HomeMy WebLinkAboutSW6220802_Supplement-EZ Form_20230217 (2)SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION !
1 Project Name Champs Convenience Store
2 Project Area (ac) 3.46
3 Coastal Wetland Area (ac) 0
5 is this project High or Low Density?
6 Does this project use an off -site SCM? No
_ -
iCMPLl OANCE WITH 02H 1003(4)
hp& 7 Width of vegetated setbacks provided {feet) _ 50
8 Will the vegetated setback remain vegetated? _ __._ _ Yes T
9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c d)? — _____ NIA
10 Is sireambank stabilization proposed on this project? —_ No
NUMBER AND TYPE OF SCMs
11 Infiltrations stem
12 Bioretention Cell
13
Wet Pond--
14
Stormwater Wetland
15
Permeable Pavement.__�---
16
Sand Filter
17
Rainwater Harvesting (RWH)ry
18
Green Roof
19
Level Spreader -Filter Strip LS-FS
20
Disconnected Impervious Surface (DIS)
21
Treatment Swale
22
Dry Pond_--
23
StormFilter
24
Silva Cell
_ _ _--
25
Bayfilter
-- ----_
26
Fllterra
FORMS LOADED
fGNER CERTIFICATfON
Name and Title:
address:
Email:
Johnny Glenn Tew / Project Engineer
ECLS Global Inc.
N.C.
Certification Statement:
I certify, under penalty of law that this Supplement EZ form and all supporting information were prepared under my direction or supervision; thatthe
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
ME
ESS/OM .�°���i
s a�
80
`'off;•. �'N�+rr�E� : � `��;
Sign a a of Desf der
Date
DRAINAGE AREAS
1
Is this a hi h density project?
Yes
! 2
If so, number of drainage areaslSCMs
1
3
Does this project have low density areas?
No
4
if so, number of low density drainage areas
0
jL
is alllpart of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION Entire Site 1
j 4
Type of SCM _
Infiltration !j
5
Total drainage area (sq ft i_
87,120.00
6
_-
Onsite drainage area (sq ft
_155,509,20
150,717.60
82,328.40 {
7
Offsite drainage area {sq ft)
4,791.60
4791.6 -_
8
9
Total BUA in project s ft
New BUA on subdivided lots (subject to permitting)
(sq ft)
$3200 sf
NA —
_ J.
72310 sf NI
NA
10
New BUA not on subdivided lots (subject to
permitting) s
78408 sf
67518 sf
11
Offsite BUA s ft
4792 sf
4792 sf
12
Breakdown of new BUA not on subdivided lots:
'i
Parkin sq ft
8086 sf
8086 sf
Sidewalk (sg ft
10271 sf
4608 sf
- Roof (sq ft),
6600 sf
6600 sf
- Roadway (sq ft)
52819 sf
47592 sf
- Future (sq6
NA
NA _
Other, please specify in the comment box
below- sq ft)
5424 sf
5424 sf
13
New infiltrating permeable pavement on �
subdivided lots (sq ft
u
NA
NA
j! 14
New infiltrating permeable pavement not on
subdivided lots {s ft
NA
NA
I.115
Existing BUA that will remain (not subject to
ermittinWs ft
NA
NA
16
ExistingBUA that is alreadypermitted s ft
NA
NA
17
Existing BUA that will be removed s ft
NA
NA
18
Percent BUA
54%
83%
19
Design storm inches
1.0 in.
20
Design volume of SCM (cu ft)
72600
21
( Calculation method for design volume
MDC5
.ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22
"Other" impervious came from big fuel island (3,360 so, small fuel island {
1,056.00 so, big slab over fuel tanks(528 so, small slab over fuel tanks (96
so , dumpster pad and apron ( 384 so.
INFILTRATION SYSTEM
9 Drainage area number 1
2 EMinimum renulmd treatment volume (cu ft) 7260 cf
GENERAL MDC FROM 021-11050
3 is the SCM sized to treat the SW from all surfaces at build -out? j Yes
4
1s the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V or enter "Vertical' for
trenches)?
vertical
6
Does the SCM have retaining walls, gabkon walls or other engineered
side slopes?
No
—
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred} -'
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access compk with General MDC (8)?
Yes
12
1 Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General Mpg 10 ?
NIA
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the device specific MDC?
YesT
17 C Was the SCM designed by an NC licensed professional?
INFILTRATION SYSTEM MDC FROM GZH .1051
18 Proposed slope of the subgrade surface (%) -
Yes
0% _
19 Are terraces or baffles provided? No
20 T pe of pretreatment: Other
Soils Data
21
Was the soil investigated in the footprint and at the elevation of the
infiltrationstem?
Yes
22
SHWT elevation (fmsk)
326,00
23
Depth to SHWT per soils report (in)
24.00
24
Ground elevation at boring in soils report (fmsl)
328.00
25
Is a detailed hydrogeologic study attached if the separation is
between 1 and 2 feet?
NIA
26
Soil infiltration rate (inlhr)
0,60
27
Factor of safety (FS) (2 is recommended):
2.27
II Elevations
29
Bottom elevation (fmsk)
328 ft
30
Storage elevation (fmsi)
330.37 ft
31
Bypass elevation (fmsl)
330 ft
For Basins Only
32
Bottom surface area (ft2)
4577 ft
33
Storage elevation surface area (ft!}
4577, ft
For Trenches Only
34
Length (ft)
93 It
35
Width (ft)
56 ft
36
Perforated pipe diameter, if applicable (inches)
NA
37
Number of laterals
NA
38
Total length of perforated piping
NA
39
Stone type, if applicable
#4
40
Stone porosity (%)
40%
41
Is stone free of fines?
Yes
42
Is the stone wrapped in geotextile fabric?
Yes
43
Has at least one inspection port been provided?
Yes
Volumes/Drawdown
44 Design volume of SCM (cu ft) _ 7260 cf
45 Time to draw down {hours) _ _ _ �_ 72 hours
ADDITIONAL INFORMATION
46 Please use this space to provide any additional information about the
infiltration system(sY.
'I
Infiltration system is a network of underground storm chambers wifhV2 foot sumps in
inlet structures to serve as forebay5 _.
Infiltration 1 11:38 AM 2/13/2023