HomeMy WebLinkAbout20211530 Ver 1_ePCN Application_20230223DWR
Division of Water Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
April 13, 2022 Ver 4.3
Initial Review
Has this project met the requirements for acceptance in to the review process?
Yes
No
Is this project a public transportation project?*
Yes No
Change only If needed.
Pre -Filing Meeting Date Request was submitted on:
10/22/2021
BIMS # Assigned
20211530
Is a payment required for this project?*
No payment required
Fee received
Fee needed - send electronic notification
Select Project Reviewer*
Hannah Sprinkle:hannah.sprinkle@ncdenr.gov
Information for Initial Review
la. Name of project:
Bridge 28 over Long Creek on NC 210
1a. Who is the Primary Contact?*
Jason Dilday
1b. Primary Contact Email: *
jldildayl@ncdot.gov
Date Submitted
2/23/2023
Nearest Body of Water
Long Creek
Basin
Cape Fear
Water Classification
C;SW
Site Coordinates
Latitude:
34.439239
A. Processing Information
County (or Counties) where the project is located:
Pender
Is this a NCDMS Project
Yes No
Is this project a public transportation project?*
Yes No
Longitude:
-78.025815
Version#*
1
Reviewing Office`
Wilmington Regional Office - (910) 796-7215
1c. Primary Contact Phone: *
(919)707-6111
a
Is this a NCDOT Project?*
Yes No
(NCDOT only) T.I.P. or state project number:
B-5156
WBS # (1)
42331.1.2
1a. Type(s) of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
Yes
No
1b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Regional General Permit (RGP) Number:
RGP Numbers (for multiple RGPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
201902350 - Work associated with bridge construction, widening, replacement, and
interchanges
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
401 Water Quality Certification - Express
Riparian Buffer Authorization
1f. Is this an after -the -fact permit application? *
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1h. Is the project located in any of NC's twenty coastal counties?
Yes No
1i. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
Yes No Unknown
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
NCDOT
2b. Deed book and page no.:
2c. Contact Person:
Yes No
Yes No
O
2d. Address
Street Address
1598 Mail Service Center
Address Line 2
City
Raleigh
Postal / Zip Code
27699-1598
2e. Telephone Number:
(919)707-6111
2g. Email Address:*
maturchy@ncdot.gov
3. Applicant Information (if different from owner)
3a. Name:
Jason Dilday
3b. Business Name:
3c. Address
Street Address
1598 Mail Service Center
Address Line 2
city
Raleigh
Postal / Zip Code
27699-1598
3d. Telephone Number:
(919)707-6111
3f. Email Address:*
jldildayl@ncdot.gov
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality / town:
Long Creek
2. Project Identification
2a. Property Identification Number:
2c. Project Address
Street Address
Address Line 2
City
Postal / Zip Code
3. Surface Waters
3a. Name of the nearest body of water to proposed project:
Long Creek
3b. Water Resources Classification of nearest receiving water:
C;SW
3c. What river basin(s) is your project located in?*
Cape Fear
3d. Please provide the 12-digit HUC in which the project is located.
030300070704
4. Project Description and History
State / Province / Region
NC
Country
USA
2f. Fax Number:
State / Province / Region
NC
Country
USA
3e. Fax Number:
2b. Property size:
State / Province / Region
Country
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Land use in the project vicinity consists primarily of forested communities, with agricultural fields and residential development.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?
Yes No Unknown
4f. List the total estimated acreage of all existing wetlands on the property:
2.13
4g. List the total estimated linear feet of all existing streams on the property:
500
4h. Explain the purpose of the proposed project:*
The purpose of this project is to replace a structurally deficient bridge.
41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
This project involves replacing the 170-foot, 4 span bridge with a 205-foot, 5 span on a new alignment, slightly upstream of the existing bridge. Traffic will be maintained on the existing
bridge during construction of the new structure. Standard road building equipment, such as trucks, dozers and cranes will be used.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes No
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
SAW-2015-00992
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Eric Black
Agency/Consultant Company: North State Engineering
Other:
O Unknown
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
PJD issued 12/13/2018
6. Future Project Plans
6a. Is this a phased project?*
Yes No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries Buffers
Open Waters Pond Construction
2. Wetland Impacts
2a1 Reason (?)
2b. Impact type * (?)
2c. Type of W. *
2d. W. name
2e. Forested *
2f. Type of Jurisdicition *
?)
2g• Impact
area *
Fill
P
f7verine Swamp Forest
WA, WC
Yes
Both
0.692
(acres)
Excavation
P
Fv.rine Swamp Forest
WD
Yes
Both
0.038
(acres)
Mach. Clearing
P
f7yerine Swamp Forest J71
WD
Yes
Both
0.198
(acres)
2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact
0.000 0.928
2g. Total Wetland Impact
0.928
2i. Comments:
An additional 0.246 ac of handclearing will occur in wetlands WA and WC.
0.98 ac of handclearing will occur to wetlands WB and WD due to overhead utility relocation.
4. Open Water Impacts
4a. Site #
4a1. Impact Reason
4b. Impact type
4c. Name of waterbody
4d. Activity type
4e. Waterbody type
4f. Impact area
Bent removal
T
Long Creek
Dewatering
Tributary
0.01
4g. Total temporary open water Impacts:
0.01
4g. Total open water impacts:
0.01
4h. Comments:
E. Impact Justification and Mitigation
1. Avoidance and Minimization
4g. Total permanent open water impacts:
0.00
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
The bridge will remain open to traffic as the new structure is constructed. The new bridge will have less bents in the water than the existing structure.
See stormwater management plan for additional minimization measures.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
2:1 slopes were used to minimize impacts to existing wetlands where practicable. Stormwater is collected to outfall either outside of existing wetlands or
where mechanized clearing will occur.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2c. If yes, mitigation is required by (check all that apply):
DWR Corps
2d. If yes, which mitigation option(s) will be used for this project?
Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
Yes No
4b. Stream mitigation requested:
(linear feet)
4d. Buffer mitigation requested (DWR only):
(square feet)
4f. Non -riparian wetland mitigation requested
4h. Comments
4c. If using stream mitigation, what is the stream temperature:
4e. Riparian wetland mitigation requested:
(acres)
4g. Coastal (tidal) wetland mitigation requested:
(acres)
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
If no, explain why:
This project occurs outside of an NC Riparian Buffer area.
2. Stormwater Management Plan
O
2a. Is this a NC DOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? *
Yes No
Comments:
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? *
Yes No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)?*
Yes No
1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?
Yes No
Comments: *
Type I Categorical Exclusions do not require submittal to the State Clearing House.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?
Yes No
3b. If you answered "no," provide a short narrative description.
Due to minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby land uses nor stimulate growth.
Therefore, a detailed indirect or cumulative effects study will not be necessary.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?
Yes No N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?
Yes No
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
5d. Is another Federal agency involved?*
Yes No
5e. Is this a DOT project located within Division's 1-8?
Yes No
Unknown
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
N.C. Natural Heritage Program database; USFWS-Raleigh IPaC review of project area which lists; Northern long-eared bat, West Indian manatee,
piping plover, red know, red -cockaded woodpecker, American alligator, green sea turtle, Kemp's ridley sea turtle, leatherback sea turtle, loggerhead sea
turtle, Cooley's meadowrue, rough -leaved loosestrife and seabeach amaranth. Northern long-eared bat is covered under the PBO for the species. The
American alligator does not require surveys due to its listing of Threatened Due to Similarity of Appearance. Habitat for Cooley's meadowrue and rough -
leaved loosestrife exists in the study area. Surveys, most recently updated in July 2022 found no specimens. Surveys for Cooley's meadowrue and
rough -leaved loosestrife will be updated prior to project construction. All other species received biological conclusions of No Effect, due to no habitat
being present.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?
NOAA EFH mapper
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? *
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NEPA documentation
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?
Yes No
8b. If yes, explain how project meets FEMA requirements:
NCDOT Hydraulics Unit coordination with FEMA
8c. What source(s) did you use to make the floodplain determination?
FEMA maps
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
B-5156 Pander February 2023.pdf 9AMB
File must be PDF or KMZ
Comments
Signature
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction' subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Michael Turchy
Signature
Gael Arc*
Date
2/23/2023