Summary Letter of Responses to NCDEMLR Review Comments dated 11/1/2022
This letter is to serve as a summary letter of our review responses to the above
referenced review comments. We are submitting 1) Two sets of sheets that were revised
with revision date of 11-10-2022. 2) This summary letter with revised calculations. 3)
Revised sheets form the application as per your request. 4) Revised sheets from the FZ
supplement as per your request. 5) Revised calculations using Hydro-cadd software to
show routing of stormwater through the SCM and the areas that will bypass the SCM
pre -development And post -development Conditions). Our responses are as follows:
First we address the pretreatment requirement for the SCM by providing a 2 foot deep
sump in the two inlet structures at the SCM ( inlet structure # 26 and # 30). Having met
the requirement for providing pretreament for the SCM all of the Stormtech chambers
should be able to be used for volume storage and infiltration area.
Next we determine the maximum design volume for the SCM ( Stormtech infiltration
chambers) as follows:
Using equation #2 from the MDC C-1 Infiltration system guidance document we the
maximum design volume using a revised and enlarged SCM surface area of 4,577 SF. We
also are using a factor of safety of 2, a K value of 0.6 in/hr, and a Time of 72 hours.
Solving for maximum volume using these values we get a volume of 8,238.6 CF.
We however are using a smaller design volume based on using the volume of a 1 inch
runoff from the drainage area of the SCM as follows:
DV= 2 Acres X ( 43,560 SF/AC) X ( 1"/ 12 inches per foot) = 7,260 CF.
This smaller volume DV will result in a larger factor of safety of 2.27 as follows:
FS = 4577SF ( 0.6 in/hr)( 72 hours) / 7,260 CF ( 12) = 2.27,
910-897-3257 OFFICE WWW.ECLSGLOBAL.COM 910-897-2329 FAX
ECLS. A `Veteran —Owned' Company
GLOBAL Inc.
The design volume of 7,260 CF equates to an elevation of 330.37 within our revised and
enlarged stormtech chamber system ( see Stormtech MC-700 cumulative storage volume
chart on sheet 11 of 16 of project plans). We have shown a 2 inch diameter outlet orifice
with invert equal to elevation 330.37 to isolate the design volume below this elevation of
330.37 feet.
We have shown a 4 foot wide outlet weir at elevation 334.00 in order to maximize the
total storage volume and to minimize the post development runoff volume after routing
through the underground storage.
We have analyzed the 10 year pre -development runoff for the entire site versus the 10
year post- development runoff from the combination of the post-dev. Areas that bypass
the SCM plus the past-dev. of the drainage area that is routed through the SCM as
follows.
10 year- predevelopment runoff ( entire site) = 0.515 Acre feet.
10 year- post development runoff ( areas that bypass the SCM) = 0.226 Acre feet.
10 year- post development runoff ( area that is routed through the SCM) = 0.254 Acre
feet
Note: Total 10 year post-- development runoff ( 0.226AF +0.254 AF) equals 0.480 Acre
feet.
Since 0.480 Acre feet is less than the 0.515 Acre feet, the post development runoff
volume will be less than the pre -development runoff volume for the 10 year storm event.
Also the post development Q10 peak flow rate leaving the entire site can be seen to be
3.81 cfs ( 1.55cfs routed through SCM plus 2.26 cfs bypassing SCM). The pre -
development Q10 peak flow rate leaving the entire site can be seen to be 5.14 cfs. Since
3.81 cfs is less than 5.14 cfs the post development Q10 flow rate is less than the pre -
development Q10 peak flow rate.
We have included 1 hard copy of the Hydro-cadd calculations which verify these
quantities.
910-897-3257 OFFICE WWW.ECLSGLOBAL.COM 910-897-2329 FAX
ELLS.
GLOBAL Inc.
A `Veteran —Owned' Company
We are also including 2 sets of hard copy revised plans which have a latest revision date
of 11-10-2022 which reflect the responses to the review comments and the enlarged
underground storage system.
We are also including 1 hard copy of sheets from the application and the EZ supplement
showing the revised values as per the review comments requests.
We have addressed each of the review items as follows:
1) We have increased the area and volume of the underground storage chambers.
We have also increased the factor of safety to 2.27 for the design volume to be
infiltrated as per the calculations at the beginning of this letter. We have provided
hydro-cadd calculations to show the post -development runoff volume for the
entire site is less than the pre -development runoff volume for the entire site for
the 10 year storm event.
2) We have accounted for the post -development condition of the off -site area by
assuming that this area will be 100% impervious ( worst case condition). We are
unable to divert this off -site flow due to the fact that we are using this area as a
septic drain field area ( which can not be disturbed).
3) We are specifying that a 2 foot sump be installed at both of the inlet structures
into the SCM ( structures # 26 and #30) to serve as pretreatment for the SCM.
4) We have provided for the design volume to be above the bottom of the storage
chambers system ( elevation 328.00). We have provided a 2 inch diameter orifice
with invert of 330.37 which provides a design volume of 7,260 CF ( based on 1
inch runoff from the 2 acre drainage area flowing to the SCM. This provides a
factor of safety of 2.27 ( greater than 2.0 minimum) due to a larger footprint area
under a larger storage volume of chambers ( 4,577CF). We also are using the
design K-factor of 0.6 in/hr and a maximum drawdown time of 72 hours. We used
equation 2 from MDCS to determine these values.
5) We have used the drainage area flowing to the SCM ( 2 acres) to determine the
design volume of 7,260CF.
910-897-3257 OFFICE WWW.ECLSGLOBAL.COM 910-897-2329 FAX
5CLSA `Veteran —Owned' Company
GLOBAL Inc. --------�^mm-_
6) We have submitted this project to the Harnett County Development Review Board
and their requirement is only that we provide them a copy of the permit obtained
from NCDEMLR ( which we will do upon receiving the permit).
7a) We have addressed this item ( IV-10) as follows:
We are providing a revised copy of Section IV-10 of the stormwater application
with the values filled in that relate to the area flowing to the SCM only.
7b) We have noted in item IV-11 as follows:
Offsite drainage area was determined from the GIS topo. map. We have assumed this
post --development condition is 100% impervious ( see attached GIS topo. map).
8ai) We have shown a value of 50 feet for this item ( we have also answered "yes" for
line #8 on cover sheet for EZ supplement document).
8bi) We have shown the value of 7,260 CF for this item on Drainage Area sheet of the
EZ supplement document ( see calculations at first of this letter). Note: We are
providing a completely revised supplement coversheet, drainage area sheet, and
infiltration system sheet due to the fact that several items have changed due to
revisions.
8ci) We have shown 7,260 CF for this item ( using only the area flowing to the SCM
and 1 inch runoff).
8cii) We have answered "yes" to this item. As discussed previously all the areas
flowing to the SCM are designed at 100% buildout conditions, however there are
some areas of the entire site that bypass the SCM due to site grades. The areas of the
entire site that bypass the SCM have an impervious percentage of 15.92% ( 0.25 Acres
paved parking, HSG B and 1.32 Acres grass,75% grass cover HSG B — 1.57 Acres total).
8ciii) We have answered "yes" to this question.
910-897-3257 OFFICE WWW.ECLSGLOBAL.COM 910-897-2329 FAX
ECLS.
GLOBAL Inc.
A 'Veteran -Owned' Company
8civ) We have answered "other" to this item ( we have specified a 2 foot deep sump
in the bottom of structures #26 and #30 which are inlet structures into the SCM).
8cv) We have answered 2.27 for this item. See calculations at the beginning of this
letter).
8cvi) We have answered 330.37 for lines #30 and #31. This is the elevation of the
invert of the 2 inch diameter orifice through the weir wall within the outlet structure.
All water below 330.37 will be infiltrated and all water above 330.37 will be routed
through the SCM.
8cvii) We have answered 4,577 CF for items # 32 and #33. This is due to the addition
of storage chambers and increasing the storage foot print area. We have either
answered items # 34 through # 43 or we have written NA and given an explanation
why the question does not apply to our design.
8cviii) We have answered 7,260CF for this item. Line #44 is now same as line #20 on
drainage area sheet EZ supplement).
Note: We have revised the answer in item #46 to note that 2 each 2 foot deep sumps
have now been designated as pretreatment for the SCM.
This concludes our summary of responses to the review comments dated 11/1/2022.