Memo To: Harry Lucas
Engineer
From: Doug Lane
Preliminary Estimate Engineer
Subject: B-2500 (Long Bridge) Alternative Functional Design Construction Estimates, Dare County.
LONG BRIDGE
Description Alternate A Alternate C
(18.5 Miles) (18.1 Miles)
Segment A $2,800,000
Segment C $1,900,000
Strs 8� Dredging $796,000,000 $794,000,000
Segment F $1,400,000 $1,400,000
B-2500 Long Bridge $800,200,000 $797,300,000
(Conventional)
B-2500 Long Bridge $1,014,000,000 $1,011,000,000
(Design Build)
Note: Design Buiid Cost �hown is an Average of the High and Low Range.
E-1
NC-DOT
Contract Standards and Development Unit
Preliminary Estimate Section
June 8, 2012
Memo To: Harry Lucas
Engineer
From: Doug Lane
Preliminary Estimate Engineer
Subject: Design Build Construction Estimate for B-2500 Long Bridge, in Dare County.
B-2500 Lonq Bridqe (Hiqh Ranqe)
( Alternate A �
DESCRIPTION CONSTR.COST
B-2500 Long Br (Conventionai Construction Cost 6-8-12) $796,000,000
Inf�ate to Lett Date 0.00% $0
PE 10.00% $80,000,000
Sub-Total $876,000,000
Permits, R/W Acq.,Plans,1/2CT $170,000,000
6 Years at 3% / Yr
Sub-Total $1,046,000,000
Risk 10.00% $104,000,000
Design Build Constructlen Cost (High Range� $1,150,000,000
Note: Estimate Date to Letting Date 2.0 Years
Permits, R/W Acquisition, and Plan Completion 1.5 Years
One Half Contract Time (Contract Time = Months) 2.5 Years
DB Construction Cost includes 15% E. & C.
cc: Beth Smyre, PE
E-2
NC-DOT
Contract Standards and Development Unit
Preliminary Estimate Section
June 8, 2012
Memo To: Harry Lucas
Engineer
From: Doug Lane
Preliminary Estimate Engineer
Subject: Design Build Construction Estimate for B-2500 Long Bridge, in Dare County.
B-2500 Lonq Bridqe (Low Ranqe)
( Alternate A )
DESCRIPTION CONSTR.COST
B-2500 Long Br (Conventional Construction Cost 6-8-12) $796,000,000
Inflate to Lett Date 0.00% $0
PE 5.00% $40�000�000
Sub-Total $836,000,000
Permits, R/W Acq.,Plans,1/2CT
Months 2%/Yr
Su b-Total $836,000,000
Risk 5.00% $42,000,000
Design Build Construction Cost (Low Range) �878,000,000
Note: Estimate Date to Letting Date 2.0 Years
Permits, R/W Acquisition, and Plan Completion 1.5 Years
One Half Contract Time (Contract Time = Months) 2.5 Years
DB Construction Cost includes 15% E. & C.
cc: Beth Smyre, PE
E-3
NC-DOT
Contract Standards and Development Unit
Preliminary Estimate Section
June 8, 2012
Memo To: Harry Lucas
Engineer
From: Doug Lane
Preliminary Estimate Engineer
Subject: Design Build Construction Estimate for B-2500 Long Bridge, in Dare County.
B-2500 Lonq Bridqe (Hiqh Ranqe)
( Alternate C )
DESCRIPTION CONSTR.COST
B-2500 Long Br (Conventional Construction Cost 6-8-12) $794,000,000
Inflate to Lett Date 0.00% $0
PE 10.00% �79,000,000
Sub-Total �873,000,000
Permits, R/W Acq.,Plans,1/2CT $169,000,000
6 Years at 3% / Yr
Sub-Total $1,042,000,000
Risk 10.00% $104,000,000
Design Build Construction Cost (High Range) $1,146,000,000
Note: Estimate Date to Letting Date 2.0 Years
Permits, R/W Acquisition, and Plan Completion 1.5 Years
One Half Contract Time (Contract Time = Months) 2.5 Years
DB Construction Cost includes 15% E. & C.
cc: Beth Smyre, PE
E-4
NC-DOT
Contract Standards and Development Unit
Preliminary Estimate Section
June 8, 2012
Memo To: Harry Lucas
Engineer
From: Doug Lane
Preliminary Estimate Engineer
Subject: Design Build Construction Estimate for B-2500 Long Bridge, in Dare County.
B-2500 Lonq Bridqe (Low Ranqe)
( Alternate C )
DESCRIPTION CONSTR.COST
B-2500 Long Br (Conventional Construction Cost 6-8-12) $794,000,000
Inflate to Lett Date 0.00% $0
PE 5.00% $40,000,000
Sub-Total $834,000,000
Permits, R/W Acq.,Plans,1/2CT
Months 2%/Yr
Sub-Total $834,000,000
Risk 5.00% $42,000,000
Design Build Construction Cost (Low Ra;iye) $876,000,000
Note: Estimate Date to Letting Date 2.0 Years
Permits, R/W Acquisition, and Plan Completion 1.5 Years
One Half Contract Time (Contrect Time = Months) 2.5 Years
DB Construction Cost includes 15% E. & C.
cc: Beth Smyre, PE
E-5
NC-DOT
Contract Standards and Development Unit
Preliminary Estimate Section
June 8, 2012 Updated Prices
Memo To: Harry Lucas
Engineer
From: Doug Lane
Preliminary Estimate Engineer
Subject: B-2500 (Long Bridge) Alternative Functional Design Construction Estimates, Dare County.
LONG BRIDGE
Description Alternate A Alternate C
(18.5 Miles) (18.1 Miles)
Segment A $2,800,000
Segment C $1,900,000
Strs & Dredging $796,000,000 $794,000,000
Segment F $1,400,000 $1,400,000
B-2500 Long Bridge $800,200,000 $797,300,000
(Conventional)
B-2500 Long Bridge $1,014,000,000 $1,011,000,000
(Design Build)
Note: Design Build Cost shown is an Aver�ge of the High and Low Range.
E-6
TIP No
Route
From
Typical Section
North Carolina Department of Transportation
Preliminary Estimate
B-2500 Seg A County
NC 12
Oregon Inlet to Rodanthe - Curved Rodanthe Terminus (Segment A)
Approach Road
2 Lane Shoulder
Priced By: Doug Lane
Quantities By: Casey Woodall
Requested By: Victor Barbour, PE
10/31/11 Updated Prices Only
10/8/03
10/28/11
DARE
CONSTR. COST
$2,800,000
Line Sec
Item Des No. Description Quantity Unit Price Amount
Clearin and Grubbina 1.5 Acre $ 30,000.00 $ 45,000.00
Earthwork 20,000 CY $ 15.00 $ 300,000.00
Pavement Removal 650 SY $ 5.00 $ 3,250.00
Draina e New Location 0.7 Miles $ 150,000.00 $ 105,000.00
Fine Gradin 12,600 SY $ 3.00 $ 37,800.00
Pavement Widenin 0 SY $ -
New Pavement 11,000 SY $ 80.00 $ 880,000.00
Pavement Resurfacin 0 SY $ _
5.0"Avera e As halt Wed in 3,600 SY $ 30.00 $ 108,000.00
Sub rade Stabilization 11,300 SY $ 7.00 $ 79,100.00
1'-6" Concrete Curb and Gutter 0 LF $ _
2'-6" Concrete Curb and Gutter 0 LF $ _
4" Concrete Sidewalk both sides 0 SY $ _
7" Monolithic Islands 0 SY $ _
Erosion Control 7 Acres $ 15,000.00 $ 105,000.00
New RR Si nal wiih Gates 0 Each $ _
Rubber Railroad Crossintr 0 Each $ _
U rade Traffic Si nal 0 Each $ _
Traffic Control 0.7 Miles $ 25,000.00 $ 17,500.00
Thermo and Markers 0.7 Miles $ 20,000.00 $ 14,000.00
Utilitv Construction
Relocate Existina «%ater Line 0 LF $ _
Relocate Existin� Se���er Line 0 LP � _
A�Iisc. R. Mob (1 �% Strs&Util)
Misc. & Mob (45% Functional) � 762,350.00
L�'Ltl V./ 1VEIIC�
�ontract �.ost ....................... .............
�. c� �. � $ % . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
�onstruction �'o�t ....................................
E-7
� 2,4�7,000.00
� �a3>000.00
S 2,800,000.00
TIP No
Route
From
Typical Section
Priced By:
Quantities By:
Requested By:
North Carolina Department of Transportation
Preliminary Estimate
B-2500 Seg C County: DARE
NC 12
Oregon Inlet to Rodanthe - Intersection Rodanthe Terminus (Segment C) CONSTR. COST
Approach Road $1,900,000
2 Lane Shoulder
Doug Lane 10/31/11 Updated Unit Prices Only
Casey Woodall 10/8/03
Victor Barbour, PE 10/28/11
Line Sec
Item Des No. Description Quantity Unit Price Amount
Clearin and Grubbin 0.5 Acre $ 30,000.00 $ 15 000.00
$ -
Earthwork 6,000 CY $ 20.00 $ 120,000.00
Pavement Removal 0 SY $ -
Draina e New Location 0.40 Miles $ I50,000.00 $ 60,000.00
Fine Gradin 8,600 SY $ 3.00 $ 25,800.00
Pavement Widenin 4,500 SY $ 90.00 $ 405,000.00
New Pavement 2,900 SY $ 80.00 $ 232,000.00
Pavement Resurfacin 3,200 SY $ 15.00 $ 48,000.00
."Avera e As halt Wed ina 0 SY $ -
Sub rade Stabilization 8,100 SY $ 7.00 $ 56,700.00
1'-6" Concrete Curb and Gutter 0 LF $ -
2'-6" Concrete Curb and Gutter 0 LF $ -
4" Concrete Sidewalk both sides 0 SY $ -
7" Monolithic Islands 0 SY $ -
Erosion Control 4.2 Acres $ 15,000.00 $ 63,000.00
New RR SiQnal with Gates 0 Each $ -
Rubber Railroad Crossin 0 Each $ -
New Traffic Si nal (NC12 & Old NC12 1 Each $ 90,000.00 $ 90,000.00
Traffic Control 0.4 Miles $ 35,000.00 $ 14,000.00
Thenno and Markers 0.4 Miles $ 20,000.00 $ 8,000.00
Utilitv Construction
Relocate Existina V��ater Line 0 LF $ -
Relocate �xistina Sewer Line 0 LF � -
Misc. R. Mob ( I S% Strs�.Util)
Misc. & Mob (45% Functional) � 511,�00.00
Lgth 0.4 NiiEes Contract Cost ....................... .............. $ 1,649,000.00
E. & C. 1_5% ..................................... � 2�I.U00.00
Construction Cost ....................... .............. � 1,9QQ,OOa.00
:
TIP No
Route
From
Typical Section
Priced By:
Quantities By:
Requested By:
North Carolina Department of Transportation
Preliminary Estimate
B-2500 Lon� Deen �'�'ater Alternative Alt A Strs County:
NC 12
Replacement of Bridge #11 (Herbert C. Bonner Bridge)
with Curved Rodanthe Tenninus (Segment A)
Long Deep Water Alternative
Doug Lane / Harry Lucas 06/08/12 Updated Unit Prices
Casey Woodail l0/14/03
Victor Barbour, PE 10/28/1 I
DARE
CONSTR. COST
�796,000,000
Line Sec
Item Des No. Description Quantity Unit Price Amount
Thermo and Markers 17.5 Miles $ 12,000.00 $ 210,000.00
1.3 Mi. Southern A roach 40' x 6,575' 263,000 SF $ 125.00 $ 32,875,000.00
(Const. From Work Brid e)
13.9 Mi. Southern A roach 40' x 73,821' 2,952,840 SF $ 130.00 $ 383,869,200.00
(Constr. From Bar e)
0.5 Mi. Hi h Level & Channel 40' x 2,400' 96,000 SF $ 375.00 $ 36,000,000.00
Bum Outs (6Ea x 12,OOOSF) 72,000 SF $ 130.00 $ 9,360,000.00
1.8 Mi. Northern A roach 40' x 9,475' 379,000 SF $ 125.00 $ 47,375,000.00
(Constr. From Work Brid e)
Tem orar Access
Work Brid es and Dred in 1 LS $ 120,000,000.00 $ 120,000,000.00
Misc. & Mob (10% Structure) l LS $ 62,968,800.00
Lgin i i.� iviiies
�:ontract c.ost ...........
E. & C. 15% ...........
Construction Cost ...........
E-9
. ........................ � 6y"l,6Sx,000.00
. ........................ $ 103,342,000.00
. ........................ $ 796,000,000.00
TIP No
Route
From
Typical Section
Priced Bv:
Prepared By:
Requested By:
North Carolina Department of Transportation
• Preliminary Estimate
B-2500 Long Deep Water Alternative Alt C Strs County:
NC 12
Replacement of Bridge #11 (Herbert C. Bonner Bridge)
with Intersection Rodanthe Terminus (Segment C)
Long Deep Water Alternative
Doug Lane / Hany Lucas 6/8/12 Updated Unit Prices
Casey Woodall ]0/l4/03
Victor Barbour, PE 10/28/11
DARE
CONSTR. COST
$794,000,000
Line Sec
Item Des No. Description Quantity Unit Price Amount
Thermo and Markers 17.5 Miles $ 12,000.00 $ 210,000.00
1.2 Mi. Southern A roach 40' x 6,300' 252,000 SF $ 125.00 $ 31,500,000.00
(Const. From Work Brid e)
13.9 Mi. Southern A roach 40' x 73,773' 2,950,920 SF $ 130.00 $ 383,619,600.00
(Constr. From Bar e)
0.5 Mi. Hi h Level & Channel 40' x 2,400' 96,000 SF $ 375.00 $ 36,000,000.00
Bum Outs (6 Ea x 12,000 SF) 72,000 SF $ 130.00 $ 9,360,000.00
1.8 Mi. Northern A roach 40' x 9,475' 379,000 SF $ 125.00 $ 47,375,000.00
(Constr. From Work Brid e)
Tem orar Access
Work BridQes and Dred in 1 LS $ 120,000,000.00 $ 120,000,000.00
Misc. & Mob (10% Structure) ] LS $ 62,806,400.00
Lgth 17.4 Miles Contract Cost .............. ........................ $ 690,871,000.00
E. & C. 15% .............. ........................ $ 103,129,000.00
Construction Cost .............. .......... .............. � 794,000,000.00
E-10
North Caro]ina Department of Transportation
Preliminary Estimate
TIP No. B-2500 Seg F County: DARE
Route NC 12
From Oregon Inlet to Rodanthe - Bodie Island Terminus (Segment F) CONSTR. COST
Typical Section 2 Lane Shoulder $1,400,000
Priced By: Doug Lane 10/31/11 Updated Unit Prices Only
Quantities By: Casey Woodall 10/8/03
Requested By: Victor Barbour, PE 10/28/11
Line Sec
Item Des No. Description Quantity Unit Price Amount
Clearin and Grubbin 0.7 Acre $ 30,000.00 $ 21,000.00
Earthwork 17,000 CY $ 15.00 $ 255,000.00
Pavement Removal 2,000 SY $ 5.00 $ 10,000.00
Draina e New Location 0.30 Miles $ 150,000.00 $ 45,000.00
Fine Gradin 5,300 SY $ 3.00 � 15,900.00
Pavement Widenin 0 SY $ -
New Pavement 4,300 SY $ 80.00 $ 344,000.00
Pavement Resurfacin 3,000 SY $ 12.00 $ 36,000.00
."Avera e As halt Wed in 0 SY $ -
Sub rade Stabilization 4,600 SY $ 7.00 $ 32,200.00
1'-6" Concrete Curb and Gutter 0 LF $ -
2'-6" Concrete Curb and Gutter 0 LF $ -
4" Concrete Sidewalk both sides 0 SY $ -
7" Monolithic Islands 0 SY $ -
Erosion Control 3.7 Acres $ 15,000.00 $ 55,500.00
New RR Si nal with Gates 0 Each $ -
Rubber Railroad Crossin 0 Each $ -
U rade Traffic Si nal 0 Each $ -
Traffic Control 0.3 Miles $ 30,000.00 $ 9,000.00
Thermo and Markers 0.3 Miles $ 20,000.00 $ 6,000.00
Utilitv Construction
Relocate Existin Water Line 0 LP $ -
Relocate Existina Sewer Line 0 LP $ -
Misc. & Mob (IS% Strs&Util)
Misc. & Mob (45% Functional) $ 373,400.00
Lgin u.s rvtues
t:ontract t:ost ....................... .............
E. & C. I 5 % . . . . . . . . . . . .. . . . . . . . . .. . . . . . . . . . . . . .
Construction Co�t ............. .......... .............
E-11
� 1,203,000.00
� 197,000.00
� Z,400,QOQ.QO