Loading...
HomeMy WebLinkAbout20230126 Ver 1_More Info Requested_20230222Homewood, Sue From: Homewood, Sue Sent: Wednesday, February 22, 2023 11:33 AM To: Michelle Measday, PWS Cc: David.E.Bailey2@usace.army.mil Subject: More Info Request for Nelsons Creek at Mocksville / Country Lane / Davie County - DWR#20230126 Michelle, The Division has the same concerns and questions as itemized by the USACE below. Please copy me on you response to these items. In addition, on the ePCN, you indicated that this project is subject to Phase II stormwater requirements but according to DEMLR's online interactive stormwater map it appears that it is not within the jurisdiction of a local stormwater program. Please provide evidence from the local government if the map is inaccurate and the project is subject to Water Quality Stormwater Review under a delegated Phase II or Water Supply program, or provide either: a. A Completed Stormwater Management Plan, OR b. The following items to document that the project will not cause degradation of downstream surface waters: 1) A discussion on how the project will not cause degradation of downstream surface waters when considering the volume and velocity of the increased flows and the current size/condition of the receiving stream. 2) Delineation of each drainage area and accompanying calculations to show that flows from every discharge point will be non -erosive to both the land surface and the receiving surface water during the peak flow from the 10-year storm event. You may refer to the guidelines from DEMLR - Sedimentation and Erosion Control to determine an appropriate non -erosive velocity. The permissible velocities for erosion protection are under Appendix 8.05 (i.e. Chapter 8). 3) Calculations to demonstrate that for any discharge points proposed to increase flow rate and volume, the structural stability of the receiving surface water will not be compromised. 4) Designed drawings (both aerial and profile views showing the actual designed dimensions) and calculations of any proposed diffuse/dispersed flow or detention systems and any vegetated conveyances (if provided). Please respond to this email within 30 days and please note that the Division considers this project "on hold" until a complete response is received. Thanks, Sue Homewood (she/her/hers) 401 & Buffer Permitting Branch Division of Water Resources Sue.Homewood@ncdenr.gov 336 813 1863 mobile 919-707-3679 office *new* Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 From: Bailey, David E CIV USARMY CESAW (USA) Sent: Friday, February 17, 2023 1:02 PM To: Michelle Savage-Measday, PWS <MMeasday@ecslimited.com>; Richard Denzler <rdenzler06130@roadrunner.com> Cc: Homer, Seren M <seren.homer@ncdenr.gov>; Chandler, Rebecca D <rebecca.chandler@ncdenr.gov> Subject: Request for Additional Information: SAW-2022-00168 (Nelsons Creek / Country Lane / Mocksville NC / Davie County) All, Thank you for your PCN, dated 1/20/2023, for the above referenced project. I have reviewed the information and need clarification before proceeding with verifying the use of Nationwide Permit (NWP) 29 (https://saw- reg.usace.army.mil/NWP2021/NWP29.pdf). Please submit the requested information below (via e-mail is fine) within 30 days of receipt of this Notification, otherwise we may deny verification of the use of the Nationwide Permit or consider your application withdrawn and close the file: 1) Stream Crossing 3A includes a vertical drop of approximately 5 feet within the culvert structure. This design does not appear to comply with NWP 29 General Condition 2 or Regional Condition B.9.c. Please re -design this crossing to fit the NWP terms and conditions, or fully detail how such a design complies with these terms and conditions. Note also that such a design, even if justified, would effectively isolate the stream reach above the culvert structure, estimated at approximately 60 linear feet (0.003 acre), reducing the aquatic function of this length/amount of channel; such reasonably foreseeable indirect impacts are taken into account when determining compensatory mitigation requirements per the NWP General Conditions "District Engineers Decision." 2) Proposed permanent loss stream impacts rely on rounding to the ten -thousandth place to reach figures ostensibly below the compensatory mitigation threshold. However, stream length impacts taken to the sub -foot as are shown on the plans, and then translated to acreage estimates as shown, are too precise to be relied on in the field during construction based on the Corps experience. As such, and based on additional indirect losses of stream function as described in item 1 above, the Corps would require compensatory mitigation for permanent loss stream impacts as currently proposed, per NWP 29 Regional Condition B.7 and the NWP General Conditions "District Engineers Decision." If additional plan revisions are not practicable to further reduce permanent loss stream impacts, please submit a compensatory mitigation plan. The mitigation rule generally prescribes purchasing stream credits first through a mitigation bank with stream credits available in this 8-digit HUC (03040101), or second through the NC Division of Mitigation Services. Please provide a mitigation acceptance letter from your proposed compensatory mitigation provider. Typically, compensatory mitigation is required at a 2:1 credit to impact ratio unless otherwise justified based on evaluation of aquatic function (i.e. NCSAM). 3) Based on Plan Sheet 1, Stream T1 would flow directly next to/between a proposed fill slopes for Lot 232 and a retaining wall for Lots 383-385. How will these fills/structures be constructed while avoiding direct and indirect impacts to Stream T1. Further, how will future secondary impacts be avoided, anticipating that Stream T1 could predictably migrate into these fill/structures? 4) Per NWP 29 Regional Conditions B.11, please provide a restoration plan that thoroughly describes how all temporary wetland and stream impacts will be removed, how pre -project conditions will be restored (should involve use of biodegradable matting and seeding with regionally appropriate native wetland and riparian seed mix), and include a timetable for all restoration activities. Please let me know if you have any questions. Sincerely, Dave Bailey 2 David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: RaleighNCREG <RaleighNCREG@usace.army.mil> Sent: Tuesday, January 24, 2023 12:25 PM To: Michelle Savage-Measday, PWS <MMeasday@ecslimited.com> Cc: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Subject: SAW-2022-00168 (Nelsons Creek / Country Lane / Mocksville NC / Davie County) Good afternoon, We have received your Pre -Construction Notification (PCN) NWP request for the above project and forwarded it to Dave Bailey for further processing. Thank you, Josephine Schaffer From: Wallace, Nancy L CIV USARMY CESAW (USA) <Nancy.Wallace@usace.army.mil> Sent: Monday, January 23, 2023 3:21 PM To: Schaffer, Josephine L CIV USARMY CESAW (USA) <Josephine.L.Schaffer@usace.army.mil> Subject: FW: PCN - Davie - Non -DOT Hey, Josephine. This project was too large to send to the RaleighNCREG mailbox (106 MB) so I saved it on the y: drive for you to pick up. The location is: Y:\Common\RG\CESAW-RG-R\E-PCNs From Charlotte\Davie - Nelson's Creek at Mocksville - 1_20_2023 5 40 PM Nancy Wallace 828-271-7980 Ext 4221 Office Schedule: Mon-Tues 0730-1530 Telework Schedule: Weds 0700-1500 nancy.wallace@usace.army.m i USACE Wilmington District Asheville Regulatory Field Office 151 Patton Avenue RM 208 Asheville, NC 28801 From: laserfiche@ncdenr.gov <laserfiche@ncdenr.gov> Sent: Friday, January 20, 2023 5:45 PM To: CharlotteNCREG <CharlotteNCREGI@usace.army.mil> 3 Cc: SAW-PCN-RG <SAW-PCN-RG@usace.army.mil> Subject: [Non-DoD Source] PCN - Davie - Non -DOT A new project has been received on 1/20/2023 5:40 PM for Nelson's Creek at Mocksville. The link below will take you to the project folder. https://edocs.deq.nc.gov/Laserfiche/index.aspx?db=WaterResources#id=2650701;view=browse This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored. 4