Loading...
HomeMy WebLinkAbout20221135 Ver 2_TriWest Business Center - Operation & Maintenance Agr_20230224Operation & Maintenance Agreement Project Name: TriWest Business Center Project Location: I Davie County Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & corresponding O&M sheets wil Infiltration Basin Quantity: Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Quantity: Stormwater Wetland Quantity: Permeable Pavement Quantity: Sand Filter Quantity: Rainwater Harvesting Quantity: Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: Dry Pond Quantity: Disconnected Impervious Surface Present: User Defined SCM Present: Low Density Present: Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Type: 2 No No No oe aaaea automaticai I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Signature: Responsible Party: Mocksville Development Partners, LLC Title & Organization: Daniel Barnes,4APkw w4Member/Manager of The Crown Companies LLC, Authorized Agent Street address: 121 N. Crutchfield Street City, state, zip: Dobson, NC 27017 Phone number(s): 336.386.9790 Email: I danielb@crown-companies.com cz:y Date: 02/24/2023 I, Michelle S. Gough a Notary Public for the State of North Carolina County of Surry do hereby certify that Daniel Barnes personally appeared before me this 24 day of February 2023 and acknowledge the due execution of the Operations and Maintenance Agre ment . Witness my hand and official seal, Michello S. Gough NOTA PUBLIC Surry ounty, NC My Commission xpires July 05, 2025 My commission expires July 5, 2025 STORM-EZ 2/22/2023 Version 1.5 O&M Agreement Page 1 of 4 Wet Pond Maintenance Requirements Important operation and maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and - perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet pond should be fertilized after the initial fertilization that is required to establish the plants on the vegetated shelf. _ Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet pond. If the pond must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain will be minimized as much as possible. At least once annually, a dam safety expert will inspect the embankment. Any problems that are found will be repaired immediately. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. After the wet pond is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: The entire wet pond Trash/debris is present. Remove the trash/debris. Areas of bare soil and/or Regrade the soil if necessary to remove the gully, plant ground The perimeter of the wet erosive gullies have cover and water until it is established. Provide lime and a one - pond formed. time fertilizer application. The inlet pipe is clogged (if Unclog the pipe. Dispose of the sediment off -site. applicable). The inlet pipe is cracked or otherwise damaged (if Repair or replace the pipe. The inlet device applicable). Regrade the swale if necessary and provide erosion control Erosion is occurring in the devices such as reinforced turf matting or riprap to avoid future swale (if applicable). problems with erosion. Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a location design depth for sediment where it will not cause impacts to streams or the SCM. storage. The forebay Provide additional erosion protection such as reinforced turf Erosion has occurred. matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticide is used, Weeds are present. wipe it on the plants rather than spraying. Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a location design sediment storage where it will not cause impacts to streams or the SCM. depth. Algal growth covers over Consult a professional to remove and control the algal growth. The main treatment area 50% of the area. Cattails, phragmites or other invasive plants cover Remove the plants by wiping them with pesticide (do not spray). 50% of the basin surface. Best professional practices show that pruning is Prune according to best professional practices. needed to maintain optimal plant health. The vegetated shelf Determine the source of the problem: soils, hydrology, disease, Plants are dead, diseased etc. Remedy the problem and replace plants. Provide a one - or dying. time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Remove the weeds, preferably by hand. If pesticide is used, Weeds are present. wipe it on the plants rather than spraying. Shrubs have started to Remove shrubs immediately. grow on the embankment. Evidence of muskrat or Consult a professional to remove muskrats or beavers and beaver activity is present. repair any holes or erosion. A tree has started to grow Consult a dam safety specialist to remove the tree. The embankment on the embankment. An annual inspection by an appropriate professional Make all needed repairs immediately. shows that the embankment needs repair. Clean out the outlet device and dispose of any sediment in a Clogging has occurred. gg g location where it will not cause impacts to streams or the SCM. The outlet device The outlet device is Repair or replace the outlet device. damaged. Weeds or volunteer trees Remove the weeds or trees. are growing on the mat. Floating wetland island The anchor cable is (if applicable) damaged, disconnected or Restore the anchor cable to its design state. missing. Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. Discharges from the wet The receiving water pond are causing erosion or sedimentation in the Contact the local NCDEQ Regional Office. receiving water. 0 Pretreatment other No than forebay? Has Veg. Filter? No O Pretreatment other No than forebay? Has Veg. Filter? [;;No Wet Detention Pond Design Summary Wet Pond Diagram Permanent Pool El. 710.5 Temporary Pool El: 712.72 Clean Out Depth: 6 Sediment Removal EI 704.5 Bottom Elevation: 705 FOREBAY Permanent Pool El. 701.5 Temporary Pool El: 702.5 Clean Out Depth: 4 Sediment Removal Ell 697.5 Bottom Elevation: 1 698 Permanent Pool El. 710.5 Temporary Pool El: 712.72 Clean Out Depth: 6 Sediment Removal El 704.5 Bottom Elevation: 705 RAIN POND Permanent Pool El. 701.5 Temporary Pool El: 702.5 1 Clean Out Depth: 4 Sediment Removal Ell 697.5 Bottom Elevation: 1 698