Loading...
HomeMy WebLinkAboutRE_ US 158 from N of US 421_I-40 to US 220_ R-2577ABC_ Forsyth and Guilford CountiesWanucha, Dave From: Gledhill-earley, Renee Sent: Friday, February 24, 2023 2:51 PM To: Euliss, Amy Cc: Eric.C.Alsmeyer@usace.army.mil; stephen.a.brumagin@usace.army.mil; Wanucha, Dave; Reap, Shelby L; Furr, Mary P.; Chris Rivenbark; James, Connie K; Scott Blevins Subject: RE: US 158 from N of US 421/1-40 to US 220, R-2577ABC, Forsyth and Guilford Counties, ER 04-1615 Thank you, Amy. Much appreciated. Renee From: Euliss, Amy <aeuliss@ncdot.gov> Sent: Friday, February 24, 2023 2:02 PM To: Gledhill-earley, Renee <renee.gledhill-earley@ncdcr.gov> Cc: Eric.C.Alsmeyer@usace.army.mil; stephen.a.brumagin@usace.army.mil; Wanucha, Dave <dave.wanucha@ncdenr.gov>; Reap, Shelby L <slreap@ncdot.gov>; Furr, Mary P. <mpfurr@ncdot.gov>; Chris Rivenbark <crivenbark@rkk.com>; James, Connie K <ckjamesl@ncdot.gov>; Scott Blevins <sblevins@rkk.com> Subject: RE: US 158 from N of US 421/1-40 to US 220, R-2577ABC, Forsyth and Guilford Counties, ER 04-1615 Renee, The revised commitments associated with the Edgewood Baptist Church are included on page 13 of 18 on the cover letter (also page 13 of the pdf). The commitments for the Bel Air Drive-thru were inadvertently left out of the cover letter. I'll get the cover letter revised to also include the commitments for the Bel Air Drive-Thru. The project green sheet commitments that you reference on page 93-94 are part of the 2018 State EA/FONSI that was provided as supporting documentation for the IP. The greensheets are updated at construction consultation and once the permits are finalized. Both will be done prior to let. I am not sure why the commitments for the Bel Air Drive-Thru or the Edgewood Baptist Church were not included on the greensheets when the EA/FONSI. However, we will be sure to add them to the greensheets when they are updated at the construction consultation and after permitting. If we include the commitments in the cover letter that should suffice for the USACE incorporating them into the permit approval. I'll copy you on the revised cover letter when we submit it to the USACE. Thanks. Amy From: DCR - Environmental_ Review<Environmental.Review@ncdcr.gov> Sent: Friday, February 24, 2023 1:40 PM To: Euliss, Amy <aeuliss@ncdot.gov> Cc: Eric.C.Alsmever@usace.army.mil; Stephen.a.brumagin@usace.army.mil; Wanucha, Dave <dave.wanucha@ncdenr.gov>; Reap, Shelby L <slreap@ncdot.gov>; Furr, Mary P. <mpfurr@ncdot.gov> Subject: US 158 from N of US 421/1-40 to US 220, R-2577ABC, Forsyth and Guilford Counties, ER 04-1615 Importance: High Our response is attached. Thank you. Best, Devon L. Borgardt Environmental Review Assistant State Historic Preservation Office 109 E. Jones Street MSC 4603 Raleigh, NC 27699 ■■■EM ■■■EM NC DEPARTMENT OF ■■' ■ SOMME NATURAL AND CULTURAL RESOURCES SEMEN Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Please Note: Requests for project review or responses to our review comments should be sent to the Environmental Review emailbox at environmental.review@ncdcr.gov. Otherwise, your request will be returned and you will be asked to send it to the proper mailbox. This will cause delays in your project. Information on email project submittal is at: NCHPO ER Proiect Review Checklist Facebook Twitter Instagram YouTube Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.