HomeMy WebLinkAbout201902441 Ver 1_07c_WBRR PHASE 3 Plans 2022-1011_11x17_20221115GENERAL NOTES: THE CONTRACTOR SHALL ONLY CONDUCT BANK AND STREAM BED WORK, INCLUDING ALL IN -STREAM, GRADING BANK STABILIZATION, AND IN -STREAM STRUCTURES ON A SECTION OF STREAM THAT CAN BE ENTIRELY STABILIZED BEFORE MOBILIZING TO A NONADJACENT REACH OF PROPOSED CHANNEL IMPROVEMENTS. EVERY EFFORT SHALL BE TAKEN TO MINIMIZE DISTURBANCE GAINING ACCESS TO/FROM THE WORK AREA. THE GRADE LINE ELEVATIONS SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED OR FUTURE SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS GRADE LINES MAY BE ADJUSTED AT THEIR BEGINNING, ENDING AND AT STRUCTURES AS DIRECTED BY THE DESIGNER IN ORDER TO SECURE A PROPER TIE-IN, SAVE TREES OR TO CREATE A MORE "NATURAL" APPEARANCE. NOTE, FINISHED GRADE ELEVATIONS AS SHOWN IN THE PLANS INCLUDE PLACED TOPSOIL AS DESCRIBED IN THE PLANTING NOTES SUBSURFACE: NO SUBSURFACE DATA IS MADE AVAILABLE TO THE CONTRACTOR FOR THIS PROJECT OTHER THAN THAT PROVIDED IN THE BID MANUAL. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING HIS OWN SUBSURFACE INVESTIGATIONS AS THEY RELATE TO THIS PROJECT, SITE/EASEMENT: THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGED ITEMS DURING CONSTRUCTION INCLUDING, BUT NOT LIMITED TO, EXISTING ROADS, FENCES, SIDEWALKS, LANDSCAPING. CURB AND GUTTER. SEWER LINES. MANHOLES. ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY IMPROVEMENT TO THE ROAD CONDITION, GATES, SIDEWALKS, CURB AND GUTTER, SEWER LINES, MANHOLES AND FENCES. REQUIRED FOR ACCESS DURING CONSTRUCTION. ANY DRAINAGE TO PUBLIC INFRASTRUCTURE IN THE VICINITY OF THE TEMPORARY CONSTRUCTION ENTRANCE/EXIT SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER. THE TEMPORARY CONSTRUCTION ENTRANCE/EXIT SHALL BE REMOVED AND RETURNED TO THE ORIGINAL CONDITION OR BETTER AT THE END OF USE. STAGING STOCKPILES AND HAUL ROAD AREAS: SPECIFIED AREAS SHOWN ON THE PLANS HAVE BEEN ESTABLISHED AS ACCESS AND STAGING AREAS. THE CONTRACTOR SHALL ESTABLISH STOCKPILE AREAS ALONG THE PROJECT, AS NECESSARY, TO CARRY OUT THE WORK, ALL STOCKPILE AREAS MUST BE INSIDE THE LIMITS OF CONSTRUCTION AND APPROVED BY THE DESIGNER, ADDITIONAL STOCKPILE AREAS SHOULD NOT BE LOCATED WITHIN FORESTED AREAS, SILT FENCE SHALL BE REQUIRED IN AREAS WHERE LOOSE SOIL HAS BEEN PLACED IN THE STAGING AND STOCKPILING AREAS. EXISTING GRADE ELEVATIONS WITHIN THE 100 YEAR FLOODPLAIN SHALL NOT BE RAISED AS PART OF THIS PROJECT UNLESS SHOWN. ANY EXCESS MATERIAL MUST BE TRANSPORTED OFFSITE TO AN APPROPRIATE DISPOSAL AREA. MATERIALS THE UPPER 6 OF TOPSOIL SHALL BE SAVED FROM THOSE AREAS THAT WILL BE DISTURBED BY EXCAVATION, FILL, HAUL ROADS, OR COMPACTION EQUIPMENT, TOPSOIL SHALL BE KEPT SEPARATE FROM ANY SITE SPOIL UPON COMPLETION OF CONSTRUCTION, TOPSOIL WILL BE SPREAD OVER AREAS TO BE PLANTED. SEE PLANTING NOTES FOR ADDITIONAL INFORMATION. STREAM BED MATERIAL, DEEMED SUITABLE BY THE DESIGNER, SHALL BE SAVED FROM AREAS OF THE EXISTING STREAM THAT WILL BE IMPACTED BY CONSTRUCTION. THESE AREAS WILL BE FLAGGED BY THE STREAM DESIGNER PRIOR TO THE CONSTRUCTION OF THE PROPOSED STREAM, EXCAVATED BED MATERIALS, (le, GRAVEL ROCK AND COARSE SAND) WILL BE UTILIZED IN CLOSE PROXIMITY TO THEIR LOCATION OF EXCAVATION, AND WILL NOT REQUIRE EXTENSIVE HAULING. THIS EXCAVATED BED MATERIAL WILL BE USED IN THE STREAMS RIFFLES AND IN —STREAM STRUCTURES, THE REMAINING EXCAVATED MATERIAL, NOT MENTIONED ABOVE, SHALL BE CONSIDERED SITE SPOIL AND BE STOCKPILED SEPARATELY FROM THE ITEMS LISTED ABOVE. APPROPRIATE AMOUNT OF SUITABLE SITE SPOIL SHALL BE SAVED FOR LATER USE AS BACKFILL. OTHER SITE SPOIL SHALL BE LEGALLY TRANSPORTED OFFSITE,IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THIS ACTION IS CONDUCTED UNDER AN EROSION CONTROL PERMIT. THE CONTRACTOR SHALL NOTIFY THE NORTH CAROLINA LAND QUALITY SECTION'S MOORESVILLE REGIONAL OFFICE AT (704) 663-1699 BEFORE ANY SPOIL IS TRANSPORTED OFFSITE. CONTRACTOR WILL BE REQUIRED TO INFORM THE LAND QUALITY SECTION OF THE LOCATION AND METHOD OF OFFSITE SPOIL DISPOSAL, ALL PERMITS REQUIRED FOR THE OFFSITE DISPOSAL OF SITE SPOIL IS THE RESPONSIBILTY OF THE CONTRACTOR. CONSTRUCTION SURVEY: THE STREAM CENTERLINE, BREAK LINES SHOWN, CUT AND FILL LINES, AND LIMITS OF DISTURBANCE SHOULD BE SET AND STAKED PER THE DRAWINGS. UPON COMPLETION OF THE CONSTRUCTION STAKING THE DESIGNER MUST INSPECT AND APPROVE THE STAKING BEFORE CONSTRUCTION CAN BEGIN. THE DESIGNER RESERVES THE RIGHT TO ADJUST THE LOCATION OF THE PROPOSED STREAM CENTERLINE, BREAKLINES, CUTLINES OR ANY HAUL ROADS. TREE PROTECTION: TREES GREATER THAN 6" DBH OUTSIDE THE CUT LINE ARE NOT To BE REMOVED WITHOUT THE ENGINEER'S APPROVAL, UNLESS THEY ARE MARKED IN THE PLANS. CONTRACTOR SHALL PREVENT DAMAGE TO TREES TO REMAIN. IN THE EVENT OF DAMAGE, REPAIR ANY DAMAGE TO THE CROWN, TRUNK, OR ROOT SYSTEM IMMEDIATELY. + REPAIR ROOTS BY CUTTING OFF DAMAGED AREAS AND PAINTING THEM WITH TREE PAINT SPREAD PEAT MOSS OR MOIST TOPSOIL OVER EXPOSED ROOTS. + REPAIR DAMAGE TO BARK BY TRIMMING AROUND DAMAGED AREA, TAPER THE CUT TO PROVIDE DRAINAGE, AND PAINT WITH TREE PAINT. CUT OFF ALL DAMAGED TREE LIMBS ABOVE THE TREE COLLAR AT THE TRUNK OR MAIN BRANCH. USE A SEPARATE CUT TO AVOID PEELING BARK FROM HEALTHY AREAS OF THE TREE. REFER TO THE RODEO EROSION CONTROL MANUAL FOR MORE INFORMATION. TRAFFIC CONTROL: ALL TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). WORK IN THE RIGHT-OF-WAY OR STATE SYSTEM STREETS MAY REQUIRE ADDITIONAL TRAFFIC CONTROL PROVISIONS, REFER TO NCDOT WORK ZONE TRAFFIC CONTROL PROGRAM, MUTCD AND NODAL STANDARD DRAWINGS. EROSION CONTROL: TOTAL AREA DISTURBED - 21,2 ACRES SOIL TYPES: MONACAN (Mo). INSTALLATION OF SEDIMENTATION AND EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH STATE EROSION CONTROL REGULATIONS. THE CONTRACTOR SHALL INSTALL AND MAINTAIN THROUGHOUT THE PROJECT CONSTRUCTION ALL EROSION CONTROL MEASURES SHOWN WITHIN THESE PLANS IN ACCORDANCE WITH APPLICABLE NCDEQ EROSION AND SEDIMENT CONTROL REGULATIONS, THE CONTRACTOR MAY ADJUST LOCATION OF HAUL ROADS AND SILT FENCE AS NECESSARY AFTER SUCH PROPOSED CHANGES HAVE BEEN APPROVED BY THE DESIGNER. ALL CONSTRUCTION WORK SHALL BE IN COMPLIANCE WITH REGULATIONS OF THE NATIONAL AND STATE POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) STORM WATER GENERAL PERMIT, CONTRACTOR SHALL BE RESPONSIBLE FOR HAVING A RAIN GAUGE ON THE PROJECT SITE AND FOR RECORDING DAILY RAINFALL AMOUNTS DURING CONSTRUCTION. SILT FENCE 5H OULD BE LOCATED BETWEEN THE HAUL ROAD AND STREAM WHERE HAUL ROADS ARE LOCATED NEAR A SECTION OF STREAM THAT WILL NOT BE WORKED ON AS PART OF THIS PROJECT. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED CONTINUOUSLY, RELOCATED WHEN AND AS NECESSARY, AND SHALL BE CHECKED FOR MAINTENANCE ISSUES AFTER EVERY RAINFALL, THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE LOCAL OR NCDEQ EROSION CONTROL INSPECTOR SO THAT PERIODIC INSPECTIONS CAN BE PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION, CONSTRUCTION SEQUENCE: 1, STAKE THE STREAM PER SPECIFICATIONS.. 2, THE CONTRACTOR SHALL INSTALL THE EROSION CONTROL MEASURES, THE CONTRACTOR SHALL CLEAR ONLY AS NECESSARY TO INSTALL THESE ITEMS, AND SHALL NOTIFY THE PROJECT ENGINEER WHEN INSTALLATION OF THESE ITEMS IS COMPLETE FOR INSPECTION BY THE LOCAL EROSION CONTROL INSPECTOR, 3. WHERE PROPOSED CHANNEL GRADING IS TO BE PERFORMED, EXCAVATE AND STORE DESIGNATED TOPSOIL, CHANNEL BED MATERIAL, AND TREES THAT CAN BE UTILIZED FOR CONSTRUCTION OF IN —STREAM STRUCTURES, INCLUDING LOG VANES, JOG J—HOOKS, LOG RIFFLES, AND TOE WOOD. CLEAR THE LOGS, BRUSH, TREES AND SHRUBS INSIDE THE CUT LINES. NO TREES OUTSIDE OF THE DESIGNATED AREAS OF EXCAVATION GREATER THAN 6" DBH ARE TO BE REMOVED WITHOUT DESIGNER'S APPROVAL, SHRUBS AND TREES THAT ARE TO BE TRANSPLANTED SHALL BE MARKED. THESE SHRUBS AND TREES SHALL BE SAVED FOR TRANSPLANTING AND STOCKPILED. ALL SHRUBS AND TREES MARKED TO BE TRANSPLANTED SHALL BE REMOVED ENSURING THAT THE ROOT MASS IS INTACT. 4, CONSTRUCTION SHALL BE COMPLETED INCLUDING TEMPORARY VEGETATION, EROSION CONTROL MATTING, LIVE STAKING, MATERIAL TRANSPLANTS (INCLUDING BED MATERIAL), AND STRUCTURES, THESE SHALL BE APPROVED BY THE DESIGNER PRIOR TO DIVERTING STREAM FLOWS INTO THE NEW CHANNEL. 5. THE CONTRACTOR SHALL STABILIZE THE SITE AS AREAS ARE BROUGHT UP To FINISHED GRADE. 6, INSTALL PLANTINGS ACCORDING TO THE PLANTING PLANS. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. SEEDED AREAS SHALL BE CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED, RESEEDED AND MULCHED AS NECESSARY TO OBTAIN A DENSE STAND OF GRASS, ALL DISTURBED AREAS THAT ARE NOT OTHERWISE STABILIZED SHALL BE TOP SOILED AND SEEDED, TEMPORARILY OR PERMANENTLY UTILITIES: IN ACCORDANCE WITH THE NORTH CAROLINA SEDIMENT CONTROL REGULATIONS. PERMANENT SEEDING AND GRASS ESTABLISHMENT IS REQUIRED PRIOR TO PROJECT COMPLETION AND THE CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES INSIDE THE CONSTRUCTION ACCEPTANCE. CORRIDOR. CONTRACTOR SHALL PROVIDE GROUND STABILIZATION ON PERIMETER AREAS AND EXPOSED UNDERGROUND UTILITIES TO BE TRAVERSED BY CONSTRUCTION EQUIPMENT SHALL BE SLOPES GREATER THAN 3:1 WITHIN 7 DAYS AND WITHIN 14 DAYS IN ALL OTHER AREAS, APPROPRIATELY PROTECTED OR BRIDGED TO PREVENT DAMAGE, THE CONTRACTOR CONTRACTOR TO LIMIT CLEARING TO 1,000 LF PRIOR TO COMPLETING BANK GRADING SHALL FURNISH ALL PROTECTION CROSSINGS REQUIRED FOR ALL UTILITY CROSSINGS. AND/OR STABILIZATION. LIMIT REMOVAL OF TREE STUMPS PRIOR TO INITIATION OF BANK PROTECTION CROSSINGS SHALL BE INSTALLED AS REQUIRED TO PROTECT EXISTING GRADING. UTILITIES. IN THE AREA OF THE DUKE HIGH TRANSMISSION LINE, CONCRETE BARRIERS SHOULD BE ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 21 PLACED AROUND THE TOWER (NO CLOSER THAN 10') TO PROTECT THE TOWER, DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE INCURRED TO ANY UTILITY FURTHER EROSION AND SEDIMENTATION, LINES DURING THE CONSTRUCTION PROCESS. CONTRACTOR SHALL KEEP ALL SURROUNDING PUBLIC ROADWAYS AND DRAINAGE SYSTEMS FREE FROM DIRT, MUD, AND CONSTRUCTION DEBRIS AT ALL TIMES. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT ALL ACCESS LOCATIONS PER THE PLANS AND SPECIFICATIONS, WHEN A CRUSHED STONE CONSTRUCTION ENTRANCE HAS BEEN COVERED WITH SOIL OR HAS BEEN PUSHED INTO THE SOIL BY CONSTRUCTION TRAFFIC, IT SHALL BE REPLACED WITH A DEPTH OF STONE EQUAL TO THAT OF THE ORIGINAL APPLICATION. ALL DRAINAGE INLETS SHALL BE PROTECTED FROM SILTATION. INEFFECTIVE PROTECTION DEVICES SHALL BE IMMEDIATELY REPLACED AND THE INLET CLEANED. FLUSHING IS NOT AN ACCEPTABLE METHOD OF CLEANING. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL TEMPORARY SOIL STOCKPILES ON SITE AS WELL AS SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SI TE, ALL HAUL ROAD LOCATIONS ONSITE MAY BE ADJUSTED IN THE FIELD TO PROTECT EXISTING TREES LARGER THAN 6' DBH. THE FINAL STAKING OF THE HAUL ROADS SHALL BE APPROVED BY THE DESIGNER BEFORE CLEARING COMMENCES. CONTRACTOR SHALL ONLY CROSS STREAM AT STABILIZED CROSSINGS AS SHOWN IN PLANS, CONTRACTOR TO COORDINATE WITH NCDEQ IF ADDITIONAL CROSSINGS ARE NEEDED, SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, TEMPORARY SILT CHECK DAMS, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND —DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE, STABILIZATION MEASURES SHALL BE APPLIED TO STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. DURING CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN ON THE PLANS BUT NECESSARY TO CONTROL EXCESS SEDIMENT. IF DETERMINED TO BE NECESSARY BY THE DESIGNER. GENERAL SEQUENCE: THE CONTRACTOR SHALL CONSTRUCT NEW CHANNEL SECTIONS TO A STABLE FORM BEFORE MOVING OUT OF THE WORK AREA, A STABLE FORM SHALL INCLUDE, BUT IS NOT LIMITED TO THE COMPLETE INSTALLATION OF IN STREAM STRUCTURES, EROSION CONTROL MATTING, AND TEMPORARY VEGETATION, PERMANENT VEGETATION SHALL BE INSTALLED IN CONJUNCTION WITH TEMPORARY SEEDING IF CONSTRUCTION IS PERFORMED DURING THE SEASON SPECIFIED IN THE DRAWINGS AND SPECIFICATIONS. PERMANENT VEGETATION SHALL BE INSTALLED DURING SPECIFIED PLANTING SEASONS. THE CONTRACTOR SHALL FOLLOW OSHA GUIDELINES AND UTILITY OWNER GUIDELINES WHEN WORKING NEAR UTILITIES. THE CONTRACTOR SHALL CALL THE "CONTACT ONE —CALL CENTER" BY DIALING 811 OR 1-800-632-4949 BEFORE DIGGING. O kmowwhats below. Call before you dig, a - M r M. 71 o °. ImMTING LEGEND TEXT LEGEND: BFP - BACK FLOW PREVENTOR BDP - BARDFORD PEAR (TREE) BRC - BIRCH (TREE) CATV - CABLE TV BOX CB - CATCH BASIN CONC. - CONCRETE CO - CLEAN OUT DB - DEED BOOK DI - DROP INLET FIR - EXISTING IRON ROD ELEV - ELEVATION EMM - EXISTING METAL MONUMENT EN - EXISTING NAIL EU - END UNKNOWN FES - FLARED END SECTION LIFE - FINISH FLOOR ELEVATION FH - FIRE HYDRANT GDP - GUARD POST GDR - GUARD RAIL GM - GAS METER GMKR - GAS MARKER GP - GUY POLE GR - GATE GV - GAS VALVE GW - GUY WIRE HVAC - HEATING/COOLING UNIT INV - INVERT MA - MAPLE (TREE) MB - MAP BOOK MBX - MAILBOX NIR - NEW IRON ROD PB - POWER BOX PG - PAGE PP - POWER POLE RCP - REINFORCED CONCRETE PIPE TB - TELEPHONE BOX WM - WATER METER LINE LEGEND: PROPERTY LINE (NOT SURVEYED) RIGHT-OF-WAY (NOT SURVEYED) APPROXIMATE CENTERLINE OF CREEK/BRANCH GUARD RAIL UNDER GROUND GAS c c c UNDERGROUND TELEPHONE Ur Ur U OVERHEAD POWER oc oc oc EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR EXISTING UNPAVED ROAD PROP0,5ED PLAN LEGEND we we --MEPF PROPOSED STREAM TOE e BB c PROPOSED OUT LINF PROPOSED FILL I.INF x x PROPOSED OR RFLOCATED FENCE PROPOSED i.OG CROSS 1 PROPOSED i.OG S-HOOK PROPOSED LOG � - PROPOSED ROCK TOE PROTECTION 0 0 o PROPOSED RIP RAP PROPOSED CHANNEL RIA.. PROPOSED CHANNEL. BI..00K PROFILE LEGEND - - - - - - - .EXISTING GROUND AT PROPOSED GENTERL�NE B F..XISTIN0 GROUND AT PROPOSED) RIGHT BANK FIJL L EXISTING GROUND AT PROPOSED UEF- 3ANKFl1i,€,, PROPOSED CHANNEL BOTTOM — — — — — — — PROPOSED CHANNEL aANKFUI.L. PROPOSED EROSION CONTROL LEGEND LOD e e V EASEMENT 0 V F_NTRANCE/EXff TP ; PROTECTION FENC ON VVAT E R C ROSSI NG CHANNEL CRvSSING :1pINTS { CHECK C 15. kmowwhats below. Call before you dig. 69C 68E 68E 684 682 68C 67E 67E 674 67, 67C 66E 66E 664 66, 66C 65E 65E 654 652 65C ie 0 U � 0 U IAMN OM Z II C�Qw minty Z yM0 O'n� II OQ� � Zt0 O+in Z_ C�QW UI�M N+ UO II UZw �inw L L / v / R soy; PROFILE for WBRR tLOWER REAL HOT Scale:1-30' Wrt -5*W: "'=V 0 ��_� /���,-tz� �-MErKUNBURG COUN'�x -� S ���--�7v ., =�"VI (� /_`-r-- i'-' _ t DB1226804, PC 380 \ ^) r /1 t_.° /7 ) l 1r i \ e - 1= /L TRACT A, ABERSHAM SUBDIVISION 2�\ (_�� _ 7 ) THE, TOWN OF DAVIDS�'w- /� \1 - - y� \ MB 53, PG 580 �"`-" �., - /�`I `t / F= PB 14620, PG 750 = m J-i _ _ _ TAX PARCEL- 003-041-03 - - _ _ o \ a TAX PARCEL 8 ARCE03-i 11-041 2�- 1855�API418R2N �.BERSHAM DRIVE �` ) R ) �.� 40NE&: R �� ZONED: RR',-� TRAiL � _ \\ III -,�\\ fy EX. ASPHALT o� DE SIDE ° 5� _� _ U �-_ )� a' o�� 5DE t:Y� Ii �V1 v �A Ivv vv vv� ✓ o -- -- \\\ \Tl �-1 o = p = Z J ?SE TO PR EVI%''S PHA,-S V\� V_ �� p {� \\ (\\\ \\\-_-_-_-_-_-_-_-_-_--------------------- ^/ Chi --_-11------ \ \\\ _------------------_--_---_--_---___-_-_-_ ______------------------------ _ C -1\ ) \ \\\�\ - _ \\\ ------ —------- — — — — —------------ ------- - - - ----- -�_ C-- _ --- — — — -- — — — _—_— — — -- _______________--- ----+— — = �_ _ego � -o ---------------- \�---------------------------------------— `\` )= '] —==I -- — — — — — — — — — —I — — — — — — — — — — — ----- — fi#------ — — —--------- — \`, l�\ - _--_IB? — — — — — — — — — — — — — — — — — — — — — — — — — i ----------------- — — -- — ---------------------------------- _ — — - - _--- ----- ----- _ - ------------------ ------------------------- --------------------------------------- __ - �VBH BE --_-__ — - - - - - - - - - - - - -__ SDE l 1 jam-.. c �c E c c c c c c c-`7�c SDE SIDE ssD��sRE SIDE 1 /�_ �i=/� i ���i �� f/� _ / -E r _ soe SM SEA �--SDE 1SDE _ sDE sDE-'o--SE�.soF SILVER FOX FAI�X LLC `,�/_//�=i Vi - -`_ y�. >r �<J T ��i1 �_ �/ j r -"- , �s 1 i Z 0' DUKE POWER DB 2966 ,,,PG 6'� ��1 , �,'//�/ /(/ �/ / ��� ! / -- - SION LINE EASEMENT TAX PARCEL: 003-13fl,94�E > lr. f/ I i \pg\1g,53,5 P�-Bg�rr�___-___` Y 2040 CIUeRDZI` Rom / //_ / _ _ �� TAX PAL c ab3-n21�a3_�--,---_,- B 53, PG 580 , , zgnDN A1`�D R, vI''vL - 1/ / // // 1 / v /�/ / / �i a 'A ) ENERGY PLAN FILE/ 4 r / // /�� _ j%1t�60��E1OLFK`� R`✓ER &9AD-32 AND 107-14 0 � 1�u r''%VXSZ°67115E N�E/^ �-�- 590 688 686 584 682 580 578 676 574 572 670 668 566 564 562 560 658 656 554 552 550 fl 7 GRAPHIC SCALE IN FEET 0 15 30 60 8- kmowwhats below. Call before you dig, 68E 68E 684 68, 68C 67E 67E 674 67� 67C 66E 66E 664 66" 66C 65E 65E 654 65� 65C 64E ZMN ZU U1O0� O°'a U6tMD C�� zil>oa� Ulh� ZO+m UmrNn I<w mmm ZMy U1V1� Zm uNN zap mrnw �tpN r Ul0 J�m Um� pr'J" �mw YUOm O�y Soin+m+N J claw �mw Nh inV 7cnw o� U+� oaf �inw �rnw P C L R � R C 19:110121.4aroTits'1 588 586 384 382 580 578 576 574 372 370 568 366 364 562 360 358 556 354 352 550 348 `` (APPROXIMATE LO �� -' 1 J --� ✓.t � �' ✓ -vt✓ /^i--,-t �.,,L_�� a ! o 7�}�E TBWN OF DAulf3 'QN _,.) `t , 1<-•_ c,-6a-�..; C ° �� 70' PIEDMONT NA 0AS COMN g— ^� DB 14620. PC 5Q r l .• T h� DBPG O „ TAX PARCEL: 003'y111-04 $ ZONED: RR t r GRAPHIC SCALE IN FEET C V G ✓_ 15 30 60 t�� - t✓ �t��s.t �- .,✓�� � f ' � � °;9J, i, ,ice IL S" Dc � sDE=T sDE---yyy���� s9E. _ � rA< � \._- , .7 f >> sDE sDE �T SDO`1DE SDE / DE v� E S/ / (APP� xIMATE ODE 1 L CATION) A 96 _ 8 �- sDE E � s ✓✓ �70' Re NATURAL �r-c • < C C sDE SIDE SIDE soE� COMPANY �t 7,,r✓/o > o YZ �< r e lr _�zr` .r✓ / 1/ B.27406, PG 590 \�r �G\'_ Y�°5> `b °XT�t�r✓✓\ P�c o i-)��.%�'r tar`..rrE �r�- \<;;e --A Q G T- ✓ BB -�-�� ✓ 13 C C l 1 r r Y C ` 3s t] \r \\\\`` \l BB �\ ..,BBB-86 BB B F� eB �� Lr Far r \`\\�1'\+7 _ _ - - - - 0. - - - - _ - '- \ �11PX 1�✓ ^ / _ -__ a-�_ - - - =s`== � � ✓ - ate✓_ �r --.$$ >�t-�-��— - -- _ --_ - _ _ - _�✓-_ - tin � -_ — v r chic c -c c i� j r cs�-0 ��° C c C c C� C —c s c c c c 1 &�,--,zc c —'mach �`�'�/ Y� _ /� IT - �_ SDE SDE A� � \ s SDE � DE SIDE SIDE SEE SEE SIDE SIDE SIDE SIDE SDE SDI SDE SIDE SIDE iD€/SIDE\ \�-r<i ✓ _t �� �Lr— \ice x�l - -ter l�1 �� - ✓ -r--- BARGER FARM, L4/� �✓ � ✓-� � � �✓ / _ y I71�T DB-16535. PG X121 i� / �/ \ Ji! f �J^ rt``- ✓ -�,- - s _ L rJ oN� TAX PARCEL: -03 ` -.`\ J✓J y --w� 003-121 7 �� t / 1'- XV \�rti/ �Atp° IF13601 EAST ROCKY RIVER ROAD \� -;'✓ - �.i _ o r �� - - - c v �f `�i., ZONED: NE AND R ,� t _i %� -✓i _i - _ ---_ _ --�- -- y�✓� -.� ... - r - o- - _ - _ - - — `� - 2<-- -✓ r _ -V� c.✓ two Z f _ y f _ - _ _ / _ TEL ` � --_ --_ -ter ,-. o p �) ,,o� /✓�-c - _V t �- � �i ��� s �- � __-. �.�✓ �r_� _- -- -� - '- �{'.C7W 64h8Y5 below. ---- Call before you dig. 68E 684 68, 68C 67E 67E 674 67, 67C 66E 66E 664 66, 66C 65E 65E 654 65, 65C 64E 64E 0 U K o� pY� ��M OU i(]N COQw m inw OWN O,�Kn. UFw mu,w YOJO J m[nwr—ANw U+' �^ II C9Q� minty � Umco C94� SON Kifl� C9Qw p~J Z �/I 4 tnh C�Q� p�nw w Oa> ,p UN� UZw prow C�Q pQw -IFP w[nw � R P R R P R 78+00 PROFILE for WBRR 1LOWER REACH 386 384 382 380 578 576 374 372 370 368 566 364 362 360 358 356 554 352 350 348 346 c^ �}JK/ / o/ 1 5 TIE TO TIE TO EXISTING 4"D EXISTING ION EAL� ) e _ / e\ / GROUND GROUND r\ IT l / E.2 THE TOWN OF DAVIDS0,RI ,✓✓ DB 146g0, PG 750 o r� `'� SECTION A -A 5 TAX PARCEI,ff. 003RR-R111-p4 ) SDE -�-� NOT TO SCALE e_.v C ��j SDE t \R SDE ZO ED: $oE SDE soE soE_ SDE 7 'SDE 5 SDE .. L SLDE >"cl!^SDE SD d?oD G>- SDE SDE 5 SDE SDE \ a SEE �r /L/ C ) /Lo \ T \ ) // C—C� —° ,] r WEST Zq o P / r \7 Cw�"0 0 CIA �BB V 7/\0.7 ° 11J1 �� J� / �C�C C SC C C c C C °�` - s� s-a -__ BB� BB ti�-rya. C C C C C C C T�`i s I BB�� — u .,�J� \"da BBB _ y ` BB -- � 7 e� /1`�<S Ji �\ _ii__ __� \.. \p t�\`\�•\ \l ) L.�v ."ter/_"__/__��� - ��\� -\ —`kL// ji (/ f6(1)r� r1�5 c�C�v�C R ))J/i'1)) )\\��\ C v cJ GRAPHIC SCALE IN FEET SDE 0 15 30 60 C �"�C 1 � ° otRr° �> " soE E\'���� �� 3D P O G n .��ti� t, r C�G C �IC L ColG 0 ) �',�7 � � ',`� �L \ �.r/ C C S vo SDE ` _SDE�SDE 5@E� 56� SDF f`lyO ` _ �l SDE SDE SDE SDE SDE SDE � / r SDE—�,SOE� SDE -� r.!'"p �1,0�-.'� ✓ \ _v N\ �� �_ — t f> 1 ARGER LLC"L r ��.� „FARM, 16535, TAXRO€L 603-12g�1�� �13601 EPST ROCKY RIV R R o ZONED: NE AND R U��� —��� ��� kmowwhptr below. Call before you dig, r j.1 +i ,CLrL St1'.1: k3.F.nllil S[i f:OliAi Y' O _W ..L 9�ar`Ef CLPUOVOo! P 68E 684 6K 68C 67E 67E 674 67L 67C 66E 66E 664 66� 66C 65E 65E 654 65, 65C 64E 64E r J 0 O Q U4� �mtp craw L � U � OMtMO o W U Om� UJ o Uri c�Q� m inw r U W NCO 04. z mrnw U W CJ ZVm z�� m�nw W O}if]+N KN<p c�Qw �M� of o�J Ul�> i �mw �a� craw aN J}M �m i ��,,, R l � a� TIE TO TIE TO EXISTING a.D EXISTING GROUND GROUND AS R oo N �EQo SECT N6L Not TO SCALE SDE SDE SDE SEE cSD [;����3�1.�.��•Titi'1..:3����1��liiTJ.�:�:�.�:i�1;1 r <sp o< , T LIE Q ; �� �,.-..� A l D�k �PPOWER r THE TOWN OF DAVIDSON � o -�I ---ems —�Ij a) ) � �" E--- � COMP'AI�Y Y -��e✓5 DE 14620, PG 750 khti mT - „�.wy �� RIGHTkRIINES TAX PARCEL: 003-111-04_(�/eC ZONED: RR A ��-` l °�7SEE SDE SEE SEE SDE SEE SEE SDE SDE $DP SDE S �. SDE/ SDE TDE C C C C C C C C DE— "s SD sDE � ° L oc` anY EIn,(:x E3nNk;��wlYNir� hu Ktw � iiMFNT I E /� 2-1 L/ 1 C Dry 'z\l� Y�,� JY C C �' C C � C C C C c c c c C—F J \ \ l s� _ '� ------ EE— ---- _ —1 C BB '^— )T— 21 — — /S Tt <,/c✓ lam. o �� - 2) ) �J"r�)cb�}%�_\ -� o v—r'J_ �Y�I \\�°c""Tp JTa C � � �✓��53)�C--)ood i1 J r—C C C C C SDI SDE SDE SDE SDE SDE SDE SDE SDE SDE SDE SDE ,f" S(DE SIDE j0ODE S SJDE SDE SDE SDE SDE5LLS`SRE - _TSDE DE L BARGER FARM, LLLI DH 16535, PG 1104C m 51 TAx7 PARSEI -a�q 003-121-03 `t�>�� Qi �/i. 360? {H§ Res RIVER R�aD ti _ — r o m o z)bNRD:� 1 p c o S T ° /- �— — _ i86 i84 382 i80 S78 576 i74 J72 370 368 566 364 362 i60 358 356 554 352 350 i48 i46 ............. 1-11, . ....... GRAPHIC SCALE IN FEET ~... 0 15 30 60 = 9�• ,ice e �'•.�Ef CLPUO��.�`• 15. kmowwhats below. Call before you dig, 31' PROPOSED GROUND, BANK HEAD OF RIFFLE [ PROTECTED PER MATTING DETAIL SEE PLAN AND PROFILE SHEETS FOR ELEVATION �' IIIIIIIII—III— TAIL OF RIFFLE St1'.1: k3.F.nllil S[i f:OliAi Y' Q�P —III=III=III=III=III=III RIFFLE GLADE RiF LE SEE PLAN AND PROFILE QUO =III=III=III=III=III=III DEPTH SHEETS FOR ELEVATION 3BASE FLOW "-6" ABOVE 50 _= IIII IIII IIII IIIIB-B POOL - I _ _ = RIFFLE MATERIAL OIF O III —III III=III — SECTION EXTEND RIFFLE ABOVE TOE OF SLOPE EQUIVALENT TO 25% I\ ^\ O APPROXIMATE BASE _ _ _ IF HEIGHT (RIFFLE SECTION) TOP OF BANK BANKFULL DEPTH OR 0.3' MIN. FLOW WATER LEVEL '> _ _ O O THALWEG RIFFLE - E _ III —III _11 DEPTH , - WELL -GRADED MIX OF - • _ RIP -RAP (SIZE PER TABLE) 12" THICK AND EARTH MATERIAL MIX III SHALL BE AT GRADE AND FLUSH WITH BANK III TOE OF SLOPE RIFFLE MATERIAL PROPOSED GROUND, BANK RIFFLE RIFFLE SECTION PROTECTED PER MATTING DETAIL TTOM WIDTH COIR FIBER MATTING, EXTEND 1.C' BELOW TOE OF SLOPE UNDER THE RIP RAP AND ANCHOR AT TOP OF BANK PER MATTING DETAIL IIIIII—III P Q IIIIIIIII=III= PLC IIIIIIIIIIII=III=III IIIIII=III— 3.-6. ABOVE = = BASE FLOW SECTION A —A DISTANCE ALONG TOE EXTEND RIFFLE —III A ALONG TOE (TYR) BANKFULL APPROXIMATE BASE O 11 O HEIOHT 00 FLOW WATER LEVEL (POOL SECTION) TOE OF SLOPE IIII FLOW 12" THICK WELL -GRADED MIX OF O RIP -RAP (SIZE PER TABLE) HEAD OF RIFFLE TAIL OF RIFFLE AND EARTH MATERIAL. MIX SHALL BE AT GRADE AND FLUSH WITH BANK TOE OF SLOPE BANKFULL POOL SECTION PLAN VIEW o _; O NOTES, NOTES. 1. MAJORITY OF BRUSH SHOULD BE 0.5-2.0" IN DIAMETER AND NO LARGER THAN 1. ROCK TOE TO BE PLACED ON TOP OF COIR MATTING 6" AND EXTEND INTO THE BANK 2 FEET ON EACH SIDE. WOODY MATERIAL SHALL BE VARYING DIAMETER TO ALLOW MATERIAL TO BE COMPACTED. - 2. PLACE LOGS AND WOOD DEBRIS WITH MINIMAL GAPS. A LAYER OF ON -SITE o CHANNEL MATERIAL SHOULD BE APPLIED TO FILL VOIDS IN BRUSH AND LOGS PRIOR TO THE INSTALLATION OF ADDITIONAL LAYERS. 3. BOULDERS TO BE PLACED AS SPECIFIED ON PLANS S - - Q �I kmowwhats below. Call before you dig, THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH 17 WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY 70 KIMLEY-HORN AND ASSOCIATES, INC. NONWOVEN GE07EX7ILE FABRIC, TYP. NAIL FILTER FABRIC TO BACK OF LOG rn i CV ..)-lv SEE PLAN AND PROFILE SHEETS FOR LOG ELEVATIONS. LOG TO REMAIN WET, MAX. DROP ACROSS LOG NOT TO EXCEED 0.1'. RIFFLE 1'-12' WELL GRADED MIX wauowG W5T STONE AND NATURAL CHANNEL DESIGN FLOW POOL DEPTH BANKFULL MATERIAL, 12" DEEP LOG VANE A L© CRO55 LOG O BACKFILL MATERIAL OW o O PERAPROFD EPOOL o ^\ II _ - BED III _III— LOW AREA,TYP I - AND RIFFLE SECTION B B E o — NAIL ALL UPSTREAM FACES OF LOGS WITH TYPE II FABRIC, TYP. AXB HEBOULDER EQUIVALENT TOE 5% SLOPE EXCAVATED POOL, SEE PROJECT SPECIAL PROVISIONS DEPTH SEE TYPICAL SECTIONS FOR DEPTH SECTION A -A 2.D GGMPAGTED BRUSH SECTION A -A - REACH LOWER ARM LENGTH (L) 25' BOULDERS TO BE BURIED AND PLACED AT SEE PLAN AND PROFILE SHEETS ARM TIE-IN HEIGHT 0,5' EDGE OF WATER PARTIALLY INTO THE BANK FOR SPACING BETWEEN LOGS ARM SLOPE (S) 1.07-2.07 f EXCAVATED POOL PER ROFILE STEP SPACING (X) 8' BANKFU eL a a y o e a BBANKFULL NOTES: - a TOE OF SLOPE L� I TOE OF SLOPE 1. DEEPEST PART OF POOL TO BE IN LINE WITH WHERE VANE ARM TIES INTO THE BANK. A 2. BACKFILL MIX TO BE USED TO REDUCE VOIDS BETWEEN LOGS, 3, ALL LOGS TO 8E HARDWOOD SPECIES, 8"-10" DIAMETER MINIMUM. - FLOW 0 O 0 0 0 00 000 0 A O 0 n 0 -► E �� POOL Uo FLOW LINE o p TOE OF SLOPE O TOE OF SLOPE 1/2 1/2 e a e 8 e AAXNN� BASE FLOW BASE FLOW BANKFULL O BANKFULL EAIeEooEo NAIL ALL UPSTREAM FACES LENCTH BOULDER AND ROCK TOE PROTECTION1A WHERE NORMAL WATER MEETS THE BANKS _ )F LOGS WITH TYPE II FABRIC, t } A fea ANCHOR BOULDER CUT LOGS TO MAKE FLUSH CONNECTION, CONNECT END OF LOGS TOGETHER, PLAN VIEW OVERLAP FABRIC ARM LENGTH (L) NAIL ALL UPSTREAM FACES O OF LOGS WITH NONWOVEN CEO V GE OTEXTILE FABRIC, TYP. E NOTES: — - CROSS LOG 1. PLACE FABRIC ON THE UPSTREAM SIDE OF THE MOST UPSTREAM LOG SILL IN BACKFILL (TYP), SEE SEPARATE DETAIL o z ,- tt:_ THE CONSTRUCTED RIFFLE. `oQ "- 1012" GALVANIZED NAIL 2. BOULDERS SHALL BE USED TO ANCHOR LOGS IF NEEDED. CC 3. THE LOG SILL SHALL ALL BE DESIGNED TO BE SUBMERGED OR COVERED AT LOW FLOWS. )oL 4. LOGS SHOULD BE 8" 12" DIAMETER. LOG VANE Pc o� o o SILL LOG A 3 N 0 - TIE VANE ARM INTO INNER BERM ELEVATION KEY IN VANE TO BANK A POOL EXCAVATED PER PROFILE MINIMUM OF 4.0' OR DIRECTION OF ENGINEER PLAN VIEW v Ix �I C4 Knowwhats below. Call before you dig, THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH 17 WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION RY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY 70 KIMLEY-HORN AND ASSOCIATES, INC. SEE PLAN AND PROFILE SHEETS FOR BOULDER, TYP. SEE PROFILE FOR ELEVATION ELEVATION. LOG TO REMAIN WET, MAX DROP ACROSS LOG NOT TO EXCEED 0.1'. SCOUR PROTECTION FLOW —�� SCOUR PROTECTION 1/3 POOL LENGTH OR 2' MIN. TYPE II FABRIC 1/3 POOL LENGTH OR 2' MIN. StF.1: k3.F.nllil S[f fA..)lV LOG VANEE] GLIUE RIFFLE OW L-o -M- - 0O CONSTRUCTE POOL T i VARIABLE RIFFLE, SEE POOL SEPBACKFILL ARATE DETAIL MATERIAL SILL AND BACKFILL DEPTH SCOUR PROTECTION DEPTH 2.0' MINo S UR PROTECTION DEPTH BACKFILL MATERIAL 2' MIN. TYPE II FABRIC, SECTION A -A NAIL FABRIC TO BACK OF LOG. SECTION A -A D LENGTH AT ANELBDEEATION EQUAL TO BANKFULL HEADER BOULDER COVER UPSTREAM FACES WITH TYPE II FABRIC AND FOOTER BOULDER NAIL TO BACK OF LOG VANE. H EMBEDDED LENGTH INTO ` CHANNEL 2' MIN. BANKFULL EMBEDDED LENGTH 1/4 TOE OF SLOPE ANGL \ BASE FLOW A VANE LENGTH \ FL TOE OF SLOPE 1/� POOL -- A- - -- -- A BASE FLOW OHo FLOW 1/ ANCHOR LOG BY PINNING ��� .may POOL BASE�FLOW WITH HEADER BOULDER -----� TOE OF SLOPE--- OF SLOPE SCOUR PROTECTIO .. CONSTRUCTED OR B �� VARIABLE RIFFLE, SEE ROCK LENGTH BANKFULL eH �,f•• ~•L ,,'_ SEPARATE DETAIL EXTEND BACKFILL MATERIAL O"2' ABOVE TOE OF SLOPE _ ' �'O�Ef CLPUO��,..• l llr BACKFILL MATERIAL 1 f PLAN VIEW MIN. PLAN VIEW NOTES: P.. '= 1. ELEVATION CONTROL POINTS SHALL BE DESIGNATED AT THE UPSTREAM z, 3: 3 INVERT (CENTER) OF THE CROSS VANE TO ESTABLISH PART OF THE PROFILE. N POOL ELEVATION CONTROL POINTS OR EXCAVATION TO A SPECIFIED MAXIMUM POOL DEPTH SHALL BE DESIGNATED TO ESTABLISH THE REMAINING PROFILE. SURVEY OF CONTROL POINTS SHALL BE REQUIRED TO ESTABLISH ACCURATE CROSS VANE INSTALLATION WITHIN THE TOLERANCE SPECIFIED BY THE NOTES: DESIOD 2 ER BOULDER IS REQUIRED IF BOULDER DEPTH IS LESS THAN DESIGN 1. Ai LOG SILL MAY BE USED ALONE OR IN COMBINATION WITH A CONSTRUCTED OR VARIABLE RIFFLE. POOL DEPTH. 3. BOULDERS SHOULD HAVE 2' MIN. DEPTH. 2. LOG TO REMAIN WET, MAX DROP ACROSS LOG NOT TO EXCEED C.1 FT. 4. DEEPEST PART OF POOL TO BE IN LINE WITH WHERE VANE ARM TIES INTO o - 3. THE USE OF LOGS IN THE STREAM BED SHALL BE LIMITED TO PERENNIAL WATERBODIES ONLY. THE BANK. 5. POOL DEPTH SHOULD BE ACCORDING TO PROFILE AND TYPICAL SECTIONS. " 4. NO PART OF THE SILL SHALL BE PLACED ABOVE THE ELEVATION OF THE 6. LOGS SHOULD BE 8"-12" DIAMETER. u' - UPSTREAM AND//OR ADJACENT STREAM BED. o 5. A HEADER/F00'-ER LOG COMBINATION MAY BE USED IN LIEU OF A SINGLE LOG. IF A HEADER/FOOTFR LOG IS USED, LOG USED NEED TO BE CONNECTED/PINNED TOGETHER USING ////3 REBAR OR SIMILAR. 6. 7. POOL DEPTH SHOULD BE PER THE PR6FILE. LOGS SHOULD BE 89 12" DIAMETER. Q I �I Ic E"`I kmowwhats below. Call before you dig, THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH 17 WAS PREPARED" REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY 70 KIMLEY-HORN AND ASSOCIATES, INC. BASE/NORMAL BACKFILL COIR MATTING', t FLOW ELEVATION BANKFULL (TYP.) SEE DETAIL 4;�! STREAM GRADING MATCH TYPICAL TYPE II PER PLAN DIMENSIONS FABRIC St1'.1: k3.F.nllil S[i f:OliAi Y' 6' MAX ABOVE BASE FLOW r 16" MI HEIGHT �© POOL � O EXCAVATE OL PRO�OE ^ WRAP COIR MATTING 6" PRIOR TO PLACING BACKFILL BRUSH LAID PERPENDICULAR - �^ TO FLOW. SECTION A -A -WIDTH� t � i � w THIS SPACE IS INTENTIONALLY LEFT BLANK Y BRUSH SHOWN ¢ YC FOR ILLUSTRATIVE PURPOSES ONLY o o, \ A A ,� \ POOL PER PROFILE POOL % GTIT •"�'>' �'� � •'OGEE CLPUOV�`°�. µ 65% BRUSH (STICKS/ SEE PLANS FOR LEAVES/BRANCHES) 25% eEXT\ OF TOE WOOD ON -SITE EARTH MATERIAL, o 1C% 2"-10" RIP RAP w _ g <` to �r O •: O PLAN VIEW a - NOTES. 1. BRUSH SHALL BE A VARIETY OF DIAMETERS AND SHALL BE LAID GENERALLY PERPENDICULAR TO FLOW AND COMPACTED BY DIRT. 2. LAYERS SHALL BE 65% BRUSH OF A VARIETY OF SIZES WITH 25% ON SITE MATERIAL FILLING VOIDS AND 10% 2"-10" RIP RAP. 3. BRUSH SHOULD BE BROUGHT UP IN 6"-B" LIFTS. y� 4. GRADING ABOVE THE TOE WOOD IS PER THE TYPICAL SECTION AND/OR GRADING PLAN. Q CUD, kmowwhatS below. Call before you dig, THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH 17 WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION RY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY 70 KIMLEY-HORN AND ASSOCIATES, INC. TIE TO PROPOSED TOP OF BANK TIE TO PROPOSED TOP sik.i: [<3.F.n'TsiI S[i f:O11Ai Y' NEW STREAMBANK SHALL _ EXISTING SANITARY OF BANK BE TREATED PER PLANS 1s' UNCOMPACTED BACKFILL _ _ SEWER PIPE (TYP OR SPECIFICATIONS FINISH GRADE 2-12" RIP RAP WITH #57 STONE TOP WIDrH EXTEND CHANNEL PLUG ROCK SHOULD BE SET FLUSH TO FINAL GRADE MIN. OF 1' BEYOND INVERT (SEE PROFILE SHEETS). CHANNEL SHOULD BE OF EXISTING CHANNEL FILTER FABRIC OVER DUG BY 1'-2' TO ACCOMMODATE ROCK. _ (IF SU BGRARE SANITARY SEWER CROSSING, THE CONTRACTOR SHALL VERIFY PIPE DEPTH BEFORE � AND CHANNEL GRADING ABOVE). A SECTION A -A F COMPACTED COMPACTED 2-12" RIP R - BACKFILL PLUG COMPACTED BACKFILL SECTION A -A N ,.o LIFTS Y Q ,mom=" Elm PROPOSED \ C H A—WEL— COMPACTED PLAN BACKFILL T A F t 9�4 f Q EXTEND CHANNEL PLUG MIN. OF 1.C' BEYOND LIMITS OF d EXISTING CHANNEL c�j���� °, •!Ff BLGU����o� PLAN VIEW N �r O •: A[ < O DOTE$ 1. CHANNEL PLUGS SHALL BE INSTALLED AT LOCATIONS INDICATED ON THE PLANS WHERE THE PROPOSED CHANNEL ALIGNMENT DIVERGES FROM THE EXISTING CHANNEL ALIGNMENT. CHANNEL PLUGS SHALL BE OF SUFFICIENT DESIGN TO PREVENT CHANNEL FLOW FROM REVERTING BACK INTO THE o - ORIGINAL ALIGNMENT. "= 2. THE MATERIAL USED IN THE CHANNEL PLUG SHALL BE SUCH THAT THE N PLASTICITY INDEX SHALL EQUAL OR EXCEED THAT OF THE NATURAL SOILS SURROUNDING THE STREAM. THE MATERIAL IN THE CHANNEL PLUG SHALL BE COMPACTED TO A DENSITY OF AT LEAST 90% AS OBTAINED BY COMPACTING A SAMPLE OF MATERIAL IN ACCORDANCE WITH AASHTO T99. LIFT THICKNESS SHALL NOT EXCEED 1.0 FOOT. COMPACTION SHALL BE ACHIEVED BY HEAVY EQUIPMENT OR COMPACTION EQUIPMENT. ORGANIC MATERIAL IN THE PLUG SHALL NOT EXCEED 10% OF THE TOTAL VOLUME OF FILL USED. rr� Q LOO, �I kmowwhats below. Call before you dig. THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH 17 WAS PREPARED. REUSE OF AND IMPROPER RELIAN ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY—HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY 70 KIMLEY—HORN AND ASSOCIATES, INC. o GRAPHIC SCALE IN FEET dig. --_ ____- THE S T OF- �' _ -�- V ° \4 DAME LJ�, may- � _ t �"� / rL c,1I 111 1�VA� J o�P EX. ASPHALT TR IL �' c O T !-2L� DB j46L+]l P6`_7,� j �"'9...� r o .. GRAPHIC SCALE IN FEET - �Ill� LT ��. �,-'._ T �, -�"ZAX PARED:.�c� 0 25 50 100 vv�vvs�� �� _-1f1-o4 t _J xr.��s..n�asrr:wr��r T '`/-w---tdE�tLE �UYT6� LINTY e 1, ((77 0- },5 �! �°s7 ° j 1 L \ \ `JZON ED o'HR D9 2$$M�eG �_ TRACK A. ABERSFAM,f 1J\C\\T�=___ SUBDIVISION ° "-r' `moo r // ~^~ 859.50 659.50 �H _ ��_ Sao a° S�o� 2-z os s� �_ `°« <�_ = o� �� � � �` soE SOE soE s59so � 1 TB 55 �,3N� 1��� �/ / 1 659.62 L --_ DE: b. �© B6rnPBERSHAA0. ��IpE_ _ \`= ��_ _ _ _ _ __- , a ==i.Y; L 660.45 _ lam„ 8 .,... 5 E = -J -_-- �6�1E9-' RR ��q-�-_-- _ -- 6�� ., / ( } � l .... 663� 660.23. �,,.. �LX'�E J659.891as 680.32659.93 d .. T _ pp�C �\ _ SDE 880..L\\�tii'o /�U _ SDE 855 _ 855y- - `__ �-., _ - _ _ _ _ _ __ _ '-655 - - -_8_ - k Z /�_- .. / / 667� �� 660 666- (5[fE t - _ 68s. C ✓ rV'J�%jT/ 1 / / ii �����%�� / f� 7r?�(^' �-,SDE ^ .CT 7�Stie e88 J, ;~ C oC Y 66]___. A i R �Lr \,\ 5,.,Ci-rr°/(-; , soE oA SDE s[fE �-SDE SDE SDE �sDE 5DE rse `-=�,�.SOA�� sC�EF 5D6_, t lJ- ' '.s^ eJ;o ARGER FARMIiT.F,.L�LA Is �,^ - v1�1111�11 L -- _ �`� -�� -'�T- i �' , i �1Ij1111 t//--_ r \ �� _ _ _ q03-1o,_�-�- �D1ao;,ai° /�/� �< s% �IllUllll/ / Y,- -.� �_ - _ �//13601 EAST ROCKY �mvsM swam umE EnsEMEmT %i�i/ A �f"}� o �t ��°-. .. 1 1� jam-- d n -a a �I�Ee�i%�ii - E d' �� /I(I�111(`a_� _ v� r-ZO €AND��t _� _ , _ _ - , L� `"= e, v v _- nN; / � .�� 1 ° -,y °. ��A l� I> E _ T .-� -- "_vim �`�✓- _ ��.� �= �ffi JG P�� / O _ 'A'/r A/ / / oii Y'a o �, �.-��_-_ _ _ /� is >oAt 1 �11��1 IiS T �- �- �1 � ���_ ACT / '_ _ "��l �ii� _�� _ _ ___ o / 7/ ��A��< iTl ll A S Tt 4 T iC / OWN re/��v D titer w�� V L1V 11A\\ J` .,..r '� / 46A 0; PGA, 750 �.-,-� _ -� _�.. i� J� tPti >?�'°'. ,.o 's' , ,`rv' __, ti 1i� E L�AA r� EE rTAX PA&CEL - �h� ,Try '� ��`� b1 \ _- /�3�11--- �- ..... QAp�� h., ,_ 1z- _---________ _ - .Ef CLP� en_vA - �9NED�hHR r�_-��---��_-- - F <� o T `d �L 1 1 \ �- -L T�.�- ,�� GRAPHIC SCALE IN FEET 7b - \ 1 L \ �s S ,� S r ,-0 0 0%�' = "= �- < 0 25 50 100 _�`- -- - NYC �°'�to C�� g . ig� �s �y Do 864.67 N T TS ! _ 3 `� o vt �1S �eo / 1. !�. SDE \ = s < y A, C SDE ElSD�J /- SDE 5�E 885 C� s, }. 657.95 \ /�}/ 't T4 // E\ of ✓o ° .. 5DE 86_0_ 654.55IT, `J l Sl "°'� 0 C p " 65g \ i < 860' C 864� ` C --__ 680 _ e_BO_ T, L o 655 _1\ � E� � SDE 855 _ -.S El D w: e _ _ �66 ° m > c 664 66s vVCOT B AN �rKY RiV �—c c � SDE C ,o C G 653.37 A�L��➢iQAE� PAM. LLB'-� �"9"J TL SL 3'ci sDE� (-. a ^e 6 q ( J C, � 6d�SD PG 804 �� S A�� E F }SDE 5DE 'T �� 1 �._ _ �� `- '✓E -h3oaa3�� �J-' r-E 0 C-� cam° ° 663.0a '.�Y t 1l 1=; i �,S> T Eo s V�GI�e{°N JL�,r bv�G' -- ! /.r^( P ,v T 1 L J/ �v s 1� A nJ r �L.ow�dhaYs b210W. \I \> y f .° >, s a o. g r C2II before you dig. THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH 17 WAS PREPARED- REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL RE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. GRAPHIC SCALE IN FEET 0 25 50 100 . . St1'.1: k3.F.nllil S[i f:OliAi Y' a �vM1M W+h'° e .�� �f2s C•�°`\ � � \ 1't -\, "� � f� e - �GE_�'"tTY" S�rTIN THE TOWN `OF t T1s ��0 1 2 v @-111�04 4 �� I flo D3 ss `'Ls4 . c ZONQ_ RR -ICU _-a i o SDESDE SDE SDE SDE b ?"`t SDE "�� dy_4,�zd \ / sDE "1 1 �1 DEter- �D� �ID�I V` nip- �sDE Co `fL C 663-r C -663 ie 660 }-.. 660680 855 652 ---� ,655 _ 663 O 3 880 J —880 ,- C C 661 660 860 C 682 ` vIT^ C - `W S� _. � � WEST E3 ANCi-R�C4C�( �, �� v z - �� I p SDE SIDE SDE �� SBIE� SDE S.4C1 SDFn SEE g �Fl 'SDE c SDE SDI 5DE SIDE W D -��"N �� W�''� ' `'f2`,�r,� t� L �� `.::-�tl o .. (T R ��M, LC ��%\v. E^.�..f., `„� j�C-_`�:"� iifid 3hN _�y'� 71 DB 1 ��3,9,-PG 804 TAX PARCEL;.7- f�l o m J_ti': :.FSEr�iG.N� Qs eL�"1 003-12I-D3 LSE #13601 EAST ROCKY - l RIVER ROAD °ZONED: NE AND R AE _ �I vi - •-� of r 29i, ..�� \ s ` ^ 0, �a o o• V - oti 2 Ip`eareexrtem�T�.�saAl 'l a'IEa IN. NA -AL - - --^fHE TOWN OF Y Tn/r �S J DAVIDSON V A A�N'11 AA�\A \ 7 owl k �. `_ c7'� ), r .:Ri,,. f� ," , v AA ti �� \,� - 5� q,. GRAPHIC SCALE IN FEET oe z,4os. Pc sso DB 14620, PG 750 \ J\ �5>\©t ti \ ; v � �� 16" °6 _SP� F, I �� 0 25 50 100 -tN G TAX PARCEL: °\�!\ \ \ L °' 4�1 �P"0��� Z, S 003-11 1-04 m \� �\ �� \\` \\ 'c1 t \� o ^,off ao v —L ��, zoNEDFrR� y �wv _ i 0v14r o` "�1 e� �L, J a_ Y1 i w SE n.9y J J r� o - z . �n /s ��[� r� r N [ �� �j1 q ° o K Ns , p f 5DE�\QYs E \w\ \\� �i\\ C` c'°.'s �'✓,ate-�'� _/ '2 �'°-, _._...� -'' i�> > a - o � SSE f V A 1�i11A�V /ssi.a3 N N A.t e-.. a- Hry �1 y-SDE sDE 'v d �v 1`_ / �P' 9 �`F; _=�=_���ti= _ 1v� SDE J � � 662 QTP 655 `l`P'e 655 1 = `Si r�-'662, 860 65. y-=ry a �v�N r J` _ - _ -655. _ _ 850��l,~ _ -653 p0O/-� I / COLyNTYI_ ✓.�10 4 C DB 2305, 650 _ 959 655 l bbic� �� PLC 777: 855 4880 o CpC� 3�v�F����"1 "� O °J--.>'---.F pE �i-_�Y �>1 %/i�a's� j.. �; -- J NIL' '} SDE— � <�-= o � 6 sP A 1R_ / oC� ` � SDE � f --T j i. I v ° v N, ��w �Ei6 lj;RGEFAR�MLL\_\ _ � O SDE sDE SDE SEE pp�/ LDB 16535, PG r-� 804 TAX PARCEL: 003-12)- 3r% IN e _ � ,-�, - ' �-X5_01 RocKY i -�- �� J RIVER RO#%c 0 kmowwhptr below. Call before you dig, THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH 17 WAS PREPARED_ REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL RE WITHOUT LIABILITY 70 KIMLEY-HORN AND ASSOCIATES, INC. ck IJ ` / l t�_`�� v 1 \ L I (° vr° v t"\v v A"v" VA vV T� �i/vvv Av\vvv vv Vvv LL Ifs�3 / r 1 f= IT f \V` i ` \vvwAwvv tvvvA���� v vvvvvA`vl�yn�)vty (—1 ,v(\i\VvV1�2r.- VvAV� VAA �� A� v��\\� \\l\T\�\\ �� \\\\\ � �' \ VAA A vw,vV�t\i{ 5/ilv;vv<)vL dill \� Tv v�\vTVA 4f\\A V AA l r /ll r A�si, �tiJA\ zv� /! / ��vvv�`�a�v\ �,vvV��yvv!v(\i'v,- vv,slO "r )Lilttl/, I (L v i\\'1vf> J vv vv vA AA l\,U( \AI1A, l(\V `Vv �`tlA\1 1(/yl 1JC Lw ., \\1\\\y \\\\\\`'\�l\\\`\1\ 7�\\`1\.-\s\\�L 11\ r=.\\\\�`1\C17171f 1��/lll/IJOff �! b � \11)/J11/I, \\�\I\_�\\\\\\�\Jl� �S Ill vv v(\ v,'.vv'�vvvv�v.=i 1,1 `%vIvv�`��t�viuA�vI,(l,Irl - ,,11 vT(wvvvv vw��vwwl�`v Ivv ��2v1� � vv tilyvvv>Ifi vii/i�/�' �, Mil l/// vvvAv v vv J v v vL v `vv v� `vI (\ v_v vL Illnll(/fl lfir/ n rill U {(I/Yw r(s vv vvv/\) lfl}!(\lv vIlIillll(i/u/ r sf N�—�ul� vvI �u// / t L 1Tvvv(�Av!v llAl(\fIIlllii�jl(N vs ` \�\`fig—silt lill�r 1 // )!///(/I!/// V11�1)If II11�1111�1I1�N\ \ \J i\vl Ar\r l!�\!!r �((!1 /f//�/ 1vv)ly } ��� v v v �!v/vvy( 1vvl\vtliLtvIv1111nn1f(IlPvIl �J��v r) 1(nvv vtivl(i r y y fr/ / 1 T- lA1V�ASIIl�lll��(11�111 / �°�.ti �1 �VAAV xAA\ IAI1 7 p J/r / // )7,)L \�I, TTO. VA5 \1A� dll( flli \V�11V��VAf )y1 w J r �(\v )v Ivlivvlvviv)vf��� ✓ °-w `/�1 lill)� fu/�/I(()5�)�I �L//r/� 1 ) 1 r ! ( \� 1 A v� 1 >A AA 3 , ti ' 'v (> `, ( I v f v(\ i v vti'�v)vv l vvI yvvAv0vv0\vv \`�� 0`.4�4�� 2 I� r /` r> �� `% f/.1\r % /!/�I` {r ( �f s` (�,'s`I(\�\1,I/l'rvyvIviv1�11�lii�v��v)�yv�v�vv o✓%s�Lr��"i�iiJiri�/r%'!j�/�//�i/i�/ /, / { `vv"vvvvv\vviful ) vlvllvI}, ///,/f 11� �..IT ) 1. C. vl f \ v�- _ _ � �� j� � n; , � � \ v IT / '— _ _ — /� � � )/ v ( �/ , ' l 4 L / v v n ,� �, _ 1 / / /' v\v t tAvv vv rvvv /v-.� aAIIIII/ f/l r ,v // f(fI Milli II (I J 1 f J / i \vtivvi,ill 'll;/ 41v� I v \y(r�l `'fly!v ;yllrly iv WSJ` _ ,,v�I((II loll /i i)r\))l\\{ \\)ll\\\\\I \ Lll")))II1 llfl) \ l , o�ralll/f 1 (1 \ - -- =�_✓� v)1v �r yvt r. v v IT/ ;r/Ifl // 14(\!1,�yvvv `, �` i(\v/)lf, -, vI vv, _ _— t / 1 ! v r I f, f-,'/—�`� .v._'il��,- -"✓� � J �/, / 1 � ) A ,vA L l v VvV , v vvvv �vv(\vvv 43vy T;/r //irl'I/\`Iwi i_;/i�^.jIA 1 � > �,s Il/1/ r)//.'/.r l t i° It inl/� t c-"_-_ �'/,.i - _ __ •�-_�„°�'��, /rJi J/) I�//f/�f /7 '�/r�4L` r �/ / / r t/ !,f / v ° L s tl r r / >T _� ;</sr _ _ � �i�_�✓✓_ �i / r / /)/11vv / A(/f vfl Iv, 1 / „ h vv1 1 _--;'✓v(\/vA rjA r li r /l l��f// //�// tv//// <-� �/ / (//i�� /v //)/ f!//l1 - ✓=s! vv, 1v / Iy ytlrlvr f /i/' ,/ r I �' �� //rr / _ -- - / s/ lfr/ //�, �/� / �J,III Ir(f / / rEo� ( rv/( (/y J r' ,r� e // i✓ - - r / Sr Ir I! \ / '� 1 I \ 1 ✓��, /I,f(fll////n"I'— Li/ �l u,�!/ /��/�/�� /, �J/ , �{ /,/, � (// / r _ i /�i i a / ry `vv'�(\vvi)) tw ! ' (' r r _ / ,/l!/////l /��%� l_�1''/'`.i'�-^//� • / / �d' C V V 1A( I l / r/r- /r�/r!li>/ < I/,/ %/ �r,� v 1� i� _ _ T- //,-// /-�,_ �(��fl I ° vZwvvvLvwv /// � /' J° 'i `v" ////�,/ /L i/%l /i�iv �/ �� v Av �wA v v ( � / �/ A t iv / 1,��� / ////�,// /�/// //—�� � _ ✓__sv•_ zb`�°� ��, �� ` v�-, 1 I v v(` � s� v,�/ !/ )fI v 1 rt /li/l/r � //� r/l � ✓r=—^�.-�-.� — � _v v �,`vA��� v v v /i` -,tv ` v v L � r �S,r., � �� r—y ,1/f 1 I � �ri�� �V 1 �i a r�; �.L �v/JJ�J" ,lwvtiv(I�Ilirr/rr/r/!u r J v I r IIJ rl I 1 / ) — I� \\\\fl\\\\\L\\\\L f\\ ��� \ \ l j tL°\ w J /'l nC� / ✓ \�/ I 11 �\ � \ �\\\� \,`_ -, \ � ---�_��•\ 1 1\ / �( ( �/l ! \ \\\\ 10\\\\\\ 1\ \� __ _�__—_ \ _ 1 _ _ \, _ `- \\ )i \ (I +rr flu" !` \\� \\\ \���\\ _ % rd� l \ -`\- -\� \ I \\l IIS(1 /I111711� \ / �'\ �� � _\ r.w-��_—,a \\L (\\ �\\\\\�\\ \\\��\ ,_� \ �` ��_ ��i �, _„! > )A IT \h `.� \\�_� �`� ��\\��.- t ; `\\ L1(y/flr"I i� il�l(f (II/Ili) `rrsB�GER F�k1 �, \\\�\T�\\\�\\\\-��\\ \`✓\\\ �� `\ �-.. - -- -003-121 Sf 11(I rllll ll lll7 l�lQB 1653 r`,7 PG �8�4 \(1li\�/)71 �(Iff 1l fll )t i IIlI) Ilil f/ / TAX PARCEL(✓�/// -\ \"� \ .,'•1� r ,� �\ \� _-- �- / G,�c-.`zV :s' ya rJ vl- _r �'-, 1�,/ ` -\\ �\ \I1/7 rllflfllil/II/1y14()ii lil�/!�)1`3�0`f EAST -Irv^�� / ^i\, _ -\� \.\ \ _ �` �` \ \ )i 1 1 ) / \;1�1\Z� `� \\`�` v.. \ ��,\ \ \� \ ! 1 11 1\l ili yl 1 II Itl\\I f) / RAVE#11I3��d/? l \ �. �,\ l \\emu\�`�\ (�\,\ \11 _L/,(/� ��.. \Q r �` \�\.�!IIIf li Illl \120NED. N FA �F/r)E 7 <�,.I�frl \—�\. r� ,� y � �' f ; `� / r / I r r � \ \\\ \L� \ _ � _-'rrif_,_ / > � i ` f rs ti �� (I r � J"; j 1 i> i /I��� s rs 1/ r / i/! It/r!//fell \\ \��� \\�\\\\\��� �\ , 1 o J r'r / i/s �r 1�J !( /llJlf �fr!%�I l� !� lllf ,' \�f`�f 1 (fr 1 } f< c 1 ` _� \ \ I r 11 i J M TT \�lLL11/— \ / ���� —\\�\\``\Z\\���\\\�� ��\1 ,� \� \ \.�/ .�. }`\�11z� ♦�\ \ `�. \ la Jf 111111'\(4)�\1\i 11i11�f�1 I "\\) ��\ \\\\ \\�\\ 9\\�\✓ _ \`\/J1 h�° r \\l ll) I{( II II{ \ 11 IJIyI / I /r li 11I —A-T, ,v� �r slrls�, j,,il},/fl c GRAPHIC SCALE IN FEET G 15. kmowwhatS below. Call before you dig. ,,I;� --,� EX, ASPHALT TRAIL c____ GRAPHIC SCALE IN FEET G— 0 25 50 100 �— / SHE SDE SDE SDE � ��n ❑,. nn SDE SDE « ° ° °° ° SDE �© co oo o0 ocoo 0000 0 000°Oo °o 0 0 o O * o O O O O O o o O O O o c (io O O°o0°oo°co°co°O ° 000000°0000� 2+0c 00 00 00 0o oo 63+Qa _ SDF �. �fi ° °° °°° _ SDE ' °°#� ° SDE W SDE OV 5 •� �— SDE AFE S A SDE 5 G OOooOooOooOooOooOoo GOOoo OOOoo OOOoo 000 G O Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo O Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo / 00 00 00 00 oo 'o 0o 0o 00 00 00 00 00 00 C) Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo O O o o o c o 00 00 00 o _ 00 00 00 00 ° Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo O O O O O O O O O O O O Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo / 00 00 00 00 00 00 00 00 °O °O °O °O °O °O O O O O O O O O O O O O O O / 00 00 00 00 00 00 00 00 00 00 00 00 00 00 / O O Oo Oo Oo Oo Oo Oo Oo Oo Oo Oo O / O O O Oo Oo Ooo0oo0 / v O / O O � o / / / , OO O 00 °° oo oo °° 00 iiiiiiiiiiiiiiiiio GRAPHIC SCALE IN FEET 0 25 50 100 z DE —SDE AlO ° o o - o O SDE O°O O oo-oo °O O SDE— O°O°O 0o / Z:± N °n 0 0 0 0 000o O SDE °O°O°O O o CR O O o O O O O O r, ,� ° O o� C°° °O OoO�O°Oo.""oOOO oOo OoOo O oOOO o�oo O°O-C o DE < o O O O O SD O o0000000oo 00000000°0°0°00000�00 �o '�o E E sDE5.. O O O°°0000000 °°000000°v Ov ° �O°O 00 SDE SDE\ a O O O 0- O OoOo°SA [j,`SA}(`�j/°O 5DE SDE SDE SDE ^y �000000°OOO °�O°O°O°o 00 �r`J- O ° OoOo°°O°O°°°° OOo°°O°O°O°O°O°O°Oo00°O O O °° 0 0 0 0 0 000000 c)o O OoOo 0 0 0 ° rL O 00 O OOOOOOOOOOOOOO°0000000000°O°OOOOOOO OOO OO OO°00�0PF Z O O O O O ti ° LO O O Oo O O O Oo ` x ° o y ° 1°° SV o° o � O° O °o kmowwhats below. Call before you dig, THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH 17 WAS PREPARED- REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION RY KIMLEY-HORN AND ASSOCIATES, INC. SHALL HE WITHOUT LIADILITY 70 KIMLEY-HORN AND ASSOCIATES, INC. MATCHLINE , SEE SHEET C-7.3 O °Oo 2 �[ 000 00 GRAPHIC SCALE IN FEET ° 0 25 50 100 O St1'.1: k3.F.nllil S[i f:OliAi Y' O Oo m SDE SDE SDE SDE SEE SEE O O 5DE DE SDE SDE SDE SDE Oo rr�.-� ° o PF '+J OOO�0o0o0000oo00O0o0o0ooO0 OooO oo O O O O 0 0 0 O O Oo0 O Oo Oo0°O !!I °o°o°°°°oOOO°°OOOO°°O°°o°o°0000°o°oO000000°o°oo"000°°OooO°°oO°O°o°O°°°o°°000°°OOO o°o°°000°°q°o°°` T O i >~v e> d IS i A oo°000°o o 0000 0 0 coo °o°o°000 O 00000 o °oo' 00 000°o°o 00 Qc o0000000°O O000000000o c I 000O0000000�oo°000°oo o I o0°0°o0000°000°000000° 0,o0000 o O o0°0 o O O 0 0 0 00000°000 0000000000 0 00000°o°o°00000°o°oo 000oo00o oo°000C) OSF 0000°0000°oo0 0o o0oo000o o o k, f. i •.,, Ef CLPU� o` GRAPHIC SCALE IN FEET 0 25 50 100 0 i E � C7 O o sE o°o°o — soE— 000 D 00000 <, o SDE sEE 000 0 oOO SDE O E SDE O°O 0000 OoOo — SDE O O O O O O QC) O oo0°O Oo0o0Q C) OoOO° o° O — o O00000000oo000000°O°000000 o ti g7k5� 0 00000°O°OOLoo-000000000000°0°0 0 — °o°00000o°O°OC) o o o °k5 ° ° °°ro SFo� oo 0 0 R. w 0 o ° °C° s AS FF r+ Q r�1l kmowwhats below. Call before you dig, THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH 17 WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY 70 KIMLEY-HORN AND ASSOCIATES, INC. ccj y VC GRAPHIC SCALE IN FEET 0 60 120 240 5 0o j'�° \ S11'A"k3.F.hllil S[i f:OliAi Y' — O !� fa. .ALF j \� �Ef CLPUO GRAPHIC SCALE IN FEET 0 0 60 120 240 $$yy �a 1 M U l o� SF O TK !wK FmNN� �5 W r%i yy i� I�^ ,py= 1+� 1 M 0 OC �f7/Yi. kmowwhatS below. - ° Call before you dig, THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH 17 WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION RY KIMLEY—HORN AND ASSOCIATES, INC. SHALL HE WITHOUT LIADILITY 70 KIMLEY—HORN AND ASSOCIATES, INC. ° Jfl-`---- _ y - t \J - L.y y y -THE TOWN OF _-v—__ �v t „r-�. - VA �r DAVIDS1`L 0.. 45�t ti �v rrr 9' r� <'_,-o- � �n DE laezo,Pc 70 t'� VL� ar a vt - TARe PARCEL: Ex. ASPHALT TRAIL �� f c r� 1�� n o 003-1-1x=0hp 0jBE-0rR-ar-I - V '� �� I-�-� _ 1 \V AAY✓✓ �" ''�-- DKE B SO0111, P 03�., e V ,--r } 7�t t' t^,� o ' O� „5 ,-_. oe5 o OGRAP2�IC SCALE IN FEE100 TRACL A; AI4ERSHANI_`i SUBDIVISION 09 A r-Z r.z �� \�. �7 a-r ta._-,V, v `---<.------/ V 1 j SDI—T SDIoy �_ o l Y APE - SDE r -Z _�'r r l -tom C LOD aL�t��_ —'LOD �c�� LODE o° / Jr \C l;�eee c\ Al 1�x c c c c cam\ ptz' a \ge c c ol o tv % i �- /-' ' 1�.0.� ��� "� �o t-• - - �� o c c Ls - - Y �\ S-ems%is �� sslc\�L _ _Lc C s er--,-r c pC C SDE 5 ' r.,� %i SOE sDE soe soe vsoe SEE �soEV`sDEy--s�E�--�1 "A •`i-�� t� V -�-De$I'ACr ING AREA �- ��,'�— VCti- �`1�tvdtt� - ° I1 oZti c 1 t�� A`VEEL\ t 7-/i'- r��� j �%% �i�t rwr_� c �, A 1t A�1 I � � -•_ __ _ - �, -, ��� � �\r �¢� �-�Eb�;N><atvD\�= -_- - - -� - _ � a� be°�" 7,z t,A}V11 t�t1 i J\ Y rs �v 'mot ��r - _ was^_�� v w sr f-�r�a\ �rr / ��r r / r' � k, f. r ,.5 i 1� _ .,,9 +.......... oc o ` TAX R�4 a t t \ t f o r \ \ �`irg a4l �r�1 003-1 ✓,1t�4VAA \ � AI -7- y �e r P' ZONED:IR��AAA T -'� r� �_r r�� ! ---- -= r r `° GRAPHIC SCALE IN FEET rr 1 -/ - - if' 0 25 50 100 .'� �p;.��`v,r--- �— ��A��t `L r r` �v -o___,___e" -�- - - - - - - -- - y_ P� o Sr'2 _o TEMPORARY HAUL ROAD IS APPROX. 15'WIDE AND „Nay (aaPRaxirna,E Lo naiaM r� \\ \ 1 - l s> 1�!✓ 'yam- '-�Lt" IS TO HAVE APPROX. 6" DEEP WOOD CHIP MULCH - "-`� N ro F t . l t[ \ --' y / { r Y ' < �J 1" ,f '?^' Ft�� OR SIMILAR GROUND COVER IN WET AREAS. SLOPE �M o A 3Ni� R[]AF+AWAY {ll.'+R��fi. �IN,A�, '"iq;F4 ROAD _ 3 LOCATION TO BE FIELD STAKED TO AVOID MATURE z J. TREES T6 TH[Id.nyll.?.lfi EnxTENT PRACTICAL.o Fp a ae.1 _ DE SOS ,k LOD C+1 a — LOD---_�—)GDO' J ry n� rs l J CLODE SEE�o _ SD O Cm1 C C LOD DE 1 �C A ig sic sDE -> w M \6� " -'c °-v_y�f�"t /�+� �' fs /mot S4E E ti .9. o!Y"r� v� -`M1 .�Y�4 o C—c ,JV ,r �\ §Y^� d SDE SDE SDE SEE l O ry � % `V LO.- "- 0 LOB'' LOD LOD .�V `LO��� LOD r f C ' `f I' �j 9 %W _ ael`c ch--c c .rac c c cf 77 c C FQ —~ fir rly _~r \\ -- ` — '\S\<<7tfir r,J \ ��B� —ee — __ --- �c� TS o , m G 'IirC�i '_PB 6 BB; o Y� R.' rIt VV - L ��- -- s c\f �a�tit✓ ° e� _�. -�llq-DIT.18r\N�J `�� t �a w .° �C _� ���_ �,` r �, y s� �c 5`�CA�� Lam& `ate cue b �tX c X Y, �T �Iv _X� a reec L c� d �° c c— k7 fry ��� ,7rfl` � 136Oi E�4T `�1 z3 Gaa �r '°-LOE� LOD C� LOD LOD soE rt �" P • SDE soE e '2 ser r- "I'dN Knowwh8Y5 below. Call before you dig, THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH 17 WAS PREPARED" REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION RY KIMLEY-HORN AND ASSOCIATES, INC. SHALL HE WITHOUT LIADILITY 70 KIMLEY-HORN AND ASSOCIATES, INC. H'HE" TOWN TEIJI'CKi4RY:iAt1L R0.46 15.4Ai4;0%. 1L 'n':CE a �� OF :. HAVi= ArIIROX. fi" DEEP t.'p<)D:; H IP LSOL[ AV]DSAN iSK BI.SILFR GROUND COvi=R IN tti'EF .L'EAS. $L Y�° DB 12Q „F \ \ Y AXF P E�: 1 Q� Y.IUL ROAD A'l1a,]' FRa�.: CREEri. =�'!AL 3.1i1L R .c'ti�J" OOBI 1 O- 4 { rT DicN \ Q 4 LOCATnrq TO BE RELD STAKE) TO AVOID h!ATI � � � LEc, �irvEEs 2 _NF 5`.O Ylt %FAXi4WN1:kT+:3JT 9WK:-ICAL. S1 001`d Cf'R e ` E `A GRAPHIC SCALE IN FEET .� s 0 0 25 50 100 - SEE SDI SIDE SDE SIDE . , SDE tiC = ` SEE �1 j DE pE \ti SDe 3DEf:V ..)lV SDE _ — LOD L00 LOD LOD LOD LOD LOD 'y ,m I d�t40p r i� LX zc— c c c� c pc d -��_- �, c c, —CJ c c-� -Bg' T: �HBB .f�/J = °�r�'-tea/ITICID .15P _ - /\ FE TS Ufp _ .r �` �• e/>r `i a P _ o �_ Tf)g s. 6 �� L �l C C d C C - C C C. C C G C C SyL CT `, ° ` vJJ COD LOD LOD",� LOD C�v = �flD �''tD"'' LOd -�_�-'- -�_ _ OD .L00 w SDI—SDE SDE— SEg&' SDE Fyr SDE SDE SDE SIDE SDE StJr e ,f DE tit .ry .��Aati s J!� �, �'_` ✓l ate. V !L �Ll' {(��� sTY HS L-FX�. ,�J�1 /.T '�zra �Y ti E"CER FORM LCCo��r7�a� . '�" ° L�X rr ZJ{� S/ T��`°/ JD o •-�• RsF,, Pc !oa � - - � � 5, }� ai� Ur r- o J� F�Ek: i� ;� T''? p �'03, v° q N1360vE� f�aEpp(E-q<�W ZONE15 N IF sX -� lam' �� Z ��-� c"' Jtto-' _r" '.,A s .. .l , fir _ 4.. H aPoo-,e LocnT� - Sly Ih�� t a ail T VA�� $-T TTs it a l :J o o - , CLP0 \\��ql,T \/\\ \' �S Rl. cocj, f Ri.,.j�� e_11, ° ° -. De eTaos. Pc ssa ��X - X° - X 1 6� p ® O,. GRAPHIC SCALE IN FEET _ �) r )` D _ 0 25 50 100 5"� c V /� �y\�11A A ti TJt �r� `:� �-%e a° v - °la', �t /r s ?OL r R-1 5 o �a�� gz1Na� _p o o `.`y _. JB�°--"-i•-o °°sue __ u�'- �_ `a fYPPRoximnTE LD 0ti1 m d �' OF '-9 �) o Xr �_°E l �Q\E ' �� De zTaoc Pc ss L ` jN g o _ a t`soE�`�E �4\Vq�11�� �i�� °['��''s�,.nJ....�''ra'✓./�P°.,._....--� �� i��--�_s �� a o EDE 4r i -SLr d0 y tom- ° .-��s�� SD; LOD 'r.L'QD - P'� y, o T �E 1 .' �� _ - rti XTP TP �C /�_�_ �d.o s.=r�-`"�---=r _ €._- _i �s_ �_> - -kr�_� �.�..- �- - ' i=; C �LENHlRUJ _ _ o _ �a ! C STY _ -_ ��� as Y o L s o yo�Taq��,,• ° t i" N - \-dLaN s ~fir' - r w -. _✓ C �' -�- 5 '^r y D Q Ps =� o i ti q % % S-� W -COD�� "�"'f T -- ° LOD —�� Dri B Ell > �LEA-��:- sT `✓a��s=" "'�a,P._� "'�,w � °-i_�/ � tir✓-v 1'i °`' T€-°cTo E��L,. �� Ci � � � kmowwhptr below. Call before you dig, THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH 17 WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL RE WITHOUT LIABILITY 70 KIMLEY-HORN AND ASSOCIATES, INC. LO l d I r! Ir _V OUP riJ/G t , � ` 1 c � \� I( �/Ji/L // lrlfi�/� �.• •- ro//Jf // itil ' 11' LOD— % l/ E-- \' /� r // � � /✓ 1x � �)Jl�ti�trl`wyU�1A���`y��li�llt� nillfl�t�il (1scfifil ho // / is S}{117{tl S�'ltl ��111 l/ /J i�tl�(flrl�7/d ��vV`��`��A v vip tv1 v�-_ r \ate '- '`ter\lit in/c?rrf lilit i \-" IIISIIIIi'tJ y r ,'� r �I�III(S Jei,/i R, r�Iffll�\\�_..�v "3,1 1✓�;` s'jl'� �`��(��\ I='; 5�,� � �`� �\\I����,Jii�'illl`I�i\�\�_'='___` ❑ ��>1bCK 5{LY C•iEck nO Z� �av/ o�//(�v,ti.,..,���vv�� J �//��//• %> ;�'� � pit � 1 r//i"li�r >� �� � 3, r;��ti �'�� � was /r s/ / ill /ti //� ✓ v v/tl�t v14 f, r1�7 , � �o�. � �, '� •;,r` f r'�i, i'rt'/r'' Pf <o ,frrjs�r° r{��• �r3rl�iii' /��t. �63 /r `:5 t. rol a�r„/ a/rr f / {r�Iu Irk �'I 11 5 �13 (`t xw \�\vim 0 �4 GRAPHIC SCALE IN FEET 0 60 120 240 C C kmowwhats below. I Call before you dig. GROUND STAWL17AVON AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE W" Tempmly Swbiaasion Permanent Stahitization • Temporary grass seed covered with straw or s Permanent grass seed covered with straw or other mulches and tackifiers other mulches and to calfie rs • Hydroseeding r Gectextile fabrics such as pe mla rent soil ■ Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeciing ■ Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch r Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed EQiJiPMENTAND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids_ UTTER, BUILDING MATE WALAND LAND CLEARtf G WASTE ?. Never cury or buff waste. Place €iYYer ar:d debris:h aepruved was!e container 2. provide a sufficient_ number a-d size of waste containers (e.g dumpster, _rash receutacie) on site to contain co-6,ruct:on and domest't wastes. 3. Loxate waste containers at least 50 feet away from storm drain inlets and surfa waters unless no other aEternatives are reasonably avaIEable. 4. Locate waste containers on areas t^at do not receive substantial amounts of f;, from upland areas and does not drain directly to a storm drain, stream or wets. 5. Cover waste containers at the end of each workday ancd before storm events a provide secondary eontairmert_ repair or replace damaged waste eon=.others. 6. Anchor alt ksghtweigh:':ter s ir. waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up imsrtediateiy containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste container PAI NT AND OTH ER UQU1D WASTE DO not dump pain[ and otter liqui3 waste intostorr drains, strearns or wetiarvis. 2. Locate paint was;icI at Seast 50 feet away from storm drain inlets and surface waters unless no otter a€ternatives are reas:maNy avaiiable. 3. Contain liquid wastes in a controlled area. E. Con_air merit must be €abeled, sized and placed appropriately fox- the needs of site. `a. Prevr:nt the discharge of soaps, solvents, detergents and other liquid Wastes'folr+ EARTHEN STOCKP33.E MANAGEMENT snow st:,ckpile vocations nn plans. !orate earthen -material stoc?pi€e are= 50 feet away from storm drain Wets, sediment basins, perimeter sedirnei and surface wa.ess unless it can be shown .no other a3ternat ves are reasc available. Protect stockpi€e with si`:t fence installed along toe of s€ope with a noniron five feet'rom the toe o! stockpile. Pfovide stable stone access point when feasible. Stabilize stockpile within the time€rames provided on this sheet and in au with the approved p€an and any additional requirements. Soil stabilizatso as vegetative, physical or chemica3 coverage techniques thal, wll€ restrain erc,52on on disturbed soils for temporary or permanent control needs. 7. 9. 9- ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER Pi nu cs= uxwEo won sw.wE x �iw�sraJ sn� sear 0 o 0 0 P(um:l e" a rmw 0 0 0o 0 1 0 sE�no� a a aa..ax E. u1nMa uniuuu iz ELlN ABOVE GRAOEorWuA50UT STRUCTUREEu� •'O�Ef CLPUO��,.�• NCC.iDI (3'ROUND STABILIZATION AND MATERIALS HANDLING I EFFECTIVE. 04/0 ./1.91 i4.owwhats below. Call before you dig. 5� �1 2 MAINTENANCE: INSPECT CHECK DAMS AND CHANNELS AT WEEKLY AND AFTER EACH SIGNIFICANT 10' 5• (L(EAST R INCH VENT AND PAIR MMEDIATELY.OR ) CLEAN CUTRAINFALL E SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. a ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM OO° CROSS SECTIC7N HIGH FLOWS AROUND THE EDGES OF THE DAM CORRECT ALL DAMAGE IMMEDIATELY. IF O SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN BE TAKE SUCH - T AS, INSTALLING A PROTECTIVE RIPRAP LINER y _ IN THAT PORTION OF THE CHANNEL (PRACTICE 6.31, RIPRAP-LINE AND PAVED CHANNELS) a TOP VIEW 2 REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO 1 CHANNEL VEGETATION, ALLOW THE CHANNEL /1 1 TO DRAIN THROUGH THE STONE CHECK DAM, V/ AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO o w NOTES: FRONT VIE"VV DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. g 1. CONSTRUCT STREAM CROSSING WHEN FLOW IS AT NORMAL BASE FLOW. • 2. MINIMIZE CLEARING AND EXCAVATION OF STREAMBANKS. DO NOT EXCAVATE CHANNEL BOTTOM. 3. INSTALL STREAM CROSSING PERPENDICULAR TO THE FLOW. 4. MAINTAIN CROSSING SO THAT RUNOFF IN THE CONSTRUCTION r ROAD DOES NOT ENTER EXISTING CHANNEL. C_P� 5. STABILIZE AN ACCESS RAMP OF CLASS B STONE TO THE N EDGE OF THE MUD MAT. 6. CONTRACTOR SHALL DETERMINE AN APPROPRIATE RAMP ANGLE ACCORDING TO THE EQUIPMENT UTILIZED. 7. MUST BE REMOVED IF STORN EVENT IS PREDICTED. MAINTENANCE: MAINTENANCE: ° 1. INSPECT TEMPORARY STREAM CROSSINGS AFTER RUNOFF -PRODUCING RAINS TO CHECK FOR BLOCKAGE IN INSPECT SEDIMENT FENCES AT LEAST ONCE A _ CHANNEL, EROSION OF ABUTMENTS, CHANNEL SCOUR, RIPRAP WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. DISPLACEMENT, OR PIPING. MAKE ALL REPAIRS IMMEDIATELY TO PREVENT FURTHER DAMAGE TO THE INSTALLATION. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME i INEFFECTIVE, REPLACE IT PROMPTLY. 3 N REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FCIII TO AVOID E.GHEAFENCE KE RDURIING UUN ERMININCLEAN OUT. - REMOVE ALL FENCING MATERIAL AND _- UNSTABLE SEDIMENT DEPOSITS AND BRING - I THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN TILT PROPERLY STABILIZED. FRONT VIEW SIDE VIEW o NOTES: * FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 STONE 1. USEISILT FENCE ONLY WHEN FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. DRASAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER = i = ;y• fe N AREAS OF CONCENTRATED ;, pk•,, ,i p FLOW. .,�.iEf CLPUOV�``O,• 2. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. gL MAX 6: 1 MAk a Oo° NOTES: MAINTENANCE: zo O — 1. A STABILIZED PAD OF CRUSHED STONE SHALL 1. MAINTAIN THE GRAVEL PAD IN A CONDITION TO '^' ¢ - o BE LOCATED WHERE TRAFFIC WILL BE ENTERING PREVENT MUD OR SEDIMENT FROM LEAVING OR LEAVING A CONSTRUCTION SITE TO OR FROM A PUBLIC STREET. THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. PC, C'- 2. STONE TO BE 2-3 INCH WASHED STONE. AFTER EACH RAINFALL, INSPECT ANY 3. THE ENTRANCE SHALL BE MAINTAINED IN A STRUCTURE USED TO TRAP SEDIMENT AND CONDITION WHICH WILL PREVENT TRACKING OR CLEAN IT OUT AS NECESSARY. IMMEDIATELY Q FLOWING OF SEDIMENT ONTO PUBLIC STREETS REMOVE ALL OBJECTIONABLE MATERIALS OF EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. o �- STONE AS CONDITIONS DEMAND AND REPAIR AND//OR CLEANOUT OF ANY MEASURES USED "> s _ - TO 1RAP SEDIMENT NOTES: 4. ALL SEDIMENT SPILLED, DROPPED, WASHED OR o 00 00� oo� TRACKED ONTO PUBLIC STREETS MUST BE 1. CONSTRUCT STREAM CROSSING WHEN FLOW IS AT NORMAL BASEFLOW. REMOVED IMMEDIATELY. 5. WHEN MECCESSARY WHEELS MUST BE CLEANED 2. MINIMIZE CLEARING AND EXCAVATION OF STREAMBANKS. DO TO REMOVE SEDIMENT PRIOR TO ENTERING A NOT EXCAVATE CHANNEL BOTTOM. 8,0°'° 8,0°'� PUBLIC STREET. WHEN WASHING IS REQUIRED, 3. INSTALL STREAM CROSSING PERPENDICULAR TO THE FLOW. IT SHALL BE DONE ON AN AREA STABILLIZED 4. MAINTAIN CROSSING SO THAT RUNOFF IN THE CONSTRUCTION WITH CRUSHED STONE WHICH DRAINS INTO AN ROAD DOES NOT ENTER EXISTING CHANNEL. 5. STABILIZE AN ACCESS RAMP OF CLASS B STONE TO THE APPROVED SEDIMENT BASIN. 6. FILTER FABRIC SHALL BE PLACED UNDER THE ~ EDGE OF THE MUD MAT. 6. CONTRACTOR SHALL DETERMINE AN APPROPRIATE RAMP ENTRANCE/EXIT AND SHALL BE MIRAFI 500 OR d �5 ANGLE ACCORDING TO THE EQUIPMENT UTILIZED. EQUIVALENT. PLAN 7. ASPHALT APRON MAY BE REQUIRED PER a MAINTENANCE: NCDOT, AS DIRECTED BY ENGINEER. THE APRON Q SHALL EXTEND A MINIMUM OF 5C' PAST THE EDGE OF PAVEMENT. THE ASPHALT APRON E`^ 1. INSPECT TEMPORARY STREAM CROSSINGS AFTER NOTE: ENTRANCE WILL BE DESIGNED FOR 54-30, SHALL INCLUDE 4: INTERMEDIATE AND 4' BASE RUNOFF -PRODUCING RAINS TO CHECK FOR BLOCKAGE IN CHANNEL, EROSION ABUTMENTS, CHANNEL SCOUR, RIPRAP RIPING. COURSE. �] DISPLACEMENT, OR PI MAKE ALL REPAIRS IMMEDIATELY TO PREVENT FURTHER DAMAGE TO THE INSTALLATION. r Li} �4.awwnars below. - Call before you dig. THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH 17 WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL RE WITHOUT LIABILITY 70 KIMLEY-HORN AND ASSOCIATES, INC. FLOODPLAIN/EXISTING GROUND TOP OF BANK SPECIAL STILLING 8" STONE OR APPROVED PROTECT UPSTREAM SIDE OF IMPERVIOUS n MATTING STAKE (TYP) BASIN (SEE NOTE 7) ALTERNATIVEPOLYETHYLENE WITH SANDBAGS, RIP-RAPOR OTHER NON -ERODIBLE MATERIALAPPROXIMATETEMPORARY FLEXIBLE HOSE BASE FLOW rj TOP WIDTH WATER SURFACE OE, MIN. �Q`pe - FLOW FLOW PLATE WITH IMPERVIOUS TOE OF o -"' POLYETHYLENE e ` - BANK - 2 MAX. MEMBRANE, 20 MIL THICK MATTING III- III -III III=III=III=III I� HEICHr f/z eKP o o AREA _ �1 IiII-_III_ DEPTH MIN. OR WSE + 1.0' DRY TYPE II FABRIC A EA r_« III11 1 EXISTING STREAM BED L-© SPECIAL �,7`TILLIN�' R7A�,7`If'€ TRENCH IN FABRIC CLASS I RIP -RAP OR O MIN, 1 FOOT OTHER APPROVED T - TOE OF SLOPE TYPE II FABRIC NON -ERODIBLE MATERIAL 2 - - 5EQT10N A -A Q III MATTING ANCHOR, SEE DETAIL THIS SHEET �\ IMPERVIOUS DIKE APPROXIMATE BASE TEMPORARY FLEXIBLE FLOW WATER LEVEL ANCHOR BELOW NORMAL WATER. HOSE, TYP. SECTION T I PICAS,,.� TEMPORARY FLEXIBLE 5 6" OVERLAP I HOSE (SEE NOTE 8) • I� 'PUPTOP STAKE (TYP) - 18" SPACING EXISTING STREAM CHANNEL RIP -RAP ID PONDED WATER D/=III o SPLASH PASTABILIZED r OUTLET THICKNESS TOP OF BANK IMPERVIOUS DIKE, TYP. MATTING EDGE DRY WORK AREA DEWATERING - PUMP FOR SPLASH PAD SEDIMENT LADEN LENGTH TYPE II FABRIC a WATER WITHIN i e. OVERLAP WORK AREA I TEMPORARY STABILIZED OUTLET SPECIAL STILLING BASIN WITH STABILIZED OUTLET MATTING STAKE (TYP)- 3' SPACING WITH ALTERNATING PATTERN BETWEEN ROWS T ULHeRT�-Q \ STREAM APPROXIMATE BASE BYPASS PUMP BASE FLOW VFLOW WATER LEVEL FOR CLEAN UPSTREAM AFLDw _ CHANNEL BASE FLOW -ti ANCHOR STAKE (TYP)--- 2' SPACING OIF FLOW N TOE OF IMPERVIOUS OF FLOW III MDRILI SLOPE DIKE, TYP. BY-PASS PUMP OUTLET WITH 6" OVERLAP TEMPORARY STABILIZED PLAN VIEW OUTLET, TYP. PLAN VIEW i 1" X 1" (NOMINAL) 1" X 1" (NOMINAL) TOE ANCHOR WOODEN STAKE .k......... ''O�Ef CLPUOA,,.�• �. Lt ,• Lf ,• NOTES: ` *GALVANIZED NAIL MAY BE *GALVANIZED NAIL MAY BE 0 1. IMPERVIOUS DIKES ARE TO T USED TO ISOLATE WORK FROM STREAM FLOW. N •'• _ USED IN LIEU OF THE NOTCH, USED IN LIEU OF THE NOTCH, 2. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED a o nh;rn„A THE SAME WORKING DAY. WATER FILLED COFFER DAMS CAN BE USED IN 1-l1Yti,+ `� OPTION PLACE OF IMPERVIOUS DIKES. 3. MAINTENANCE OF STREAM FLOW OPERATION SHALL BE INCIDENTAL TO THE WORK. THIS INCLUDES PUMPS AND HOSES. 4. PUMPS AND HOSES SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. 0 8. GRADED STREAM BANKS SHALL BE STABILIZED, WITH MATTING, PRIOR TO o _ PREDICTED RAIN FALL EVENTS. THE EXIT LOCATION SHALL BE CHOSEN TO PREVENT EROSION. 6. GRAVITY -BASED GEOTEXTILE BAG (SPECIAL STILLING BASIN) FILTERS SHALL w _- _ BE USED TO COLLECT SILT AND SEDIMENT FROM WORK AREA DEWATERING. S 7, A STABILIZED OUTLET SHALL BE USED TO CONTROL THE EFFLUENT FROM ALL NOTES: PUMPING OPERATIONS, UNLESS NATIVE STREAMBED STONE MATERIAL IS DEEMED SUITABLE BY DESIGNER AT DISCHARGE LOCATION. 1. THE SLOPE AND OR STREAM BANK SHALL BE PREPARED GRADED, TILLED, 8. TYPE II FABRIC SHALL BE USED UNDERNEATH ALL STONE/RIP-RAP PLACED / ( FOR SEDIMENT BAGS, STABILIZED OUTLETS, AND SPLASH PADS. SMOOTHED, ETC.) AND SEEDED AND MULCHED AS SPECIFIED BY THE DESIGNER 9. REFER TO THE PROJECT SPECIFICATION FOR ADDITIONAL NOTES. PRIOR TO THE PLACEMENT OF THE MATTING. 10. DAILY CONSTRUCTION AREA TO BE STABILIZED BY THE END OF THE DAY. 2. THE MATTING SHALL BE INSTALLED SO AS TO NOT BE IN TENSION, BUT BE MAY VARY IN SIZE FROM TOTAL WORK AREA. POE PLACED NEATLY, FLUSH AGAINST THE SOIL, AND WITH NO GAPS OR WRINKLES. d� 3. MATTING SHALL BE NEATLY SECURED AROUND ANY PROJECT STRUCTURES, STRUCTURE ARMS, AND/OR SILLS TO PREVENT ANY LOOSE OR FRAYED EDGES. 4. THERE SHALL BE NO LOOSE ENDS OR UNSECURED MATTING ON THE COMPLETED {� Q m WORK. � F.•., ja: rVvt tip tv S�aft , 3 kmowwhptr below. Call before you dig. THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH 17 WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY—HORN AND ASSOCIATES, INC. SHALL RE WITHOUT LIABILITY 70 KIMLEY—HORN AND ASSOCIATES, INC. 65+50 688 684 680 676 672 664 660 \ 656 _ - _ - 652 648100 -91 -80 -70 -60 -50 -40 -30 -20 -10 0 64+00 688 684 680 676 672 ---- 664 660 656 EE L -L652 10 20 30 40 50 60 70 80 90 10848 692 692 688 688 684 684 680 680 676 676 672 672 --------- - - - - - - - - 668 664 664 \ 660 660 656 - _ i 656 65 00 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 10052 63+50 684 684 680 680 676 676 672 672 668 ---- ---- ----- ---- --------- _--- _- - - - - - - - - - - - - - - - - _-_- 668 664 664 660 660 656 _ - 656 652 652 648 6648 644100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 66 70 80 90 10044 20 10 15. 0 0 10 20 �4.owwhats below. Call before you dig. SCALE 69+70 68+70 67+00 20 10 15. 0 0 10 20 mowwhats below. I Call before you dig. SCALE 74+10 684 -684 680 -680 676 676 672 -672 668 -668 664 -664 660 660 656 656 652- -652 73+00 71+50 20 10 15. 0 0 10 20 mowwhats below. I Call before you dig. SCALE 79+30 78+00 76+50 20 10 15. 0 0 10 20 mowwhats below. I Call before you dig. SCALE 84+30 688 B 688 684 684 680 680 676 676 672 672 668 668 — — 664 / sso sso 656 656 652 - - - - 6652 64 g100 -910 -810 -70 -610 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 10048 83+25 684 684 680 68C 676 67E 672 671 668 66E 664---- ---_---� - - - - --- -- -- ---- ----664 ----- ---- ---- ---- -- 660 66C 656 65E 652 - - - - - 65: 81+00 688 68 684 68 680 68 676 67 672 67 668 66 - - - - - - - - - - - - - - 66 660 66 656 65 65RR2 - - 665 64'100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 1A 20 10 15. 0 0 10 20 �4.owwhars below. Call before you dig. SCALE r,v �''.�Ef CLPUO��.�`• 88+50 87+50 85+50 20 10 0 0 10 20 kmowwhats below. I Call before you dig. SCALE J., E I 92+80 684 6 684 680 680 676 676 672 672 668 668 664 664 -- 660---------- 660 656 656 652 652 648 6648 644100 -90 -810 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 10044 91+50 684 680 676 672 668 664 660 656 652 648 6441 89+50 684 684 680 680 676 676 672 672 668 668 664 664 660 - - - � 660 656 656 652 _ , 652 648 p648 644100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 10044 r,v �''.2Ef CLPUO��.�`• 20 10 0 }+ 0 10 20 kmowwhats below. scn2E Call before you dig. i 684 680 676 672 668 664 660 656 652 648 644, 96+00 95+00 93+90 20 10 15. 0 o 10 20 �4.owwhats below. Call before you dig. SCALE r,v �''.�Ef CLPUO��...•