HomeMy WebLinkAboutDredge Spoil Sampling Methodology Project No. 20181108V3 TJ's Transient MarianaFrom: Steve Trowell
To: Tankard. Robert
Cc: May. David; Sullivan. Shelton; Tetterton. Toby (tobin(d)rsnet.ora); Bodnar. Gregg; Spivey. Kellv; Staples. Shane
Subject: [External] Dredge Spoil Sampling Methodology Project No. 20181108V3 TT's Transient Mariana
Date: Monday, November 28, 2022 5:55:00 AM
Attachments: Complete Dredae Samplina Plan.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to Report Spam.
Robert:
Toby Tetterton has hired Terracon to perform the requested dredge spoil sampling. Attached
is a description of the methodology including sample locations. A total of five samples are
proposed to be taken in the Boat Harbor canal. Please advise if the methodology is acceptable
or any changes you would like to make.
Steve Trowell
(252) 402-4015