Loading...
HomeMy WebLinkAbout20221135 Ver 2_SuppEZ Form_20230224SUPPLEMENT-EZ COVER PAGE FORMS LOADED OJECT INFORMATION Project Name Project Area (ac) Coastal Wetland Area (ac) Surface Water Area (ac) 1 TriWest Business Center 2 201.14 3 0 4 Low 5 Is this project High or Low Density? 6 Does this project use an off -site SCM? No H 02H .1003(4) etated setbacks provided (feet) 30 etated setback remain vegetated? 71RUA Yes posed in the setback, does it meet NCACO2H.1003(4)(c-d)? N/A nk stabilization proposed on this project? No NUMBER D TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 2 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting (RWH) 18 Green Roof 19 Level Spreader -Filter Strip (LS-FS) 20 Disconnected Impervious Surface (DIS) 21 Treatment Swale 22 Dry Pond 23 Storm Filter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Luke Bugenske, PE / Partner 28 Organization: OAK Engineering, PLLC 29 Street address: 4929 Monroe Road 30 City, State, Zip: Charlotte, NC 28205 31 Phone number(s): 803.312.5074 32 Email: Juke@ oak. engineering Certification Statement: I certify, under penalty of lawthatthis Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. I III" 'ARn.— i SEAL r ; 045345 •'•� I NEBUG EF, •• ���: III•__ Sea/ _•*%% Signa re o De igner Date 2/23/2023 DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes 4 If so, number of low density drainage areas 2 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA I 4 Type of SCM Entire Site LD 1 Wet Pond LD 2 Wet Pond 5 Total drainage area (sq ft) 862,052 664726 6 Onsite drainage area (sq ft) 862,052 664726 7 Offsite drainage area (sq ft) 0 0 8 Total BUA in project (sq ft) 639971 sf 479595 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) n/a n/a 10 New BUA not on subdivided lots (subject to permitting) (sf) 639971 sf 479595 sf 11 JOffsite BUA (sq ft) n/a n/a 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft) 73086 sf 181995 sf Sidewalk (sq ft) 7013 sf n/a Roof (sq ft) n/a 297600 sf Roadway (sq ft) 55598 sf n/a Future (sq ft) 504971 sf n/a Other, please specify in the comment box below (sq ft) n/a n/a 13 New infiltrating permeable pavement on subdivided lots (sq ft) n/a n/a 14 New infiltrating permeable pavement not on subdivided lots (sq ft) n/a n/a 15 Existing BUA that will remain (not subject to permitting) (sq ft) n/a n/a 16 Existing BUA that is already permitted (sq ft) n/a n/a 17 Existing BUA that will be removed (sq ft) n/a n/a 18 Percent BUA 74 % 72 19 Design storm (inches) 1.0 in 1.0 in 20 Design volume of SCM (cu ft) 51584 cf 38740 cf 21 Calculation method for design volume Simple Method Simple Method ITIONAL INFORMATION 122 Please use this space to provide any additional information about the drainage area(s): WET POND 11 Drainage area number 2 3 21 Minimum re uired treatment volume cu ft 51584 cf 38740 cf GENERAL MDC FROM 02H .1050 31 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V)? 31 31 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? No No 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes 13 f the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? Yes Yes 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes 161 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed by an NC licensed professional? Yes Yes WET POND 18 MDC FROM 02H .1053 Sizing method used SA/DA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 704.50 697.50 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 705.00 698.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 710.00 701.00 23 Elevation of the permanent pool (fmsl) 710.50 701.50 24 Elevation of the top of the vegetated shelf (fmsl) 711.00 7002.00 25 Elevation of the temporary pool (fmsl) 712.72 702.50 26 Surface area of the main permanent pool (square feet) 20568 22118 27 Volume of the main permanent pool (cubic feet) 91040 cf 65775 cf 28 Average depth of the main pool (feet) 5.10 ft 3.36 ft 29 Average depth equation used Equation 2 Equation 2 30 If using equation 3, main pool perimeter (feet) 31 If using equation 3, width of submerged veg. shelf (feet) 32 Volume of the forebay (cubic feet) 16814 cf 13068 cf 33 Is this 15-20 % of the volume in the main pool? Yes Yes 34 Clean -out depth for forebay (inches) 6 m 4 m 35 Design volume of SCM (cu ft) 114799 cf 168513 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice, orifice diameter (inches) 5 in 5 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 2.3 2.5 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes Yes 42 Are berms or baffles provided to improve the flow path? No No 43 Depth of forebay at entrance (inches) 72 in 48 in 44 Depth of forebay at exit (inches) 66 in 42 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 47 Slope of vegetated shelf (H:V) 61 61 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment Bermuda Bermuda 541 Hasa planting plan been provided for the ve etated shelf? Yes Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 11:51 AM 2/23/2023