HomeMy WebLinkAbout20191748 Ver 3_sheet2_20230213(3KAHH1U tiUALtz rtztz I
Site
SUMMARY TABLE
ACTIVIT
Reach Length
No. Instream Structures
Length (in ft) Impacted
by Instream Structures
Length (in ft) of Streambank
Sloping
Length (in ft) of Live Stake
Planting
Riparian Buffer Planting (Acres)
Area Disturbed During
Construction (Acres)
REACH
2000 Feet
704
2000
2.3
0.54
— III
6
—1 I I I I-1 I I I I-1 I I I I-1 I I I IJ I I I IJ I I I IJ I I I I-1 I I I I-1 I I I I-1 I I I I-1 I I I I-1 I I I I-1 I I I I-flM M]HH—MH I
.n� NoT NO GN
PLAN
SHEET 2 of 4
KXV
0
Z
LEGEND:
Bank resloping
Rock Vane
Boulder Cluster
Root Wad
u I d
lust
Rock
ti o 4+32
M p �
� Rock Vane Ca
, 5+43
\ Toe Rock
Christopher Isaacs
� ar
CD
Boulder Cluster
-AUGA TOWNSHIP, WATAUGA COUNTY, NORTH CAROLINA
'P • 11 11XI 1 o+h 7n77 I Ir10 Klr%