HomeMy WebLinkAboutNCC213976_MODIFICATION Supporting Documents_2023021764 r90N C06,
ZOR
�►CARO
Jackson County Office of Permitting & Code Enforcement
www. iacksonnc. org/code-enforcement. himl
Tony, Elders, Director tonyelders ,lacksonnc.org
LH Saratay Properties LLC
1827 Powers Ferry Road
Atlanta, GA 30336
Sylva Office: 538 Scotts Creek Road, Suite 205, Phone: 828-586-7560/Fax: 828-586-7563
CashiersOffice: 357 Frank Allen Road, Phone: 828-745-6850/Fax: 828-745-6867
Approval Date: 02/03/23
Erosion Control Plan Review Notes
Re: Project Name: Saratay Development
New Submittal( ) Revision( X ) Modification( )
Please be advised that Article V, Section 5.3.4, b, iii of the Jackson County Unified
Development Ordinance requires that a copy of the approved soil erosion control plan be on
file at the job site.
Our office has approved the as -built plans submitted 02/03/23; construction may resume
onsite.
There were no comments by Jackson County Soil and Water Conservation District.
Due to the close proximity to Fowler Creek and some slopes onsite being greater than 35%. 2 rows of
metal post, wire backed silt fencing need to be installed onsite (8' maximum span standard strength
fabric with wire fencel.
Project is in an area designated a Class C Trout Stream with Outstanding Resource Water (C; Tr,+); a
30-foot Buffer Zone set back is required from the top of the bank of all perennial streams.
All measures onsite must be designed to meet 25-year storm requirements.
Approval does not cover areas which require 401 and 404 permits from the US Army Corps of
Engineers and NC Department of Environment and Natural Resources, and/or other such governing
agencies, until such time as said permits are in place.
This approval does not exempt this project from any other state or local permits or regulations that
may be additionally required.
Please know that approval of this sedimentation and erosion control plan does not qualify this site for
vested rights with regard to the proposed subdivision ordinance and that this development may be
subject to the subdivision ordinance when adopted.
Note: Should the plan not perform adequately; a revised plan will be required.