Loading...
HomeMy WebLinkAboutNCG140520_Outfall 2 Info_20230224Notice of Intent -Amendments and Additions for WolfSpeed Portable Plant Chandler Concrete Company This amendment means to add a tire wash system to the proposed NOI as well as a second outfall. Tire wash systems are covered under NPDES permit NCG140000 part F-2, a(i). These additions will be included in the SWPPP. F-2. Process Wastewater a) These requirements apply to all process wastewater from ready -mixed concrete production operations which includes, but may not be limited to, the water involved in: i. Vehicle and equipment cleaning, H. Wetting of raw material stockpiles, iii. Mixing drum cleanout. Industrial activities draining to outfall 002. OUTFALL 2 COORDINATES Lat: 35.74291 Long: 79.53997 The stormwater for the given area will only be in contact with construction trailers, parking, and the tire wash station OF 2 Potential Pollutants Include • Fuels and oils from transient vehicles, • Residual stone, sand and aggregate solids from tire wash station The requirement for non -polar oil and grease testing is outlined in NPDES permit NCG140000 part E-1, a, is as follows. E-1. Required Baseline Sampling The permittee shall perform baseline sampling of all stormwater discharge outfalls and/or authorized representative discharge outfalls in accordance with this part. (a) Grab samples shall be collected, analyzed, and reported for the following parameters listed in Table 2. In addition, grab samples shall be analyzed for Non - Polar Oil & Grease in vehicle or equipment maintenance areas in which more than 55 gallons of new motor oil and/or hydraulic oil per month is used when averaged over the calendar year. No vehicle maintenance will occur within the drainage areas of OF 1 or OF 2, therefore, non -polar oil and grease will not be tested for at these outfalls as it does not meet the requirement for testing. Notice of Intent -Amendments and Additions for WolfSpeed Portable Plant Chandler Concrete Company Tire Wash A tire wash system is proposed to remove sediment from truck tires leaving the active construction area. The sediment slurry is discharged to swales leading to a sediment basin where the water will be monitored. The "wastewater" from the tire wash will be comingled with stormwater in the sediment basin leading to outfall 2. A complete description of the proposed tire wash is attached in an additional document. Outfall 2 fSed Basin Drainage Area: 3.o8 ac Bottom Area: 4,800 SF Volume: 24,325 CF Surface Area at spillway: ioo SF Notice of Intent -Amendments and Additions for WolfSpeed Portable Plant Chandler Concrete Company Checklist for OF2 addition A) Outline of drainage areas- Attached B) Stormwater Structures available in previously submitted NOI and E&SC plan on site C) There are two defined outfalls within the Chandler Concrete production area. D) Delineation of Drainage Area- Attached E) Runoff Conveyance Structures — see E&SC plan on site and previously submitted NOI F) Construction trailers and tire wash site acreage OF 2- 3.o8 i. Material storage is not expected to take place within OF2 drainage area. G) Impervious Acreage- 82.47% compacted grade H) See Surface Waters Map on previously submitted NOI I) See Surface Waters Map on previously submitted NOI J) ioo year flood plain not applicable K) Acreage of topographical stormwater area a. OF2 - 3.o8 acres L) Wastewater or stormwater discharge structures- available in E&SC plan on site. There are no hazardous materials generated, stored, treated, or disposed of in the immediate drainage area of OF2 M) Water Quality Classification for OFs and OF2- See below N) Site Location available in previously submitted NOI and E&SC plan on site. Surface Water Classifications: Stream Index: 17-23 Stream Name: Brush Creek Description: From source to Deep River Classification: C Date of Class.: , i 7e 30, 1973 What does this Class, mea -? Vlevv River Basin: Cape Fea Notice of Intent -Amendments and Additions for WolfSpeed Portable Plant Chandler Concrete Company Additional Map for drainage area of OF1 Outfall 1 [Sed Basin 21 • Drainage Area: 3.98 ac • Bottom Area: 4,300 SF • Volume: 40,425 CF • Surface Area at spillway: 14,800 SF �J Notice of Intent -Amendments and Additions for WolfSpeed Portable Plant Chandler Concrete Company fz