.00 35.00 0.00 75,255 713.61 0.91 0.91 0.00 37.50 0.00 67,281 713.32 0.86 0.86 0.00 40.00 0.00 59,738 713.03 0.81 0.81 0.00 42.50 0.00 52,635 712.75 0.76 0.76 0.00 45.00 0.00 45,981 712.49 0.71 0.71 0.00 47.50 0.00 39,785 712.24 0.66 0.66 0.00 50.00 0.00 34,055 712.01 0.61 0.61 0.00 52.50 0.00 28,800 711.79 0.56 0.56 0.00 55.00 0.00 24,027 711.58 0.50 0.50 0.00 57.50 0.00 19,745 711.40 0.45 0.45 0.00 60.00 0.00 15,960 711.23 0.39 0.39 0.00 62.50 0.00 12,679 711.09 0.34 0.34 0.00 65.00 0.00 9,908 710.96 0.28 0.28 0.00 67.50 0.00 7,651 710.86 0.22 0.22 0.00 70.00 0.00 5,925 710.78 0.16 0.16 0.00 72.50 0.00 4,714 710.72 0.11 0.11 0.00 75.00 0.00 3,864 710.68 0.08 0.08 0.00 77.50 0.00 3,250 710.66 0.06 0.06 0.00 80.00 0.00 2,792 710.63 0.04 0.04 0.00 82.50 0.00 2,440 710.62 0.03 0.03 0.00 85.00 0.00 2,162 710.60 0.03 0.03 0.00 87.50 0.00 1,939 710.59 0.02 0.02 0.00 90.00 0.00 1,755 710.58 0.02 0.02 0.00 92.50 0.00 1,602 710.58 0.02 0.02 0.00 95.00 0.00 1,473 710.57 0.01 0.01 0.00 97.50 0.00 1,362 710.57 0.01 0.01 0.00 100.00 0.00 1,267 710.56 0.01 0.01 0.00 102.50 0.00 1,183 710.56 0.01 0.01 0.00 105.00 0.00 1,110 710.55 0.01 0.01 0.00 107.50 0.00 1,045 710.55 0.01 0.01 0.00 110.00 0.00 987 710.55 0.01 0.01 0.00 112.50 0.00 935 710.55 0.01 0.01 0.00 115.00 0.00 888 710.54 0.00 0.00 0.00 117.50 0.00 845 710.54 0.00 0.00 0.00 120.00 0.00 806 710.54 0.00 0.00 0.00 Type 1124-hr 10yr-24hr Rainfall=4.96" Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 26 Stage -Discharge for Pond 2P: POND 2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 710.50 0.00 0.00 0.00 710.60 0.03 0.03 0.00 710.70 0.09 0.09 0.00 710.80 0.18 0.18 0.00 710.90 0.25 0.25 0.00 711.00 0.30 0.30 0.00 711.10 0.34 0.34 0.00 711.20 0.38 0.38 0.00 711.30 0.42 0.42 0.00 711.40 0.45 0.45 0.00 711.50 0.48 0.48 0.00 711.60 0.51 0.51 0.00 711.70 0.54 0.54 0.00 711.80 0.56 0.56 0.00 711.90 0.59 0.59 0.00 712.00 0.61 0.61 0.00 712.10 0.63 0.63 0.00 712.20 0.65 0.65 0.00 712.30 0.68 0.68 0.00 712.40 0.70 0.70 0.00 712.50 0.72 0.72 0.00 712.60 0.74 0.74 0.00 712.70 0.75 0.75 0.00 712.80 0.77 0.77 0.00 712.90 0.79 0.79 0.00 713.00 0.81 0.81 0.00 713.10 0.83 0.83 0.00 713.20 0.84 0.84 0.00 713.30 0.86 0.86 0.00 713.40 0.88 0.88 0.00 713.50 0.89 0.89 0.00 713.60 0.91 0.91 0.00 713.70 0.92 0.92 0.00 713.80 0.94 0.94 0.00 713.90 0.95 0.95 0.00 714.00 0.97 0.97 0.00 714.10 0.98 0.98 0.00 714.20 1.00 1.00 0.00 714.30 1.01 1.01 0.00 714.40 1.02 1.02 0.00 714.50 1.04 1.04 0.00 714.60 1.05 1.05 0.00 714.70 1.07 1.07 0.00 714.80 1.08 1.08 0.00 714.90 1.09 1.09 0.00 715.00 1.10 1.10 0.00 715.10 2.03 2.03 0.00 715.20 3.71 3.71 0.00 715.30 5.89 5.89 0.00 715.40 8.46 8.46 0.00 715.50 11.38 11.38 0.00 715.60 13.69 13.69 0.00 715.70 15.53 15.53 0.00 715.80 17.13 17.13 0.00 715.90 18.57 18.57 0.00 716.00 19.90 19.90 0.00 716.10 21.14 21.14 0.00 716.20 22.31 22.31 0.00 716.30 23.41 23.41 0.00 716.40 24.46 24.46 0.00 716.50 25.47 25.47 0.00 716.60 26.43 26.43 0.00 716.70 27.36 27.36 0.00 716.80 28.26 28.26 0.00 716.90 29.13 29.13 0.00 717.00 29.97 29.97 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 717.10 30.80 30.80 0.00 717.20 31.59 31.59 0.00 717.30 32.37 32.37 0.00 717.40 33.13 33.13 0.00 717.50 33.87 33.87 0.00 717.60 34.60 34.60 0.00 717.70 35.31 35.31 0.00 717.80 36.00 36.00 0.00 717.90 36.69 36.69 0.00 718.00 37.36 37.36 0.00 718.10 39.67 39.67 0.00 718.20 42.27 42.27 0.00 718.30 42.54 42.54 0.00 718.40 42.81 42.81 0.00 718.50 43.08 43.08 0.00 718.60 44.13 43.34 0.79 718.70 45.83 43.61 2.23 718.80 48.02 43.87 4.15 718.90 50.60 44.13 6.48 719.00 53.68 44.39 9.30 719.10 57.19 44.64 12.55 719.20 60.68 44.90 15.78 719.30 64.40 45.15 19.25 719.40 68.33 45.41 22.92 719.50 72.46 45.66 26.80 719.60 76.88 45.91 30.98 719.70 81.52 46.16 35.36 719.80 86.13 46.40 39.72 719.90 90.88 46.65 44.23 720.00 95.67 46.89 48.78 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 27 Stage -Area -Storage for Pond 2P: POND 2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 710.50 20,568 0 710.60 20,916 2,074 710.70 21,265 4,183 710.80 21,613 6,327 710.90 21,962 8,506 711.00 22,310 10,720 711.10 22,490 12,960 711.20 22,671 15,218 711.30 22,851 17,494 711.40 23,031 19,788 711.50 23,212 22,100 711.60 23,392 24,430 711.70 23,572 26,778 711.80 23,752 29,144 711.90 23,933 31,529 712.00 24,113 33,931 712.10 24,299 36,352 712.20 24,485 38,791 712.30 24,672 41,249 712.40 24,858 43,725 712.50 25,044 46,220 712.60 25,230 48,734 712.70 25,416 51,266 712.80 25,603 53,817 712.90 25,789 56,387 713.00 25,975 58,975 713.10 26,167 61,582 713.20 26,359 64,208 713.30 26,552 66,854 713.40 26,744 69,519 713.50 26,936 72,203 713.60 27,128 74,906 713.70 27,320 77,628 713.80 27,513 80,370 713.90 27,705 83,131 714.00 27,897 85,911 714.10 28,095 88,711 714.20 28,293 91,530 714.30 28,492 94,369 714.40 28,690 97,228 714.50 28,888 100,107 714.60 29,086 103,006 714.70 29,284 105,924 714.80 29,483 108,863 714.90 29,681 111,821 715.00 29,879 114,799 715.10 30,083 117,797 715.20 30,287 120,816 715.30 30,491 123,855 715.40 30,695 126,914 715.50 30,900 129,994 715.60 31,104 133,094 715.70 31,308 136,214 715.80 31,512 139,355 715.90 31,716 142,517 716.00 31,920 145,699 716.10 32,130 148,901 716.20 32,340 152,125 716.30 32,550 155,369 716.40 32,760 158,635 716.50 32,971 161,921 716.60 33,181 165,229 716.70 33,391 168,557 716.80 33,601 171,907 716.90 33,811 175,277 717.00 34.021 178.669 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 717.10 34,237 182,082 717.20 34,453 185,516 717.30 34,670 188,973 717.40 34,886 192,450 717.50 35,102 195,950 717.60 35,318 199,471 717.70 35,534 203,013 717.80 35,751 206,578 717.90 35,967 210,164 718.00 36,183 213,771 718.10 36,405 217,400 718.20 36,627 221,052 718.30 36,849 224,726 718.40 37,071 228,422 718.50 37,294 232,140 718.60 37,516 235,881 718.70 37,738 239,643 718.80 37,960 243,428 718.90 38,182 247,235 719.00 38,404 251,065 719.10 38,632 254,916 719.20 38,860 258,791 719.30 39,089 262,688 719.40 39,317 266,609 719.50 39,545 270,552 719.60 39,773 274,518 719.70 40,001 278,506 719.80 40,230 282,518 719.90 40,458 286,552 720.00 40,686 290,610 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 28 Summary for Pond 8P: POND 3 Inflow Area = 15.260 ac, 72.15% Impervious, Inflow Depth = 3.63" for 10yr-24hr event Inflow = 94.73 cfs @ 11.95 hrs, Volume= 4.617 of Outflow = 0.94 cfs @ 20.06 hrs, Volume= 4.565 af, Atten= 99%, Lag= 486.4 min Primary = 0.94 cfs @ 20.06 hrs, Volume= 4.565 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 704.83' @ 20.06 hrs Surf.Area= 56,906 sf Storage= 158,739 cf Plug -Flow detention time= 1,977.5 min calculated for 4.565 of (99% of inflow) Center -of -Mass det. time= 1,970.4 min ( 2,764.5 - 794.1 ) Volume Invert Avail.Storage Storage Description #1 701.50' 519,480 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 701.50 22,118 0 0 702.00 43,792 16,478 16,478 703.00 48,320 46,056 62,534 704.00 52,961 50,641 113,174 705.00 57,717 55,339 168,513 706.00 62,582 60,150 228,663 707.00 67,552 65,067 293,730 708.00 72,628 70,090 363,820 709.00 77,809 75,219 439,038 710.00 83,074 80,442 519,480 Device Routing Invert Outlet Devices #1 Primary 701.39' 24.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 701.39' / 701.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 701.50' 4.5" Vert. 4.5" Orifice C= 0.600 #3 Device 1 705.00' 36.0" W x 6.0" H Vert. Slotted Weirs X 2.00 C= 0.600 #4 Device 1 708.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 708.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.94 cfs @ 20.06 hrs HW=704.83' TW=0.00' (Dynamic Tailwater) 1­1=Culvert (Passes 0.94 cfs of 22.33 cfs potential flow) 2=4.5" Orifice (Orifice Controls 0.94 cfs @ 8.53 fps) 3=Slotted Weirs ( Controls 0.00 cfs) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=701.50' TW=0.00' (Dynamic Tailwater) T 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 29 '1.71 E:iA19]isIll Hydrograph - -- CfS - L-L--L-L--L-L--L- -,--, - --, --,-- , - ---- ----L--L-L--L--'-- -,--, --,--, ---- , --,--, - --, --,-_ -L--L- --L-L- IN Inflow IN Outflow - - --r- --r- --r- --r- --r r r r ----- b`O a_ _ IN Primary 105 - - --- - ---- -- -- - ----; - --;-lnflorware ■Secondary 100- 95 90 --'- -'--'---'----------------------- ra e�'F'�-8 /'J� c 9 85 -1- --r- --r- --r- --r-1--i-- --r --r r �--r� 1 -- 80 - - - - 75 - - -- - -- - -- - -- - ---- -- - -- ---- - -- - -- - -- 70 - - -- - -- - --r- -- - -- - -- - -- ----r- -- - --r- -- 65 w 60 -1- --r- --r- --r- --r-1--i-- --r- --r--i--r---r-1--r- -- !' 55 - - --- - ---- -- - -- - ------- -------- - -- - -- ---- 3 50 - - -- - -- - -- - -- - ---- -- - -- ---- - -- - -- - -- M 45 - - 7--Ir- --Ir- --r- --Ir- --Ir-7--Ir----Ir--li--r----Ir- --r-7-- 40 - - - - - - - - - - - - - 35 - - -- - -- - -- - -- - ---- -- - -- ---- - -- - -- - -- 30 - - - - --- -------------,-- -- --- 25 Z L--'--L-L--L-L--L-L-- 20 1 s 0.94 cfs 0.00 Cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 © 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 8P: POND 3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 701.50 0.00 0.00 0.00 2.50 0.00 0 701.50 0.00 0.00 0.00 5.00 0.06 45 701.50 0.00 0.00 0.00 7.50 0.47 2,276 701.59 0.02 0.02 0.00 10.00 1.55 9,562 701.83 0.20 0.20 0.00 12.50 7.31 126,364 704.25 0.85 0.85 0.00 15.00 2.18 149,794 704.67 0.92 0.92 0.00 17.50 1.40 156,636 704.79 0.94 0.94 0.00 20.00 0.95 158,738 704.83 0.94 0.94 0.00 22.50 0.85 158,328 704.82 0.94 0.94 0.00 25.00 0.00 154,562 704.76 0.93 0.93 0.00 27.50 0.00 146,280 704.61 0.91 0.91 0.00 30.00 0.00 138,203 704.46 0.89 0.89 0.00 32.50 0.00 130,333 704.32 0.86 0.86 0.00 35.00 0.00 122,674 704.18 0.84 0.84 0.00 37.50 0.00 115,228 704.04 0.82 0.82 0.00 40.00 0.00 107,997 703.90 0.79 0.79 0.00 42.50 0.00 100,984 703.77 0.77 0.77 0.00 45.00 0.00 94,193 703.64 0.74 0.74 0.00 47.50 0.00 87,624 703.51 0.72 0.72 0.00 50.00 0.00 81,282 703.38 0.69 0.69 0.00 52.50 0.00 75,168 703.26 0.67 0.67 0.00 55.00 0.00 69,286 703.14 0.64 0.64 0.00 57.50 0.00 63,637 703.02 0.61 0.61 0.00 60.00 0.00 58,225 702.91 0.59 0.59 0.00 62.50 0.00 53,052 702.80 0.56 0.56 0.00 65.00 0.00 48,121 702.70 0.53 0.53 0.00 67.50 0.00 43,433 702.60 0.51 0.51 0.00 70.00 0.00 38,992 702.50 0.48 0.48 0.00 72.50 0.00 34,799 702.41 0.45 0.45 0.00 75.00 0.00 30,858 702.32 0.42 0.42 0.00 77.50 0.00 27,169 702.24 0.40 0.40 0.00 80.00 0.00 23,736 702.16 0.37 0.37 0.00 82.50 0.00 20,560 702.09 0.34 0.34 0.00 85.00 0.00 17,643 702.03 0.31 0.31 0.00 87.50 0.00 14,987 701.97 0.28 0.28 0.00 90.00 0.00 12,602 701.91 0.25 0.25 0.00 92.50 0.00 10,501 701.85 0.22 0.22 0.00 95.00 0.00 8,709 701.80 0.18 0.18 0.00 97.50 0.00 7,261 701.76 0.14 0.14 0.00 100.00 0.00 6,115 701.73 0.11 0.11 0.00 102.50 0.00 5,210 701.70 0.09 0.09 0.00 105.00 0.00 4,494 701.67 0.07 0.07 0.00 107.50 0.00 3,920 701.65 0.06 0.06 0.00 110.00 0.00 3,456 701.64 0.05 0.05 0.00 112.50 0.00 3,077 701.62 0.04 0.04 0.00 115.00 0.00 2,763 701.61 0.03 0.03 0.00 117.50 0.00 2,500 701.60 0.03 0.03 0.00 120.00 0.00 2,278 701.59 0.02 0.02 0.00 Type 1124-hr 10yr-24hr Rainfall=4.96" Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 31 Stage -Discharge for Pond 8P: POND 3 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 701.50 0.00 0.00 0.00 701.60 0.03 0.03 0.00 701.70 0.09 0.09 0.00 701.80 0.18 0.18 0.00 701.90 0.25 0.25 0.00 702.00 0.30 0.30 0.00 702.10 0.34 0.34 0.00 702.20 0.38 0.38 0.00 702.30 0.42 0.42 0.00 702.40 0.45 0.45 0.00 702.50 0.48 0.48 0.00 702.60 0.51 0.51 0.00 702.70 0.54 0.54 0.00 702.80 0.56 0.56 0.00 702.90 0.59 0.59 0.00 703.00 0.61 0.61 0.00 703.10 0.63 0.63 0.00 703.20 0.65 0.65 0.00 703.30 0.68 0.68 0.00 703.40 0.70 0.70 0.00 703.50 0.72 0.72 0.00 703.60 0.74 0.74 0.00 703.70 0.75 0.75 0.00 703.80 0.77 0.77 0.00 703.90 0.79 0.79 0.00 704.00 0.81 0.81 0.00 704.10 0.83 0.83 0.00 704.20 0.84 0.84 0.00 704.30 0.86 0.86 0.00 704.40 0.88 0.88 0.00 704.50 0.89 0.89 0.00 704.60 0.91 0.91 0.00 704.70 0.92 0.92 0.00 704.80 0.94 0.94 0.00 704.90 0.95 0.95 0.00 705.00 0.97 0.97 0.00 705.10 1.59 1.59 0.00 705.20 2.72 2.72 0.00 705.30 4.18 4.18 0.00 705.40 5.90 5.90 0.00 705.50 7.85 7.85 0.00 705.60 9.39 9.39 0.00 705.70 10.62 10.62 0.00 705.80 11.69 11.69 0.00 705.90 12.66 12.66 0.00 706.00 13.55 13.55 0.00 706.10 14.39 14.39 0.00 706.20 15.17 15.17 0.00 706.30 15.91 15.91 0.00 706.40 16.61 16.61 0.00 706.50 17.29 17.29 0.00 706.60 17.94 17.94 0.00 706.70 18.56 18.56 0.00 706.80 19.17 19.17 0.00 706.90 19.75 19.75 0.00 707.00 20.32 20.32 0.00 707.10 20.87 20.87 0.00 707.20 21.41 21.41 0.00 707.30 21.93 21.93 0.00 707.40 22.44 22.44 0.00 707.50 22.94 22.94 0.00 707.60 23.43 23.43 0.00 707.70 23.90 23.90 0.00 707.80 24.37 24.37 0.00 707.90 24.83 24.83 0.00 708.00 25.28 25.28 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 708.10 27.38 27.38 0.00 708.20 30.84 30.84 0.00 708.30 35.18 35.18 0.00 708.40 37.08 37.08 0.00 708.50 37.39 37.39 0.00 708.60 38.48 37.70 0.79 708.70 40.22 38.00 2.23 708.80 42.45 38.30 4.15 708.90 45.07 38.60 6.48 709.00 48.19 38.89 9.30 709.10 51.73 39.18 12.55 709.20 55.26 39.47 15.78 709.30 59.01 39.76 19.25 709.40 62.97 40.05 22.92 709.50 67.13 40.33 26.80 709.60 71.59 40.62 30.98 709.70 76.26 40.90 35.36 709.80 80.90 41.18 39.72 709.90 85.68 41.45 44.23 710.00 90.50 41.73 48.78 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 32 Stage -Area -Storage for Pond 8P: POND 3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 701.50 22,118 0 701.60 26,453 2,429 701.70 30,788 5,291 701.80 35,122 8,586 701.90 39,457 12,315 702.00 43,792 16,478 702.10 44,245 20,879 702.20 44,698 25,326 702.30 45,150 29,819 702.40 45,603 34,357 702.50 46,056 38,940 702.60 46,509 43,568 702.70 46,962 48,241 702.80 47,414 52,960 702.90 47,867 57,724 703.00 48,320 62,534 703.10 48,784 67,389 703.20 49,248 72,290 703.30 49,712 77,238 703.40 50,176 82,233 703.50 50,641 87,274 703.60 51,105 92,361 703.70 51,569 97,495 703.80 52,033 102,675 703.90 52,497 107,901 704.00 52,961 113,174 704.10 53,437 118,494 704.20 53,912 123,861 704.30 54,388 129,276 704.40 54,863 134,739 704.50 55,339 140,249 704.60 55,815 145,807 704.70 56,290 151,412 704.80 56,766 157,065 704.90 57,241 162,765 705.00 57,717 168,513 705.10 58,204 174,309 705.20 58,690 180,154 705.30 59,176 186,047 705.40 59,663 191,989 705.50 60,150 197,980 705.60 60,636 204,019 705.70 61,123 210,107 705.80 61,609 216,243 705.90 62,095 222,429 706.00 62,582 228,663 706.10 63,079 234,946 706.20 63,576 241,278 706.30 64,073 247,661 706.40 64,570 254,093 706.50 65,067 260,575 706.60 65,564 267,106 706.70 66,061 273,688 706.80 66,558 280,318 706.90 67,055 286,999 707.00 67,552 293,730 707.10 68,060 300,510 707.20 68,567 307,341 707.30 69,075 314,224 707.40 69,582 321,156 707.50 70,090 328,140 707.60 70,598 335,174 707.70 71,105 342,260 707.80 71,613 349,395 707.90 72,120 356,582 708.00 72.628 363.820 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 708.10 73,146 371,108 708.20 73,664 378,449 708.30 74,182 385,841 708.40 74,700 393,285 708.50 75,219 400,781 708.60 75,737 408,329 708.70 76,255 415,928 708.80 76,773 423,580 708.90 77,291 431,283 709.00 77,809 439,038 709.10 78,336 446,845 709.20 78,862 454,705 709.30 79,388 462,618 709.40 79,915 470,583 709.50 80,442 478,601 709.60 80,968 486,671 709.70 81,495 494,794 709.80 82,021 502,970 709.90 82,547 511,198 710.00 83,074 519,480 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 33 Summary for Pond 10P: POND 4 Inflow Area = 10.550 ac, 69.48% Impervious, Inflow Depth = 3.53" for 10yr-24hr event Inflow = 64.12 cfs @ 11.95 hrs, Volume= 3.103 of Outflow = 7.53 cfs @ 12.27 hrs, Volume= 3.103 af, Atten= 88%, Lag= 18.8 min Primary = 7.53 cfs @ 12.27 hrs, Volume= 3.103 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 682.67' @ 12.27 hrs Surf.Area= 20,295 sf Storage= 62,288 cf Plug -Flow detention time= 159.7 min calculated for 3.103 of (100% of inflow) Center -of -Mass det. time= 159.1 min ( 956.6 - 797.5 ) Volume Invert Avail.Storage Storage Description #1 677.00' 120,639 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 677.00 4,560 0 0 678.00 5,909 5,235 5,235 679.00 7,780 6,845 12,079 680.00 10,667 9,224 21,303 681.00 14,076 12,372 33,674 682.00 17,710 15,893 49,567 683.00 21,571 19,641 69,208 684.00 25,659 23,615 92,823 685.00 29,973 27,816 120,639 Device Routing Invert Outlet Devices #1 Primary 676.39' 24.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 676.39' / 676.00' S= 0.0050 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 677.00' 8.0" Vert. 8" Orifice C= 0.600 #3 Device 1 682.50' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #4 Secondary 683.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=7.51 cfs @ 12.27 hrs HW=682.67' TW=0.00' (Dynamic Tailwater) 1­1=Culvert (Passes 7.51 cfs of 34.75 cfs potential flow) 2=8" Orifice (Orifice Controls 3.88 cfs @ 11.12 fps) 1 3=Top of OS (Weir Controls 3.63 cfs @ 1.34 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=677.00' TW=0.00' (Dynamic Tailwater) 4=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 34 '0=6 1 gi[1]A191MIX! ..... I 1 1 1 ����������������������������������������������������l���������������� iiiiii TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 © 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 10P: POND 4 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 677.00 0.00 0.00 0.00 2.50 0.00 0 677.00 0.00 0.00 0.00 5.00 0.01 2 677.00 0.00 0.00 0.00 7.50 0.28 928 677.20 0.13 0.13 0.00 10.00 0.99 2,555 677.52 0.72 0.72 0.00 12.50 4.99 61,556 682.63 6.41 6.41 0.00 15.00 1.49 47,224 681.87 3.58 3.58 0.00 17.50 0.96 27,756 680.56 3.02 3.02 0.00 20.00 0.65 11,521 678.93 2.12 2.12 0.00 22.50 0.58 3,314 677.66 0.97 0.97 0.00 25.00 0.00 1,128 677.24 0.19 0.19 0.00 27.50 0.00 431 677.09 0.03 0.03 0.00 30.00 0.00 261 677.06 0.01 0.01 0.00 32.50 0.00 186 677.04 0.01 0.01 0.00 35.00 0.00 144 677.03 0.00 0.00 0.00 37.50 0.00 117 677.03 0.00 0.00 0.00 40.00 0.00 99 677.02 0.00 0.00 0.00 42.50 0.00 86 677.02 0.00 0.00 0.00 45.00 0.00 75 677.02 0.00 0.00 0.00 47.50 0.00 67 677.01 0.00 0.00 0.00 50.00 0.00 61 677.01 0.00 0.00 0.00 52.50 0.00 55 677.01 0.00 0.00 0.00 55.00 0.00 51 677.01 0.00 0.00 0.00 57.50 0.00 47 677.01 0.00 0.00 0.00 60.00 0.00 44 677.01 0.00 0.00 0.00 62.50 0.00 41 677.01 0.00 0.00 0.00 65.00 0.00 38 677.01 0.00 0.00 0.00 67.50 0.00 36 677.01 0.00 0.00 0.00 70.00 0.00 34 677.01 0.00 0.00 0.00 72.50 0.00 33 677.01 0.00 0.00 0.00 75.00 0.00 31 677.01 0.00 0.00 0.00 77.50 0.00 29 677.01 0.00 0.00 0.00 80.00 0.00 28 677.01 0.00 0.00 0.00 82.50 0.00 27 677.01 0.00 0.00 0.00 85.00 0.00 26 677.01 0.00 0.00 0.00 87.50 0.00 25 677.01 0.00 0.00 0.00 90.00 0.00 24 677.01 0.00 0.00 0.00 92.50 0.00 23 677.01 0.00 0.00 0.00 95.00 0.00 22 677.00 0.00 0.00 0.00 97.50 0.00 21 677.00 0.00 0.00 0.00 100.00 0.00 21 677.00 0.00 0.00 0.00 102.50 0.00 20 677.00 0.00 0.00 0.00 105.00 0.00 19 677.00 0.00 0.00 0.00 107.50 0.00 19 677.00 0.00 0.00 0.00 110.00 0.00 18 677.00 0.00 0.00 0.00 112.50 0.00 18 677.00 0.00 0.00 0.00 115.00 0.00 17 677.00 0.00 0.00 0.00 117.50 0.00 17 677.00 0.00 0.00 0.00 120.00 0.00 16 677.00 0.00 0.00 0.00 Type 1124-hr 10yr-24hr Rainfall=4.96" Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 36 Stage -Discharge for Pond 10P: POND 4 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 677.00 0.00 0.00 0.00 677.10 0.04 0.04 0.00 677.20 0.13 0.13 0.00 677.30 0.28 0.28 0.00 677.40 0.47 0.47 0.00 677.50 0.68 0.68 0.00 677.60 0.87 0.87 0.00 677.70 1.02 1.02 0.00 677.80 1.15 1.15 0.00 677.90 1.27 1.27 0.00 678.00 1.37 1.37 0.00 678.10 1.47 1.47 0.00 678.20 1.56 1.56 0.00 678.30 1.65 1.65 0.00 678.40 1.74 1.74 0.00 678.50 1.82 1.82 0.00 678.60 1.89 1.89 0.00 678.70 1.96 1.96 0.00 678.80 2.04 2.04 0.00 678.90 2.10 2.10 0.00 679.00 2.17 2.17 0.00 679.10 2.23 2.23 0.00 679.20 2.30 2.30 0.00 679.30 2.36 2.36 0.00 679.40 2.42 2.42 0.00 679.50 2.47 2.47 0.00 679.60 2.53 2.53 0.00 679.70 2.59 2.59 0.00 679.80 2.64 2.64 0.00 679.90 2.69 2.69 0.00 680.00 2.74 2.74 0.00 680.10 2.80 2.80 0.00 680.20 2.85 2.85 0.00 680.30 2.89 2.89 0.00 680.40 2.94 2.94 0.00 680.50 2.99 2.99 0.00 680.60 3.04 3.04 0.00 680.70 3.08 3.08 0.00 680.80 3.13 3.13 0.00 680.90 3.17 3.17 0.00 681.00 3.22 3.22 0.00 681.10 3.26 3.26 0.00 681.20 3.30 3.30 0.00 681.30 3.35 3.35 0.00 681.40 3.39 3.39 0.00 681.50 3.43 3.43 0.00 681.60 3.47 3.47 0.00 681.70 3.51 3.51 0.00 681.80 3.55 3.55 0.00 681.90 3.59 3.59 0.00 682.00 3.63 3.63 0.00 682.10 3.67 3.67 0.00 682.20 3.71 3.71 0.00 682.30 3.75 3.75 0.00 682.40 3.78 3.78 0.00 682.50 3.82 3.82 0.00 682.60 5.51 5.51 0.00 682.70 8.57 8.57 0.00 682.80 12.53 12.53 0.00 682.90 17.20 17.20 0.00 683.00 22.50 22.50 0.00 683.10 28.35 28.35 0.00 683.20 34.71 34.71 0.00 683.30 36.77 36.77 0.00 683.40 37.08 37.08 0.00 683.50 37.39 37.39 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 683.60 38.48 37.70 0.79 683.70 40.22 38.00 2.23 683.80 42.45 38.30 4.15 683.90 45.07 38.60 6.48 684.00 48.19 38.89 9.30 684.10 51.73 39.18 12.55 684.20 55.26 39.47 15.78 684.30 59.01 39.76 19.25 684.40 62.97 40.05 22.92 684.50 67.13 40.33 26.80 684.60 71.59 40.62 30.98 684.70 76.26 40.90 35.36 684.80 80.90 41.18 39.72 684.90 85.68 41.45 44.23 685.00 90.50 41.73 48.78 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 37 Stage -Area -Storage for Pond 10P: POND 4 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 677.00 4,560 0 677.10 4,695 463 677.20 4,830 939 677.30 4,965 1,429 677.40 5,100 1,932 677.50 5,235 2,449 677.60 5,369 2,979 677.70 5,504 3,523 677.80 5,639 4,080 677.90 5,774 4,650 678.00 5,909 5,235 678.10 6,096 5,835 678.20 6,283 6,454 678.30 6,470 7,091 678.40 6,657 7,748 678.50 6,845 8,423 678.60 7,032 9,117 678.70 7,219 9,829 678.80 7,406 10,560 678.90 7,593 11,310 679.00 7,780 12,079 679.10 8,069 12,871 679.20 8,357 13,693 679.30 8,646 14,543 679.40 8,935 15,422 679.50 9,224 16,330 679.60 9,512 17,267 679.70 9,801 18,232 679.80 10,090 19,227 679.90 10,378 20,250 680.00 10,667 21,303 680.10 11,008 22,386 680.20 11,349 23,504 680.30 11,690 24,656 680.40 12,031 25,842 680.50 12,372 27,062 680.60 12,712 28,316 680.70 13,053 29,605 680.80 13,394 30,927 680.90 13,735 32,283 681.00 14,076 33,674 681.10 14,439 35,100 681.20 14,803 36,562 681.30 15,166 38,060 681.40 15,530 39,595 681.50 15,893 41,166 681.60 16,256 42,774 681.70 16,620 44,418 681.80 16,983 46,098 681.90 17,347 47,814 682.00 17,710 49,567 682.10 18,096 51,357 682.20 18,482 53,186 682.30 18,868 55,054 682.40 19,254 56,960 682.50 19,641 58,905 682.60 20,027 60,888 682.70 20,413 62,910 682.80 20,799 64,971 682.90 21,185 67,070 683.00 21,571 69,208 683.10 21,980 71,385 683.20 22,389 73,603 683.30 22,797 75,863 683.40 23,206 78,163 683.50 23.615 80.504 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 683.60 24,024 82,886 683.70 24,433 85,309 683.80 24,841 87,772 683.90 25,250 90,277 684.00 25,659 92,823 684.10 26,090 95,410 684.20 26,522 98,041 684.30 26,953 100,714 684.40 27,385 103,431 684.50 27,816 106,191 684.60 28,247 108,994 684.70 28,679 111,841 684.80 29,110 114,730 684.90 29,542 117,663 685.00 29,973 120,639 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HydroCAD®10.00-26 s/n 10066 ©2020 HydroCAD Software Solutions LLC Page 38 Summary for Pond 11 P: POST - OUTFALL #2 Inflow Area = 60.330 ac, 54.75% Impervious, Inflow Depth > 2.99" for 10yr-24hr event Inflow = 40.69 cfs @ 12.19 hrs, Volume= 15.045 of Primary = 40.69 cfs @ 12.19 hrs, Volume= 15.045 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Pond 11 P: POST - OUTFALL #2 Hydrograph ❑ Inflow 44 -r--�---�--�--r--�--�--�--r--�--�--�--+--r--�---�--�--r--�--�-- -L--1---1--L--L-----'-- --L--L--1--J--1--L--1---1--L--L--+--'-- ❑Primary 40.69 cfs-IrtfloW rec a� 40 -- - --;-----1-- --1 - 38 - -L--L--'---'--L--L--1---1--J--1--L--1-J--1--L--1---'--L--L--L--'-- 36 -- --r------- --r-------1--T--Ir----I--T--r-------I--r--Ir---- 34 -- ---------------------------------------------------------- 32 -- --L---------+------- --+-- ------+--L------- --L-- ---- 30 -- T--T------- T --T -- ------T--T-----1 T--T-------T--T--Ir---- 28 - - - - - - - - - - - - - H 26 -- +--+--+-+--+--+--+-+--+--+--+--+-+--+--+----+--+--+--+-+-- 24 3 22 LL 20 rt--r--r-------r--r----y--+--r--r-y--+--r-------rt--r--r--I-- 18 16 -- 1--L--1---'--L--L--'---'--L--L--L----J--L--L-------L--L--L--'-- 14 -- 7--r--li---li----r--Ir--li----r--Ir--li--7--T--r--Ir--li----r--Ir--li-- 12 -- -------------------------------------------------------- 10 -- L---------+------- --+-- ------+--L------- --L-- ---- 8 - - - - - I- - T - - T - - - -II - - T - - T - - Ir - - - - T - - T - - T - - - - -II - - T - - T - - Ir - - - - 6 - - -------------- --------- ---- - ---- - -- --- - - - - - - - 4 2 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 39 Hydrograph for Pond 11 P: POST - OUTFALL #2 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 1.00 0.00 0.00 2.00 0.00 0.00 3.00 0.00 0.00 4.00 0.00 0.00 5.00 0.00 0.00 6.00 0.01 0.01 7.00 0.10 0.10 8.00 0.33 0.33 9.00 0.73 0.73 10.00 1.24 1.24 11.00 1.99 1.99 12.00 15.16 15.16 13.00 16.30 16.30 14.00 10.53 10.53 15.00 8.80 8.80 16.00 7.74 7.74 17.00 6.96 6.96 18.00 6.36 6.36 19.00 5.72 5.72 20.00 5.01 5.01 21.00 4.35 4.35 22.00 3.79 3.79 23.00 3.36 3.36 24.00 3.12 3.12 25.00 2.21 2.21 26.00 2.07 2.07 27.00 2.01 2.01 28.00 1.97 1.97 29.00 1.93 1.93 30.00 1.90 1.90 31.00 1.87 1.87 32.00 1.84 1.84 33.00 1.81 1.81 34.00 1.78 1.78 35.00 1.75 1.75 36.00 1.72 1.72 37.00 1.69 1.69 38.00 1.67 1.67 39.00 1.64 1.64 40.00 1.61 1.61 41.00 1.58 1.58 42.00 1.55 1.55 43.00 1.52 1.52 44.00 1.49 1.49 45.00 1.46 1.46 46.00 1.43 1.43 47.00 1.40 1.40 48.00 1.37 1.37 49.00 1.33 1.33 50.00 1.30 1.30 51.00 1.27 1.27 52.00 1.24 1.24 53.00 1.21 1.21 54.00 1.18 1.18 55.00 1.14 1.14 56.00 1.11 1.11 57.00 1.08 1.08 58.00 1.05 1.05 59.00 1.01 1.01 60.00 0.98 0.98 61.00 0.95 0.95 62.00 0.91 0.91 63.00 0.88 0.88 64.00 0.85 0.85 65.00 0.81 0.81 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 66.00 0.78 0.78 67.00 0.75 0.75 68.00 0.71 0.71 69.00 0.68 0.68 70.00 0.64 0.64 71.00 0.61 0.61 72.00 0.58 0.58 73.00 0.55 0.55 74.00 0.53 0.53 75.00 0.50 0.50 76.00 0.48 0.48 77.00 0.46 0.46 78.00 0.45 0.45 79.00 0.43 0.43 80.00 0.41 0.41 81.00 0.40 0.40 82.00 0.38 0.38 83.00 0.37 0.37 84.00 0.35 0.35 85.00 0.34 0.34 86.00 0.32 0.32 87.00 0.31 0.31 88.00 0.30 0.30 89.00 0.28 0.28 90.00 0.27 0.27 91.00 0.25 0.25 92.00 0.24 0.24 93.00 0.23 0.23 94.00 0.21 0.21 95.00 0.19 0.19 96.00 0.18 0.18 97.00 0.16 0.16 98.00 0.15 0.15 99.00 0.13 0.13 100.00 0.12 0.12 101.00 0.11 0.11 102.00 0.10 0.10 103.00 0.09 0.09 104.00 0.09 0.09 105.00 0.08 0.08 106.00 0.07 0.07 107.00 0.07 0.07 108.00 0.06 0.06 109.00 0.06 0.06 110.00 0.05 0.05 111.00 0.05 0.05 112.00 0.05 0.05 113.00 0.04 0.04 114.00 0.04 0.04 115.00 0.04 0.04 116.00 0.03 0.03 117.00 0.03 0.03 118.00 0.03 0.03 119.00 0.03 0.03 120.00 0.03 0.03 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 40 Summary for Pond 13P: POND 1 Inflow Area = 36.370 ac, 81.50% Impervious, Inflow Depth = 3.94" for 10yr-24hr event Inflow = 238.99 cfs @ 11.95 hrs, Volume= 11.951 of Outflow = 40.96 cfs @ 12.14 hrs, Volume= 11.942 af, Atten= 83%, Lag= 11.2 min Primary = 40.96 cfs @ 12.14 hrs, Volume= 11.942 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 707.75' @ 12.14 hrs Surf.Area= 53,428 sf Storage= 258,505 cf Plug -Flow detention time= 301.6 min calculated for 11.942 of (100% of inflow) Center -of -Mass det. time= 301.0 min ( 1,083.9 - 782.9 ) Volume Invert Avail.Storage Storage Description #1 701.00' 393,227 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 701.00 22,606 0 0 702.00 30,532 26,569 26,569 703.00 33,334 31,933 58,502 704.00 36,378 34,856 93,358 705.00 39,732 38,055 131,413 706.00 43,988 41,860 173,273 707.00 49,187 46,588 219,861 708.00 54,818 52,003 271,863 709.00 60,624 57,721 329,584 710.00 66,662 63,643 393,227 Device Routing Invert Outlet Devices #1 Primary 700.39' 36.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 700.39' / 700.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 7.07 sf #2 Device 1 701.00' 10.0" Vert. 8" Orifice C= 0.600 #3 Device 1 706.00' 36.0" W x 8.0" H Vert. Orifice/Grate X 3.00 C= 0.600 #4 Device 1 708.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 708.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=40.91 cfs @ 12.14 hrs HW=707.75' TW=0.00' (Dynamic Tailwater) 1­1=Culvert (Passes 40.91 cfs of 82.39 cfs potential flow) 2=8" Orifice (Orifice Controls 6.61 cfs @ 12.12 fps) 3=Orifice/Grate (Orifice Controls 34.31 cfs @ 5.72 fps) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=701.00' TW=0.00' (Dynamic Tailwater) T 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 41 '0=6 1 IC AZORII7i Hydrograph 238.99 Cfs ■ inflow -J--J- -- -J--J-----J--J-J--J -'---J-c-J--/-�L-J- ■Outflow - �aflow rAr�ea=36,37-0 at - ■ Primary -J- J--r-J--r-�--r-J--r-J--�- � r r Secondary 260 r� 240 - - --- ---- - -- ---- - -- ---- -F�ea f] eV=7-07.7-51 - 220 Storage=2�58,SOS cf 200 --'- -'--'I--'--'I--'--'I--'--'I--'--'I --'11 --'11 -_--'I --'11 --'11 --'1 -J- J--�-J--�-�--�-J--�-J--i--J--�-J--�--i--�-J--�-J--�-J-- 180 J--�-J--�-�--�-J--�-J--i--J--�-J--�--i--�-J--�-J--�-J-- 140 --i --i--i ---i --i--i ---i --i--i --i--i --i--i --i--i ---i --i-- 0 120 100 80 40.96 cfs - �- -- -- �- -- - - �- -- -- 60 40 0.00 Cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 © 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 13P: POND 1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 701.00 0.00 0.00 0.00 2.50 0.00 0 701.00 0.00 0.00 0.00 5.00 0.54 1,403 701.06 0.02 0.02 0.00 7.50 1.68 9,461 701.39 0.54 0.54 0.00 10.00 4.59 24,596 701.93 1.89 1.89 0.00 12.50 18.07 241,101 707.42 36.45 36.45 0.00 15.00 5.34 178,146 706.11 6.74 6.74 0.00 17.50 3.41 163,477 705.77 5.48 5.48 0.00 20.00 2.32 141,386 705.25 5.14 5.14 0.00 22.50 2.08 116,755 704.63 4.70 4.70 0.00 25.00 0.00 88,131 703.86 4.10 4.10 0.00 27.50 0.00 55,220 702.90 3.20 3.20 0.00 30.00 0.00 30,749 702.14 2.23 2.23 0.00 32.50 0.00 15,384 701.61 1.15 1.15 0.00 35.00 0.00 8,668 701.36 0.46 0.46 0.00 37.50 0.00 5,754 701.24 0.22 0.22 0.00 40.00 0.00 4,232 701.18 0.13 0.13 0.00 42.50 0.00 3,320 701.14 0.08 0.08 0.00 45.00 0.00 2,720 701.12 0.06 0.06 0.00 47.50 0.00 2,298 701.10 0.04 0.04 0.00 50.00 0.00 1,987 701.09 0.03 0.03 0.00 52.50 0.00 1,748 701.08 0.02 0.02 0.00 55.00 0.00 1,559 701.07 0.02 0.02 0.00 57.50 0.00 1,406 701.06 0.02 0.02 0.00 60.00 0.00 1,280 701.06 0.01 0.01 0.00 62.50 0.00 1,175 701.05 0.01 0.01 0.00 65.00 0.00 1,085 701.05 0.01 0.01 0.00 67.50 0.00 1,008 701.04 0.01 0.01 0.00 70.00 0.00 941 701.04 0.01 0.01 0.00 72.50 0.00 882 701.04 0.01 0.01 0.00 75.00 0.00 830 701.04 0.01 0.01 0.00 77.50 0.00 784 701.03 0.00 0.00 0.00 80.00 0.00 742 701.03 0.00 0.00 0.00 82.50 0.00 705 701.03 0.00 0.00 0.00 85.00 0.00 671 701.03 0.00 0.00 0.00 87.50 0.00 640 701.03 0.00 0.00 0.00 90.00 0.00 612 701.03 0.00 0.00 0.00 92.50 0.00 587 701.03 0.00 0.00 0.00 95.00 0.00 563 701.02 0.00 0.00 0.00 97.50 0.00 541 701.02 0.00 0.00 0.00 100.00 0.00 521 701.02 0.00 0.00 0.00 102.50 0.00 502 701.02 0.00 0.00 0.00 105.00 0.00 485 701.02 0.00 0.00 0.00 107.50 0.00 468 701.02 0.00 0.00 0.00 110.00 0.00 453 701.02 0.00 0.00 0.00 112.50 0.00 439 701.02 0.00 0.00 0.00 115.00 0.00 425 701.02 0.00 0.00 0.00 117.50 0.00 413 701.02 0.00 0.00 0.00 120.00 0.00 401 701.02 0.00 0.00 0.00 Type 1124-hr 10yr-24hr Rainfall=4.96" Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 43 Stage -Discharge for Pond 13P: POND 1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 701.00 0.00 0.00 0.00 701.10 0.04 0.04 0.00 701.20 0.15 0.15 0.00 701.30 0.33 0.33 0.00 701.40 0.56 0.56 0.00 701.50 0.82 0.82 0.00 701.60 1.11 1.11 0.00 701.70 1.39 1.39 0.00 701.80 1.64 1.64 0.00 701.90 1.83 1.83 0.00 702.00 2.01 2.01 0.00 702.10 2.17 2.17 0.00 702.20 2.32 2.32 0.00 702.30 2.47 2.47 0.00 702.40 2.60 2.60 0.00 702.50 2.73 2.73 0.00 702.60 2.86 2.86 0.00 702.70 2.98 2.98 0.00 702.80 3.09 3.09 0.00 702.90 3.20 3.20 0.00 703.00 3.30 3.30 0.00 703.10 3.41 3.41 0.00 703.20 3.51 3.51 0.00 703.30 3.60 3.60 0.00 703.40 3.70 3.70 0.00 703.50 3.79 3.79 0.00 703.60 3.88 3.88 0.00 703.70 3.97 3.97 0.00 703.80 4.05 4.05 0.00 703.90 4.14 4.14 0.00 704.00 4.22 4.22 0.00 704.10 4.30 4.30 0.00 704.20 4.38 4.38 0.00 704.30 4.46 4.46 0.00 704.40 4.54 4.54 0.00 704.50 4.61 4.61 0.00 704.60 4.69 4.69 0.00 704.70 4.76 4.76 0.00 704.80 4.83 4.83 0.00 704.90 4.90 4.90 0.00 705.00 4.97 4.97 0.00 705.10 5.04 5.04 0.00 705.20 5.11 5.11 0.00 705.30 5.18 5.18 0.00 705.40 5.24 5.24 0.00 705.50 5.31 5.31 0.00 705.60 5.37 5.37 0.00 705.70 5.44 5.44 0.00 705.80 5.50 5.50 0.00 705.90 5.56 5.56 0.00 706.00 5.62 5.62 0.00 706.10 6.60 6.60 0.00 706.20 8.33 8.33 0.00 706.30 10.55 10.55 0.00 706.40 13.17 13.17 0.00 706.50 16.14 16.14 0.00 706.60 19.41 19.41 0.00 706.70 22.78 22.78 0.00 706.80 25.36 25.36 0.00 706.90 27.56 27.56 0.00 707.00 29.54 29.54 0.00 707.10 31.35 31.35 0.00 707.20 33.04 33.04 0.00 707.30 34.63 34.63 0.00 707.40 36.14 36.14 0.00 707.50 37.57 37.57 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 707.60 38.95 38.95 0.00 707.70 40.27 40.27 0.00 707.80 41.55 41.55 0.00 707.90 42.78 42.78 0.00 708.00 43.97 43.97 0.00 708.10 46.79 46.79 0.00 708.20 50.94 50.94 0.00 708.30 55.95 55.95 0.00 708.40 61.66 61.66 0.00 708.50 67.97 67.97 0.00 708.60 75.60 74.81 0.79 708.70 84.36 82.14 2.23 708.80 93.62 89.47 4.15 708.90 96.59 90.11 6.48 709.00 100.05 90.75 9.30 709.10 103.94 91.39 12.55 709.20 107.80 92.02 15.78 709.30 111.90 92.65 19.25 709.40 116.20 93.27 22.92 709.50 120.69 93.89 26.80 709.60 125.48 94.50 30.98 709.70 130.48 95.12 35.36 709.80 135.45 95.72 39.72 709.90 140.55 96.33 44.23 710.00 145.70 96.93 48.78 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 44 Stage -Area -Storage for Pond 13P: POND 1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 701.00 22,606 0 701.10 23,399 2,300 701.20 24,191 4,680 701.30 24,984 7,138 701.40 25,776 9,676 701.50 26,569 12,294 701.60 27,362 14,990 701.70 28,154 17,766 701.80 28,947 20,621 701.90 29,739 23,555 702.00 30,532 26,569 702.10 30,812 29,636 702.20 31,092 32,731 702.30 31,373 35,855 702.40 31,653 39,006 702.50 31,933 42,185 702.60 32,213 45,393 702.70 32,493 48,628 702.80 32,774 51,891 702.90 33,054 55,183 703.00 33,334 58,502 703.10 33,638 61,851 703.20 33,943 65,230 703.30 34,247 68,639 703.40 34,552 72,079 703.50 34,856 75,550 703.60 35,160 79,050 703.70 35,465 82,582 703.80 35,769 86,143 703.90 36,074 89,735 704.00 36,378 93,358 704.10 36,713 97,013 704.20 37,049 100,701 704.30 37,384 104,422 704.40 37,720 108,178 704.50 38,055 111,966 704.60 38,390 115,789 704.70 38,726 119,644 704.80 39,061 123,534 704.90 39,397 127,457 705.00 39,732 131,413 705.10 40,158 135,407 705.20 40,583 139,445 705.30 41,009 143,524 705.40 41,434 147,646 705.50 41,860 151,811 705.60 42,286 156,018 705.70 42,711 160,268 705.80 43,137 164,561 705.90 43,562 168,895 706.00 43,988 173,273 706.10 44,508 177,698 706.20 45,028 182,175 706.30 45,548 186,703 706.40 46,068 191,284 706.50 46,588 195,917 706.60 47,107 200,602 706.70 47,627 205,338 706.80 48,147 210,127 706.90 48,667 214,968 707.00 49,187 219,861 707.10 49,750 224,807 707.20 50,313 229,811 707.30 50,876 234,870 707.40 51,439 239,986 707.50 52.003 245.158 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 707.60 52,566 250,386 707.70 53,129 255,671 707.80 53,692 261,012 707.90 54,255 266,409 708.00 54,818 271,863 708.10 55,399 277,374 708.20 55,979 282,943 708.30 56,560 288,570 708.40 57,140 294,255 708.50 57,721 299,998 708.60 58,302 305,799 708.70 58,882 311,658 708.80 59,463 317,575 708.90 60,043 323,551 709.00 60,624 329,584 709.10 61,228 335,677 709.20 61,832 341,830 709.30 62,435 348,043 709.40 63,039 354,317 709.50 63,643 360,651 709.60 64,247 367,045 709.70 64,851 373,500 709.80 65,454 380,015 709.90 66,058 386,591 710.00 66,662 393,227 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 45 Summary for Pond 15P: POND 6 Inflow Area = 13.860 ac, 74.39% Impervious, Inflow Depth = 3.73" for 10yr-24hr event Inflow = 87.79 cfs @ 11.95 hrs, Volume= 4.312 of Outflow = 6.77 cfs @ 12.50 hrs, Volume= 4.300 af, Atten= 92%, Lag= 32.8 min Primary = 6.77 cfs @ 12.50 hrs, Volume= 4.300 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 680.19' @ 12.50 hrs Surf.Area= 37,545 sf Storage= 103,430 cf Plug -Flow detention time= 326.4 min calculated for 4.300 of (100% of inflow) Center -of -Mass det. time= 324.5 min ( 1,115.1 - 790.6 ) Volume Invert Avail.Storage Storage Description #1 677.00' 270,951 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 677.00 27,493 0 0 678.00 30,495 28,994 28,994 679.00 33,652 32,074 61,068 680.00 36,914 35,283 96,351 681.00 40,232 38,573 134,924 682.00 43,608 41,920 176,844 683.00 47,039 45,324 222,167 684.00 50,528 48,784 270,951 Device Routing Invert Outlet Devices #1 Primary 676.39' 36.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 676.39' / 676.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 7.07 sf #2 Device 1 677.00' 10.0" Vert. 8" Orifice C= 0.600 #3 Device 1 680.00' 36.0" W x 8.0" H Vert. Orifice/Grate X 3.00 C= 0.600 #4 Device 1 682.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 682.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=6.77 cfs @ 12.50 hrs HW=680.19' TW=0.00' (Dynamic Tailwater) 1­1=Culvert (Passes 6.77 cfs of 46.69 cfs potential flow) 2=8" Orifice (Orifice Controls 4.37 cfs @ 8.02 fps) 3=Orifice/Grate (Orifice Controls 2.40 cfs @ 1.40 fps) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=677.00' TW=0.00' (Dynamic Tailwater) T 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 46 '0=6 1 gMiMR09]i:I1I:j Hydrograph i - 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 © 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 15P: POND 6 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 677.00 0.00 0.00 0.00 2.50 0.00 0 677.00 0.00 0.00 0.00 5.00 0.10 136 677.00 0.00 0.00 0.00 7.50 0.49 2,632 677.10 0.04 0.04 0.00 10.00 1.52 9,300 677.33 0.40 0.40 0.00 12.50 6.73 103,430 680.19 6.77 6.77 0.00 15.00 2.00 88,919 679.80 4.05 4.05 0.00 17.50 1.28 68,649 679.22 3.53 3.53 0.00 20.00 0.87 49,290 678.64 2.91 2.91 0.00 22.50 0.78 33,504 678.15 2.24 2.24 0.00 25.00 0.00 20,706 677.72 1.46 1.46 0.00 27.50 0.00 11,918 677.42 0.62 0.62 0.00 30.00 0.00 8,003 677.29 0.30 0.30 0.00 32.50 0.00 5,936 677.21 0.17 0.17 0.00 35.00 0.00 4,687 677.17 0.11 0.11 0.00 37.50 0.00 3,859 677.14 0.08 0.08 0.00 40.00 0.00 3,274 677.12 0.06 0.06 0.00 42.50 0.00 2,839 677.10 0.04 0.04 0.00 45.00 0.00 2,504 677.09 0.03 0.03 0.00 47.50 0.00 2,239 677.08 0.03 0.03 0.00 50.00 0.00 2,023 677.07 0.02 0.02 0.00 52.50 0.00 1,845 677.07 0.02 0.02 0.00 55.00 0.00 1,695 677.06 0.02 0.02 0.00 57.50 0.00 1,568 677.06 0.01 0.01 0.00 60.00 0.00 1,458 677.05 0.01 0.01 0.00 62.50 0.00 1,362 677.05 0.01 0.01 0.00 65.00 0.00 1,278 677.05 0.01 0.01 0.00 67.50 0.00 1,204 677.04 0.01 0.01 0.00 70.00 0.00 1,138 677.04 0.01 0.01 0.00 72.50 0.00 1,078 677.04 0.01 0.01 0.00 75.00 0.00 1,025 677.04 0.01 0.01 0.00 77.50 0.00 976 677.04 0.01 0.01 0.00 80.00 0.00 932 677.03 0.00 0.00 0.00 82.50 0.00 892 677.03 0.00 0.00 0.00 85.00 0.00 855 677.03 0.00 0.00 0.00 87.50 0.00 821 677.03 0.00 0.00 0.00 90.00 0.00 789 677.03 0.00 0.00 0.00 92.50 0.00 760 677.03 0.00 0.00 0.00 95.00 0.00 733 677.03 0.00 0.00 0.00 97.50 0.00 708 677.03 0.00 0.00 0.00 100.00 0.00 684 677.02 0.00 0.00 0.00 102.50 0.00 662 677.02 0.00 0.00 0.00 105.00 0.00 641 677.02 0.00 0.00 0.00 107.50 0.00 622 677.02 0.00 0.00 0.00 110.00 0.00 603 677.02 0.00 0.00 0.00 112.50 0.00 586 677.02 0.00 0.00 0.00 115.00 0.00 570 677.02 0.00 0.00 0.00 117.50 0.00 554 677.02 0.00 0.00 0.00 120.00 0.00 540 677.02 0.00 0.00 0.00 Type 1124-hr 10yr-24hr Rainfall=4.96" Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 48 Stage -Discharge for Pond 15P: POND 6 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 677.00 0.00 0.00 0.00 677.10 0.04 0.04 0.00 677.20 0.15 0.15 0.00 677.30 0.33 0.33 0.00 677.40 0.56 0.56 0.00 677.50 0.82 0.82 0.00 677.60 1.11 1.11 0.00 677.70 1.39 1.39 0.00 677.80 1.64 1.64 0.00 677.90 1.83 1.83 0.00 678.00 2.01 2.01 0.00 678.10 2.17 2.17 0.00 678.20 2.32 2.32 0.00 678.30 2.47 2.47 0.00 678.40 2.60 2.60 0.00 678.50 2.73 2.73 0.00 678.60 2.86 2.86 0.00 678.70 2.98 2.98 0.00 678.80 3.09 3.09 0.00 678.90 3.20 3.20 0.00 679.00 3.30 3.30 0.00 679.10 3.41 3.41 0.00 679.20 3.51 3.51 0.00 679.30 3.60 3.60 0.00 679.40 3.70 3.70 0.00 679.50 3.79 3.79 0.00 679.60 3.88 3.88 0.00 679.70 3.97 3.97 0.00 679.80 4.05 4.05 0.00 679.90 4.14 4.14 0.00 680.00 4.22 4.22 0.00 680.10 5.22 5.22 0.00 680.20 6.97 6.97 0.00 680.30 9.21 9.21 0.00 680.40 11.84 11.84 0.00 680.50 14.83 14.83 0.00 680.60 18.11 18.11 0.00 680.70 21.50 21.50 0.00 680.80 24.10 24.10 0.00 680.90 26.31 26.31 0.00 681.00 28.30 28.30 0.00 681.10 30.13 30.13 0.00 681.20 31.83 31.83 0.00 681.30 33.44 33.44 0.00 681.40 34.95 34.95 0.00 681.50 36.40 36.40 0.00 681.60 37.79 37.79 0.00 681.70 39.12 39.12 0.00 681.80 40.41 40.41 0.00 681.90 41.65 41.65 0.00 682.00 42.86 42.86 0.00 682.10 45.68 45.68 0.00 682.20 49.84 49.84 0.00 682.30 54.87 54.87 0.00 682.40 60.59 60.59 0.00 682.50 66.90 66.90 0.00 682.60 74.54 73.75 0.79 682.70 76.87 74.64 2.23 682.80 79.57 75.42 4.15 682.90 82.66 76.18 6.48 683.00 86.24 76.94 9.30 683.10 90.23 77.69 12.55 683.20 94.21 78.43 15.78 683.30 98.41 79.16 19.25 683.40 102.82 79.89 22.92 683.50 107.41 80.61 26.80 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 683.60 112.31 81.33 30.98 683.70 117.40 82.04 35.36 683.80 122.46 82.74 39.72 683.90 127.67 83.44 44.23 684.00 132.90 84.13 48.78 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 49 Stage -Area -Storage for Pond 15P: POND 6 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 677.00 27,493 0 677.10 27,793 2,764 677.20 28,093 5,559 677.30 28,394 8,383 677.40 28,694 11,237 677.50 28,994 14,122 677.60 29,294 17,036 677.70 29,594 19,981 677.80 29,895 22,955 677.90 30,195 25,960 678.00 30,495 28,994 678.10 30,811 32,059 678.20 31,126 35,156 678.30 31,442 38,285 678.40 31,758 41,445 678.50 32,074 44,636 678.60 32,389 47,859 678.70 32,705 51,114 678.80 33,021 54,400 678.90 33,336 57,718 679.00 33,652 61,068 679.10 33,978 64,449 679.20 34,304 67,863 679.30 34,631 71,310 679.40 34,957 74,789 679.50 35,283 78,301 679.60 35,609 81,846 679.70 35,935 85,423 679.80 36,262 89,033 679.90 36,588 92,675 680.00 36,914 96,351 680.10 37,246 100,058 680.20 37,578 103,800 680.30 37,909 107,574 680.40 38,241 111,382 680.50 38,573 115,222 680.60 38,905 119,096 680.70 39,237 123,003 680.80 39,568 126,943 680.90 39,900 130,917 681.00 40,232 134,924 681.10 40,570 138,964 681.20 40,907 143,037 681.30 41,245 147,145 681.40 41,582 151,286 681.50 41,920 155,462 681.60 42,258 159,670 681.70 42,595 163,913 681.80 42,933 168,189 681.90 43,270 172,500 682.00 43,608 176,844 682.10 43,951 181,221 682.20 44,294 185,634 682.30 44,637 190,080 682.40 44,980 194,561 682.50 45,324 199,076 682.60 45,667 203,626 682.70 46,010 208,210 682.80 46,353 212,828 682.90 46,696 217,480 683.00 47,039 222,167 683.10 47,388 226,888 683.20 47,737 231,645 683.30 48,086 236,436 683.40 48,435 241,262 683.50 48.784 246.123 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 683.60 49,132 251,018 683.70 49,481 255,949 683.80 49,830 260,915 683.90 50,179 265,915 684.00 50,528 270,951 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HydroCAD®10.00-26 s/n 10066 ©2020 HydroCAD Software Solutions LLC Page 50 Summary for Pond 18P: POST - OUTFALL #1 Inflow Area = 48.760 ac, 68.58% Impervious, Inflow Depth = 3.49" for 10yr-24hr event Inflow = 75.87 cfs @ 12.00 hrs, Volume= 14.180 of Primary = 75.87 cfs @ 12.00 hrs, Volume= 14.180 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Pond 18P: POST - OUTFALL #1 Hydrograph -- ——--r---------r---------+--r------+--r-------rt--r--'r--'i-- ❑ Inflow � ❑ Primary 80 75.87 cfs----------- ------------ -Iore- r��0-a 75 70 65 -- -7--r-----'-- --r--' --'-- --r--' --'----T--r-----'-- --r--' --'-- 60 __ 55 50 -1--L--1---'--1--L--1---1--J--1--L--1--J--1--L--1---'--1--L--�--'-- 45 lL 35 30 25 15 -- -r-------I--r --' --'-- --r--' --'----T--r-----'-- --r--' --'-- - 10 __ 5 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 51 Hydrograph for Pond 18P: POST - OUTFALL #1 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 1.00 0.00 0.00 2.00 0.00 0.00 3.00 0.00 0.00 4.00 0.00 0.00 5.00 0.02 0.02 6.00 0.11 0.11 7.00 0.36 0.36 8.00 0.75 0.75 9.00 1.32 1.32 10.00 2.02 2.02 11.00 3.34 3.34 12.00 75.87 75.87 13.00 28.02 28.02 14.00 11.61 11.61 15.00 8.10 8.10 16.00 6.69 6.69 17.00 6.48 6.48 18.00 6.26 6.26 19.00 6.02 6.02 20.00 5.76 5.76 21.00 5.56 5.56 22.00 5.36 5.36 23.00 5.16 5.16 24.00 4.95 4.95 25.00 4.10 4.10 26.00 3.75 3.75 27.00 3.39 3.39 28.00 3.01 3.01 29.00 2.62 2.62 30.00 2.23 2.23 31.00 1.82 1.82 32.00 1.38 1.38 33.00 0.95 0.95 34.00 0.65 0.65 35.00 0.46 0.46 36.00 0.34 0.34 37.00 0.26 0.26 38.00 0.20 0.20 39.00 0.16 0.16 40.00 0.13 0.13 41.00 0.10 0.10 42.00 0.09 0.09 43.00 0.07 0.07 44.00 0.06 0.06 45.00 0.06 0.06 46.00 0.05 0.05 47.00 0.04 0.04 48.00 0.04 0.04 49.00 0.03 0.03 50.00 0.03 0.03 51.00 0.03 0.03 52.00 0.02 0.02 53.00 0.02 0.02 54.00 0.02 0.02 55.00 0.02 0.02 56.00 0.02 0.02 57.00 0.02 0.02 58.00 0.01 0.01 59.00 0.01 0.01 60.00 0.01 0.01 61.00 0.01 0.01 62.00 0.01 0.01 63.00 0.01 0.01 64.00 0.01 0.01 65.00 0.01 0.01 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 66.00 0.01 0.01 67.00 0.01 0.01 68.00 0.01 0.01 69.00 0.01 0.01 70.00 0.01 0.01 71.00 0.01 0.01 72.00 0.01 0.01 73.00 0.01 0.01 74.00 0.01 0.01 75.00 0.01 0.01 76.00 0.01 0.01 77.00 0.00 0.00 78.00 0.00 0.00 79.00 0.00 0.00 80.00 0.00 0.00 81.00 0.00 0.00 82.00 0.00 0.00 83.00 0.00 0.00 84.00 0.00 0.00 85.00 0.00 0.00 86.00 0.00 0.00 87.00 0.00 0.00 88.00 0.00 0.00 89.00 0.00 0.00 90.00 0.00 0.00 91.00 0.00 0.00 92.00 0.00 0.00 93.00 0.00 0.00 94.00 0.00 0.00 95.00 0.00 0.00 96.00 0.00 0.00 97.00 0.00 0.00 98.00 0.00 0.00 99.00 0.00 0.00 100.00 0.00 0.00 101.00 0.00 0.00 102.00 0.00 0.00 103.00 0.00 0.00 104.00 0.00 0.00 105.00 0.00 0.00 106.00 0.00 0.00 107.00 0.00 0.00 108.00 0.00 0.00 109.00 0.00 0.00 110.00 0.00 0.00 111.00 0.00 0.00 112.00 0.00 0.00 113.00 0.00 0.00 114.00 0.00 0.00 115.00 0.00 0.00 116.00 0.00 0.00 117.00 0.00 0.00 118.00 0.00 0.00 119.00 0.00 0.00 120.00 0.00 0.00 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hr Rainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HydroCAD®10.00-26 s/n 10066 ©2020 HydroCAD Software Solutions LLC Page 52 Summary for Pond 21 P: POST - OUTFALL #3 Inflow Area = 17.630 ac, 58.48% Impervious, Inflow Depth > 3.19" for 10yr-24hr event Inflow = 9.64 cfs @ 12.23 hrs, Volume= 4.681 of Primary = 9.64 cfs @ 12.23 hrs, Volume= 4.681 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Pond 21 P: POST - OUTFALL #3 Hydrograph -'-----'-- I'I --' --------'I--' --------'-- I'I --'-----'-- I'I ---'-- ❑ Inflow 9.64 CfS ❑ Primary 10 rt--r----------t-------�-- irtfloW r',e�=17,630Ya - 9 I I I I - -'- -'---' - -I 1---I I ----'-- --I Y--Y--_____Y--Y_____--Y--Y--Y----Y--Y--Y-----I--Y Y--Y--I-- i I I I I I I I I I I I I I I I I I I I I I I I 7 __I L__L__I___I__ __L__I___I__J__L__L__I__J__ L__L__I--- I__L__L__L__I__ w 6 i I I I I I I I I I I I I I I I I I I I I I I Q rj LL 4- 3- 2- 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 10yr-24hrRainfall=4.96" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 53 Hydrograph for Pond 21 P: POST - OUTFALL #3 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 1.00 0.00 0.00 2.00 0.00 0.00 3.00 0.00 0.00 4.00 0.00 0.00 5.00 0.00 0.00 6.00 0.00 0.00 7.00 0.02 0.02 8.00 0.06 0.06 9.00 0.17 0.17 10.00 0.40 0.40 11.00 0.91 0.91 12.00 5.78 5.78 13.00 6.42 6.42 14.00 4.60 4.60 15.00 4.35 4.35 16.00 4.10 4.10 17.00 3.85 3.85 18.00 3.60 3.60 19.00 3.33 3.33 20.00 3.05 3.05 21.00 2.77 2.77 22.00 2.50 2.50 23.00 2.24 2.24 24.00 1.98 1.98 25.00 1.46 1.46 26.00 1.03 1.03 27.00 0.73 0.73 28.00 0.53 0.53 29.00 0.39 0.39 30.00 0.30 0.30 31.00 0.24 0.24 32.00 0.19 0.19 33.00 0.16 0.16 34.00 0.13 0.13 35.00 0.11 0.11 36.00 0.09 0.09 37.00 0.08 0.08 38.00 0.07 0.07 39.00 0.06 0.06 40.00 0.06 0.06 41.00 0.05 0.05 42.00 0.04 0.04 43.00 0.04 0.04 44.00 0.04 0.04 45.00 0.03 0.03 46.00 0.03 0.03 47.00 0.03 0.03 48.00 0.03 0.03 49.00 0.02 0.02 50.00 0.02 0.02 51.00 0.02 0.02 52.00 0.02 0.02 53.00 0.02 0.02 54.00 0.02 0.02 55.00 0.02 0.02 56.00 0.01 0.01 57.00 0.01 0.01 58.00 0.01 0.01 59.00 0.01 0.01 60.00 0.01 0.01 61.00 0.01 0.01 62.00 0.01 0.01 63.00 0.01 0.01 64.00 0.01 0.01 65.00 0.01 0.01 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 66.00 0.01 0.01 67.00 0.01 0.01 68.00 0.01 0.01 69.00 0.01 0.01 70.00 0.01 0.01 71.00 0.01 0.01 72.00 0.01 0.01 73.00 0.01 0.01 74.00 0.01 0.01 75.00 0.01 0.01 76.00 0.01 0.01 77.00 0.01 0.01 78.00 0.01 0.01 79.00 0.00 0.00 80.00 0.00 0.00 81.00 0.00 0.00 82.00 0.00 0.00 83.00 0.00 0.00 84.00 0.00 0.00 85.00 0.00 0.00 86.00 0.00 0.00 87.00 0.00 0.00 88.00 0.00 0.00 89.00 0.00 0.00 90.00 0.00 0.00 91.00 0.00 0.00 92.00 0.00 0.00 93.00 0.00 0.00 94.00 0.00 0.00 95.00 0.00 0.00 96.00 0.00 0.00 97.00 0.00 0.00 98.00 0.00 0.00 99.00 0.00 0.00 100.00 0.00 0.00 101.00 0.00 0.00 102.00 0.00 0.00 103.00 0.00 0.00 104.00 0.00 0.00 105.00 0.00 0.00 106.00 0.00 0.00 107.00 0.00 0.00 108.00 0.00 0.00 109.00 0.00 0.00 110.00 0.00 0.00 111.00 0.00 0.00 112.00 0.00 0.00 113.00 0.00 0.00 114.00 0.00 0.00 115.00 0.00 0.00 116.00 0.00 0.00 117.00 0.00 0.00 118.00 0.00 0.00 119.00 0.00 0.00 120.00 0.00 0.00 OAK E N G I N E E R I N G HYDROCAD OUTPUT 25-YEAR, 24-HOUR STORM EVENT (PONDS ONLY) TriWest Building 2 SWM (Wet Ponds) Type/1 24-hr 25yr-24hrRainfall=5.90" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 1 Summary for Pond 2P: POND 2 Inflow Area = 19.790 ac, 74.23% Impervious, Inflow Depth = 4.53" for 25yr-24hr event Inflow = 151.16 cfs @ 11.95 hrs, Volume= 7.470 of Outflow = 27.76 cfs @ 12.13 hrs, Volume= 7.452 af, Atten= 82%, Lag= 10.4 min Primary = 27.76 cfs @ 12.13 hrs, Volume= 7.452 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 716.74' @ 12.13 hrs Surf.Area= 33,484 sf Storage= 170,040 cf Plug -Flow detention time= 703.2 min calculated for 7.452 of (100% of inflow) Center -of -Mass det. time= 701.6 min ( 1,489.5 - 787.9 ) Volume Invert Avail.Storage Storage Description #1 710.50' 290,610 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 710.50 20,568 0 0 711.00 22,310 10,720 10,720 712.00 24,113 23,212 33,931 713.00 25,975 25,044 58,975 714.00 27,897 26,936 85,911 715.00 29,879 28,888 114,799 716.00 31,920 30,900 145,699 717.00 34,021 32,971 178,669 718.00 36,183 35,102 213,771 719.00 38,404 37,294 251,065 720.00 40,686 39,545 290,610 Device Routing Invert Outlet Devices #1 Primary 709.39' 24.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 709.39' / 709.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 710.50' 4.5" Vert. 4.5" Orifice C= 0.600 #3 Device 1 715.00' 36.0" W x 6.0" H Vert. Slotted Weirs X 3.00 C= 0.600 #4 Device 1 718.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 718.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=27.72 cfs @ 12.13 hrs HW=716.74' TW=0.00' (Dynamic Tailwater) L1=Culvert (Passes 27.72 cfs of 38.12 cfs potential flow) 2=4.5" Orifice (Orifice Controls 1.31 cfs @ 11.85 fps) 3=Slotted Weirs (Orifice Controls 26.42 cfs @ 5.87 fps) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=710.50' TW=0.00' (Dynamic Tailwater) 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 25yr-24hr Rainfall=5.90" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 2 Pond 2P: POND 2 Hydrograph 151.16 cfS Outflow I a low Areea=-19790rae - IMInflow Primary Secondary 160 - - --------,-- -------,-- -------,-- -- - - -� r- Peak BeV=r716.74 150 - - - F SIvra�je_'h7�7{040 f 130 - - - I - 120 - - -- - -- - --r- -- - -- - -- - -- ----r- -- - --r- -- 110 - - -- - -- - --r- -- - -- - -- - -- ----r- -- - --r- -- 100 - - -- - -- - --r--1 r--1 -r--r-r--r----r--1 r-r- -r- -I-- w 90 Z-r- r--r-r--r-r--r-r--r-r--r-r--r-r--r----r-r--r-r--r-r-- 0 80 -,- --r- --r- --r- --r-,---- --r- --r----r---r-,--r- -- LL 70 __-----r---r------------r----r------r-�-- 60 50 -,- --r- -r- --r- --r- --r- --r-,---- --r- --r- --r-7--r----r----r----r----r-7-- --r----r---r-,--r- -- ao 27.76 cfs J'--r- -- - -- ---- - -- --------- - -- ---- - ------r-,- 30 20 0.00 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 © 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 2P: POND 2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 710.50 0.00 0.00 0.00 2.50 0.00 0 710.50 0.00 0.00 0.00 5.00 0.23 415 710.52 0.00 0.00 0.00 7.50 0.92 5,109 710.74 0.13 0.13 0.00 10.00 2.71 17,464 711.30 0.42 0.42 0.00 12.50 11.53 157,294 716.36 24.04 24.04 0.00 15.00 3.42 120,978 715.21 3.82 3.82 0.00 17.50 2.19 118,453 715.12 2.35 2.35 0.00 20.00 1.49 116,958 715.07 1.67 1.67 0.00 22.50 1.33 116,150 715.05 1.39 1.39 0.00 25.00 0.00 112,132 714.91 1.09 1.09 0.00 27.50 0.00 102,491 714.58 1.05 1.05 0.00 30.00 0.00 93,244 714.26 1.01 1.01 0.00 32.50 0.00 84,400 713.95 0.96 0.96 0.00 35.00 0.00 75,968 713.64 0.91 0.91 0.00 37.50 0.00 67,957 713.34 0.87 0.87 0.00 40.00 0.00 60,377 713.05 0.82 0.82 0.00 42.50 0.00 53,235 712.78 0.77 0.77 0.00 45.00 0.00 46,542 712.51 0.72 0.72 0.00 47.50 0.00 40,305 712.26 0.67 0.67 0.00 50.00 0.00 34,535 712.03 0.62 0.62 0.00 52.50 0.00 29,238 711.80 0.56 0.56 0.00 55.00 0.00 24,423 711.60 0.51 0.51 0.00 57.50 0.00 20,098 711.41 0.45 0.45 0.00 60.00 0.00 16,269 711.25 0.40 0.40 0.00 62.50 0.00 12,944 711.10 0.34 0.34 0.00 65.00 0.00 10,128 710.97 0.28 0.28 0.00 67.50 0.00 7,828 710.87 0.23 0.23 0.00 70.00 0.00 6,053 710.79 0.17 0.17 0.00 72.50 0.00 4,803 710.73 0.12 0.12 0.00 75.00 0.00 3,928 710.69 0.08 0.08 0.00 77.50 0.00 3,297 710.66 0.06 0.06 0.00 80.00 0.00 2,827 710.64 0.05 0.05 0.00 82.50 0.00 2,467 710.62 0.04 0.04 0.00 85.00 0.00 2,184 710.61 0.03 0.03 0.00 87.50 0.00 1,956 710.59 0.02 0.02 0.00 90.00 0.00 1,770 710.59 0.02 0.02 0.00 92.50 0.00 1,615 710.58 0.02 0.02 0.00 95.00 0.00 1,483 710.57 0.01 0.01 0.00 97.50 0.00 1,371 710.57 0.01 0.01 0.00 100.00 0.00 1,274 710.56 0.01 0.01 0.00 102.50 0.00 1,190 710.56 0.01 0.01 0.00 105.00 0.00 1,116 710.55 0.01 0.01 0.00 107.50 0.00 1,050 710.55 0.01 0.01 0.00 110.00 0.00 991 710.55 0.01 0.01 0.00 112.50 0.00 939 710.55 0.01 0.01 0.00 115.00 0.00 892 710.54 0.01 0.01 0.00 117.50 0.00 849 710.54 0.00 0.00 0.00 120.00 0.00 810 710.54 0.00 0.00 0.00 Type/1 24-hr 25yr-24hr Rainfall=5.90" Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type/1 24-hr 25yr-24hrRainfall=5.90" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 4 Stage -Discharge for Pond 2P: POND 2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 710.50 0.00 0.00 0.00 710.60 0.03 0.03 0.00 710.70 0.09 0.09 0.00 710.80 0.18 0.18 0.00 710.90 0.25 0.25 0.00 711.00 0.30 0.30 0.00 711.10 0.34 0.34 0.00 711.20 0.38 0.38 0.00 711.30 0.42 0.42 0.00 711.40 0.45 0.45 0.00 711.50 0.48 0.48 0.00 711.60 0.51 0.51 0.00 711.70 0.54 0.54 0.00 711.80 0.56 0.56 0.00 711.90 0.59 0.59 0.00 712.00 0.61 0.61 0.00 712.10 0.63 0.63 0.00 712.20 0.65 0.65 0.00 712.30 0.68 0.68 0.00 712.40 0.70 0.70 0.00 712.50 0.72 0.72 0.00 712.60 0.74 0.74 0.00 712.70 0.75 0.75 0.00 712.80 0.77 0.77 0.00 712.90 0.79 0.79 0.00 713.00 0.81 0.81 0.00 713.10 0.83 0.83 0.00 713.20 0.84 0.84 0.00 713.30 0.86 0.86 0.00 713.40 0.88 0.88 0.00 713.50 0.89 0.89 0.00 713.60 0.91 0.91 0.00 713.70 0.92 0.92 0.00 713.80 0.94 0.94 0.00 713.90 0.95 0.95 0.00 714.00 0.97 0.97 0.00 714.10 0.98 0.98 0.00 714.20 1.00 1.00 0.00 714.30 1.01 1.01 0.00 714.40 1.02 1.02 0.00 714.50 1.04 1.04 0.00 714.60 1.05 1.05 0.00 714.70 1.07 1.07 0.00 714.80 1.08 1.08 0.00 714.90 1.09 1.09 0.00 715.00 1.10 1.10 0.00 715.10 2.03 2.03 0.00 715.20 3.71 3.71 0.00 715.30 5.89 5.89 0.00 715.40 8.46 8.46 0.00 715.50 11.38 11.38 0.00 715.60 13.69 13.69 0.00 715.70 15.53 15.53 0.00 715.80 17.13 17.13 0.00 715.90 18.57 18.57 0.00 716.00 19.90 19.90 0.00 716.10 21.14 21.14 0.00 716.20 22.31 22.31 0.00 716.30 23.41 23.41 0.00 716.40 24.46 24.46 0.00 716.50 25.47 25.47 0.00 716.60 26.43 26.43 0.00 716.70 27.36 27.36 0.00 716.80 28.26 28.26 0.00 716.90 29.13 29.13 0.00 717.00 29.97 29.97 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 717.10 30.80 30.80 0.00 717.20 31.59 31.59 0.00 717.30 32.37 32.37 0.00 717.40 33.13 33.13 0.00 717.50 33.87 33.87 0.00 717.60 34.60 34.60 0.00 717.70 35.31 35.31 0.00 717.80 36.00 36.00 0.00 717.90 36.69 36.69 0.00 718.00 37.36 37.36 0.00 718.10 39.67 39.67 0.00 718.20 42.27 42.27 0.00 718.30 42.54 42.54 0.00 718.40 42.81 42.81 0.00 718.50 43.08 43.08 0.00 718.60 44.13 43.34 0.79 718.70 45.83 43.61 2.23 718.80 48.02 43.87 4.15 718.90 50.60 44.13 6.48 719.00 53.68 44.39 9.30 719.10 57.19 44.64 12.55 719.20 60.68 44.90 15.78 719.30 64.40 45.15 19.25 719.40 68.33 45.41 22.92 719.50 72.46 45.66 26.80 719.60 76.88 45.91 30.98 719.70 81.52 46.16 35.36 719.80 86.13 46.40 39.72 719.90 90.88 46.65 44.23 720.00 95.67 46.89 48.78 TriWest Building 2 SWM (Wet Ponds) Type/1 24-hr 25yr-24hrRainfall=5.90" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 5 Stage -Area -Storage for Pond 2P: POND 2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 710.50 20,568 0 710.60 20,916 2,074 710.70 21,265 4,183 710.80 21,613 6,327 710.90 21,962 8,506 711.00 22,310 10,720 711.10 22,490 12,960 711.20 22,671 15,218 711.30 22,851 17,494 711.40 23,031 19,788 711.50 23,212 22,100 711.60 23,392 24,430 711.70 23,572 26,778 711.80 23,752 29,144 711.90 23,933 31,529 712.00 24,113 33,931 712.10 24,299 36,352 712.20 24,485 38,791 712.30 24,672 41,249 712.40 24,858 43,725 712.50 25,044 46,220 712.60 25,230 48,734 712.70 25,416 51,266 712.80 25,603 53,817 712.90 25,789 56,387 713.00 25,975 58,975 713.10 26,167 61,582 713.20 26,359 64,208 713.30 26,552 66,854 713.40 26,744 69,519 713.50 26,936 72,203 713.60 27,128 74,906 713.70 27,320 77,628 713.80 27,513 80,370 713.90 27,705 83,131 714.00 27,897 85,911 714.10 28,095 88,711 714.20 28,293 91,530 714.30 28,492 94,369 714.40 28,690 97,228 714.50 28,888 100,107 714.60 29,086 103,006 714.70 29,284 105,924 714.80 29,483 108,863 714.90 29,681 111,821 715.00 29,879 114,799 715.10 30,083 117,797 715.20 30,287 120,816 715.30 30,491 123,855 715.40 30,695 126,914 715.50 30,900 129,994 715.60 31,104 133,094 715.70 31,308 136,214 715.80 31,512 139,355 715.90 31,716 142,517 716.00 31,920 145,699 716.10 32,130 148,901 716.20 32,340 152,125 716.30 32,550 155,369 716.40 32,760 158,635 716.50 32,971 161,921 716.60 33,181 165,229 716.70 33,391 168,557 716.80 33,601 171,907 716.90 33,811 175,277 717.00 34.021 178.669 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 717.10 34,237 182,082 717.20 34,453 185,516 717.30 34,670 188,973 717.40 34,886 192,450 717.50 35,102 195,950 717.60 35,318 199,471 717.70 35,534 203,013 717.80 35,751 206,578 717.90 35,967 210,164 718.00 36,183 213,771 718.10 36,405 217,400 718.20 36,627 221,052 718.30 36,849 224,726 718.40 37,071 228,422 718.50 37,294 232,140 718.60 37,516 235,881 718.70 37,738 239,643 718.80 37,960 243,428 718.90 38,182 247,235 719.00 38,404 251,065 719.10 38,632 254,916 719.20 38,860 258,791 719.30 39,089 262,688 719.40 39,317 266,609 719.50 39,545 270,552 719.60 39,773 274,518 719.70 40,001 278,506 719.80 40,230 282,518 719.90 40,458 286,552 720.00 40,686 290,610 TriWest Building 2 SWM (Wet Ponds) Type/1 24-hr 25yr-24hrRainfall=5.90" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 6 Summary for Pond 8P: POND 3 Inflow Area = 15.260 ac, 72.15% Impervious, Inflow Depth = 4.53" for 25yr-24hr event Inflow = 116.56 cfs @ 11.95 hrs, Volume= 5.760 of Outflow = 2.71 cfs @ 14.87 hrs, Volume= 5.700 af, Atten= 98%, Lag= 174.9 min Primary = 2.71 cfs @ 14.87 hrs, Volume= 5.700 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 705.20' @ 14.87 hrs Surf.Area= 58,688 sf Storage= 180,131 cf Plug -Flow detention time= 1,791.3 min calculated for 5.700 of (99% of inflow) Center -of -Mass det. time= 1,784.6 min ( 2,572.6 - 787.9 ) Volume Invert Avail.Storage Storage Description #1 701.50' 519,480 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 701.50 22,118 0 0 702.00 43,792 16,478 16,478 703.00 48,320 46,056 62,534 704.00 52,961 50,641 113,174 705.00 57,717 55,339 168,513 706.00 62,582 60,150 228,663 707.00 67,552 65,067 293,730 708.00 72,628 70,090 363,820 709.00 77,809 75,219 439,038 710.00 83,074 80,442 519,480 Device Routing Invert Outlet Devices #1 Primary 701.39' 24.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 701.39' / 701.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 701.50' 4.5" Vert. 4.5" Orifice C= 0.600 #3 Device 1 705.00' 36.0" W x 6.0" H Vert. Slotted Weirs X 2.00 C= 0.600 #4 Device 1 708.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 708.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=2.71 cfs @ 14.87 hrs HW=705.20' TW=0.00' (Dynamic Tailwater) 1­1=Culvert (Passes 2.71 cfs of 24.48 cfs potential flow) 2=4.5" Orifice (Orifice Controls 1.00 cfs @ 9.02 fps) 3=Slotted Weirs (Orifice Controls 1.72 cfs @ 1.43 fps) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=701.50' TW=0.00' (Dynamic Tailwater) T 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 25yr-24hr Rainfall=5.90" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 7 Hydrograph -r--r-r--r-r--r-r--r-r--r-r--r-r--r-r--r--i--r-r--r-r--r-r-- ____ --'--' --'--' --'-- IN Inflow IN Outflow - - -- - -- - -- - -- - --r- /� .,�Crq r 1 nfl" Arr ea—'� &26-0' atv IN Primary 130 ■ Secondary 120 -�- �--�r-�--�r-�--r-�--it-�--�i --1--�r 6-�r q 7� //�� //yyr- Ir ea l e l/ -%V �{� 110 - - ---I ----I - --I ----I - --I-----Storade=180�131 cf 100 80 w u 70 -I- -1--r--1--r-7--r--1--it--1 --1 F-1--r----F -1 F--1 T- -1-- LL 50 -1---r---r---r---r-1------r---r----r---r-1--r-�-- 30 - - J--L-J--L-L--L-L--L- --'-- -- - -- --'-- - -- - --L- - 20 2.71 cfs 0.00 Cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 © 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 8P: POND 3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 701.50 0.00 0.00 0.00 2.50 0.00 0 701.50 0.00 0.00 0.00 5.00 0.18 320 701.51 0.00 0.00 0.00 7.50 0.71 4,046 701.66 0.06 0.06 0.00 10.00 2.09 14,031 701.94 0.27 0.27 0.00 12.50 8.89 160,064 704.85 0.95 0.95 0.00 15.00 2.63 180,113 705.20 2.71 2.71 0.00 17.50 1.69 176,900 705.14 2.05 2.05 0.00 20.00 1.15 173,763 705.09 1.51 1.51 0.00 22.50 1.03 171,528 705.05 1.20 1.20 0.00 25.00 0.00 167,299 704.98 0.96 0.96 0.00 27.50 0.00 158,716 704.83 0.94 0.94 0.00 30.00 0.00 150,334 704.68 0.92 0.92 0.00 32.50 0.00 142,155 704.53 0.90 0.90 0.00 35.00 0.00 134,183 704.39 0.87 0.87 0.00 37.50 0.00 126,420 704.25 0.85 0.85 0.00 40.00 0.00 118,869 704.11 0.83 0.83 0.00 42.50 0.00 111,532 703.97 0.80 0.80 0.00 45.00 0.00 104,411 703.83 0.78 0.78 0.00 47.50 0.00 97,510 703.70 0.75 0.75 0.00 50.00 0.00 90,832 703.57 0.73 0.73 0.00 52.50 0.00 84,377 703.44 0.70 0.70 0.00 55.00 0.00 78,151 703.32 0.68 0.68 0.00 57.50 0.00 72,154 703.20 0.65 0.65 0.00 60.00 0.00 66,390 703.08 0.63 0.63 0.00 62.50 0.00 60,861 702.97 0.60 0.60 0.00 65.00 0.00 55,570 702.85 0.57 0.57 0.00 67.50 0.00 50,519 702.75 0.55 0.55 0.00 70.00 0.00 45,711 702.65 0.52 0.52 0.00 72.50 0.00 41,149 702.55 0.49 0.49 0.00 75.00 0.00 36,833 702.45 0.47 0.47 0.00 77.50 0.00 32,768 702.37 0.44 0.44 0.00 80.00 0.00 28,954 702.28 0.41 0.41 0.00 82.50 0.00 25,395 702.20 0.38 0.38 0.00 85.00 0.00 22,092 702.13 0.35 0.35 0.00 87.50 0.00 19,047 702.06 0.32 0.32 0.00 90.00 0.00 16,262 702.00 0.29 0.29 0.00 92.50 0.00 13,742 701.94 0.26 0.26 0.00 95.00 0.00 11,501 701.88 0.23 0.23 0.00 97.50 0.00 9,548 701.83 0.20 0.20 0.00 100.00 0.00 7,933 701.78 0.16 0.16 0.00 102.50 0.00 6,645 701.74 0.13 0.13 0.00 105.00 0.00 5,629 701.71 0.10 0.10 0.00 107.50 0.00 4,826 701.68 0.08 0.08 0.00 110.00 0.00 4,187 701.66 0.06 0.06 0.00 112.50 0.00 3,673 701.65 0.05 0.05 0.00 115.00 0.00 3,254 701.63 0.04 0.04 0.00 117.50 0.00 2,910 701.62 0.03 0.03 0.00 120.00 0.00 2,624 701.61 0.03 0.03 0.00 Type/1 24-hr 25yr-24hr Rainfall=5.90" Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type/1 24-hr 25yr-24hrRainfall=5.90" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 9 Stage -Discharge for Pond 8P: POND 3 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 701.50 0.00 0.00 0.00 701.60 0.03 0.03 0.00 701.70 0.09 0.09 0.00 701.80 0.18 0.18 0.00 701.90 0.25 0.25 0.00 702.00 0.30 0.30 0.00 702.10 0.34 0.34 0.00 702.20 0.38 0.38 0.00 702.30 0.42 0.42 0.00 702.40 0.45 0.45 0.00 702.50 0.48 0.48 0.00 702.60 0.51 0.51 0.00 702.70 0.54 0.54 0.00 702.80 0.56 0.56 0.00 702.90 0.59 0.59 0.00 703.00 0.61 0.61 0.00 703.10 0.63 0.63 0.00 703.20 0.65 0.65 0.00 703.30 0.68 0.68 0.00 703.40 0.70 0.70 0.00 703.50 0.72 0.72 0.00 703.60 0.74 0.74 0.00 703.70 0.75 0.75 0.00 703.80 0.77 0.77 0.00 703.90 0.79 0.79 0.00 704.00 0.81 0.81 0.00 704.10 0.83 0.83 0.00 704.20 0.84 0.84 0.00 704.30 0.86 0.86 0.00 704.40 0.88 0.88 0.00 704.50 0.89 0.89 0.00 704.60 0.91 0.91 0.00 704.70 0.92 0.92 0.00 704.80 0.94 0.94 0.00 704.90 0.95 0.95 0.00 705.00 0.97 0.97 0.00 705.10 1.59 1.59 0.00 705.20 2.72 2.72 0.00 705.30 4.18 4.18 0.00 705.40 5.90 5.90 0.00 705.50 7.85 7.85 0.00 705.60 9.39 9.39 0.00 705.70 10.62 10.62 0.00 705.80 11.69 11.69 0.00 705.90 12.66 12.66 0.00 706.00 13.55 13.55 0.00 706.10 14.39 14.39 0.00 706.20 15.17 15.17 0.00 706.30 15.91 15.91 0.00 706.40 16.61 16.61 0.00 706.50 17.29 17.29 0.00 706.60 17.94 17.94 0.00 706.70 18.56 18.56 0.00 706.80 19.17 19.17 0.00 706.90 19.75 19.75 0.00 707.00 20.32 20.32 0.00 707.10 20.87 20.87 0.00 707.20 21.41 21.41 0.00 707.30 21.93 21.93 0.00 707.40 22.44 22.44 0.00 707.50 22.94 22.94 0.00 707.60 23.43 23.43 0.00 707.70 23.90 23.90 0.00 707.80 24.37 24.37 0.00 707.90 24.83 24.83 0.00 708.00 25.28 25.28 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 708.10 27.38 27.38 0.00 708.20 30.84 30.84 0.00 708.30 35.18 35.18 0.00 708.40 37.08 37.08 0.00 708.50 37.39 37.39 0.00 708.60 38.48 37.70 0.79 708.70 40.22 38.00 2.23 708.80 42.45 38.30 4.15 708.90 45.07 38.60 6.48 709.00 48.19 38.89 9.30 709.10 51.73 39.18 12.55 709.20 55.26 39.47 15.78 709.30 59.01 39.76 19.25 709.40 62.97 40.05 22.92 709.50 67.13 40.33 26.80 709.60 71.59 40.62 30.98 709.70 76.26 40.90 35.36 709.80 80.90 41.18 39.72 709.90 85.68 41.45 44.23 710.00 90.50 41.73 48.78 TriWest Building 2 SWM (Wet Ponds) Type/1 24-hr 25yr-24hrRainfall=5.90" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 10 Stage -Area -Storage for Pond 8P: POND 3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 701.50 22,118 0 701.60 26,453 2,429 701.70 30,788 5,291 701.80 35,122 8,586 701.90 39,457 12,315 702.00 43,792 16,478 702.10 44,245 20,879 702.20 44,698 25,326 702.30 45,150 29,819 702.40 45,603 34,357 702.50 46,056 38,940 702.60 46,509 43,568 702.70 46,962 48,241 702.80 47,414 52,960 702.90 47,867 57,724 703.00 48,320 62,534 703.10 48,784 67,389 703.20 49,248 72,290 703.30 49,712 77,238 703.40 50,176 82,233 703.50 50,641 87,274 703.60 51,105 92,361 703.70 51,569 97,495 703.80 52,033 102,675 703.90 52,497 107,901 704.00 52,961 113,174 704.10 53,437 118,494 704.20 53,912 123,861 704.30 54,388 129,276 704.40 54,863 134,739 704.50 55,339 140,249 704.60 55,815 145,807 704.70 56,290 151,412 704.80 56,766 157,065 704.90 57,241 162,765 705.00 57,717 168,513 705.10 58,204 174,309 705.20 58,690 180,154 705.30 59,176 186,047 705.40 59,663 191,989 705.50 60,150 197,980 705.60 60,636 204,019 705.70 61,123 210,107 705.80 61,609 216,243 705.90 62,095 222,429 706.00 62,582 228,663 706.10 63,079 234,946 706.20 63,576 241,278 706.30 64,073 247,661 706.40 64,570 254,093 706.50 65,067 260,575 706.60 65,564 267,106 706.70 66,061 273,688 706.80 66,558 280,318 706.90 67,055 286,999 707.00 67,552 293,730 707.10 68,060 300,510 707.20 68,567 307,341 707.30 69,075 314,224 707.40 69,582 321,156 707.50 70,090 328,140 707.60 70,598 335,174 707.70 71,105 342,260 707.80 71,613 349,395 707.90 72,120 356,582 708.00 72.628 363.820 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 708.10 73,146 371,108 708.20 73,664 378,449 708.30 74,182 385,841 708.40 74,700 393,285 708.50 75,219 400,781 708.60 75,737 408,329 708.70 76,255 415,928 708.80 76,773 423,580 708.90 77,291 431,283 709.00 77,809 439,038 709.10 78,336 446,845 709.20 78,862 454,705 709.30 79,388 462,618 709.40 79,915 470,583 709.50 80,442 478,601 709.60 80,968 486,671 709.70 81,495 494,794 709.80 82,021 502,970 709.90 82,547 511,198 710.00 83,074 519,480 OAK E N G I N E E R I N G HYDROCAD OUTPUT 50-YEAR, 24-HOUR STORM EVENT (PONDS ONLY) TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 50yr-24hrRainfall=6.66" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 1 Summary for Pond 2P: POND 2 Inflow Area = 19.790 ac, 74.23% Impervious, Inflow Depth = 5.26" for 50yr-24hr event Inflow = 173.95 cfs @ 11.95 hrs, Volume= 8.680 of Outflow = 33.96 cfs @ 12.12 hrs, Volume= 8.662 af, Atten= 80%, Lag= 10.2 min Primary = 33.96 cfs @ 12.12 hrs, Volume= 8.662 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 717.51' @ 12.12 hrs Surf.Area= 35,127 sf Storage= 196,354 cf Plug -Flow detention time= 614.9 min calculated for 8.658 of (100% of inflow) Center -of -Mass det. time= 615.5 min ( 1,399.3 - 783.8 ) Volume Invert Avail.Storage Storage Description #1 710.50' 290,610 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 710.50 20,568 0 0 711.00 22,310 10,720 10,720 712.00 24,113 23,212 33,931 713.00 25,975 25,044 58,975 714.00 27,897 26,936 85,911 715.00 29,879 28,888 114,799 716.00 31,920 30,900 145,699 717.00 34,021 32,971 178,669 718.00 36,183 35,102 213,771 719.00 38,404 37,294 251,065 720.00 40,686 39,545 290,610 Device Routing Invert Outlet Devices #1 Primary 709.39' 24.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 709.39' / 709.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 710.50' 4.5" Vert. 4.5" Orifice C= 0.600 #3 Device 1 715.00' 36.0" W x 6.0" H Vert. Slotted Weirs X 3.00 C= 0.600 #4 Device 1 718.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 718.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=33.83 cfs @ 12.12 hrs HW=717.49' TW=0.00' (Dynamic Tailwater) L1=Culvert (Passes 33.83 cfs of 40.32 cfs potential flow) 2=4.5" Orifice (Orifice Controls 1.39 cfs @ 12.56 fps) 3=Slotted Weirs (Orifice Controls 32.45 cfs @ 7.21 fps) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=710.50' TW=0.00' (Dynamic Tailwater) 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 50yr-24hr Rainfall=6.66" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 2 '0 i glPAA14i Hydrograph 173.95 Cfs --!-- - -!--L -!----! ---- -----!--- ---- L-!----!--! - -- IN Inflow - -- - -- - -- - ---- -- - --r --- - -A- -�-/-� - -- Infaow Area= ■Outflow IN Primary 190 -,- r--r- --r- --r- --r-,--r .79Ora l ■Secondary 180 - - J--L-J--L-L--L-L--r-L----L--r-PeA]Ele4=717 Sot - 170 160 - - -r- --r- r--r-r--r-r--r-r--r-r----r--r --r- --r- --r- --r- --L-L----r - Sorae=19�5 cf - r--r r r--r r--r r-- 1s0 - - - - - - - - - - 140 130 - - -- - -- - -- - -- - ---- -- - -- ---- - -- - -- - -- 120 w 110 100 0 _ _ _ -'---' -'---' -'---' -'---' -'-- -'---'------'---' -'---' -'---- 90 -�- �--r-�--r-�--r-�--r-�--L-�--r-�--L--i--r-�--r-�--r-�-- LL 80 -�- �--Ir-�--Ir-�--r-�--Ir-�--Ir-�--Ir-�--Ir--li--r-�--Ir-�--r-�-- 70 _ 0 33.96 cfs �- --L--r-L--L--1 � � � L -1-- -L-- r -L--r- --L--1 L-1--L--J � 5 so 40 30 0.00 Cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 © 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 2P: POND 2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 710.50 0.00 0.00 0.00 2.50 0.00 0 710.50 0.00 0.00 0.00 5.00 0.37 915 710.54 0.01 0.01 0.00 7.50 1.19 7,137 710.84 0.21 0.21 0.00 10.00 3.30 22,511 711.52 0.48 0.48 0.00 12.50 13.17 178,369 716.99 29.90 29.90 0.00 15.00 3.89 121,777 715.23 4.36 4.36 0.00 17.50 2.49 119,046 715.14 2.66 2.66 0.00 20.00 1.69 117,473 715.09 1.89 1.89 0.00 22.50 1.52 116,681 715.06 1.57 1.57 0.00 25.00 0.00 112,566 714.93 1.09 1.09 0.00 27.50 0.00 102,908 714.60 1.05 1.05 0.00 30.00 0.00 93,643 714.27 1.01 1.01 0.00 32.50 0.00 84,781 713.96 0.96 0.96 0.00 35.00 0.00 76,331 713.65 0.92 0.92 0.00 37.50 0.00 68,302 713.35 0.87 0.87 0.00 40.00 0.00 60,702 713.07 0.82 0.82 0.00 42.50 0.00 53,541 712.79 0.77 0.77 0.00 45.00 0.00 46,827 712.52 0.72 0.72 0.00 47.50 0.00 40,571 712.27 0.67 0.67 0.00 50.00 0.00 34,779 712.04 0.62 0.62 0.00 52.50 0.00 29,461 711.81 0.56 0.56 0.00 55.00 0.00 24,625 711.61 0.51 0.51 0.00 57.50 0.00 20,278 711.42 0.46 0.46 0.00 60.00 0.00 16,427 711.25 0.40 0.40 0.00 62.50 0.00 13,080 711.11 0.34 0.34 0.00 65.00 0.00 10,242 710.98 0.29 0.29 0.00 67.50 0.00 7,919 710.87 0.23 0.23 0.00 70.00 0.00 6,119 710.79 0.17 0.17 0.00 72.50 0.00 4,849 710.73 0.12 0.12 0.00 75.00 0.00 3,960 710.69 0.08 0.08 0.00 77.50 0.00 3,321 710.66 0.06 0.06 0.00 80.00 0.00 2,845 710.64 0.05 0.05 0.00 82.50 0.00 2,481 710.62 0.04 0.04 0.00 85.00 0.00 2,195 710.61 0.03 0.03 0.00 87.50 0.00 1,966 710.59 0.02 0.02 0.00 90.00 0.00 1,777 710.59 0.02 0.02 0.00 92.50 0.00 1,621 710.58 0.02 0.02 0.00 95.00 0.00 1,489 710.57 0.01 0.01 0.00 97.50 0.00 1,376 710.57 0.01 0.01 0.00 100.00 0.00 1,278 710.56 0.01 0.01 0.00 102.50 0.00 1,193 710.56 0.01 0.01 0.00 105.00 0.00 1,119 710.55 0.01 0.01 0.00 107.50 0.00 1,053 710.55 0.01 0.01 0.00 110.00 0.00 994 710.55 0.01 0.01 0.00 112.50 0.00 941 710.55 0.01 0.01 0.00 115.00 0.00 894 710.54 0.01 0.01 0.00 117.50 0.00 850 710.54 0.00 0.00 0.00 120.00 0.00 811 710.54 0.00 0.00 0.00 Type/1 24-hr 50yr-24hr Rainfall=6.66" Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 50yr-24hrRainfall=6.66" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 4 Stage -Discharge for Pond 2P: POND 2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 710.50 0.00 0.00 0.00 710.60 0.03 0.03 0.00 710.70 0.09 0.09 0.00 710.80 0.18 0.18 0.00 710.90 0.25 0.25 0.00 711.00 0.30 0.30 0.00 711.10 0.34 0.34 0.00 711.20 0.38 0.38 0.00 711.30 0.42 0.42 0.00 711.40 0.45 0.45 0.00 711.50 0.48 0.48 0.00 711.60 0.51 0.51 0.00 711.70 0.54 0.54 0.00 711.80 0.56 0.56 0.00 711.90 0.59 0.59 0.00 712.00 0.61 0.61 0.00 712.10 0.63 0.63 0.00 712.20 0.65 0.65 0.00 712.30 0.68 0.68 0.00 712.40 0.70 0.70 0.00 712.50 0.72 0.72 0.00 712.60 0.74 0.74 0.00 712.70 0.75 0.75 0.00 712.80 0.77 0.77 0.00 712.90 0.79 0.79 0.00 713.00 0.81 0.81 0.00 713.10 0.83 0.83 0.00 713.20 0.84 0.84 0.00 713.30 0.86 0.86 0.00 713.40 0.88 0.88 0.00 713.50 0.89 0.89 0.00 713.60 0.91 0.91 0.00 713.70 0.92 0.92 0.00 713.80 0.94 0.94 0.00 713.90 0.95 0.95 0.00 714.00 0.97 0.97 0.00 714.10 0.98 0.98 0.00 714.20 1.00 1.00 0.00 714.30 1.01 1.01 0.00 714.40 1.02 1.02 0.00 714.50 1.04 1.04 0.00 714.60 1.05 1.05 0.00 714.70 1.07 1.07 0.00 714.80 1.08 1.08 0.00 714.90 1.09 1.09 0.00 715.00 1.10 1.10 0.00 715.10 2.03 2.03 0.00 715.20 3.71 3.71 0.00 715.30 5.89 5.89 0.00 715.40 8.46 8.46 0.00 715.50 11.38 11.38 0.00 715.60 13.69 13.69 0.00 715.70 15.53 15.53 0.00 715.80 17.13 17.13 0.00 715.90 18.57 18.57 0.00 716.00 19.90 19.90 0.00 716.10 21.14 21.14 0.00 716.20 22.31 22.31 0.00 716.30 23.41 23.41 0.00 716.40 24.46 24.46 0.00 716.50 25.47 25.47 0.00 716.60 26.43 26.43 0.00 716.70 27.36 27.36 0.00 716.80 28.26 28.26 0.00 716.90 29.13 29.13 0.00 717.00 29.97 29.97 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 717.10 30.80 30.80 0.00 717.20 31.59 31.59 0.00 717.30 32.37 32.37 0.00 717.40 33.13 33.13 0.00 717.50 33.87 33.87 0.00 717.60 34.60 34.60 0.00 717.70 35.31 35.31 0.00 717.80 36.00 36.00 0.00 717.90 36.69 36.69 0.00 718.00 37.36 37.36 0.00 718.10 39.67 39.67 0.00 718.20 42.27 42.27 0.00 718.30 42.54 42.54 0.00 718.40 42.81 42.81 0.00 718.50 43.08 43.08 0.00 718.60 44.13 43.34 0.79 718.70 45.83 43.61 2.23 718.80 48.02 43.87 4.15 718.90 50.60 44.13 6.48 719.00 53.68 44.39 9.30 719.10 57.19 44.64 12.55 719.20 60.68 44.90 15.78 719.30 64.40 45.15 19.25 719.40 68.33 45.41 22.92 719.50 72.46 45.66 26.80 719.60 76.88 45.91 30.98 719.70 81.52 46.16 35.36 719.80 86.13 46.40 39.72 719.90 90.88 46.65 44.23 720.00 95.67 46.89 48.78 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 50yr-24hrRainfall=6.66" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 5 Stage -Area -Storage for Pond 2P: POND 2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 710.50 20,568 0 710.60 20,916 2,074 710.70 21,265 4,183 710.80 21,613 6,327 710.90 21,962 8,506 711.00 22,310 10,720 711.10 22,490 12,960 711.20 22,671 15,218 711.30 22,851 17,494 711.40 23,031 19,788 711.50 23,212 22,100 711.60 23,392 24,430 711.70 23,572 26,778 711.80 23,752 29,144 711.90 23,933 31,529 712.00 24,113 33,931 712.10 24,299 36,352 712.20 24,485 38,791 712.30 24,672 41,249 712.40 24,858 43,725 712.50 25,044 46,220 712.60 25,230 48,734 712.70 25,416 51,266 712.80 25,603 53,817 712.90 25,789 56,387 713.00 25,975 58,975 713.10 26,167 61,582 713.20 26,359 64,208 713.30 26,552 66,854 713.40 26,744 69,519 713.50 26,936 72,203 713.60 27,128 74,906 713.70 27,320 77,628 713.80 27,513 80,370 713.90 27,705 83,131 714.00 27,897 85,911 714.10 28,095 88,711 714.20 28,293 91,530 714.30 28,492 94,369 714.40 28,690 97,228 714.50 28,888 100,107 714.60 29,086 103,006 714.70 29,284 105,924 714.80 29,483 108,863 714.90 29,681 111,821 715.00 29,879 114,799 715.10 30,083 117,797 715.20 30,287 120,816 715.30 30,491 123,855 715.40 30,695 126,914 715.50 30,900 129,994 715.60 31,104 133,094 715.70 31,308 136,214 715.80 31,512 139,355 715.90 31,716 142,517 716.00 31,920 145,699 716.10 32,130 148,901 716.20 32,340 152,125 716.30 32,550 155,369 716.40 32,760 158,635 716.50 32,971 161,921 716.60 33,181 165,229 716.70 33,391 168,557 716.80 33,601 171,907 716.90 33,811 175,277 717.00 34.021 178.669 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 717.10 34,237 182,082 717.20 34,453 185,516 717.30 34,670 188,973 717.40 34,886 192,450 717.50 35,102 195,950 717.60 35,318 199,471 717.70 35,534 203,013 717.80 35,751 206,578 717.90 35,967 210,164 718.00 36,183 213,771 718.10 36,405 217,400 718.20 36,627 221,052 718.30 36,849 224,726 718.40 37,071 228,422 718.50 37,294 232,140 718.60 37,516 235,881 718.70 37,738 239,643 718.80 37,960 243,428 718.90 38,182 247,235 719.00 38,404 251,065 719.10 38,632 254,916 719.20 38,860 258,791 719.30 39,089 262,688 719.40 39,317 266,609 719.50 39,545 270,552 719.60 39,773 274,518 719.70 40,001 278,506 719.80 40,230 282,518 719.90 40,458 286,552 720.00 40,686 290,610 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 50yr-24hrRainfall=6.66" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 6 Summary for Pond 8P: POND 3 Inflow Area = 15.260 ac, 72.15% Impervious, Inflow Depth = 5.26" for 50yr-24hr event Inflow = 134.13 cfs @ 11.95 hrs, Volume= 6.693 of Outflow = 5.57 cfs @ 13.22 hrs, Volume= 6.633 af, Atten= 96%, Lag= 76.0 min Primary = 5.57 cfs @ 13.22 hrs, Volume= 6.633 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 705.38' @ 13.22 hrs Surf.Area= 59,576 sf Storage= 190,923 cf Plug -Flow detention time= 1,565.9 min calculated for 6.633 of (99% of inflow) Center -of -Mass det. time= 1,560.1 min ( 2,343.9 - 783.8 ) Volume Invert Avail.Storage Storage Description #1 701.50' 519,480 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 701.50 22,118 0 0 702.00 43,792 16,478 16,478 703.00 48,320 46,056 62,534 704.00 52,961 50,641 113,174 705.00 57,717 55,339 168,513 706.00 62,582 60,150 228,663 707.00 67,552 65,067 293,730 708.00 72,628 70,090 363,820 709.00 77,809 75,219 439,038 710.00 83,074 80,442 519,480 Device Routing Invert Outlet Devices #1 Primary 701.39' 24.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 701.39' / 701.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 701.50' 4.5" Vert. 4.5" Orifice C= 0.600 #3 Device 1 705.00' 36.0" W x 6.0" H Vert. Slotted Weirs X 2.00 C= 0.600 #4 Device 1 708.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 708.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=5.57 cfs @ 13.22 hrs HW=705.38' TW=0.00' (Dynamic Tailwater) 1­1=Culvert (Passes 5.57 cfs of 25.48 cfs potential flow) 2=4.5" Orifice (Orifice Controls 1.02 cfs @ 9.26 fps) 3=Slotted Weirs (Orifice Controls 4.55 cfs @ 1.98 fps) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=701.50' TW=0.00' (Dynamic Tailwater) T 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 50yr-24hr Rainfall=6.66" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 7 Hydrograph 134.13 cfS - -- - -- - -- - ---- -- - -- ---- - -- - -- - -- IN Inflow IN Outflow - - --L-J--L-1-- - -- - --'-- -- - -- --'-- - -- - --L- -- Inflow IAr�ea=�15L2W ac IN Primary 150 ■Secondary 140 130 - - -- - -- - -- - -- - ---- -- - --- - StoMde=' 19 a23 cf - 120 1 1 1 1 1 1 f 11 1 110 - - -- - -- - --r- -- - --i- -- - ----i--r- -- - --r- -- 100 - - -- - -- - -- - -- - ---- -- - -- ---- - -- - -- - -- 90 - - J--L-J--L- -- -J--L- ----J--L-J--L--'-- -J--L---L-J-- u 80 70 -1---1-1--1-1--1-1--1-1--I ---1-1--1----1-1--1-1--1-1-- LL 60 50 - - J--L-J--L- -- -J--L- ----J--L-J--L--'-- -J--L---L-J-- 40 20 ZI 5.57 cfs 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 © 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 8P: POND 3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 701.50 0.00 0.00 0.00 2.50 0.00 0 701.50 0.00 0.00 0.00 5.00 0.29 707 701.53 0.00 0.00 0.00 7.50 0.92 5,710 701.71 0.10 0.10 0.00 10.00 2.55 18,041 702.04 0.31 0.31 0.00 12.50 10.15 185,649 705.29 4.07 4.07 0.00 15.00 3.00 185,056 705.28 3.91 3.91 0.00 17.50 1.92 178,643 705.17 2.39 2.39 0.00 20.00 1.31 174,960 705.11 1.70 1.70 0.00 22.50 1.17 172,631 705.07 1.34 1.34 0.00 25.00 0.00 168,238 705.00 0.97 0.97 0.00 27.50 0.00 159,633 704.85 0.94 0.94 0.00 30.00 0.00 151,229 704.70 0.92 0.92 0.00 32.50 0.00 143,028 704.55 0.90 0.90 0.00 35.00 0.00 135,034 704.41 0.88 0.88 0.00 37.50 0.00 127,248 704.26 0.85 0.85 0.00 40.00 0.00 119,674 704.12 0.83 0.83 0.00 42.50 0.00 112,313 703.98 0.81 0.81 0.00 45.00 0.00 105,169 703.85 0.78 0.78 0.00 47.50 0.00 98,245 703.71 0.76 0.76 0.00 50.00 0.00 91,542 703.58 0.73 0.73 0.00 52.50 0.00 85,063 703.46 0.71 0.71 0.00 55.00 0.00 78,812 703.33 0.68 0.68 0.00 57.50 0.00 72,790 703.21 0.66 0.66 0.00 60.00 0.00 67,001 703.09 0.63 0.63 0.00 62.50 0.00 61,446 702.98 0.60 0.60 0.00 65.00 0.00 56,130 702.87 0.58 0.58 0.00 67.50 0.00 51,053 702.76 0.55 0.55 0.00 70.00 0.00 46,219 702.66 0.52 0.52 0.00 72.50 0.00 41,629 702.56 0.50 0.50 0.00 75.00 0.00 37,287 702.46 0.47 0.47 0.00 77.50 0.00 33,195 702.37 0.44 0.44 0.00 80.00 0.00 29,354 702.29 0.41 0.41 0.00 82.50 0.00 25,767 702.21 0.38 0.38 0.00 85.00 0.00 22,436 702.14 0.36 0.36 0.00 87.50 0.00 19,363 702.07 0.33 0.33 0.00 90.00 0.00 16,550 702.00 0.30 0.30 0.00 92.50 0.00 14,001 701.94 0.27 0.27 0.00 95.00 0.00 11,729 701.89 0.24 0.24 0.00 97.50 0.00 9,743 701.83 0.20 0.20 0.00 100.00 0.00 8,091 701.79 0.16 0.16 0.00 102.50 0.00 6,770 701.75 0.13 0.13 0.00 105.00 0.00 5,728 701.71 0.10 0.10 0.00 107.50 0.00 4,904 701.69 0.08 0.08 0.00 110.00 0.00 4,249 701.67 0.06 0.06 0.00 112.50 0.00 3,723 701.65 0.05 0.05 0.00 115.00 0.00 3,296 701.63 0.04 0.04 0.00 117.50 0.00 2,944 701.62 0.04 0.04 0.00 120.00 0.00 2,652 701.61 0.03 0.03 0.00 Type/1 24-hr 50yr-24hr Rainfall=6.66" Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 50yr-24hrRainfall=6.66" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 9 Stage -Discharge for Pond 8P: POND 3 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 701.50 0.00 0.00 0.00 701.60 0.03 0.03 0.00 701.70 0.09 0.09 0.00 701.80 0.18 0.18 0.00 701.90 0.25 0.25 0.00 702.00 0.30 0.30 0.00 702.10 0.34 0.34 0.00 702.20 0.38 0.38 0.00 702.30 0.42 0.42 0.00 702.40 0.45 0.45 0.00 702.50 0.48 0.48 0.00 702.60 0.51 0.51 0.00 702.70 0.54 0.54 0.00 702.80 0.56 0.56 0.00 702.90 0.59 0.59 0.00 703.00 0.61 0.61 0.00 703.10 0.63 0.63 0.00 703.20 0.65 0.65 0.00 703.30 0.68 0.68 0.00 703.40 0.70 0.70 0.00 703.50 0.72 0.72 0.00 703.60 0.74 0.74 0.00 703.70 0.75 0.75 0.00 703.80 0.77 0.77 0.00 703.90 0.79 0.79 0.00 704.00 0.81 0.81 0.00 704.10 0.83 0.83 0.00 704.20 0.84 0.84 0.00 704.30 0.86 0.86 0.00 704.40 0.88 0.88 0.00 704.50 0.89 0.89 0.00 704.60 0.91 0.91 0.00 704.70 0.92 0.92 0.00 704.80 0.94 0.94 0.00 704.90 0.95 0.95 0.00 705.00 0.97 0.97 0.00 705.10 1.59 1.59 0.00 705.20 2.72 2.72 0.00 705.30 4.18 4.18 0.00 705.40 5.90 5.90 0.00 705.50 7.85 7.85 0.00 705.60 9.39 9.39 0.00 705.70 10.62 10.62 0.00 705.80 11.69 11.69 0.00 705.90 12.66 12.66 0.00 706.00 13.55 13.55 0.00 706.10 14.39 14.39 0.00 706.20 15.17 15.17 0.00 706.30 15.91 15.91 0.00 706.40 16.61 16.61 0.00 706.50 17.29 17.29 0.00 706.60 17.94 17.94 0.00 706.70 18.56 18.56 0.00 706.80 19.17 19.17 0.00 706.90 19.75 19.75 0.00 707.00 20.32 20.32 0.00 707.10 20.87 20.87 0.00 707.20 21.41 21.41 0.00 707.30 21.93 21.93 0.00 707.40 22.44 22.44 0.00 707.50 22.94 22.94 0.00 707.60 23.43 23.43 0.00 707.70 23.90 23.90 0.00 707.80 24.37 24.37 0.00 707.90 24.83 24.83 0.00 708.00 25.28 25.28 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 708.10 27.38 27.38 0.00 708.20 30.84 30.84 0.00 708.30 35.18 35.18 0.00 708.40 37.08 37.08 0.00 708.50 37.39 37.39 0.00 708.60 38.48 37.70 0.79 708.70 40.22 38.00 2.23 708.80 42.45 38.30 4.15 708.90 45.07 38.60 6.48 709.00 48.19 38.89 9.30 709.10 51.73 39.18 12.55 709.20 55.26 39.47 15.78 709.30 59.01 39.76 19.25 709.40 62.97 40.05 22.92 709.50 67.13 40.33 26.80 709.60 71.59 40.62 30.98 709.70 76.26 40.90 35.36 709.80 80.90 41.18 39.72 709.90 85.68 41.45 44.23 710.00 90.50 41.73 48.78 TriWest Building 2 SWM (Wet Ponds) Type // 24-hr 50yr-24hrRainfall=6.66" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 10 Stage -Area -Storage for Pond 8P: POND 3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 701.50 22,118 0 701.60 26,453 2,429 701.70 30,788 5,291 701.80 35,122 8,586 701.90 39,457 12,315 702.00 43,792 16,478 702.10 44,245 20,879 702.20 44,698 25,326 702.30 45,150 29,819 702.40 45,603 34,357 702.50 46,056 38,940 702.60 46,509 43,568 702.70 46,962 48,241 702.80 47,414 52,960 702.90 47,867 57,724 703.00 48,320 62,534 703.10 48,784 67,389 703.20 49,248 72,290 703.30 49,712 77,238 703.40 50,176 82,233 703.50 50,641 87,274 703.60 51,105 92,361 703.70 51,569 97,495 703.80 52,033 102,675 703.90 52,497 107,901 704.00 52,961 113,174 704.10 53,437 118,494 704.20 53,912 123,861 704.30 54,388 129,276 704.40 54,863 134,739 704.50 55,339 140,249 704.60 55,815 145,807 704.70 56,290 151,412 704.80 56,766 157,065 704.90 57,241 162,765 705.00 57,717 168,513 705.10 58,204 174,309 705.20 58,690 180,154 705.30 59,176 186,047 705.40 59,663 191,989 705.50 60,150 197,980 705.60 60,636 204,019 705.70 61,123 210,107 705.80 61,609 216,243 705.90 62,095 222,429 706.00 62,582 228,663 706.10 63,079 234,946 706.20 63,576 241,278 706.30 64,073 247,661 706.40 64,570 254,093 706.50 65,067 260,575 706.60 65,564 267,106 706.70 66,061 273,688 706.80 66,558 280,318 706.90 67,055 286,999 707.00 67,552 293,730 707.10 68,060 300,510 707.20 68,567 307,341 707.30 69,075 314,224 707.40 69,582 321,156 707.50 70,090 328,140 707.60 70,598 335,174 707.70 71,105 342,260 707.80 71,613 349,395 707.90 72,120 356,582 708.00 72.628 363.820 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 708.10 73,146 371,108 708.20 73,664 378,449 708.30 74,182 385,841 708.40 74,700 393,285 708.50 75,219 400,781 708.60 75,737 408,329 708.70 76,255 415,928 708.80 76,773 423,580 708.90 77,291 431,283 709.00 77,809 439,038 709.10 78,336 446,845 709.20 78,862 454,705 709.30 79,388 462,618 709.40 79,915 470,583 709.50 80,442 478,601 709.60 80,968 486,671 709.70 81,495 494,794 709.80 82,021 502,970 709.90 82,547 511,198 710.00 83,074 519,480 OAK E N G I N E E R I N G HYDROCAD OUTPUT 100-YEAR, 24-HOUR STORM EVENT (PONDS ONLY) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 100yr-24hrRainfall=7.43" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 1 Summary for Pond 2P: POND 2 Inflow Area = 19.790 ac, 74.23% Impervious, Inflow Depth = 6.01" for 100yr-24hr event Inflow = 196.95 cfs @ 11.95 hrs, Volume= 9.915 of Outflow = 42.63 cfs @ 12.12 hrs, Volume= 9.896 af, Atten= 78%, Lag= 10.3 min Primary = 42.63 cfs @ 12.12 hrs, Volume= 9.896 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 718.23' @ 12.11 hrs Surf.Area= 36,697 sf Storage= 222,209 cf Plug -Flow detention time= 550.8 min calculated for 9.896 of (100% of inflow) Center -of -Mass det. time= 549.5 min ( 1,329.7 - 780.2 ) Volume Invert Avail.Storage Storage Description #1 710.50' 290,610 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 710.50 20,568 0 0 711.00 22,310 10,720 10,720 712.00 24,113 23,212 33,931 713.00 25,975 25,044 58,975 714.00 27,897 26,936 85,911 715.00 29,879 28,888 114,799 716.00 31,920 30,900 145,699 717.00 34,021 32,971 178,669 718.00 36,183 35,102 213,771 719.00 38,404 37,294 251,065 720.00 40,686 39,545 290,610 Device Routing Invert Outlet Devices #1 Primary 709.39' 24.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 709.39' / 709.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 710.50' 4.5" Vert. 4.5" Orifice C= 0.600 #3 Device 1 715.00' 36.0" W x 6.0" H Vert. Slotted Weirs X 3.00 C= 0.600 #4 Device 1 718.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 718.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=42.30 cfs @ 12.12 hrs HW=718.21' TW=0.00' (Dynamic Tailwater) L1=Culvert (Inlet Controls 42.30 cfs @ 13.47 fps) 2=4.5" Orifice (Passes < 1.46 cfs potential flow) 3=Slotted Weirs (Passes < 37.27 cfs potential flow) =Top of OS (Passes < 5.05 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=710.50' TW=0.00' (Dynamic Tailwater) 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 100yr-24hr Rainfall=7.43" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 2 Hydrograph -r--r-r--r-r--r-r--r-r--r-r--r-r--r-r--r-r--r-r--r-r--r-r-- 196.95 cfs r-y--r- --r-y--r-y--r-y--r-y--r----r-y--r-y--r-y-- ■Inflow N Outflow --- ---'---'--'---'--------------InflowAr�e� 49,79O,a�- ■Primary 220 - - --r- --r- --r- --r- --Ir ti r ■Secondary 210 200 - - - - --------,-- -- - -- -------,-- - -- - -- -------r_-�ga��IF-I��0.Y..7� - ---- -- - 190 180 - - - - -,--r -- --,--r - -- - --r - -- --,--r - -- ------,--r - ---- --LOKae2A- -r --,--r - -- 170 - - --r- --r- --r- --r- -- - --r- --r----r- --r- --r- -- 160 - - L--L-L--L- --r-L--L- ----L-- L-L--L----r -L--L---L-L-- 150 - - 7--Ir- --Ir- --r- --Ir- --Ir-7--Ir- --Ir--li--r- --Ir---r-7-- 140 --'- -'--L-L--'---'--'--L--L--'--'---'--L-L'--'---'--'---'--L--''--'---'-- 130120 w --r-y--Ir-y--Ir-y--Ir-y--Ir--li--r-y--Ir-y--r-y-- 110 0 - - --r- --r- --r- --r- --r- --r- --r--i--r- --r- --r- -- 100 - - --- - ---- -- - -- -------- -------- - -- - -- ---- LL90 - - -- - -- I_ - -- I_ - -- I_ - ---- I -- - -- ---- - -- - -- - -- I_ I_ I_ I I_ 80 -- --II --Ir - -- --II -- - --II --II-- --II --II --II-- --II -- - -- --II-- 70 60 42.63 cfs -- 1 - - -- - r - - - r - -- - - - r - -- - - - r - ---- - , - -r -- - 7 - - -- ---- - -- - -- - -- - r - - - r - -I- - r - - - r - , - - r - 7 - so L--L-L--L-�--r-L--L-�--L-L--L-L--L--�--r-L--L-�--r-L-- 40 30 0.00 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 © 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 2P: POND 2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 710.50 0.00 0.00 0.00 2.50 0.00 0 710.50 0.00 0.00 0.00 5.00 0.53 1,589 710.58 0.02 0.02 0.00 7.50 1.48 9,414 710.94 0.27 0.27 0.00 10.00 3.91 28,036 711.75 0.55 0.55 0.00 12.50 14.83 199,767 717.61 34.66 34.66 0.00 15.00 4.37 122,580 715.26 4.93 4.93 0.00 17.50 2.80 119,606 715.16 2.97 2.97 0.00 20.00 1.90 117,950 715.11 2.10 2.10 0.00 22.50 1.70 117,157 715.08 1.75 1.75 0.00 25.00 0.00 112,903 714.94 1.10 1.10 0.00 27.50 0.00 103,232 714.61 1.05 1.05 0.00 30.00 0.00 93,953 714.29 1.01 1.01 0.00 32.50 0.00 85,078 713.97 0.96 0.96 0.00 35.00 0.00 76,613 713.66 0.92 0.92 0.00 37.50 0.00 68,569 713.36 0.87 0.87 0.00 40.00 0.00 60,955 713.08 0.82 0.82 0.00 42.50 0.00 53,778 712.80 0.77 0.77 0.00 45.00 0.00 47,050 712.53 0.72 0.72 0.00 47.50 0.00 40,777 712.28 0.67 0.67 0.00 50.00 0.00 34,969 712.04 0.62 0.62 0.00 52.50 0.00 29,635 711.82 0.57 0.57 0.00 55.00 0.00 24,782 711.62 0.51 0.51 0.00 57.50 0.00 20,419 711.43 0.46 0.46 0.00 60.00 0.00 16,551 711.26 0.40 0.40 0.00 62.50 0.00 13,186 711.11 0.35 0.35 0.00 65.00 0.00 10,330 710.98 0.29 0.29 0.00 67.50 0.00 7,989 710.88 0.23 0.23 0.00 70.00 0.00 6,171 710.79 0.17 0.17 0.00 72.50 0.00 4,885 710.73 0.12 0.12 0.00 75.00 0.00 3,986 710.69 0.08 0.08 0.00 77.50 0.00 3,339 710.66 0.06 0.06 0.00 80.00 0.00 2,859 710.64 0.05 0.05 0.00 82.50 0.00 2,492 710.62 0.04 0.04 0.00 85.00 0.00 2,204 710.61 0.03 0.03 0.00 87.50 0.00 1,973 710.60 0.02 0.02 0.00 90.00 0.00 1,783 710.59 0.02 0.02 0.00 92.50 0.00 1,626 710.58 0.02 0.02 0.00 95.00 0.00 1,493 710.57 0.01 0.01 0.00 97.50 0.00 1,379 710.57 0.01 0.01 0.00 100.00 0.00 1,282 710.56 0.01 0.01 0.00 102.50 0.00 1,196 710.56 0.01 0.01 0.00 105.00 0.00 1,121 710.55 0.01 0.01 0.00 107.50 0.00 1,055 710.55 0.01 0.01 0.00 110.00 0.00 996 710.55 0.01 0.01 0.00 112.50 0.00 943 710.55 0.01 0.01 0.00 115.00 0.00 895 710.54 0.01 0.01 0.00 117.50 0.00 852 710.54 0.00 0.00 0.00 120.00 0.00 813 710.54 0.00 0.00 0.00 Type 1124-hr 100yr-24hr Rainfall=7.43" Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 100yr-24hrRainfall=7.43" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 4 Stage -Discharge for Pond 2P: POND 2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 710.50 0.00 0.00 0.00 710.60 0.03 0.03 0.00 710.70 0.09 0.09 0.00 710.80 0.18 0.18 0.00 710.90 0.25 0.25 0.00 711.00 0.30 0.30 0.00 711.10 0.34 0.34 0.00 711.20 0.38 0.38 0.00 711.30 0.42 0.42 0.00 711.40 0.45 0.45 0.00 711.50 0.48 0.48 0.00 711.60 0.51 0.51 0.00 711.70 0.54 0.54 0.00 711.80 0.56 0.56 0.00 711.90 0.59 0.59 0.00 712.00 0.61 0.61 0.00 712.10 0.63 0.63 0.00 712.20 0.65 0.65 0.00 712.30 0.68 0.68 0.00 712.40 0.70 0.70 0.00 712.50 0.72 0.72 0.00 712.60 0.74 0.74 0.00 712.70 0.75 0.75 0.00 712.80 0.77 0.77 0.00 712.90 0.79 0.79 0.00 713.00 0.81 0.81 0.00 713.10 0.83 0.83 0.00 713.20 0.84 0.84 0.00 713.30 0.86 0.86 0.00 713.40 0.88 0.88 0.00 713.50 0.89 0.89 0.00 713.60 0.91 0.91 0.00 713.70 0.92 0.92 0.00 713.80 0.94 0.94 0.00 713.90 0.95 0.95 0.00 714.00 0.97 0.97 0.00 714.10 0.98 0.98 0.00 714.20 1.00 1.00 0.00 714.30 1.01 1.01 0.00 714.40 1.02 1.02 0.00 714.50 1.04 1.04 0.00 714.60 1.05 1.05 0.00 714.70 1.07 1.07 0.00 714.80 1.08 1.08 0.00 714.90 1.09 1.09 0.00 715.00 1.10 1.10 0.00 715.10 2.03 2.03 0.00 715.20 3.71 3.71 0.00 715.30 5.89 5.89 0.00 715.40 8.46 8.46 0.00 715.50 11.38 11.38 0.00 715.60 13.69 13.69 0.00 715.70 15.53 15.53 0.00 715.80 17.13 17.13 0.00 715.90 18.57 18.57 0.00 716.00 19.90 19.90 0.00 716.10 21.14 21.14 0.00 716.20 22.31 22.31 0.00 716.30 23.41 23.41 0.00 716.40 24.46 24.46 0.00 716.50 25.47 25.47 0.00 716.60 26.43 26.43 0.00 716.70 27.36 27.36 0.00 716.80 28.26 28.26 0.00 716.90 29.13 29.13 0.00 717.00 29.97 29.97 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 717.10 30.80 30.80 0.00 717.20 31.59 31.59 0.00 717.30 32.37 32.37 0.00 717.40 33.13 33.13 0.00 717.50 33.87 33.87 0.00 717.60 34.60 34.60 0.00 717.70 35.31 35.31 0.00 717.80 36.00 36.00 0.00 717.90 36.69 36.69 0.00 718.00 37.36 37.36 0.00 718.10 39.67 39.67 0.00 718.20 42.27 42.27 0.00 718.30 42.54 42.54 0.00 718.40 42.81 42.81 0.00 718.50 43.08 43.08 0.00 718.60 44.13 43.34 0.79 718.70 45.83 43.61 2.23 718.80 48.02 43.87 4.15 718.90 50.60 44.13 6.48 719.00 53.68 44.39 9.30 719.10 57.19 44.64 12.55 719.20 60.68 44.90 15.78 719.30 64.40 45.15 19.25 719.40 68.33 45.41 22.92 719.50 72.46 45.66 26.80 719.60 76.88 45.91 30.98 719.70 81.52 46.16 35.36 719.80 86.13 46.40 39.72 719.90 90.88 46.65 44.23 720.00 95.67 46.89 48.78 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 100yr-24hrRainfall=7.43" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 5 Stage -Area -Storage for Pond 2P: POND 2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 710.50 20,568 0 710.60 20,916 2,074 710.70 21,265 4,183 710.80 21,613 6,327 710.90 21,962 8,506 711.00 22,310 10,720 711.10 22,490 12,960 711.20 22,671 15,218 711.30 22,851 17,494 711.40 23,031 19,788 711.50 23,212 22,100 711.60 23,392 24,430 711.70 23,572 26,778 711.80 23,752 29,144 711.90 23,933 31,529 712.00 24,113 33,931 712.10 24,299 36,352 712.20 24,485 38,791 712.30 24,672 41,249 712.40 24,858 43,725 712.50 25,044 46,220 712.60 25,230 48,734 712.70 25,416 51,266 712.80 25,603 53,817 712.90 25,789 56,387 713.00 25,975 58,975 713.10 26,167 61,582 713.20 26,359 64,208 713.30 26,552 66,854 713.40 26,744 69,519 713.50 26,936 72,203 713.60 27,128 74,906 713.70 27,320 77,628 713.80 27,513 80,370 713.90 27,705 83,131 714.00 27,897 85,911 714.10 28,095 88,711 714.20 28,293 91,530 714.30 28,492 94,369 714.40 28,690 97,228 714.50 28,888 100,107 714.60 29,086 103,006 714.70 29,284 105,924 714.80 29,483 108,863 714.90 29,681 111,821 715.00 29,879 114,799 715.10 30,083 117,797 715.20 30,287 120,816 715.30 30,491 123,855 715.40 30,695 126,914 715.50 30,900 129,994 715.60 31,104 133,094 715.70 31,308 136,214 715.80 31,512 139,355 715.90 31,716 142,517 716.00 31,920 145,699 716.10 32,130 148,901 716.20 32,340 152,125 716.30 32,550 155,369 716.40 32,760 158,635 716.50 32,971 161,921 716.60 33,181 165,229 716.70 33,391 168,557 716.80 33,601 171,907 716.90 33,811 175,277 717.00 34.021 178.669 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 717.10 34,237 182,082 717.20 34,453 185,516 717.30 34,670 188,973 717.40 34,886 192,450 717.50 35,102 195,950 717.60 35,318 199,471 717.70 35,534 203,013 717.80 35,751 206,578 717.90 35,967 210,164 718.00 36,183 213,771 718.10 36,405 217,400 718.20 36,627 221,052 718.30 36,849 224,726 718.40 37,071 228,422 718.50 37,294 232,140 718.60 37,516 235,881 718.70 37,738 239,643 718.80 37,960 243,428 718.90 38,182 247,235 719.00 38,404 251,065 719.10 38,632 254,916 719.20 38,860 258,791 719.30 39,089 262,688 719.40 39,317 266,609 719.50 39,545 270,552 719.60 39,773 274,518 719.70 40,001 278,506 719.80 40,230 282,518 719.90 40,458 286,552 720.00 40,686 290,610 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 100yr-24hrRainfall=7.43" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 6 Summary for Pond 8P: POND 3 Inflow Area = 15.260 ac, 72.15% Impervious, Inflow Depth = 6.01" for 100yr-24hr event Inflow = 151.86 cfs @ 11.95 hrs, Volume= 7.645 of Outflow = 9.61 cfs @ 12.60 hrs, Volume= 7.584 af, Atten= 94%, Lag= 39.0 min Primary = 9.61 cfs @ 12.60 hrs, Volume= 7.584 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 705.62' @ 12.60 hrs Surf.Area= 60,715 sf Storage= 205,000 cf Plug -Flow detention time= 1,388.3 min calculated for 7.584 of (99% of inflow) Center -of -Mass det. time= 1,383.1 min ( 2,163.3 - 780.2 ) Volume Invert Avail.Storage Storage Description #1 701.50' 519,480 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 701.50 22,118 0 0 702.00 43,792 16,478 16,478 703.00 48,320 46,056 62,534 704.00 52,961 50,641 113,174 705.00 57,717 55,339 168,513 706.00 62,582 60,150 228,663 707.00 67,552 65,067 293,730 708.00 72,628 70,090 363,820 709.00 77,809 75,219 439,038 710.00 83,074 80,442 519,480 Device Routing Invert Outlet Devices #1 Primary 701.39' 24.0" Round Culvert L= 78.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 701.39' / 701.00' S= 0.0050 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 701.50' 4.5" Vert. 4.5" Orifice C= 0.600 #3 Device 1 705.00' 36.0" W x 6.0" H Vert. Slotted Weirs X 2.00 C= 0.600 #4 Device 1 708.00' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #5 Secondary 708.50' 10.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=9.61 cfs @ 12.60 hrs HW=705.62' TW=0.00' (Dynamic Tailwater) 1­1=Culvert (Passes 9.61 cfs of 26.70 cfs potential flow) 2=4.5" Orifice (Orifice Controls 1.05 cfs @ 9.54 fps) 3=Slotted Weirs (Orifice Controls 8.55 cfs @ 2.85 fps) =Top of OS ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=701.50' TW=0.00' (Dynamic Tailwater) T 5=Emergency Spillway ( Controls 0.00 cfs) TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 100yr-24hr Rainfall=7.43" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Pane 7 Pond 8P: POND 3 Hydrograph 151.86 CfS r---r-r--r- --r-,--r-r--r- --r----r---r-,--r-r-- ■Inflow -,- r- --r- --r- --r- --r- --r- --r-,--r --r---r-7--�r/----r-7-C-r---/-�r----- artfaow Are-a=,'��r260ra ■Outflow ■ Primary 170 r--r- ■Secondary - - - Pedk 1=-1ew=7`05- 62 ---r�r�--r--I--r-.yr/--�+r-/yr--/yr-ram-- 150 140 - - 7--r-7--r-r--r-7--r--1 -- r-r- - r -,--r I- -r- -r 1 ---r-r--rStorage=-2106,-000ic - 130 - - --r- --r- --r- -- - --r-r--r----r-r--r-r--r-r-- 120 - - r--r- --r- --r- --r- --r-r--r- r-- r--li-- r -r - -r---r-r-- 110 - - r--r-r--r- --r- --r- -- - --r---r----r- --r- --r- -- 100 w -,- - -r- r--r -r --r- --r-r--r- --r---r----r---r-,--r- -- v 90 - - --r- --r- --r- --r- --r- --r---r--li--r- --r- --r- -- 0 80 -,- r--r-r--r-r--r- -- r -,--r-r--r---r----r---r-,--r-r-- LL 70r--r-__r-__r-__r-__--r--r-r--r----r-r--r-r--r-r-- 60 -,- r-- r-r--r -r --r- --r-,--r-r--r- --r----r---r-,--r-r-- 50 - - r--r- --r- --r- --r- --r-r--r---r--li--r- --r---r-r-- 40 --r-r--r-r--r-r--r-,--r-r--r-r--r--1--r- --r-,--r-r-- 30 9.61 cfs 20 0.00 Cfs MWITAR 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) TriWest Building 2 SWM (Wet Ponds) Prepared by OAK Engineering, PLLC HvdroCAD® 10.00-26 s/n 10066 © 2020 HvdroCAD Software Solutions LLC Hydrograph for Pond 8P: POND 3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 701.50 0.00 0.00 0.00 2.50 0.00 0 701.50 0.00 0.00 0.00 5.00 0.41 1,231 701.55 0.01 0.01 0.00 7.50 1.14 7,571 701.77 0.15 0.15 0.00 10.00 3.02 22,418 702.13 0.36 0.36 0.00 12.50 11.43 204,715 705.61 9.55 9.55 0.00 15.00 3.37 187,881 705.33 4.68 4.68 0.00 17.50 2.16 179,984 705.20 2.68 2.68 0.00 20.00 1.47 176,011 705.13 1.88 1.88 0.00 22.50 1.31 173,620 705.09 1.48 1.48 0.00 25.00 0.00 168,992 705.01 0.98 0.98 0.00 27.50 0.00 160,367 704.86 0.95 0.95 0.00 30.00 0.00 151,945 704.71 0.92 0.92 0.00 32.50 0.00 143,727 704.56 0.90 0.90 0.00 35.00 0.00 135,715 704.42 0.88 0.88 0.00 37.50 0.00 127,911 704.27 0.86 0.86 0.00 40.00 0.00 120,318 704.13 0.83 0.83 0.00 42.50 0.00 112,939 704.00 0.81 0.81 0.00 45.00 0.00 105,777 703.86 0.78 0.78 0.00 47.50 0.00 98,833 703.73 0.76 0.76 0.00 50.00 0.00 92,111 703.60 0.73 0.73 0.00 52.50 0.00 85,613 703.47 0.71 0.71 0.00 55.00 0.00 79,342 703.34 0.68 0.68 0.00 57.50 0.00 73,300 703.22 0.66 0.66 0.00 60.00 0.00 67,491 703.10 0.63 0.63 0.00 62.50 0.00 61,916 702.99 0.61 0.61 0.00 65.00 0.00 56,578 702.88 0.58 0.58 0.00 67.50 0.00 51,481 702.77 0.55 0.55 0.00 70.00 0.00 46,626 702.67 0.53 0.53 0.00 72.50 0.00 42,015 702.57 0.50 0.50 0.00 75.00 0.00 37,652 702.47 0.47 0.47 0.00 77.50 0.00 33,537 702.38 0.44 0.44 0.00 80.00 0.00 29,675 702.30 0.42 0.42 0.00 82.50 0.00 26,066 702.22 0.39 0.39 0.00 85.00 0.00 22,713 702.14 0.36 0.36 0.00 87.50 0.00 19,618 702.07 0.33 0.33 0.00 90.00 0.00 16,782 702.01 0.30 0.30 0.00 92.50 0.00 14,210 701.95 0.27 0.27 0.00 95.00 0.00 11,913 701.89 0.24 0.24 0.00 97.50 0.00 9,902 701.84 0.21 0.21 0.00 100.00 0.00 8,219 701.79 0.17 0.17 0.00 102.50 0.00 6,872 701.75 0.13 0.13 0.00 105.00 0.00 5,808 701.72 0.10 0.10 0.00 107.50 0.00 4,968 701.69 0.08 0.08 0.00 110.00 0.00 4,300 701.67 0.07 0.07 0.00 112.50 0.00 3,764 701.65 0.05 0.05 0.00 115.00 0.00 3,329 701.63 0.04 0.04 0.00 117.50 0.00 2,972 701.62 0.04 0.04 0.00 120.00 0.00 2,675 701.61 0.03 0.03 0.00 Type 1124-hr 100yr-24hr Rainfall=7.43" Printed 1/17/2023 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 100yr-24hrRainfall=7.43" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 9 Stage -Discharge for Pond 8P: POND 3 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 701.50 0.00 0.00 0.00 701.60 0.03 0.03 0.00 701.70 0.09 0.09 0.00 701.80 0.18 0.18 0.00 701.90 0.25 0.25 0.00 702.00 0.30 0.30 0.00 702.10 0.34 0.34 0.00 702.20 0.38 0.38 0.00 702.30 0.42 0.42 0.00 702.40 0.45 0.45 0.00 702.50 0.48 0.48 0.00 702.60 0.51 0.51 0.00 702.70 0.54 0.54 0.00 702.80 0.56 0.56 0.00 702.90 0.59 0.59 0.00 703.00 0.61 0.61 0.00 703.10 0.63 0.63 0.00 703.20 0.65 0.65 0.00 703.30 0.68 0.68 0.00 703.40 0.70 0.70 0.00 703.50 0.72 0.72 0.00 703.60 0.74 0.74 0.00 703.70 0.75 0.75 0.00 703.80 0.77 0.77 0.00 703.90 0.79 0.79 0.00 704.00 0.81 0.81 0.00 704.10 0.83 0.83 0.00 704.20 0.84 0.84 0.00 704.30 0.86 0.86 0.00 704.40 0.88 0.88 0.00 704.50 0.89 0.89 0.00 704.60 0.91 0.91 0.00 704.70 0.92 0.92 0.00 704.80 0.94 0.94 0.00 704.90 0.95 0.95 0.00 705.00 0.97 0.97 0.00 705.10 1.59 1.59 0.00 705.20 2.72 2.72 0.00 705.30 4.18 4.18 0.00 705.40 5.90 5.90 0.00 705.50 7.85 7.85 0.00 705.60 9.39 9.39 0.00 705.70 10.62 10.62 0.00 705.80 11.69 11.69 0.00 705.90 12.66 12.66 0.00 706.00 13.55 13.55 0.00 706.10 14.39 14.39 0.00 706.20 15.17 15.17 0.00 706.30 15.91 15.91 0.00 706.40 16.61 16.61 0.00 706.50 17.29 17.29 0.00 706.60 17.94 17.94 0.00 706.70 18.56 18.56 0.00 706.80 19.17 19.17 0.00 706.90 19.75 19.75 0.00 707.00 20.32 20.32 0.00 707.10 20.87 20.87 0.00 707.20 21.41 21.41 0.00 707.30 21.93 21.93 0.00 707.40 22.44 22.44 0.00 707.50 22.94 22.94 0.00 707.60 23.43 23.43 0.00 707.70 23.90 23.90 0.00 707.80 24.37 24.37 0.00 707.90 24.83 24.83 0.00 708.00 25.28 25.28 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 708.10 27.38 27.38 0.00 708.20 30.84 30.84 0.00 708.30 35.18 35.18 0.00 708.40 37.08 37.08 0.00 708.50 37.39 37.39 0.00 708.60 38.48 37.70 0.79 708.70 40.22 38.00 2.23 708.80 42.45 38.30 4.15 708.90 45.07 38.60 6.48 709.00 48.19 38.89 9.30 709.10 51.73 39.18 12.55 709.20 55.26 39.47 15.78 709.30 59.01 39.76 19.25 709.40 62.97 40.05 22.92 709.50 67.13 40.33 26.80 709.60 71.59 40.62 30.98 709.70 76.26 40.90 35.36 709.80 80.90 41.18 39.72 709.90 85.68 41.45 44.23 710.00 90.50 41.73 48.78 TriWest Building 2 SWM (Wet Ponds) Type 1124-hr 100yr-24hrRainfall=7.43" Prepared by OAK Engineering, PLLC Printed 1/17/2023 HvdroCAD®10.00-26 s/n 10066 ©2020 HvdroCAD Software Solutions LLC Paae 10 Stage -Area -Storage for Pond 8P: POND 3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 701.50 22,118 0 701.60 26,453 2,429 701.70 30,788 5,291 701.80 35,122 8,586 701.90 39,457 12,315 702.00 43,792 16,478 702.10 44,245 20,879 702.20 44,698 25,326 702.30 45,150 29,819 702.40 45,603 34,357 702.50 46,056 38,940 702.60 46,509 43,568 702.70 46,962 48,241 702.80 47,414 52,960 702.90 47,867 57,724 703.00 48,320 62,534 703.10 48,784 67,389 703.20 49,248 72,290 703.30 49,712 77,238 703.40 50,176 82,233 703.50 50,641 87,274 703.60 51,105 92,361 703.70 51,569 97,495 703.80 52,033 102,675 703.90 52,497 107,901 704.00 52,961 113,174 704.10 53,437 118,494 704.20 53,912 123,861 704.30 54,388 129,276 704.40 54,863 134,739 704.50 55,339 140,249 704.60 55,815 145,807 704.70 56,290 151,412 704.80 56,766 157,065 704.90 57,241 162,765 705.00 57,717 168,513 705.10 58,204 174,309 705.20 58,690 180,154 705.30 59,176 186,047 705.40 59,663 191,989 705.50 60,150 197,980 705.60 60,636 204,019 705.70 61,123 210,107 705.80 61,609 216,243 705.90 62,095 222,429 706.00 62,582 228,663 706.10 63,079 234,946 706.20 63,576 241,278 706.30 64,073 247,661 706.40 64,570 254,093 706.50 65,067 260,575 706.60 65,564 267,106 706.70 66,061 273,688 706.80 66,558 280,318 706.90 67,055 286,999 707.00 67,552 293,730 707.10 68,060 300,510 707.20 68,567 307,341 707.30 69,075 314,224 707.40 69,582 321,156 707.50 70,090 328,140 707.60 70,598 335,174 707.70 71,105 342,260 707.80 71,613 349,395 707.90 72,120 356,582 708.00 72.628 363.820 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 708.10 73,146 371,108 708.20 73,664 378,449 708.30 74,182 385,841 708.40 74,700 393,285 708.50 75,219 400,781 708.60 75,737 408,329 708.70 76,255 415,928 708.80 76,773 423,580 708.90 77,291 431,283 709.00 77,809 439,038 709.10 78,336 446,845 709.20 78,862 454,705 709.30 79,388 462,618 709.40 79,915 470,583 709.50 80,442 478,601 709.60 80,968 486,671 709.70 81,495 494,794 709.80 82,021 502,970 709.90 82,547 511,198 710.00 83,074 519,480