Loading...
HomeMy WebLinkAboutNCC230526_Site Plan or Location Map_20230224l�hF�C��SS�R p'OPD RIVER'S EDGE PINE 1SNCJtL DR. APARTMENTS �y� S.R. WATERFORD fl� APARTMENTS s�0 ho SITE , CHAPEL HILL RD. O8�9 �� VICINITY MAP (N.T.S.) LEGEND DIVERSION BERM W/ MATTING DIVERSION BERM (TYP-) ,,,,;,IM e,a. ,.,.,:' a .'sm:...:. CONSTRUCTION LIMITS (TYP.) - -x- - -x- - -x- SILT FENCE TYP. CHECK DAM GRAVEL. BERM REINFORCED SILT FENCE OUTLET TEMPORARY GRAVEL CONSTRUCTION ENTRANCE LOA INLET PROTECTION y' '4' u' w ar w W WETLANDS RIP RAP APRON -,.,- BAFFLES PERMANENT POND RISER W/ TEMP. SKIMMER TEMP. SKIMMER. W/ OUTLET APRON . - .-.-- -FM- FORCE MAIN EX. OVERHEAD ELECT. - ._-- _-- _-- 0! - - -- -- EXISTING CONTOUR 101 PROPOSED CONTOUR TURF MATTING ON SLOPE EX. SANITARY SEWER ... ............ . ....... ........... _ ,_. ,...... EX STREAM LINE T ail RA Y SEDIMENT SKIMMER BASINS BASIN ID TSSB-1 TSSB-2 (DRAINAGE AREA (AC) 1.162 .44 DISTURBED AREA (AC) 1.162 .44 REQUIRED STORAGE VOLUME (CUBIC FEET) 2092 7J7 REQUIRED SURFACE AREA. SO. FT. 1416 540 AVG, LENGTH 120' 45' AVG. WIDTH 12' 18' DEPTH 2.0' 2.0' ACTUAL SURFACE AREA SQ. FT 1440 810 ACTUAL STORAGE VOLUME (CUBIC FEET) TOP ELEVATION ( ALL ELE. IN FT) 2880 187.00 1620 186.00 EMERGENCY SPILLWAY ELEVATION 185.50 184.50 S.A. ELEVATION 185.50 184.50 BOTTOM ELEVATION! 183.50 182.50 SKIMMER SIZE (INCHES) 1.511 1.5" SKIMMER ORFICE SIZE (DIAMETER) (INCHES 1.011 i� 611 EMERGENCY SPILLWAY "WIDTH (FEET) 121 12° Q=+CIA (C-0.5, 1=7.5) (CFS) 4.36 1,66 TEMP. GRAVEL CONST. ENTRANCE 'y/Cr -- -- -- (TYP.) ',1 H/D EX. DROP INLET (A4) SILT FENCE BAFFLES (TYP.) (TYP.) SILT FENCE (TYP.) M/, GRAVEL BERM ACROSS R/W `V (TYP.) �! 441! U NOTE:TEI PORARY SKIMMER BASIN TSSB-1 and TSSB-2 WILL BE REMOVED l ONCE STORM DRAINAGE IS INSTALLED j AND DIRECTING SITE RUNOFF DOUBLE ROW 4F % SILT FENCE 4#V �ATERFORD POND #2. -ING FIRE (TYP.) -I YI]IR AN T 41 41 V w 41 t t 4 REINFORCED SILT FENCE OUTLET (TYP.) I W 4i C V A/ 4� REINFORCED SILT a I `I' FENCE OUTLET (TYP.) w w STORM CB1 44 I Id _14 DAY GROUND �STORM CB3 STABILIZATION REQ'D (TYP.) 4 4 CONSTRUCTION LIMITS (TYP.) r -% Ai r PARKING LOT TEMPLATE TOBE .co EX. DRGP INLET Al USED AS DIVERSION BERM UPON J COMPLETION OF SITE GRADING REINFORCED SILT ,+� AND CONSTRUCTION (TYP.) L FENCE OUTLET (TYP.) c, 4i TSSB #1 TDB - "AT' OUTLET-1 W/TURF MATTING REQUIRED ALONG ENTIRE aRF OUTLET TO DISCHARGE INTO p LENGTH OF TDB-C2 (157 S.Y. MAX) (TYP.) EX. DROP INLET (A4). ,. *7 DAY STABILIZATION REQD 852 ;�,.30 ► +,� fi +►%✓ . BAFFLES I Y f F t V f 1 TSSB (�TEMP. SEDIMENT Dim SK IMM ER BASIN MWAFAW- co Buffer Zphe/No SILT FENCE , I a rr !: { ,7 l a I b t' f tM f iM i �4 a, �r •IK �� Y i 1 F I6 d 1 r •, PARKING LOT TEMPLATE TO BE - USED AS DIVERSION BERM (TYP.) h CONSTRUCTION / LIMITS (TYP.) (DEED r#:0512-25-4508 s PG. 858 . PROPERTY Zi ■ s 6.) VERTICAL DATUM IS NAVD88 30 15 0 30 60 90 SCALE 1" = 30' 1 �Z- �1 0 0 I` _ to 0 REINFORCED SILT FENCE OUTLET (TYP.) r� TSSB #2 xIr-1 OUTLET-2 TSSB #2 0 SKIMMER {TYP.) Dun 45' x 18' �� L TEMP, SEDIMENT ` SKIMMER BASIN 1 C T W/ Baffles equally spaced I at 11.25 It, 1 TDB B2" W/ TURF MATTING REQUIRED ALONG ENTI LENGTH OF TDB B2 (96 S.Y.MAX) (TYP.) *7 DAY STABILIZATION REQ'D "V 22" 7 TDB - "BI„ 2 *7 DAY STABILIZATION REQ'D SILT FEN, - m (TYP.) CIIECI' DAM t 89 (TYP.) CONSTRUCTION LIMITS (TYP.) t _ **14 DAY GROUND 9 STABILIZATION REQ'D (TYP.),' �.4" �r PARKING LOT TEMPLATE TO BE 1s9 USED AS DIVERSION BERM (TYP.) INLET �` PROTECTION (TYP.) / / 0, STORM oil r n F\!l ,. x f CONSTRUCTION LIMITS (TYP.) t�4 Y, g I P 1 X d 3 i 1-I 4 k 1 Y \ 0 9,.� _asern nt ij s %f r3 O f k r� 1 C NIF: 5T D 13 �-a• STORM T T LITTLERIVER INVESTMENTS LL. �,. 639CUTIVE PL 400 �o ,> w -FAYETTEVILLE, NC 28303 PIN#0 - - 08 f P L A,T 4° 01 , 0 EE 1 0, 0 58 TURF MATTING AT THE NORTHEASTERN PROPERTY CORNER SLOPE (646 S.Y. MAX) (TYP,) *7 DAY GROUND STABILIZATION ,/ REQ'D ('TYP.) I� XISTING �F�IRE HYDRANT e a ROLLMAX 150 TO BE USED ON ALL SLOPED SECTIONtS REQUIRING M[ATTIINIG. TEMPO Y DIVERSION BERM VELOCITY CALCULATION BERM SECTION $E S PES BOTTOM WIDTH MIN. DEPTH AREA (AC) (FT) C-CUMMULATIVE VELOCITY (F/S) LINING TDB -Al 3:1; 8:1 1' 1' .09 AC .34 cfs 1.93 F/S NO TDB-A2 3:1; 8.1 1 ° 1' 1.162 AC 4.36 cfs 4.06 F/S YES TDB-B1 3:1; 8:1 1' 1' .200 AC .75 cfs 1.93 F/S NO TDB-B2 3:1; 8:1 1' 1' .440 AC 1.65 cfs 2.32 F/S YES TURF REINFORCEMENT MATTINGTO LINE HALFWAY UP THE SIDE OF DIVERSION BERM AND TO EXTEND UP TO TI IF SAME ELEVATION ON TI IL EXISTING GROUND 2' COMPACTED SOIL. MIN J., 6' TYPICAL DIVERSION BERM W/ ROLtMAX S150TEMPOIZARY TURF REINFORCEMENT MATTING (N ES ) =11111,. t", F Rip Rai - d 50 Id ado -a- GROUND STABILIZATION SITE AREA STABILIZATION EXCEPTIONS DESCRIPTION TIME FRAME PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES & SLOPES HIGH QUALITY 7 DAYS NONE WATER ZONES (HOW) SLOPES STEEPER 7 DAYS IF SLOPES ARE 19 THAN 3:1 OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 14 DAYS 7 DAYS FOR FLATTER SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS i4 DAYS NONE (EXCEPT FOR WITH SLOPES PERIMETERS AND FLATTER THAN 4:1 HOW ZONES) EC -CONSTRUCTION S CHh,I}UI.E OUTLINE FOR CLEARING, GRUBBING & MASS GRADING f. Obtain all. permits before beginning constr uction. p g g 2. Install gravel construction entrances at the locations shown, then install all silt fences and silt fence reinforced outlets around the perimeter of the construction area. 3. Construct temporary skimmer basin #1 (TSSB-I), and temporary skimmer basin#2 (TSSB-2). 4. Clear and grub, strip topsoil and construct all diversion benns, check dams and n the erosion control plan with turf reinforcement mattin . armor the berms noted o p g 5, Topsoil to be placed as necessary for future use on site. 6. Continue clearing and grubbing of the site as necessary. 7. Provide temporary seeding & mulching as necessary to stabilize the outer perimeter of the site. 8. Seed and mulch all completed diversion beans within 7 days of their completion. the site 'while maintaining 9. Continue mass grading h g all erosion control measures and diversion berms duringthe site's grading. g g After t' all site radio re -spread topsoil, fine grade, seed and mulch all 10. A r completion of grading, p p g , disturbed areas that will not be disturbed by the site's utility work by providing ground cover within 7 to 1.4 days per NPDES requirements. FOR STREET & UTILITY CONSTRUCTION 11. Begin utility construction for the proposed stone, sewer and water mains. Install all necessary storm drainage manifolds. 12, Install inlet protection around all proposed storm drainage as necessary to keep sediment laden storm runoff from entering the stone drainage network. Install gutter 1 Maintain all inlet buddies around inlet protection devices within paved areas_ T✓lainta a e P p protection in non -paved areas. 13. Once all storm is in pla ce direct required stone runoff through new Inlet protected p q g storm system which wit] be diverted to Waterford's main water detention pond #2. Then b i ackfill the temporary skimmer basins. 14. Continue Fine radio 0 fthe subgrade for the parking lots, entrances and building grading �• p g g ad as necessary, rl' 15. Pour all concrete curb, set storm drainage frames & grates and spread ABC stone in parking lots as proposed_ Four concrete aprons around building's truck docks as shown. Fine t parking lots as well as truck entrances to the recommended 16 F grade all stone in g P g v parking pavement structures. Pave p g lots and entrances. in with topsoil, grade, seed and mulch or landscape. 17. Backflll behind all Curbing p , gr e p 18. Seed and mulch all disturbed areas to establish ground otnid cover. P 19. Final inspection and closeout with NCDEQ upon the establishment ofpennanent groundcover and construction completion. MAX L T UTL TPROTECTIONII/ RIP RAP APROINCALICS. TSSB-1 OUTLET-1 TSSB-2 OUTLET-1 PIPE SIZE (do) 4" 4" Q .12 CFS A2 CFS VELOCITY 2.4 FPS 2.4 FPS ado 1211 1211 d50 /i,l1 411 °W = La + do 6�.3' 6.3' La (CHART MIN.) 61 6' PIPE. SIZE (do) " 411 THK. 1211 12" drawn by L.S. reviewed s .. „ Iiw ui • 44 M i Cn 1 r« Ily,�Cn y �:.. M -a 1.9 C a) "All construction to be in accordance with current applicable Cumberland ounty, Town of Spring Lake, North.! Field Book No. Department of Transportation (NCDOT), and North Carolina it Irr Department of Environmental standards ! specifications, �M WATERFORD_BUILDING_ADDITION_ECPLAN