HomeMy WebLinkAbout20140268_05_Pamlico Sound Bridge Corridor Cost Analysis (October 2012) - Appendix D_20150317Appendix D Contractor Estimates — Task 2 B-2500 Pamlico Bridge Cost Study Task 2 Results: Modification of Task 1 Cost Study To Include Changes in Items, Materials, and Quantities. Based on 2012 Pricing Prepared For: NCDOT (under 2011 AECOM Structures Limited Services Agreement) Prepared By: A=COM Project Manager: Mark Pearson, PE 701 Corporate Center Dr. Raleigh, NC 27607 Lead Estimator: John Kovac, PE 200 Liberty St. New York, NY 10281 June 6, 2012 D-1 TABLE OF CONTENTS B-2500 Pamlico Bridge Cost Study: Task 2 Results TITLE 1. Figure S-1: Replacement Bridge Corridors and Preferred Alternative 2. Executive Summary 3. Study Bid Totals for Bonner (Parallel) Bridge — Option 1(2012 Pricing) 4. Study Bid Totals for Bonner (Parallel) Bridge — Option 2(2012 Pricing) 5. Study Bid Totals for Pamlico Bridge Segment (2012 Pricing) 6. Estimate Recap for Bonner (Parallel) Bridge — Option 1(2012) 7. Estimate Recap for Bonner (Parallel) Bridge — Option 2(2012) 8. Estimate Recap for Pamlico Bridge Segment (2012) 9. Appendix A: Supporting Data for Task 2 i. Bonner (Parallel) Bridge Cost Report — Option 1 ii. Bonner (Parallel) Bridge Cost Report — Option 2 iii. Pamlico Bridge Cost Report A=COM 701 Corporate Center Drive, Suite 475 Raleigh, NC 27607 Project Manager: L. Mark Pearson, PE PAGES 1-10 11-14 15-18 19-20 21-23 24-26 27-29 A1-52 A53-114 A115-134 Lead Estimator: John Kovac, PE REPLAGENIENT BRIDGE CORRIDQRS AND Figure PREFERRED ALTERNATIVE S-� (Provided by NCDOT) B-2500 Pamlico Bridge Cost Study E�ECUTIVE S UMMARY �.� ���� EXECUTIVE SUMMARY TASK 1 AECOM was requested to perform estimating tasks as part of a cost study to update pricing to 2012 for the Pamlico Sound Bridge Segment (14.8 miles) and the Parallel Bridge Corridor (2.7 miles) for the B- 2500 project in Dare County, North Carolina. The effort is based on the Finley Engineering Group, Inc. 2006 construction cost estimates for the Pamlico Sound Bridge Corridor and the Parallel Bridge Corridor. The Parallel Bridge Corridor would involve replacing Bonner Bridge with a 2.7-mile long bridge immediately west of the existing structure. The estimate for the 17.5 mile structure was generated by preparing an estimate for the 14.8 mile Pamlico Sound Bridge segment and adding to it the estimate for the 2.7 mile Parallel Bridge segment to create a total. The estimate values from Task 1 are: Bonner (2.7 miles) Pamlico (14.8 miles) Combined (17.5 miles) 2006 $ 222,962,625.60 $ 431,061,636.46 $ 654,024,262.06 2012 $ 240,118,222.43 $ 459,849,869.41 $ 699,968,091.84 The cost estimate above only includes 2012 construction costs for the structures, including demolition of the existing structure. The cost estimate excludes design, acquisition and permitting costs, utility costs, civil work costs, escalation, contingencies, O&M costs. TASK 2 Task 2 includes updating the bridge design quantities to reflect more current concepts, material changes and DOT requirements that were incorporated into a recent Design-Build RFP in 2011, in preliminary design documents provided by the DOT from that contract and design concepts included for the long bridge option in the final EIS for the project, as well as other changes requested by the DOT. The revised quantities are priced in 2012 dollars. Bonner Bridge now contains two options. The first option retains portions of existing bridge for a 1,200 foot long fishing pier. The second option includes construction of a new 1,200 foot long fishing pier. AECOM utilized the updated 2012 HCSS estimates to perform Task 2. • BONNER2012 (04/26/2012) • PAMLICO2012 (04/26/2012) The basis of the estimates used in this study, including development of labor rates, is included in the documentation of Task 1. AECOM has made no fundamental changes in the basic means and methods utilized in the original 2006 estimate. Therefore, although some items and quantities have changed in D-5 the estimates, the fundamental construction approaches assumed and utilized in the 2006 estimates have not been altered for the purposes of these study tasks. For the Task 2 portion of the study AECOM adjusted the estimates from Task 1 based on new items of work and changed quantities generated from more current design concepts. In general the major design concept changes that affect the cost are: Bonner Bridge o Revising the reinforcing steel from epoxy coated to stainless steel for all cast in place concrete as well as precast concrete within twelve feet of inean high water. o Modification to existing structure for fishing pier — Option 1 o Construction of new fishing pier — Option 2 0 0 Substructure work Revising type, size and spacing of piles. Partial elimination of precast concrete columns, replacing with cylinder piles. Superstructure work Utilizing 45" and 96" Florida I-Beam (FIB)type girders with cast in place concrete deck in lieu of precast segmental construction for approximately 75% of the structure length. • Pamlico Bridge o Revising the reinforcing steel from epoxy coated to stainless steel for all cast in place concrete as well as precast concrete within twelve feet of inean high water. � 0 Substructure work ■ Revising type, size and spacing of piles. ■ Elimination of precast concrete columns, replacing with cylinder piles. Superstructure work ■ Utilizing 96" Florida-I Beam girders in lieu of 78" bulb tee girders. The estimate values are: Bonner (2.7 miles) Bonner (2.7 miles) Pamlico (14.8 miles) Combined (17.5 miles) Combined (17.5 miles) 2012 Option 1 $ 216,456,883.01 Option 2 $ 221,568,517.36 $ 574,353,484.56 Option 1 $ 790,810,367.57 Option 2 $ 795,922,001.92 Part of Task 2 includes the addition of dredging 2000 feet for the 2.8-mile Bonner Bridge and 42,240 feet (S miles) for the Pamlico Bridge. The original 2006 Bonner Bridge (2.7 miles) estimate already included (Bid Item 2900, activity 230002) approximately $23MM direct cost for dredging for the portion of the work contemplated as marine access. Therefore no additional dredging cost was included in this study. The original 2006 Pamlico Bridge (14.8 miles) estimate utilized dual trestles as temporary access for all construction operations. Updated in 2012 costs, the "budget" for temporary access is approximately $122.6MM. Should means and methods change to marine access that would require dredging, the above "budget" may be sufficient to cover those costs. Therefore no additional dredging cost was included in this study. 2 D-6 In consideration of the fact that the available bridge plans for the 2.7-mile parallel bridge are in a preliminary stage of development based on the 2011 B-2500 Request for Proposal and that structure plans are not available for the 14.8 mile Pamlico bridge segment, AECOM recommends adding 20% to the 2012 Task 2 estimated construction costs for the project development contingency. CONCLUSION The combined totals in 2012 dollars are $790,810,367.57 (17.5 mile Option 1) and $795,922,001.92 (17.5 mile Option 2). The cost estimate only includes 2012 construction costs for the structures, including demolition of the existing structure. The cost estimate excludes design, acquisition and permitting costs, utility costs, civil work costs, escalation, contingencies, O&M costs. AECOM recommends adding 20% to the 2012 Task 2 estimated construction costs for the project development contingency (not included in the cost figures above). We also recommend that an escalation factor be added through the anticipated mid-point year of construction to account for increasing costs over time beyond 2012. The current rate is believed to be approximately 3%. Adding the contingency amount of 20% to the estimated structure construction costs of Option 1 and assuming a 3% escalation rate with a mid-point of construction in year 2016, the cost analysis for the structure is as follows: Structure Cost Bonner (2.7 miles) Pamlico (14.8 miles) Combined (17.5 milesl 2012 Construction Estimate $ 216,456,883.01 $ 574,353,484.56 $ 790,810,367.57 20% Construction Contin�ency $ 43,291,376.60 $ 114,870,696.91 $ 158,162,073.51 2012 Construction Total $ 259,748,259.61 $ 689,224,181.47 $ 948,972,441.08 2016 Cost Escalation (12.55%) $ 32,598,406.58 $ 86,497,634.77 $ 119,096,041.35 Construction Total* $ 292,346,666.19 $ 775,721,816.24 $ 1,068,068,482.43 *Range for structure costs includes construction contingency and assumed escalation for a 2016 mid- point of construction. Costs for engineering design, acquisition and permitting costs, utility costs, construction phase administration, engineering and inspection, civil works, and operations and maintenance are not included in the bridge construction cost study. 3 D-7 CREDENTIALS The credentials of the AECOM cost study team are listed as follows: 1VI�r1� Pearson, �E Project Manager Education: MCE, Structures and Engineering Mechanics, North Carolina State University, 1979 BS, Civil Engineering, Clemson University, 1977 Licenses/Registrations: Professional Engineer— North Carolina, South Carolina, Georgia, Mississippi, Alabama, Virginia, Tennessee, Florida Years of Experience: 34 Professional Associations: • American Society of Civil Engineers • American Railway Engineering and Maintenance-of-Way Association Training and Certifications: • FHWA Curved Stee) I-Girder Workshop • PCI Bridge Design Manual Seminar • FHWA & ALDOT Prefabricated Bridge Elements Workshop • SCDOT Seismic Design Specifications Training Workshop • FICE/FDOT LRFD Training Seminar • FHWA Design of Bridges for Extreme Events Mark Pearson, PE, has 34 years of structural design and design management experience. Mr. Pearson has spent his entire career in North Carolina and has worked on NCDOT projects for 33 years. He has served as project manager, lead structures engineer, and Structures QC manager on numerous bridge projects for NCDOT and throughout the Southeast. He has been involved with challenging bridge designs and large design-build projects in North Carolina and Florida. His experience includes: • Structures lead engineer for the bid phase of the $1.2 B, I-595 Roadway Corridor Improvements PPP project for Florida DOT • Project Manager for the I-440/US 64 Knightdale Bypass 3-level interchange flyover bridges in Wake County for NCDOT • Engineer of record for the US 231 bridges over the Tennessee River in Huntsville, AL • Structures Design QC Manager for the $199M, 2.8-mile US 17 Washington Bypass Bridge Design- Build project for NCDOT • 30 other projects for NCDOT over his career 4 D-8 Wally jorc�an, PE Project Technical Reviewer Education: MS, Civil Engineering, Auburn University, 1984 Years of Experience: 28 BS, Civil Engineering, Auburn University, 1982 Professional Associations: Licenses/Registrations: • American Segmental Bridge Institute • Chi Epsilon Professional Engineer — North Carolina, South . NCEES Structural Examination Carolina, Alabama, Florida, Virginia, Maryland, Committee, Member Georgia, New York. NCEES. Mr. Jordan has 28 years of experience in major bridge design, construction, project management and design-build projects involving multiple engineering disciplines and supervision of technical design and production staff. His extensive experience includes large-scale transportation projects working directly with the Federal Highway Administration, state DOTs, and contractors. He has expertise in major and complex bridges including precast segmental and cable-stayed design, construction, and inspection. A resident of North Carolina, Mr. Jordan has worked on NCDOT projects for 24 years. Mr. Jordan's bridge experience includes: • Structures Design Manager for the $199M, 2.8-mile US 17 Washington Bypass Bridge Design- Build project for NCDOT • Construction Engineer for the Modeling of the erection of Albemarle Sound Bridge, NCDOT • Design Project Manager and Engineer-of-Record on the Ringling Causeway Design-Build Project, Florida DOT • Design Project Manager and Engineer-of-Record for the contractor's value engineering proposal of the redesign Memorial Causeway, Florida DOT 5 D-9 ����y IV�otri�an, I�� Quantities Review and Development Education: BS, Civil Engineering, Virginia Polytechnic Institute and State University, 2000 Licenses/Registrations: Professional Engineer— North Carolina, Virginia. Years of Experience: 12 Professional Associations: American Society of Civil Engineers American Institute of Steel Construction Training and Certifications: • Railroad General Roadway Worker Protection (RWP) On-Track Safety • Structural Design of Buildings and Industrial Facilities for Bomb Blasts and Accidental Chemical Explosions • LRFD 3rd ed. Design for Steel Bridge Superstructures Mr. Morrison is an engineer with 12 years of structural design experience in the design of bridge and highway structures, culverts, retaining walls, water and wastewater treatment facilities and tank structures, and structural foundations. He also has experience in hydraulic investigation of scour for bridges and culverts. His varied experience includes structures design for major highway design-build projects as well as projects with state DOTs, the department of defense, municipalities, and transit and aviation structures. A resident of North Carolina, Mr. Morrison has been designing bridges on local projects for nine years. His projects include: • Structures engineer on four structures on the $1.2 B, I-595 Roadway Corridor Improvements PPP project for Florida DOT • Structures Engineer on the $199M, 2.8-mile US 17 Washington Bypass Bridge Design-Build project for NCDOT • Structures Engineer for 16 bridges on the I-520 Palmetto Parkway Phase II, South Carolina DOT 6 D-10 ��"illi�in J. �����°����°���, F'F Chief Estimator Education: BS, Civil Engineering, University of Vermont, 1982 Licenses/Registrations: Professional Engineer — NJ, CT, VT Years of Experience: 29 Other: • Adjunct professor of Construction Estimating at Manhattan College, Riverdale, NY • Graduate Construction Management Program. Mr. Bayersdorfer is a civil engineer with 29 years of experience in all types of heavy/civil construction, mechanical and plumbing, and electrical energy projects. His experience includes the planning, costing, and implementation of heavy/highway projects, underground utility construction, complex excavations for underground structures, earth support systems of every type, slurry walls, groundwater control, environmental remediation, HVAC and Energy. Prior to joining AECOM, Mr. Bayersdorfer's career was with the leading contractors in the types of work mentioned. As Chief Estimator, is responsible for developing capital cost estimates during the design process as well as directing all cost engineering efforts and negotiations associated with contractor's changes on CM projects. His work experience includes: • TBTA, Feasibility Study to Restore Two-Way tolling to Verrazano-Narrows Bridge, Staten Island and Brooklyn, NY. Developed well selected modeling for parametric estimating for alternative analysis for restoring bi-directional tolling. Alternatives analyzed involved complex roadway and bridge realignments all under active roadway conditions with complex staging of traffic. Projected construction costs of individual alternatives ranged from $200 -$500 million. • Cost Estimator for the $250M, NJDOT, Route 52 Causeway Bridge Replacement, Somers Point & Ocean City, NJ. • Cost Estimator for the NJDOT Route 139 Viaduct Reconstruction, Jersey City, NJ. • NYCDOT, Replacement of six (6) bridges, Belt Parkway, Brooklyn, NY. Responsible for the complete takeoff and estimated cost of construction for replacement of bridges (over water courses and perpendicular roadways). Projects involve complex foundations within sheeted cofferdams, pile foundations, soil improvement, subaqueous pipeline construction, complex staging to maintain traffic, all structures and pavements. Estimated costs for individual bridges range from $30 - $140 million. 7 D-11 J��n C. I���ac, P1� Deputy Chief Estimator Education: Education: BS, Construction Engineering Technology, 1995 Newark College of Engineering, NJIT Licenses/Registrations: Professional Engineer — New Jersey Years of Experience: 15 Professional Associations: • ASCE, American Society of Civil Engineers Other: Primavera Project Planner 3.1 Training Certificate Mr. Kovac is a Civil Engineer with over 15 years experience in all types of heavy construction. His experience includes the costing, engineering, inspection, analysis and management of heavy/highway projects and underground utility construction. Mr. Kovac also has extensive field experience working for a leading contractor and engineering firm for the types of work mentioned. Since joining AECOM, Mr. Kovac is responsible for the development and preparation of comprehensive design and change order cost estimates from project conception through final design. Mr. Kovac specializes in the review and analysis of all aspects of construction claims including entitlement, cost/damages and schedule from the project level to litigation. His work experience includes:: NYCDOT, Replacement of (6) Belt Parkway bridges, Brooklyn, NY. Projects involve complex foundations within sheeted cofferdams, pile foundations, soil improvement, sub-aqueous pipeline construction, complex staging to maintain traffic, all structures and pavements. Providing constructability review, quantity calculations and detailed cost estimate. Estimated costs for individual bridges range from $30 -$140 million. NJDOT, Route 139 Viaduct Reconstruction, Jersey City, NJ. Project involves the rehabilitation and replacement of 70 year old concrete encased steel structures with complex traffic patterns to maintain traffic, extensive night work, small and large steel replacement, foundation construction in heavily contaminated soil, and roadway surface replacement. Provided detailed estimate analysis for non-standard items and review of standard item unit prices. NJDOT, Route 52 Causeway, Somers Point, NJ. Project involves the staged construction of (2) high level structures over navigable waters as well as the demolition of the existing Route 52 bascule bridge and trestle structure. Provided constructability review and detailed cost estimate for comparison to Engineer of Record estimate. 8 D-12 ��� is I��neie��ian Senior Estimator Education: MS, Industrial & Civil Engineering Years of Experience: 30 College of Railroad Engineers, Belarus, 1979 Mr. Lenderman has more than 30 years of practical experience in the construction industry as a civil engineer with extensive skills in cost estimating, project controls, and project management. His knowledge encompasses all stages of the construction process in transportation, industrial, and residential projects. Mr. Lenderman specializes in major transportation and heavy construction projects as an Estimator and Project Controls Engineer. He is a knowledgeable civil, structural, and architectural estimator within the transportation industry. He has working knowledge of HCSS and Winest Estimating software, and Primavera P3. His work experience includes: Indianapolis: Assisted in developing Engineering Estimate for Deep Rock Tunnel Connector in the cost range of $200 Mil. New York City Subway: Provides Construction Phase services and Bid support services for 2 Ave Subway Phase 1 Contracts. New York City Subway: With previous employer on the 2nd Ave Subway Project in New York City, supervised a team of estimators and was fully responsible for developing and updating cost estimates for all stations of the Phase #1 Project for different stages of design, starting from the conceptual stage to 100% design. Phase #1 includes 4 stations with the total cost of $4.5 billion. 9 D-13 C��.����� ��y�r, �F Project Reviewer Education: BSCE, Civil Engineering, University of Florida, Gainesville, FL, 1990 Licenses/Registrations: Professional Engineer — Florida, South Carolina Years of Experience: 21 Professional Associations: • American Society of Civil Engineers • American Council of Engineering Companies of South Carolina, Board of Directors • Civil Engineers Club of Charleston Training and Certifications: • SCDOT Strategic Training for Transportation Agency Representatives (STTAR) • SCDOT Resident Engineer Academy • AECOM Quality Management System Project Quality Representative Charles Dwyer, PE, has 21 years of transportation engineering and project and program management experience. His experience includes the procurement of large and complex design-build projects as an employee of the South Carolina Department of Transportation. Mr. Dwyer has experience in both the public and private sector performing program management. His experience includes: • SCDOT Design-build project manager (2001 to 2007) for the $700 million replacement of the Cooper River Bridges in Charleston, SC, including o The $540 million design-build project to build the new cable-stayed Arthur Ravenel Bridge o The $65 million design-build project for demolition of the old Cooper River Bridges and complete the connecting interchanges o The $35 million consultant contracts for design review and CEI. • Member of the 2004 FHWA Peer Review Team for alternatives analysis of the San Francisco— Oakland Bay Bridge (SFOBB) project. 10 D-14 B-2500 Pamlico Bridge Cost Study S TUDY B ID TOTALS FOR BONNER PARALLEL B RID GE - OPTION 1 2012 PRICING (Revision 1 of AECOM Estimate 04/26/12 D-15 OS/04/2012 12:19 RBON20120PT1 BONNER 2012 REVISION 1(OPT1) *** Boris Lenderman BID TOTALS Biditem Description uantit CONSTR & REMOVAL OF TEMP ACCESS REMOVAL OF EXISTING BRIDGE FOUNDATION EXCAVATION UNCLASSIFIED STRUCTURE EXCAVATION CI AA CONCRETE FTGS STAINLESS STEEL REINFORCEMENT-CIP PILE F STAINLESS STEEL SPIRAL REBAR-CIP PILE FOO 1371 MM PRESTR CONC CYL PILE (54-IN) 36" Sq. Prestressed Concrete Piles 20" Sq. P/C Conc Piles-End Bents STATIC AXIAL LD TEST ON 54" CYL PILE STATIC AXIAL LD TEST ON 36° CYL PILE LATERAL LD TEST ON 54" CYL PILE LATERAL LD TEST ON 36" CYL PILE PRODUCTION DYNAMIC LD TEST ON CYL PILE PRECAST CONCRETE COLS & CAPS EPDXY-COAT. COLUMNS AND CAPS REINFORC STAINLESS STEEL COLUMNS AND CAPS REINF PT STRAND IN PC COLS & CAPS PT BAR IN PC COLS & CAPS DECK SLAB REINFORCEMENT STEEL (ASTM A CONC DECK END BENTS RFC-STAINLESS STEEL (ASTM A 95 END BENTS-CIP CONCRETE REBAR IN PC DK SEGS PRE CAST CON DK SEGS ERECT PC DK SEGS 96" FIB GIRDERS 45" FIB GIRDERS PT STRAND IN DK SEGS PT BAR IN DK SEGS SEG CASTING & ERECTION EQUIP GROOVING DECK POT BEARINGS ELASTOMETRIC BEARING PADS EXPANSION JOINTS ACCESS SYSTEM APPROACH SLABS TWO BAR METAL RAIL 355MM X 800MM CONC PARAPET FILTER FABRIC FOR DRAINAGE SOLAR ARRAY SUPPORT PLATFORM TELEPHONE COND & INSERTS POWER & CATV SLEEVES & DUCTBANKS GRANITE SLOPE PAVING NAVIGATION LIGHTS REMOVE EXiSTING BRIDGE RAIL(FISHING PIER TWO BAR METAL RAIL (F1SH PIER) REMOVABLE TRAFFIC BARRIER (FISH PIER) 355MM X 800MM CONC PARAPET (FISH PIER) STR. IMP. TO RETAINED BRDGEPORT.(1200')(FIS 1.000 1.000 1.000 2,241.695 13,307.612 1,996,746.032 l 19,356.261 16,758.530 58,979.659 600394 2.000 2.000 2.000 2.000 l 5.000 6,568.140 1,349,437.831 293,225309 243,1 15.079 210,260.141 3,921,069.224 15,678.786 29,212.963 117.709 2,346,175.044 13,401.779 13,401.779 47,270341 1,528.871 33,516314 1,364,682.540 1.000 563,591398 1.000 614.000 570.866 20,418.871 1.000 30,052.493 29,063320 6,748387 1.000 1.000 1.000 2,150.538 1.000 2,401.575 2,440.945 40.026 2,440.945 1.000 Units Unit Price Bid Total LS 60,597,628.49 60,597,628.49 LS 9,687,62834 9,687,62834 LS CY 64.90 145,486.00 CY 533.20 7,095,618.71 LB 3.14 6,269,782.54 LB 3.14 374,'778.65 FT 329.75 5,526,125.26 FT 300.6417,731,644.68 FT 257.52 154,613.46 EA 454,599.55 909,199.10 EA 454,599.55 909,199.10 EA 454,599.55 909,199.10 EA 454,599.55 909,199.10 EA 2,272.67 34,090.05 CY 410.96 2,699,242.81 LB 1.05 1,416,909.72 L.B 314 920,727.47 LB 3.03 736,638.68 LB 4.17 876,784.78 LB 3.1412,312,15736 CY 8383013,143,52630 LB 3.14 91,728.70 CY 1,134.01 133,483.18 LB 1.02 2,393,098.54 CY 1,024.7013,732,802.94 CY 437.03 5,856,979.47 FT 477.18 22,556,46131 FT 342.76 524,035.82 LB 2.41 80,77431 LB 3.64 4,967,444.44 LS 2,348,568.99 2,348,568.99 SF 0.42 236,70838 LS 2,075,706.62 2,075,706.62 EA 2,860.41 1,756,291.74 FT 2,141.24 1,222,361.11 LB 0.68 13,884.83 LS 43,508.62 43,508.62 FT 323 31 9,716,271.51 FT 102.64 2,983,059.16 SF 1.41 9,515.22 LS 5,136.14 S,136.14 LS 234,672.68 234,672.68 LS 134,106.87 134,106.87 SF 1.41 3,032.25 LS 30,306.64 30,306.64 FT 78.98 189,676.39 FT 32331 789,18192 FT 296.19 11,85530 FT 102.69 250,660.64 LS 647,854.56 647,854.56 11 D-16 1 OS/04/2012 12:19 RBON20120PT1 BONNER 2012 REVISION 1(OPT1) * * * Boris Lenderman Biditem Description BID TOTALS uantit Units Bid Total =_______> D-17 2 Unit Price Bid Total $216,399,347.98 12 OS/04/2012 12:17 RBON20120PT1 BONNER 2012 REVISION 1(OPT1) *** Boris Lenderman BID TOTALS Biditem Description uantit CONSTR & REMOVAL OF TEMP ACCESS REMOVAL OF EXISTING BRIDGE FOUNDATION EXCAVATION UNCLASSIFIED STRUCTURE EXCAVATION CI AA CONCRETE FTGS STAINLESS STEEL REINFORCEMENT-CIP PILE F STAINLESS STEEL SPIRAL REBAR-CIP PILE FOO 1371 MM PRESTR CONC CYL PILE (54-IN) 36" Sq. Prestressed Concrete Piles 20" Sq. P/C Conc Piles-End Bents STATIC AXIAL LD TEST ON 54" CYL PILE STATIC AXIAL LD TEST ON 36° CYL PILE LATERAL LD TEST ON 54" CYL PILE LATERAL LD TEST ON 36" CYL PILE PRODUCTION DYNAMIC LD TEST ON CYL PILE PRECAST CONCRETE COLS & CAPS EPDXY-COAT. COLUMNS AND CAPS REINFORC STAINLESS STEEL COLUMNS AND CAPS REINF PT STRAND IN PC COLS & CAPS PT BAR IN PC COLS & CAPS DECK SLAB REINFORCEMENT STEEL (ASTM A CONC DECK END BENTS RFC-STAINLESS STEEL (ASTM A 95 END BENTS-CIP CONCRETE REBAR W PC DK SEGS PRE CAST CON DK SEGS ERECT PC DK SEGS 96" FIB GIRDERS 45" FIB GIRDERS PT STRAND IN DK SEGS PT BAR IN DK SEGS SEG CASTING & ERECTION EQUIP GROOVING DECK POT BEARINGS ELASTOMETRIC BEARING PADS EXPANSION JOINTS ACCESS SYSTEM APPROACH SLABS TWO BAR METAL RAIL 355MM X 800MM CONC PARAPET FILTER FABRIC FOR DRAINAGE SOLAR ARRAY SUPPORT PLATFORM TELEPHONE COND & INSERTS POWER & CATV SLEEVES & DUCTBANKS GRANITE SLOPE PAVING NAVIGATION LIGHTS REMOVE EXiSTING BRIDGE RAIL(FISHING PIER TWO BAR METAL RAIL (FISH PIER) REMOVABLE TRAFFIC BARRIER (FISH PIER) 355MM X 800MM CONC PARAPET (FISH PIER) STR. IMP. TO RETAINED BRDGEPORT.(1200')(FIS 1.000 1.000 1.000 1,714.000 l 0,175.000 905,724.000 54,140.000 5,108.000 17,977.000 183.000 2.000 2.000 2.000 2.000 15.000 5,022.000 612,105.000 133,007.000 110,277.000 95,374.000 1,778,597.000 11,988.000 13,251.000 90.000 1,064,225.000 10,247.000 10,247.000 14,408.000 466.000 15,203.000 619,020.000 1.000 52,414.000 1.000 614.000 174.000 9,262.000 1.000 9,160.000 8,858.500 627.600 1.000 1.000 1.000 200.000 1.000 732.000 744.000 12.200 744.000 1.000 Units Unit Price Bid Total LS 60,597,628.49 60,597,628.49 LS 9,687,62834 9,687,62834 LS M3 84.89 145,501.46 M3 69736 7,095,638.00 KG 6.93 6,276,66732 KG 6.93 375,190.20 M 1,081.87 5,526,191.96 M 9863717,731,973.49 M 844.91 154,618.53 EA 454,599.55 909,199.10 EA 454,599.55 909,199.10 EA 454,599.55 909,199.10 EA 454,599.55 909,199.10 EA 2,272.67 34,090.05 M3 537.49 2,699,274.78 KG 233 1,426,204.65 KG 6.93 921,738.51 KG 6.69 737,753.13 KG 9.21 878,394.54 KG 6.9312,325,677.21 M3 1,09639 13,143,52332 KG 6.93 91,829.43 M3 1,483.15 133,483.50 KG 2.26 2,405,148.50 M3 1,340.18 I 3,73 2,824.46 M3 571.58 5,856,980.26 M 1,565.56 22,556,588.48 M 1,124.56 524,044.96 KG 533 81,031.99 KG 8.04 4,976,920.80 LS 2,348,568.99 2,348,568.99 M2 4.53 237,435.42 LS 2,075,706.62 2,075,706.62 EA 2,860.41 1,756,291.74 M 7,025.09 1,222,365.66 KG 1.52 14,078.24 LS 43,508.62 43,508.62 M 1,060.73 9,716,286.80 M 336.77 2,983,277.05 M2 15.16 9,514.42 LS 5,136.14 S,136.14 LS 234,672.68 234,672.68 LS 134,106.87 134,106.87 M2 15.16 3,032.00 LS 30,306.64 30,306.64 M 259.14 189,690.48 M 1,060.73 789,183.12 M 971.78 11,855.72 M 336.92 250,668.48 LS 647,854.56 647,854.56 13 D-18 1 OS/04/2012 12:17 RBON20120PT1 BONNER 2012 REVISION 1(OPT1) * * * Boris Lenderman Biditem Description BID TOTALS uantit Units Bid Total =_______> D-19 2 Unit Price Bid Total $216,456,883.01 14 B-2500 Pamlico Bridge Cost Study S TUDY B ID TOTALS FOR BONNER PARALLEL B RID GE - OPTION 2 2012 PRICING (Revision 2 of AECOM Estimate 04/26/12 D-20 OS/04/2012 12:02 RBONNER2012 BONNER 2012 REVISION 2(OPT 2) *** Boris Lenderman BID TOTALS Biditem Description uantit CONSTR & REMOVAL OF TEMP ACCESS REMOVAL OF EXISTING BRIDGE FOUNDATION EXCAVATION UNCLASSIFIED STRUCTURE EXCAVATION CI AA CONCRETE FTGS STAINLESS STEEL REINFORCEMENT-CIP PILE F STAINLESS STEEL SPIRAL REBAR-CIP PILE FOO 1371 MM PRESTR CONC CYL PILE (54-IN) 36" Sq. Prestressed Concrete Piles 20" Sq. P/C Conc Piles-End Bents STATIC AXIAL LD TEST ON 54" CYL PILE STATIC AXIAL LD TEST ON 36° CYL PILE LATERAL LD TEST ON 54" CYL PILE LATERAL LD TEST ON 36" CYL PILE PRODUCTION DYNAMIC LD TEST ON CYL PILE PRECAST CONCRETE COLS & CAPS EPDXY-COAT. COLUMNS AND CAPS REINFORC STAINLESS STEEL COLUMNS AND CAPS REINF PT STRAND IN PC COLS & CAPS PT BAR IN PC COLS & CAPS DECK SLAB REINFORCEMENT STEEL (ASTM A CONC DECK END BENTS RFC-STAINLESS STEEL (ASTM A 95 END BENTS-CIP CONCRETE REBAR IN PC DK SEGS PRE CAST CON DK SEGS ERECT PC DK SEGS 96" FIB GIRDERS 45" FIB GIRDERS PT STRAND IN DK SEGS PT BAR IN DK SEGS SEG CASTING & ERECTION EQUIP GROOVING DECK POT BEARINGS ELASTOMETRIC BEARING PADS EXPANSION JOINTS ACCESS SYSTEM APPROACH SLABS TWO BAR METAL RAIL 355MM X 800MM CONC PARAPET FILTER FABRIC FOR DRAINAGE SOLAR ARRAY SUPPORT PLATFORM TELEPHONE COND & INSERTS POWER & CATV SLEEVES & DUCTBANKS GRANITE SLOPE PAVING NAVIGATION LIGHTS 508MM SQ PRESTR CONCRETE PILE (FISH PIER) 1371MM PRESTR CONC CYL PILE (54-IN)(FISH PI PRECAST CONCRETE COLS & CAPS (FISH PIER) REBAR IN PC COLS & CAPS (FISH PIER) DECK SLAB REINFORCING STEEL (ASTM A955)( CONC DECK (FISH PIER) AASHTO TYP III GIRDERS (FISH PIER) D-21 1 1.000 1.000 1.000 2,241.695 13,307.612 1,996,746.032 l 19,356.261 16,758.530 58,979.659 600394 2.000 2.000 2.000 2.000 l 5.000 6,568.140 1,349,437.831 293,225309 243,1 15.079 210,260.141 3,921,069.224 15,678.786 29,212.963 117.709 2,346,175.044 13,401.779 13,401.779 47,270341 1,528.871 33,516314 1,364,682.540 1.000 563,591398 1.000 614.000 570.866 20,418.871 1.000 29,921.260 29,063320 6,748387 1.000 1.000 1.000 2,150.538 1.000 164.042 3,202.100 204.028 50,659.171 248,026.896 710.175 3,602.362 Units Unit Price Bid Total LS 60,436,536.12 60,436,536.12 LS 10,572,339.84 10,572,339.84 LS CY 64.73 l 45,104.91 CY 531.78 7,076,721.90 LB 3.13 6,249,815.08 LB 3.13 373,585.09 FT 328.87 5,511,377.76 FT 299.8417,684,460.95 FT 256.84 154,205.19 EA 453,391.04 906,782.08 EA 453,391.04 906,782.08 EA 453,391.04 906,782.08 EA 453,391.04 906,782.08 EA 2,266.63 33,999.45 CY 409.87 2,692,083.54 LB 1.05 1,416,909.72 L.B 3.13 917,795.21 LB 3.02 734,207.53 LB 4.16 874,682.18 LB 3.1312,272,946.67 CY 836.0713,108,562.61 LB 3.13 91,436.57 CY 1,131.00 133,128.87 LB 1.02 2,393,098.54 CY 1,021.97 I 3,696,216.08 CY 435.86 5,841,299.39 FT 4759122,496,427.98 FT 341.85 522,644.55 LB 2.40 80,439.15 LB 3.63 4,953,797.62 LS 2,342,325.57 2,342,325.57 SF 0.42 236,70838 LS 2,070,188.58 2,070,188.58 EA 2,852.81 1,751,62534 FT 2,135.55 1,219,112.88 LB 0.68 13,884.83 LS 43,392.95 43,392.95 FT 322.45 9,648,110.28 FT 10237 2,975,212.06 SF 1.40 9,447.74 LS 5,122.49 5,122.49 LS 234,048.83 234,048.83 LS 133,75036 133,75036 SF 1.40 3,010.75 LS 30,226.07 30,226.07 FT 189.09 31,018.70 FT 360.53 ],154,453.11 CY 549.51 112,115.42 LB 3.13 158,563.20 LB 3.13 776,324.18 CY 836.61 594,139.50 FT 269.93 972,385.�� 15 OS/04/2012 12:02 RBONNER2012 BONNER 2012 REVISION 2(OPT 2) *** Boris Lenderman BID TOTALS Biditem 5260 5270 5280 5310 5311 5320 Description GROOVING DECK (FISH PIER) POT BEARII�IGS (FISH PIER) EXPANSION JOINTS (FISH PIER) TWO BAR METAL RAIL (FISH PIER) REMOVABLE TRAFFIC BARRIER (FISH PIER) 355MM X 800MM CONC PARAPET (FISH PIER) uantit 26,881.'720 1.000 114.829 2,424.541 22.966 2,424.541 Bid Total Units Unit Price SF 0.42 LS 1,806,710.01 FT 411.96 FT 322.45 FT 295.41 FT 10237 Bid Total 11,29032 1,806,710.01 47,304.95 781,793.24 6,78438 248,200.26 ________> $221,508,200.77 16 D-22 2 OS/04/2012 11:59 RBONNER2012 BONNER 2012 REVISION 2(OPT 2) *** Boris Lenderman BID TOTALS Biditem Description uantit CONSTR & REMOVAL OF TEMP ACCESS REMOVAL OF EXISTING BRIDGE FOUNDATION EXCAVATION UNCLASSIFIED STRUCTURE EXCAVATION CI AA CONCRETE FTGS STAINLESS STEEL REINFORCEMENT-CIP PILE F STAINLESS STEEL SPIRAL REBAR-CIP PILE FOO 1371 MM PRESTR CONC CYL PILE (54-IN) 36" Sq. Prestressed Concrete Piles 20" Sq. P/C Conc Piles-End Bents STATIC AXIAL LD TEST ON 54" CYL PILE STATIC AXIAL LD TEST ON 36° CYL PILE LATERAL LD TEST ON 54" CYL PILE LATERAL LD TEST ON 36" CYL PILE PRODUCTION DYNAMIC LD TEST ON CYL PILE PRECAST CONCRETE COLS & CAPS EPDXY-COAT. COLUMNS AND CAPS REINFORC STAINLESS STEEL COLUMNS AND CAPS REINF PT STRAND IN PC COLS & CAPS PT BAR IN PC COLS & CAPS DECK SLAB REINFORCEMENT STEEL (ASTM A CONC DECK END BENTS RFC-STAINLESS STEEL (ASTM A 95 END BENTS-CIP CONCRETE REBAR W PC DK SEGS PRE CAST CON DK SEGS ERECT PC DK SEGS 96" FIB GIRDERS 45" FIB GIRDERS PT STRAND IN DK SEGS PT BAR IN DK SEGS SEG CASTING & ERECTION EQUIP GROOVING DECK POT BEARINGS ELASTOMETRIC BEARING PADS EXPANSION JOINTS ACCESS SYSTEM APPROACH SLABS TWO BAR METAL RAIL 355MM X 800MM CONC PARAPET FILTER FABRIC FOR DRAINAGE SOLAR ARRAY SUPPORT PLATFORM TELEPHONE COND & INSERTS POWER & CATV SLEEVES & DUCTBANKS GRANITE SLOPE PAVING NAVIGATION LIGHTS 508MM SQ PRESTR CONCRETE PILE (FISH PIER) 1371MM PRESTR CONC CYL PILE (54-IN)(FISH PI PRECAST CONCRETE COLS & CAPS (FISH PIER) REBAR IN PC COLS & CAPS (FISH PIER) DECK SLAB REINFORCING STEEL (ASTM A955)( CONC DECK (FISH PIER) AASHTO TYP III GIRDERS (FISH PIER) D-23 1 1.000 1.000 1.000 1,714.000 l 0,175.000 905,724.000 54,140.000 5,108.000 17,977.000 183.000 2.000 2.000 2.000 2.000 15.000 5,022.000 612,105.000 133,007.000 110,277.000 95,374.000 1,778,597.000 11,988.000 13,251.000 90.000 1,064,225.000 10,247.000 10,247.000 14,408.000 466.000 15,203.000 619,020.000 1.000 52,414.000 1.000 614.000 174.000 9,262.000 1.000 9,120.000 8,858.500 627.600 1.000 1.000 1.000 200.000 1.000 50.000 976.000 156.000 22,979.000 112,505.000 543.000 1,098.000 Units Unit Price Bid Total LS 60,436,536.12 60,436,536.12 LS 10,572,339.84 10,572,339.84 LS M3 84.66 l 45,107.24 M3 695.51 7,076,814.25 KG 6.91 6,258,552.84 KG 6.91 374,107.40 M 1,078.99 5,511,480.92 M 983.7517,684,873.75 M 842.67 154,208.61 EA 453,391.04 906,782.08 EA 453,391.04 906,782.08 EA 453,391.04 906,782.08 EA 453,391.04 906,782.08 EA 2,266.63 33,999.45 M3 536.06 2,692,09332 KG 232 1,420,083.60 KG 6.91 919,07837 KG 6.67 735,547.59 KG 9.19 876,487.06 KG 6.91 12,290,105.27 M3 1,093.48 13,108,638.24 KG 6.91 91,564.41 M3 1,479.21 133,128.90 KG 2.26 2,405,148.50 M3 1,336.61 I 3,696,242.67 M3 570.06 5,841,404.82 M 1,561.40 22,496,651.20 M 1,121.57 522,651.62 KG 531 80,727.93 KG 8.02 4,964,540.40 LS 2,342,325.57 2,342,325.57 M2 4.52 236,911.28 LS 2,070,188.58 2,070,188.58 EA 2,852.81 1,751,62534 M 7,006.42 1,219,117.08 KG 1.51 13,985.62 LS 43,392.95 43,392.95 M 1,057.91 9,648,139.20 M 335.88 2,975,392.98 M2 15.12 9,48931 LS 5,122.49 5,122.49 LS 234,048.83 234,048.83 LS 133,75036 133,75036 M2 15.12 3,024.00 LS 30,226.07 30,226.07 M 62038 31,019.00 M 1,182.84 ] ,154,451.84 M3 718.70 112,1 17.20 KG 6.91 158,784.89 KG 6.91 777,409.55 M3 1,094.19 594,145.17 M 885.60 972,388.� � 17 OS/04/2012 11:59 RBONNER2012 BONNER 2012 REVISION 2(OPT 2) *** Boris Lenderman BID TOTALS Biditem 5260 5270 5280 5310 5311 5320 Description GROOVING DECK (FISH PIER) POT BEARINC3S (FISH PIER) EXPANSION JOINTS (FISH PIER) TWO BAR METAL RAIL (FISH PIER) REMOVABLE TRAFFIC BARRIER (FISH PIER) 355MM X 800MM CONC PARAPET (FISH PIER) uantit 2,500.000 1.000 35.000 739.000 7.000 739.000 Bid Total Units Unit Price M2 4.56 LS 1,806,710.01 M 1,351.60 M 1,057.91 M 969.20 M 335.89 Bid Total 11,400.00 1,806,710.01 47,306.00 781,795.49 6,784.40 248,222.71 ________> $221,568,51736 18 D-24 2 B-2500 Pamlico Bridge Cost Study S TUDY B ID TOTALS FOR PAMLICO B RIDGE S EGMENT 2012 PRICING (Revision 1 of AECOM Estimate 04/26/12 D-25 � M1 C�'1 ��' O� O v� d' v1 CO N Vl 00 M �D l� N d' �O y O� O� �--� ��O �O O O� O l� v� O N�' �' �� 00 .--� �' � O� 00 v1 Vl 00 � O 00 � O� O�--� N N O� 00 O l� O N F [� c+'� O O� O� 00 �O N l� �--� N�O �-- 00 �-- M N�O O ,.� 00 O\ �O �D vl O 00 \O � 00 v) M`O �-- M O�O � O\ 00 �' V'� O� O� O� M O M 00 l� O� O� M�O l� �D N O� � Q� O��O �D �D �' V'� N�' Vl l� O l� �--� �O �O d' 00 O� 00 �O 00 00 00 .— 00 N N�O 01 l� �O m�O O d' 01 .-- �O O 00 01 v1 N N N 01 ��-- O�--� �-- C� �-- N v) � l� 00 -- �--� t+'1 v M1 d' l� [� O M�--� O� 00 M O� O� [� �-- �--� �D N �O � c+� O� l� Vl � l� N O 00 O� N O� �-- �[� �-- � N O� � 00 �t"' O� v� N N M�--� N r'1 l� N d' O O� �O 00 M N� 00 � I� �-- O O[� l� v1 O N O�-- l� d' �--� � oo m o0 00 ,—� � � oo � cv o cv �� � � � c�i c�i � � � � � � 0 N �I v�H¢¢¢�cnr�ar�aHr�a�-w¢Hv��HHF- � awW W W�,�aaw,���Wwawwww � � � C C� � "'� C � i � R � � � � F � F A � � z O � � > � 0 c� O U a r � N � � a � � 'i � � � c� � A � � o � O � U '� �. � o a o � � � � � ° -� �a V� �y -X- O F� -7F Q� oc�000��+-,�o��--a��mov�or-�mm O C� O O O Vl 01 N� �O N N r- O 00 O N N N N O �O O O O O� O�O � l� Vl �--� �O O 00 O O O M M ^-� � N N 00 v1 �--� v'� GO O O O� � 00 M�--� N N[� l� [� l� V1 O� M v� �D O d' v1 00 l� rn M�O �O M l� 00 �' �' \O ^-� �' d' 00 .-- M M �O �O �O O 00 O� � N O� �O v1 M� �O �O [� [� 00 N O� �O �O �-- [� O M v1 Vl [� l� •-- �--� l� �O (*1 �O ,--� 01 ,-- •--� V1 �O N N � � U `� p awa � a v �a� w U � °z� O O O Wv�i� �G W � °� a" Q � � a v��¢ � o�¢ ��-. � � W � �l ¢ A. � �i E-� � U W ¢ W `� O c�i, �, W E�-� �¢wa � � �o ¢ z � � oa¢�¢ � a � �W � 0. W'� � U W z`� � W ¢�ao�3 c� � o¢�3W z w a. � a ° E-� U�" Z�l Q� Q P�-. �� W W� O W�� 0� OU QQ�'c�'i�°WUQ � U p�] p-' � tb � C'7 a. 0�- o°o � Z� ��UQ���w�C7��XQ0�3 Q� X� Q� x Q 0� d W�� W W O w O��0 `L' v z O¢ a, �� �,� 3 a a w a a o Q��� w¢��� O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o v� o 0 0 O M�' v1 �O �--� N r'� d' l� 00 O� �O l� CO O� O�--� ��O O� O O O O ^-� N N N N� M M M N c� 1 c� 1 M c� 1� d' �' ��' �' d' �' d' �' �' d' �' �' �' D-26 (+l M � �' O O �' � � 69 � O F-' '.� rQ 19 OS/04/2012 12:25 RPAMLICO2012 PAMLICO 2012 REVISION 1 * * * Boris Lenderman Biditem Descriution 2900 3030 3040 3050 3060 4110 4120 4130 4140 4170 4180 4190 4260 4270 4280 4290 4305 d4310 �4350 4360 N O CONSTR & REMOVAL OF TEMP ACCESS ] 377 MM PRESTR CONC OYL PILE (54-IN) AXIAL LD TEST ON 1371MM CYL PILE LATERAL LOAD TEST ON I371 MM CYL PILE PRODUCTION DYNAMIC LD TEST ON CYL PILE PRECAST CONCRETE PILE CAP EPDXY-COATED PILE CAP REINF. STEEL PT STRAND IN PC COLS & CAPS PT BAR IN PC COLS & CAPS 96" FIB (�IRDERS DECK SLAB REINFORCEMENT STEEL (ASTM A 955) CONC DECK GROOVING DECK BEARING PADS EXPANSION JOINT SEALS ACCESS SYSTEM 355MM X 800MM CONC PARAPET TWO BAR METAL RAIL TELEPHONE COND & iNSERTS POWER & CATV SLEEVES & DUCTS BID TOTALS Status - Rnd uantit 1.000 56,807.000 2.000 2.000 78.000 15,870.000 2,358,217.000 349,016.000 301,852.000 95,299.000 12,1 O l ,640.000 81,391.000 272,997.000 3,888.000 1,577.000 1.000 47,650.000 47,650.000 23,673.000 23,673.000 Bid Total Units LS M EA EA EA M3 KG KG KG M KG M3 M2 EA M LS M M M M ________> Unit Price 120,604,879.93 1,035.92 434,802.57 434,802.57 2,173.70 620.24 2.23 6.39 8.79 1,500.11 6.61 1,051.78 5.08 2,729.71 676.24 67,018.46 240.23 797.13 50.72 28.99 Bid Total 120,604,879.93 58,847,507.44 869,605.14 869,605.14 169,548.60 9,843,208.80 5,258,823.91 2,230,212.24 2,653,279.08 142,958,982.89 79,991,840.40 85,605,425.98 1,386,824.76 10,613,112.48 1,066,430.48 67,018.46 11,446,959.50 37,983,244.50 1,200,694.56 686,280.27 $574,353,484.56 B-2500 Pamlico Bridge Cost Study ESTIMATE RECAP FOR BONNER PARALLEL B RID GE - OPTION 1 2012 (Revision 1 of AECOM Estimate 04/26/12 :: DMJM Harris OS/04/2012 12:15 RBON20120PT1 BONNER 2012 REVISION 1(OPT1) * * * Boris Lenderman ESTIMATE RECAP - BID QUANTITIES DIRECT INDIRECT TOTAL % OF TOTAL Labor 10,138,285.75 6,557,576.80 16,695,862.55 8.870% Burden 4,838,285.27 2,202,08330 7,040,368.57 3.741% Lab+Bur 14,976,571.02 8,759,660.10 23,736,23112 12.611% Perm Matl 66,990,396.65 66,990,396.65 35.592% ConstrMtl 12,539,591.51 6,263,409.50 18,803,001.01 9.990% Co. Equip 12,407,60139 1,788,791.74 14,196,393.13 7.542% Rented Eq 0.000% Eqp Oper 8,344,843.07 2,536,195.08 10,881,03815 5.781% Sub 53,464,729.66 147,649.88 53,612,379.54 28.484% Total Costs: 168,723,733.20 19,495,706.30 188,219,439.50 100.000% % of Total 89.642% 10358% 100.000% Escalation on: Labor 0 100.00 % Eq Op Exp 0 100.00 % Markup on Resource Costs MARKUP TOTALS =__> Burden Perm Matl Const Matl 0 0 0 100.00 % 100.00 % 100.00 % Sub 0 100.00 % * Data Below here is dependent on the Summary Process. * The Summary Process was last run OS/04/2012 at 12:15 PM COST + MARKUP -------------------> There * ARE NOT * closing accounts for this bid. Rounding difference: Unbalancing difference: From Cut&Add Sheet-costs: From Cut&Add Sheet-markup: Net Adjustments (to the balanced bid): BALANCED BID TOTAL DESIRED BID (if specified) BID TOTAL (on bid quantities) BID COSTS (on bid quantities) MARKUP (on bid quantities) EXPECTED JOB VALUE (on takeoffquantities): D-29 1 28,232,915.98 28,232,915.98 Co Eqp Rented Eqp 0 0 100.00 % 100.00 % Total Escalation 0 100.00 % 15.0000% 15.0000% (% of costs) $216,452,355.48 (On Takeoff Quantity) -Effect on Bid- 4,527.51 Adjusted (on Bid Quantiry) (on Bid Quantiry) $4,527.51 [or desired bid] $216,452,355.48 $216,456,883.01 $188,219,439.49 $28,237,443.52 $216,456,883.01 15.002% 21 DMJM Harris RBON20120PT1 BONNER 2012 REVISION 1(OPT1) * * * Boris Lenderman EXPECTED COSTS (on takeoffquantities): EXPECTEDMARKUP (ontakeoffquantities): Adjust to Bid Quantities = Y Report Variation = Uses customized report headings On Takeoff Quantities Labor Hrs. (MH/MHS) �35,799 182,552 618,351 (incl burden) 14,976,571 8,759,660 23,736,231 Labar (DAY/DAYS) 0 0 0 (incl burden) 0 0 0 Labor (OtherUnits) 0 0 0 (incl burden) Labor Burden 4,838,285 2,202,083 7,040,368 Spread Indirects on: Spread Addons&Bond on: Markup on: Kev Indicators Balanced Markup 28,232,915.99 Indirect Cost 19,495,70630 Labor 15.00% EOE 15.00% Burden l 5.00% Sub 15.00% / / / / Total Cost Total Cost PermMatl 15.00% Total Labor 23,736,231.12 Direct Cost 168,723,733.20 $188,219,439.50 $28,237,443.51 OS/04/2012 12:15 15.002% Spread Markup on: Total Cost CM CoEqp RentedEqp 15.00% 15.00% 15.00% = Balanced Markup/Total I.abor = 118.94% = Indirect Cost/Direct Cost = 11.55% ------ ESTIMATE NOTES: ------ Bid Date: Owner: Engr Firm: Estimator-In-Charge: Desired Bid (if specified) = 0.00 Notes: ************Estimate created on: 04/05/2012 by User#: 2- John Kovac Source estimate used: V:\HEAVYBID\EST\PORTJVPLATFO ************Estimate created on: 04/19/2012 by User#: 2- John Kovac Source estimate used: V:\HEAVYBID\EST\BONNER ************Estimate created on: 04/26/2012 by User#: 2- John Kovac Source estimate used: V:\HEAVYBID\EST\BONNER2012 22 D-30 2 DMJM Harris RBON20120PT1 * * * Boris Lenderman OS/04/2012 12:15 BONNER 2012 REVISION 1(OPT1) ************Estimate created on: 05/03/2012 by User#: 4- Boris Lenderman Source estimate used: V:\HEAVYBID\EST\RBONNER2012 L,ast Summary on OS/04/2012 at 12:15 PM. Last Spread on OS/04/2012 at 12:15 PM. 23 D-31 3 B-2500 Pamlico Bridge Cost Study ESTIMATE RECAP FOR BONNER PARALLEL B RID GE - OPTION 2 2012 (Revision 2 of AECOM Estimate 04/26/12 D-32 DMJM Harris OS/04/2012 12:03 RBONNER2012 BONNER 2012 REVISION 2(OPT 2) * * * Boris Lenderman ESTIMATE RECAP - BID QUANTITIES DIRECT INDIRECT TOTAL % OF TOTAL Labor 10,400,776.45 6,557,576.80 16,958,353.25 8.802% Burden 4,958,855.13 2,202,08330 7,160,938.43 3.717% Lab+Bur 15,359,631.58 8,759,660.10 24,ll9,291.68 12.519% Perm Matl 70,471,099.09 70,471,099.09 36.577% ConstrMtl 12,588,925.48 6,263,409.50 18,852,334.98 9.785% Co. Equip 12,636,091.17 1,788,791.74 14,424,882.91 7.487% Rented Eq 0.000% Eqp Oper 8,541,832.16 2,536,195.08 11,078,027.24 5.750% Sub 53,570,550.63 147,649.88 53,718,200.51 27.882% Total Costs: 173,168,130.01 19,495,706.30 192,663,83631 100.000% % of Total 89.881 % 10119% 100.000% Escalation on: Labor 0 100.00 % Eq Op Exp 0 100.00 % Markup on Resource Costs MARKUP TOTALS =__> Burden Perm Matl Const Matl 0 0 0 100.00 % 100.00 % 100.00 % Sub 0 100.00 % * Data Below here is dependent on the Summary Process. * The Summary Process was last run OS/04/2012 at 11:59 AM COST + MARKUP -------------------> There * ARE NOT * closing accounts for this bid. Rounding difference: Unbalancing difference: From Cut&Add Sheet-costs: From Cut&Add Sheet-markup: Net Adjustments (to the balanced bid): BALANCED BID TOTAL DESIRED BID (if specified) BID TOTAL (on bid quantities) BID COSTS (on bid quantities) MARKUP (on bid quantities) EXPECTED JOB VALUE (on takeoffquantities): D-33 1 28,899,575.51 28,899,575.51 Co Eqp Rented Eqp 0 0 100.00 % 100.00 % Total Escalation 0 100.00 % 15.0000% 15.0000% (% of costs) $221,563,411.82 (On Takeoff Quantity) -Effect on Bid- 5,105.52 Adjusted (on Bid Quantiry) (on Bid Quantiry) $5,105.52 [or desired bid] $221,563,411.84 $221,568,51736 $192,663,83633 $28,904,681.03 15.002% $221,568,S1736 24 DMJM Harris RBONNER2012 BONNER 2012 REVISION 2(OPT 2) * * * Boris Lenderman EXPECTED COSTS (on takeoffquantities): EXPECTEDMARKUP (ontakeoffquantities): Adjust to Bid Quantities = Y Report Variation = Uses customized report headings On Takeoff Quantities Labor Hrs. (MH/MHS) a4�,4i� 182,552 629,969 (incl burden) 15,359,631 8,759,660 24,119,291 Labar (DAY/DAYS) 0 0 0 (incl burden) 0 0 0 Labor (OtherUnits) 0 0 0 (incl burden) Labor Burden 4,958,855 2,202,083 7,160,938 Spread Indirects on: Spread Addons&Bond on: Markup on: Kev Indicators Balanced Markup 28,899,575.51 Indirect Cost 19,495,70630 Labor 15.00% EOE 15.00% Burden l 5.00% Sub 15.00% / / / / Total Cost Total Cost PermMatl 15.00% Total Labor 24,119,291.68 Direct Cost 173,168,130.01 CM l 5.00% $192,663,836.31 $28,904,681.05 Spread Markup on: CoEqp 15.00% OS/04/2012 12:03 15.002% Total Cost RentedEqp 15.00% = Balanced Markup/Total I.abor = 119.82% = Indirect Cost/Direct Cost = 11.26% ------ ESTIMATE NOTES: ------ Bid Date: Owner: Engr Firm: Estimator-In-Charge: Desired Bid (if specified) = 0.00 Notes: ************Estimate created on: 04/05/2012 by User#: 2- John Kovac Source estimate used: V:\HEAVYBID\EST\PORTJVPLATFO ************Estimate created on: 04/19/2012 by User#: 2- John Kovac Source estimate used: V:\HEAVYBID\EST\BONNER ************Estimate created on: 04/26/2012 by User#: 2- John Kovac Source estimate used: V:\HEAVYBID\EST\BONNER2012 Last Summary on OS/04/2012 at 11:59 AM. 25 D-34 2 DMJM Harris OS/04/2012 12:03 RBONNER2012 BONNER 2012 REVISION 2(OPT 2) * * * Boris Lenderman Last Spread on OS/04/2012 at 11:59 AM. 26 D-35 3 B-2500 Pamlico Bridge Cost Study ES TIMATE RECAP FOR PAMLICO B RIDGE S EGMENT 2012 (Revision 1 of AECOM Estimate 04/26/12 D-36 DMJM Harris OS/04/2012 12:24 RPAMLICO2012 PAMLICO 2012 REVISION 1 * * * Boris Lenderman ESTIMATE RECAP - BID QUANTITIES DIRECT INDIRECT TOTAL % OF TOTAL Labor 39,310,919.28 8,221,391.00 47,532,310.28 9.517% Burden 17,808,259.54 2,796,517.42 20,604,776.96 4125% Lab+Bur 57,119,178.82 11,017,908.42 68,137,087.24 13.642% Perm Matl 258,981,724.12 258,981,724.12 51.852% ConstrMtl 16,234,165.16 10,218,796.07 26,452,961.23 5.296% Co. Equip 58,759,89633 4,572,575.40 63,332,471.73 12.680% Rented Eq 0.000% Eqp Oper 31,913,935.69 5,303,032.05 37,216,967.74 7.451% Sub 45,103,35638 236,239.00 45,339,595.38 9.078% Total Costs: 468,112,256.48 31,348,550.94 499,460,807.42 99.999% % of Total 93.724% 6.276% 100.000% Escalation on: Labor 0 100.00 % Eq Op Exp 0 100.00 % Markup on Resource Costs MARKUP TOTALS =__> Burden Perm Matl Const Matl 0 0 0 100.00 % 100.00 % 100.00 % Sub 0 100.00 % * Data Below here is dependent on the Summary Process. * The Summary Process was last run OS/04/2012 at 12:24 PM COST + MARKUP -------------------> There * ARE NOT * closing accounts for this bid. Rounding difference: Unbalancing difference: From Cut&Add Sheet-costs: From Cut&Add Sheet-markup: Net Adjustments (to the balanced bid): BALANCED BID TOTAL DESIRED BID (if specified) BID TOTAL (on bid quantities) BID COSTS (on bid quantities) MARKUP (on bid quantities) EXPECTED JOB VALUE (on takeoffquantities): D-37 1 74,919,121.13 74,919,12 L 13 $574,379,928.55 (On Takeoff Quantity) -26,444.01 Co Eqp Rented Eqp 0 0 100.00 % 100.00 % Total Escalation 0 100.00 % 15.0000% 15.0000% (% of costs) -Effect on Bid- Adjusted (on Bid Quantiry) (on Bid Quantiry) -$26,444.01 [or desired bid] $574,379,928.57 $574,353,484.56 $499,460,807.44 $74,892,677.12 14.994% $574,353,484.56 27 DMJM Harris RPAMLICO2012 PAMLICO 2012 REVISION 1 * * * Boris Lenderman EXPECTED COSTS (on takeoffquantities): EXPECTEDMARKUP (ontakeoffquantities): Adjust to Bid Quantities = Y Report Variation = Uses customized report headings On Takeoff Quantities Labor Hrs. (MH/MHS) '�732�984 232,170 1,965,154 (inclburden) 57,119,178 11,017,908 68,137,087 Labar (DAY/DAYS) 0 0 0 (incl burden) 0 0 0 Labar (OtherUnits) 0 0 0 (incl burden) Labar Burden 17,808,259 2,796,517 20,604,776 Spread Indirects on: Total Cost Spread Addons&Bond on: Total Cost Markup on: Labor Burden PermMatl 15.00% 15.00% 15.00% EOE Sub 15.00% 15.00% Kev Indicators Balanced Markup 74,919,121.13 Indirect Cost 31,348,550.94 / / / / Total Labor 68,137,087.24 Direct Cost 468,112,256.48 CM l 5.00% $499,460,807.42 $74,892,67714 OS/04/2012 12:24 14.994% Spread Markup on: Total Cost CoEqp RentedEqp 15.00% 15.00% = Balanced Markup/Total I.abor = 109.95% = Indirect Cost/Direct Cost = 6.70% ------ ESTIMATE NOTES: ------ Bid Date: Owner: Engr Firm: Estimator-In-Charge: Desired Bid (if specified) = 0.00 Notes: ************Estimate created on: 04/05/2012 by User#: 2- John Kovac Source estimate used: V:\HEAVYBID\EST\PORTJVPLATFO ************Estimate created on: 04/18/2012 by User#: 2- John Kovac Source estimate used: V:\HEAVYBID\EST\BONNER ************Estimate created on: 04/19/2012 by User#: 2- John Kovac Source estimate used: V:\HEAVYBID\EST\PAMLICO 2$ D-38 2 DMJM Harris OS/04/2012 12:24 RPAMLICO2012 PAMLICO 2012 REVISION 1 * * * Boris Lenderman ************Estimate created on: 04/26/2012 by User#: 2- John Kovac Source estimate used: V:\HEAVYBID\EST\PAMLICO2012 L,ast Summary on OS/04/2012 at 12:24 PM. Last Spread on OS/04/2012 at 12:24 PM. 29 D-39 3 B-2500 Pamlico Bridge Cost Study APPEND I� A : S UPPORTING DATA FOR TAS K 2 D-40 B-2500 Pamlico Bridge Cost Study BONNER PARALLEL BRIDGE COST REPORT - OPTION 1 (Revision 1 of AECOM Estimate 04/26/12 D-41 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Quantity Pcs Unit BIDITEM = 2900 Description = CONSTR & RI;MOVAL OF TEMP ACCI:SS Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Unit= LS TakeoffQuan: 1.000 F,ngr Quan: 1.000 100 Install & remove trestle for 250t Marine Quan: 6,000.00 LF Hrs/Shft: 10.00 Cal: 510 WC: NONE 1400m req + 20 fingers x 20m = 1800m or 60001f Buy a total of 2336' = 73# section x 32' as GLF have 73# available. From info from K. Latham broker assume wt/lf = 10291bs @$0.50 =$515/lf Assume 24"dia x 1/2" wall pipe piles x 60'= 1261b/lf x$0.50 =$63/lf. Pipe pile cost/lf 2# x 60'x $63/lf =$7560/16'=$472.5/lf or 14#x23# x60 = 193201f say 200001f Assume 12" x 12" oak decking @$10/sf x 35' _$350/lf Trestle & dk cost/lf =$865/lf x 2336 lf =$2020640 salvage @ SOo say lm. Alternatively use GLF trestle from Wilmington $2,100,000 x SOo =$1,O50M. � Erect & remove - figure trestle at piers assume 23# x 96'= 2304'. i Assume that av of 4# 24" d pipe piles @16'cc are driven for 1 x 32'section & 32'of Ntrestle can be installed and removed in two days i.e 161f /day I& R Haul say 10001bs /lf x 2336 23360001bs/44000 = 53 lds x$1000 =$53,000. PILE Pile Crew Sheet 3,750.00 CH Prod: 16.0000 US Lab Pcs: 3PIPEP�LE 24" pipe pilE@107% 52,08333 LF 63.000 3SALVAGE Salvage pipe pile@107% 52,083.33 LF -20.000 3SUPPLIES Welding/slings/mi@107% 375.00 DAY 500.000 3TRESTLE Trestle@l07% 6,000.00 LF 450.000 4HAUL Haul Carolina to@] O1% 138.02 TRIP 1,169.500 84308R American 7260 100T 1.00 3,750.00 HR 163.010 8491 OC 400 Amp Welder 1.00 3,750.00 HR 1].250 85130C Pump 10 in Cent 350 1.00 3,750.00 HR 35.870 85610C lce 4l6 Vibro 65T 1.00 3,750.00 HR 109.6] 0 85655C Delmag D30-32 & LEAD 1.00 3,750.00 HR 82.960 OPO4 Operator, Crane 91T 1.00 3,750.00 MH 28.000 ] 59,552 OP12 Oiler 1.00 3,750.00 MH 14.000 85,401 PDO1 Piledriver Foreman 1.00 3,750.00 MH 23.000 136,589 PD02 PiledriverJourneyinan 3.00 ll,250.00 MH 21.000 377,071 $7,917,745.77 3.7500 MH/LF 22,500.0000 MH [ 88 ] 758,613 0.6250 Hr/Unit 375.0000 Shifts 3.7500 MH/Unit 126.44 104 S,I & R timber mats@ N& S ends Quan: 50,000.00 SF Hrs/Shft: 10.00 No salvage allowed as it is likely that mats will be damaged or buried. assume 395m @ N& 329m @ s = 724m 724m x 10m- 7240m2 or 80000sf AOP1 45 Ton RT w/Operator 320.00 CH Prod: 250.0000 UH Lab Pcs: D � Page 1 OS/04/2012 1221 Total 6.00 Eqp Pcs: 5.00 3,510,937 3,510,937 1,1 14,583 -1,ll4,583 200,625 200,625 2,889,000 2,889,000 163,029 163,029 314,288 297,000 611,288 7,125 35,063 42,188 52,950 81,563 134,513 153,225 257,813 411,038 ] 78,538 132,563 31 ],] 00 159,552 85,401 136,589 377,071 5,485,979 706,125 804,000 163,029 7,917,746 914.33 117.69 134.00 27.17 1,319.62 Cal: 510 WC: NONE 4.00 Eqp Pcs: 2.00 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report BID [TEM = 2900 Description = CONSTR & REMOVAL OF TEMP ACCESS Unit = LS 3TTMBER M Timber mats 5'@l07% 80,000.00 SF ] 0.000 8321 OC Cat D6H(] 70 Hp) 1.00 320.00 HR ] 08.280 845]SR 45 Ton R.T. (RT745) 1.00 320.00 HR 100.610 LA02 Laborer,Slcilled 2.00 640.00 MH 14.500 OP02 Operator,Crane<50 T 2.00 640.00 MH 26.000 $963,703.55 0.0160 MH/SF 1,280.0000 MH [ 0.356 ] 0.0040 Hr/Unit 32.0000 Shifts 0.0]60 MH/Unit 230001 Mob/Demob Dredge Quan: 1.00 LS 4DREDGINGM Mob & dcmob dredg@101 1.00 LS 175,425.000 $]77,179.25 [ ] d i � 230002 Dredge and Dispose Quan: 1.00 CY Assume cost to keep Oregon Inlet open is $8m /yr x 3 yrs =$24m as a check cost 4DRF.DGING Mob and demob@l01% 300,000.00 M3 87.710 $26,576,130.00 [ ] Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract TakeoffQuan: 1.000 Engr Quan: 1.000 856,000 15,674 ] 8,976 13,859 18,336 241 Select fill & minor excav Quan: 25,000.00 CY assume same area as timber mats 724 m x lOm =7240m2 7240 x 1 m= 7240m3 or 15000tonne of agregate F.XCV Excavate w/Backhoe 500.00 CH Prod: 500.0000 US 2B0050.20 #5 (1-U2)@]07% 15,000.00 TON 20.000 804480 D-6 DOZER 140 HP 1.00 500.00 HR 96.000 804560 LOADER 3-CY 130 1.00 500.00 HR 52.860 83165C Dump Truck 12 CY 1.00 500.00 HR 80.600 84225C Cat CS563 7' Vib Rolle 1.00 500.00 HR 59.790 LA01 Laborer Foreman 1.00 500.00 MH 16.500 LA02 Laborer,Skilled 1.00 500.00 MH 14.500 LA03 Labarer, unskilled 1.00 500.00 MH 13.000 OP08 Operator, Backlioe 2.00 1,000.00 MH 23.000 $537,653.43 0.1000 MH/CY 2,500.0000 MH [ 1.98 ] 0.0200 Hr/Unit 50.0000 Shifts 0.1000 MH/Unit 2900 Marine equip & crew for all opper Marine Quan: 1.00 LS D N 15,436 25,422 40,859 856,000 29,533 37,312 0.51 10.70 0.37 0.47 Hrs/Shft: 10.00 Cal: 510 WC: NONE Hrs/Shft: 10.00 Cal: 510 WC: NONE Hrs/Shft: 10.00 Cal: Sl0 WC: NONE Page 2 OS/04/2012 1221 Total 856,000 34,650 32,195 15,436 25,422 963,704 ] 2.05 177,179 177,179 177,179 177,] 79 177,] 79.25 177,179.25 26,576,130 26,576,] 30 26,576,130 26,576,130 26,576,130.00 26,576,130.00 Lab Pcs: 5.00 Eqp Pcs: 4.00 32 ] ,000 22,]25 25,875 ] 0,155 l 6,275 9,275 31,025 11,695 18,200 13,516 l 2,060 10,967 35,485 72,028 321,000 53,250 91,375 2.88 12.84 2.13 3.66 Hrs/Shft: 10.00 Cal: 510 WC: NONE 321,000 48,000 26,430 40,300 29,895 13,516 12,060 10,967 35,485 537,653 21.51 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report BID [TEM = 2900 Description = CONSTR & REMOVAL OF TEMP ACCESS Unit = LS Assume access stn 277 - 281 = 395m is road & mats Stn 281 - 295 = 1400m is trestle with fingers Stn 295 -318 is dredged & marine wk. Stn 318 - 321 = 329m is road & mats 803260 —> Carpenter barge 32'xl 9,000.00 HR 5].150 803340 =_> BARGE 140x45x8-6 18,000.00 HR 102.130 803370 => BARGE 150x52x9-3 15,200.00 HR l 16.610 803440 =_> BARGF, 250x72x16 3,000.00 HR 385.070 803460 => 12000 LB WINCH 12 18,000.00 HR 9.680 803480 =_> 50000 LB WINCH G 15,200.00 HR 15.550 803500 => 70000 LB WINCH R 3,000.00 HR 26.130 803560 => SEADOZER I 550 H 15,800.00 HR ] 24.050 803620 SKIFF 18' 30,000.00 HR 2.000 d 803680 OUTBOARD MOTOR 25 30,000.00 HR 9.000 �P 803700 OUTBOARD MOTOR ] 50 9,000.00 HR 21.000 `P L205 =_> Captain 15,800.00 MH 28.200 L215 => Deck Hand 31,600.00 MH 2l .630 $]0,472,596.14 47,400.0000 MWLS 47,400.0000 MH [ 1241974.8 ] 47,400.0000 MH/Unit 910001 Mobilize Equipment Marine Quan: 1.00 LS 4HAUL.01 HAUL Carolina@l O1 % ].00 LS 584,750.000 $590,597.50 [ ] _____> Item Totals: 2900 - CONSTR & REMOVAL OF TEMP ACCESS $47,235,605.64 73,680.0000 MH/LS 73,680.00 MH [ 1847986.8 ] 47,235,605.640 1 LS Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract TakeoffQuan: 1.000 Engr Quan: 1.000 378,000 82,350 1,521,155 445,869 1,355,232 417,240 892,765 343,310 97,740 76,500 146,680 89,680 51,840 26,550 605,] 40 1,354,850 60,000 27Q000 189,000 787,309 1,281,387 2,068,696 5,567,552 2,836,349 2,068,695.64 5,567,552.00 2,836,348.50 Hrs/Shft: 10.00 Cal: 510 WC: NONE Page 3 OS/04/2012 1221 Total 460,350 1,967,024 1,772,472 1,236,075 174,240 236,360 78,390 1,959,990 60,000 270,000 189,000 787,309 1,281,387 10,472,596 ] 0,472,596.14 590,598 590,598 590,598 590,598 590,597.50 590,597.50 2,940,196 32],000 6,341,979 6,356,460 3,769,036 27,506,935 47,235,606 2,940,196.04 321,000.00 6,341,979.02 6,356,459.80 3,769,035.50 27,506,935.28 47,235,605.64 BIDITEM = 2910 Description = REMOVAL OF EXISTING BRIDGE Unit = LS TakeoffQuan: Assume length 4.25km x llm =46,750M2-THIS ORIGINAL ASSUMPTION AS MEASURED IN 2012 VIA ON SCREEN TAKEOFF: D W 1.000 Engr Quan: 1.000 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Page 4 OS/04/2012 1221 Total BID [TEM = 2910 Description = REMOVAL OF EXISTING BRIDGE Unit = LS TakeoffQuan: 1.000 Engr Quan: 1.000 **THE TOTAL LENGTH OF THE EXISTING BRIDGE IS 12,952 LF; THE EXISTING BRIDGE WIDTH VARIES. 1. FOR W= 40'-O" (SOUTH APPROACH W/ CATWALK) L= 1,230 LF. A= 1,230 X 40 = 49,200 SF. 2. FOR W= 33'-6" (MIDDLE PORTION) L= 10,423 LF. A= 10,423 X 33.5 = 349,171 SF. 3. FOR W= 40'-10" (NORTH APPROACH)L = 1,299 LF. A= 1,299 X 40.83 = 53,043 SF. TOTAL AREA =(49,200 + 349,171 + 53,043) = 451,414 SF X 0.0929 = 41,937 M2. HOWEVER, WE DO NOT KNOW WHAT PREVIOUS ASSUMPTIONS WERE MADE IN DETERMINING THE AVG WIDTH FOR THE BID QUANTITY TO ACCOUNT FOR PROTRUDING PILE CAPS, ETC....THEREFORE, WE HAVE LEFT THE QUANTITY UNCHANGED. C� FOR OPT-1 1200 LF OF EXISTING BRIDGE STRUCTURE SHOULD BE RETAINED AND USED FOR A FISHING PIER. rP 12001f*0.3048=366 m � Demoliton will be (4250 m-366m)*11 m=42,724 m2 Assume catwalk demo is included in bridge demolition. 2910 Removal of existing Brige Marine Quan: 42,724.00 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE Assume length 4.25km x llm =46750M2-THIS IS ORIGINAL ASSUMPTION MEASURED BY ON SCREEN TAKEOFF: **THE TOTAL LENGTH OF THE EXISTING BRIDGE IS 12,952 LF; THE EXISTING BRIDGE WIDTH VARIES. 1. FOR W= 40'-0" (SOUTH APPROACH W/ CATWALK) L= 1,230 LF. A= 1,230 X 40 = 49,200 SF. 2. FOR W= 33'-6" (MIDDLE PORTION) L= 10,423 LF. A= 10,423 X 33.5 = 349,171 SF. 3. FOR W= 40'-10" (NORTH APPROACH)L = 1,299 LF. A= 1,299 X 40.83 = 53,043 SF. TOTAL AREA =(49,200 + 349,171 + 53,043) = 451,414 SF X 0.0929 = 41,937 M2. HOWEVER, WE DO NOT KNOW WHAT PREVIOUS ASSUMPTIONS WERE MADE IN DETERMINING THE AVG WIDTH FOR THE BID QUANTITY TO ACCOUNT FOR PROTRUDING PILE CAPS, ETC....THEREFORE, WE HAVE LEFT THE QUANTITY UNCHANGED. FOR OPT-1 1200 LF OF EXISTING BRIDGE STRUCTURE SHOULD BE RETAINED AND USED FOR A FISHING PIER. 12001f*0.3048=366 m Demoliton will be (4250 m-366m)"11 m=42,724 m2 Assume catwalk demo is included in bridge demolition. 4DEM0 Demolition Sub@101% 42,724.00 M2 175.000 7,551,467 7,551,467 $7,SS1,467.00 [ ] 7,551,467 7,551,467 � DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 2910 Description = REMOVAL OF EXISTING BRIDGE Unit = LS TakeoffQuan: 1.000 Engr Quan: 1.000 176.75 BIDITEM = 2970 Description= FOiJNDAT[ONEXCAVATION Unit= LS TakeoffQuan: 1.000 EngrQuan: 1.000 There are no activities in this biditem. BID TTEM = 2980 Description= iJNCLASSIFIEDSTRUCTUREEXCAVATION Unit= M3 TakeoffQuan: ],7]4.000 F,ngrQuan: 1,714.000 d i � 241 Excav & backtill ftgs incl 6" ston Marin Quan: 1,714.00 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE F,XCV Excavate wBackhoe 371.96 CH Prod: 37.1962 S Lab Pcs: 5.00 Eqp Pcs: 5.00 2BOOSO.lS #5 (1-1/2)@107% 141.72 TON 20.000 3,033 804180 3" DIAPHRAGM 8 H 1.00 37l .96 HR 2.340 870 804300 3-6 KW GENERATOR 1.00 371.96 HR 3.240 331 874 804460 BACKHOF. 2 CY 250 1.00 37l .96 HR 74.260 13,735 15,820 804560 LOADF,R 3-CY 130 l.00 371.96 HR 52.860 7,555 12,107 84215C BW60S 30" Smooth 1.00 371.96 HR 14.8]0 3,184 2,325 LA01 Laborer Fareman 1.00 371.96 MH 16.500 10,055 LA02 Laborer,Skilled 1.00 371.96 MH 14.500 8,971 LA03 Laborer, unskilled 1.00 371.96 MH 13.000 8,159 OP08 Operator, Backhoe 2.00 743.92 MH 23.000 26,398 $113,417.48 1.0850 MH/M3 1,859.8000 MH [ 21.484 ] 53,583 3,033 25,675 31,127 0.2170 Hr/Unit 37.1960 Shifts * 1.0851 MH/Unit 3 L26 1.77 14.98 18.16 _____> Item Totals: 2980 - UNCLA55IFIED STRUCTURE EXCAVATION $] 13,417.48 1.0850 MH/M3 1,859.80 MH [ 21.484 ] 53,583 3,033 25,675 31,] 27 66.171 1774 M3 31.26 1.77 1498 18.16 Page 5 OS/04/2012 1221 Total 176.75 3,033 870 1,205 29,555 19,662 5,509 10,055 8,971 8,159 26,398 113,417 66.17 l 13,417 66.17 BID ITEM = 2990 Description = CI AA CONCRETE FTGS Unit = M3 Takeoff Quan: ] 0,175.000 Engr Quan: 10,175.000 Assume the following: The bottom of the form will be the pile driving template secured with a few temporary pipe piles. Side forms will be D cn DMJM Harris Page 6 RBON20120PT1 BONNER 2012 REVISION 1(OPTI) OS/04/2012 1221 Baris Lenderman Cost Report Activity Description Quantity Unit Perm Constr Equipment Equipment Sub- Resource Pcs Unit Cost Labor Material Matl/Exp Ownership Operation Contract Total BID [TEM = 2990 Description = Ci AA CONCRETE FTGS Unit= M3 TakeoffQuan: ] 0,175.000 Engr Quan: 10,175.000 reusable. Seal bottom holes with hydraulic cement and tremie seal, then pump out. Tie rebar and cast footing. Pull pipes, strip sides, sacrifice bottom and move to next. FOOTING SIZES FOR CIP FOOTINGS FORMWORK CALCULATIONS BENT ## L W H BOTTOM AREA, M2 SIDE FORMS, M2 NOTE 6 24 42 10 94 123 BUY 2 SETS 7 24 42 10 94 123 BUY 2 SETS 8 24 42 10 94 123 9 24 42 10 94 123 10 24 42 10 94 123 11 24 42 10 94 123 12 24 42 10 94 123 d 13 24 42 10 94 123 V 14 24 42 10 94 123 15 24 42 10 94 123 16 24 42 10 94 123 17 24 42 10 94 123 18 33 42 10 129 139 BUY 2 SETS 19 33 42 10 129 139 BUY 2 SETS 20 33 42 10 129 139 21 33 42 10 129 139 22 33 51 10 156 156 BUY 2 SETS 23 33 51 10 156 156 BUY 2 SETS 24 33 51 10 156 156 25 33 51 10 156 156 26 33 51 10 156 156 27 33 51 10 156 156 28 33 42 10 129 139 29 33 42 10 129 139 30 15 24 10 33 72 BUY 2 SETS 31 15 24 10 33 72 BUY 2 SETS 32 15 24 10 33 72 33 15 24 10 33 72 34 15 24 10 33 72 35 15 24 10 33 72 36 15 24 10 33 72 37 15 24 10 33 72 38 15 24 10 33 72 39 15 24 10 33 72 40 15 24 10 33 72 • DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs BID [TEM = 2990 Description = Ci AA CONCRETE FTGS 41 15 24 10 33 72 42 15 24 10 33 72 43 15 24 10 33 72 44 15 24 10 33 72 TOTAL AREA, M2 3,336 4,331 BUY SIDE FORMS(2 SETS EACH) 981 Quantity Unit Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Unit= M3 TakeoffQuan: ]0,175.000 EngrQuan: 10,175.000 500 I& R template, piles and formst Marine Quan: 39.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE �Assume av template made of 12BP53 62' x 50'with brackets for 6# 24" dia pipe piles, make �4# Steel (4 x 2 x(70'+ 30')x 531bs/lf = 21t Pipe piles 6# x.5"th x 24"d x 50'x 1261bs/lf = 20T Soffit supports 12BP53 4x40# x 50'x 531bs/lf = 212t Soffit supports @ piles C12x27 4# x6# x 2x10'x27 = 6T Total steel 21t + 20t + 212t + 6t = 259t x$1000/t x Oo salvage =$259K. Assume 11/2"dia coil rod from chanels to soffit support beams 12# x 10'x 61b/lf = 7201bs x $1.0/lb = $720 x 2 = $1.SK Buy 3.5" PCPS conc soffit panels for all ftgs 3,336 M2 PILEA Pile Crew Small 3,900.00 CH Prod: 10.0000 SU Lab Pcs: 6.00 Eqp Pcs: 6.00 2PCPSSLABS PC SIP 3.5" dk sl@107% 3,336.00 M2 96.840 345,672 3STEF.L Steel supports bu@107% 191.32 TON 1,300.000 266,126 804025 Pile/Drill template 1.00 3,900.00 HR 12.000 46,800 804030 Pile Driving Jig 1.00 3,900.00 HR 7.000 27,300 804240 3 stage jet pump 250 1.00 3,900.00 HR 22.120 27,963 58,305 84308R American 7260 100T 1.00 3,900.00 HR 163.O10 326,859 308,880 84910C 400 Amp Welder ].00 3,900.00 HR 11.250 7,410 36,465 85655C Delmag D30-32 & LEAD l.00 3,900.00 HR 82.960 185,679 137,865 OPO4 Operator, Crane 91T 1.00 3,900.00 MH 28.000 165,934 OP12 Oiler 1.00 3,900.00 MH 14.000 88,817 PDO] Piledriver Foreman 1.00 3,900.00 MH 23.000 142,053 PD02 Piledriver Journeyman 3.00 11,700.00 MH 21.000 392,154 $2,564,282.20 600.0000 MH/EA 23,400.0000 MH [ 14080 ] 788,958 345,672 266,126 622,011 541,515 100.0000 Hr/Unit 390.0000 Shifts 600.0000 MH/Unit 20,229.69 8,863.39 6,823.75 15,949.00 13,885.00 D � Page 7 OS/04/2012 1221 Total 345,672 266,126 46,800 27,300 86,268 635,739 43,875 323,544 165,934 88,817 142,053 392,154 2,564,282 65,750.83 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description B�D ITEM = 2990 Description = Ci AA CONCRF,TF. FTGS Pcs Quantity Unit Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Unit= M3 Takeot�fQuan: 10,175.000 6n� Quan: 10,175.000 501 Form fitg sides marine Quan: 4,331.00 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE F&5006 6 man Form & Strip Crew 1,443.66 CH Prod: 0.5000 UM Lab Pcs: 6.00 Eqp Pcs: 3.00 3FMFW Metal Wall Forms@107% 98].00 SF 335.000 351,639 84308R American 7260 100T 1.00 1,443.67 HR 163.O10 ] 20,994 114,339 84700C 185 CFM Compressor 1.00 1,443.67 HR 18.520 5,515 21,222 85005C 20 KW GENERATOR 1.00 1,443.67 HR 15.450 5,342 16,963 CA01 Carpenter Foreman 1.00 1,443.67 MH 23.000 53,146 CA02 Carpenter Journeyman 2.00 2,887.33 MH 21.000 97,803 LA02 Laborer,Skilled 2.00 2,887.33 MH 14.500 69,641 OP02 Operator,Crane<50 T 1.00 1,443.67 MH 26.000 57,346 �$913,949.65 2.0000 MH/M2 8,662.0000 MH [ 44 ] 277,936 351,639 131,850 152,524 i 0.3333 Hr/Unit 144.3660 Shifts 2.0000 MH/Unit 64.17 81.19 30.44 3522 �P � 503 Assist rebar sub hi scour ftgs Marine Quan: 11.63 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE F&5006 6 man Form 8r Snip Crew 332.] 1 CH Prod: 33.2113 S Lab Pcs: 6.00 Eqp Pcs: 3.00 84308R American 7260 100T 1.00 332.11 HR 163.010 27,834 26,303 84700C 185 CFM Compressor 1.00 332.11 HR 18.520 1,269 4,882 85005C 20 KW GENERATOR 1.00 332.1 l HR ] 5.450 1,229 3,902 CA01 Carpenter Foreman 1.00 332.11 MH 23.000 12,226 CA02 Carpenter Journeyman 2.00 664.23 MH 21.000 22,500 LA02 Laborer,Skilled 2.00 664.23 MH 14.500 16,021 OP02 Operator,Crane<50T 1.00 332.11 MH 26.000 13,192 $129,357.71 171.3396 MH/LS ],992.6800 MH [ 3769.468 ] 63,939 30,332 35,087 28.5563 Hr/Unit 332110 Shifts * 171.3396 MH/Unit 5,497.74 2,608.05 3,016.97 504 Pour concrete hi scour ftgs Quan: 10,175.00 CY Hrs/Shft: 10.00 Cal: 510 WC: NONE CNCOS CONC CREW W/3900 203.49 CH Prod: 5.0001 UM Lab Pcs: 10.00 Eqp Pcs: 16.00 2CFL002 Cl-AA Concreta 42@107% 10,48025 M3 ] 57.200 1,762,820 84335R 3900 Manitowoc 110 2.00 406.99 HR 156.470 33,849 29,832 85000C 5 KW GENERATOR 1.00 203.50 HR 4.550 224 702 85320C Concr bucket 1.-5-3 C 6.00 1,220.98 HR 12.090 10,061 4,701 85340R Pump Truck 1.00 203.50 HR 111.450 7,814 14,866 85360C Hi-CycleConcreteVibr 6.00 1,220.98 HR 1.410 1,233 488 CM02 Concrete Finisher Journeym 1.00 203.50 MH 18.250 6,020 LA01 Laborer Foreman 1.00 203.50 MH 16.500 5,501 ' Page 8 OS/04/2012 1221 Total 351,639 235,333 26,737 22,305 53,146 97,803 69,641 57,346 913,950 211.03 54,137 6,151 5,131 12,226 22,500 16,021 13,192 129,358 l 1.122.76 1,762,820 63,682 926 14,762 22,680 1,722 6,020 5,501 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report BID [TEM = 2990 Description = Ci AA CONCRETE FTGS Unit = M3 LA02 Labarer,Skilled 2.00 406.99 MH 14.500 LA03 Labarer, unskilled 2.00 406.99 MH 13.000 OPO4 Operator, Crane 91T 2.00 406.99 MH 28.000 OP12 Oiler 2.00 406.99 MH 14.000 $1,923,44022 0.1999 MH/CY 2,034.9600 MH [ 3.822 ] 0.0200 Hr/Unit 20.3490 Shifts 02000 MH/Unit _____> Item Totals: 2990 - CI AA CONCRETE FTGS $5,53],029.78 3.5468 MH/M3 36,089.64 MH [ 80.827 ] 543.590 l O175 M3 Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract TakeoffQuan: ]0,175.000 EngrQuan: 10,175.000 9,816 8,927 17,316 9,269 56,849 1,762,820 53,182 50,589 5.59 173.25 5.23 4.97 ],187,682 2,108,492 617,766 837,375 779,715 116.73 207.22 60.71 82.30 76.63 � B�D ITEM = 3000 p Description = STAINLESS STF.EL RF,INFORCEMENT-CIP PILE F Unit= KG Takeot�f Quan: 905,724.000 6n� Quan: 905,724.000 3000 Epoxy coated rebar Quan: 905,724.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE Page 9 OS/04/2012 1221 Total 9,816 8,927 17,316 9,269 1,923,440 189.04 5,531,030 543.59 2SRASS ResteelAccessori@107% 905,723.95 KG 0.250 242,281 242,281 2SRSS Reinforcing Steel@107% 905,723.95 KG 4.250 4,118,780 4,118,780 4REBAR Rebarplace@101% 905,723.95 KG 0.580 530,573 530,573 $4,891,633.91 [ ] 4,361,061 530,573 4,891,634 4.81 0.59 5.40 _____> Item Totals: 3000 - 5TAINLESS STEEL REINFORCEMENT-CIP PILE F $4,891,633.9] [ ] 4,361,061 530,573 4,891,634 5.401 905724 KG BID ITEM = 3010 Description = STAINLESS STEF.L SPIRAL REBAR-CIP PILE FO 433 Epoxy coated spiral rebar 2SRASS Resteel Accessori@107% 54,140.00 KG 2SRSS ReinforcingSteel@107% 54,]40.00 KG 4REBAR Rebar place@101 % 54,140.00 KG 4.81 Unit = KG Takeoff Quan: 54,140.000 Engr Quan: Quan: 54,140.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE 0.250 14,482 4.250 246,202 0.580 0.59 5.40 54,140.000 14,482 246,202 31,715 31,715 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report BID [TEM = 3010 Description = STAINLESS STEEL SPIRAL REBAR-CIP PILE FO Unit= KG $292,399.31 [ ] ____> Item Totals: 3010 - STAINLESS STEEL SPIRAL REBAR-CIP PILE FO $292,399.31 [ ] 5.401 54140 KG Page 10 OS/04/2012 1221 Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Total TakeoffQuan: 54,140.000 Engr Quan: 54,140.000 260,684 31,715 292,399 4.82 0.59 5.40 260,684 4.82 31,715 292,399 0.59 5.40 BID ITEM = 3031 BL Description = 1371 MM PRESTR CONC CYL PILE (54-IN) Unit= M TakeoffQuan: 5,108.000 Engr Quan: 5,] 08.000 d3030 1371mm prestr conc cyl pile Marine Quan: 130.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE � U� ~'***** Copied and adjusted from RPAMLICO2012 ***** PILEC Pile Crew Large 866.65 CH Prod: 1.5000 US Lab Pcs: 6.00 Eqp Pcs: 6.00 2FCP54 54 PSPC Conc Cyl @107% 5,108.00 M 525.000 2,869,419 2FCP54SS 54" PSPC S.St] Pr@107% 633.95 M 476.000 322,883 804025 Pile/Drill template 1.00 866.66 HR 12.000 10,400 804030 Pile Driving Jig 1.00 866.66 HR 7.000 6,067 804240 3 stage jet pump 250 1.00 866.66 HR 22.120 6,214 12,957 84304R 9299 SKYHORSF, & BAR 1.00 866.66 HR 462.970 226,866 174,372 849] OC 400 Amp Welder 1.00 866.66 HR 11.250 1,647 8,103 85664C DELMAG D160-32 & LEA 1.00 866.66 HR 475.820 243,375 168,999 OPOS Operator, Crane>140 T 1.00 866.66 MH 28.000 36,874 OP12 Oiler 1.00 866.66 MH 14.000 19,737 PD01 PiledriverFareman 1.00 866.66 MH 23.000 31,567 PD02 Piledriver Journeyman 3.00 2,599.97 MH 21.000 87, l44 $4,226,623.37 39.9996 MH/F,A 5,199.9500 MH [ 938.658 ] 175,322 3,192,302 494,568 364,431 6.6665 Hr/Unit 86.6650 Shifts 39.9996 MH/Unit 1,348.63 24,556.17 3,804.37 2,80331 31332 Cutoff Concrete Piles 1371 mm Quan: 130.00 EA Hrs/Shft: 10.00 Cal: Sl0 WC: NONE ***** Copied and adjusted from RPAMLICO2012 ***** PIL64 Pile CutoffCrew 866.65 CH Prod: 1.5000 US Lab Pcs: 3.12 Eqp Pcs: 1.12 3SAWBLADE Sawblades@107% 130.00 EA 10.000 1,39] 83150C L,owboy 60 ton trailer 0.12 104.00 HR 23.000 1,394 998 85325C Concrete Saw Handheld 1.00 866.66 HR 11.460 2,435 7,497 LA01 Laborer Foreman 1.00 866.66 MH 16.500 23,428 D � 0 ** Unrcviewed 2,869,419 322,883 10,400 6,067 19,17] 401,23 8 9,750 412,374 36,874 l 9,737 31,567 87,144 4,226,623 32,512.49 **Unreviewed 1,391 2,392 9,932 23,428 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report BID [TEM = 3031 Description = 1371MM PRESTR CONC CYL PILE (54-IN) Unit= M LA02 Labarer,Skilled 2.00 1,733.31 MH 14.500 TMO1 Teamster 0.12 104.00 MH 12.000 $81,023.88 20.7997 MH/EA 2,703.9700 MH [ 344.223 ] 6.6665 Hr/Unit 86.6650 Shifts 20.7998 MH/Unit _____> Item Totals: 3031 - 1371MM PRESTR CONC CYL PILE (54-IN) $4,307,647.25 1.5473 MH/M 7,903.92 MH [ 32.65 ] 843.314 5108 M Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BL TakeoffQuan: 5,108.000 Engr Quan: 5,108.000 4],806 2,075 67,309 1,391 3,829 8,495 517.76 10.70 29.45 6535 242,631 3,192,302 1,391 498,397 372,926 47.50 624.96 0.27 97.57 73.01 BID ITEM = 3033 BL � Description = 36" Sq. Prestressed Conerete Piles Unit = M Tal<eoff Quan: 17,977.000 F.ngr Quan: 17,977.000 C�.n N 3030 36" Sq. Prestressed Concrete Pies Quan: 530.00 EA Hrs/Shft: 10.00 Cal: Sl0 WC: NONE ***** Copied and adjusted from RPAMLICO2012 ***** PILEC Pile Crew Large 2,650.00 CH Prod: 2.0000 US 2FCP36 36" Sq P/C-P/S Pi@] 07% 17,977.00 M 393.600 2FCP36SS 36" PSPC S.St. Pr@] 07% 17,977.00 M 147.600 804025 Pile/Drill template 1.00 2,650.00 HR 12.000 804030 Pile Driving Jig 1.00 2,650.00 HR 7.000 804240 3 stage jet pump 250 1.00 2,650.00 HR 22.120 84304R 9299 SKYHORSE & BAR 1.00 2,650.00 HR 462.970 84910C 400 Amp Welder 1.00 2,650.00 HR 11250 85664C DELMAG D160-32 & LEA 1.00 2,650.00 HR 475.820 OPOS Operator, Crane>140 T 1.00 2,650.00 MH 28.000 OPl2 Oilcr 1.00 2,650.00 MH 14.000 PD01 Piledriver Foreman 1.00 2,650.00 MH 23.000 PD02 Piledriver Journeyman 3.00 7,950.00 MH 2l .000 $13,572,853.74 30.0000 MH/EA 15,900.0000 MH [ 704 ] 5.0000 Hr/Unit 265.0000 Shifts 30.0000 MH/Unit 31332 Cutoff Concrete Piles 36" Sq Conc. Piles Quan: 530.00 EA ***�* Copied and adjusted from RPAMLICO2012 ***** PILE4 PileCutoffCrew 2,650.00 CH Prod: 2.0000 US 3SAWBLADE Sawblades@107% 530.00 EA 10.000 83150C L,owboy 60 ton trailer 0.12 318.00 HR 23.000 D � � Lab Pcs: 6.00 Eqp Pcs: 6.00 7,571,050 2,839,144 31,800 18,550 19,001 39,618 693,691 533,180 5,035 24,778 744,173 516,750 112,750 60,350 96,523 266,463 536,087 10,410,193 1,512,249 l,l 14,325 1,01 L48 19,641.87 2,853.30 2,102.50 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 3.12 F,qp Pcs: l.12 5,671 4,261 3,053 Page 11 OS/04/2012 1221 Total 41,806 2,075 81,024 623.26 4,307,647 843.31 * * U nrcvi ewcd 7,571,050 2,839,144 31,800 18,550 5 8,618 1,226,871 29,813 1,260,923 112,750 60,350 96,523 266,463 ] 3,572,854 25,609.16 **Unreviewed 5,671 7,314 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report BID [TEM = 3033 Description = 36" Sq. Prestressed Concrete Piles Unit = M 85325C Concrete Saw Handheld 1.00 2,650.00 HR 11.460 LA01 Labarer Foreman 1.00 2,650.00 MH 16.500 LA02 Laborer,Skilled 2.00 5,300.00 MH 14.500 TMO1 Teamster 0.12 318.00 MH 12.000 $249,166.41 15.6000 MH/EA 8,268.0000 MH [ 258.17 ] 5.0000 Hr/Unit 265.0000 Shifts 15.6000 MH/Unit _____> Item Totals: 3033 - 36" Sq. Prestressed Concrete Piles $] 3,822,02015 1.3443 MH/M 24,168.00 MH [ 28.367 ] 768.872 17977 M Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BL TakeoffQuan: 17,977.000 Engr Quan: 17,977.000 7,447 22,923 71,636 127,833 6,344 205,812 5,671 11,708 25,975 388.33 10.70 22.09 49.01 74],89910,410,193 5,671 1,523,957 1,140,300 41.27 579.08 0.32 84.77 63.43 � B�D ITEM = 3035 BL � Description = 20" Sq. P/C Conc Piles-F,nd Bents Unit= M TakeoffQuan: 183.000 6ng Quan: 183.000 3030 20" Sq. PS Concrete Piles-End Bents Quan: 15.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from RPAMLICO2012 ***** PILEC Pile Crew Large 50.00 CH Prod: 3.0000 US 2FCP20 20" Sq P/C-P/S Pi@107% 183.00 M 196.800 2FCP20SS 20" PSPC S.St. Pr@] 07% 183.00 M 98.400 804025 Pile/Drill template 0.00 HR 12.000 804030 Pile Driving Jig 1.00 50.00 HR 7.000 804240 3 stage jet pump 250 0.00 HR 22.120 84304R 9299 SKYHORSE & BAR 1.00 50.00 HR 462.970 84910C 400 Amp Welder 1.00 50.00 HR l 1.250 85664C DELMAG D160-32 & LEA 1.00 50.00 HR 475.820 OPOS Operator, Crane>140 T 1.00 50.00 MH 28.000 OP12 Oiler 1.00 50.00 MH 14.000 PDO] Piledriver Foreman 1.00 50.00 MH 23.000 PD02 Piledriver Joumeyman 3.00 150.00 MH 21.000 $115,769.95 20.0000 MH/EA 300.0000 MH [ 469.333 ] 3.3333 Hr/Unit 5.0000 Shifts 20.0000 MH/Unit 31332 Cutoff Concrete Piles 20" Sq Conc. Piles Quan: 15.00 EA ***** Copied and adjusted from RPAMLICO2012 ***** PILE4 PileCutoffCrew 50.00 CH Prod: 3.0000 US D � N Lab Pcs: 6.00 Eqp Pcs: 4.00 38,535 19,268 350 13,089 l 0,060 95 468 14,041 9,750 2,127 ],139 ],821 5,028 10,115 57,803 27,575 20,278 674.32 3,853.54 1,838.30 1,351.83 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 3.12 Eqp Pcs: 1.12 Page 12 OS/04/2012 1221 Total 30,369 71,636 127,833 6,344 249, l 66 470.13 ] 3,822,020 768.87 **Unrevicwcd 38,535 19,268 350 23,149 563 23,791 2,127 1,139 1,821 5,028 115,770 7,718.00 ** Unrcvicwcd DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Cost Report Unit Cost BID [TEM = 3035 Description = 20" Sq. P/C Conc Piles-End Bents Unit = M 3SAWBLADE Saw blades@107% 15.00 EA ] 0.000 831 SOC Lowboy 60 ton trailer 0.12 6.00 HR 23.000 85325C Concrete Saw Handheld 1.00 50.00 HR 11.460 LA01 Laborer Foreman 1.00 50.00 MH 16.500 LA02 Laborer,Sl<illed 2.00 100.00 MH 14.500 TM01 Teamster 0.12 6.00 MH 12.000 $4,754.75 10.4000 MH/EA ] 56.0000 MH [ 172113 ] 3.3333 Hr/Unit 5.0000 Shifts 10.4000 MH/Unit ____> Item Totals: 3035 - 20" Sq. P/C Conc Piles-End Bents $] 20,524.70 2.4918 MH/M 456.00 MH [ 52.578 ] 658.605 183 M d Cn �P Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BL TakeoffQuan: 183.000 Engr Quan: 183.000 161 80 58 ]41 433 1,352 2,412 120 3,883 161 221 490 258.88 10.70 14.73 32.67 13,998 57,803 l6l 27,795 20,768 76.49 315.86 0.88 151.89 ] 13.48 BID ITEM = 3052 BL Description = STATIC AXIAL LD TEST ON 54° CYL PILE Unit = EA Takeoff Quan: 2.000 F.,ngr Quan: 3050 ?ixial ld test on 1676mm cyl pile Quan: 2.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 4TEST.O] Piletcst@]O1% 2.00 LS 350,850.000 $708,717.00 [ ] BID ITEM = 3053 BL Description = STATIC AX1AL LD TF.ST ON 36" CYL PILF. Unit= F,A TakeoffQuan: 2.000 6ngr Quan: 3050 Axial ld test on 1676mm cyl pile Quan: 2.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 4TEST.01 Pile test@101% 2.00 LS 350,850.000 $708,717.00 [ ] D � W 2.000 Page 13 OS/04/2012 1221 Total ]61 ]38 573 1,352 2,412 ]20 4,755 316.98 120,525 658.60 708,717 708,717 708,717 708,717 354,358.50 354,358.50 2.000 708,717 708,717 708,717 708,717 354,358.50 354,358.50 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BIDITEM = 3055 BL Description = LATERAL LD TEST ON 54" CYL PILE Unit = EA Takeoff Quan: 2.000 Engr Quan: 3050 Axial ld test on 1676mm cyl pile Quan: 2.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 4TF.ST.01 Piletest@10]% 2.00 LS 350,850.000 $708,717.00 [ ] BID ITEM = 3056 BL Description = LATERAL LD TEST ON 36" CYL PILF. Unit= EA TakeoffQuan: 2.000 F.ngr Quan: d 3050 Axial ►d test on 1676mm cyl pile Quan: 2.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE � Ui 4TEST.01 Pilc tcst@101% 2.00 LS 350,850.000 $708,717.00 [ ] BID TTEM = 3060 Description = PRODUCTION DYNAMIC LD TF,ST ON CYL P[LE Unit= EA TakeoffQuan: 15.000 F.ngr Quan: 309000 Pile testing, Complete-on Cylindr. pIles Quan: 3214 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 4TEST Piletest@l01% 15.00 LS 1,754.000 $26,573.10 [ ] BIDITEM = 4110 Description = PRF.CAST CONCRETE COLS & CAPS 41530 Cast cols & caps incl form set up Marine ***** Copied and adjusted from BONNER2012 ***** SEG 4.5 Man Segxneni Precasring 2,231.99 CH D � � 2.000 Page 14 OS/04/2012 1221 Total 708,717 708,717 708,717 708,717 354,358.50 354,358.50 2.000 708,717 708,717 708,717 708,717 354,358.50 354,358.50 15.000 26,573 26,573 26,573 26,573 826.79 826.79 BL Unit = M3 Takeoff Quan: 5,022.000 Engr Quan: 5,022.000 Quan: 5,022.00 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE Prod: 0.5000 UM Lab Pcs: 4.50 Eqp Pcs: 0.00 ** Unrcvicwcd DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4110 BL Description = PRECAST CONCRETE COLS & CAPS Unit= M3 TakeoffQuan: 5,022.000 Engr Quan: 5,022.000 2CFL007 Superplastizer@l07% 5,022.00 M3 15.000 80,603 2CFL025 Cl-IV Conc (FL)@107% 5,022.00 M3 196.500 1,055,901 3FMF METAL FORMS@107% 49430 M2 550.000 290,896 CA01 Carpenter Foreman 0.50 1,116.00 MH 23.000 41,084 CA02 Carpenter Journeyman 1.00 2,232.00 MH 21.000 75,605 CMOI Concrete Finisher Foreman 1.00 2,232.00 MH 2O.250 72,527 IWO1 IronworkerForeman 1.00 2,232.00 MH 28.000 100,176 LA02 Labor�r,Skilled 1.00 2,232.00 MH 14.500 53,834 $1,770,626.04 2.0000 MH/M3 10,044.0000 MH [ 46.567 ] 343,227 1,136,504 290,896 0.4444 Hr/Unit 223.1990 Shifrs 2.0000 MH/Unit 68.34 22631 57.92 44330L Erect conc PC cols & caps Marine Quan: 120.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE ,�From bent 1 to bent 5=5ea and from bent 45 to bent 81=37 ea, tota1=42-pile cap only-42 pcs total, �From bent 6 to bent 44=39 ea-two elements (pile cap and PC column) , toto1=78 ea TOTAL NUMBER:42+78=120 EA FRM087 Formwork crew w/9320 599.94 CH Prod: 2.0002 US Lab Pcs: 8.00 Eqp Pcs: 84303R American 9320 250 T 1.00 599.95 HR 291.660 95,158 85000C 5 KW GENERATOR 1.00 599.95 HR 4.550 660 CA01 Carpenter Fareman 1.00 599.95 MH 23.000 22,086 CA02 CarpenterJoumeyman 4.00 2,399.79 MH 21.000 81,288 LA03 Laborer,unskilled 1.00 599.95 MH 13.000 13,160 OPOS Operator, Crane>140 T 1.00 599.95 MH 28.000 25,526 OP12 Oiler 1.00 599.95 MH 14.000 ]3,663 $333,434.75 39.9965 MH/EA 4,799.5900 MH [ 890.924 ] 155,724 95,818 4.9995 Hr/Unit 59.9940 Shifts 39.9966 MH/Unit 1,297J0 798.48 _____> Item Totals: 4110 - PRECAST CONCRETE COLS & CAPS $2,]04,060.79 2.9557 MH/M3 14,843.59 MH [ 67.855 ] 498,950 1,136,504 290,896 95,818 418.969 5022 M3 99.35 226.31 57.92 19.08 BID ITEM = 4120 Description= EPDXY-COAT. COLUMNS AND CAPS RF,INFORCEME 433 S& I Reinforcing Steelr-Epoxy -Coated ***** Copied and adjusted from RPAMLICO2012 ***** D � cn 2.00 79,823 2,070 81,893 682.44 81,893 16.31 BL Unit= KG TakeoffQuan: 612,105.000 F.ngr Quan: 612,105.000 Quan: 612,105.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE Page 15 OS/04/2012 1221 Total 80,603 1,055,901 290,896 41,084 75,605 72,527 100,176 53,834 1,770,626 352.57 * * U nrcvi ewcd 174,981 2,730 22,086 81,288 13,160 25,526 13,663 333,435 2,778.62 2,104,061 418.97 �*Unrcvicwcd DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report BID [TEM = 4120 Description = EPDXY-COAT. COLUMNS AND CAPS REINFORCEME Unit= KG 2SRFPDXY Reinforcing Steel@107% 612,104.99 KG 1.050 2SREPDXYA Resteel Accessori ct 107% 612,104.99 KG 0.100 4REBAR Rebarplace@101% 612,104.99 KG 0.580 $1,111,766.29 L ] _____> ltem Totals: 4120 - EPDXY-COAT. COLUMNS AND CAPS REINFORCEME $1,111,766.29 [ ] ].816 612105 KG Page 16 OS/04/2012 1221 Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Total BL TakeoffQuan: 612,105.000 F,ngr Quan: 612,105.000 687,700 687,700 65,495 65,495 358,571 358,571 753,195 358,571 1,111,766 1.23 0.59 l .82 753,195 1.23 358,571 ],]ll,766 0.59 1.82 BIDITEM = 4125 BL � Description = STAINLESS STEF.L COLUMNS AND CAPS REINFO Unit= KG TakeoffQuan: 133,007.000 Engr Quan: 133,007.000 U� V 434 S& I Stainless Steel Reinforcement � Quan: 133,007.00 KG I3rs/Shft: 10.00 Cal: 510 WC: NONE * * Unrcviewcd ***** Copied and adjusted from RPAMLICO2012 ***** 2SRASS Resteel Accessori ct 107% 133,007.00 KG 0.250 35,579 35,579 2SRSS Reinforcing Steel@107% 133,007.00 KG 4.250 604,849 604,849 4REBAR Rebarplace@101% ]33,007.00 KG 0.580 77,916 77,916 $718,344.20 [ ] 640,429 77,916 718,344 ____> Item Totals: 4125 $7] 8,344.20 5.401 133007 KG 4.81 0.59 5.40 - STAINLESS STEEL COLUMN5 AND CAPS REINFO [ ] 640,429 77,916 718,344 4.81 BID ITEM = 4730 Description = PT STRAND IN PC COLS & CAPS 4130 PT strand in PC cols & caps PTS 5 Man PT Crew 2PTGROUT PT Grout Materia]@] 07% 2PTSTRAND PT STRAND SUPPLY@10 D � rn 0.59 5.40 Unit= KG TakeoffQuan: 110,277.000 Engr Quan: 110,277.000 Quan: 110,277.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE 1,102.77 CH Prod: 20.0000 UM Lab Pcs: 5.00 Eqp Pcs: 0.00 23.53 M3 300.000 7,553 7,553 ] 10,277.00 KG 3.100 365,789 365,789 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report BID [TEM = 4130 Description = PT STRAND IN PC COLS & CAPS Unit = KG IWO1 lronworker Fareman 2.00 2,205.54 MH 28.000 IWOI 1 Nonwarker Fareman 1.00 1,102.77 MH 28.000 LA02 Laborer,Skilled 2.00 2,205.54 MH 14.500 $575,021.27 0.0500 MH/KG 5,513.8500 MH [ 1.243 ] 0.0100 Hr/Unit 110.2770 Shifts 0.0500 MH/Unit _____> ltem Totals: 4130 - PT STRAND IN PC COLS & CAPS $575,021.27 0.0500 MH/KG 5,513.85 MH [ 1.243 ] 5.214 110277 KG Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract TakeoffQuan: 110,277.000 Engr Quan: 110,277.000 98,989 49,494 53,196 201,679 373,342 1.83 339 201,679 373,342 1.83 3.39 � BID ITEM = 4140 � Description = PT BAR IN PC COLS & CAPS Unit= KG TakeoffQuan: 95,374.000 Engr Quan: 95,374.000 U� � 4140 PT Bar in PC cols & caps Quan: 95,374.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE PTS 5 Man PT Crew 953.74 CH Prod: 20.0000 UM Lab Pcs: 5.00 F,qp Pcs: 0.00 2PTBAR PT Bar supply@107% 95,374.00 KG 5.000 510,251 IWOI IronwarkerFareman 2.00 1,907.48 MH 28.000 85,6ll IW011 Nonworker Foreman 1.00 953.74 MH 28.000 42,806 LA02 Laborer,Skilled 2.00 1,907.48 MH 14.500 46,007 $684,674.98 0.0500 MH/KG 4,768.7000 MH [ 1.243 ] 174,424 510,251 0.0100 Hr/Unit 95.3740 Shifts 0.0500 MH/Unit L83 5.35 _____> Item Totals: 4140 - PT BAR IN PC COLS & CAPS $684,674.98 0.0500 MH/KG 4,768.70 MH [].243 ] 174,424 510,251 7.179 95374 KG 1.83 5.35 Page 17 OS/04/2012 1221 Total 98,989 49,494 53,196 575,021 5.21 575,021 5.21 510,251 85,611 42,806 46,007 684,675 7.18 684,675 7.l 8 BID TTEM = 4150 BL Dcscription = DECK SLAB RF.INFORCF,MENT STEEL (ASTM A 95 Unit= KG TakcoffQuan: 1,778,597.000 Engr Quan: 1,778,597.000 433 S& I Reinforcing Steel Quan: 1,778,596.95 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE **Unreviewed ***** Copied and adjusted from RPAMLICO2012 ***** 2SRASS Resteel Accessori c�i ]07% 1,778,596.95 KG 0.250 475,775 475,775 D � � DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit BID [TEM = 4150 Description = DECK SLAB REINFORCF.MENT STF.EL (ASTM A 95 2SRSS Reinforcing Steel@107% 1,778,596.95 KG 4REBARSS Stainless Steel R@] O1 % 1,778,596.95 KG $9,605,846.40 Page 18 OS/04/2012 1221 Cost Report Unit Perm Constr Equipment Equipment Sub- Cost Labor Material Matl/Exp Ownership Operation Contract Total BL Unit= KG TakeoffQuan: 1,778,597.000 Engr Quan: ],778,597.000 4.250 8,088,170 8,088,170 0.580 1,041,902 1,041,902 [ ] 8,563,944 ],041,902 9,605,846 4.81 0.59 5.40 _____> Item Totals: 4150 - DECK SLAB REINFORCEMENT STEEL (ASTM A 95 $9,605,846.40 [ ] 5.401 1778597 KG 8,563,944 4.81 1,041,902 9,605,846 0.59 5.40 BID ITEM = 4160 BL �Description= CONCDECK Unit= M3 Tal<eoffQuan: ]1,988.000 F.ngrQuan: ll,988.000 Cn � 366002 Set & strip dk cantilever Quan: 6,564.88 M2 Hrs/Shft: ] 0.00 Cal: Sl0 WC: NONE ***** Copied and adjusted from RPAMLICO2012 ***** FRM08] Farmwork Crew w/7260 1,641.21 CH Prod: 0.5000 UM 3Fl WOODEN FORMS@107% 6,564.88 M2 32.250 84308R American 7260 100T 1.00 1,641.22 HR 163.010 84700C 185 CFM Compressor 1.00 1,64122 HR 18.520 85000C 5 KW GF,NERATOR 1.00 1,641.22 HR 4.550 CA01 Carpenter Fareman 1.00 1,641.22 MH 23.000 CA02 Carpenter Joumeyman 4.00 6,564.88 MH 21.000 LA03 Laborer, unskilled 1.00 1,641.22 MH 13.000 OPO4 Operator, Crane 91T 1.00 1,641.22 MH 28.000 OP12 Oiler 1.00 1,641.22 MH 14.000 $957,933.30 2.0000 MH/M2 13,129.7600 MH [ 44.55 ] 0.2500 Hr/Unit 164.1210 Shifts 2.0000 MH/Unit 366005 Set & Strip Deck Bulkhead Quan: 180.92 M2 ***** Copied and adjusted from RPAMLICO2012 ***** ACARP3 3 Man Carpenter Crew 723.66 CH Prod: 0.2500 UH 3Fl WOODEN FORMS@107°/a 180.92 M2 32.250 CA01 Carpenter Fareman 0.50 36l .83 MH 23.000 CA02 CarpenterJourneyman 3.00 2,170.98 MH 21.000 $93,101.24 13.9996 MH/M2 2,532.8100 MH [ 327.791 ] 3.9999 Hr/Unit 72.3660 Shifts 13.9996 MH/Unit •. Lab Pcs: 8.00 Eqp Pcs: 3.00 226,538 ] 37,551 129,985 6,269 24,126 1,805 5,662 60,419 222,373 36,000 69,829 37,376 425,998 226,538 145,625 159,773 64.89 34.51 22.18 2434 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 13,320 73,538 86,858 480.09 3.50 Eqp Pcs 6,243 6,243 34.51 0.00 * * Unrevi ewed 226,538 267,535 30,395 7,468 60,419 222,373 36,000 69,829 37,376 957,933 145.92 ** Unreviewed 6,243 13,320 73,538 93, l 01 514.60 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report B�D ITEM = 4]60 Descriptiou= CONCDECK Unit= M3 366008 Set & Strip Fascia Quan: 1,83810 M ***** Copied and adjusted from RPAMLICO2012 ***** Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BL TakeoffQuan: 11,988.000 Engr Quan: 11,988.000 2 Hrs/Shft: 10.00 Cal: 510 WC: NONE ACARP3 3 Man Carpenter Crew 1,750.57 CH Prod: 0.3000 UM 3F] WOODEN FORMS@107% ],83810 M2 32.250 CA01 Carpenter Foreman 0.50 875.29 MH 23.000 CA02 Carpenter Journeyman 3.00 5,251.72 MH 21.000 $273,542.99 3.3333 MH/M2 6,127.0100 MH [ 78.048 ] 0.9524 Hr/Unit 175.0570 Shifts 3.3333 MH/Unit 366010 F& I Stay-In-Place Deck Forms Quan: 24,412.01 M2 d***** Copied and adjusted from RPAMLICO2012 ***** � FRM081 Formwark Crew w/7260 1,525.75 CH Prod: 2.0000 UM �2M�SCSTEEL Miscsteel@107% 36.18 TON 1,500.000 2NEOPRENE Neoprene strip@l07% 6,951.84 LF 0.500 2SIP-F Stay-in Place For@107% 24,412.01 M2 120.000 3GA101 Welding Supplies@107% 0.18 LS 50,000.000 84308R American 7260 100T 1.00 1,525.75 HR 163.010 84700C l85 CFM Compressar 1.00 1,525.75 HR 18.520 85000C 5 KW GENERATOR 1.00 1,525.75 HR 4.550 CAOl Carpenter Foreman 1.00 1,525.75 MH 23.000 CA02 Carpenter Journeyxnan 4.00 6,103.00 MH 2l .000 LA03 Laborer, unskilled 1.00 1,525.75 MH 13.000 OPO4 Operator, Crane 91T 1.00 1,525.75 MH 28.000 OPl2 Oiler 1.00 1,525.75 MH 14.000 $3,885,857.68 0.4999 MWM2 12,206.0000 MH [ 11.137 ] 0.0625 Hr/Unit ] 52.5750 Shifts 0.5000 MH/Unit 366012 F& S diaphrams Quan: 3,811.34 M2 ***�* Copied and adjusted from RPAMLICO2012 ***** FRM087 Formwork crew w/9320 692.97 CH Prod: 0.5000 UM 3F] WOODEN FORMS@107% 3,81134 M2 32.250 84303R American 9320 250 T 1.00 692.97 HR 29].660 85000C 5 KW GENERATOR 1.00 692.97 HR 4.550 CA01 Carpenter Foreman 1.00 692.97 MH 23.000 CA02 Carpenter Journeyman 4.00 2,771.89 MH 21.000 LA03 Laborer, unskilled 4.00 2,771.89 MH 13.000 D � � Lab Pcs: 3.50 Eqp Pcs: 0.00 63,428 32,222 177,892 210,115 114.31 Hrs/Shft: 10.00 Lab Pcs: 58,069 3,719 3,134,502 56, l 68 206,728 33,467 64,916 34,747 396,026 3,196,290 ]6.22 130.93 Hrs/Shft: 10.00 25,51 l 93,893 60,800 63,428 34.51 Cal: 510 WC: NONE 8.00 F,qp Pcs: 3.00 9,630 127,873 120,839 5,828 22,429 1,678 5,264 9,630 135,380 148,532 0.39 5.55 6.08 Cal: 510 WC: NONE Lab Pcs: 11.00 Eqp Pcs: 2.00 ] 31,520 109,912 92,200 762 2,391 Page 19 OS/04/2012 1221 Total **Unrevicwed 63,428 32,222 177,892 273,543 148.82 * * U nrevi ewed 58,069 3,719 3,134,502 9,630 248,713 28,257 6,942 56,168 206,728 33,467 64,916 34,747 3,885,858 159.18 **Unrcvicwcd 131,520 202,1 l2 3,153 25,511 93,893 60,800 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report BID [TEM = 4160 Description = CONC DECK Unit = M3 OPOS Operator, Crane>140 T 1.00 692.97 MH 28.000 OP12 Oiler 1.00 692.97 MH 14.000 $562,253.45 2.0000 MH/M2 7,622.6900 MH [ 402 ] 0.1818 Hr/Unit 692970 Shifts 2.0000 MH/Unit 366102 Set Bidwell Screed Rail Quan: 8,565.62 M ***** Copied and adjusted from RPAMLICO2012 ***** Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BL TakeoffQuan: 11,988.000 Engr Quan: 11,988.000 29,484 15,781 225,469 ] 31,520 ] ] 0,674 94,590 59.1(i 34.51 29.04 24.82 Hrs/Shft: 10.00 Cal: 510 WC: NONE CNC90 Screed Rail Crew 1,631.54 CH Prod: 1.5000 UM 3SCRAIL ScreedRailMater@107% 499.33 M 20.000 85000C 5 KW GENERATOR 1.00 1,631.55 HR 4.550 CA01 Carpenter Foreman 0.50 815.77 MH 23.000 CA02 Carpenter Journeyman 2.00 3,263.09 MH 21.000 d LA03 Laborer, unskilled 1.00 1,631.55 MH 13.000 �$194,459.10 0.6666 MH/M 5,710.4100 MH [ 13.933 ] 0.1905 Hr/Unit 163.1540 Shifts 0.6667 MH/Unit 366104 Pour & Finish Deck & diaph Quan: 11,988.00 M3 ***** Copied and adjusted from RPAMLICO2012 ***** CNC087 Conc Crew w/9320 1,498.50 CH Prod: 1.0000 UM 2C0005 4500 PSI Concrete@107% 12,587.40 M3 153.250 84303R American 9320 250 T 1.00 1,498.50 HR 291.660 85000C 5 KW GENERATOR 1.00 1,498.50 HR 4.550 85320C Concr bucket 1.-5-3 C 1.00 1,498.50 HR 12.090 85340R Pump Truck L00 1,498.50 HR ] 11.450 85360C Hi-Cyde Concrete Vibr 2.00 2,997.00 HR 1.410 CM02 Concrete Finisher Journeym 1.00 1,498.50 MH 18250 LA01 Laborer Foreman 1.00 1,498.50 MH 16.500 LA02 Laborer,Skilled 2.00 2,997.00 MH 14.500 LA03 Laborer, unskilled 2.00 2,997.00 MH 13.000 OPOS Operator, Crane>140 T 1.00 1,498.50 MH 28.000 OPl2 Oiler 1.00 1,498.50 MH 14.000 $3,O18,01431 1.0000 MH/M3 11,988.0000 MH [ 18.116 ] O.1250 Hr/Unit ]49.8500 Shifts 1.0000 MH/Unit 366143 Cure conc diaph & facia Quan: 617,542.19 M2 ***** Copied and adjusted from RPAMLICO2012 ***** AFNSH3 3 man Finisher Crew 7,057.56 CH Prod: 25.0002 UM D N O Lab Pcs: 3.50 Eqp Pcs: 1.00 10,686 1,795 5,629 30,031 110,531 35,787 176,350 20.59 Hrs/Shft: 10.00 10,686 1,795 5,629 125 0.27 0.66 Cal: 510 WC: NONE Lab Pcs: 8.00 2,064,050 44,328 40,508 72,286 65,738 63,757 34,126 320,743 2,064,050 26.76 172.18 Hrs/Shft: 10.00 Eqp Pcs: 6.00 237,677 199,375 1,648 5,170 12,348 5,769 57,542 109,465 3,027 l,] 99 312,242 320,979 26.05 26.77 Cal: 510 WC: NONE Lab Pcs: 3.50 Bqp Pcs: 0.00 Page 20 OS/04/2012 1221 Total 29,484 15,781 562,253 147.52 **Unreviewed 10,686 7,424 30,031 110,531 35,787 l 94,459 22.70 * * U nrevi ewcd 2,0(4,050 437,053 6,818 18,117 167,008 4,226 44,328 40,508 72,286 65,738 63,757 34,126 3,018,014 251.75 * * Unrcviewcd DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4160 BL Description= CONCDECK Unit= M3 TakeoffQuan: 1],988.000 EngrQuan: 11,988.000 3CURFMAT Curing MATERIALS@107 617,542.19 M2 0.550 363,424 CMO1 Concrete Finisher Foreman 0.50 3,528.78 MH 2O.250 114,665 CM02 Concrete Finisher Journeym 3.00 21,172.71 MH 18.250 626,316 $1,104,405.35 0.0399 MH/M2 24,701.4900 MH [ 0.816 ] 740,982 363,424 0.0] 14 Hr/Unit 705.7560 Shifts 0.0400 MH/Unit 1.20 0.59 366144 Rub & Finish conc Quan: 2,351.90 SM Hrs/Shft: 10.00 Cal: 510 WC: NONE ***�* Copied and adjusted from RPAMLICO2012 ***** AFNSH2 2 Man finish Crew 348.42 CH Prod: 3.0000 UM 3RUBMAT Rub mat@107% 2,351.90 M2 1.000 CMO1 Concrete Finisher Foreman 0.25 87.11 MH 2O.250 CM02 Concrete Finisher Journe}nn 2.00 696.86 MH l 8.250 d$25,961.15 0.3333 MH/SM 783.9700 MH [ 6.773 ] � 0.1481 Hr/Unit 34.8420 Shifts 03333 MWUnit N 366150 S& I safety rails Quan: 8,565.62 M ***** Copied and adjusted from RPAMLICO2012 ***** ACARP3 3 Man Carpenter Crew 407.88 CH Prod: 6.0000 UM 3SAFERAIL SafetyRail@107% 8,565.62 M 5.000 85300C 450 Desck Finisher 1.05 428.28 HR 31.500 85305C Work Bridge 1.05 428.28 HR 5.340 CA01 Carpenter Foreman 0.50 203.94 MH 23.000 CA02 CarpenterJourneyman 3.00 1,223.66 MH 21.000 $110,560.85 O.1666 MH/M 1,427.6000 MH [ 3.902 ] 0.0476 Hr/Unit 40.7880 Shifts 0.1667 MHNnit 366151 Access - Conc in superstr dk slabs, HPC Quan: 0.80 LS ***** Copied and adjusted from RPAMLICO2012 ***** 3EA08 Stair Tower@l07% 0.18 LS ] 00,000.000 $]9,260.00 [ ] _____> Item Totals: 4160 - CONC DECK $10,245,349.42 7.1930 MH/M3 86,229.74 MH 854.634 1 ] 988 M3 D N � Lab Pcs: 2.25 Eqp Pcs: 0.00 2,517 2,831 20,614 23,445 2,517 9.97 1.07 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 3.50 Eqp Pcs: 2.10 45,826 13,491 2,287 7,508 41,449 48,957 45,826 15,778 5.72 5.35 1.84 Hrs/Shft: 10.00 Cal: 510 WC: NONE 19,260 19,260 24,075.00 [ 150.972 ] 2,654,941 5,260,341 879,071 721,494 729,502 221.47 438.80 73.33 60.18 60.85 Page 21 OS/04/2012 1221 Total 363,424 ll 4,665 626,316 1,104,405 1.79 **Unrcvicwcd 2,517 2,831 20,614 25,961 l 1.04 **Unreviewed 45,826 13,491 2,287 7,508 41,449 110,561 12.91 ** Unreviewed 19,260 19,260 24,075.00 ] 0,245,349 854.63 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit BIDITEM = 4170 Description = END BENTS RFC-STAINLESS STEEL (ASTM A 95 433 S& I Reinforcing Steel-End Bents 1& 2 ***** Copied and adjusted from RPAMLICO2012 ***** 2SRASS Restcel Accessori@]07% 13,250.98 KG 2SRSS Reinforcing Steel@] 07% 13,250.98 KG 4REBARSS Stainless Ste�l R@] Ol % 13,250.98 KG $71,565.89 Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BL Unit= KG TakeoffQuan: 13,251.000 Engr Quan: 13,251.000 Quan: 13,250.98 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE 0.250 4.250 0.580 �� _____> Item Totals: 4170 - END BENTS RFGSTAINLESS STEEL (ASTM A 95 $7l ,565.89 [ ] � 5.401 13251 KG � W BID ITEM = 4175 3,545 60,259 63,803 4.82 63,803 4.81 BL Description = END BENTS-CIP CONCRETF, Unit= M3 TakeoffQuan: 90.000 Engr Quan: 90.000 400 Set & Strip End Bent Forms Quan: 163.00 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE End bent is 8'(h)x3.5'(w)x52'(1)-two total Formwork is(1+16)*2*2.4*2=165 m2 ACARP3 3 Man Carpenter Crew 65 ].14 CH Prod: 0.2503 UH Lab Pcs: 3.50 Eqp Pcs: 0.00 3Fl WOODEN FORMS@107% 163.00 M2 32.250 5,625 CA01 Carpenter Foreman 0.50 325.57 MH 23.000 11,985 CA02 Carpenter Journeyman 3.00 1,953.45 MH 21.000 66, l70 $83,779.58 13.9817 MH/M2 2,279.0200 MH [ 327.372 ] 78,155 5,625 3.9947 Hr/Unit 65.1140 Shifts 13.9817 MH/Unit 479.48 34.51 410 Pour & Finish End Bents 1& 2 Quan: 90.00 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE CNC087 Conc Crew w/9320 7.50 CH Prod: 1.5000 UM Lab Pcs: 8.00 F,qp Pcs: 6.00 2C0005 4500 PSI Concrete@107% 94.50 M3 153.250 15,496 84303R American9320 250 T 1.00 7.50 HR 291.660 1,190 998 85000C 5 KW GENERATOR 1.00 7.50 HR 4.550 8 26 85320C Concrbucket 1.-5-3 C 1.00 7.50 HR 12.090 62 29 85340R Pump Truck 1.00 7.50 HR 1 11.450 288 548 85360C Hi-Cycle Concrete Vibr 2.00 15.00 HR 1.410 15 6 D N N 7,762 7,762 0.59 Page 22 OS/04/2012 1221 Total * * U nrcvi cwed 3,545 6Q259 7,762 71,566 5.40 7,762 71,566 0.59 5.40 **Unrevicwed 5,625 1 1,985 66,170 83,780 513.99 ** Unreviewed 15,496 2,l 87 34 91 836 2l DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report BID [TEM = 4175 Description = END BENTS-CIP CONCRETE Unit= M3 CM02 Concrete Finisher Journeym 1.00 7.50 MH 18.250 LA01 Labarer Foreman 1.00 7.50 MH 16.500 LA02 Laborer,Skilled 2.00 15.00 MH 14.500 LA03 Laborer, unskilled 2.00 15.00 MH 13.000 OPOS Operator, Crane>140 T 1.00 7.50 MH 28.000 OP12 Oiler 1.00 7.50 MH 14.000 $20,270.44 0.6666 MH/M3 60.0000 MH [ 12.077 ] 0.0833 Hr/Unit 0.7500 Shifts 0.6667 MH/Unit ____> Item Totals: 4775 - END BENTS-CIP CONCRETE $] 04,050.02 25.989] MH/M3 2,339.02 MH [ 604.984 ] 1,156.11 ] 90 M3 d � �P BID ITEM = 4180 Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BL TakeoffQuan: 90.000 Engr Quan: 90.000 222 203 362 329 319 l71 1,605 l 5,496 ]7.84 172.18 1,563 1,606 17.36 17.85 79,760 15,496 5,625 1,563 1,606 886.22 172.18 62.50 17.36 17.85 Page 23 OS/04/2012 1221 Total 222 203 362 329 319 171 20,270 225.23 104,050 1,156.11 Description = REBAR IN PC DK SEGS Unit= KG TakeoffQuan: 1,064,225.000 Engr Quan: 1,064,225.000 4100 Rebars in segs Quan: 1,064,224.98 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE ** Unrcvicwed 15 mhrs/tonne x $30/hr = $450/1000kg = $0.45/kg 2SR Reinforcing Stcel@107% 1,064,224.98 KG 1.000 1,138,72] 1,138,721 2SRA Restcel Accessori@]07% 1,064,224.98 KG 0.100 ll3,872 113,872 4REBAR Rebarplace@101% 1,064,224.98 KG 0.580 623,423 623,423 $1,876,015.79 [ ] 1,252,593 623,423 1,876,016 1.18 0.59 1.76 ____> Item Totals: 4180 - REBAR IN PC DK SEGS $],876,015.79 1.763 1064225 KG � 1,252,593 1.18 623,423 ],876,016 0.59 1.76 BID ITEM = 4190 Description = PRE CAST CON DK SEGS Unit = M3 Takeoff Quan: ] 0,247.000 Engr Quan: 10,247.000 QUANTITY OF PRECAST SEGMENTAL BOX GIRDERS WAS REDUCED FROM 38,918 M3 TO 10,247 M3, OR APPROX. BY 74°. ALL RESOURCES REQUIRED FOR SEGMENTAL GIRDERS PRODUCTIONS ARE REDUCED ACCORDINGLY, ALL RESOURCES THAT REQUIRED TO SET-UP AND MAINTAIN THE YARD- ARE THE SAME. D N W DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract B�D ITEM = 4]90 Description = PRE CAST CON DK SF,GS Unit= M3 Takcot�fQuan: 10,247.000 6n� Quan: 20500 Casting Yard Staff Quan: 6.24 MTH Hrs/Shft: 10.00 Cal: 510 WC: NONE Z035 --> Casting Supt 1,372.80 MH 58.000 101,615 Z040 =_> Project F.ngineer 1,372.80 MH 58.000 101,615 Z045 --> Filed Engineer#1 1,372.80 MH 38.500 69,759 Z070 -->ChiefSurveyar 1,372.80 MH 58.000 lO1,615 Z122 --> Accounting Clerk 1,372.80 MH 17.000 34,636 $409,238.55 1,100.0000 MH/MTH 6,864.0000 MH [ 50490 ] 409,239 1,100.0000 MH/Unit 65,583.10 20500A Geometry Control Staff Quan: 7.70 MTH Hrs/Shft: 10.00 Cal: 510 WC: NONE dXZ072 > Inshumcnt man 4,991.22 MH 30.000 193,160 �$] 93,160.21 648.2103 MH/MTH 4,991.2200 MH [] 9446.312 ] 193,160 648.2704 MH/Unit 25,085.74 20500A001 Cost of Land Quan: 22.53 ACRE Hrs/Shft: 10.00 Cal: 510 WC: NONE 6LAND Land RenULease 1.00 LS l,] 69,500.000 l,] 69,500 $1,]69,500.00 [ ] 1,169,500 51,908.57 20500A003 Clear and Grub Site Quan: 25.00 ACRE Hrs/Shft: 10.00 Cal: 510 WC: NONE 4CLR Clear and Grub Su@101 % 25.00 ACRE 1,754.000 $44,288.50 [ ] 20500A005 Crade and Level Quan: 54,083.10 CY Hrs/Shft: 10.00 Cal: 510 WC: NONE Assume average of 1/2 cy cut/fill over 25 acres x 4840/2 = 60500cy yard site of push dirt 4ROAD Road Work Sub@] Ol% 54,083.] 0 CY 3.500 $191,183.76 L l 20500A007 Stone Fill Quan: 27,041.00 TON Hrs/Shft: 10.00 Cal: 510 WC: NONE Assumed 1/3 yd over 1/2 of 25 acres x 4840 x 1.Ston /cy = 30000 ton D N � 10,247.000 Page 24 OS/04/2012 1221 Total 101,615 101,615 69,759 101,615 34,636 409,239 65,583.10 193,160 193,160 25,085.74 1,169,500 1,169,500 51,908.57 44,289 44,289 44,289 44,289 1.771.54 1.771.54 191,184 191,184 191,184 191,184 3.54 3.54 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Page 25 OS/04/2012 1221 Total BID [TEM = 4190 Description = PRE CAST CON DK SEGS Unit = M3 Takeoff Quan: ] 0,247.000 Engr Quan: 10,247.000 4ROAD.01 Road Work Sub@101% 26,613.09 LTN 23.390 628,705 628,705 $628,704.98 [ ] 628,705 628,705 23.25 23.25 20500A009 Fencing Quan: 5,924.98 FT Hrs/Shft: 10.00 Cal: 510 WC: NONE 4FENCE Fencing Subcontra@101% 5,92498 FT 17.540 $104,963.39 [ ] 20500A011 Yard Lights Quan: 22.22 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 46LEC Elcctrical Subcon@101% 25.00 EA 2,924.000 d $73,831.00 [ ] rn � 20500A015 Uh1iYy hook-Ups Quan: 10.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 3UTHOOK Utility Hook-ups@107% 10.00 EA 2,500.000 26,750 $26,750.00 [ ] 26,750 2,675.00 20500A017 Set-Up Trailers Quan: 2.71 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE F&5006 6 man Form & Sh-ip Crew 100.00 CH Prod: 10.0000 S Lab Pcs: 6.00 Eqp Pcs: 2.00 3MISC Miscellaneous Mat@107% 1.00 LS 10,000.000 10,700 3TRAILER 60' by l 0' Traile@107% 3.00 EA 20,000.000 64,200 84700C 185 CFM Compressor 1.00 100.00 HR 18.520 382 1,470 85005C 20 KW GENERATOR 1.00 100.00 HR 15.450 370 1,175 CA01 Carpenter Foreman 1.00 100.00 MH 23.000 3,681 CA02 Carpenter Journeyman 2.00 200.00 MH 21.000 6,775 LA02 Laborer,Skilled 2.00 200.00 MH 14.500 4,824 LA03 Laborer,unskilled 1.00 100.00 MH 13.000 2,193 $95,770.32 221.4022 MH/EA 600.0000 MH [ 4343.173 ] 17,473 74,900 752 2,645 36.9004 Hr/Unit 10.0000 Shifts * 221.4022 MH/Unit 6,447.72 27,638.38 277.49 976.01 20500A019 Expences Quan: 5.62 MTH Hrs/Shft: 10.00 Cal: 510 WC: NONE 30FFSUPPL Office Supply@107% 6.24 MTH 1,000.000 6,677 3SECURITY Security@107% 6.24 MTH 1,000.000 6,677 D N CJl 104,963 104,963 104,963 104,963 17.72 17.72 73,831 73,831 73,831 73,831 3,322.73 3,322.73 26,750 26,750 2,675.00 10,700 64,200 ],852 1,545 3,681 6,775 4,824 2,193 95,770 35,339.60 6,677 6,677 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description BID [TEM = 4190 Description = PRE CAST CON DK SEGS 3STOR-BOX Steel Storage Con@107% 3TRASH Garbage Disposal ct 107% 3UTILEXP Utility Expenses@107% $36,861.50 Pcs Quantity Unit ].30 EA 6.24 MTH 6.24 MTH Cost Report Unit Cost Unit = M3 2,500.000 1,000.000 2,000.000 �l Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Takeoff Quan: ] 0,247.000 Engr Quan: 10,247.000 20500A021 Furn/Off Machines/Computers Quan: 0.90 LS 3FURN Trailer Furnishin@107% 1.00 LS 20,000.000 30FFMACH Office Machines@107% 1.00 LS 30,000.000 $53,500.00 [ ] d 20500B01 Set up Rebar Jigs & Hang-Up Racks Quan: 8.00 EA � v 8 Jigs @ the 16 m width & 8 Hang-Up Racks F&5006 6 man Form & Strip Crew 243.90 CH Prod: 24.3902 S 2CFL005 Cl-P Conc 5000@107% 48.76 CY 96.000 3F$025 Form Supplies@107% 2,439.00 SF 2.000 3FIN-PLY Fin-Ply@] 07% 2,439.00 SF 4.000 3SCAFF-15K 15 Kip/Leg Scaffo@107% 39.04 EA 325.000 84700C 185 CFM Compressor 1.00 243.90 HR L8.520 85005C 20 KW GENERATOR 1.00 243.90 HR 15.450 CA01 Carpenter Foreman 1.00 243.90 MH 23.000 CA02 Carpenter Joumeyman 2.00 487.80 MH 21.000 LA02 Laborer,Skilled 2.00 487.80 MH 14.500 LA03 Laborer, unskilled 1.00 243.90 MH I 3.000 $85,145.86 182.9250 MH/EA 1,463.4000 MH [ 3588.379 ] 30.4875 Hr/Unit 24.3900 Shifts * 182.9250 MH/Unit 20500B02 Survey Platforms Quan: 4.00 EA 8# square platforms 10' in the air F&5006 6 man Form & Strip Crew 40.03 CH Prod: 4.0030 S 2CFL005 C]-P Conc 5000@107% 10.00 CY 96.000 3F$O15 Farmwark@l07% 500.44 SF 2.000 3SCAFF-15K 15 Kip/Leg Scaffo@]07% 20.00 EA 325.000 84308R American 7260 100T 0.00 HR 163.010 84700C 185 CFM Compressor 1.00 40.03 HR I 8.520 85005C 20 KW GENERATOR 1.00 40.03 HR L5.450 D N O� 3,478 6,677 13,354 36,862 6,558.99 Hrs/Shft: 10.00 Cal: 510 WC: NONE 21,400 32,100 53,500 5 J,444.44 Hrs/Shf't: 10.00 Cal: 510 WC: NONE Lab Pcs: 6.00 Eqp Pcs: 2.00 5,009 5,219 10,439 I3,576 932 3,585 902 2,866 8,979 16,523 1 ],765 5,350 42,617 5,009 29,235 1,834 6,451 5,327.18 626.08 3,654.32 229.27 806.39 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 6.00 Eqp Pcs: 2.00 ],027 1,07] 6,955 153 588 148 470 Page 26 OS/04/2012 1221 Total 3,478 6,677 ] 3,354 36,862 6,558.99 21,400 32,100 53,500 59,444.44 5,009 5,219 10,439 13,576 4,517 3,768 8,979 16,523 11,765 5,350 85,146 10,643.23 1,027 1,071 6,955 741 618 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4190 Description = PRE CAST CON DK SEGS Unit= M3 TakeoffQuan: ] 0,247.000 F,ngr Quan: 10,247.000 CA01 Carpenter Foreman 1.00 40.03 MH 23.000 1,474 CA02 Carpenter Journeyman 2.00 80.06 MH 21.000 2,712 LA02 Laborer,Skilled 2.00 80.06 MH 14.500 ],931 LA03 Laborer, unskilled 1.00 40.03 MH 13.000 878 OP02 Ope�ator,Crane<50 T 0.00 MH 26.000 $17,407.52 60.0450 MH/EA 240.1800 MH [ 1177.885 ] 6,995 1,027 8,026 301 1,059 10.0075 Hr/Unit 4.0030 Shifts * 60.0450 MH/Unit 1,748.64 256.80 2,006.49 7526 264.70 20500B03 Casting Machine Foundations Quan: 500.00 CY Hrs/Shft: 10.00 Cal: 510 WC: NONE 8 Beds F&5006 6 man Form & Strip Crew 191.14 CH Prod: 19.1140 S 2CFL005 Cl-P Conc 5000@107% 500.00 CY 96.000 d2SR ReinfarcingSteel�c�107% 75,000.41 KG 1.000 �2SRA Resteel Accessori@107% 64,513.06 KG 0.100 3F$O10 Formwork@107% 7,500.04 SF 2.000 4RBR Resteel Install S@10]% 75,000.41 LB 0.320 84700C 185 CFM Compressor 1.00 19l .14 HR 18.520 85005C 20 KW GENERATOR 1.00 191.14 HR 15.450 CA01 Carpenter Foreman 1.00 191.14 MH 23.000 CA02 Carpenter Journeyman 2.00 382.28 MH 21.000 LA02 Laborer,Skilled 2.00 382.28 MH 14.500 LA03 Laborer, unskilled 1.00 191.14 MH 13.000 $218,695.06 22936 MH/CY 1,146.8400 MH [ 44.994 ] 0.3823 Hr/Unit 19.1140 Shifts * 2.2937 MH/Unit 20500B04 Canopies Quan: 4.00 EA 3CANOPY Seg Mach Canopies@107% 5,004.20 SF ] 0.000 $53,544.94 [ ] 20500B05 F&5006 2CFL005 2SR 2SRA 3F$005 D N v Gantry Crane Rail 6 man Form & St�ip Crew Cl-P Conc 5000@] 07% Reinforcing Steel@107% Resteel Accessori@107% Formwark@107% 196.74 CH 1,500.00 CY 119,999.97 KG 119,999.97 KG 6,000.00 LF Quan: 6,000.00 LF Prod: 19.6740 S 96.000 1.000 0.100 2.000 Lab Pcs: 6.00 Eqp Pcs: 2.00 51,360 80,250 6,903 16,050 24,240 730 2,8]0 707 2,246 7,037 12,949 9,220 4,193 33,399 138,513 16,050 1,437 5,056 24,240 66.80 277.03 32.10 2.87 10.11 48.48 Hrs/Shft: 10.00 Cal: 510 WC: NONE 53,545 53,545 13,38624 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 6.00 F,qp Pcs: 2.00 154,080 128,400 12,840 12,840 Page 27 OS/04/2012 1221 Total 1,474 2,712 1,931 878 17,408 4,35 ] .88 51,360 80,250 6,903 16,050 24,240 3,540 2,953 7,037 12,949 9,220 4,193 218,695 437.39 53,545 53,545 13,386.24 154,080 128,400 ] 2,840 l 2,840 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4190 Description = PRE CAST CON DK SEGS Unit= M3 TakeoffQuan: 3GANTRAIL 100# Gantry Rail@107% 6,000.00 LF 20.000 3TRACKSWTC Gantry Track Swit@107% 0.60 EA 35,000.000 4RBR Resteel Install S@l01 % l 19,999.97 LB 0.320 84700C 185 CFM Compressor 1.00 196.74 HR 18.520 85005C 20 KW GENERATOR 1.00 196.74 HR 15.450 CA01 Carpenter Fareman 1.00 196.74 MH 23.000 CA02 Carpenter Journeyman 2.00 393.48 MH 21.000 LA02 Laborcr,Skilled 2.00 393.48 MH 14.500 LA03 Laborer, unskilled 1.00 196.74 MH 13.000 $538,874.20 O.1967 MH/LF 1,180.4400 MH [ 3.859 ] 0.0328 Hr/Unit 19.6740 Shifts * 0.1967 MH/Unit � 20500B06 Set-Up Casting Machines Quan: 7.21 EA � � F&5006 6 man Form & Strip Crew 72] 37 CH Prod: 72.1370 S 3MISC.01 Miscellaneous Mat@107% 721 EA 1.000 84700C 185 CFM Compressor 1.00 72l .37 HR 18.520 85005C 20 KW GENERATOR 1.00 721.37 HR 15.450 CA01 Carpenter Foreman 1.00 721.37 MH 23.000 CA02 CarpenterJourneyman 2.00 ],442.74 MH 21.000 LA02 Laborer,Skilled 2.00 1,442.74 MH 14.500 LA03 Laborer, unskilled 1.00 72l .37 MH 13.000 $150,559.87 600.3079 MH/EA 4,328.2200 MH [ 11776.039 ] 100.0513 Hr/Unit 72.1370 Shifts * 6003079 MH/Unit 20500D Speciality Engineering Quan: 1.00 LS 6SREC-ENG Spccial Engineering 1.00 LS 1,169,500.000 $],169,500.00 [ ] 20500E Casting Yard Equip & Op's Equip based on 176 hr/mth & 24 months to cast 3FMFC Meta] Column Farm@107 0.50 SF 81 1 GANTRY 1 OOT Gantry Crane 999.99 HR 8] 1PC-PU OP Precast Yard P/U Op's 10,560.00 HR 8llPC-PU'S PrecastYardPick-Up 2.50 EA 811 PGPUSA PC Yard P/U Salvage 2.50 EA •. Quan ] 50,000.000 1 18.000 3.000 30,000.000 ] 0,000.000 ] 0,247.000 Engr Quan: 10,247.000 128,400 22,470 38,784 752 2,892 728 2,312 7,243 13,328 9,491 4,315 34,377 295,320 163,710 1,479 5,204 38,784 5.73 49.22 2729 0.25 0.87 6.46 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 6.00 F,qp Pcs: 2.00 8 2,756 10,604 2,669 8,476 26,556 48,870 34,798 ] 5,823 126,047 17,482.28 Hrs/Shft: 10.00 6.00 MTH Hrs/Shft: 10.00 8 5,425 19,080 1.07 752.38 2,64636 Cal: 510 WC: NONE 1,169,500 1,169,500 1,169,500.00 Cal: 510 WC: NONE 80,250 l ] 7,999 31,680 75,000 25,000 Page 28 OS/04/2012 1221 Total 128,400 22,470 38,784 3,644 3,040 7,243 13,328 9,491 4,315 538,874 89.81 8 13,360 11,145 26,556 48,870 34,798 15,823 150,560 20,882.09 1,169,500 1,169,500 1, l 69,500.00 80,250 ll 7,999 31,680 75,000 25,000 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit BID [TEM = 4190 Description = PRE CAST CON DK SEGS 8ll RLLRSCR Rollar Scroed 81 1 TRLRPMP --> Trailer Pump(60 cy/hr) 83405C --> CAT 966F (220 HP) 84308R =_> American 7260 100T 84510R =_> 50 Ton R.T. 84700C --> 185 CFM Compressar 84910C --> 400 Amp Welder 85005C =_> 20 KW GENF.RATOR 85315 => Conc. Bucket 5 CY 85320C => Concr bucket 1.-5-3 C 85325C =_> Concrete Saw Handhel L165 =_> Mechanic OP03 =_> Operator, crane S l T ,� OPO4 =_> Operator, Crane 91 T pOPl 0 =_> Operator, Loader $1,209,721.70 999.9966 MH/MTH 20500F Concrete and Embeds 2ACCESSH Access HATCHES@107°/a 2BOX-DRN Box Drains@107% 2cFLOZS.o1 c�-TV con� �FL�@io�°io 2CSUPER Super-plasticizer@107% 2DIAP-DOOR Diphragm Door As@l 07% 2LIFT-BLK Lifting Block Out@107% 2RF,STR-PIPE Restrainer Assemb@107°/o 2SCUPPFRS Seg Deck Scuppers@] 07% $2,337,366.32 20500G03 SF,G CA01 CA02 CMO1 IWO1 LA02 D N � Cost Report Unit Cost Unit = M3 ].00 EA ll,000.000 999.99 HR 48.400 999.99 HR 87.530 999.99 HR 163.010 999.99 HR 128.100 2,000.00 HR L8.520 2,000.00 HR 11.250 2,000.00 HR 15.450 2,000.00 HR 18.040 2,000.00 HR 12.090 2,000.00 HR 11.460 2,000.00 MH 35.000 999.99 MH 26.000 2,000.00 MH 28.000 999.99 MH 2O.500 5,9999800 MH [31624913] 999.9967 MH/Unit Form Pier & end bent special seg's 4.5 Man Scgxnent Precasting Carpenter Foreman 0.50 Carpenter Journeyman 1.00 Concrete Finisher Foreman 1.00 Ironwarker Fareman 1.00 Laborer,Skilled 1.00 13.17 EA 394.95 EA 10,247.20 M3 10,247.20 M3 13.17 EA 1,527.15 EA 26.33 SA 210.64 EA 333.33 CH 166.67 MH 33333 MH 333.33 MH 333.33 MH 333.33 MH Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract TakeoffQuan: ]0,247.000 Quan: 10,247.20 M3 350.000 1.000 196.500 15.000 550.000 2.500 30.000 1.500 �l 101,630 39,722 85,094 31,954 258,400 43,066.71 Hrs/Shft: 10.00 4,932 423 2,154,525 164,468 7,751 4,085 845 338 2,337,366 228.10 Quan: 10.00 EA Prod: 150.0000 MU 23.000 21.000 20.250 28.000 14.500 Hrs/Shft: 10.00 Lab Pcs: 6,136 1 ] ,291 10,831 14,960 8,040 Engr Quan: 1 1,770 16,400 34,230 83,809 56,174 7,640 3,800 7,400 24,580 16,480 5,620 10,247.000 32,000 53,299 79,199 80,891 29,400 18,700 23,500 11,500 7,700 17,300 80,250 517,582 353,490 13,375.00 86,263.65 58,914.92 Cal: 510 WC: NONE Cal: 510 WC: NONE 4.50 F,qp Pcs: 0.00 Page 29 OS/04/2012 1221 Total 11,770 48,400 87,529 163,008 137,066 37,040 22,500 30,900 36,080 24,180 22,920 101,630 39,722 85,094 31,954 1,209,722 201,620.28 4,932 423 2,154,525 164,468 7,751 4,085 845 338 2,337,366 228.10 6,136 11,291 10,831 14,960 8,040 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4190 Description = PRE CAST CON DK SEGS Unit= M3 TakeoffQuan: ] 0,247.000 F,ngr Quan: 10,247.000 $51,258.14 149.9990 MH/EA 1,499.9900 MH [ 3492.477 ] 5],258 33.3330 Hr/Unit 33.3330 Shifts 149.9990 MH/Unit * 5,125.81 20500005 Form typical seg's Quan: 340.00 EA Hrs/Shft: 10.00 The segmental box was quantified based on the overall length shown on the 2006 Preliminary Plans. lOft +/-, thus the total number of sections (boxes) would be approximately 350. Pier segments-10 ea, typical segments-340 ea SEG 4.5 Man Se�neni Precasting 7,555.57 CH Prod: 100.0003 MU Lab Pcs: CA01 Carpenter Foreman 0.50 3,777.79 MH 23.000 139,073 CA02 CarpenterJourneyman ].00 7,555.58 MH 21.000 255,931 CMO1 Concretc Finisher Foreman 1.00 7,555.58 MH 2O.250 245,513 IWOI IronworkcrFareman 1.00 7,555.58 MH 28.000 339,108 dLA02 Laborer,Skilled 1.00 7,555.58 MH 14.500 182,236 �$1,161,862.63 ]00.0003 MH/EA 34,000.1100 MH [2328341] 1,161,863 22.2223 Hr/Unit 755.5570 Shifts 100.0003 MH/Unit * 3,417.24 20500H Pour Segments Quan: 350.00 EA Hrs/Shft: 10.00 CON006 6 Man Conc Place and Finish 1,050.00 CH Prod: 3.0000 HU Lab Pcs: 84700C 185 CFM Compressor 1.00 1,050.00 HR 18.520 85005C 20 KW GENERATOR 1.00 1,050.00 HR 15.450 85360C Hi-Cycle Concrete Vibr 2.00 2,100.00 HR L410 CM02 Concrete Finisher Joumeym 2.00 2,100.00 MH 18.250 62,121 LA01 LaborerForeman 1.00 1,050.00 MH 16.500 28,384 LA02 Laborer,Skilled 2.00 2,100.00 MH 14.500 50,651 LA03 Laborer, unskilled 1.00 1,050.00 MH 13.000 23,031 OPO1 Operator Foreman 1.00 1,050.00 MH 30.000 47,641 $250,456.98 21.0000 MH/EA 7,350.0000 MH [412.5] 211,827 3.0000 Hr/Unit * 105.0000 Shifts 21.0000 MH/Unit 605.22 20500I Clean and Rub Segments Quan: 350.00 EA Hrs/Shft: 10.00 CNC71 Point, Patch and Rub Crew 1,166.66 CH Prod: 3.0000 US Lab Pcs: 3CCA Concrete rubbing c�] 07% 13,070.54 M2 1.000 3CURE Curing@107% 24,204.70 M2 0.550 3SAND Sand Blasring Mat@107% 4,295.12 M2 2.500 CMO1 Concrete Finisher Foreman L00 1,166.67 MH 2O.250 37,910 CM02 Concrete Finisher Joumeym 5.00 5,83333 MH 18.250 172,558 $250,187.08 20.0000 MH/EA 7,000.0000 MH [ 408.833 ] 210,468 D w 0 Page 30 OS/04/2012 1221 Total 51,258 5,125.81 Cal: 510 WC: NONE The segments were assumed to have a length of 4.50 Eqp Pcs: 0.00 Cal: 510 WC: NONE 7.00 Eqp Pcs: 4.00 4,011 15,435 3,885 12,338 2,121 840 ] 0,017 28.62 Cal: 510 WC: NONE 6.00 F,qp Pcs: 13,985 14,244 l 1,489 39,719 28,613 81.75 0.00 139,073 255,931 245,513 339,108 182,236 1,161,863 3,417.24 19,446 16,223 2,961 62,121 28,384 50,651 23,031 47,641 250,457 715.59 13,985 14,244 11,489 37,910 172,558 250,187 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4190 Description = PRE CAST CON DK SEGS Unit= M3 TakeoffQuan: ] 0,247.000 Engr Quan: 10,247.000 3.3333 Hr/Unit 116.6660 Shifts 20.0000 MH/Unit 601.34 113.48 20500K Store Segments Quan: 300.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 3DUNNAGE Hardwood Blocking@107% 15.64 MBFT 1,000.000 16,735 $]6,734.80 [ ] 16,735 55.78 20500L Dismantle Casting Yard Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE F&5006 6 man Form & St�ip Crew 200.00 CH Prod: 20.0000 S Lab Pcs: 6.00 F,qp Pcs: 2.00 Page 31 OS/04/2012 1221 Total 714.82 ** Unrcviewed 16,735 16,735 55.78 4DEM0.0] Demolition Sub@10]% 2,096.91 CY 58.480 123,854 123,854 84308R American 7260 100T 0.00 HR 163.010 d 84700C 185 CFM Compressor 1.00 200.00 HR 18.520 764 2,940 3,704 N 85005C 20 KW GENERATOR 1.00 200.00 HR 15.450 740 2,350 3,090 CA01 Carpenter Foreman 1.00 200.00 MH 23.000 7,363 7,363 CA02 Carpenter Journeyman 2.00 400.00 MH 21.000 13,549 13,549 LA02 Laborer,Skilled 2.00 400.00 MH 14.500 9,648 9,648 LA03 Laborer, unskilled 1.00 200.00 MH 13.000 4,387 4,387 OP02 Operator,Crane<50 T 0.00 MH 26.000 $165,594.21 1,200.0000 MH/LS 1,200.0000 MH [ 23540 ] 34,947 1,504 5,290 123,854 165,594 200.0000 Hr/Unit 20.0000 Shifts * ],200.0000 MH/Unit 34,946.64 1,504.00 5,290.00 123,853.57 165,594.21 _____> Item Totals: 4190 - PRE CAST CON DK 5EG5 $10,704,661.52 7.5987 MH/M3 77,864.38 MH [ 192.042 ] 2,792,070 2,777,235 2,938,289 540,332 426,887 1,229,849 ]0,704,662 1,044.663 10247 M3 272.48 271.03 286.75 52.73 41.66 120.02 1,044.66 BID ITEM = 4191 Description = ERECT PC DK SEGS Unit= 21100A01 Heavy Lift Crane Assembly Marine Quan: ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** LA02 --> Laborer,Skilled 78.00 MH 14.50 OPOS =_> Operator, Crane>140 156.00 MH 28.00 $8,518.67 600.0000 MH/LS 234.0000 MH [ 15510 600.0000 MH/Unit D w � BL M3 TakeoffQuan: 10,247.000 Engr Quan: 10,247.000 0.39 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 0 1,881 0 6,637 ] 8,519 21,842.74 * * U nrcvi ewed 1,881 6,637 8,519 21,842.74 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract B�D ITEM = 4191 BL Description = ERECT PC DK SEGS Unit= M3 TakeoffQuan: 10,247.000 Engr Quan: 10,247.000 21100A02 Heavy Crane Site Moves Marine Quan: 2.73 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** LA02 =_> Laborer,Skilled 2730 MH 14.500 OPOS =_> Operator, Crane>140 54.60 MH 28.000 $2,981.54 30.0000 MH/EA 81.9000 MH [ 775.502 ] 30.0000 MH/Unit 2ll00E Prop Extended Catilevers Quan: 9.02 EA ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** F&5006 6 man Form & Strip Crew 263.29 CH Prod: 26.3296 S d3MSTRSTL Misc Struc Steel@107% 13.16 TON 1,000.000 V 3SHOR-100K 100 Kip Shoring@107% 0.26 LS 250,000.000 � 84700C 185 CFM Compressar 1.00 263.30 HR 18.520 85005C 20 KW GENERATOR 1.00 263.30 HR 15.450 CA01 Carpenter Foreman 1.00 263.30 MH 23.000 CA02 Carpenter Journeyman 2.00 526.59 MH 21.000 LA02 Labor�r,Skilled 2.00 526.59 MH 14.500 LA03 Laborer, unskilled 1.00 26330 MH 13.000 $138,582.15 175.1419 MH/EA 1,579.7800 MH [ 3435.70] ] 29.1896 HdUnir 26.3290 Shifta * 175.1419 MH/Uuir 2ll00F Stability Systems Quan: 17.09 EA ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** F&5006 6 man Form & Strip Crew 256.29 CH Prod: 1.4997 SU 3MISC Miscellaneous Mat@107% 17.09 LS 1.000 3PIERBRKT Erection Truss Pi@] 07% 1.05 EA 50,000.000 84700C 185 CFM Compressor 1.00 25629 HR 18.520 85005C 20 KW GENERATOR 1.00 256.29 HR 15.450 CA01 Carpenter Fareman 1.00 256.29 MH 23.000 CA02 Carpenter Journeyman 2.00 512.59 MH 21.000 LA02 Laborer,Skilled 2.00 512.59 MH 14.500 LA03 Laborer, unskilled l.00 256.29 MH 13.000 $109,682.39 89.9801 MH/EA 1,537.7600 MH [ 1765.11 ] 14.9965 Hr/Unit 25.6290 Shifts 89.9801 MH/Unit D w N 658 2,323 2,982 1,092.14 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 6.00 Eqp Pcs: 2.00 14,08] 69,550 1,006 3,871 974 3,094 9,693 17,837 12,701 5,775 46,007 83,631 1,980 6,964 5,100.52 9,271.75 219.51 772.09 Hrs/Shft: 10.00 Cal: 510 WC: NONE 9,435 17,363 12,363 5,622 44,783 2,620.42 Lab Pcs: 6.00 Eqp Pcs: 2.00 18 56,] 75 979 3,767 948 3,011 56,193 1,927 6,779 3,288.08 712.77 396.66 Page 32 OS/04/2012 1221 Total **Unrevicwed 658 2,323 2,982 1,092.14 ** Unrevicwed 14,081 69,550 4,876 4,068 9,693 17,837 12,701 5,775 138,582 15,363.87 **Unreviewed 18 56,175 4,746 3,960 9,435 17,363 l 2,363 5,622 109,682 6,417.93 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract B�D ITEM = 4191 BL Description = ERF.CT PC DK SEGS Unit= M3 TakeoffQuan: 10,247.000 Engr Quan: 10,247.000 21100H load Out Seg' @ PC Yard Quan: 358.35 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** LAB02 2 Man Labor Crew 895.86 CH Prod: 4.0000 US 3MISC Miscellaneous Mat@107% 35835 EA ] 0.000 4HAUL Haul Carolina to@101% 358.35 TRIP 1,169.500 LA02 Labarer,Skilled 1.00 895.86 MH 14.500 LA03 Laborer, unskilled 1.00 895.86 MH 13.000 $468,373.54 4.9999 MH/EA 1,791.7200 MH [ 75.624 ] 2.5000 Hr/Unit 89.5860 Shifts 4.9999 MH/Unit � 21100J Apply Epoxy Quan: 380.73 EA i �***�* Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** LAB02 2 Man Labor Crew 95l .81 CH Prod: 2.5000 RU 2EPDXY Segment Epoxy Glu@l07% 2,28435 GAL 22.000 3GLOVES Gloves to apply E@107% 761.45 PR 2.500 LA02 Labarer,Skilled 1.00 951.81 MH 14.500 LA03 Laborer, unskilled 1.00 951.81 MH 13.000 $99,645.16 4.9999 MH/F,A 1,903.6200 MH [ 75.624 ] 2.5000 Hr/Unit * 95.1810 Shifts 4.9999 MH/Unit 21100K Erect Pier, abut & special Segme Quan: 33.70 EA ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** ERFCT8 Sc�nent Erection Crew 1,685.09 CH Prod: 5.0003 SU 3MISC Miscellaneous Mat@107% 33.70 EA 1.000 843]0 4]OOManitowocS2 1.00 1,685.09 HR 327.850 84700C 185 CFM Compressor 1.00 1,685.09 HR 18.520 85005C 20 KW GENERATOR 1.00 1,685.09 HR 15.450 IWO11 NonworkerFareman 1.00 1,685.09 MH 28.000 IW02 Ironwarker Jorneyman 3.00 5,055.28 MH 26.000 LA02 Laborer,Skilled 3.00 5,05528 MH 14.500 OPOS Operator, Crane>140 T 1.00 1,685.09 MH 28.000 $],090,758.50 400.0219 MH/EA 13,480.7400 MH [ 9763.035 ] 50.0027 Hr/Unit 168.5090 Shifts 400.0220 MH/Unit 21100L Erect Cantilever Segments Quan: 348.08 EA D w W Lab Pcs: 2.00 Eqp Pcs: 0.00 3,834 21,608 19,650 41,258 3,834 115.13 10.70 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 2.00 F,qp Pcs: 0.00 53,774 2,037 22,957 20,878 43,835 53,774 2,037 115.13 141.24 5.35 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 8.00 Eqp Pcs: 3.00 36 298,851 253,606 6,437 24,771 6,235 19,800 75,630 211,767 ] 21,930 71,696 481,023 36 3]],523 298,177 14,273.69 1.07 9,243.99 8,847.97 Hrs/Shft: 10.00 Cal: 510 WC: NONE Page 33 OS/04/2012 1221 Total **Unrevicwed 3,834 423,281 423,281 21,608 19,650 423,281 468,374 1,]81.20 ],307.03 **Unreviewed 53,774 2,037 22,957 20,878 99,645 261.72 * * Unrevi ewed 36 552,457 31,208 26,035 75,630 211,767 121,930 71,696 I,090,759 32,366.72 **Unrevicwcd DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4191 Description = ERECT PC DK SEGS Unit = M3 Takeoff Quan: 10,247.000 ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** F..RECT8 Seginent Erection Crew 1,160.25 CH Prod: 3.0000 US Lab Pcs: 84310 4100 Manitowoc S2 1.00 1,160.26 HR 327.850 84700C 185 CFM Compressor 1.00 1,16026 HR 18.520 85005C 20 KW GENERATOR 1.00 1,160.26 HR 15.450 IWO11 IronworkerForeman 1.00 1,160.26 MH 28.000 52,075 IW02 IronwarkerJorneyman 3.00 3,480.77 MH 26.000 145,810 LA02 Laborer,Sl<illed 3.00 3,480.77 MH 14.500 83,954 OPOS Operator, Crane>140 T 1.00 1,160.26 MH 28.000 49,366 $751,010.19 26.6664 MH/EA 9,282.0600 MH [ 650.828 ] 33],205 3.3333 Hr/Unit 116.0250 Shifts 26.6665 MH/Unit 951.52 � 21100M01 Clean Excess Epoxy Quan: 380.73 JTS Hrs/Shft: 10.00 i �***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** LAB02 2 Man Labar Crew 571.08 CH Prod: 3.0000 MU Lab Pcs: LA02 Labarer,Skilled 1.00 57].09 MH 14.500 13,774 LA03 Labarer,unskilled 1.00 57].09 MH 13.000 12,527 $26,301.00 2.9999 MH/JTS 1,142.1800 MH [ 45375 ] 26,301 1.5000 Hr/Unit 57.1080 Shifts 3.0000 MH/Unit * 69.08 21100N Temp Handrail Quan: 6,95].Ol LF Hrs/Shft: ]0.00 ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** F&5006 6 man Form & Strip Crew 57.90 CH Prod: 20.0055 UM 84700C 185 CFM Co�npressar 1.00 57.91 HR 18.520 85005C 20 KW GENERATOR 1.00 57.91 HR 15.450 CA01 Carpenter Foreman 1.00 57.91 MH 23.000 CA02 Carpenter Journeyman 2.00 115.82 MH 21.000 LA02 Laborer,Skilled 2.00 1i5.82 MH 14.500 LA03 Labarer, unskilled 1.00 57.91 MH 13.000 $] 2,085.97 0.0499 MH/LF 347.4600 MH [ 0.981 ] 0.0083 Hr/Unit 5.7900 Shifts 0.0500 MH/Unit 21100P Form & Strip CIP Segments Quan: 426.54 M2 ***�* Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** F&5006 6 man Form & Sfip Crew 355.44 CH Prod: 0.2000 UM 3F$O10 Fonnwork@]07% 2633 M2 600.000 84700C 185 CFM Compressor 1.00 355.45 HR 18.520 D w � BL F,ngr Quan: 10,247.000 Eqp Pcs: 3.00 205,772 174,6] 9 4,432 17,056 4,293 ]3,633 214,497 205,308 61623 589.83 Cal: 510 WC: NONE 2.00 Eqp Pcs: 0.00 Cal: 510 WC: NONE Lab Pcs: 6.00 Sqp Pcs: 2.00 221 851 214 680 2,132 3,923 2,794 ],270 10,119 I .46 Hrs/Shft: 10.00 435 1,532 0.06 0.22 Cal: 510 WC: NONE Lab Pcs: 6.00 F,qp Pcs: 2.00 16,904 1,358 5,225 Page 34 OS/04/2012 1221 Total 380,391 21,488 17,926 52,075 145,810 83,954 49,366 751,010 2,157.58 ** Unrcvicwed 13,774 12,527 26,301 6).08 * * U nrcvi ewcd 1,072 895 2,132 3,923 2,794 1,270 12,086 ] .74 **Unr¢viewed 16,904 6,583 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report BID [TEM = 4191 Description = ERECT PC DK SEGS Unit= M3 85005C 20 KW GENERATOR 1.00 355.45 HR 15.450 CA01 Carpenter Fareman 1.00 355.45 MH 23.000 CA02 Carpenter Journeyman 2.00 710.90 MH 21.000 LA02 Laborer,Skilled 2.00 710.90 MH 14.500 LA03 Laborer, unskilled 1.00 355.45 MH 13.000 $91,087.39 5.0000 MH/M2 2,132.7000 MH [ 98.083 ] 0.8333 Hr/Unit 35.5440 Shifts 5.0000 MH/Unit 21100P01 Pour Closure Segments Quan: 101.90 M; ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BL TakeoffQuan: 10,247.000 F,ngr Quan: 10,247.000 1,315 4,177 13,085 24,080 17,146 7,797 62, I 09 145.(il Hrs/Shft: 10.00 CNCOS CONC CREW W/3900 2037 CH Prod: 0.5000 UM 2C0006 5000 PSI Concrete@107% 111.51 M3 157.200 d 84335R 3900 Manitowoc 110 2.00 40.76 HR 156.470 � 85000C 5 KW GENERATOR 1.00 20.38 HR 4.550 85320C Concr bucket ].-5-3 C 6.00 122.27 HR 12.090 85360C Hi-Cycle Concrete Vibr 6.00 122.27 HR 1.410 CM02 Concrete Finisher Journeym l.00 20.38 MH 18250 LAOI Labarer Fareman 1.00 20.38 MH 16.500 LA02 Labor�r,Skilled 2.00 40.76 MH 14.500 LA03 Laborer, unskilled 2.00 40.76 MH 13.000 OPO4 Operator, Crane 91T 2.00 40.76 MH 28.000 OP12 Oiler 2.00 40.76 MH 14.000 $32,570.91 2.0000 MH/M3 203.8000 MH [ 38225 ] 0.1999 Hr/Unit 2.0370 Shifts 2.0000 MH/Unit CLASS-V CI-V Concrete Coating Quan: 390,005.32 SF ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** 4COAT10 Class V Sub@101% 390,005.32 SF 4.390 $],729,244.59 [ ] 16,904 2,673 9,402 39.63 627 22.04 Cal: 510 WC: NONE Lab Pcs: 10.00 Eqp Pcs: 15.00 18,756 3,390 2,988 22 70 1,008 471 123 49 603 551 983 894 ],734 928 5,693 18,756 55.87 184.07 Hrs/Shft: 10.00 4,543 3,578 44.59 35.1 l Cal: 510 WC: NONE PROFILE Profilograph of Deck Surface Quan: 0.26 YD Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** 4PROFILE Profillograph Sub@101 % 2.63 DAY 1,754.000 $4,659.15 [ ] D w cn Page 35 OS/04/2012 1221 Total 5,492 13,085 24,080 17,146 7,797 91,087 213.55 * * U nrcvicwcd 18,756 6,378 93 1,478 172 603 SSl 983 894 1,734 928 32,571 319.64 * * U nrcvi cwcd 1,729,245 1,729,245 1,729,245 1,729,245 4.43 4.43 ** Unrevicwed 4,659 4,659 4,659 4,659 17,919.81 17,919.81 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit BID [TEM = 4191 Description = ERECT PC DK SEGS _____> ltem Totals: 4191 - ERECT PC DK SECS $4,565,501.15 3.2904 MH/M3 33,717.72 MH 445.545 ] 0247 M3 Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Page 36 OS/04/2012 1221 Total BL Unit = M3 Takeoff Quan: 10,247.000 F,ngr Quan: 10,247.000 [ 73.25 ] 1,103,833 72,530 162,636 537,579 531,739 2,157,185 4,565,501 107.72 7.08 15.87 52.46 51.89 210.52 445.55 BID ITEM = 4192 BL Dcscription = 96" FIB GIRDFRS Unit= M TakeoffQuan: 14,408.000 Engr Quan: 14,408.000 367301 Precast Beams Quan: 289.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** � Al W4 PC Placing 96333 CH Prod: 3.0000 US V 2PCGFIB96 96" FIB GIRDERS@107% 14,408.00 M 1,050.000 v 804380 400 AMP WELDER 1.00 963.33 HR 11.250 84303R American 9320 250 T 2.00 1,926.67 HR 291.660 8TRUSS Dea] girder trus & po 0.15 HR l 50,000.000 IWOI Ironwarker Foreman 1.00 963.33 MH 28.000 IW02 IronwarkerJorneyman 6.00 5,780.00 MH 26.000 LA02 Laborer,Sl<illed 2.00 ],926.67 MH 14.500 OP05 Operator, Crane>140 T 2.00 1,926.67 MH 28.000 OPl2 Oilcr 2.00 1,926.67 MH 14.000 $17,240,341.60 43.3333 MH/EA 12,523.3400 MH []089] 3.3333 Hr/Unit 96.3330 Shifts 433334 MH/Unit 367310 S& P Steel x Bracing Quan: 427.00 EA ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** A 1 W3 Rebar/ Ironworker Crew 711.66 CH Prod: 6.0000 US 2MISCSTEFL Misc steel@107% 117.44 TON 1,500.000 804040 185 CFM 170 HP %0 1.00 71 1.67 HR 18.520 IWOI IronworkerForeman 1.00 711.67 MH 28.000 IW02 IronwarkerJorneyman 4.00 2,846.68 MH 26.000 $342,399.05 8.3333 MH/EA 3,5583500 MH [ 242.001 ] 1.6667 Hr/Unit 71.1660 Shifts 83334 MH/Unit ____> Item Totals: 4192 - 96" FIB GIRDERS $] 7,582,740.65 l.l 16] MH/M 16,081.69 MH [ 29.0] 6] 1,220.346 14408 M D w rn Lab Pcs: 13.00 Eqp Pcs: 3.00 16,187,388 1,830 9,007 305,589 256,343 22,500 43,236 242,126 46,470 81,974 43,877 457,68416,187,388 329,919 265,351 1,583.68 56,011.72 1,141.59 918.17 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 5.00 Eqp Pcs: 1.00 188,491 2,719 31,941 119,248 151, l 89 188,491 354.07 441.43 608,873 16,375,879 42.26 1,136.58 2,719 6.37 332,638 265,351 23.09 18.42 **Unrcvicwcd ] 6,187,388 10,837 561,933 22,500 43,236 242,] 26 46,470 81,974 43,877 ] 7,240,342 59,655.16 **Unreviewed 188,491 2,719 31,941 119,248 342,399 801.87 ] 7,582,741 1,220.35 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BIDITEM = 4193 BL Description = 45" FIB GTRDERS Unit= M TakeoffQuan: 466.000 Engr Quan: 466.000 367301 Precast Beams Quan: 18.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** Al W4 PC Placing 40.00 CH Prod: 4.5000 US 2PCGFIB45 45" FIB GIRDERS@107% 466.00 M 690.000 804380 400 AMP WELDER 1.00 40.00 HR 11.250 84303R American 9320 250 T 2.00 80.00 HR 291.660 8TRUSS Deal girder trus & po 0.00 HR 150,000.000 iW01 lronworker Fareman 1.00 40.00 MH 28.000 IW02 lronwarker Jorneyman 6.00 240.00 MH 26.000 LA02 Labarer,Skilled 2.00 80.00 MH 14.500 �OPOS Operator, Crane>140 T 2.00 80.00 MH 28.000 V OP12 Oiler 2.00 80.00 MH 14.000 �$386,834.76 28.8888 MH/EA 520.0000 MH [ 726 ] 22222 Hr/Unit 4.0000 Shifts 28.8889 MH/Unit 367310 S& P Steel x Bracing Quan: 27.00 EA ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** A1 W3 Rebar/ Ironworker Crew 44.99 CH Prod: 6.0005 US 2MISCSTEEL Misc steel@107% 7.43 TON 1,500.000 804040 185 CFM 170 HP %0 1.00 45.00 HR 18.520 IWO1 Ironworker Foreman 1.00 45.00 MH 28.000 IW02 IronworkerJorneyman 4.00 179.99 MH 26.000 $21,656.56 8.3329 MH/EA 224.9900 MH [ 241.989 ] 1.6663 Hr/Unit 4.4990 Shifts 83330 MH/Unit _____> Item Totals: 4193 - 45" FIB GIRDERS $408,491.32 1.5986 MH/M 744.99 MH [ 42.064 ] 876.591 466 M BID ITEM = 4210 Dcscription = PT STRAND IN DK SF,GS 22600 PT longitudinal D w � Lab Pcs: 13.00 Eqp Pcs: 3.00 344,048 76 374 ] 2,689 10,644 1,795 10,054 ],930 3,404 1,822 ] 9,004 344,048 12,765 11,018 1,055.79 19,113.77 709.16 612.11 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 5.00 Eqp Pcs: 1.00 11,925 172 2,020 7,540 9,560 11,925 354.06 441.67 28,564 355,973 61.30 763.89 172 6.37 12,937 ll,018 27.76 23.64 Unit= KG TakcoffQuan: 15,203.000 Engr Quan: 15,203.000 Quan: 15,202.99 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE Page 37 OS/04/2012 1221 Total * * U nrcvi cwed 344,048 450 23,333 1,795 l 0,054 1,930 3,404 1,822 386,835 21,490.82 * * U nrcvicwcd 11,925 ]72 2,020 7,540 21,657 802.09 408,491 876.59 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4210 Description = PT STRAND IN DK SEGS Unit = KG Takeoff Quan: PTS 5 Man PT Crew 47.50 CH Prod: 64.0001 UM 2PTGROUT PT Grout Material@l07% 1.97 M3 300.000 2PTSRACC PT Strand Accesso@107% 7.60 TE ] 50.000 2PTST Supply PT strand@107% 15,20298 KG 3.100 3PTEQUIP PT Equipment@107% 0.01 LS 200,000.000 ] 5,203.000 Fngr Quan: Lab Pcs: 5.00 Eqp Pcs 632 1,220 50,428 2,140 iW01 Ironworkcr Foreman 2.00 95.02 MH 28.000 4,265 IWOlI IronwarkerForeman 1.00 47.51 MH 28.000 2,132 LA02 Laborer,Skilled 2.00 95.02 MH 14.500 2,292 $63,109.30 0.0156 MH/KG 237.5500 MH [ 0388 ] 8,689 52,280 2,140 0.0031 Hr/Unit 4.7500 Shifts 0.0156 MH/Unit 0.57 3.44 0.14 _____> Item Totals: 4210 - PT STRAND IN DK SEGS $63,109.30 O.O156 MH/KG 237.55 MH [ 0388 ] 8,689 52,280 2,140 ,� 4.151 15203 KG 0.57 3.44 0.14 v � 15,203.000 0.00 BID ITEM = 4230 Description = PT BAR IN DK SEGS Unit= KG Tal<eotFQuan: 619,020.000 F.ngr Quan: 619,020.000 4230 PT Bars in superstructure Quan: 619,020.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE Use 40 mhr/ton or SOlb/mhr PTS 5 Man PT Crew 3,095.15 CH Prod: 39.9993 UM Lab Pcs: 5.00 2PTBAR PT Bar supply@107% 619,020.00 KG 5.000 3,311,757 IWO] ]ronworker Foreman 2.00 6,190.31 MH 28.000 277,833 iW011 Ironwarker Foreman 1.00 3,095.15 MH 28.000 138,916 LA02 Labarer,Skilled 2.00 6,190.31 MH 14.500 149,307 $3,877,812.06 0.0250 MH/KG 15,475.7700 MH [ 0.622 ] 566,055 3,311,757 0.0050 Hr/Unit 309.5150 Shifts 0.0250 MH/Unit 0.91 535 _____> Item Totals: 4230 - PT BAR IN DK SEGS $3,877,812.06 0.0250 MH/KG 15,475.77 MH [ 0.622 ] 566,055 3,311,757 6.264 619020 KG 0.91 5.35 •. Eqp Pcs: 0.00 Page 38 OS/04/2012 1221 Total 632 1,220 50,428 2,140 4,265 2,132 2,292 63,109 4.15 63,109 4.15 3,311,757 277,833 13 8,916 149,307 3,877,812 626 3,877,812 6.26 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit BIDITEM = 4250 Description = SEG CASTING & ERECTION EQUIP 4250 PC seg erection equipment Assume that two 100t travel lifts req @#375K/ ea. 3FSEG010 2-Lane EB Seg For c�i l07% 3.00 EA 3FSEG020 2-Lane Pier Seg F@l07% 1.00 EA 3SEGLIFT SegmentLiftingD@107% 4.00 EA 86005C Straddle Crane -60T 2.00 LS $1,830,700.00 Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Unit= LS TakeoffQuan: 1.000 Engr Quan: Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 250,000.000 802,500 200,000.000 214,000 15,000.000 64,200 375,000.000 750,000 [ ] 1,080,700 750,000 _____> Item Totals: 4250 - SEG CASTING & ERECTION EQUIP � $1,830,700.00 � ],830,700.000 1 LS O BIDITEM = 4260 Description = GROOVING DF.CK GRIND Grinding Sub 4GRIND Grinding Sub@101% $] 85,283.49 BID TTEM = 4270 Description = POT BEARINGS 4270 Pot Bearings FRM22 Expansion Joint Crew #3 2BRNG031 EXP (>8900 KN)@107% 84515R 45 Ton R.T. (RT745) 84900C 200 Amp Wclder CA01 Carpenter Foreman D w � 1,080,700.00 750,000.00 [ ] 1,080,700 750,000 1,080,700.00 750,000.00 Unit= M2 TakeoffQuan: 52,414.000 Engr Quan. Quan: 52,414.00 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE 52,414.00 M2 3.500 Ll 550.00 CH 110.00 EA 1.00 550.00 HR 1.00 550.00 HR 1.00 550.00 MH 1.000 52,414.000 Page 39 OS/04/2012 1221 Total 802,500 214,000 64,200 750,000 1,830,700 1,830,700.00 1,830,700 1,830,700.00 185,283 185,283 185,283 185,283 3.54 3.54 Unit= LS TakeoffQuan: 1.000 Engr Quan: 1.000 Quan: 110.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE Prod: 2.0000 US Lab Pcs: 6.00 Eqp Pcs: 2.00 l 2,285.000 1,445,945 100.610 23,821 31,515 4.120 616 1,650 23.000 20,247 1,445,945 55,336 2,266 20,247 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report BID [TEM = 4270 Description = POT BEARINGS Unit = LS CA02 Carpenter Journeyman 2.00 1,100.00 MH 21.000 IW02 IronwarkerJorneyman 1.00 550.00 MH 26.000 LA03 Laborer, unskilled L00 550.00 MH 13.000 OP02 Operator,Crane<50 T 1.00 550.00 MH 26.000 $1,618,004.89 30.0000 MH/EA 3,300.0000 MH [ 715 ] 5.0000 Hr/Unit 55.0000 Shifts 30.0000 MH/Unit _____> Item Totals: 4270 - POT BEARINGS $],618,004.89 3,300.0000 MH/LS 3,300.00 MH [ 78650 ] 7,618,004.890 l LS Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract TakeoffQuan: 1.000 Engr Quan: 1.000 37,260 23,040 12,064 21,847 114,459 ],445,945 1,040.54 13,144.95 l l 4,459 1,445,945 1 ] 4,458.89 1,445,944.50 24,437 33,165 222.15 301.50 24,437 33,]65 24,436.50 33,165.00 � B�D ITEM = 4275 BL �Description= ELASTOMF,TRICBEARINGPADS Unit= F,A TakeoffQuan: 6]4.000 Eng Quan: 6]4.000 4270 Bearing Pads Quan: 614.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from RPAMLICO2012 ***** FRM22 Expansion Joint Crew #3 614.00 CH Prod: 10.0000 US Lab Pcs: 3.00 Eqp Pcs: 0.00 2BRNU031 EXP (>8900 KN)@107% 614.00 EA 2,000.000 1,313,960 CA02 Carpenter Jowmeyman 2.00 1,228.00 MH 21.000 41,596 LA03 Laborer,unskilled 1.00 6]4.00 MH 13.000 13,468 $1,369,024.09 3.0000 MH/F.A 1,842.0000 MH [ 60.5 ] 55,064 1,313,960 1.0000 Hr/Unit 61.4000 Shifts 3.0000 MH/Unit 89.68 2,140.00 _____> Item Totals: 4275 - ELASTOMETRIC BEARING PADS $1,369,024.09 3.0000 MH/EA 1,842.00 MH [ 60.5 ] 55,064 1,313,960 2,229.681 6l4 EA 89.68 2,140.00 BID ITEM = 4280 Description= EXPANSIONJOINTS Unit= 4280 Expansion Joints Quan ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** D � 0 BL M TakeoffQuan: 174.000 Engr Quan: 174.000 174.00 M Hrs/Shft: 10.00 Cal: 510 WC: NONE Page 40 OS/04/2012 1221 Total 37,260 23,040 12,064 21,847 1,618,005 14,709.14 1,618,005 1,618,004.89 **Unrevicwcd 1,313,960 41,596 l 3,468 1,369,024 2,229.68 ],369,024 2,229.68 * * U nrcvi ewcd DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4280 BL Description = EXPANSION JOINTS Unit = M TakeoffQuan: 174.000 Engr Quan: 174.000 FRM22 Expansion Joint Crew #3 290.00 CH Prod: 0.] 000 UM Lab Pcs: 6.00 Eqp Pcs: 2.00 2EXPJT-M Modular Expansion@107% 174.00 M 4,630.500 862,106 845] SR 45 Ton R.T. (RT745) 1.00 290.00 HR ] 00.610 12,560 ] 6,617 84900C 200 Amp Welder 1.00 290.00 HR 4.120 325 870 CA01 Carpenter Foreman 1.00 290.00 MH 23.000 10,676 CA02 Carpenter Joumeyman 2.00 580.00 MH 21.000 19,646 IW02 IronwarkerJomeyman 1.00 290.00 MH 26.000 12,148 LA03 Laborcr, unskilled 1.00 290.00 MH 13.000 6,361 OP02 Operator,Crane<50 T 1.00 290.00 MH 26.000 1],520 $952,829.24 10.0000 MH/M 1,740.0000 MH [ 238.333 ] 60,351 862,106 12,885 17,487 1.6667 Hr/Unit 29.0000 Shifts 10.0000 MH/Unit 346.85 4,954.64 74.05 100.50 _____> Item Totals: 4280 - EXPAN5ION JOINTS ,� $952,829.24 10.0000 MH/M 1,740.00 MH [ 238.333 ] 60,351 862,106 12,885 17,487 N 5,476.030 174 M 346.85 4,954.64 74.05 100.50 BIDITEM = 4290 Description = ACCESS SYSTEM 4290 Access System 4METAL Miscell. metal@101% $10,94491 BID ITEM = 4300 Dcscription = APPROACH SLABS 4300 Approach Slabs 4CONC Concrete-Sub@101% $33,914.79 D � � Unit = KG Takeoff Quan: 9,262.000 Engr Quan: Quan: 9,262.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE 9,262.00 KG 1.170 �l Unit = LS TakeoffQuan: 1.000 F,ngr Quan: Quan: 41.00 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE 41.00 M3 819.000 �l Page 41 OS/04/2012 1221 Total 862,106 29,177 1,195 l 0,676 19,646 12,148 6,361 11,520 952,829 5,476.03 952,829 5,476.03 9,262.000 10,945 10,945 10,945 10,945 1.18 1.18 1.000 33,915 33,915 33,915 33,915 827.19 827.19 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit BIDITEM = 4310 Description = TWO BAR METAL RAIL 4310 Two bar metal rail 4GR Guard Rail-Sub@l Ol % $7,540,748.88 4311 Two bar metal rail-Fishing Pier 4GR Guard Rail-Sub@10] % 9,]20.00 M 40.00 M $33,073.46 d '____> Item Totals: 4310 - TWO BAR METAL RAIL � � $7,573,82234 826.837 9160 M Cost Report Unit Cost Unit = M Quan: 9,120.00 M 818.650 �� Quan: 40.00 M 818.650 �l � Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract TakeoffQuan: 9,160.000 Engr Quan: 9,160.000 Hrs/Shft: 10.00 Cal: 510 WC: NONE Hrs/Shft: 10.00 Cal: 510 WC: NONE Page 42 OS/04/2012 1221 Total 7,540,749 7,540,749 7,540,749 7,540,749 826.84 826.84 33,073 33,073 33,073 33,073 826.84 826.84 7,573,822 7,573,822 826.84 826.84 BID ITEM = 4320 Description = 355MM X 800MM CONC PARAPET Unit= M TakeoffQuan: 8,858.500 Engr Quan: 8,858.500 4305 S& P concrete Jersey Barrier Quan: 2,516.00 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE CNCO2 Conc Crew w/35 Ton RT 513.46 CH Prod: 0.7000 UM Lab Pcs: 7.00 F,qp Pcs: 5.00 2C0006 5000 PSI Concrete@107% 2,641.80 M3 ] 57.200 444,36] 84520R 35 Ton R.T. (RT635C) 1.00 513.47 HR 79.870 ] 8,572 22,439 85000C 5 KW GENERATOR ].00 513.47 HR 4.550 565 1,771 85320C Concr bucket 1.-5-3 C 1.00 513.47 HR 12.090 4,231 1,977 85360C Hi-Cycle Concrete Vibr 2.00 1,026.94 HR 1.410 1,037 41 l CM02 Concrete Finisher Journeym 1.00 513.47 MH 18250 15,189 LA01 Laborer Foreman 1.00 513.47 MH 16.500 13,880 LA02 Laborer,Skilled 2.00 ],026.94 MH 14.500 24,769 LA03 Laborer, unskilled 2.00 1,026.94 MH 13.000 22,526 OP02 Operator,Crane<50 T 1.00 513.47 MH 26.000 20,396 $592,124.69 1.4285 MH/M3 3,594.2900 MH [ 25.985 ] 96,760 444,361 24,405 26,598 0.2041 Hr/Unit 51.3460 Shifts 1.4286 MH/Unit 38.46 176.61 9.70 10.57 D � N 444,361 41,011 2,336 6,208 1,448 15,189 13,880 24,769 22,526 20,396 592,125 23534 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract B�D ITEM = 4320 Description= 355MM X 800MM CONC PARAPF,T Unit= M Takeot�fQuan: 8,858.500 F.ng Quan: 8,858.500 4306 F& S Jersey Barrier Quan: 14,174.00 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE FRM02 Formwork Crew w/ 35 Ton RT 2,024.85 CH Prod: 1.0000 UM Lab Pcs: 7.00 Eqp Pcs: 2.00 3FM METAL FORMS@107% 320.00 M2 550.000 l 88,320 84520R 35 Ton R.T. (RT635C) 1.00 2,024.86 HR 79.870 73,239 88,486 85000C 5 KW GENERATOR 1.00 2,024.86 HR 4.550 2,227 6,986 CA01 Carpenter Foreman 1.00 2,024.86 MH 23.000 74,542 CA02 Carpenter Journeyman 4.00 8,099.43 MH 21.000 274,353 LA03 Laborer, unskilled 1.00 2,024.86 MH 13.000 44,415 OP02 Operator,Crane<50 T 1.00 2,024.86 MH 26.000 80,432 $833,000.80 1.0000 MH/M2 14,174.0100 MH [ 22.943 ] 473,742 188,320 75,467 95,472 � 0.1429 Hr/Unit 202.4850 Shifts 1.0000 MH/Unit 33.42 13.29 532 6.74 � � 4307 Rub & Finish Jersey Barrier Quan: 14,173.56 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE AFNSH3 3 man Finisher Crew 2,024.79 CH Prod: 2.0000 UM Lab Pcs: 3.50 Eqp Pcs: 0.00 3CURF. Curing@]07% 14,173.56 M2 0.550 8,341 CMO1 Concrete Finisher Foreman 0.50 1,012.40 MH 2O.250 32,897 CM02 Concrete Finisher Journe}nn 3.00 6,074.38 MH 18.250 179,688 $220,926.50 0.5000 MH/M2 7,086.7800 MH [ 10.195 ] 212,585 8,341 0.1429 Hr/Unit 202.4790 Shifts 0.5000 MH/Unit 15.00 0.59 4308 S& P stainless rebar Quan: 125,800.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE 2SRASS Resteel Acccssori@107% ]25,800.00 KG 0.250 33,652 2SRSS Reinforcing Steel@l07% 125,800.00 KG 4.250 572,076 4REBARSS Stainless Steel R@101 % 125,800.00 KG 0.580 73,694 $679,420.64 [ ] 605,727 73,694 4.82 0.59 _____> Item Totals: 4320 - 355MM X 800MM CONC PARAPET $2,325,472.63 2.8057 MH/M 24,855.08 MH [ 60.401 ] 262.513 8858.5 M D � W Page 43 OS/04/2012 1221 Total 188,320 161,726 9,213 74,542 274,353 44,415 80,432 833,001 58.77 8,341 32,897 179,688 220,927 15.59 **Unrcviewed 33,652 572,076 73,694 679,421 5.40 783,088 1,050,088 ] 96,661 99,872 122,070 73,694 2,325,473 88.40 118.54 22.20 ll.27 13.78 8.32 262.51 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit BIDITEM = 4330 Description = FILTF.R FABRIC FOR DRAINAGE 4330 Filter fabric for drainage 4LAND Landscapc-Sub(c�101% $7,416.35 Cost Report Unit Cost Page 44 OS/04/2012 1221 Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Total Unit= M2 TakeoffQuan: 627.600 Engr Quan: 627.600 Quan: 627.60 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE 627.60 M2 11.700 7,416 7,416 [ ] 7,416 7,416 11.82 ll.82 BID ITEM = 4340 Description = SOLAR ARRAY SUPPORT PLATFORM Unit= LS Tal<eoffQuan: 1.000 Engr Quan: ,� 4340 Solar array support platform Quan: 3,388.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE � � 4METAL Misccll. mctal cD101% 3,388.00 KG 1.170 $4,003.60 [ ] BID TTEM = 4350 Description = TELEPHONE COND & INSF.RTS Unit= LS TakeoffQuan: 1.000 6ngr Quan: 4350 Telephone cond & inserts Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 4ELFC Electrical Subcon@101% 4,425.00 M 40.930 $] 82,926.40 [ ] BIDITEM = 4360 Description = POWER & CATV SLEF.VES & DUCTBANKS 4360 Power & CATV sleeves and ductbanks 4ELEC Electrical Subcon@101 % 4,425.00 M $104,535.76 D � � Unit = LS Takeoff Quan: 1.000 Engr Quan: Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 23.390 �] 1.000 4,004 4,004 4,004 4,004 1.18 1.18 1.000 182,926 182,926 182,926 182,926 ] 82,926.40 182,926.40 1.000 104,536 104,536 104,536 104,536 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit BID [TEM = 4360 Description = POWER & CATV SLEEVES & DUCTBANKS BIDITEM = 4370 Description = GRANITE SLOPE PAVING 4370 Granite slope paving 4LAND Landscape-Sub@101% $2,363.40 d � � BID ITEM = 4380 Description= NAVIGATION LIGHTS 4380 Navigation Lights 4ELEC Elcctrical SuUcon@101 % $23,623.90 Page 45 OS/04/2012 1221 Cost Report Unit Perm Constr Equipment Equipment Sub- Cost Labor Material Matl/Exp Ownership Operation Contract Total Unit = LS Takeoff Quan: 1.000 Engr Quan: 1.000 104,535.76 104,535.76 Unit= M2 TakeoffQuan: 200.000 EngrQuan: 200.000 Quan: 2,002.00 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE 200.00 M2 11.700 2,363 2,363 [ ] 2,363 2,363 1.18 1.18 Unit= LS TakeoffQuan: 1.000 Engr Quan: Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE ].00 LS 23,390.000 �] B�D ITEM = 5300 Description = RFMOVF. EXISTING BRIDGF. RAIL(FISHING PIER 530 REMOVE EXISTING BRIDGE RAIL 4GR-1 GUARDRAILSUB@l Ol % 732.00 M $147,864.00 D � cn 1.000 23,624 23,624 23,624 23,624 23,623.90 23,623.90 BL Unit = M TakcotiQuan: 732.000 Engr Quan: 732.000 Quan: 732.00 M Hrs/Shft: 10.00 Cal: 510 WC: NONE * * Unrevicwed 200.000 147,864 147,864 [ ] 147,864 147,864 202.00 202.00 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report BIDITEM = 5310 Description = TWO BAR METAL RAIL (FiSH PIER) Unit= M 4310 Two bar metal rail Quan: 744.00 M 4GR Guard Rail-Sub@l Ol % 744.00 M 818.650 $6]5,166.36 [ ] Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract WJB TakeoffQuan: 744.000 Engr Quan: 744.000 Hrs/Shft: 10.00 Cal: 510 WC: NONE BID ITEM = 531] WJB Description = REMOVABLE TRAFFIC BARRIER (FISH PIER) Unit= M TakeoffQuan: 12200 Engr Quan: ;� A ALW FOR REM TRAF'F BARRIER Quan: 12.20 M Hrs/Shft: 10.00 Cal: 510 WC: NONE � V 4ALWREMBARR ALW FOR REMVABL B@ 1220 M 750.000 $9,241.50 [ ] Page 46 OS/04/2012 1221 Total 6] 5,166 615,166 6]5,166 615,166 826.84 826.84 12.200 9,242 9,242 757.50 BID TTEM = 5320 WJB Description = 355MM X 800MM CONC PARAPET (FISH PIER) Unit = M Takeoff Quan: 744.000 Engr Quan: 744.000 4305 S& P concrete Jersey Barrier Quan: 2ll.34 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE CNCO2 Conc Crew w/35 Ton RT 43.12 CH Prod: 0.7000 UM Lab Pcs: 7.00 Eqp Pcs: 5.00 2C0006 5000 PSi Concrete@107% 221.78 M3 157.200 37,304 84520R 35 Ton R.T. (RT635C) 1.00 43.13 HR 79.870 1,560 1,885 85000C 5 KW GENERATOR 1.00 43.13 HR 4.550 47 149 85320C Concr bucket l.-5-3 C 1.00 43.13 HR 12.090 355 l66 85360C Hi-Cycle Concrete Vibr 2.00 86.26 HR 1.410 87 35 CM02 Concrete Finisher Journeym 1.00 43.13 MH 18.250 1,276 LA01 Laborer Foreman 1.00 43.13 MH 16.500 1,166 LA02 Laborer,Skilled 2.00 86.26 MH 14.500 2,081 LA03 Laborer, unskilled 2.00 86.26 MH 13.000 1,892 OP02 Operator,Crane<50 T 1.00 43.13 MH 26.000 1,713 $49,715.96 1.4285 MH/M3 301.9100 MH [ 25.984 ] 8,128 37,304 2,050 2,234 0.2040 Hr/Unit 4.3120 Shifts 1.4286 MH/Unit 38.46 ] 76.51 9.70 ] 0.57 D � rn **Unrcvicwcd 9,242 9,242 757.50 37,304 3,445 196 521 122 1,276 ],166 2,081 1,892 1,713 49,716 235.24 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract B�D ITEM = 5320 WJB Description= 355MM X 800MM CONC PARAPF,T (FISH PIER) Unit= M TakeoffQuan: 744.000 6ng Quan: 744.000 4306 F& S Jersey Barrier Quan: 1,190.64 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE FRM02 Formwork Crew w/ 35 Ton RT 170.09 CH Prod: 1.0000 UM Lab Pcs: 7.00 Eqp Pcs: 2.00 3FM METAL FORMS@107% 27.03 M2 550.000 15,907 84520R 35 Ton R.T. (RT635C) 1.00 170.09 HR 79.870 6,152 7,433 85000C 5 KW GENERATOR L00 170.09 HR 4.550 l 87 587 CA01 Carpenter Foreman 1.00 170.09 MH 23.000 6,262 CA02 Carpenter Journeyman 4.00 680.37 MH 21.000 23,046 LA03 Laborer, unskilled 1.00 170.09 MH 13.000 3,731 OP02 Operator,Crane<50 T 1.00 170.09 MH 26.000 6,756 $70,061.26 1.0000 MH/M2 1,190.6400 MH [ 22.943 ] 39,795 15,907 6,339 8,020 � 0.1429 Hr/Unit 17.0090 Shifts 1.0000 MH/Unit 33.42 1336 532 6.74 � � 4307 Rub & Finish Jersey Barrier Quan: 1,190.64 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE AFNSH3 3 man Finisher Crew 170.09 CH Prod: 2.0000 UM Lab Pcs: 3.50 Eqp Pcs: 0.00 3CURF. Curing@]07% 1,190.64 M2 0.550 70] CMO1 Concrete Finisher Foreman 0.50 85.05 MH 2O.250 2,764 CM02 Concrete Finisher Journe}nn 3.00 510.28 MH 18.250 15,095 $18,559.08 0.5000 MH/M2 595.3300 MH [ 10.195 ] 17,858 701 0.1429 Hr/Unit 17.0090 Shifts 0.5000 MH/Unit 15.00 0.59 4308 S& P stainless rebar Quan: 10,565.29 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE 2SRASS Resteel Acccssori@107% 10,56529 KG 0.250 2,826 2SRSS Reinforcing Steel@107% 10,565.29 KG 4.250 48,046 4RF,BARSS Stainless Steel R@101 % 10,565.29 KG 0.580 6,189 $57,061.03 [ ] 50,872 6,189 4.82 0.59 _____> IYem Totals: 5320 - 355MM X 800MM CONC PARAPET (FISH PIER) $] 95,397.33 2.8062 MH/M 2,087.88 MH [ 60.412 ] 262.631 744 M D � � Page 47 OS/04/2012 1221 Total 15,907 13,585 774 6,262 23,046 3,731 6,756 70,061 58.84 701 2,764 15,095 18,559 15.59 **Unrcviewed 2,826 48,046 6,189 57,061 5.40 65,781 88,176 16,608 8,389 10,254 6,189 195,397 88.42 118.52 2232 ll.28 13.78 8.32 262.63 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report BIDITEM = 5325 Description = STR IMP. TO RETAINED BRDGEPORT.(1200')( Unit= LS 5325 STR IMPR TO RETAINED PORTION OF BRIDGE Quan: 1.00 LS 4STRSUBIMPR SUB FOR STR IMROV@l ].00 LS 500,000.000 $505,000.00 [ ] BID ITEM = 9100 Description = OVERHEADS d 9200 Site Facilities - Complete � � Operators & drivers for yard equip 20000 hrs 804040 --> ] 85 CFM 170 HP 6,000.00 HR 804320 =_> 20-50 KW GENER 50- 6,000.00 HR 804380 =_> 400 AMP WELDER 6,000.00 HR 805020 --> FLATBAD TRACTO 6,000.00 HR 81 1 WTRBL 2,000.00 HR 83130C -> Water truck 2500 GA 500.00 HR 83140C --> Boom truck-12 TON 6,000.00 HR 83150C --> Lowboy 60 ton trailer 4,000.00 HR 83185C Small Vac Sweeper 500.00 HR 83400C =_> Cat 950F (170 HP) 500.00 HR 83800C =_> Bobcat 553-21 S HP 2,000.00 HR 84535R => 18 Ton R.T. (RT420) 6,000.00 HR 85 ] OSC => Pump 3-in Subm. Elect 2,000.00 HR 85335C => Sandblaster 500.00 HR 85355C =_> Concrete Conveyor 500.00 HR 85845R =_> Boat, Supe�visor(Boss) 1,000.00 HR 85850R Boat, Personnel 25 Per 1,000.00 HR 85855R Boat, Personnel 10 Per 1,000.00 HR 86115C Light Plant 6,000.00 HR 86120C =_> Arrow Board 6,000.00 HR 8TURNTABL Turntable for Readym 2.00 EA OP02 =_> Operator,Crane<50 T 24,000.00 MH $2,562,297.60 24,000.0000 MH/LS 24,000.0000 MH •. Unit = Quan 18.520 23.890 11.250 30.830 15.000 33.640 17.980 23.000 37.420 65.070 18.120 65.450 4.560 20.670 15.760 22.220 70.090 42.070 3.370 5.450 75,000.000 26.000 [ 686400 ] Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BL TakeoffQuan: 1.000 Engr Quan: Hrs/Shft: 10.00 Cal: 510 WC: NONE LS TakeoffQuan: 1.000 Engr Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 953,338 953,338 22,920 88,200 31,440 111,900 11,400 56,]00 49,380 135,600 30,000 5,070 11,750 69,480 38,400 53,600 38,400 18,710 13,735 18,800 17,240 l 9,000 171,000 221,700 4,520 4,600 8,O10 2,325 2,680 5,200 3,420 18,800 70,090 42,070 20,220 16,200 l 6,500 l 60,500 821,685 787,275 1.000 Page 48 OS/04/2012 1221 Total * * U nrcvi cwed 505,000 505,000 505,000 505,000 505,000.00 505,000.00 1.000 ll 1,120 143,340 67,500 184,980 30,000 16,820 107,880 92,000 18,7] 0 32,535 36,240 392,700 9,120 10,335 7,880 22,220 70,090 42,070 20,220 32,700 160,500 953,338 2,562,298 DMJM Harris RBON20120PT1 Baris Lenderman Actrvity Resource BONNER 2072 REVISION ](OPTl) Description BID [TEM = 9100 Description = OVERHF,ADS I90120 Supervison - Salaricd L236 --> Project Managcr L240 =_> Project Engineer L242 --> Field F,nginc�r L243 —> Schedule Engineer L244 =_> Office Engineer L246 --> QC Engineer L248 --> Secretary L249 —> Office Manager L250 —> Clerk ,� L252 =_> Runner p $3,860,622.18 80,256.0000 MH/LS Pcs Quantity Unit Unit Cost Cost Report Unit = LS 24,000.0000 MH/Unit Quan: 1.00 LS 7,744.00 MH 62.500 7,744.00 MH 58.000 10,560.00 MH 38.500 6,000.00 MH 38.500 12,600.00 MH 38.500 4,000.00 MH 38.500 6,336.00 MH 17.000 6,336.00 MH 45.000 12,600.00 MH 17.000 6,336.00 MH 13.000 80,256.0000 MH [ 2907448.8 ] 80,256.0000 MH/Unit I90125 Supervision Hourly Quan: 1.00 LS Mechanic 3# av 30 mths x 176 hrs = 15840 hrs 4# Supers x av 30 mths x 176 hrs = 21120 hrs L165 —> Mechanic 15,840.00 MH 35.000 L232 —> General Superintendent 6,336.00 MH 58.000 L238 --> Superintendent 2],120.00 MH 45.000 L2421 =_> Party Chief 7,000.00 MH 38.000 L2423 =_> Rodman 14,000.00 MH 25.000 L2424 => Instrument man 14,000.00 MH 30.000 $3,945,70032 78,296.0000 MWLS 78,296.0000 MH [ 2963728 ] 78,296.0000 MH/Unit I90130 Project Vehicles Quan: 1.00 LS 83000C —> Pick-Up 1/2 Ton 138,000.00 HR 15.310 $2,ll2,780.00 [ ] I90150 83110C $313,680.00 D � � Mechanic budget __> Mcch.Tkr-1 TON 12,000.00 HR Quan: 1.00 LS 26.140 �l Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract TakeoffQuan: 1.000 Engr Quan: 1.000 953,337.60 821,685.00 787,275.00 Hrs/Shft: 10.00 Cal: 510 WC: NONE 614,680 573,2ll 536,606 304,890 640,269 203,260 159,857 370,973 317,898 138,978 3,860,622 3,860,622.18 Hrs/Shft: 10.00 Cal: 510 WC: NONE 804,910 468,991 1,236,576 362,544 491,400 581,280 3,945,700 3,945,700.32 Hrs/Shft: 10.00 Cal: 510 WC: NONE 622,380 1,490,400 622,380 1,490,400 622,3 80.00 I ,490,400.00 Hrs/Shft: 10.00 Cal: 510 WC: NONE 70,080 243,600 70,080 243,600 Page 49 OS/04/2012 1221 Total 2,562,297.60 614,680 573,21 1 536,606 304,890 640,269 203,260 159,857 370,973 317,898 138,978 3,860,622 3,860,622.] 8 804,910 468,991 1,236,576 362,544 491,400 581,280 3,945,700 3,945,700.32 2,] 12,780 2,112,780 2,1 12,780.00 313,680 313,680 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit BID [TEM = 9100 Description = OVERHF,ADS I90220 Subsistance 9SUB8 Subsistancc 9SUB9 Subsistance $1,368,600.00 I90225 Consumables 9DH1 Safety Supplies 9DH3 Small Tools d $369,884.29 � � I90250 Travel & Other Expenses 3ZF53 Admin/STAFF Expen@107 3ZF60 Project Signs@107% 9601 Joint venture expenses 9MEDICAL Medical Expenses 9SUB1 Air Fare, single 9TR001 Crew Relocation 9TR002 Frmn Rclocation 9TR006 Home Office travel $411,027.17 I90310 Office Supply 9SU001 Supplies 9SU005 PHOTOS 9SU008 Fedex/Postage $ ] ,669.92 I90420 Engineering Services 4ENG Engineering@101% D � 0 300.00 MO 720.00 MO 626,922.53 HR 626,922.53 HR 42.00 MO 1.00 LS 1.00 LS 1.00 LS 42.00 EA 12.00 EA 12.00 EA 42.00 MOS 42.00 MOS 42.00 MOS 42.00 MOS 1.00 LS Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Unit = LS Takeoff Quan: 1.000 Engr Quan: 1.00 70,080.00 243,600.00 Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 1,754.000 526,200 1,170.000 842,400 [ ] 1,368,600 7,368,600.00 Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 0.120 75,231 0.470 294,654 [ ] 369,884 369,88429 Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 2,000.000 89,880 5,000.000 5,350 1.170 1 87,712.000 87,712 2,924.000 122,808 1,754.000 21,048 2,924.000 35,088 1,l 70.000 49,140 [ ] 411,027 411,027.17 Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 16.370 688 5.850 246 17.540 737 [ ] 1,670 1,669.92 Quan: 1.00 DA Hrs/Shft: 10.00 Cal: 510 WC: NONE 87.713.000 Page 50 OS/04/2012 1221 Total 313,680.00 ** Unrcviewed 526,200 842,400 1,368,600 1,368,600.00 75,231 294,654 369,884 369,884.29 89,880 5,350 1 87,712 122,808 21,048 35,088 49,140 411,027 411,027.17 688 246 737 1,670 1,669.92 88,590 88,590 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 9100 Description = OVERHF,ADS Unit = LS TakeoffQuan: 1.000 Engr Quan: $88,590.13 [ ] I90610 Communications Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 805260 RADIOS 66,000.00 HR 1.010 66,660 9DCO2 Copy machine 3.00 EA ] 1,695.000 35,085 9DC05 Computer 20.00 F,A 3,509.000 70,180 9SU009 Phone/Fax 840.00 DA 81.860 68,762 9SU014 Cell Pl�one Costs 840.00 DA 58.480 49,123 $289,8]0.60 [ ] 223,151 66,660 223,150.60 66,660.00 d I90912 Testing Lab Quan: 1.00 LS Hrs/Shf't: 10.00 Cal: 510 WC: NONE � N 4ECONC ConcrcteTesting@101% 1.00 LS 58,475.000 $59,059.75 [ ] I92150 Trailers & Utilities Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 805140 --> OFFICE TRAILER 42.00 MOS 921.380 26,487 14,920 805141 Engs/clients office 1.00 LS 150,000.000 160,500 85225C Tool/Office Vans 45' 42.00 MOS 500.000 21,000 9DH4 Ice and Water 626,922.53 HR 0.175 109,711 9SU002 Electric 42.00 MOS 585.000 24,570 9SU003 Portajons 42.00 MOS 585.000 24,570 9SU004 Dumpsters 42.00 MOS 1,170.000 49,140 9SU007 Water/Sewer 42.00 MOS 585.000 24,570 9SU015 OfficeCleaning 42.00 MOS 1,170.000 49,140 $504,608.25 [ ] 281,701 207,987 14,920 281,701.44 207,986.73 14,920.08 I94010 Bond & Insurance Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE To use auot calculation for buildre's risk add bid marup percent to the adjustment field 3Z130 Builders Risk@107% 220,000.00 YD 1.045 246,040 9GA0] Insurance Costs 220,000.00 YD 6.844 1,505,680 9TX001 Pennits 1.00 K$ 29,238.000 29,238 9TX003 Performance Bond 220,000.00 YD 6.935 1,525,898 D � � Page 51 OS/04/2012 1221 Total 1.000 88,590 88,590 88,590.13 88,590.13 ** Unrcvicwed 66,660 35,085 70,180 68,762 49,] 23 289,811 289,810.60 59,060 59,060 59,060 59,060 59,059.75 59,059.75 41,407 160,500 21,000 109,71 l 24,570 24,570 49, l 40 24,570 49,140 504,608 504,60825 246,040 1,505,680 29,238 1,525,898 DMJM Harris RBON20120PT] BONNER 2072 REVISION ](OPTl) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Page 52 OS/04/2012 1221 Total BID [TEM = 9100 Description = OVERHF,ADS Unit = LS TakeoffQuan: 1.000 Engr Quan: 1.000 $3,306,856.08 [ ] 3,306,856 3,306,856 3,306,856.08 3,306,856.08 I94020 Taxes & Duties Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 9AGENT Agent Fees 4.00 EA 585.000 2,340 2,340 9TX008 Equipment Tax, 4% ] 70,000.00 C 1.754 298,180 298,] 80 $300,520.00 [ ] 300,520 300,520 300,520.00 300,520.00 _____> Item Totals: 9100 - OVFRHFADS $]9,495,706.29 182,552.0000 MH/LS 182,552.00 MH [ 6557576.8 ] 8,759,660 6,263,410 1,788,792 2,536,195 147,650 ]9,495,706 �]9,495,706.290 l LS 8,759,660.10 6,263,409.50 I,788,791.73 2,536,195.08 ]47,649.88 19,495,706.29 � W $188,219,438.64 *** Report Totals *** 618,351.32 MH 23,736,231 66,990,397 18,803,001 14,196,393 10,881,038 53,612,380 188,219,439 »> indicates Non Additive Activity ------Report Notes:------ The estimate was prepared with TAKEOFF Quantities. This report shows TAKEOFF Quantities with the resources. "Unreviewed" Activities are marked. Bid Date: Owner: F,ngineering Firm: Estimator-In-Charge: * on units of MH indicate average labor unit cost was used rather than base rate. [] in the Unit Cost Column = Labor Unit Cost Without Labor Burdens In equipment resources, rent o and EOE o not = 100o are represented as XXXoYYY where XXX=Rento and YYY=EOEo ------Calendar Codes------ 508 REG 40 HR WF,EK DAY SHIFTS 510 M-F 10 HOURS PER DAY (Default Calendar) 610 MO - SA 10 HR/DAY OFF OFFSHIFT D � N B-2500 Pamlico Bridge Cost Study BONNER PARALLEL BRIDGE COST REPORT - OPTION 2 (Revision 2 of AECOM Estimate 04/26/12 ; ., DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 207 2 REVISION 2(OPT 2) Description Quantity Pcs Unit BIDITEM = 2900 Description = CONSTR & RI;MOVAL OF TEMP ACCI:SS Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Unit= LS TakeoffQuan: 1.000 F,ngr Quan: 1.000 100 Install & remove trestle for 250t Marine Quan: 6,000.00 LF Hrs/Shft: 10.00 Cal: 510 WC: NONE 1400m req + 20 fingers x 20m = 1800m or 60001f Buy a total of 2336' = 73# section x 32' as GLF have 73# available. From info from K. Latham broker assume wt/lf = 10291bs @$0.50 =$515/lf Assume 24"dia x 1/2" wall pipe piles x 60'= 1261b/lf x$0.50 =$63/lf. Pipe pile cost/lf 2# x 60'x $63/lf =$7560/16'=$472.5/lf or 14#x23# x60 = 193201f say 200001f Assume 12" x 12" oak decking @$10/sf x 35' _$350/lf Trestle & dk cost/lf =$865/lf x 2336 lf =$2020640 salvage @ SOo say lm. Alternatively use GLF trestle from Wilmington $2,100,000 x SOo =$1,O50M. � Erect & remove - figure trestle at piers assume 23# x 96'= 2304'. i Assume that av of 4# 24" d pipe piles @16'cc are driven for 1 x 32'section & 32'of � trestle can be installed and removed in two days i.e 161f /day I& R Haul say 10001bs /lf x 2336 23360001bs/44000 = 53 lds x$1000 =$53,000. PILE Pile Crew Sheet 3,750.00 CH Prod: 16.0000 US Lab Pcs: 3PIPEP�LE 24" pipe pilE@107% 52,08333 LF 63.000 3SALVAGE Salvage pipe pile@107% 52,083.33 LF -20.000 3SUPPLIES Welding/slings/mi@107% 375.00 DAY 500.000 3TRESTLE Trestle@l07% 6,000.00 LF 450.000 4HAUL Haul Carolina to@] O1% 138.02 TRIP 1,169.500 84308R American 7260 100T 1.00 3,750.00 HR 163.010 8491 OC 400 Amp Welder 1.00 3,750.00 HR 1].250 85130C Pump 10 in Cent 350 1.00 3,750.00 HR 35.870 85610C lce 4l6 Vibro 65T 1.00 3,750.00 HR 109.6] 0 85655C Delmag D30-32 & LEAD 1.00 3,750.00 HR 82.960 OPO4 Operator, Crane 91T 1.00 3,750.00 MH 28.000 ] 59,552 OP12 Oiler 1.00 3,750.00 MH 14.000 85,401 PDO1 Piledriver Foreman 1.00 3,750.00 MH 23.000 136,589 PD02 PiledriverJourneyinan 3.00 ll,250.00 MH 21.000 377,071 $7,917,745.77 3.7500 MH/LF 22,500.0000 MH [ 88 ] 758,613 0.6250 Hr/Unit 375.0000 Shifts 3.7500 MH/Unit 126.44 104 S,I & R timber mats@ N& S ends Quan: 50,000.00 SF Hrs/Shft: 10.00 No salvage allowed as it is likely that mats will be damaged or buried. assume 395m @ N& 329m @ s = 724m 724m x 10m- 7240m2 or 80000sf AOP1 45 Ton RT w/Operator 320.00 CH Prod: 250.0000 UH Lab Pcs: D � W Page 1 OS/04/2012 12:08 Total 6.00 Eqp Pcs: 5.00 3,510,937 3,510,937 1,1 14,583 -1,ll4,583 200,625 200,625 2,889,000 2,889,000 163,029 163,029 314,288 297,000 611,288 7,125 35,063 42,188 52,950 81,563 134,513 153,225 257,813 411,038 ] 78,538 132,563 31 ],] 00 159,552 85,401 136,589 377,071 5,485,979 706,125 804,000 163,029 7,917,746 914.33 117.69 134.00 27.17 1,319.62 Cal: 510 WC: NONE 4.00 Eqp Pcs: 2.00 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 207 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report BID [TEM = 2900 Description = CONSTR & REMOVAL OF TEMP ACCESS Unit = LS 3TTMBER M Timber mats 5'@l07% 80,000.00 SF ] 0.000 8321 OC Cat D6H(] 70 Hp) 1.00 320.00 HR ] 08.280 845]SR 45 Ton R.T. (RT745) 1.00 320.00 HR 100.610 LA02 Laborer,Slcilled 2.00 640.00 MH 14.500 OP02 Operator,Crane<50 T 2.00 640.00 MH 26.000 $963,703.55 0.0160 MH/SF 1,280.0000 MH [ 0.356 ] 0.0040 Hr/Unit 32.0000 Shifts 0.0]60 MH/Unit 230001 Mob/Demob Dredge Quan: 1.00 LS 4DREDGINGM Mob & dcmob dredg@101 1.00 LS 175,425.000 $]77,179.25 [ ] d � 230002 Dredge and Dispose Quan: 1.00 CY Assume cost to keep Oregon Inlet open is $8m /yr x 3 yrs =$24m as a check cost 4DRF.DGING Mob and demob@l01% 300,000.00 M3 87.710 $26,576,130.00 [ ] Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract TakeoffQuan: 1.000 Engr Quan: 1.000 856,000 15,674 ] 8,976 13,859 18,336 241 Select fill & minor excav Quan: 25,000.00 CY assume same area as timber mats 724 m x lOm =7240m2 7240 x 1 m= 7240m3 or 15000tonne of agregate F.XCV Excavate w/Backhoe 500.00 CH Prod: 500.0000 US 2B0050.20 #5 (1-U2)@]07% 15,000.00 TON 20.000 804480 D-6 DOZER 140 HP 1.00 500.00 HR 96.000 804560 LOADER 3-CY 130 1.00 500.00 HR 52.860 83165C Dump Truck 12 CY 1.00 500.00 HR 80.600 84225C Cat CS563 7' Vib Rolle 1.00 500.00 HR 59.790 LA01 Laborer Foreman 1.00 500.00 MH 16.500 LA02 Laborer,Skilled 1.00 500.00 MH 14.500 LA03 Labarer, unskilled 1.00 500.00 MH 13.000 OP08 Operator, Backlioe 2.00 1,000.00 MH 23.000 $537,653.43 0.1000 MH/CY 2,500.0000 MH [ 1.98 ] 0.0200 Hr/Unit 50.0000 Shifts 0.1000 MH/Unit 2900 Marine equip & crew for all opper Marine Quan: 1.00 LS D � � 15,436 25,422 40,859 856,000 29,533 37,312 0.51 10.70 0.37 0.47 Hrs/Shft: 10.00 Cal: 510 WC: NONE Hrs/Shft: 10.00 Cal: 510 WC: NONE Hrs/Shft: 10.00 Cal: Sl0 WC: NONE Page 2 OS/04/2012 12:08 Total 856,000 34,650 32,195 15,436 25,422 963,704 ] 2.05 177,179 177,179 177,179 177,] 79 177,] 79.25 177,179.25 26,576,130 26,576,] 30 26,576,130 26,576,130 26,576,130.00 26,576,130.00 Lab Pcs: 5.00 Eqp Pcs: 4.00 32 ] ,000 22,]25 25,875 ] 0,155 l 6,275 9,275 31,025 11,695 18,200 13,516 l 2,060 10,967 35,485 72,028 321,000 53,250 91,375 2.88 12.84 2.13 3.66 Hrs/Shft: 10.00 Cal: 510 WC: NONE 321,000 48,000 26,430 40,300 29,895 13,516 12,060 10,967 35,485 537,653 21.51 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNSR 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report BID [TEM = 2900 Description = CONSTR & REMOVAL OF TEMP ACCESS Unit = LS Assume access stn 277 - 281 = 395m is road & mats Stn 281 - 295 = 1400m is trestle with fingers Stn 295 -318 is dredged & marine wk. Stn 318 - 321 = 329m is road & mats 803260 —> Carpenter barge 32'xl 9,000.00 HR 5].150 803340 =_> BARGE 140x45x8-6 18,000.00 HR 102.130 803370 => BARGE 150x52x9-3 15,200.00 HR l 16.610 803440 =_> BARGF, 250x72x16 3,000.00 HR 385.070 803460 => 12000 LB WINCH 12 18,000.00 HR 9.680 803480 =_> 50000 LB WINCH G 15,200.00 HR 15.550 803500 => 70000 LB WINCH R 3,000.00 HR 26.130 803560 => SEADOZER I 550 H 15,800.00 HR ] 24.050 803620 SKIFF 18' 30,000.00 HR 2.000 d 803680 OUTBOARD MOTOR 25 30,000.00 HR 9.000 � 803700 OUTBOARD MOTOR ] 50 9,000.00 HR 21.000 � L205 =_> Captain 15,800.00 MH 28.200 L215 => Deck Hand 31,600.00 MH 2l .630 $]0,472,596.14 47,400.0000 MWLS 47,400.0000 MH [ 1241974.8 ] 47,400.0000 MH/Unit 910001 Mobilize Equipment Marine Quan: 1.00 LS 4HAUL.01 HAUL Carolina@l O1 % ].00 LS 584,750.000 $590,597.50 [ ] _____> Item Totals: 2900 - CONSTR & REMOVAL OF TEMP ACCESS $47,235,605.64 73,680.0000 MH/LS 73,680.00 MH [ 1847986.8 ] 47,235,605.640 1 LS Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract TakeoffQuan: 1.000 Engr Quan: 1.000 378,000 82,350 1,521,155 445,869 1,355,232 417,240 892,765 343,310 97,740 76,500 146,680 89,680 51,840 26,550 605,] 40 1,354,850 60,000 27Q000 189,000 787,309 1,281,387 2,068,696 5,567,552 2,836,349 2,068,695.64 5,567,552.00 2,836,348.50 Hrs/Shft: 10.00 Cal: 510 WC: NONE Page 3 OS/04/20] 2 l 2:08 Total 460,350 1,967,024 1,772,472 1,236,075 174,240 236,360 78,390 1,959,990 60,000 270,000 189,000 787,309 1,281,387 10,472,596 ] 0,472,596.14 590,598 590,598 590,598 590,598 590,597.50 590,597.50 2,940,196 32],000 6,341,979 6,356,460 3,769,036 27,506,935 47,235,606 2,940,196.04 321,000.00 6,341,979.02 6,356,459.80 3,769,035.50 27,506,935.28 47,235,605.64 BIDITEM = 2910 Description = REMOVAL OF EXISTING BRIDGE Unit = LS TakeoffQuan: Assume length 4.25km x llm =46,750M2-THIS ORIGINAL ASSUMPTION AS MEASURED IN 2012 VIA ON SCREEN TAKEOFF: D � cn 1.000 Engr Quan: 1.000 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 207 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Page 4 OS/04/2012 12:08 Total BID [TEM = 2910 Description = REMOVAL OF EXISTING BRIDGE Unit = LS TakeoffQuan: 1.000 Engr Quan: 1.000 **THE TOTAL LENGTH OF THE EXISTING BRIDGE IS 12,952 LF; THE EXISTING BRIDGE WIDTH VARIES. 1. FOR W= 40'-O" (SOUTH APPROACH W/ CATWALK) L= 1,230 LF. A= 1,230 X 40 = 49,200 SF. 2. FOR W= 33'-6" (MIDDLE PORTION) L= 10,423 LF. A= 10,423 X 33.5 = 349,171 SF. 3. FOR W= 40'-10" (NORTH APPROACH)L = 1,299 LF. A= 1,299 X 40.83 = 53,043 SF. TOTAL AREA =(49,200 + 349,171 + 53,043) = 451,414 SF X 0.0929 = 41,937 M2. HOWEVER, WE DO NOT KNOW WHAT PREVIOUS ASSUMPTIONS WERE MADE IN DETERMINING THE AVG WIDTH FOR THE BID QUANTITY TO ACCOUNT FOR PROTRUDING PILE CAPS, ETC....THEREFORE, WE HAVE LEFT THE QUANTITY UNCHANGED. d � 2910 Removal of existing Brige Marine Quan: 46,750.00 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE Assume length 4.25km x llm =46750M2-THIS IS ORIGINAL ASSUMPTION MEASURED BY ON SCREEN TAKEOFF: **THE TOTAL LENGTH OF THE EXISTING BRIDGE IS 12,952 LF; THE EXISTING BRIDGE WIDTH VARIES. 1. FOR W= 40'-0" (SOUTH APPROACH W/ CATWALK) L= 1,230 LF. A= 1,230 X 40 = 49,200 SF. 2. FOR W= 33'-6" (MIDDLE PORTION) L= 10,423 LF. A= 10,423 X 33.5 = 349,171 SF. 3. FOR W= 40'-10" (NORTH APPROACH)L = 1,299 LF. A= 1,299 X 40.83 = 53,043 SF. TOTAL AREA =(49,200 + 349,171 + 53,043) = 451,414 SF X 0.0929 = 41,937 M2. HOWEVER, WE DO NOT KNOW WHAT PREVIOUS ASSUMPTIONS WERE MADE IN DETERMINING THE AVG WIDTH FOR THE BID QUANTITY TO ACCOUNT FOR PROTRUDING PILE CAPS, ETC....THEREFORE, WE HAVE LEFT THE QUANTITY UNCHANGED. 4DEM0 Demolition Sub@101% 46,750.00 M2 175.000 8,263,063 8,263,063 $8,263,062.50 [ ] 8,263,063 8,263,063 ]76.75 176.75 BID ITEM = 2970 Description = FOiJNDATION EXCAVATION There are no activities in this biditena. D � rn Unit= LS TakeoffQuan: 1.000 Engr Quan: 1.000 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNSR 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BIDITEM = 2980 Description = iJNCLASSIFIFD STRUCTURE EXCAVATION Unit= M3 TakeoffQuan: ],714.000 Engr Quan: ],714.000 241 Excav & backfill ftgs inc16" ston Marin Quan: 1,714.00 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE 6XCV Excavate w/Backhoe 371.96 CH Prod: 371962 S Lab Pcs: 5.00 Eqp Pcs: 5.00 2B0050.15 #5 (1-1/2) ct 107% 141.72 TON 20.000 3,033 804] 80 3" DIAPHRAGM 8 H 1.00 371.96 HR 2.340 870 804300 3-6 KW GF.NERATOR 1.00 371.96 HR 3.240 331 874 804460 BACKHOE 2 CY 250 1.00 371.96 HR 74.260 13,735 15,820 804560 LOADER 3-CY 130 1.00 371.96 HR 52.860 7,555 12,107 84215C BW60S 30" Smooth 1.00 371.96 HR 14.810 3,184 2,325 LA01 Laborer Foreman 1.00 371.96 MH 16.500 LA02 Laborer,Skilled 1.00 371.96 MH 14.500 � LA03 Laborer, unskilled 1.00 371.96 MH 13.000 �'p OP08 Operator, Backlioe 2.00 743.92 MH 23.000 �$113,417.48 1.0850 MH/M3 1,859.8000 MH [ 21.484 ] 0.2170 Hr/Unit 37.1960 Shifts * 1.0851 MH/Unit _____> Item Totals: 2980 - UNCLASSIFIF.D STRUCTURE EXCAVATION $113,417.48 1.0850 MH/M3 1,859.80 MH [ 21.484 ] 66.171 1714 M3 10,055 8,971 8, l 59 26,398 53,583 31.26 3,033 1.77 53,583 3,033 31.26 1.77 25,675 31,127 14.98 18.16 25,675 31,127 1498 ] 8.16 Page 5 OS/04/20] 2 l 2:08 Total 3,033 870 1,205 29,555 19,662 5,509 10,055 8,971 8,159 26,398 l l 3,417 66.17 l 13,417 66.17 BIDITEM = 2990 Description = CI AA CONCRETE FTGS Unit= M3 TakeoffQuan: 10,175.000 Engr Quan: 10,175.000 Assume the following: The bottom of the form will be the pile driving template secured with a few temporary pipe piles. Side forms will be reusable. Seal bottom holes with hydraulic cement and tremie seal, then pump out. Tie rebar and cast footing. Pull pipes, strip sides, sacrifice bottom and move to next. FOOTING SIZES FOR CIP FOOTINGS FORMWORK CALCULATIONS BENT ## L W H BOTTOM AREA, M2 SIDE FORMS, M2 NOTE 6 24 42 10 94 123 BUY 2 SETS 7 24 42 10 94 123 BUY 2 SETS 8 24 42 10 94 123 9 24 42 10 94 123 10 24 42 10 94 123 11 24 42 10 94 123 D � � DMJM Harris RBONNFR20] 2 BONNER 20] 2 REVISION 2(OPT 2) Baris Lenderman Activity Description Quantity Resource Pcs Unit BID [TEM = 2990 Description = Ci AA CONCRETE FTGS 12 24 42 10 94 123 13 24 42 10 94 123 14 24 42 10 94 123 15 24 42 10 94 123 16 24 42 10 94 123 17 24 42 10 94 123 18 33 42 10 129 139 BUY 2 SETS 19 33 42 10 129 139 BUY 2 SETS 20 33 42 10 129 139 21 33 42 10 129 139 22 33 51 10 156 156 BUY 2 SETS 23 33 51 10 156 156 BUY 2 SETS 24 33 51 10 156 156 � 25 33 51 10 156 156 , 26 33 51 10 156 156 � 27 33 51 10 156 156 � 28 33 42 10 129 139 29 33 42 10 129 139 30 15 24 10 33 72 BUY 2 SETS 31 15 24 10 33 72 BUY 2 SETS 32 15 24 10 33 72 33 15 24 10 33 72 34 15 24 10 33 72 35 15 24 10 33 72 36 15 24 10 33 72 37 15 24 10 33 72 38 15 24 10 33 72 39 15 24 10 33 72 40 15 24 10 33 72 41 15 24 10 33 72 42 15 24 10 33 72 43 15 24 10 33 72 44 15 24 10 33 72 TOTAL AREA, M2 3,336 4,331 BUY SIDE FORMS(2 SETS EACH) 981 Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Unit= M3 TakeoffQuan: ]0,175.000 EngrQuan: 10,175.000 Page 6 OS/04/2012 12:08 Total DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 207 2 REVISION 2(OPT 2) Description B�D ITEM = 2990 Description = Ci AA CONCRETF, FTGS Quantity Pcs Unit Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Unit= M3 Takeot�fQuan: 10,175.000 6n� Quan 500 I& R template, piles and formst Marine Quan: 39.00 EA Hrs/Shft: 10.00 Assume av template made of 12BP53 62' x 50'with brackets for 6# 24" dia pipe piles, make 4# Steel (4 x 2 x(70'+ 30')x 531bs/lf = 21t Pipe piles 6# x.5"th x 24"d x 50'x 1261bs/lf = 20T Soffit supports 12BP53 4x40# x 50'x 531bs/lf = 212t Soffit supports @ piles C12x27 4# x6# x 2x10'x27 = 6T Total steel 21t + 20t + 212t + 6t = 259t x$1000/t x Oo salvage =$259K. Assume 11/2"dia coil rod from chanels to soffit support beams 12# x 10'x 61b/lf = 7201bs x $1.0/lb = $720 x 2 = $1.SK Buy 3.5" PCPS conc soffit panels for all ftgs 3,336 M2 � P1L6A Pile Crew Small 3,900.00 CH Prod: 10.0000 SU Lab Pcs: � 2PCPSSLABS PC SIP 3.5" dk sl@107% 3,336.00 M2 96.840 345,672 � 3STEEL Steel supports bu@107% 191.32 TON 1,300.000 804025 Pile/Drill template 1.00 3,900.00 HR 12.000 804030 Pile Driving Jig 1.00 3,900.00 HR 7.000 804240 3 stage jet pump 250 1.00 3,900.00 HR 22.120 84308R American 7260 100T 1.00 3,900.00 HR 163.0] 0 8491 OC 400 Amp Welder 1.00 3,900.00 HR 11.250 85655C Delmag D30-32 & LEAD L00 3,900.00 HR 82.960 Cal: 510 WC: NONE 6.00 Eqp Pcs 266,126 10,175.000 6.00 46,800 27,300 27,963 58,305 326,859 308,880 7,410 36,465 185,679 137,865 OPO4 Operator, Crana 91T 1.00 3,900.00 MH 28.000 165,934 OP12 Oiler 1.00 3,900.00 MH 14.000 88,817 PDOI Piledriver Fareman 1.00 3,900.00 MH 23.000 142,053 PD02 Piledriver Journeyman 3.00 11,700.00 MH 21.000 392,154 $2,564,282.20 600.0000 MH/F,A 23,400.0000 MH [ 14080 ] 788,958 345,672 266,126 622,011 541,515 100.0000 Hr/Unit 390.0000 Shifts 600.0000 MH/Unit 20,229.69 8,86339 6,823.75 15,949.00 13,885.00 501 Form fitg sides marine Quan: 4,331.00 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE F&5006 6 inan Form 8r Snip Crew 1,443.66 CH Prod: 0.5000 UM Lab Pcs: 6.00 Eqp Pcs: 3.00 3FMFW Meta] Wall Forms@]07% 981.00 SF 335.000 351,639 84308R American 7260 100T 1.00 1,443.67 HR 163.010 120,994 ll4,339 84700C 185 CFM Compressor 1.00 1,443.67 HR 18.520 5,515 21,222 85005C 20 KW GENERATOR 1.00 1,443.67 HR 15.450 5,342 16,963 CAOI Caipenter Foreman 1.00 1,443.67 MH 23.000 53,146 CA02 Carpenter Joumeyman 2.00 2,887.33 MH 21.000 97,803 LA02 Laborer,Skilled 2.00 2,887.33 MH 14.500 69,641 OP02 Operator,Crane<50 T 1.00 1,443.67 MH 26.000 57,346 D � � Page 7 OS/04/2012 12:08 Total 345,672 266,126 46,800 27,300 86,268 635,739 43,875 323,544 165,934 88,817 142,053 392,154 2,564,282 65,750.83 351,639 235,333 26,737 22,305 53,146 97,803 69,641 57,346 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNSR 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 2990 Description = Ci AA CONCRETE FTGS Unit= M3 TakeoffQuan: ] 0,175.000 Engr Quan: 10,175.000 $913,949.65 2.0000 MH/M2 8,662.0000 MH [ 44 ] 277,936 351,639 131,850 152,524 0.3333 Hr/Unit 144.3660 Shifts 2.0000 MH/Unit 64.17 81.19 30.44 35.22 503 Assist rebar sub hi scour ftgs Marine Quan: 11.63 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE F&5006 6 man Form & Stnp Crcw 332.11 CH Prod: 33.2113 S Lab Pcs: 6.00 Eqp Pcs: 3.00 84308R American 7260 100T 1.00 332.11 HR ] 63.010 27,834 26,303 84700C 185 CFM Compressar 1.00 332.] 1 HR 18.520 1,269 4,882 85005C 20 KW GENERATOR 1.00 332.11 HR 15.450 1,229 3,902 CA01 Carpenter Foreman 1.00 332.11 MH 23.000 12,226 CA02 Carpenter Journeyman 2.00 664.23 MH 21.000 22,500 LA02 Laborer,Skilled 2.00 664.23 MH 14.500 16,021 � OP02 Operator,Crane<50 T 1.00 332.] 1 MH 26.000 13,192 �,$129,357.71 1713396 MH/LS 1,992.6800 MH [ 3769.468 ] 63,939 �O 28.5563 Hr/Unit 332110 Shifts * 1713396 MH/Unit 5,497.74 O 504 Pour concrete hi scour f'tgs Quan: 10,175.00 CY Hrs/Shft: 10.00 CNCOS CONC CRF,W W/3900 203.49 CH Prod: 5.0001 OM Lab Pcs: 2CFL002 C]-AA Concrete 42@107% 10,480.25 M3 157.200 1,762,820 84335R 3900 Manitowoc 110 2.00 406.99 HR 156.470 85000C 5 KW GENERATOR 1.00 203.50 HR 4.550 85320C Concr bucket 1.-5-3 C 6.00 1,220.98 HR 12.090 85340R Pump Truck 1.00 203.50 HR l 1].450 85360C Hi-Cycle Concrete Vibr 6.00 1,220.98 HR 1.410 CM02 Concrete Finisher Journeym 1.00 203.50 MH 18.250 6,020 LA01 Laborer Foreman 1.00 203.50 MH 16.500 5,501 LA02 Labarer,Skilled 2.00 406.99 MH 14.500 9,816 LA03 Laborer, unskilled 2.00 406.99 MH 13.000 8,927 OPO4 Operator, Crane 91 T 2.00 406.99 MH 28.000 17,316 OP12 Oiler 2.00 406.99 MH 14.000 9,269 $1,923,440.22 0.1999 MH/CY 2,034.9600 MH [ 3.822 ] 56,849 1,762,820 0.0200 Hr/Unit 20.3490 Shifts 0.2000 MH/Unit 5.59 173.25 _____> Item Totals: 2990 - CI AA CONCRETE FTGS 30,332 35,087 2,608.05 3,016.97 Cal: 510 WC: NONE 10.00 F,c� Pcs: 16.00 33,849 29,832 224 702 10,061 4,701 7,814 14,866 1,233 488 53,182 50,589 5.23 4.97 $5,53],029.78 3.5468 MH/M3 36,089.64 MH [ 80.827 ] ],187,682 2,108,492 617,766 837,375 779,715 543.590 10175 M3 116.73 207.22 60.71 82.30 76.63 � Page 8 OS/04/20] 2 l 2:08 Total 913,950 211.03 54,137 6,151 5,131 12,226 22,500 16,021 13,192 129,358 1 1 .7 22.76 1,762,820 63,682 926 14,762 22,680 1,722 6,020 5,501 9,8 ] 6 8,927 17,316 9,269 1,923,440 189.04 5,531,030 543.59 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 207 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BIDITEM = 3000 Description = STAINLESS STEEL REINFORCEMENT-CIP PILE F Unit= KG TakeoffQuan: 905,724.000 Engr Quan: 905,724.000 3000 Epoxy coated rebar Quan: 905,724.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE Page 9 OS/04/2012 12:08 Total 2SRASS RestEel Accessori@107% 905,723.95 KG 0.250 242,281 242,281 2SRSS Reinforcing Stecl@107% 905,723.95 KG 4.250 4,118,780 4,118,780 4REBAR Rebarplace@101% 905,723.95 KG 0.580 530,573 530,573 $4,891,633.91 [ ] 4,361,061 530,573 4,891,634 4.81 0.59 5.40 _____> Item Totals: 3000 - STAINLESS STEEL REINFORCEMENT-CIP PILE F $4,891,633.91 [ ] 4,361,06] 530,573 4,891,634 5.401 905724 KG d N O W BID ITEM = 3010 4.8] Description = STAINLESS STF.EL SPIRAL REBAR-CIP PILE FO Unit= KG TakeoffQuan: 54,140.000 Engr Quan: 433 Epoxy coated spiral rebar Quan: 54,140.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE 2SRASS Rcstcel Acccssori@107% 54,140.00 KG 0250 14,482 2SRSS Reinforcing Steel@107% 54,140.00 KG 4.250 246,202 4REBAR Rebarplace@101°/o 54,140.00 KG 0.580 $292,399.31 [ ] 260,684 4.82 _____> Item Totals: 3010 - STAINLESS STEEL SP[RAI. REBAR-CIP PILE FO $292,399.31 [ ] 260,684 5.401 54140 KG 4.82 BID ITEM = 3031 Description = 1371 MM PR�STR CONC CVL PTLF (54-IN) 3030 1371mm prestr conc cyl pile Marine ***** Copied and adjusted from RPAMLICO2012 ***** D rn � 0.59 5.40 54,140.000 14,482 246,202 31,715 31,715 31,715 292,399 0.59 5.40 31,715 292,399 0.59 5.40 BL Unit= M TakeoffQuan: 5,108.000 EngrQuan: 5,108.000 Quan: 130.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE * * Unrcviewed DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 3031 Description = 1371MM PRESTR CONC CYL PILE (54-IN) Unit= M TakeoffQuan: PILEC Pile Crew Large 866.65 CH Prod: 1.5000 US 2FCP54 54 PSPC Conc Cyl @107% 5,108.00 M 525.000 2FCP54SS 54" PSPC S.StI Pr@107% 633.95 M 476.000 804025 File/Drill template 1.00 866.66 HR 12.000 804030 Pile Driving Jig 1.00 866.66 HR 7.000 804240 3 stage jet pump 250 1.00 866.66 HR 22.120 84304R 9299 SKYHORSF, & BAR 1.00 866.66 HR 462.970 84910C 400 Amp Welder 1.00 866.66 HR l 1.250 85664C DELMAG D160-32 & LEA 1.00 866.66 HR 475.820 OPOS Operator, Crane>140 T 1.00 866.66 MH 28.000 OPl2 Oiler 1.00 866.66 MH 14.000 PD01 Piledriver Fareman 1.00 866.66 MH 23.000 � PD02 Piledriver Journeyman 3.00 2,599.97 MH 21.000 f! ,$4,226,623.37 39.9996 MH/EA 5,199.9500 MH [ 938.658 ] � 6.6665 Hr/Unit 86.6650 Shifts 39.9996 MH/Unit FP 31332 Cutoff Concrete Piles 137] mm Quan: 130.00 EA ***** Copied and adjusted from RPAMLICO2012 ***** PILE4 Pile Cutoff Crew 866.65 CH Prod: 1.5000 US 3SAWBLADE Sawblades@107% 130.00 EA 10.000 83150C L,owboy 60 ton trailer 0.12 104.00 HR 23.000 85325C Concrete Saw Handheld 1.00 866.66 HR 11.460 LAO l Labarer Foreman 1.00 866.66 MH 16.500 LA02 Laborer,Sl<illed 2.00 1,733.31 MH 14.500 TMOI Teamster 0.12 104.00 MH 12.000 $81,023.88 20.7997 MH/EA 2,703.9700 MH [ 344.223 ] 6.6665 Hr/Unit 86.6650 Shifts 20.7998 MH/Unit _____> Item Totals: 3031 - 1371MM PRESTR CONC CYL PILE (54-IN) $4,307,647.25 1.5473 MH/M 7,903.92 MH [ 32.65 ] 843.314 5 ] 08 M BIDITEM = 3033 Description = 36" Sq. Prestressed Concrete Piles D rn N BL 5,108.000 Engr Quan: 5,108.000 Lab Pcs: 6.00 Eqp Pcs: 6.00 2,869,419 322,883 10,400 6,067 6,214 12,957 226,866 174,372 1,647 8,103 243,375 168,999 36,874 l 9,737 31,567 87, l44 175,322 3,192,302 494,568 364,431 1,348.63 24,556.17 3,804.37 2,80331 Hrs/Shft: 10.00 Cal: 510 WC: NONE 23,428 41,806 2,075 67,309 517.76 Lab Pcs: 3.12 Eqp Pcs: 1,39] 1,394 2,435 1.12 998 7,497 1,391 3,829 8,495 10.70 29.45 6535 242,631 3,192,302 1,391 498,397 372,926 47.50 624.96 0.27 97.57 73.01 BL Unit = M Takeoff Quan: 17,977.000 Engr Quan: 17,977.000 Page 10 OS/04/2012 12:08 Total 2,869,419 322,883 10,400 6,067 19,17] 401,23 8 9,750 412,374 36,874 l 9,737 31,567 87,144 4,226,623 32,512.49 **Unreviewed 1,391 2,392 9,932 23,428 41,806 2,075 81,024 623.26 4,307,647 843.31 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract B�D ITEM = 3033 BL Description= 36" Sq. Prestressed Concrete Piles Unit= M TakeoffQuan: 17,977.000 Eng Quan: 17,977.000 3030 36" Sq. Prestressed Concrete Pies Quan: 530.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from RPAMLICO2012 ***** PILEC Pile Crew Large 2,650.00 CH Prod: 2.0000 US 2FCP36 36" Sq P/C-P/S Pi@] 07% 17,977.00 M 393.600 2FCP36SS 36" PSPC S.St. Pr@]07% 17,977.00 M ]47.600 804025 Pile/Drill template 1.00 2,650.00 HR 12.000 804030 Pile Driving Jig 1.00 2,650.00 HR 7.000 804240 3 stage jet pump 250 1.00 2,650.00 HR 22.120 84304R 9299 SKYHORSE & BAR 1.00 2,650.00 HR 462.970 84910C 400 Amp Welder 1.00 2,650.00 HR 11.250 � 85664C DELMAG D160-32 & LEA 1.00 2,650.00 HR 475.820 � OPOS Operator, Crane>140 T 1.00 2,650.00 MH 28.000 OOPl2 Oiler 1.00 2,650.00 MH 14.000 � PDOI Piledriver Foreman 1.00 2,650.00 MH 23.000 PD02 Piledriver Joumeyman 3.00 7,950.00 MH 21.000 $13,572,853.74 30.0000 MH/F,A 15,900.0000 MH [ 704 ] 5.0000 Hr/Unit 265.0000 Shifts 30.0000 MH/Unit 31332 Cutoff Concrete Piles 36" Sq Conc. Piles Quan: 530.00 EA ***** Copied and adjusted from RPAMLICO2012 ***** PILE4 PileCutoffCrew 2,650.00 CH Prod: 2.0000 US 3SAWBLADE Sawblades@107% 530.00 EA 10.000 831 SOC Lowboy 60 ton t� ailer 0.12 3] 8.00 HR 23.000 85325C Concrete Saw Handheld 1.00 2,650.00 HR 11.460 LA01 Laborer Foreman 1.00 2,650.00 MH 16.500 LA02 Laborer,Skilled 2.00 5,300.00 MH 14.500 TMO1 Teamster 0.12 318.00 MH 12.000 $249,166.41 15.6000 MH/EA 8,268.0000 MH [ 258.17 ] 5.0000 Hr/Unit 265.0000 Shifts 15.6000 MH/Unit ____> Item Totals: 3033 - 36" Sq. Prestressed Concrete Piles $] 3,822,020.15 13443 MH/M 24,168.00 MH [ 28.367 ] 768.872 17977 M D rn w Lab Pcs: 6.00 Eqp Pcs: 6.00 7,571,050 2,839,144 31,800 18,550 19,00L 39,618 693,69] 533,7 80 5,035 24,778 744,173 516,750 112,750 60,350 96,523 266,463 536,087 10,410,193 1,S12,249 L,]14,325 1,O1 L48 19,641.87 2,853.30 2,102.50 Hrs/Shft: 10.00 Cal: 510 WC: NONE 71,636 127,833 6,344 205,812 388.33 Lab Pcs: 3.12 Eqp Pcs: 1.12 5,67] 4,261 3,053 7,447 22,923 5,671 11,708 25,975 lOJO 22.09 49.01 741,899 10,410,193 5,671 1,523,957 L,140,300 41.27 579.08 0.32 84.77 63.43 Page 11 OS/04/2012 12:08 Total **Unrevicwed 7,571,050 2,839,144 3],800 18,550 58,618 1,226,871 29,813 1,260,923 112,750 6Q350 96,523 266,463 13,572,854 25,609.16 ** Unrcvicwcd 5,671 7,314 30,369 71,636 ] 27,833 6,344 249,166 470.13 ] 3,822,020 76R.87 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BIDITEM = 3035 BL Description = 20" Sq. P/C Conc Piles-Fnd Bents Unit= M TakeoffQuan: 183.000 Engr Quan: 183.000 3030 20" Sq. PS Concrete Piles-End Bents Quan: 15.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from RPAMLICO2012 ***** P1LEC Pile Crew Large 50.00 CH Prod: 3.0000 US 2FCP20 20" Sq P/C-P/S Pi@107% 183.00 M 196.800 2FCP20SS 20" PSPC S.St. Pr c�i 107% 183.00 M 98.400 804025 Pile/Drill template 0.00 HR 12.000 804030 Pile Driving Jig 1.00 50.00 HR 7.000 804240 3 stage jet pump 250 0.00 HR 22.120 84304R 9299 SKYHORSF. & BAR 1.00 50.00 HR 462.970 84910C 400 Amp Welder 1.00 50.00 HR 11.250 C� 85664C DELMAG D160-32 & LEA 1.00 50.00 HR 475.820 �OPOS Operator, Crane>140 T 1.00 50.00 MH 28.000 � OP] 2 Oiler 1.00 50.00 MH 14.000 PDO1 Piledriver Foreman 1.00 50.00 MH 23.000 PD02 Piledriver Journeyman 3.00 150.00 MH 21.000 $1 ] 5,769.95 20.0000 MH/EA 300.0000 MH [ 469.333 ] 33333 Hr/Unit 5.0000 Shifrs 20.0000 MH/Unit 31332 Cutoff Concrete Piles 20" Sq Conc. Piles Quan: 15.00 EA ***** Copied and adjusted from RPAMLICO2012 ***** PILE4 PileCutoffCrew 50.00 CH Prod: 3.0000 US 3SAWBLADE Sawblades@107% 15.00 EA 10.000 83150C L,owboy 60 ton trailer 0.12 6.00 HR 23.000 85325C Concrete Saw Handheld 1.00 50.00 HR 1 l.460 LAO l Labarer Foreman 1.00 50.00 MH 16.500 LA02 Laborer,Skilled 2.00 100.00 MH 14.500 TMO1 Teamster 0.12 6.00 MH 12.000 $4,754.75 10.4000 MH/EA 156.0000 MH [ 172.1 13 ] 33333 Hr/Unit 5.0000 Shifts 10.4000 MH/Unit ____> ltem Totals: 3035 - 20" Sq. P/C Conc Piles-End Bents $120,524.70 2.4918 MH/M 456.00 MH [ 52.578 ] 658.605 183 M Lab Pcs 6.00 Eqp Pcs: 4.00 38,535 19,268 350 13,089 10,060 95 468 14,041 9,750 2,127 1,139 1,821 5,028 10,115 57,803 27,575 20,278 67432 3,853.54 1,838.30 ],351.83 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 3.12 Eqp Pcs: 1.12 161 80 58 141 433 1,352 2,412 120 3,883 258.88 13,998 57,803 76.49 3 ] 5.86 16] 221 490 ] 0.70 14.73 32.67 16] 27,795 20,768 0.88 151.89 ll3.48 Page 12 OS/04/2012 12:08 Total * * U nrcvi cwed 38,535 19,268 350 23,149 563 23,791 2,127 1,139 ],821 5,028 115,770 7,718.00 * * U nrcvi ewcd 161 138 573 1,352 2,412 120 4,755 316.98 120,525 658.60 DMJM Harris RBONNFR20] 2 BONNER 20] 2 REVISION 2(OPT 2) Baris Lenderman Activity Description Quantity Resource Pcs Unit BIDITEM = 3052 Description = STATIC AX1AL LD TEST ON 54" CYL PILE 3050 Axial ld test on 1676mm cyl pile 4TF.ST.01 Piletest@10]% 2.00 LS $708,717.00 BID ITEM = 3053 Description = STATIC AX1AL LD TF.ST ON 36" CYL PILF, � 3050 Axial ►d test on 1676mm cyl pile O �4TEST.01 Pilctcst@101% 2.00 LS $708,717.00 BID TTEM = 3055 Description = LATERAL LD TEST ON 54" CYL PILE 3050 Axial ld test on � 676mm cyl pile 4TEST.01 Pile test@701% 2.00 LS $708,717.00 BIDITEM = 3056 Descriprion = LATERAL LD TEST ON 36" CYL PILE 3050 Aixial ld test on 1676mm cyl pile 4TEST.01 PiletESta101% $708,717.00 D rn cn Cost Report Unit Cost Page 13 OS/04/2012 12:08 Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Total BL Unit= EA TakeoffQuan: 2.000 Engr Quan: 2.000 Quan: 2.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 350,850.000 708,717 708,717 [ ] 708,717 708,717 354,358.50 354,358.50 BL Unit= EA TakeoffQuan: 2.000 F.ngrQuan: 2.000 Quan: 2.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 350,850.000 708,717 708,717 [ ] 708,717 708,717 354,358.50 354,358.50 BL Unit = EA Takeoff Quan: 2.000 Engr Quan: 2.000 Quan: 2.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 350,850.000 708,717 708,717 [ ] 708,717 708,717 354,358.50 354,358.50 BL Unit = EA Takeoff Quan: 2.000 Engr Quan: 2.000 Quan: 2.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 2.00 LS 350,850.000 708,717 708,717 [ ] 708,717 708,717 DMJM Harris RBONNFR20] 2 BONNER 20] 2 REVISION 2(OPT 2) Baris Lenderman Activity Description Quantity Resource Pcs Unit BID [TEM = 3056 Description = LATF.RAL LD TEST ON 36" CYL PILE Page 14 OS/04/2012 12:08 Cost Report Unit Perm Constr Equipment Equipment Sub- Cost Labor Material Matl/Exp Ownership Operation Contract Total BL Unit = EA Takeoff Quan: 2.000 Engr Quan: 2.000 354,358.50 354,358.50 BIDITEM = 3060 Description = PRODUCTION DYNAMIC LD TEST ON CYL PILE Unit= EA TakeoffQuan: 15.000 Engr Quan: 309000 Pile testing, Complete-on Cylindr. pIles Quan: 3214 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 4TEST Piletest@IO]% 15.00 LS 1,754.000 $26,57310 [ ] d N O � 15.000 26,573 26,573 26,573 26,573 826.79 826.79 BID ITEM = 4110 BL Description = PRECAST CONCRETE COLS & CAPS Unit= M3 TakeoffQuan: 5,022.000 F.ngr Quan: 5,022.000 41530 Cast cols & caps incl form set up Marine Quan: 5,022.00 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from BONNER2012 ***** SEG 4.5 Man Segment Precasting 2,231.99 CH Prod: 0.5000 UM Lab Pcs: 4.50 Eqp Pcs: 0.00 2CFL007 Superplastizer c�i 107% 5,022.00 M3 15.000 80,603 2CFL025 C]-IV Conc (FL)@107% 5,022.00 M3 196.500 1,055,901 3FMF METAL FORMS@107% 494.30 M2 550.000 290,896 CA01 Carpenter Foreman 0.50 1,116.00 MH 23.000 41,084 CA02 Carpenter Journeyman 1.00 2,232.00 MH 21.000 75,605 CMO1 Concrete Finisher Foreman 1.00 2,232.00 MH 2O.250 72,527 IWOI IronworkerForeman 1.00 2,232.00 MH 28.000 100,176 LA02 Laborer,Skilled 1.00 2,232.00 MH 14.500 53,834 $1,770,626.04 2.0000 MH/M3 10,044.0000 MH [ 46.567 ] 343,227 1,136,504 290,896 0.4444 Hr/Unit 223.1990 Shifts 2.0000 MH/Unit 68.34 22631 57.92 44330L Erect conc PC cols & caps Marine Quan: 120.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE From bent 1 to bent 5=5ea and from bent 45 to bent 81=37 ea, tota1=42-pile cap only-42 pcs total, From bent 6 to bent 44=39 ea-two elements(pile cap and PC column), toto1=78 ea TOTAL NUMBER:42+78=120 EA FRM087 Formwork crew w/9320 599.94 CH Prod: 2.0002 US Lab Pcs: 8.00 Eqp Pcs: 2.00 D rn rn * * Unrevi ewed 80,603 1,055,901 290,896 41,084 75,605 72,527 100,] 76 53,834 1,770,626 352.57 **Unrcviewed DMJM Harris RBONNFR20] 2 BONNER 20] 2 REVISION 2(OPT 2) Baris Lenderman Activity Description Quantity Unit Resource Pcs Unit Cost Cost Report BID [TEM = 4110 Description = PRECAST CONCRETE COLS & CAPS Unit = M3 84303R American 9320 250 T 1.00 599.95 HR 291.660 85000C 5 KW GENERATOR 1.00 59995 HR 4.550 CAOI Carpenter Foreman 1.00 599.95 MH 23.000 CA02 Carpenter Journeyman 4.00 2,399.79 MH 21.000 LA03 Laborer, unskilled 1.00 599.95 MH 13.000 OPOS Operator, Crane>140 T 1.00 599.95 MH 28.000 OPl2 Oiler 1.00 599.95 MH 14.000 $333,434J5 39.9965 MH/EA 4,799.5900 MH [ 890.924 ] 4.9995 Hr/Unit 59.9940 Shifts 39.9966 MH/Unit _____> Item Totals: 4110 - PRECAST CONCRETE COLS & CAPS $2,104,060.79 2.9557 MH/M3 14,843.59 MH [ 67.855 ] �418.969 5022 M3 � O � Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BL TakeoffQuan: 5,022.000 Engr Quan: 5,022.000 95,158 79,823 660 2,070 22,086 81,288 13, l60 25,526 13,663 155,724 1,297.70 95,818 81,893 798.48 682.44 498,950 1,136,504 290,896 95,818 81,893 99.35 226.31 57.92 19.08 16.31 BID ITEM = 4120 BL Desc��iption = EPDXY-COAT. COLUMNS AND CAPS REINFORCRME Unit= KG Takcot�fQuan: 612,105.000 Engr Quan: 612,105.000 433 S& I Reinforcing Steelr-Epoxy -Coated Quan: 612,105.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE Page 15 OS/04/2012 12:08 Total 174,981 2,730 22,086 81,288 13,160 25,526 13,663 333,435 2,778.62 2,l 04,061 418.97 **Unreviewed ***** Copied and adjusted from RPAMLICO2012 ***** 2SREPDXY Reinfarcing Steel@107% 612,104.99 KG 1.050 687,700 687,700 2SREPDXYA Resteel Accessori@107% 612,104.99 KG O.100 65,495 65,495 4REBAR Rebarplace@101°/o 612,104.99 KG 0.580 358,571 358,571 $],1ll,76629 [ ] 753,195 358,571 1,111,766 1.23 0.59 1.82 _____> Item Totals: 4120 - EPDXY-COAT. COLUMNS AND CAPS REINFORCEME $],] 1 ],766.29 [ ] 753,]95 358,571 ],117,766 1.816 612105 KG 1.23 0.59 1.82 BIDITEM = 4125 BL Description= STAINLESS STEEL COLUMNS AND CAPS REINFO Unit= KG TakcoffQuan: 133,007.000 Engr Quan: 133,007.000 434 S& I Stainless Steel Reinforcement Quan: 133,007.00 KG Hrs/Shft: 10.00 Cal: Sl0 WC: NONE D rn � DMJM Harris RBONNFR20] 2 BONNER 20] 2 REVISION 2(OPT 2) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Page 16 OS/04/2012 12:08 Total BID [TEM = 4125 BL Description = STAINLESS STEEL COLUMNS AND CAPS REINFO Unit = KG TakeoffQuan: 133,007.000 F,ngr Quan: 133,007.000 **Unreviewed ***** Copied and adjusted from RPAMLICO2012 ***** 2SRASS Resteel Accessori@107% 133,007.00 KG 0.250 35,579 35,579 2SRSS Reinfarcing Steel ct 107% 133,007.00 KG 4.250 604,849 604,849 4RF,BAR Rebar place@101 % ] 33,007.00 KG 0.580 77,916 77,916 $718,344.20 [ ] 640,429 77,916 718,344 4.81 0.59 5.40 _____> Item Totals: 4125 - STAINLESS STEEL COLUMNS AND CAPS REINFO $718,344.20 [ ] 640,429 77,916 718,344 5.40] 133007 KG 4.8] 0.59 5.40 d i..�-+B�D ITEM = 4]30 � Description = PT STRAND IN PC COLS & CAPS Unit= KG TakeoffQuan: 110,277.000 Engr Quan: 110,277.000 4130 PT strand in PC cols & caps Quan: 110,277.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE PTS 5 Man PT Crew 1,102.77 CH Prod: 20.0000 UM Lab Pcs: 5.00 Eqp Pcs: 0.00 2PTGROUT PT Grout Material@107% 23.53 M3 300.000 7,553 2PTSTRAND PT STRAND SUPPLY@10 l 10,277.00 KG 3100 365,789 IWO1 Nonworker Foreman 2.00 2,205.54 MH 28.000 98,989 IWO11 IronworkerFareman 1.00 1,102.77 MH 28.000 49,494 LA02 Laborer,Skilled 2.00 2,205.54 MH 14.500 53,196 $575,021.27 0.0500 MH/KG 5,513.8500 MH [ 1.243 ] 201,679 373,342 0.0100 Hr/Unit 110.2770 Shifts 0.0500 MH/Unit L83 339 _____> Item Totals: 4]30 - PT STRAND IN PC COLS & CAPS $575,021.27 0.0500 MH/KG S,S13.85 MH [ 1.243 ] 201,679 373,342 5.214 110277 KG L83 339 BID ITEM = 4140 Description = PT BAR IN PC COLS & CAPS 4140 PT Bar in PC cols & caps D rn � Unit= KG TakeoffQuan: 95,374.000 F,ngr Quan: 95,374.000 Quan: 95,374.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE 7,553 365,789 as,9x9 49,494 53,196 575,021 5.21 575,021 5.21 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID ITEM = 4140 Description = PT BAR IN PC COLS & CAPS Unit= KG TakeoffQuan: 95,374.000 F,ngr Quan: PTS 5 Man PT Crew 953.74 CH Prod: 20.0000 UM Lab Pcs: 5.00 Eqp Pcs 2PTBAR PT Bar supply@107% 95,374.00 KG 5.000 510,251 IWO] Ironworker Foreman 2.00 1,907.48 MH 28.000 85,611 IWO1 1 Ironworker Foreman 1.00 953.74 MH 28.000 42,806 LA02 Laborer,Sl<illed 2.00 1,907.48 MH 14.500 46,007 $684,674.98 0.0500 MH/KG 4,768.7000 MH [ 1.243 ] 174,424 510,251 0.0100 Hr/Unit 95.3740 Shifts 0.0500 MH/Unit L83 5.35 _____> lYem Totals: 4140 - PT BAR IN PC COLS & CAPS $684,674.98 0.0500 MH/KG 4,768.70 MH [ 1.243 ] 174,424 5]0,251 7.179 95374 KG L83 535 95,374.000 0.00 d N � BID ITEM = 4150 BL Description= DF,CK SLAB RFiNFORCF,M6NT STEEL (ASTM A 95 Unit= KG TakeoffQuan: 1,778,597.000 F,ngr Quan: 1,778,597.000 433 S& I Reinforcing Steel Quan: 1,778,596.95 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE Page 17 OS/04/2012 12:08 Total 510,251 85,611 42,806 46,007 684,675 7.18 684,675 7.l 8 ** Unrcvicwcd ***** Copied and adjusted from RPAMLICO2012 ***** 2SRASS Resteel Accessori@107°/a 1,778,596.95 KG 0.250 475,775 475,775 2SRSS ReinforcingSteel@107% 1,778,596.95 KG 4.250 8,088,170 8,088,]70 4REBARSS Stainless Steel R@101% 1,778,596.95 KG 0.580 1,041,902 1,041,902 $9,605,846.40 [ ] 8,563,944 1,041,902 9,605,846 4.81 0.59 5.40 _____> Item Totals: 4150 - DECK SLAB REINFORCEMENT STEEL (ASTM A 95 $9,605,846.40 [ ] 8,563,944 1,041,902 9,605,846 5.401 1778597 KG 4.81 0.59 5.40 BID ITEM = 4160 BL Description= CONC DFCK Unit= M3 TakeoffQuan: ] 1,988.000 F.ngr Quan: ll,988.000 366002 Set & strip dk cantilever Quan: 6,564.88 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE * * U nrcvi ewcd ***** Copied and adjusted from RPAMLICO2012 ***** DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4160 Description= CONCDECK Unit= M3 TakeoffQuan: FRM08 ] Farmwork Crew w/7260 1,641.21 CH Prod: 0.5000 UM 3Fl WOODEN FORMS@107°/a 6,564.88 M2 32.250 84308R American 7260 100T 1.00 1,641.22 HR ] 63.010 84700C 185 CFM Compressor 1.00 1,641.22 HR 18.520 85000C 5 KW GENERATOR 1.00 1,641.22 HR 4.550 CA01 Carpenter Foreman 1.00 1,641.22 MH 23.000 CA02 Carpenter Jou�meyman 4.00 6,564.88 MH 21.000 LA03 Laborer, unskilled 1.00 1,641.22 MH 13.000 OPO4 Operator, Crane 91T 1.00 1,64122 MH 28.000 OP12 Oiler 1.00 1,641.22 MH 14.000 $957,933.30 2.0000 MH/M2 13,129.7600 MH [ 44.55 ] 02500 Hr/Unit 1(i4.1210 Shifts 2.0000 MH/Unit d F! , 366005 Set & Strip Deck Bulkhead Quan: 180.92 M2 �-+ N***** Copied and adjusted from RPAMLICO2012 ***** ACARP3 3 Man Carpenter Crew 723.66 CH Prod: 0.2500 UH 3F1 WOODEN FORMS@107% 180.92 M2 32.250 CA01 Carpenter Foreman 0.50 36l .83 MH 23.000 CA02 CarpenterJourneyman 3.00 2,170.98 MH 21.000 $93,101.24 13.9996 MH/M2 2,532.8100 MH [ 327.791 ] 3.9999 Hr/Unit 72.3660 Shifts 13.9996 MH/Unit 366008 Set & Strip Fascia Quan: 1,83810 M2 ***** Copied and adjusted from RPAMLICO2012 ***** ACARP3 3 Man Carpenter Crew 1,750.57 CH Prod: 0.3000 UM 3F1 WOODEN FORMS@107% 1,838.10 M2 32.250 CA01 Carpenter Foreman 0.50 875.29 MH 23.000 CA02 Carpenter Journeyman 3.00 5,251.72 MH 21.000 $273,542.99 3.3333 MH/M2 6,127.O100 MH [ 78.048 ] 0.9524 Hr/Unit 175.0570 Shifts 3.3333 MH/Unit 366010 F& I Stay-In-Place Deck Forms Quan: 24,412A1 M2 ***** Copied and adjusted from RPAMLICO2012 ***** FRM081 Farmwork Crew w/7260 1,525.75 CH Prod: 2.0000 UM 2MISCSTEEL Misc steel@107% 36.18 TON 1,500.000 2NEOPRFNE Neoprenestrip@l07% 6,951.84 LF 0.500 2SIP-F Stay-in Place For@107% 24,412.01 M2 ] 20.000 D � 0 BL 11,988.000 Engr Quan: 11,988.000 Lab Pcs: 8.00 Eqp Pcs: 3.00 226,538 137,551 129,985 6,269 24,7 26 1,805 5,662 60,419 222,373 36,000 69,829 37,376 425,998 64.89 Hrs/Shft: 10.00 226,538 145,625 159,773 34.51 22.18 24.34 Cal: 510 WC: NONE Lab Pcs: 3.50 Eqp Pcs: 0.00 6,243 13,320 73,538 86,858 480.09 Hrs/Shft: 10.00 Lab Pcs: 32,222 177,892 210,115 114.31 Hrs/Shft: 10.00 6,243 34.51 Cal: 510 WC: NONE 3.50 Eqp Pcs: 0.00 63,428 63,428 34.51 Cal: 510 WC: NONE Lab Pcs: 8.00 Eqp Pcs: 3.00 58,069 3,719 3,134,502 Page 18 OS/04/2012 12:08 Total 226,538 267,535 30,395 7,468 60,419 222,373 36,000 69,829 37,376 957,933 145.92 **Unrcviewed 6,243 13,320 73,538 93,] Ol 514.60 * * Unrevi ewcd 63,428 32,222 177,892 273,543 148.82 ** Unrevicwed 58,069 3,719 3,134,502 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report BID [TEM = 4160 Description = CONC DECK Unit = M3 3GA]Ol WeldingSupplies@107% O.18 LS 50,000.000 84308R American 7260 100T 1.00 1,525.75 HR 163.010 84700C 185 CFM Compressor 1.00 1,525.75 HR 18.520 85000C 5 KW GENERATOR 1.00 1,525.75 HR 4.550 CAOl Carpenter Foreman 1.00 1,525.75 MH 23.000 CA02 Carpenter Joumeyman 4.00 6,103.00 MH 21.000 LA03 Laborer, unskilled 1.00 1,525.75 MH 13.000 OPO4 Operator, Crane 91T 1.00 1,525.75 MH 28.000 OP12 Oiler 1.00 1,525.75 MH 14.000 $3,885,857.68 0.4999 MH/1VI2 12,206.0000 MH [ 11.137 ] 0.0625 Hr/Unit 152.5750 Shifts 0.5000 MH/Unit � 366012 F& S diaphrams Quan: 3,811.34 M2 N �-+***�* Copied and adjusted from RPAMLICO2012 ***** W Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BL TakeoffQuan: 11,988.000 Engr Quan: 11,988.000 9,630 FRM087 Formwork crew w/9320 692.97 CH Prod: 0.5000 UM 3F] WOODEN FORMS@107% 3,81134 M2 32.250 84303R American 9320 250 T 1.00 692.97 HR 291.660 85000C 5 KW GF,NERATOR 1.00 692.97 HR 4.550 CA01 Carpenter Foreman 1.00 692.97 MH 23.000 CA02 Carpenter Joumeyman 4.00 2,771.89 MH 21.000 LA03 Laborer, unskilled 4.00 2,771.89 MH 13.000 OPOS Operator, Crane>140 T 1.00 692.97 MH 28.000 OP12 Oiler 1.00 692.97 MH 14.000 $562,253.45 2.0000 MH/M2 7,622.6900 MH [ 40.2 ] 0.1818 Hr/Unit 692970 Shifts 2.0000 MH/Unit 366102 Set Bidwell Screed Rail Quan: 8,565.62 M ***** Copied and adjusted from RPAMLICO2012 ***** CNC90 Screed Rail Crew 1,63 ].54 CH Prod: 1.500U UM 3SCRAIL Screed Rail Mater@107% 499.33 M 20.000 85000C 5 KW GENERATOR 1.00 1,631.55 HR 4.550 CA01 Carpenter Foreman 0.50 815.77 MH 23.000 CA02 Carpenter Joumeyman 2.00 3,263.09 MH 21.000 LA03 Laborer, unskilled 1.00 1,631.55 MH 13.000 $194,459.10 0.6666 MH/M 5,710.4100 MH [ 13.933 ] 0.1905 Hr/Unit 163.1540 Shifts 0.6667 MH/Unit D � � ] 27,873 120,839 5,828 22,429 1,678 5,264 56,168 206,728 33,467 64,916 34,747 396,026 3,196,290 9,630 ]35,380 148,532 ] 6.22 130.93 0.39 5.55 6.08 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: ] 1.00 F,qp Pcs: 2.00 ] 31,520 109,912 92,200 762 2,391 25,51 l 93,893 60,800 29,484 15,781 225,469 59.16 Hrs/Shft: 10.00 131,520 1 ] 0,674 94,590 34.51 29.04 24.82 Cal: 510 WC: NONE Lab Pcs: 3.50 Eqp Pcs: 1.00 10,686 1,795 5,629 30,031 110,531 35,787 176,350 10,686 1,795 5,629 20.59 1.25 0.21 0.66 Page 19 OS/04/2012 12:08 Total 9,630 248,713 28,257 6,942 56,168 206,728 33,467 64,916 34,747 3,885,858 159.18 * * Unrcviewcd 131,520 202,112 3,153 25,511 93,893 60,800 29,484 15,781 562,253 147.52 **Unrcvicwcd 10,686 7,424 30,031 110,531 35,787 194,459 22.70 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID ITEM = 4160 BL Description= CONCDF.CK Unit= M3 TakeoffQuan: 11,988.000 EngrQuan: 11,988.000 366104 Pour & Finish Deck & diaph Quan: 11,988.00 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from RPAMLICO2012 ***** CNC087 Conc Crew w/9320 1,498.50 CH Prod: 1.0000 UM 2C0005 4500 PS! Conerete@107% 12,587.40 M3 153.250 84303R American 9320 250 T 1.00 1,498.50 HR 291.660 85000C 5 KW GENERATOR 1.00 1,498.50 HR 4.550 85320C Concrbucket ].-5-3 C 1.00 1,498.50 HR 12.090 85340R Pump Truck 1.00 1,498.50 HR 1 11.450 85360C Hi-Cycle Concrete Vibr 2.00 2,997.00 HR 1.410 CM02 Concrete Finisher Journeym l.00 1,498.50 MH I 8250 � LAOI Labarer Fareman 1.00 1,498.50 MH 16.500 � LA02 Labor�r,Skilled 2.00 2,997.00 MH 14.500 ��-+LA03 Laborcr, unskilled 2.00 2,997.00 MH 13.000 �OPOS Operator, Crane>140 T 1.00 1,498.50 MH 28.000 OP12 Oiler 1.00 1,498.50 MH 14.000 $3,018,014.31 1.0000 MH/M3 11,988.0000 MH [ 18.1 I6 ] 0.1250 Hr/Unit 149.8500 Shifts 1.0000 MH/Unit 366143 Cure conc diaph & facia Quan: 617,54219 M2 ***** Copied and adjusted from RPAMLICO2012 ***** AFNSH3 3 man Finisher Crew 7,057.56 CH Prod: 25.0002 UM 3CURF.MAT Curing MATERIALS@107 617,542.19 M2 0.550 CMOI Concrete Finisher Foreman 0.50 3,528.78 MH 2O.250 CM02 Concrete Finishcr Journeym 3.00 21,172.71 MH 18.250 $1,104,40535 0.0399 MH/M2 24,701.4900 MH [ 0.816 ] 0.0] 14 Hr/Unit 705.7560 Shifts 0.0400 MH/Unit 366144 Rub & Finish conc Quan: 2,351.90 SM ***�* Copied and adjusted from RPAMLICO2012 ***** AFNSH2 2 Man finish Crew 348.42 CH Prod: 3.0000 UM 3RUBMAT Rub mat@] 07% 2,351.90 M2 1.000 CMO1 Concrete Finisher Foreman 0.25 87.11 MH 2O.250 CM02 Concrete Finisher Journeym 2.00 696.86 MH 18.250 $25,961.15 0.3333 MH/SM 783.9700 MH [ 6.773 ] O.1481 Hr/Unit 34.8420 Shifts 03333 MH/Unit D � N Lab Pcs: 8.00 2,064,050 44,328 40,508 72,286 65,738 63,757 34,126 320,743 2,064,050 26.76 172.18 Hrs/Shft: 10.00 Eqp Pcs: 6.00 237,677 199,375 1,648 5,770 ] 2,348 5,769 57,542 109,465 3,027 1,199 312,242 320,979 26.05 26.77 Cal: 510 WC: NONE Lab Pcs: 3.50 Eqp Pcs: 0.00 363,424 114,665 626,316 740,982 1.20 Hrs/Shft: 10.00 2,831 20,614 23,445 9.97 Lab Pcs: 363,424 0.59 Cal: 510 WC: NONE 2.25 Eqp Pcs: 0.00 2,517 2,517 1.07 Page 20 OS/04/2012 12:08 Total **Unrevicwed 2,064,050 437,053 6,818 18,117 167,008 4,226 44,328 40,508 72,286 65,738 63,757 34,126 3,018,O14 251.75 ** Unrcvicwcd 363,424 ll 4,665 626,316 1,104,405 1.79 **Unrcvicwcd 2,517 2,831 20,614 25,961 l 1.04 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract B�D ITEM = 4]60 BL Description= CONCDF.CK Unit= M3 TakeoffQuan: 11,988.000 EngrQuan: 11,988.000 366150 S& I safety rails Quan: 8,565.62 M Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from RPAMLICO2012 ***** ACARP3 3 Man Carpenter Crew 407.88 CH Prod: 6.0000 UM Lab Pcs: 3.50 Eqp Pcs: 2.10 3SAFFRAIL Safety Rail@] 07% 8,565.62 M 5.000 45,826 85300C 450 Desck Finisher 1.05 428.28 HR 31.500 13,491 85305C Work Bridge 1.05 428.28 HR 5.340 2,287 CAOI Carpenter Fareman 0.50 203.94 MH 23.000 7,508 CA02 Carpenter Journeyman 3.00 1,223.66 MH 21.000 41,449 $l 10,560.85 0.1666 MH/M 1,427.6000 MH [ 3.902 ] 48,957 45,826 15,778 0.0476 Hr/Unit 40.7880 Shifts 0.1667 MH/Unit 5.72 5.35 1.84 � 366151 Access - Conc in superstr dk slabs, HPC Quan: 0.80 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE N F--� �***** Copied and adjusted from RPAMLICO2012 ***** 3EA08 Stair Tower c�i 107% 0.] 8 LS 100,000.000 19,260 $19,260.00 [ ] 19,260 24,075.00 _____> Item Totals: 4160 - CONC DECK $10,245,349.42 7.]930 MH/M3 86,229.74 MH [ 150.972 ] 2,654,941 5,260,34] 879,07] 721,494 729,502 854.634 ll988 M3 221.47 438.80 73.33 60.18 60.85 BID ITEM = 4] 70 BL Description = END BENTS RFC-STAINLESS STEEL (ASTM A 95 Unit= KG TakeoffQuan: ] 3,251.000 Engr Quan: 13,251.000 433 S& I Reinforcing Steel-End Bents 1& 2 Quan: 13,250.98 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from RPAMLICO2012 ***** 2SRASS Resteel Accessori@107% 13,250.98 KG 0.250 3,545 2SRSS Reinforcing Steel@107% 13,250.98 KG 4.250 60,259 4REBARSS Stainless Steel R@101 % 13,250.98 KG 0.580 $71,565.89 [ ] 63,803 _____> Item Totals: D � W 4170 4.82 - END BENTS RFC-STAINLESS STEEL (ASTM A 95 7,762 7,762 0.59 Page 21 OS/04/2012 12:08 Total **Unrevicwed 45,826 13,491 2,287 7,508 41,449 ] 10,561 12.91 **Unreviewed ] 9,260 19,260 24,075.00 ] 0,245,349 854.63 * * U nrcvi cwcd 3,545 60,259 7,762 71,566 5.40 DMJM Harris RBONNFR20] 2 BONNER 20] 2 REVISION 2(OPT 2) Baris Lenderman Activity Description Quantity Resource Pcs Unit BID [TEM = 4170 Description = END BENTS RFGSTAINLESS STEF,L (ASTM A 95 $71,565.89 5.401 13251 KG Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Unit = KG Takeoff Quan: 13,251.000 F,ngr Quan [ ] 63,803 4.81 BL 13,251.000 7,762 0.59 BID ITEM = 4175 BL Description = END BENTS-CIP CONCRF,TF. Unit = M3 TakeoffQuan: 90.000 F.ngr Quan: 90.000 400 Set & Strip End Bent Forms Quan: 163.00 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE End bent is 8'(h)x3.5'(w)x52'(1)-two total Formwork is(1+16)*2*2.4*2=165 m2 d ACARP3 3 Man Carpenter Crew 65l .l4 CH Prod: 0.2503 UH Lab Pcs: 3.50 Eqp Pcs: 0.00 N3F1 WOODEN FORMS@107% 163.00 M2 32.250 5,625 � CA01 Carpenter Foreman 0.50 325.57 MH 23.000 1 1,985 CA02 Carpenter Journeyman 3.00 1,953.45 MH 21.000 66,170 $83,779.58 13.9817 MH/M2 2,279.0200 MI1 [ 327.372 ] 78,155 5,625 3.9947 Hr/Unit 65.1140 Shifts 13.9817 MH/Unit 479.48 34.51 410 Pour & Finish End Bents 1& 2 Quan: 90.00 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE CNC087 Conc Crew w/9320 7.50 CH Prod: 1.5000 UM Lab Pcs 8.00 Eqp Pcs: 6.00 2C0005 4500 PSI Concrete@] 07% 94.50 M3 153.250 ] 5,496 84303R American 9320 250 T 1.00 7.50 HR 291.660 1,190 998 85000C 5 KW GENERATOR 1.00 7.50 HR 4.550 8 26 85320C Concr bucket 1.-5-3 C 1.00 7.50 HR 12.090 62 29 85340R Pump Truck 1.00 7.50 HR 1 11.450 288 548 85360C Hi-Cycle Concrete Vibr 2.00 15.00 HR 1.410 l5 6 CM02 Concrete Finisher Journeym 1.00 7.50 MH 18.250 222 LA01 Labarer Foreman 1.00 7.50 MH 16.500 203 LA02 Laborer,Skilled 2.00 15.00 MH 14.500 362 LA03 Laborer, unskilled 2.00 15.00 MH 13.000 329 OPOS Operator, Crane>140 T 1.00 7.50 MH 28.000 319 OPl2 Oiler 1.00 7.50 MH 14.000 l71 $20,270.44 0.6666MH/M3 60.0000 MH [12.077] 1,605 ]5,496 1,563 1,606 0.0833 Hr/Unit 0.7500 Shifts 0.6667 MH/Unit 17.84 172.18 1736 17.85 _____> Item Totals: 4175 - END BENTS-CIP CONCRETE $104,050.02 25.9891 MH/M3 2,339.02 MH [ 604.984 ] 79,760 15,496 5,625 1,563 1,606 D � � Page 22 OS/04/2012 12:08 Total 71,566 5.40 **Unreviewed 5,625 11,985 66,170 83,780 513.99 * * Unreviewed 15,496 2,] 87 34 91 836 2l 222 203 362 329 319 17l 20,270 225.23 104,050 DMJM Harris RBONNFR20] 2 BONNER 20] 2 REVISION 2(OPT 2) Baris Lenderman Activity Description Quantity Resource Pcs Unit BID [TEM = 4175 Description = END BENTS-CIP CONCRETE ],156.1 ll 90 M3 BIDITEM = 4180 Description = REBAR IN PC DK SEGS 4100 Rebars in segs 15 mhrs/tonne x $30/hr = $450/1000kg = $0.45/kg 2SR Reinfarcing Steel@107% 1,064,22498 KG 2SRA Resteel Accessori@107% 1,064,224.98 KG d 4REBAR Rebar place@101 °/o 1,064,224.98 KG N $],876,015.79 �-+ V _____> Item Totals: 4180 - REBAR IN PC DK SEGS $],876,015.79 1.763 1064225 KG Cost Report Unit Cost Unit= M3 Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BL TakeoffQuan: 90.000 Engr Quan: 90.000 886.22 172.18 62.50 17.36 17.85 Page 23 OS/04/2012 12:08 Total 1,156.1 1 Unit= KG TakeoffQuan: 1,064,225.000 Engr Quan: 1,064,225.000 Quan: 1,064,224.98 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE * * U nrcvi cwed 1.000 1,138,721 1,138,721 O.100 113,872 113,872 0.580 623,423 623,423 [ ] 1,252,593 623,423 1,876,016 1.18 0.59 1.76 [ ] 1,252,593 623,423 ],876,016 1.18 0.59 1.76 BID [TEM = 4190 Description = PRE CAST CON DK SEGS Unit = M3 Takeoff Quan: ] 0,247.000 Engr Quan: 10,247.000 QUANTITY OF PRECAST SEGMENTAL BOX GIRDERS WAS REDUCED FROM 38,918 M3 TO 10,247 M3, OR APPROX. BY 74%. ALL RESOURCES REQUIRED FOR SEGMENTAL GIRDERS PRODUCTIONS ARE REDUCED ACCORDINGLY, ALL RESOURCES THAT REQUIRED TO SET-UP AND MAINTAIN THE YARD- ARE THE SAME. 20500 Casting Yard Staff Quan: 6.24 MTH Hrs/Shft: 10.00 Cal: 510 WC: NONE Z035 --> Casting Supt 1,372.80 MH 58.000 101,615 101,615 Z040 —> Project Engineer 1,372.80 MH 58.000 101,615 101,615 Z045 —> Fi]ed F.ngineer#1 1,372.80 MH 38.500 69,759 69,759 Z070 —> ChiefSurveyor 1,372.80 MH 58.000 lO1,615 101,615 Z122 --> Accounting Clerk 1,372.80 MH 17.000 34,636 34,636 $409,238.55 1,100.0000 MH/MTH 6,864.0000 MH [ 50490 ] 409,239 409,239 1,100.0000 MH/Unit 65,58310 65,583.10 D � cn DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract B�D ITEM = 4]90 Description = PRE CAST CON DK SF,GS Unit= M3 Takcot�fQuan: 10,247.000 6n� Quan: 20500A Geometry Control Staff Quan: 7.70 MTH Hrs/Shft: 10.00 Cal: 510 WC: NONE XZ072 --> Instrument man 4,99122 MH 30.000 193,160 $193,160.21 6482103 MH/MTH 4,991.2200 MH [ 19446.312 ] 193,160 648.2104 MH/Unit 25,085.74 20500A001 Cost of Land Quan: 22.53 ACRE Hrs/Shft: 10.00 Cal: 510 WC: NONE 6LAND LandRenULease 1.00 LS 1,169,500.000 1,169,500 $1,169,500.00 [ ] 1,169,500 51,908.57 � 20500A003 Clear and Grub Site Quan: 25.00 ACRE Hrs/Shft: ] 0.00 Cal: 510 WC: NONE N N � 4CLR Clear and Grub Su@101 % 25.00 ACRE 1,754.000 $44,288.50 [ ] 20500A005 Crade and Level Quan: 54,083.10 CY Hrs/Shft: 10.00 Cal: 510 WC: NONE Assume average of 1/2 cy cut/fill over 25 acres x 4840/2 = 60500cy yard site of push dirt 4ROAD RoadWorkSub@]Ol% 54,083.]0 CY 3.500 $191,183.76 [ ] 20500A007 Stone Fill Quan: 27,041.00 TON Hrs/Shft: 10.00 Cal: 510 WC: NONE Assumed 1/3 yd over 1/2 of 25 acres x 4840 x 1.Ston /cy = 30000 ton 4ROAD.01 Road Wark Sub@] O] % 26,613.09 LTN 23.390 $628,704.98 [ ] 20500A009 Fencing Quan: 5,924.98 FT Hrs/Shft: 10.00 Cal: 510 WC: NONE 4FENCE FencingSubcontra@]O1% 5,924.98 FT 17.540 $104,963.39 [ ] D � rn 10,247.000 Page 24 OS/04/2012 12:08 Total 193,160 193,160 25,085.74 1,169,500 1,169,500 51,908.57 44,289 44,289 44,289 44,289 1.771.54 1.771.54 191,184 191,184 191,] 84 191,184 3.54 3.54 628,705 628,705 628,705 628,705 23.25 23.25 104,963 104,963 104,963 104,963 17.72 17.72 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description B�D ITEM = 4]90 Description = PRE CAST CON DK SEGS 20500A011 Yard Lights 4F.LEC Electrical Subcon@101% $73,831.00 Page 25 OS/04/2012 12:08 Cost Report Quantity Unit Perm Constr Equipment Equipment Sub- Pcs Unit Cost Labor Material Matl/Exp Ownership Operation Contract Total Unit= M3 Takeot�fQuan: 10,247.000 6n� Quan: 10,247.000 Quan: 22.22 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 25.00 EA 2,924.000 73,831 73,831 [ ] 73,831 73,831 3,322.73 3,322.73 20500A015 Utility hook-Ups Quan: 10.00 EA 3UTHOOK UtilityHook-ups@107% 10.00 EA 2,500.000 $26,750.00 [ ] � 20500A017 Set-Up Trailers Quan: 2.71 EA N N � F&5006 6 man Form & Sh-ip Crew 100.00 CH Prod: 10.0000 S 3MISC Miscellaneous Mat@107% 1.00 LS 10,000.000 3TRAlLER 60' by 10' Traile@107% 3.00 EA 20,000.000 84700C 185 CFM Compressor 1.00 ] 00.00 HR 18.520 85005C 20 KW GENERATOR 1.00 100.00 HR 15.450 Hrs/Shft: 10.00 Cal: 510 WC: NONE 26,750 26,750 2,675.00 Hrs/Shft: ]0.00 Cal: 510 WC: NONE Lab Pcs: 6.00 Eqp Pcs: 2.00 10,700 64,200 3 82 l ,470 370 1,175 CAOl Carpenter Foreman 1.00 100.00 MH 23.000 3,681 CA02 Carpenter Journeyman 2.00 200.00 MH 21.000 6,775 LA02 Laborer,Skilled 2.00 200.00 MH 14.500 4,824 LA03 Laborcr, unskilled 1.00 100.00 MH 13.000 2,193 $95,770.32 221.4022 MH/EA 600.0000 MH [ 4343.173 ] 17,473 74,900 752 2,645 36.9004 Hr/Unit 10.0000 Shifts * 221.4022 MH/Unit 6,447.72 27,638.38 277.49 976.O1 20500A019 Expences Quan: 5.62 MTH Hrs/Shft: 10.00 Cal: 510 WC: NONE 30FFSUPPL Office Supply@107% 6.24 MTH 1,000.000 6,677 3SECURlTY Security@107% 6.24 MTH 1,000.000 6,677 3STOR-BOX Steel Storage Con@107% 1.30 EA 2,500.000 3,478 3TRASH GarbageDisposal�c�,107% 6.24 MTH 1,000.000 6,677 3UTILEXP Utility Bxpenses@]07% 6.24 MTH 2,000.000 13,354 $36,861.50 [ ] 36,862 20500A021 3FURN D � � Furn/Off Machines/Computers Trailer Furnishin@107% 1.00 LS 6,558.99 Quan: 0.90 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 20,000.000 21,400 26,750 26,750 2,675.00 10,700 64,200 1,852 1,545 3,681 6,775 4,824 2,193 95,770 35,339.60 6,677 6,677 3,478 6,677 l 3,354 36,862 6,558.99 21,400 DMJM Harris RBONNFR20] 2 BONNER 20] 2 REVISION 2(OPT 2) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4190 Description = PRE CAST CON DK SEGS Unit= M3 TakeoffQuan: ] 0,247.000 F,ngr Quan: 10,247.000 30FFMACH Office Machines@107% 1.00 LS 30,000.000 32,100 $53,500.00 [ ] 53,500 59,444.44 20500B01 Set up Rebar Jigs & Hang-Up Racks Quan: 8.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 8 Jigs @ the 16 m width & 8 Hang-Up Racks F&5006 6 man Form & Strip Crew 243.90 CH Prod: 24.3902 S Lab Pcs: 6.00 Eqp Pcs: 2.00 2CFL005 Cl-P Conc 5000@107% 48.76 CY 96.000 5,009 3F$025 Form Supplies@107% 2,439.00 SF 2.000 5,219 3F[N-PLY Fin-Ply@l07% 2,439.00 SF 4.000 10,439 3SCAFF-15K 15 Kip/Leg Scaffo@107% 39.04 F.A 325.000 13,576 � 84700C 185 CFM Compressor 1.00 243.90 HR 18.520 932 3,585 � 85005C 20 KW GENERATOR 1.00 243.90 HR 15.450 902 2,866 N CA01 Carpenter Foreman 1.00 243.90 MH 23.000 8,979 � CA02 Carpenter Journeyman 2.00 487.80 MH 21.000 16,523 LA02 Laborer,Skilled 2.00 487.80 MH 14.500 11,765 LA03 Laborer, unskilled 1.00 243.90 MH 13.000 5,350 $85,145.86 182.9250 MH/FA 1,463.4000 MH [ 3588.379 ] 42,617 5,009 29,235 1,834 6,451 30.4875 Hr/Unit 24.3900 Shifts * 182.9250 MH/Unit 5,327.18 626.08 3,654.32 22927 806.39 20500B02 Survey Platforms Quan: 4.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 8# square platforms 10' in the air F&5006 6 man Form & Strip Crew 40.03 CH Prod: 4.0030 S Lab Pcs: 6.00 Eqp Pcs: 2.00 2CFL005 C]-P Conc 5000@l07% 10.00 CY 96.000 1,027 3F$O15 Farmwark@l07% 500.44 SF 2.000 1,07] 3SCAFF-15K 15 Kip/Leg Scaffo@]07% 20.00 EA 325.000 6,955 84308R American 7260 100T 0.00 HR 163.010 84700C 185 CFM Compressor 1.00 40.03 HR 18.520 153 588 85005C 20 KW GF,NERATOR 1.00 40.03 HR 15.450 148 470 CAOI Carpenter Foreman 1.00 40.03 MH 23.000 1,474 CA02 Carpenter Journeyman 2.00 80.06 MH 21.000 2,712 LA02 Laborer,Skilled 2.00 80.06 MH 14.500 ],931 LA03 Laborer, unskilled 1.00 40.03 MH 13.000 878 OP02 Operator,Crane<50 T 0.00 MH 26.000 $17,407.52 60.0450 MH/EA 240.1800 MH [ 1177.885 ] 6,995 1,027 8,026 301 ],059 ]0.0075 Hr/Unit 4.0030 Shifts * 60.0450 MH/Unit 1,748.64 256.80 2,006.49 75.26 264.70 Page 26 OS/04/2012 12:08 Total 32,] 00 53,500 59,444.44 5,009 5,219 10,439 13,576 4,517 3,768 8,979 16,523 l 1,765 5,350 85,146 10,643.23 1,027 1,071 6,955 741 618 ] ,474 2,712 1,931 878 17,408 4,351.88 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract B�D ITEM = 4]90 Description = PRE CAST CON DK SF,GS Unit= M3 Takcot�fQuan: 10,247.000 6n� Quan: 10,247.000 20500B03 Casting Machine Foundations Quan: 500.00 CY Hrs/Shft: 10.00 Cal: 510 WC: NONE 8 Beds F&5006 6 man Form & Sh7p Crew 191.14 CH Prod: 191140 S 2CFL005 C]-P Conc 5000@107% 500.00 CY 96.000 2SR Reinforcing Stcel@107% 75,000.41 KG 1.000 2SRA Resteel Accessori@107% 64,S13.06 KG 0.100 3F$O10 Farmwork@107% 7,500.04 SF 2.000 4RBR Resteel Install S@101 % 75,000.41 LB 0.320 84700C 185 CFM Compressor 1.00 19l .14 HR 18.520 85005C 20 KW GENERATOR 1.00 191.14 HR 15.450 � CA01 Carpenter Foreman 1.00 191.14 MH 23.000 � CA02 Carpenter Journeyman 2.00 382.28 MH 21.000 N LA02 Laborer,Skilled 2.00 382.28 MH 14.500 � LA03 Laborer, unskilled 1.00 191.14 MH 13.000 $218,695.06 2.2936 MH/CY 1,146.8400 MH [ 44.994 ] 0.3823 Hr/Unit 19.1140 Shifts * 2.2937 MH/Unit 20500B04 Canopies Quan: 4.00 EA 3CANOPY Scg Mach Canopies@107% 5,00420 SF 10.000 $53,544.94 [ ] 20500B05 F&5006 2CFL005 2SR 2SRA 3F$005 3GANTRAIL 3TRACKSWTC 4RBR 84700C 85005C CA01 CA02 D � � Cantry Crane Rail 6 man Form & Stnp Crew Cl-P Conc 5000@107% Reinforcing St�el@107% Resteel Accessori@107% Formwark@l 07% l00# Gantty Rail@107% GantryTrack Swit@107% Resteel Install S@l O l% 185 CFM Compressor 20 KW GENERATOR Carpenter Foreman Carpenter Journeyman 196.74 CH 1,500.00 CY ] 19,999.97 KG 119,999.97 KG 6,000.00 LF 6,000.00 LF 0.60 EA ] 19,999.97 LB 1.00 196.74 HR 1.00 196.74 HR 1.00 196J4 MH 2.00 393.48 MH Quan: 6,000.00 LF Prod: 19.6740 S 96.000 1.000 0.100 2.000 20.000 35,000.000 0.320 l 8.520 15.450 23.000 21.000 Lab Pcs: 6.00 Eqp Pcs: 2.00 51,360 80,250 6,903 16,050 24,240 730 2,810 707 2,246 7,037 12,949 9,220 4,193 33,399 138,513 16,050 1,437 5,056 24,240 66.80 277.03 32.10 2.87 10.1 ] 48.48 Hrs/Shft: 10.00 Cal: 510 WC: NONE 53,545 53,545 13,38624 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 6.00 Eqp Pcs: 2.00 154,080 128,400 12,840 12,840 128,400 22,470 38,784 752 2,892 728 2,312 7,243 13,328 Page 27 OS/04/2012 12:08 Total 51,360 80,250 6,903 16,050 24,240 3,540 2,953 7,037 12,949 9,220 4,193 218,695 437.39 53,545 53,545 13,386.24 154,080 128,400 12,840 12,840 128,400 22,470 38,784 3,644 3,040 7,243 13,328 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs BID [TEM = 4190 Description = PRE CAST CON DK SEGS LA02 Labarer,Skilled LA03 Labarer, unskilled $538,874.20 0.1967 MH/LF 0.0328 Hr/Unit 19.6740 Shifts 20500B06 Set-Up Casting Machines F&5006 6 man Form 8r Snip Crcw 3MISC.01 Miscellaneous Mat@107% 84700C 185 CFM Compressar 85005C 20 KW GENERATOR CA01 Carpenter Fareman � CA02 Carpent�r Journeyman F! , LA02 Laborer,Skilled N LA03 Laborer, unskilled �$150,559.87 600.3079 MH/F,A 100.O513 Hr/Unit 72.1370 Shifts 20500D Speciality Engineering 6SREC-ENG Special Engineering $1,169,500.00 Quantity Unit Unit Cost Cost Report Unit = M3 2.00 393.48 MH 14.500 1.00 196.74 MH 13.000 1,180.4400 MH [ 3.859 ] * 0.7967 MWOnit Page 28 OS/04/2012 12:08 Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Total Takeoff Quan: ] 0,247.000 Engr Quan: 10,247.000 9,491 9,491 4,315 4,315 34,377 295,320 ]63,710 1,479 5,204 38,784 538,874 5.73 4922 2729 0.25 0.87 6.46 89.81 Quan: 7.21 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 72] 37 CH Prod: 72.1370 S Lab Pcs: 6.00 Eqp Pcs: 2.00 7.21 EA 1.000 8 1.00 721.37 HR 18.520 2,756 10,604 L00 72137 HR 15.450 2,669 8,476 1.00 72137 MH 23.000 2.00 1,442.74 MH 21.000 2.00 ],442.74 MH 14.500 1.00 721.37 MH 13.000 4,328.2200 MH [ 11776.039 ] * 600.3079 MH/Unit Quan: 1.00 LS 1.00 LS 1,169,500.000 �l 20500E Casting Yard Equip & Op's Equip based on 176 hr/mth & 24 months to cast 3FMFC Metal Column Farm@107 0.50 SF 811 GANTRY l 00T Gantry Crane 999.99 HR 8] 1 PC-PU OP Precast Yard P/U Op's 10,560.00 HR 811PGPU'S Precast Yard Pick-Up 2.50 EA 81 l PC-PUSA PC Yard P/U Salvage 2.50 F,A 811RLLRSCR RollerScreed 1.00 EA 81 lTRLRPMP --> Trailer Pump(60 cy/hr) 999.99 HR 83405C -> CAT 966F (220 HP) 999.99 HR 84308R =_> American 7260 100T 999.99 HR 84510R =-> 50 Ton R.T. 999.99 HR 84700C =_> 185 CFM Compressor 2,000.00 HR 84910C => 400 Amp Welder 2,000.00 HR � Quan 150,000.000 l 18.000 3.000 30,000.000 10,000.000 11,000.000 48.400 87.530 163.0 ] 0 128.100 l 8.520 I 1.250 26,556 48,870 34,798 ] 5,823 126,047 17,482.28 Hrs/Shft: 10.00 6.00 MTH Hrs/Shft: ]0.00 8 5,425 19,080 1.07 752.38 2,646.36 Cal: 510 WC: NONE 1,169,500 1,169,500 1,169,500.00 Cal: 510 WC: NONE 80,250 117,999 31,680 75,000 25,000 1 1,770 16,400 32,000 34,230 53,299 83,809 79,199 56,174 80,891 7,640 29,400 3,800 18,700 8 13,360 11,145 26,556 48,870 34,798 15,823 150,560 20,882.09 1,169,500 1,169,500 1,169,500.00 8Q250 117,999 31,680 75,000 25,000 l 1,770 48,400 87,529 163,008 l 37,066 37,040 22,500 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report BID [TEM = 4190 Description = PRE CAST CON DK SEGS Unit= M3 85005C =_> 20 KW GENERATOR 2,000.00 HR 15.450 85315 --> Conc. Bucl<et 5 CY 2,000.00 HR 18.040 85320C --> Concr bucket 1.-5-3 C 2,000.00 HR 12.090 85325C --> Concrete Saw Handhel 2,000.00 HR 11.460 Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract TakeoffQuan: ]0,247.000 L165 -> Mechanic 2,000.00 MH 35.000 101,630 OP03 =_> Operator, crane S 1T 999.99 MH 26.000 39,722 OPO4 =_> Operator, Crane 91T 2,000.00 MH 28.000 85,094 OP10 =_> Operator, Loader 999.99 MH 2O.500 31,954 $1,209,721.70 999.9966 MH/MTH 5,999.9800 MH [ 31624.913 ] 258,400 9999967 MH/Unit 43,066.71 20500F Concrete and Embeds Quan: 10,247.20 M3 Hrs/Shft: 10.00 �2ACCESSH AccessHATCHF,S@107°/a 13.17 EA 350.000 4,932 N 2BOX-DRN Box Drains@107% 394.95 EA 1.000 423 W 2CFL025.01 Cl-N Conc (FL)@] 07% 10,24720 M3 196.500 2,154,525 2CSUPER Super-plasticizer@107% 10,247.20 M3 15.000 164,468 2DIAP-DOOR Diphragm Door As@107% 13.17 EA 550.000 7,751 2LIFT-BLK Lifting Block Out@107% 1,527.15 EA 2.500 4,085 2RF,STR-PIPE Restrainer Assemb@107% 2633 F,A 30.000 845 2SCUPPFRS Seg Deck Scuppers@107% 210.64 EA 1.500 338 $2,337,366.32 [ ] 2,337,366 228.10 20500G03 Form Pier & end benY special seg's Quan: 10.00 EA Hrs/Shft: 10.00 SEG 4.5 Man Segment Precasting 33333 CH Prod: 150.0000 MU Lab Pcs: CA01 Ca�penterForeman 0.50 166.67 MH 23.000 6,136 CA02 CarpenterJourneyman 1.00 333.33 MH 21.000 11,291 CMO1 Concrete Finisher Foreman 1.00 33333 MH 2O.250 10,831 IWO1 Ironwarker Foreman 1.00 333.33 MH 28.000 14,960 LA02 Laborer,Skilled 1.00 333.33 MH 14.500 8,040 $51,258.14 ]49.9990 MH/EA ],499.9900 MH [ 3492.477 ] S1,258 33.3330 Hr/Unit 33.3330 Shifts 149.9990 MH/Unit * 5,125.81 20500G05 Form typical seg's Quan: 340.00 EA Hrs/Shft: 10.00 The segmental box was quantified based on the overall length shown on the 2006 Preliminary Plans. lOft +/-, thus the total number of sections (boxes) would be approximately 350. � F,ngr Quan: 10,247.000 7,400 23,500 24,580 17,500 16,480 7,700 5,620 17,300 80,250 517,582 353,490 13,375.00 86,263.65 58,914.92 Cal: 510 WC: NONE Cal: 510 WC: NONE 4.50 Eqp Pcs: 0.00 Page 29 OS/04/2012 12:08 Total 30,900 36,080 24,] 80 22,920 ] 01,630 39,722 85,094 31,954 1,209,722 20],62028 4,932 423 2,154,525 164,468 7,751 4,085 845 338 2,337,366 228.10 6,136 11,291 10,831 14,960 8,040 51,258 5,125.81 Cal: 510 WC: NONE The segments were assumed to have a length of DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4190 Description = PRE CAST CON DK SEGS Unit = M3 Takeoff Quan: ] 0,247.000 F,ngr Quan: 10,247.000 Pier segments-10 ea, typical segments-340 ea SEG 4.5 Man Segment Precasting 7,555.57 CH Prod: 100.0003 MU Lab Pcs: CA01 Carpenter Foreman 0.50 3,777.79 MH 23.000 ] 39,073 CA02 Carpenter Journeyman 1.00 7,555.58 MH 21.000 255,931 CMO1 Concrete Finisher Foreman 1.00 7,555.58 MH 2O.250 245,513 IW01 Ironworker Foreman 1.00 7,555.58 MH 28.000 339,108 LA02 Laborer,Skilled 1.00 7,555.58 MH 14.500 182,236 $1,161,862.63 ]00.0003 MH/EA 34,000.1100 MH [2328.341 ] 1,161,863 222223 Hr/Unit 755.5570 Shifts 100.0003 MH/Unit * 3,41724 20500H Pour Segments Quan: 350.00 EA Hrs/Shft: 10.00 CON006 6 Man Conc Place and Finish 1,050.00 CH Prod: 3.0000 HU Lab Pcs: � 84700C 185 CFM Compressar 1.00 1,050.00 HR 18.520 N 85005C 20 KW GENERATOR 1.00 1,050.00 HR 15.450 � 85360C Hi-Cycle Concrete Vibr 2.00 2,100.00 HR L410 CM02 Concrete Finisher Journeym 2.00 2,100.00 MH 18.250 62,121 LA01 LaborerForeman 1.00 1,050.00 MH 16.500 28,384 LA02 Laborer,Skilled 2.00 2,100.00 MH 14.500 50,651 LA03 Laborer, unskilled 1.00 1,050.00 MH 13.000 23,031 OPO1 Operator Foreman 1.00 1,050.00 MH 30.000 47,641 $250,456.98 21.0000 MH/FA 7,350.0000 MH [ 412.5 ] 211,827 3.0000 Hr/Unit * 105.0000 Shifts 21.0000 MH/Unit 60522 20500I Clean and Rub Segments Quan: 350.00 EA Hrs/Shft: 10.00 CNC71 Pouit, Patch and Rub Crew 1,166.66 CH Prod: 3.0000 US Lab Pcs: 3CCA Concrete rubbing@107% 13,070.54 M2 1.000 3CURE Curing@107% 24,204.70 M2 0.550 3SAND Sand Blasting Mat@]07% 4,295.12 M2 2.500 CMOI Concrete Finisher Fareman 1.00 1,166.67 MH 2O.250 37,910 CM02 Concrete Finisher Journeym 5.00 5,833.33 MH 18.250 ] 72,558 $250,187.08 20.0000 MH/F.A 7,000.0000 MH [ 408.833 ] 210,468 3.3333 Hr/Unit 116.6660 Shifts 20.0000 MH/Unit 601.34 20500K Store Segments Quan: 300.00 EA Hrs/Shft: 10.00 3DUNNAGE Hardwood Blocking cr 107% 15.64 MBFT 1,000.000 $]6,734.80 [ ] � 4.50 Eqp Pcs: 0.00 Cal: 510 WC: NONE 7.00 F,c� Pcs: 4.00 4,011 15,435 3,885 12,338 2,121 840 ]0,017 28,613 28.62 81.75 Cal: 510 WC: NONE 6.00 Eqp Pcs: 0.00 13,985 14,244 11,489 39,719 113.48 Cal: 510 WC: NONE 16,735 16,735 Page 30 OS/04/2012 12:08 Total 139,073 255,931 245,513 339,108 182,236 1,] 61,863 3,417.24 19,446 16,223 2,961 62, ] 21 28,384 50,651 23,031 47,641 250,457 715.59 13,985 14,244 l 1,489 37,910 172,558 250,187 714.82 **Unreviewed ] 6,735 16,735 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4190 Description = PRE CAST CON DK SEGS Unit = M3 Takeoff Quan: ] 0,247.000 Engr Quan: 10,247.000 55.78 20500L Dismantle Casting Yard Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE F&5006 6 man Form & Strip Crcw 200.00 CH Prod: 20.0000 S Lab Pcs: 6.00 Eqp Pcs: 2.00 Page 31 OS/04/2012 12:08 Total 55.78 4DEM0.01 Demolition Sub@l0]% 2,09691 CY 58.480 123,854 123,854 84308R American 7260 100T 0.00 HR ] 63.010 84700C 185 CFM Compressor 1.00 200.00 HR 18.520 764 2,940 3,704 85005C 20 KW GENERATOR 1.00 200.00 HR 15.450 740 2,350 3,090 CA01 Carpenter Foreman 1.00 200.00 MH 23.000 7,363 7,363 CA02 Carpenter Journeyman 2.00 400.00 MH 21.000 13,549 13,549 LA02 Laborer,Skilled 2.00 400.00 MH 14.500 9,648 9,648 � LA03 Labarer, unskillcd 1.00 200.00 MH 13.000 4,387 4,387 F! , OP02 Operator,Crane<50 T 0.00 MH 26.000 �N $] 65,594.21 1,200.0000 MH/LS 1,200.0000 MH [ 23540 ] 34,947 1,504 5,290 123,854 165,594 200.0000 Hr/Unit 20.0000 Shifts * 1,200.0000 MH/Unit 34,946.64 1,504.00 5,290.00 123,853.57 165,594.21 _____> Item Totals: 4190 - PRE CAST CON DK SEGS $]0,704,661.52 7.5987 MH/M3 77,86438 MH [ 192.042 ] 2,792,070 2,777,235 2,938,289 540,332 426,887 1,229,849 ]0,704,662 1,044.663 10247 M3 272.48 27].03 286.75 52.73 41.66 ]20.02 1,044.66 BID ITEM = 4191 Description = ERECT PC DK SEGS Unit= 21100A01 Heavy Lift Crane Assembly Marine Quan: ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** LA02 =_> Laborer,Skilled 78.00 MH 14.50 OPOS --> Operator, Crane>140 156.00 MH 28.00 $8,518.67 600.0000 MWLS 234.0000 MH [ 15510 600.0000 MH/Unit 21100A02 Heavy Crane Site Moves Marine Quan: ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** LA02 --> Laborer,Skilled 27.30 MH 14.50 OPOS =_> Operator, Crane>140 54.60 MH 28.00 D � W BL M3 Takeoff Quan: ] 0,247.000 F.ngr Quan: 10,247.000 0.39 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 0 1,881 0 6,637 ] 8,519 21,842.74 2.73 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 0 658 0 2,323 **Unrcvicwcd 1,881 6,637 8,S l 9 21,842.74 * * U nreviewed 658 2,323 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4191 BL Description = ERECT PC DK SEGS Unit = M3 Takeoff Quan: 10,247.000 F,ngr Quan: 10,247.000 $2,981.54 30.0000 MH/EA 81.9000 MH [ 775.502 ] 2,982 30.0000 MH/Unit 1,092.14 21100E Prop Extended Catilevers Quan: 9.02 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted frOm V:\HEAVYBID\EST\BONNER2012 ***** F&5006 6 man Form & Sh-ip Crew 263.29 CH Prod: 26.3296 S 3MSTRSTL Misc Struc Steel@107% 13.16 TON 1,000.000 3SHOR-100K 100 Kip Shoring@107% 0.26 LS 250,000.000 84700C 185 CFM Compressar 1.00 263.30 HR 18.520 85005C 20 KW GENERATOR 1.00 26330 HR 15.450 CA01 Carpenter Foreman 1.00 263.30 MH 23.000 � CA02 Carpenter Journeyman 2.00 526.59 MH 21.000 � LA02 Laborcr,Skilled 2.00 526.59 MH 14.500 N LA03 Laborer, unskilled 1.00 26330 MH 13.000 �$138,582.15 175.1419 MH/EA 1,579.7800 MH [3435.701 ] 29.1896 Hr/Unit 26.3290 Shifts * 175.1419 MH/Ui�it 2ll OOF Stability Systems Quan: 17.09 EA ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** F&5006 6 man Form & Sh-ip Crew 256.29 CH Prod: 1.4997 SU 3MISC Miscellaneous Mat@107% 17.09 LS 1.000 3PIERBRKT Erection Truss Pi@] 07% 1.05 EA 50,000.000 84700C 185 CFM Compressor 1.00 256.29 HR 18.520 85005C 20 KW GENERATOR L00 256.29 HR ] 5.450 CA01 Carpenter Fareman 1.00 256.29 MH 23.000 CA02 Carpenter Journeyman 2.00 512.59 MH 21.000 LA02 Laborer,Skilled 2.00 512.59 MH 14.500 LA03 Laborer, unskilled 1.00 256.29 MH 13.000 $109,682.39 89.9801 MH/F,A ],537.7600 MH [ 1765.11 ] 14.9965 Hr/Unit 25.6290 Shifts 89.980] MH/Unit 21100H load Out Seg' @ PC Yard Quan: 358.35 EA ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** LAB02 2 Man Labar Crew 895.86 CH Prod: 4.0000 US 3MISC Miscellaneous Mat@107% 358.35 EA 10.000 4HAUL Haul Carolina to@101% 358.35 TRIP 1,169.500 LA02 Laborer,Skilled 1.00 895.86 MH 14.500 D � � Lab Pcs: 6.00 Eqp Pcs: 2.00 14,08] 69,550 1,006 3,871 974 3,094 9,693 l 7,837 12,701 5,775 46,007 83,631 1,980 6,964 5,100.52 9,271.75 219.51 772.09 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 6.00 Eqp Pcs: 2.00 18 56,] 75 979 3,767 948 3,011 9,435 17,363 12,363 5,622 44,783 56,193 1,927 6,779 2,620.42 3,288.08 112.77 396.66 Hrs/Shft: 10.00 Cal: 510 WC: NONE 21,608 Lab Pcs: 2.00 Eqp Pcs: 0.00 3,834 423,281 Page 32 OS/04/2012 12:08 Total 2,982 ],092.14 ** Unrcvicwed 14,081 69,550 4,876 4,068 9,693 17,837 12,701 5,775 138,582 15,363.87 **Unreviewed 18 56,175 4,746 3,960 9,435 17,363 l 2,363 5,622 109,682 6,417.93 ** Unrcvicwed 3,834 423,281 21,608 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Page 33 OS/04/2012 12:08 Total BID [TEM = 4191 BL Description = ERECT PC DK SEGS Unit = M3 Takeoff Quan: 10,247.000 F,ngr Quan: 10,247.000 LA03 Labarer, unskilled 1.00 895.86 MH 13.000 19,650 19,650 $468,373.54 4.9999 MH/EA ],791.7200 MH [ 75.624 ] 41,258 3,834 423,281 468,374 2.5000 Hr/Unit 89.5860 Shifts 4.9999 MH/Unit 115.13 10.70 1,181.20 1,307.03 21100J Apply Epoxy Quan: 380.73 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** LAB02 2 Man Labar Crew 951.81 CH Prod: 2.5000 HU 2EPDXY Segment Epoxy Glu@l07% 2,284.35 GAL 22.000 3GLOVES Gloves to apply F,@107% 761.45 PR 2.500 LA02 Laborer,Skilled 1.00 951.81 MH 14.500 LA03 Laborer, unskilled 1.00 951.81 MH 13.000 �$99,645.16 4.9999 MH/F.A 1,903.6200 MH [ 75.624 ] � 2.5000 Hr/Unit * 95.1810 Shifts 4.9999 MH/Unit r-� N � 21100K Erect Pier, abut & special Segme Quan: 33.70 EA ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** ERECT8 Se�nent Erecrion Crew 1,685.09 CH Prod: 5.0003 SU 3MISC Miscellaneous Mat@107% 33.70 EA 1.000 84310 4100 Manitowoc S2 1.00 1,685.09 HR 327.850 84700C 185 CFM Compressor 1.00 1,685.09 HR 18.520 85005C 20 KW GENERATOR 1.00 1,685.09 HR 15.450 iW011 Ironworker Foreman 1.00 1,685.09 MH 28.000 IW02 lronwarker Jorneyman 3.00 5,055.28 MH 26.000 LA02 Labor�r,Skilled 3.00 5,055.28 MH 14.500 OPOS Operator, Crane>140 T 1.00 1,685.09 MH 28.000 $],090,758.50 400.0219 MH/EA 13,480.7400 MH [ 9763.035 ] 50.0027 Hr/Unit ] 68.5090 Shifts 400.0220 MH/Unit 2ll OOL Erect Cantilever 5egments Quan: 348.08 EA ***�* Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** FRECT8 Segment Erection Crew 1,160.25 CH Prod: 3.0000 US 84310 4100 Manitowoc S2 1.00 1,160.26 HR 327.850 84700C 185 CFM Compressor 1.00 1,160.26 HR 18.520 85005C 20 KW GENERATOR 1.00 1,16026 HR 15.450 IWO11 IronworkerForeman 1.00 1,160.26 MH 28.000 IW02 Ironwarker Jorneyman 3.00 3,480.77 MH 26.000 LA02 Laborer,Skilled 3.00 3,480.77 MH 14.500 D � cn Lab Pcs: 2.00 Eqp Pcs: 0.00 53,774 2,037 22,957 20,878 43,835 53,774 2,037 115.13 14124 5.35 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 8.00 Eqp Pcs: 3.00 36 298,851 253,606 6,437 24,771 6,235 19,800 75,630 2l 1,767 12],930 71,696 481,023 36 311,523 298,177 ] 4,273.69 1.07 9,243.99 8,847.97 Hrs/Shft: 10.00 Cal: 510 WC: NONE 52,075 145,810 83,954 Lab Pcs: 8.00 Eqp Pcs: 3.00 205,772 174,619 4,432 17,056 4,293 13,633 **Unreviewed 53,774 2,037 22,957 20,878 99,645 261.72 ** Unreviewed 36 552,457 31,208 26,035 75,630 211,767 121,930 71,696 1,090,759 32,366.72 **Unrcvicwcd 380,391 21,488 17,926 52,075 145,8] 0 83,954 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Page 34 OS/04/2012 12:08 Total BID [TEM = 4191 BL Description = ERECT PC DK SEGS Unit = M3 Takeoff Quan: 10,247.000 F,ngr Quan: 10,247.000 OPOS Operator, Crane>140 T 1.00 1,160.26 MH 28.000 49,366 49,366 $751,010.19 26.6664 MH/EA 9,282.0600 MH [ 650.828 ] 331,205 214,497 205,308 751,010 3.3333 Hr/Unit 116.0250 Shifts 26.6665 MH/Unit 951.52 61623 589.83 2,157.58 21100M01 Clean Excess Epoxy Quan: 380.73 JTS Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** LAB02 2 Man Labar Crew 571.08 CH Prod: 3.0000 MU Lab Pcs: 2.00 Eqp Pcs: LA02 Labarer,Skilled 1.00 57].09 MH 14.500 13,774 LA03 Laborer, unskilled 1.00 57l .09 MH 13.000 12,527 $26,301.00 2.9999 MH/JTS 1,142.1800 MH [ 45.375 ] 26,301 1.5000 Hr/Unit 57.1080 Shifts 3.0000 MH/Unit * 69.08 �2ll00N Temp Handrail Quan: 6,951.01 LF Hrs/Shft: 10.00 Cal: 510 WC: NONE r-� N �***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** F&5006 6 man Form & Stnp Crew 57.90 CH Prod: 20.0055 UM Lab Pcs: 6.00 Eqp Pcs: 84700C 185 CFMCompressor 1.00 57.91 HR 18.520 22] 85005C 20 KW GF.,NERATOR 1.00 57.91 HR 15.450 214 CA01 Carpenter Fareman 1.00 5791 MH 23.000 2,132 CA02 Carpenter Journeyman 2.00 l 15.82 MH 21.000 3,923 LA02 Laborcr,Slcilled 2.00 115.82 MH 14.500 2,794 LA03 Laborer,unskilled ].00 57.91 MH 13.000 1,270 $12,085.97 0.0499 MH/LF 347.4600 MH [0.981 ] 10,119 435 0.0083 Hr/Unit 5.7900 Shifts 0.0500 MH/Unit 1.46 0.06 21100P Form & Strip CIP Segments Quan: 426.54 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** F&5006 6 man Form & Strip Crew 355.44 CH Prod: 0.2000 UM Lab Pcs: 6.00 Eqp Pcs: 3F$O10 Farmwark@107% 26.33 M2 600.000 16,904 84700C 185 CFM Compressor 1.00 355.45 HR 18.520 1,358 85005C 20 KW GENERATOR 1.00 355.45 HR 15.450 1,315 CAOI Caipenter Foreman 1.00 355.45 MH 23.000 13,085 CA02 Carpenter Journeyman 2.00 710.90 MH 2].000 24,080 LA02 Laborer,Skilled 2.00 710.90 MH 14.500 17,146 LA03 Laborer, unskilled 1.00 355.45 MH 13.000 7,797 $91,087.39 5.0000 MWM2 2,132.7000 MH [ 98.083 ] 62,109 16,904 2,673 0.8333 Hr/Unit 35.5440 Shifts 5.0000 MH/Unit 145.61 39.63 6.27 � 0.00 2.00 851 680 1,532 0.22 2.00 5,225 4,177 9,402 22.04 **Unreviewed 13,774 12,527 26,301 69.08 **Unreviewed 1,072 895 2,132 3,923 2,794 1,270 12,086 1.74 ** Unreviewed 16,904 6,583 5,492 13,085 24,080 17,146 7,797 91,087 213.55 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract B�D ITEM = 4191 BL Description = ERECT PC DK SEGS Unit= M3 TakeoffQuan: 10,247.000 Engr Quan: 10,247.000 21100P01 Pour Closure Segments Quan: 101.90 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** CNCOS CONC CREW W/3900 2037 CH Prod: 0.5000 UM Lab Pcs: 10.00 Eqp Pcs: 15.00 2C0006 5000 PSI Concrete@107% 111.51 M3 157.200 18,756 84335R 3900 Manitowoc l 10 2.00 40.76 HR ] 56.470 3,390 2,988 85000C 5 KW GENF.RATOR 1.00 20.38 HR 4.550 22 70 85320C Concrbucket ].-5-3 C 6.00 122.27 HR 12.090 1,008 47l 85360C Hi-CycleConcrete Vibr 6.00 122.27 HR 1.410 ]23 49 CM02 Concrete Finisher Journeym ].00 20.38 MH 18.250 603 LA01 LaborerForeman 1.00 20.38 MH 16.500 SSl � LA02 Laborer,Skilled 2.00 40.76 MH 14.500 983 � LA03 Labor�r, unskilled 2.00 40.76 MH 13.000 894 N OPO4 Operator, Crane 91 T 2.00 40.76 MH 28.000 1,734 �OP12 Oiler 2.00 40.76 MH 14.000 928 $32,570.91 2.0000 MH/M3 203.8000 MH [ 38.225 ] 5,693 18,756 4,543 3,578 0.1999 Hr/Unit 2.0370 Shifts 2.0000 MH/Unit 55.87 184.07 44.59 35.11 CLASS-V CI-V Concrete Coating Quan: 390,005.32 SF Hrs/Shft: 10.00 Cal: 510 WC: NONE Page 35 OS/04/2012 12:08 Total **Unrevicwed 18,756 6,378 93 1,478 ]72 603 SSl 983 894 1,734 928 32,571 319.64 **Unrcvicwcd ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** 4COAT10 Class V Sub@l01% 390,00532 SF 4.390 1,729,245 1�729,245 $1,729,244.59 [ ] ],729,245 1,729,245 4.43 4.43 PROFILE Profilograph of Deck Surface Quan: 0.26 YD Hrs/Shft: 10.00 Cal: 510 WC: NONE ** Unreviewed ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** 4PROFILE Profillograph Sub@l Ol% 2.63 DAY 1,754.000 4,659 4,659 $4,659.15 [ ] 4,659 4,659 _____> IYem Totals: $4,565,501.15 445.545 4191 - ERECT PC DK SECS 3.2904 MH/M3 33,717.72 MH 10247 M3 17,919.81 17,919.81 [ 73.25 ] ],103,833 72,530 ]62,636 537,579 531,739 2,157,185 4,565,501 107.72 7.08 15.87 52.46 51.89 210.52 445.55 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BIDITEM = 4192 BL Description = 96" FIB GTRDERS Unit= M TakeoffQuan: 14,408.000 Engr Quan: 14,408.000 367301 Precast Beams Quan: 289.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** Al W4 PC Placing 96333 CH Prod: 3.0000 US 2PCGFIB96 96" FIB GIRDERS@107% 14,408.00 M 1,050.000 804380 400 AMP WELDER 1.00 963.33 HR 11.250 84303R American 9320 250 T 2.00 1,926.67 HR 291.660 8TRUSS Deal girder trus & po 0.15 HR 150,000.000 IWO1 Ironwarker Fareman 1.00 963.33 MH 28.000 IW02 lronwarker Jorneyman 6.00 5,780.00 MH 26.000 LA02 Labarer,Skilled 2.00 1,926.67 MH 14.500 dOP05 Operator, Crane>140 T 2.00 1,926.67 MH 28.000 �OP12 Oiler 2.00 1,926.67 MH 14.000 p$17,240,341.60 43.3333 MH/EA 12,523.3400 MH [ 1089 ] 3.3333 Hr/Unit 96.3330 Shifts 433334 MH/Unit 367310 S& P Steel x Bracing Quan: 427.00 EA ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** A1 W3 Rebar/ Ironworker Crew 711.66 CH Prod: 6.0000 US 2MISCSTEEL Misc steel@107% 117.44 TON 1,500.000 804040 185 CFM 170 HP %0 1.00 71 ].67 HR 18.520 IWO1 IronworkerForeman 1.00 711.67 MH 28.000 IW02 IronwarkerJorneyman 4.00 2,846.68 MH 26.000 $342,399.05 8.3333 MH/EA 3,5583500 MH [ 242.001 ] 1.6667 Hr/Unit 71.1660 Shifts 83334 MH/Unit _____> Item Totals: 4192 - 96" F1B G[RDERS $] 7,582,740.65 1.] 161 MH/M ] 6,081.69 MH [ 29.016 ] 1,220.346 14408 M BID ITEM = 4193 Dcscription = 45" FIB G[RDERS 367301 Precast Beams •. Unit = Quan: Lab Pcs: 13.00 Eqp Pcs: 3.00 16,187,388 1,830 9,007 305,589 256,343 22,500 43,236 242,126 46,470 81,974 43,877 457,68416,187,388 329,919 265,351 1,583.68 56,011.72 1,141.59 918.17 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 5.00 Eqp Pcs: 1.00 188,491 2,719 31,941 119,248 l 51,189 188,491 354.07 441.43 608,873 16,375,879 42.26 1,136.58 2,719 637 332,638 265,351 23.09 18.42 BL M TakcoffQuan: 466.000 F,ngr Quan: 466.000 18.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE Page 36 OS/04/2012 12:08 Total * * U nrcvi ewed 16,187,388 10,837 561,933 22,500 43,236 242,126 46,470 81,974 43,877 17,240,342 59,655.16 * * U nrcvicwcd 188,491 2,719 31,941 119,248 342,399 801.87 ] 7,582,74] 1,220.35 * * U m�cvicwcd DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4193 Description = 45" FIB GIRDERS Unit = M TakeoffQuan: ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** Al W4 PC Placing 40.00 CH Prod: 4.5000 US 2PCGFIB45 45" F1B GIRDERS@107% 466.00 M 690.000 804380 400 AMP WELDER 1.00 40.00 HR 11.250 84303R American 9320 250 T 2.00 80.00 HR 291.660 8TRUSS Dea] girder trus & po 0.00 HR 150,000.000 BL 466.000 Engr Quan: 466.000 Lab Pcs: l 3.00 Eqp Pcs: 3.00 344,048 76 374 12,689 l 0,644 IWO1 lronworkerForeman 1.00 40.00 MH 28.000 1,795 IW02 lronworker Jorneyman 6.00 240.00 MH 26.000 10,054 LA02 Laborer,Skilled 2.00 80.00 MH 14.500 1,930 OPOS Operator, Crane>140 T 2.00 80.00 MH 28.000 3,404 OP12 Oiler 2.00 80.00 MH 14.000 1,822 $386,834.76 28.8888 MH/EA 520.0000 MH [ 726 ] 19,004 344,048 12,765 11,018 � 2.2222 Hr/Unit 4.0000 Shifts 28.8889 MH/Unit 1,055.79 19,113.77 709.16 612.11 r�-� �W 367310 S& P Steel x Bracing Quan: 27.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** Al W3 Rebar/ Ironworker Crew 44.99 CH Prod: 6.0005 US Lab Pcs: 5.00 Eqp Pcs: 1.00 2MISCSTEEL Misc steel@107% 7.43 TON 1,500.000 11,925 804040 185 CFM 170 HP %0 1.00 45.00 HR 18.520 l72 iW01 [ronworker Fareman 1.00 45.00 MH 28.000 2,020 IW02 IronwarkerJorneyman 4.00 179.99 MH 26.000 7,540 $21,656.56 8.3329 MH/EA 224.9900 MH [ 241.989 ] 9,560 l 1,925 1.6663 Hr/Unit 4.4990 Shifts 83330 MH/Unit 354.06 441.67 ____> Item Totals: 4793 - 45" FIB G[RDERS $408,491.32 1.5986 MH/M 744.99 MH [ 42.064 ] 28,564 355,973 876.591 466 M 61.30 763.89 BID ITEM = 4210 Description = PT STRAND IN DK SEGS 22600 PT longitudinal PTS 5 Man PT Crcw 2PTGROUT PT Grout Materia]@l07% 2PTSRACC PT Strand Accesso@107% � 172 6.37 ] 2,937 11,0] 8 27.76 23.64 Unit= KG TakeoffQuan: 15,203.000 Engr Quan: 15,203.000 Quan: 15,202.99 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE 47.50 CH Prod: 64.0001 UM Lab Pcs: 5.00 F,qp Pcs: 0.00 ].97 M3 300.000 632 7.60 TE 150.000 1,220 Page 37 OS/04/2012 12:08 Total 344,048 450 23,333 1,795 10,054 1,930 3,404 ],822 386,835 21,490.82 * * U nrcvi cwed 11,925 172 2,020 7,540 21,657 802.09 408,491 876.59 632 1,220 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4210 Description = PT STRAND 1N DK SEGS Unit = KG Takeoff Quan: 15,203.000 Engr Quan 2PTST Supply PT strand@107% 15,202.98 KG 3.100 50,428 3PTEQUIP PT Equipment@107% 0.01 LS 200,000.000 2,140 IWO1 Ironworker Fareman 2.00 95.02 MH 28.000 4,265 IWOII IronworkerForeman 1.00 47.51 MH 28.000 2,132 LA02 Laborer,Sl<illed 2.00 95.02 MH 14.500 2,292 $63,109.30 0.0156 MH/KG 237.5500 MH [ 0.388 ] 8,689 52,280 2,140 0.0031 Hr/Unit 4.7500 Shifts 0.0156 MH/Unit 0.57 3.44 O.14 _____> lYem Totals: 4210 - PT STRAND IN DK SEGS $63,109.30 0.0156 MH/KG 237.55 MH [ 0.388 ] 8,689 52,280 2,140 4.]5] 15203 KG 0.57 3.44 0.14 d � NBIDITEM = 4230 15,203.000 Description= PT BAR IN DK S6GS Unit= KG TakeoffQuan: 619,020.000 F,ngr Quan: 619,020.000 4230 PT Bars in superstructure Quan: 619,020.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE Use 40 mhr/ton or SOlb/mhr PTS 5 Man PT Crew 3,095.15 CH Prod: 39.9993 UM Lab Pcs: 5.00 2PTBAR PT Bar supply@107% 619,020.00 KG 5.000 3,31 ],757 IWOI ironwarkerFareman 2.00 6,190.31 MH 28.000 277,833 IWO11 Ironworker Fareman 1.00 3,095.15 MH 28.000 138,916 LA02 Laborer,Skilled 2.00 6,19031 MH 14.500 149,307 $3,877,812.06 0.0250 MH/KG 15,475.7700 MH [ 0.622 ] 566,055 3,311,757 0.0050 Hr/Unit 309.5150 Shifts 0.0250 MH/Unit 0.9] 535 _____> Item Totals: 4230 - PT BAR IN DK SEGS $3,877,812.06 0.0250 MH/KG ] 5,475.77 MH [ 0.622 ] 566,055 3,311,757 6.264 619020 KG 0.91 5.35 BIDITEM = 4250 Descriprion= SFG CASTING & FRF.CTION FQUIP 4250 PC seg erection equipment � Eqp Pcs: 0.00 Unit= LS TakcoffQuan: 1.000 Eng Quan: Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 1.000 Page 38 OS/04/2012 12:08 Total 50,428 2, ] 40 4,265 2,132 2,292 63,109 4.15 63,109 4.15 3,311,757 277,833 138,916 149,307 3,877,812 626 3,877,812 6.26 DMJM Harris RBONNFR20] 2 BONNER 20] 2 REVISION 2(OPT 2) Baris Lenderman Activity Description Quantity Resource Pcs Unit BID [TEM = 4250 Description = SEG CASTING & ERECTION EQUIP Assume that two 100t travel lifts req @#375K/ ea. 3FSEG010 2-Lane EB Seg ForC107% 3.00 EA 3FSEG020 2-Lane Pier Seg F@107% 1.00 EA 3SEGLIFT Segment Lifting D@107% 4.00 EA 86005C Straddle Crane -60T 2.00 LS $1,830,700.00 Cost Report Unit Cost Unit = LS 250,000.000 200,000.000 15,000.000 375,000.000 �l _____> Item Totals: 4250 - SEG CASTING & ERECTION EQUIP $1,830,700.00 ],830,700.000 1 LS d W BID ITEM = 4260 W Description = GROOVTNG DECK GRIND Grinding Sub 4GRIND Grinding Sub@101% 52,414.00 M2 $l 85,283.49 BID ITEM = 4270 Description= POTBF.ARINGS 4270 Pot Bearings FRM22 Expansion Joint Crew #3 550.00 CH 2BRNG031 EXP (>8900 KN)@l07% 110.00 EA 845]SR 45 Ton R.T. (RT745) 1.00 550.00 HR 84900C 200 Amp Welder 1.00 550.00 HR CA01 Carpenter Foreman 1.00 550.00 MH CA02 CarpenterJourneyman 2.00 1,100.00 MH IW02 Ironworker Jomeyman 1.00 550.00 MH LA03 Labarer, unskilled 1.00 550.00 MH D � � � Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Takeoff Quan: 1.000 Engr Quan: 802,500 214,000 64,200 750,000 1,080,700 750,000 1,080,700.00 750,000.00 1,080,700 750,000 1,080,700.00 750,000.00 1.000 Page 39 OS/04/2012 12:08 Total 802,500 214,000 64,200 750,000 1,830,700 1,830,700.00 1,830,700 1,830,700.00 Unit= M2 TakeoffQuan: 52,414.000 Engr Quan: 52,414.000 Quan: 52,414.00 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE 3500 185,283 185,283 [ ] 185,283 185,283 3.54 3.54 Unit= LS Tal<eoffQuan: 1.000 EngrQuan: ].000 Quan: 110.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE Prod: 2.0000 US Lab Pcs: 6.00 Eqp Pcs: 2.00 12,285.000 1,445,945 ] 00.610 23,821 31,515 4.120 6l6 1,650 23.000 20,247 21.000 37,260 26.000 23,040 13.000 12,064 1,445,945 55,336 2,266 20,247 37,260 23,040 12,064 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report BID [TEM = 4270 Description = POT BF.ARINGS Unit= LS OP02 Operator,Crane<50 T 1.00 550.00 MH 26.000 $1,618,004.89 30.0000 MH/EA 3,300.0000 MH [ 715 ] 5.0000 Hr/Unit 55.0000 Shifts 30.0000 MH/Unit _____> Item Totals: 4270 - POT BEARINGS $1,618,004.89 3,300.0000 MH/LS 3,300.00 MH [ 78650 ] 1,618,004.890 1 LS Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract TakeoffQuan: 1.000 Engr Quan: 1.000 21,847 114,459 1,445,945 24,437 33,165 ],040.54 13,144.95 222.15 30].50 114,459 1,445,945 24,437 33,165 114,458.89 �,4a5,9aaso 24,436.50 33,165.00 BIDITEM = 4275 BL Description = ELASTOMETRIC BEARING PADS Unit = EA Takeoff Quan: 614.000 Engr Quan: 614.000 d � 4270 Bearing Pads Quan: 614.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE FP ***** Copied and adjusted from RPAMLICO2012 ***** FRM22 F.xpansion Joint Crew #3 614.00 CH Prod: 10.0000 US Lab Pcs: 3.00 Eqp Pcs: 0.00 2BRNG031 EXP (>8900 KN)@l07% 614.00 EA 2,000.000 1,313,960 CA02 CarpenterJourneyman 2.00 1,228.00 MH 21.000 4],596 LA03 Laborer,unskilled 1.00 6]4.00 MH 13.000 13,468 $1,369,024.09 3.0000 MH/EA 1,842.0000 MH [ 60.5 ] 55,064 1,313,960 1.0000 Hr/Unit 61.4000 Shifts 3.0000 MH/Unit 89.68 2,140.00 _____> ltem Totals: 4275 - ELASTOMETRIC BEARING PADS $],369,024.09 3.0000 MH/EA 1,842.00 MH [60.5] 55,064 1,313,960 2,229.681 614 EA 89.68 2,140.00 BID ITEM = 4280 BL Description = EXPANSION JOINTS Unit= M TakeoffQuan: 174.000 Engr Quan: 174.000 4280 Expansion Joints Quan: 174.00 M Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\BONNER2012 ***** FRM22 Expansion Joint Crew #3 290.00 CH Prod: 0.1000 UM Lab Pcs: 6.00 Eqp Pcs: 2.00 2EXPJT-M Modular Expansion@107% 174.00 M 4,630.500 862,106 84515R 45 Ton R.T. (RT745) 1.00 290.00 HR 100.610 12,560 16,617 D � N Page 40 OS/04/2012 12:08 Total 21,847 1,618,005 14,709.14 1,618,005 1,618,004.89 * * U nrcvi ewed 1,313,960 41,596 13,468 1,369,024 2,229.68 1,369,024 2,229.68 * * U nrcvi cwcd 862,106 29.177 DMJM Harris RBONNFR20] 2 BONNER 20] 2 REVISION 2(OPT 2) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report BID [TEM = 4280 Description = EXPANSION JOINTS Unit = M 84900C 200 Amp Welder 1.00 290.00 HR 4.120 CA01 Carpenter Fareman 1.00 290.00 MH 23.000 CA02 Carpenter Joumeyman 2.00 580.00 MH 21.000 [W02 IronworkerJorneyman 1.00 290.00 MH 26.000 LA03 Laborer, unskilled 1.00 290.00 MH 13.000 OP02 Operator,Crane<50 T 1.00 290.00 MH 26.000 $952,829.24 10.0000 MH/M ],740.0000 MH [ 238.333 ] 1.6667 Hr/Unit 29.0000 Shifrs 10.0000 MH/Unit ____> Item Totals: 4280 - EXPANSION JOINTS $952,829.24 10.0000 MH/M ],740.00 MH [ 238.333 ] 5,476.030 174 M d N W C3� BID ITEM = 4290 Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BL TakeoffQuan: 174.000 Engr Quan: 174.000 325 870 l 0,676 19,646 12,148 6,361 11,520 60,351 862,106 346.85 4,954.64 60,351 862,] 06 346.85 4,954.64 12,885 17,487 74.05 100.50 ] 2,885 17,487 74.05 100.50 Description = ACCESS SYSTF,M Unit= KG TakeoffQuan: 9,262.000 Engr Quan: 4290 Access System Quan: 9,262.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE 4METAL Miscell.metal@]Ol% 9,262.00 KG 1.170 $10,944.91 [ ] BID ITEM = 4300 Description = APPROACH SLABS 4300 Approach Slabs 4CONC Concrete-Sub@101% $33,914.79 D � W Unit= LS TakeoffQuan: 1.000 6ng Quan: Quan: 41.00 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE 41.00 M3 819.000 �] Page 41 OS/04/2012 12:08 Total 1,195 10,676 19,646 12,] 48 6,361 11,520 952,829 5,476.03 952,829 5,476.03 9,262.000 10,945 ] 0,945 ] 0,945 l 0,945 1.18 1.18 1.000 33,915 33,915 33,915 33,915 827.19 827.19 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description BIDITEM = 4310 Description = TWO BAR METAL RAIL 4310 Two bar metal rail 4GR Guard Rail-Sub@l Ol % $7,540,748.88 Pcs Quantity Unit 9,]20.00 M Cost Report Unit Cost Unit = M Quan: 9,120.00 M 818.650 �� Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract TakeoffQuan: 9,120.000 Engr Quan: 9,120.000 Hrs/Shft: 10.00 Cal: 510 WC: NONE Page 42 OS/04/2012 12:08 Total 7,540,749 7,540,749 7,540,749 7,540,749 826.84 826.84 BID ITEM = 4320 Description = 355MM X 800MM CONC PARAPF.T Unit= M TakeoffQuan: 8,858.500 Engr Quan: 8,858.500 � 4305 S& P concrete Jersey Barrier Quan: 2,516.00 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE W � CNCO2 Conc Crew w/35 Ton RT 513.46 CH Prod: 0.7000 UM Lab Pcs: 7.00 Eqp Pcs: 5.00 2C0006 5000 PSI Concrete@107% 2,64L80 M3 157.200 444,361 84520R 35 Ton R.T. (RT635C) 1.00 513.47 HR 79.870 18,572 22,439 85000C 5 KW GENERATOR 1.00 513.47 HR 4.550 565 1,771 85320C Concr bucket 1.-5-3 C 1.00 513.47 HR 12.090 4,231 1,977 85360C Hi-CycleConcreteVibr 2.00 1,026.94 HR 1.410 1,037 411 CM02 Concrete Finisher Journeym 1.00 513.47 MH 18.250 15,189 LA01 Labarer Foreman 1.00 513.47 MH 16.500 13,880 LA02 Laborer,Skilled 2.00 1,026.94 MH 14.500 24,769 LA03 Laborer, unskilled 2.00 1,026.94 MH 13.000 22,526 OP02 Operator,Crane<50 T 1.00 513.47 MH 26.000 20,396 $592,124.69 1.4285 MH/1V[3 3,594.2900 MH [ 25.985 ] 96,760 444,361 24,405 26,598 0.2041 Hr/Unit 51.3460 Shifts 1.4286 MH/Unit 38.46 176.61 9.70 10.57 4306 F& S Jersey Barrier Quan: 14,174.00 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE FRM02 Formwark Crew w/ 35 Ton RT 2,024.85 CH Prod: 1.0000 UM Lab Pcs: 7.00 Eqp Pcs: 2.00 3FM METAL FORMS@107% 320.00 M2 550.000 188,320 84520R 35 Ton R.T. (RT635C) 1.00 2,024.86 HR 79.870 73,239 88,486 85000C 5 KW GENERATOR 1.00 2,024.86 HR 4.550 2,227 6,986 CA01 Carpenter Foreman 1.00 2,024.86 MH 23.000 74,542 CA02 Carpenter Journeyman 4.00 8,099.43 MH 21.000 274,353 LA03 Laborer, unskilled 1.00 2,024.86 MH 13.000 44,4] 5 OP02 Operator,Crane<50 T 1.00 2,024.86 MH 26.000 80,432 � 444,361 41,011 2,336 6,208 1,448 15,189 13,880 24,769 22,526 20,396 592,125 23534 188,320 161,726 9,213 74,542 274,353 44,415 80,432 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4320 Description = 355MM X 800MM CONC PARAPFT Unit= M TakeoffQuan: 8,858.500 F,ngr Quan: 8,858.500 $833,000.80 1.0000 MH/M2 14,]74.0100 MH [ 22.943 ] 473,742 188,320 75,467 95,472 0.1429 Hr/Unit 202.4850 Shifts 1.0000 MH/Unit 33.42 13.29 5.32 6.74 4307 Rub & Finish Jersey Barrier Quan: 14,173.56 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE AFNSH3 3 man Finisher Crew 2,024.79 CH Prod: 2.0000 UM Lab Pcs: 3.50 Eqp Pcs: 0.00 3CURF, Curing@l07% 14,173.56 M2 0.550 8,341 CMO1 Concrete Finisher Foreman 0.50 1,012.40 MH 2O.250 32,897 CM02 Concrete Finisher Journeym 3.00 6,07438 MH 18.250 179,688 $220,926.50 0.5000 MH/M2 7,086.7800 MH [ 10.195 ] 212,585 8,341 0.1429 Hr/Unit 202.4790 Shifts 0.5000 MH/Unit 15.00 0.59 � 4308 S& P stainless rebar Quan: 125,800.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE c�2SRASS Resteel Accessori@]07% 125,800.00 KG 0.250 33,652 � 2SRSS Reinforcing Steel@107% ] 25,800.00 KG 4.250 572,076 4REBARSS Stainless Stecl R@]Ol% 125,800.00 KG 0.580 73,694 $679,420.64 [ ] 605,727 73,694 4.82 0.59 Page 43 OS/04/2012 12:08 Total 833,001 58.77 8,341 32,897 179,688 220,927 15.59 ** Unrevicwed 33,652 572,076 73,694 679,421 5.40 _____> Item Totals: 4320 - 355MM X SOOMM CONC PARAPET $2,325,472.63 2.8057 MH/M 24,855.08 MH [ 60.401 ] 783,088 1,050,088 ] 96,661 99,872 122,070 73,694 2,325,473 262.513 8858.5 M 88.40 118.54 22.20 11.27 13.78 8.32 262.51 BID [TEM = 4330 Description = FILTER FABRIC FOR DRAINAGE Unit = M2 Takeoff Quan: 627.600 Engr Quan: 627.600 4330 Filter fabric for drainage Quan: 627.60 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE 4LAND Landscape-Sub@101% 627.60 M2 11.700 7,416 7,416 $7,416.35 [ ] 7,416 7,416 11.82 11.82 D � cn DMJM Harris RBONNFR20] 2 BONNER 20] 2 REVISION 2(OPT 2) Baris Lenderman Activity Description Quantity Resource Pcs Unit Cost Report Unit Cost Page 44 OS/04/2012 12:08 Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Total BIDITEM = 4340 Description = SOLAR ARRAY SUPPORT PLATFORM Unit= LS TakeoffQuan: 1.000 Engr Quan: 4340 Solar array support platform Quan: 3,388.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE 4MF,TAL Misccll. metal@] Ol % 3,388.00 KG 1.170 $4,003.60 [ ] BID ITEM = 4350 Description = TELEPHONF, COND & INSF,RTS � 4350 Telephone cond & inserts W 0O4ELEC Elcctrical Subcon@101% $182,926.40 4,425.00 M Unit= LS TakeoffQuan: 1.000 Engr Quan: Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 40.930 �l BID TTEM = 4360 Description = POWF.R & CATV SLF,F,VF,S & DUCTBANKS Unit = LS TakeotiQuan: 1.000 Engr Quan: 4360 Power & CATV sleeves and ductbanks Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 4ELFC Electrical Subcon@101% 4,425.00 M 23.390 $104,535.76 [ ] BIDITEM = 4370 Description = GRANITE SLOPE PAVING 4370 Granite slope paving 4LAND Landscape-Sub@101% $2,363.40 D � rn Unit = M2 Takeoff Quan: 200.000 Engr Quan: Quan: 2,002.00 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE 200.00 M2 11.700 �l 1.000 4,004 4,004 4,004 4,004 1.18 1.18 1.000 182,926 182,926 182,926 182,926 182,926.40 ] 82,926.40 1.000 104,536 104,536 104,536 104,536 ] 04,535.76 104,535.76 200.000 2,363 2,363 2,363 2,363 DMJM Harris RBONNFR20] 2 BONNER 20] 2 REVISION 2(OPT 2) Baris Lenderman Activity Description Quantity Resource Pcs Unit BID [TEM = 4370 Description = GRANITE SLOPE PAVING Cost Report Unit Cost Page 45 OS/04/2012 12:08 Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Total Unit = M2 Takeoff Quan: 200.000 Engr Quan: 200.000 1.18 1.18 BIDITEM = 4380 Description = NAVIGATION LIGHTS Unit= LS TakeoffQuan: 1.000 Engr Quan: 4380 Navigation Lights Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 4ELEC Electrical Subcon@101% 1.00 LS 23,390.000 $23,623.90 [ ] d N W � 1.000 23,624 23,624 23,624 23,624 23,623.90 23,623.90 BID ITEM = 5020 WJB Description = 508MM SQ PRESTR CONCRETE PILE (FISH PIER Unit= M TakeoffQuan: 50.000 Engr Quan: 50.000 THESE (4) PILES ARL� FOR THL� L�ND BENT ON THE NEW FISHING PIER. 3020 SOBmm sq prestr concrete pile Marine Quan: 50.00 M Hrs/Shft: 10.00 Cal: 510 WC: NONE PILEA Pilc Crew Small 14.20 CH Prod: 1.4205 S Lab Pcs: 6.00 Eqp Pcs: 6.00 2FCP20 20" Sq P/GP/S Pi@107% 50.00 M 196.800 10,529 2FCP20SS 20" PSPC S.Sf. Pr@] 07% 50.00 M 98.400 5,264 804025 Pile/Drill template 1.00 1420 HR 12.000 ] 70 804030 Pile Driving Jig 1.00 14.20 HR 7.000 99 804240 3 stage jet pump 250 1.00 14.20 HR 22.120 102 212 84308R American 7260 100T 1.00 1420 HR 163.010 1,] 90 1,] 25 84910C 400 Amp Welder 1.00 ]4.20 HR 11.250 27 133 85655C Delmag D30-32 & LEAD 1.00 14.20 HR 82.960 676 502 OPO4 Operator, Crane 91T 1.00 1420 MH 28.000 604 OP12 Oiler 1.00 14.20 MH 14.000 323 PDO1 Piledriver Foreman 1.00 14.20 MH 23.000 517 PD02 Piledriver Journeyman 3.00 42.61 MH 21.000 1,428 $22,902.58 1.7042 MWM 85.2100 MH [ 39.992 ] 2,873 15,793 2,265 1,972 0.2840 Hr/Unit 1.4200 Shifts * 1.7042 MH/Unit 57.46 315.86 45.30 39.43 D � � 10,529 5,264 170 99 314 2,315 160 1,178 604 323 517 1,428 22,903 458.05 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract B�D ITEM = 5020 WJB Description= 508MM SQ PRF,STR CONCRF.TF, PILE (FISH PIF,R Unit= M TakeoffQuan: 50.000 6ng Quan: 50.000 31332 Cutof'f Concrete Piles 508 mm land Quan: 4.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 16# x 5' x 188kg = 15 tonnes /30t = 1 loads x 10 hr PILE4 Pile CutoffCrew 1332 CH Prod: 3.0030 US Lab Pcs: 3.25 Eqp Pcs: 1.25 3SAWBLADE Saw blades@107% 4.00 EA ] 0.000 43 83150C L,owboy 60 ton trailer 0.25 3.33 HR 23.000 45 32 85325C Concrete Saw Handheld 1.00 13.32 HR 11.460 37 ] 15 LA01 Laborer Foreman 1.00 13.32 MH 16.500 360 LA02 Laborer,Skilled 2.00 26.64 MH 14.500 643 TMO1 Teamster 0.25 333 MH 12.000 66 $1,341.05 10.8225 MH/EA 43.2900 MI1 [ 177.658 ] 1,069 43 82 l47 � 33300 Hr/Unit 1.3320 Shifts 10.8225 MH/Unit 267.26 10.70 20.51 36.79 �_____> Item Totals: 5020 - 508MM SQ PRESTR CONCRETE PILE (FISH PIER �$24,243.63 2.5700 MH/M 128.50 MH [ 54.204 ] 3,942 15,793 43 2,347 2,] 19 484.873 50 M 78.84 315.86 0.86 46.94 42.38 BID ITEM = 5031 Description= 1371MM PRESTR CONC CYL PILE (54-IN)(FISH (2) EA 100-VF PILES PER BENT AT (16) BENTS. 3030 1371mm prestr conc cyl pile Marine ***** Copied and adjusted from RPAMLICO2012 ***** PILF,C Pile Crew Large 21332 CH 2FCP54 54 PSPC Conc Cyl @] 07% 976.00 M 2FCP54SS 54" PSPC S.StI Pr@107% 156.05 M 804025 Pile/Drill template 1.00 213.33 HR 804030 Pile Driving Jig 1.00 21333 HR 804240 3 stage jet pump 250 1.00 213.33 HR 84304R 9299 SKYHORSE & BAR 1.00 21333 HR 8491 OC 400 Amp Welder 1.00 21333 HR 85664C DELMAG D160-32 & LEA 1.00 21333 HR OPOS Operator, Crane>140 T 1.00 213.33 MH OP12 Oiler 1.00 21333 MH D � � WJB Unit = M Takeoff Quan: 976.000 Engr Quan: 976.000 Quan: 32.00 EA Prod: 1.5000 US 525.000 476.000 12.000 7.000 22.120 462.970 11.250 475.820 28.000 14.000 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 6.00 Eqp Pcs: 6.00 548,268 79,479 2,560 1,493 1,530 3,189 55,843 42,922 405 1,995 59,907 41,599 9,077 4,858 Page 46 OS/04/2012 12:08 Total 43 77 153 360 643 66 1,341 335.26 24,244 484.87 * * U m�cvicwcd 548,268 79,479 2,560 i ,493 4,719 98,765 2,400 101,507 9,077 4,858 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 5031 WJB Description = 1371 MM PRBSTR CONC CYL PILE (54-IN)(FISH Unit= M TakeoffQuan: 976.000 F,ngr Quan: 976.000 PDO] Piledriver Foreman 1.00 213.33 MH 23.000 7,770 PD02 PiledriverJourneyman 3.00 639.98 MH 2L000 21,450 $882,347.17 39.9990 MH/EA 1,279.9700 MH [ 938.645 ] 43,156 627,747 121,739 89,705 6.6663 Hr/Unit 21.3320 Shifts 39.999] MH/Unit 1,348.61 19,617.11 3,804.34 2,803.29 31332 Cutoff Concrete Piles 1371mm Quan: 32.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from RPAMLICO2012 ***** PILF4 PileCutoffCrew 213.32 CH Prod: 1.5000 US 3SAWBLADE Sawblades@107% 32.00 EA 10.000 83150C L,owboy 60 ton trailer 0.12 25.60 HR 23.000 85325C Concrete Saw Handheld 1.00 21333 HR 1 l.460 � LAOI Labarer Foreman 1.00 213.33 MH 16.500 � LA02 Laborer,Skilled 2.00 426.65 MH 14.500 � TMO1 Teamster 0.12 25.60 MH 12.000 �$19,944.01 20.7993 MH/EA 665.5800 MH [ 344.217 ] 6.6663 Hr/Unit 21.3320 Shifts 20.7994 MH/Unit ____> ltem Totals: 5031 -]371MM PRESTR CONC CYL PILE (54-IN)(FISH $902,29118 ].9933 MH/M 1,945.55 MH [42.061 ] 924.479 976 M BIDITEM = 5110 Dcscription = PRECAST CONCRETE COLS & CAPS (FISH PIER) 41530 Cast cols & caps incl form set up Marine SEG 4.5 Man Segment Precasting 6933 CH 2CFL007 Superplastizerci107% 156.00 M3 2CFL025 C]-IV Conc (FL)@107% 156.00 M3 3FMF METAL FORMS@107% 15.35 M2 CAOI Ca�penter Foreman 0.50 34.67 MH CA02 Carpenter Journeyman 1.00 69.33 MH CMO l Concrete Finisher Foreman 1.00 69.33 MH IWO1 Ironwarker Foreman 1.00 69.33 MH LA02 Labor�r,Skilled 1.00 69.33 MH $54,998.48 1.9999 MH/M3 311.9900 MH D � � 5,767 10,291 511 16,568 517.75 Lab Pcs: 3.12 Eqp Pcs: 342 343 599 1.12 246 1,845 342 942 2,091 10.70 29.45 6535 59,724 627,747 342 122,681 91,796 61.19 643.18 0.35 125.70 94.05 WJB Unit= M3 TakeoffQuan: 156.000 F.ngr Quan: 156.000 Quan: 156.00 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE Prod: 0.5000 UM Lab Pcs: 4.50 Eqp Pcs: 0.00 15.000 2,504 196.500 32,800 550.000 9,033 23.000 1,276 21.000 2,348 20.250 2,253 28.000 3,112 14.500 1,672 [ 46.565 ] 10,661 35,304 9,033 Page 47 OS/04/2012 12:08 Total 7,770 2 ] ,450 882,347 27,57335 **Unreviewed 342 589 2,445 5,767 10,291 511 19,944 623.25 902,291 924.48 2,504 32,800 9,033 1,276 2,348 2,253 3,] 12 ],672 54,998 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 5110 WJB Description = PRECAST CONCRETE COLS & CAPS (FISH PIER) Unit= M3 TakeoffQuan: 156.000 Engr Quan: 156.000 0.4444 Hr/Unit 6.9330 Shifts 1.9999 MH/Unit 68.34 226.31 57.91 44330L Erect conc PC cols & caps Marine Quan: 17.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE (17) PILE BENTS INCLUDING END BENT. FRM087 Formwark crew w/9320 56.63 CH Prod: 3.0019 US Lab Pcs: 8.00 Eqp Pcs: 2.00 84303R American 9320 250 T 1.00 56.63 HR 291.660 9,611 8,062 85000C 5 KW GENERATOR 1.00 56.63 HR 4.550 62 195 CA01 Carpenter Fareman 1.00 56.63 MH 23.000 CA02 Carpenter Journeyman 4.00 226.52 MH 21.000 LA03 Laborer, unskilled 1.00 56.63 MH 13.000 OPOS Operator, Crane>140 T 1.00 56.63 MH 28.000 �OPl2 Oiler 1.00 56.63 MH 14.000 �$32,629.49 26.6494 MH/EA 453.0400 MH [ 593.615 ] Fp 3.3312 Hr/Unit 5.6630 Shifts 26.6494 MH/Unit N ____> IYem Totals: 5] 10 - PRECAST CONCRETE COLS & CAPS (FISH PIER) $87,627.97 4.9040 MH/M3 765.03 MH [ 11 ].254 ] 561.718 156 M3 BIDITEM = 5120 Description = REBAR IN PC COLS & CAPS (FISH PIER) 433 S& I Reinforcing Steelr 2SRASS Resteel Accessori@107% 22,979.00 KG 2SRSS Reinforcing Steel@l07% 22,979.00 KG 4RF,BARSS Stainless Steel R@101 % 22,979.00 KG $124,104.98 _____> IYem Totals: $ ] 24, ] 04.98 5.401 D � 0 0 2,085 7,673 1,242 2,409 1,290 14,699 864.64 9,673 8,257 569.01 485.73 25,360 35,304 9,033 9,673 8,257 162.57 226.31 57.91 62.01 52.93 Page 48 OS/04/2012 12:08 Total 352.55 17,673 258 2,085 7,673 1,242 2,409 1,290 32,629 1,91938 87,628 561.72 WJB Unit= KG TakcoffQuan: 22,979.000 Engr Quan: 22,979.000 Quan: 22,979.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE 0.250 6,147 6,147 4.250 104,497 104,497 0.580 l 3,461 13,461 [ ] 110,644 ]3,461 124,105 4.81 0.59 5.40 5] 20 - REBAR IN PC COLS & CAPS (FISH PIER) �l 22979 KG 110,644 4.81 ] 3,461 124,105 0.59 5.40 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit BIDITEM = 5150 Description = DECK SLAB REINFORCING STEF,L (ASTM A955)( 433 S& I Reinforcing Steel 2SRASS Resteel Accessori ri 107% ] 12,50498 KG 2SRSS Reinforcing St�cl@l07% 1 12,504.98 KG 4RF,BARSS Stainless Steel R@101 % 1 12,504.98 KG $607,616.90 Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Page 49 OS/04/2012 12:08 Total WJB Unit= KG TakeoffQuan: 112,505.000 Engr Quan: 112,505.000 Quan: 112,504.98 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE * * U nrcvi cwed 0.250 30,095 30,095 4.250 517,616 517,676 0.580 65,905 65,905 [ ] 541,711 65,905 607,617 4.82 0.59 5.40 _____> IYem Totals: 5750 - DECK SLAB REINFORCING STEEL (ASTM A955)( $607,616.90 [ ] 541,71 ] 65,905 607,617 5.40] ] 12505 KG 4.8] 0.59 5.40 d � � W BID ITEM = 5160 WJB Description = CONC DECK (FISH PIER) Unit= M3 TakeoffQuan: 543.000 F.ngr Quan: 543.000 366002 Set & strip dk cantilever Quan: 297.36 M2 Hrs/Shft: 10.00 Cal: Sl0 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** FRM081 Formwark Crew w/7260 74.33 CH Prod: 0.5000 UM Lab Pcs: 8.00 Eqp Pcs: 3.00 3F1 WOODEN FORMS@107°/a 297.36 M2 32.250 10,261 84308R American 7260 100T 1.00 74.34 HR 163.010 6,230 5,888 84700C 185 CFM Compressor 1.00 74.34 HR 18.520 284 1,093 85000C 5 KW GENERATOR 1.00 7434 HR 4.550 82 256 CA01 Carpenter Foreman 1.00 7434 MH 23.000 2,737 CA02 Carpenter Joumeyman 4.00 297.36 MH 21.000 10,073 LA03 Laborer, unskilled 1.00 74.34 MH 13.000 1,631 OPO4 Operator, Crane 91T 1.00 7434 MH 28.000 3,163 OP12 Oiler 1.00 7434 MH 14.000 1,693 $43,390.10 2.0000 MH/M2 594.7200 MH [ 44.55 ] 19,296 10,261 6,596 7,237 02500 HrNnit 7.4330 Shifts 2.0000 MH/Unit 64.89 34.57 22.18 24.34 366005 Set & Strip Deck Bulkhead Quan: 8.19 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** ACARP3 3 Man Carpenter Crew 32.77 CH Prod: 0.2499 UH Lab Pcs: 3.50 F,qp Pcs: 0.00 3F] WOODEN FORMS@107% 819 M2 32.250 283 D � 0 � * * Unrevi ewed 10,261 12,118 1,377 338 2,737 10,073 1,631 3,163 1,693 43,390 145.92 **Unreviewed 283 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 5160 WJB Description = CONC DECK (FISH PIER) Unit= M3 TakeoffQuan: 543.000 Engr Quan: 543.000 CA01 Carpenter Foreman 0.50 16.39 MH 23.000 603 CA02 Carpenter Journeyman 3.00 98.34 MH 21.000 3,331 $4,217.08 14.0085 MH/M2 114.7300 MH [ 328 ] 3,934 283 4.0012 Hr/Unit 32770 Shifts 14.0085 MH/Unit 480.40 34.51 366008 Set & Strip Fascia Quan: 83.26 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** ACARP3 3 Man Carpenter Crew 79.29 CH Prod: 0.3000 UM 3F1 WOODEN FORMS@107% 83.26 M2 32.250 CA01 Carpenter Foreman 0.50 39.65 MH 23.000 CA02 Carpenter Journeyman 3.00 237.88 MH 21.000 �$] 2,390.50 3.3332 MH/M2 277.5300 MH [ 78.047 ] � 0.9523 Hr/Unit 7.9290 Shifts 3.3333 MH/Unit r-� FP � 366010 F& I Stay-In-Place Deck Forms Quan: 1,105.75 M2 ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** FRM08 ] Farmwork Crew w/7260 69.10 CH Prod: 2.0000 UM 2MISCSTEEL Misc steel@107% l.64 TON 1,500.000 2NEOPRENE Neoprenestrip@l07% 314.89 LF 0.500 2SIP-F Stay-in Place For@l07% 1,105.75 M2 120.000 3GA101 Welding Supplies@107% 0.01 LS 50,000.000 84308R American 7260 100T 1.00 69.11 HR 163.010 84700C l85 CFM Compressor 1.00 69.1 l HR 18.520 85000C 5 KW GENF,RATOR 1.00 69.11 HR 4.550 CA01 Carpenter Foreman 1.00 69.1 l MH 23.000 CA02 Carpenter Journeyman 4.00 276.44 MH 21.000 LA03 Laborer, unskilled 1.00 69.1 l MH 13.000 OPO4 Operator, Crane 91 T 1.00 69.11 MH 28.000 OP12 Oiler 1.00 69.11 MH 14.000 $176,1 12.22 0.5000 MH/M2 552.8800 MH [ 11.138 ] 0.0625 Hr/Unit 6.9100 Shifts 0.5000 MH/Unit 366012 F& S diaphrams Quan: 172.64 M2 ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** FRM087 Formwarkcreww/9320 31.38 CH Prod: 0.5000 UM 3F1 WOODEN FORMS@107% 172.64 M2 32.250 84303R American 9320 250 T 1.00 3l .39 HR 291.660 D � 0 N Lab Pcs: 3.50 Eqp Pcs: 0.00 2,873 ] ,460 8,058 9,517 2,873 114.31 34.51 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 8.00 Eqp Pcs: 3.00 2,632 168 141,978 535 5,792 264 76 2,544 9,364 1,516 2,940 1,574 17,938 144,779 535 6,132 16.22 130.93 0.48 5.55 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 11.00 Eqp Pcs: 5,957 4,979 5,474 1,016 238 6,728 6.08 2.00 4,176 Page 50 OS/04/2012 12:08 Total 603 3,331 4,217 514.91 **Unreviewed 2,873 1,460 8,058 12,391 148.82 ** Unreviewed 2,632 168 141,978 535 11,266 1,280 314 2,544 9,364 1,516 2,940 1,574 176,112 159.27 ** Unreviewed 5,957 9,155 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 5160 WJB Description = CONC DECK (FISH PIER) Unit= M3 TakeoffQuan: 543.000 Engr Quan: 543.000 85000C 5 KW GF.,NERATOR 1.00 31.39 HR 4.550 35 ] 08 CA01 Carpenter Fareman 1.00 31.39 MH 23.000 1,156 CA02 Carpenter Joumeyman 4.00 125.55 MH 21.000 4,253 LA03 Laborer, unskilled 4.00 125.55 MH 13.000 2,754 OPOS Operator, Crane>140 T ].00 31.39 MH 28.000 1,336 OPl2 Oiler 1.00 31.39 MH 14.000 715 $25,468.06 1.9999 MH/M2 345.2700 MH [ 40199 ] 10,213 5,957 5,013 4,285 0.1818 Hr/Unit 3.1380 Shifts ].9999 MH/Unit 59.16 34.51 29.04 24.82 366102 Set Bidwell Screed Rail Quan: 387.98 M Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** CNC90 Screed Rail Crew 73.90 CH Prod: 1.5000 UM �3SCRAIL Screed Rail Mater@107% 22.62 M 20.000 � 85000C 5 KW GENERATOR 1.00 73.90 HR 4.550 � CA01 Carpenter Foreman 0.50 36.95 MH 23.000 CA02 Carpenter Journeyman 2.00 147.80 MH 21.000 LA03 Laborer, unskilled 1.00 73.90 MH 13.000 $8,807.99 0.6666 MH/M 258.6500 MH [ 13.933 ] 0.1905 Hr/Unit 7.3900 Shifts 0.6667 MH/Unit 366104 Pour & Finish Deck & diaph Quan: 543.00 M3 ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** CNC087 Conc Crew w/9320 67.87 CH Prod: 1.0000 UM 2C0005 4500 PSi Concrete@107% 570.15 M3 153.250 84303R American 9320 250 T 1.00 67.88 HR 291.660 85000C 5 KW GENERATOR 1.00 67.88 HR 4.550 85320C Concr bucket l.-5-3 C 1.00 67.88 HR 12.090 85340R Pump Truck 1.00 67.88 HR 1 I 1.450 85360C Hi-Cycle Concrete Vibr 2.00 135.75 HR 1.410 CM02 Concrete Finisher Journeym 1.00 67.88 MH 18.250 LA01 Laborer Foreman 1.00 67.88 MH 16.500 LA02 Laborer,Skilled 2.00 135.75 MH 14.500 LA03 Laborer, unskilled 2.00 135.75 MH 13.000 OPOS Operator, Crane>140 T 1.00 67.88 MH 28.000 OPl2 Oiler 1.00 67.88 MH 14.000 $136,704.51 1.0000 MH/M3 543.0200 MH [ 18.116 ] 0.1250 Hr/Unit 6.7870 Shifts 1.0000 MH/Unit D � 0 W Lab Pcs: 3.50 Eqp Pcs: 1.00 484 81 255 7,360 5,006 1,621 7,988 484 81 255 20.59 125 021 0.66 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 8.00 93,492 2,008 1,835 3,274 2,978 2,888 1,546 14,529 93,492 26.76 17218 Eqp Pcs: 10,766 75 559 2,607 137 6.00 9,03 i 234 261 4,959 54 14,144 14,540 26.05 26.78 Page 51 OS/04/2012 12:08 Total 143 ],156 4,253 2,754 1,336 715 25,468 147.52 ** Unrcvicwed 484 336 1,360 5,006 1,621 8,808 22.70 ** Unreviewed 93,492 19,798 309 821 7,565 191 2,008 1,835 3,274 2,978 2,888 1,546 136,705 251.76 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract B�D ITEM = 5]60 WJB Description = CONC DECK (FISH PIER) Unit= M3 TakeoffQuan: 543.000 Eng Quan: 543.000 366143 Cure conc diaph & facia Quan: 27,971.75 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** AFNSH3 3 man Finisher Crew 319.67 CH Prod: 25.0002 UM 3CUREMAT Curing MATERIALS@107 27,971.75 M2 0.550 CMO1 Concrete Finisher Foreman 0.50 159.84 MH 2O.250 CM02 Concrcte Finisher Journeym 3.00 959.02 MH 18.250 $50,024.34 0.0399 MH/M2 1,118.8600 MH [ 0.816 ] 0.0114 Hr/Unit 31.9670 Shifts 0.0400 MH/Unit 366144 Rub & Finish conc Quan: 106.53 SM ,�***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** ~' AFNSH2 2 Man finish Crew 15.78 CH Prod: 3.0000 UM � � 3RUBMAT Rub mat@] 07% 106.53 M2 1.000 CMO1 Concrete Finisher Foreman 0.25 395 MH 2O.250 CM02 Concrete Finisher Journeym 2.00 31.56 MH 18.250 $],175.94 0.3333 MH/SM 35.5100 MH [ 6.773 ] 0.1481 Hr/Unit 1.5780 Shifts 03333 MH/Unit 366150 S& I safety rails Quan: 387.98 M ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** ACARP3 3 Man Carpenter Crew 18.47 CH Prod: 6.0000 UM 3SAFERAIL SafetyRail@107% 387.98 M 5.000 85300C 450 Dcsck Finisher 1.05 19.40 HR 31.500 85305C Work Bridge 1.05 19.40 HR 5.340 CA01 Carpenter Foreman 0.50 9.24 MH 23.000 CA02 Carpenter Journeyman 3.00 55.43 MH 21.000 $5,008.12 0.1666 MH/M 64.6700 MH [ 3.903 ] 0.0476 Hr/Unit 1.8470 Shifts 0.1667 MH/Unit 366151 Access - Conc in superstr dk slabs, HPC Quan: 0.04 LS ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** 3EA08 Stair Tower@107% 0.01 LS 100,000.000 $1,070.00 [ ] D � 0 � Lab Pcs: 3.50 Eqp Pcs: 0.00 16,461 5, l 94 28,369 33,563 16,461 1.20 0.59 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 2.25 F,qp Pcs 114 128 934 1,062 1 l4 9.97 1.07 Hrs/Shft: 10.00 Cal: 510 WC: NONE 0.00 Lab Pcs: 3.50 Eqp Pcs: 2.10 2,076 6ll ]04 340 1,878 2,218 2,076 7l5 5.72 5.35 ].84 Hrs/Shft: 10.00 Cal: 510 WC: NONE 1,070 1,070 26,750.00 Page 52 OS/04/2012 12:08 Total **Unrevicwed 16,461 5,194 28,369 SQ024 1.79 * * U nrcvi ewcd 114 128 934 1,176 11.04 **Unrcvicwcd 2,076 611 104 340 1,878 5,008 12.91 ** Unrcvicwed 1,070 1,070 26,750.00 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 5160 WJB Description = CONC DECK (FISH PIER) Unit= M3 TakeoffQuan: 543.000 Engr Quan: 543.000 __�> ltem Totals: 5160 - CONC DECK (FISH PIER) $464,368.86 7.1930 MH/M3 3,905.84 MH [ 150.974 ] 120,258 238,271 40,114 32,682 33,044 855.191 543 M3 221.47 438.80 73.88 60.19 60.86 BID ITEM = 5192 WJB Dcscription= AASHTO TYP IIl GTRDERS (FISH PIFR) Unit= M TakeoffQuan: 1,098.000 Engr Quan: 1,098.000 367301 Precast Beams Quan: 48.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** d A1 W4 PC Placing 106.66 CH Prod: 4.5000 US N 2FPCAASHT03 Type lI] AASHTO G@107 1,098.00 M 525.000 V 804380 400 AMP WELDER 1.00 106.67 HR 11.250 84303R American 9320 250 T 2.00 213.33 HR 291.660 8TRUSS Deal girder trus & po 0.02 HR 150,000.000 IWO] IronworkerForeman 1.00 106.67 MH 28.000 IW02 IronwarkerJorneyman 6.00 640.00 MH 26.000 LA02 Laborer,Skilled 2.00 213.33 MH 14.500 OP05 Operator, Crane>140 T 2.00 21333 MH 28.000 OPl2 Oiler 2.00 213.33 MH 14.000 $733,898.95 28.8887 MH/EA 1,386.6600 MH [ 725.998 ] 22221 Hr/Unit 10.6660 Shifts 28.8888 MH/Unit 367310 S& P Steel x Bracing Quan: 32.54 EA ***** Copied and adjusted from V:\HEAVYBID\EST\RPAMLICO2012 ***** A1 W3 Rebar/ Ironworker Crew 54.23 CH Prod: 5.9998 US 2MISCSTEFL Misc steel@107% 8.95 TON 1,500.000 804040 185 CFM 170 HP %0 1.00 54.23 HR 18.520 IWOI IronworkerForeman 1.00 54.23 MH 28.000 iW02 IronwarkerJorneyman 4.00 216.94 MH 26.000 $26,093.51 8.3334 MH/EA 271.1700 MH [ 242.002 ] 1.6666 Hr/Unit 5.4230 Shifts 83334 MH/Unit ____> Item Totals: 5192 - AASHTO TYP III GIRDERS (FISH PIER) $759,992.46 1.5098 MH/M 1,657.83 MH [ 38.91 ] 692.161 1098 M � O CJl Lab Pcs: 13.00 Eqp Pcs: 3.00 616,802 203 997 33,836 28,384 3,000 4,788 26,810 5,145 9,077 4,858 50,678 616,802 37,039 29,381 1,055.78 12,850.03 771.64 612.10 Hrs/Shft: 10.00 Cal: 510 WC: NONE Lab Pcs: 5.00 Eqp Pcs: 1.00 14,365 207 2,434 9,088 11,522 14,365 207 354.08 441.45 6.37 62,199 631,166 37,246 29,381 56.65 574.83 33.92 26.76 Page 53 OS/04/2012 12:08 Total 464,369 855.19 **Unrcvicwcd 616,802 1,200 62,220 3,000 4,788 26,810 5, ] 45 9,077 4,858 733,899 15,289.56 **Unreviewed 14,365 207 2,434 9,088 26,094 801.89 759,992 692. ] 6 DMJM Harris RBONNFR20] 2 BONNER 20] 2 REVISION 2(OPT 2) Baris Lenderman Activity Description Resource BIDITEM = 5260 Description = GROOVTNG DECK (FISH PIER) GRIND Grinding Sub 4GR1ND Grinding Sub�d,l Ol % $8,911.03 Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract WJB Unit= M2 TakeoffQuan: 2,500.000 Engr Quan: 2,500.000 Quan: 2,520.80 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE 2,520.80 SY 3.500 8,911 [ ] 8,911 3.54 BID ITEM = 5270 WJB Description = POT BEARINGS (F1SH PIER) Unit= LS TakeoffQuan: 1.000 F.ngr Quan: 1.000 � 4270 Pot Bearings Quan: 96.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE FP � FRM22 Expansion Joint Crcw #3 480.00 CH Prod: 2.0000 US Lab Pcs: 6.00 Eqp Pcs: 2.00 2BRNG031 EXP (>8900 KN)@107% 96.00 EA 12,285.000 1,261,915 84515R 45 Ton R.T. (RT745) 1.00 480.00 HR ] 00.610 20,789 27,504 84900C 200 Amp Welder 1.00 480.00 HR 4.120 538 1,440 CA01 Carpenter Foreman 1.00 480.00 MH 23.000 17,670 CA02 Carpenter Journeyman 2.00 960.00 MH 21.000 32,518 IW02 lronwarkerJorneyman 1.00 480.00 MH 26.000 20,107 LA03 Labarer, unskilled 1.00 480.00 MH 13.000 10,529 OP02 Operator,Crane<50 T 1.00 480.00 MH 26.000 19,067 $],412,076.98 30.0000 MH/EA 2,880.0000 MH [ 715 ] 99,891 1,261,915 21,326 28,944 5.0000 Hr/Unit 48.0000 Shifts 30.0000 MH/Unit 1,040.54 13,144.95 222.15 301.50 _____> Item Totals: 5270 - POT BEARiNG5 (FISH PIER) $],412,076.98 2,880.0000 MH/LS 2,880.00 MH [ 68640 ] 99,891 1,261,915 21,326 28,944 1,412,076.980 1 LS 99,891.38 1,261,915.20 2],326.40 28,944.00 BID ITEM = 5280 Description = F,XPANSION JOINTS (FISH PIFR) 4280 Expansion Joints FRM22 Expansion Joint Crew #3 D � 0 rn WJB Unit = M TakeoffQuan: 35.000 Engr Quan: 35.000 Quan: 35.00 M Hrs/Shft: 10.00 Cal: 510 WC: NONE 58.33 CH Prod: 0.1000 UM Lab Pcs: 6.00 Eqp Pcs: 2.00 Page 54 OS/04/2012 12:08 Total 8,911 8,911 3.54 1,261,915 48,293 1,978 17,670 32,518 20,107 10,529 19,067 1,412,077 14,709.14 ] ,412,077 1,412,07698 DMJM Harris RBONNFR20] 2 BONNER 20] 2 REVISION 2(OPT 2) Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report BID [TEM = 5280 Description = EXPANSION JOINTS (FISH P[ER) Unit= M 2EXPJT-M Modular E�cpansion@] 07% 35.00 M 500.000 84515R 45 Ton R.T. (RT745) 1.00 58.33 HR 100.6] 0 84900C 200 Amp Welder 1.00 58.33 HR 4.120 CA01 Carpenter Foreman 1.00 5833 MH 23.000 CA02 Carpenter Journeyman 2.00 l 16.67 MH 21.000 iW02 Ironwarker Jorneyman 1.00 58.33 MH 26.000 LA03 Laborer, unskilled 1.00 58.33 MH 13.000 OP02 Operator,Crane<50 T 1.00 58.33 MH 26.000 $36,973.12 9.9997 MH/M 349.9900 MH [ 238.327 ] 1.6666 Hr/Unit 5.8330 Shifts 9.9997 MH/Unit _____> Item Totals: 5280 - EXPANSION JOINTS (FISH PIER) �$36,973.12 9.9997 MH/M 349.99 MH [ 238327 ] F! , 1,056.375 35 M � � Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract WJB TakeoffQuan: 35.000 Engr Quan: 35.000 18,725 2,526 3,342 65 175 2,147 3,952 2,443 1,279 2,317 12,] 39 18,725 346.84 535.00 12,139 18,725 346.84 535.00 2,592 3,517 74.05 100.49 2,592 3,517 74.05 100.49 BID ITEM = 5310 WJB Description = TWO BAR METAL RAIL (FISH PIER) Unit= M TakeoffQuan: 739.000 F.ngr Quan: 739.000 4310 Two bar metal rail Quan: 739.00 M Hrs/Shft: 10.00 Cal: 510 WC: NONE Page 55 OS/04/2012 12:08 Total 18,725 5,869 240 2, l 47 3,952 2,443 1,279 2,317 36,973 1,05637 36,973 1,056.37 4GR GuardRail-Sub@101% 739.00 M 818.650 611,032 611,032 $6] 1,032.17 [ ] 611,032 611,032 826.84 826.84 BID ITEM = 5311 WJB Description = REMOVABLF, TRAFFIC BARRIER (FISH PIF.R) Unit= M TakeoffQuan: 7.000 F.ngr Quan: A ALW FOR REM TRAFF BARRIER Quan: 7.00 M Hrs/Shft: 10.00 Cal: 510 WC: NONE 4ALWREMBARR ALW FOR REMVABL B@ 7.00 M 750.000 $5,302.50 [ ] D � 0 � 7.000 **Unreviewed 5,303 5,303 5,303 5,303 757.50 757.50 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BIDITEM = 5320 WJB Description = 355MM X 800MM CONC PARAPET (FISH PIER) Unit= M TakeoffQuan: 739.000 Engr Quan: 739.000 4305 S& P concrete Jersey Barrier Quan: 209.89 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE CNCO2 Conc Crew w/35 Ton RT 42.83 CH Prod: 0.7000 UM Lab Pcs: 7.00 Eqp Pcs: 5.00 2C0006 5000 PSI Concrete@107% 22039 M3 157.200 37,070 84520R 35 Ton R.T. (RT635C) 1.00 42.84 HR 79.870 1,550 1,872 85000C 5 KW GENERATOR 1.00 42.84 HR 4.550 47 148 85320C Concr bucket ].-5-3 C 1.00 42.84 HR ] 2.090 353 165 85360C Hi-Cycle Concrete Vibr 2.00 85.67 HR 1.410 87 34 CM02 ConcreYe Finisher Journeym 1.00 42.84 MH 18.250 ],267 LAO l Laborer Foreman 1.00 42.84 MH 16.500 1, l58 LA02 Laborer,Skilled 2.00 85.67 MH 14.500 2,066 d LA03 Laborer, unskilled 2.00 85.67 MH 13.000 1,879 �' OP02 Operator,Crane<50 T 1.00 42.84 MH 26.000 1,702 O$49,398.20 1.4286 MH/M3 299.8600 MH [ 25.986 ] 8,072 37,070 2,036 2,219 02041 Hr/Unit 4.2830 Shifts 1.4287 MH/Unit 38.46 176.62 9.70 10.57 4306 F& S Jersey Barrier Quan: 1,182.43 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE FRM02 Formwork Crcw w/ 35 Ton RT 168.91 CH Prod: 1.0000 UM Lab Pcs: 7.00 F,qp Pcs: 2.00 3FM METAL FORMS@l07% 26.70 M2 550.000 15,713 84520R 35 Ton R.T. (RT635C) 1.00 168.92 HR 79.870 6,110 7,382 85000C 5 KW GF.,NERATOR 1.00 168.92 HR 4.550 186 583 CA01 Carpenter Fareman 1.00 168.92 MH 23.000 6,219 CA02 Carpenter Joumeyman 4.00 675.68 MH 21.000 22,887 LA03 Laborer, unskilled 1.00 168.92 MH 13.000 3,705 OP02 Operator,Crane<50 T 1.00 168.92 MH 26.000 6,7] 0 $69,494.21 1.0000 MH/M2 1,182.4400 MH [ 22.943 ] 39,521 15,713 6,296 7,965 0.1428 Hr/Unit 16.8910 Shifts 1.0000 MH/Unit 33.42 1329 5.32 6.74 4307 Rub & Finish Jersey Barrier Quan: 1,182.40 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE AFNSH3 3 man Finisher Crew 168.91 CH Prod: 2.0000 UM Lab Pcs: 3.50 Eqp Pcs: 0.00 3CURE Curing@107% 1,182.40 M2 0.550 696 CMO1 Concrete Finisher Foreman 0.50 84.46 MH 2O.250 2,744 CM02 Concrete Finisher Journeym 3.00 506.74 MH 18.250 14,990 $18,430.35 0.5000 MH/M2 591.2000 MH []0.195 ] 17,735 696 0.1429 Hr/Unit 16.8910 Shifts 0.5000 MH/Unit 15.00 0.59 • Page 56 OS/04/2012 12:08 Total 37,070 3,422 195 Sl8 12l 1,267 1,158 2,066 1,879 1,702 49,398 235.35 ] 5,713 13,492 769 6,219 22,887 3,705 6,710 69,494 58.77 696 2,744 14,990 18,430 15.59 DMJM Harris RBONNFR20] 2 BONNER 20] 2 REVISION 2(OPT 2) Baris Lenderman Activity Description Quantity Resource Pcs Unit BID ITEM = 5320 Description = 355MM X 800MM CONC PARAPF,T (FISH PIER) 4308 S& P stainless rebar 2SRASS Resteel Accessori ct 107% 10,49458 KG 2SRSS Reinfarcing Steel�n,107% 10,494.58 KG 4REBARSS Stainless Steel R@]Ol% 10,494.58 KG $56,679.12 Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract WJB Unit= M TakeoffQuan: 739.000 6ng Quan: 739.000 Quan: 10,494.58 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE 0.250 2,807 4.250 47,724 0.580 6,148 [ ] 50,531 6,148 4.81 0.59 _____> Item Totals: 5320 - 355MM X 800MM CONC PARAPET (FISH PIER) $194,001.88 2.8058 MH/M 2,073.50 MH [ 60.402 ] 262.519 739 M d � U� � BID ITEM = 9100 Description = OVERHEADS 9200 Site Facilities - Complete Operators & drivers for yard equip 20000 hrs 804040 --> ] 85 CFM ] 70 HP 6,000.00 HR 804320 -> 20-50 KW GENER 50- 6,000.00 HR 804380 --> 400 AMP WELDER 6,000.00 HR 805020 --> FLATBAD TRACTO 6,000.00 HR 811 WTRBL 2,000.00 HR 83130C =_> Water truck 2500 GA 500.00 HR 83140C --> Boom truck-12 TON 6,000.00 HR 83150C --> Lowboy 60 ton trailer 4,000.00 HR 83185C Small Vac Sweeper 500.00 HR 83400C => Cat 950F (170 HP) 500.00 HR 83800C =_> Bobcat 553-21 S HP 2,000.00 HR 84535R =_> 18 Ton R.T. (RT420) 6,000.00 HR 85105C => Pump 3-in Subm. F,lect 2,000.00 HR 85335C =_> Sandblaster 500.00 HR 85355C => Concrete Conveyor 500.00 HR 85845R =_> Boat, Supervisor(Boss) 1,000.00 HR 85850R Boat, Personnel 25 Per 1,000.00 HR 85855R Boat, Personnel 10 Per 1,000.00 HR D � 0 � Unit = Quan 18.520 23.890 1 1.250 30.830 15.000 33.640 17.980 23.000 37.420 65.070 18.120 65.450 4.560 20.670 I 5.760 22.220 70.090 42.070 Page 57 OS/04/2012 12:08 Total **Unrevicwed 2,807 47,724 6,148 56,679 5.40 65,328 87,602 16,409 8,332 10,184 6,148 ]94,002 88.40 118.54 2220 11.27 13.78 8.32 262.52 LS TakeoffQuan: 1.000 Engr Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 22,920 88,200 31,440 ll 1,900 ] 1,400 56,100 49,380 135,600 30,000 5,070 11,750 69,480 38,400 53,600 38,400 18,710 13,735 18,800 17,240 19,000 171,000 221,700 4,520 4,600 8,010 2,325 2,680 5,200 3,420 18,800 70,090 42,070 1.000 111,120 143,340 67,500 184,980 30,000 16,820 107,880 92,000 18,710 32,535 36,240 392,700 9,120 10,335 �,xxo 22,220 70,090 42,070 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description BID [TEM = 9100 Description = OVERHF,ADS 86115C LightPlanY 86120C --> Arrow Board 8TURNTABL Turntable for Readym OP02 --> Operator,Crane<50 T $2,562,297.60 24,000.0000 MWLS I90120 L236 L240 L242 � L243 F! , L244 cn L246 N L248 L249 L250 L252 $3,860,622.18 Supervison - Salaried __> Project Manager __> Project Engineer --> Field Engineer --> Schedule Engineer __> Office F,ngineer --> QC Engineer --> Secretary __> Office Manager --> Clerk _°> Runner 80,256.0000 MH/LS I90125 Supervision Hourly Pcs Quantity Unit Unit Cost Cost Report Unit = L`, 6,000.00 HR 3.370 6,000.00 HR 5.450 2.00 EA 75,000.000 24,000.00 MH 26.000 24,000.0000 MH [ 686400 ] 24,000.0000 MH/Unit Quan: 7,744.00 MH 62.500 7,744.00 MH 58.000 10,560.00 MH 38.500 6,000.00 MH 38.500 12,600.00 MH 38.500 4,000.00 MH 38.500 6,336.00 MH 17.000 6,336.00 MH 45.000 12,(00.00 MH 17.000 6,336.00 MH 13.000 80,256.0000 MH [ 2907448.8 ] 80,256.0000 MH/Unit Quan: 1.00 LS 1.00 LS Mechanic 3# av 30 mths x 176 hrs = 15840 hrs 4# Supers x av 30 mths x 176 hrs = 21120 hrs L165 --> Mechanic 15,840.00 MH 35.000 L232 --> General Superintendent 6,336.00 MH 58.000 L238 —> Superintendent 21,120.00 MH 45.000 L2421 --> Party Chief 7,000.00 MH 38.000 L2423 =_> Rodman 14,000.00 MH 25.000 L2424 =_> Instrument man 14,000.00 MH 30.000 $3,945,700.32 78,296.0000 MH/LS 78,296.0000 MH [ 2963728 ] 78,296.0000 MH/Orrir I90130 Project Vehicles Quan: 1.00 LS 83000C —> Pick-Up 1/2 Ton 138,000.00 HR 15.310 $2,] 12,780.00 [ ] D � � 0 Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract TakeoffQuan: 1.000 Engr Quan: 1.000 20,220 16,200 l 6,500 160,500 953,338 953,338 821,685 787,275 953,337.60 821,685.00 787,275.00 Hrs/Shft: 10.00 Cal: 510 WC: NONE 614,680 573,211 536,606 304,890 640,269 203,260 159,857 370,973 317,898 138,978 3,860,622 3,860,622.18 Hrs/Shft: 10.00 Cal: 510 WC: NONE 804,910 468,991 l ,236,576 362,544 491,400 581,280 3,945,700 3,945,700.32 Hrs/Shft: 10.00 Cal: 510 WC: NONE 622,3 80 1,490,400 622,380 1,490,400 622,3 80.00 1,490,400.00 Page 58 OS/04/2012 12:08 Total 20,220 32,700 160,500 953,338 2,562,298 2,562,297.60 614,680 573,211 536,606 304,890 640,269 203,260 159,857 370,973 317,898 138,978 3,860,622 3,860,622.18 804,910 468,991 1,236,576 362,544 49l ,400 581,280 3,945,700 3,945,700.32 2,112,780 2,] 12,780 2,] 12,780.00 DMJM Harris RBONNFR20] 2 BONNER 20] 2 REVISION 2(OPT 2) Baris Lenderman Activity Description Quantity Resource Pcs Unit BID ITEM = 9100 Description = OVERHF.ADS I90150 Mechanic budget 83110C --> Mech.Tkr-1 TON $313,680.00 I90220 Subsistance 9SUB8 Subsistance 9SUB9 Subsistance $] ,368,600.00 d � I90225 Consumables W 9DH1 Safety Supplies 9DH3 Small Tools $369,88429 I90250 Travel & Other Expenses 3ZF53 Adnun/STAFF Expen@107 3ZF60 Project Signs@107% 9601 Jointventure expenses 9MBDICAL Medical Expenses 9SUB1 Air Fare, single 9TR001 Crew Relocation 9TR002 Frmn Relocation 9TR006 Home Office travel $411,027.17 I90310 Of6ce Supply 9SU001 Supplies 9SU005 PHOTOS 9SU008 Fedex/Postage $ l ,669.92 D � � � 12,000.00 HR 300.00 MO 720.00 MO 626,922.53 HR 626,922.53 HR 42.00 MO 1.00 LS 1.00 LS ] .00 LS 42.00 EA 12.00 EA 12.00 EA 42.00 MOS 42.00 MOS 42.00 MOS 42.00 MOS Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Unit = LS Takeot�f Quan: 1.000 6ng Quan: ].000 Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 26.140 70,080 243,600 [ ] 70,080 243,600 70,080.00 243,600.00 Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 1,754.000 526,200 1,170.000 842,400 [ ] 1,368,600 1,368,600.00 Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 0.120 75,231 0.470 294,654 [ ] 369,884 369,88429 Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 2,000.000 89,880 5,000.000 5,350 1.170 1 87,7 l 2.000 87,712 2,924.000 122,808 1,754.000 21,048 2,924.000 35,088 1,170.000 49,140 [ ] 411,027 41 ],027.17 Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 16.370 688 5.850 246 17.540 737 [ ] 1,670 Page 59 OS/04/2012 12:08 Total 313,680 313,680 313,680.00 **Unreviewed 526,200 842,400 1,368,600 1,368,600.00 75,231 294,654 369,884 369,884.29 89,880 5,350 1 87,712 122,808 21,048 35,088 49, l 40 411,027 411,027.17 688 246 737 1,670 DMJM Harris RBONNFR20] 2 BONNER 20] 2 REVISION 2(OPT 2) Baris Lenderman Activity Description Quantity Resource Pcs Unit BID [TEM = 9100 Description = OVERHF,ADS I90420 Engineering Services 4ENG Engincering@101% $88,590.13 I90610 Communications 805260 RADIOS 9DCO2 Copy machine � 9DC05 Computer � 9SU009 Phone/Fax c�j� 9SU014 Cell Phone Costs `� $289,810.60 I90912 Testing Lab 4PCONC Concrete TesUng@] O] % $59,059.75 I92150 Trailers & Utilities 805140 --> OFFICE TRAILER 805141 Engs/clients office 85225C TooUOffice Vans 45' 9DH4 Ice and Water 9SU002 Electric 9SU003 Portajons 9SU004 Dumpsters 9SU007 Water/Sewer 9SUOl5 Office Cleaning $504,608.25 D � � N Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Unit = LS Takeoff Quan: 1.000 Engr Quan: 1,669.92 Quan: 1.00 DA Hrs/Shft: 10.00 Cal: 510 WC: NONE 1.00 LS 87,713.000 �] Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 66,000.00 HR 1.010 66,660 3.00 F.,A ] 1,695.000 35,085 20.00 EA 3,509.000 70,180 840.00 DA 81.860 68,762 840.00 DA 58.480 49,123 [ ] 223,151 66,660 223,150.60 66,660.00 Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 1.00 LS 58,475.000 �� Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 42.00 MOS 921.380 26,487 14,920 1.00 LS ] 50,000.000 ] 60,500 42.00 MOS 500.000 21,000 626,922.53 HR 0175 109,711 42.00 MOS 585.000 24,570 42.00 MOS 585.000 24,570 42.00 MOS 1,170.000 49,140 42.00 MOS 585.000 24,570 42.00 MOS 1,170.000 49,140 [ ] 281,70] 207,987 14,920 281,701.44 207,986.73 14,920.08 1.000 Page 60 OS/04/2012 12:08 Total 1,669.92 88,590 88,590 88,590 88,590 88,590.13 88,590.13 * * U nrcvicwed 66,660 35,085 70,180 68,762 49,123 289,8] 1 289,810.60 59,060 59,060 59,060 59,060 59,059.75 59,059.75 41,407 160,500 21,000 109,711 24,570 24,570 49, ] 40 24,570 49,] 40 504,608 504,608.25 DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Page 61 OS/04/2012 12:08 Total BID ITEM = 9]00 Description= OVERHF.ADS Unit= LS Takeot�fQuan: 1.000 6ng Quan: ].000 I94010 Bond & Insurance Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE To use auot calculation for buildre's risk add bid marup percent to the adjustment field 3Z130 Builders Risk@107% 220,000.00 YD 1.045 246,040 246,040 9GA0] Insurance Costs 220,000.00 YD 6.844 1,505,680 1,505,680 9TX001 Permits ].00 K$ 29,238.000 29,238 29,238 9TX003 Performance Bond 220,000.00 YD 6.935 1,525,898 1,525,898 $3,306,856.08 [ ] 3,306,856 3,306,856 3,306,856.08 3,306,856.08 I94020 Taxes & Duties Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE ,� 9AGENT Agent Fees 4.00 EA 585.000 2,340 2,340 � 9TX008 Equipment Tax, 4% 170,000.00 C 1.754 298,180 298,180 � $300,520.00 [ ] 300,520 300,520 300,520.00 300,520.00 _____> lYem Totals: 9100 - OVERHEADS $]9,495,706.29 182,552.0000 MH/LS 182,552.00 MH [ 6557576.8 ] 8,759,660 6,263,410 1,788,792 2,536,195 147,650 ]9,495,706 19,495,706.290 1 LS 8,759,660.10 6,263,409.50 1,788,791.73 2,536,195.08 147,649.88 19,495,706.29 $192,663,835.15 *** Report Totals *** 629,969.68 »> indicates Non Additive Activity ------Report Notes:------ The estimate was prepared with TAKEOFF Quantities. This report sbows TAKEOFF Quantiries with the resources. "Unreviewed" Activities are marked. Bid Date: Owner: Engineenng Firm: Estimator-In-Charge: MH * on units of MH indicate average labor unit cost was used rather than base rate. D � � W 24,119,292 70,471,099 18,852,335 14,424,882 11,078,027 53,718,201 192,663,835 � �J DMJM Harris RBONNER2012 Baris Lenderman Actrvity Resource BONNER 20] 2 REVISION 2(OPT 2) Description Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 9100 Description = OVERHF,ADS Unit = LS TakeoffQuan: 1.000 Engr Quan [] in the Unit Cost Column = Labor Unit Cost Without Labor Burdens In equipment resources, rent � and EOE ° not = 100o are represented as XXXoYYY where XXX=Rento and YYY=EOEo ------Calendar Codes------ 508 RF.,G 40 HR WEF,K DAY SHIFTS 5]0 M-F ]0 HOURS PER DAY (Default Calendar) 6l 0 MO - SA ] 0 HR/DAY OFF OFFSHIFT D � � � 1.000 Page 62 OS/04/2012 12:08 Total B-2500 Pamlico Bridge Cost Study PAMLIC O B RID GE COST REPORT (Revision 1 of AECOM Estimate 04/26/12 D-157 DMJM Harris RPAMLICO2012 Baris Lenderman Actrvity Resource PAMLICO 2012 REVISION 1 Description Quantity Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Page 1 OS/04/2012 1228 Total BIDITEM = 2900 Description = CONSTR & RI;MOVAL OF TEMP ACCI:SS Unit= LS TakeoffQuan: 1.000 F,ngr Quan: 1.000 100 Install & remove trestle for 250t Marine Quan: 156,240.00 LF Hrs/Shft: 10.00 Cal: 510 WC: NONE P1LE Pile Crew Shcct 97,650.00 CH Prod: 16.0000 US Lab Pcs: 6.00 Eqp Pcs: 5.00 3SUPPLIES Welding/slings@106.75% 9,765.00 DAY 100.000 1,042,414 1,042,414 3TRESTLE Trestle@106.75% 5,100.00 LF 1,460.000 7,948,605 7,948,605 4HAUL Haul Carolina to@]O1% 100.00 TRIP ],170.000 118,170 118,170 84308R American 7260 100T 1.00 97,650.00 HR 163.010 8,184,047 7,733,880 15,917,927 84910C 400 Amp Welder 1.00 97,650.00 HR 11.250 185,535 913,028 1,098,563 85130C Pump l0 in Cent 350 1.00 97,650.00 HR 35.870 1,378,818 2,123,888 3,502,706 85610C Ice 4l6 Vibro 65T 1.00 97,650.00 HR 109.610 3,989,979 6,713,438 ] 0,703,417 � 85655C Delmag D30-32 & LEAD 1.00 97,650.00 HR 82.960 4,649,117 3,451,928 8,101,044 �! ,OPO4 Operator, Crane 91T ].00 97,650.00 MH 28.000 4,154,734 4,154,734 U� OP12 Oiler l.00 97,650.00 MH 14.000 2,223,842 2,223,842 � PD01 Piledriver Fareman 1.00 97,650.00 MH 23.000 3,556,787 3,556,787 PD02 Piledriver Journeyman 3.00 292,950.00 MH 21.000 9,818,925 9,818,925 $68,187,132.13 3.7500 MH/LF 585,900.0000 MH [ 88 ] 19,754,288 8,991,019 18,387,495 20,936,160 ll 8,170 68,187,132 0.6250 Hr/Unit 9,765.0000 Shifts 3.7500 MH/Unit 126.44 57.55 117.69 134.00 0.76 436.43 101 Railway attached to trestle Quan: 78,120.00 LF Hrs/Shft: 10.00 Cal: 510 WC: NONE PILE Pile Crew Shect 19,530.00 CH Prod: 40.0000 US Lab Pcs: 6.00 F,qp Pcs: 8.00 4HAUL Haul Carolina to@]O1% 250.00 TRIP 1,170.000 295,425 295,425 84308R American 7260 100T 1.00 19,530.00 HR 163.010 1,636,809 1,546,776 3,183,585 84910C 400 Amp Welder 1.00 19,530.00 HR 11.250 37,107 182,606 219,713 85650C Delmag D 16-32 Sa 32 1.00 19,530.00 HR 71.220 739,601 651,326 1,390,927 85720C Swinging Leads Top 1.00 19,530.00 HR 1.190 23,241 23,241 85725C Swinging Leads Mid 3.00 58,590.00 HR 0.990 58,004 58,004 85730C Swinging Leads Stab 1.00 L9,530.00 HR 0.490 9,570 9,570 8CONCBUCK 5 CY CONC LAYDOWN 20.00 EA 4,000.000 85,600 85,600 8L000 RAILWAY LOCO AND C ].00 LS 500,000.000 535,000 535,000 8RAILWAY RAILWAY TRESTLE,TK 1.00 LS 18,000,000.000 19,260,000 19,260,000 IWO] lronworker Foreman 1.00 19,530.00 MH 28.000 876,542 876,542 IW02 Ironworker Jorneyman 2.00 39,060.00 MH 26.000 ],636,234 1,636,234 LA02 Laborer,Skilled 1.00 19,530.00 MH 14.500 471,052 471,052 OP02 Operator,Crane<50 T 1.00 19,530.00 MH 26.000 775,778 775,778 OPl6 Operator, locomotiv 1.00 19,530.00 MH 23.000 693,026 693,026 $29,513,696.79 1.5000 MH/LF 117,180.0000 MH [ 39.463 ] 4,452,633 22,384,932 2,380,707 295,425 29,S13,697 D � � cn DMJM Harris RPAMLICO2012 Baris Lenderman Actrvity Resource PAMLICO 2012 REVISION 1 Description Pcs BID [TEM = 2900 Description = CONSTR & REMOVAL OF TEMP ACCESS 02500 Hr/Unit 1,953.0000 Shifts 910001 Mobilize Equipment Marine 4HAUL.01 HAUL Caialina@101% $590,597.50 Quantity Unit Unit Cost Unit = 1.5000 MH/Unit Quan: 1.00 LS 584,750.000 �] Cost Report LS 1.00 LS Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract TakeoffQuan: 1.000 Engr Quan: 1.000 57.00 286.55 30.48 3.78 Hrs/Shft: 10.00 Cal: 510 WC: NONE Page 2 OS/04/2012 1228 Total 377.80 590,598 590,598 590,598 59Q598 590,597.50 590,597.50 _____> Item Totals: 2900 - CONSTR & REMOVAL OF TEMP ACCESS $98,291,426.42 703,080.0000 MH/LS 703,080.00 MH [ 16831930.5 ] 24,206,921 8,991,019 40,772,427 23,316,867 1,004,193 98,291,426 98,291,426.420 1 LS 24,206,921.27 8,991,018.75 4o,��z,azb.90 zs,3ib,abzoo 1,004,192.50 98,291,426.42 d c�ii BID ITEM = 3030 JCK � Description = 1371 MM PRESTR CONC CYL P[LF, (54-iN) Unit= M TakeoffQuan: 56,807.000 Engr Quan: 56,807.000 3030 1371mm prestr conc cyl pile Marine Quan: 1,491.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE P1LF,C Pile Crew Large 9,939.99 CH Prod: 1.5000 US Lab Pcs: 6.00 F,qp Pcs: 6.00 2FCP54 54 PSPC Conc C@106.75 56,807.00 M 525.000 31,836,773 2FCP54SS 54" PSPC S.StI@106.75% 7,271.00 M 476.000 3,694,613 804025 Pile/Drill template 1.00 9,940.00 HR 12.000 119,280 804030 Pile Driving Jig 1.00 9,940.00 HR 7.000 69,580 804240 3 stage jet pump 250 1.00 9,940.00 HR 22.120 71,270 148,603 84304R 9299 SKYHORSF, & BAR 1.00 9,940.00 HR 492200 4,892,468 8491 OC 400 Amp Welder 1.00 9,940.00 HR 1].250 18,886 92,939 85664C DELMAG D160-32 & LEA 1.00 9,940.00 HR 410.000 4,075,400 OPOS Operator, Crane>140 T 1.00 9,940.00 MH 28.000 422,919 OP12 Oiler 1.00 9,940.00 MH 14.000 226,370 PDOI Pilcdriver Foreman 1.00 9,940.00 MH 23.000 362,053 PD02 Piledriver Joumeyman 3.00 29,820.00 MH 21.000 999,489 $47,030,642.88 40.0000 MH/EA 59,640.0000 MH [ 938.667 ] 2,010,831 35,531,386 9,246,884 241,542 6.6667 Hr/Unit 993.9990 Shifts 40.0000 MH/Unit 1,348.65 23,830.57 6,201.80 162.00 31332 Cutoff Concrete Piles 1371mm Quan: 1,491.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE PILE4 Pile Cutoff Crew 9,939.99 CH Prod: 1.5000 US Lab Pcs: 3.12 Eqp Pcs: 1.12 3SAWBLADE Sawblades@106.75% 1,491.00 EA 10.000 15,916 D � � rn **Unreviewed 31,836,773 3,694,613 119,280 69,580 219,873 4,892,468 ] 11,825 4,075,400 422,919 226,370 362,053 999,489 47,030,643 31,543.02 **Unrevicwcd 15,916 DMJM Harris RPAMLICO2012 PAMLICO 2012 REVISION 1 Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report BID [TEM = 3030 Description = 1371 MM PRESTR CONC CYL PILF (54-IN) Unit = M 83150C Lowboy 60 ton trailer 0.12 1,192.80 HR 23.000 85325C Concrete Saw Handheld 1.00 9,940.00 HR 11.460 LA01 Laborer Foreman 1.00 9,940.00 MH 16.500 LA02 Laborer,Skilled 2.00 19,880.00 MH 14.500 TMOI Teamster O.12 1,192.80 MH 12.000 $929,253.94 20.8000 MH/EA 31,012.8000 MH [ 344.227 ] 6.6667 Hr/Unit 993.9990 Shifts 20.8000 MH/Unit _____> IYem Totals: 3030 - 1371MM PRESTR CONC CYL PILE (54-IN) $47,959,896.82 1.5958 MH/M 90,652.80 MH [ 33.672 ] 844.260 56807 M d � Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract JCK TakeoffQuan: 56,807.000 Engr Quan: 56,807.000 15,984 11,451 27,931 85,981 268,702 479,494 23,795 771,991 15,916 43,915 97,432 517.77 10.68 29.45 65.35 2,782,822 35,531,386 15,916 9,290,799 338,974 48.99 625.48 028 163.55 5.97 �BIDITEM = 3040 JCK Description = AXiAL LD TF,ST ON 1371 MM CYL PILE Unit= F,A TakeoffQuan: 2.000 6ngr Quan: 3050 Axial ►d test on 1676mm cyl pile Quan: 2.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 4TEST.01 Pilc test@101 % 2.00 LS 350,850.000 $708,717.00 [ ] B�D ITEM = 3050 JCK Dcscription = LATERAL LOAD TF.ST ON 1371 MM CYL PILE Unit= EA TakeoffQuan: 2.000 Engr Quan: 3050 Lateral Load test on 1676mm cyI pile Quan: 2.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE 4TEST.01 Piletest@l01% 2.00 LS 350,850.000 $708,717.00 [ ] D � � � 2.000 Page 3 OS/04/2012 12:28 Total 27,434 ll3,912 268,702 479,494 23,795 929,254 623.24 47,959,897 844.26 ** Unrcvicwcd 708,717 708,717 708,717 708,717 354,358.50 354,358.50 2.000 **Unreviewed 708,717 708,717 708,717 708,717 354,358.50 354,358.50 DMJM Harris RPAMLICO2012 Baris Lenderman Actrvity Resource PAMLICO 2012 REVISION 1 Description Quantity Pcs Unit Unit Cost Cost Report BIDITEM = 3060 Description = PRODUCTION DYNAMIC LD TEST ON CYL PILE Unit= EA 309000 Pile testing, Complete Quan: 78.00 LS 4TEST Ptiletest@701% 78.00 LS 1,754.000 $138,] 80.12 L l Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract JCK TakeoffQuan: 78.000 Engr Quan: Hrs/Shft: 10.00 Cal: 510 WC: NONE 78.000 Page 4 OS/04/2012 1228 Total * * U nrcvi cwed 138,180 138,180 138,180 138,180 1,77].54 ],771.54 BID ITEM = 4110 JCK Description = PRECAST CONCRF.TE PILE CAP Unit= M3 TakeoffQuan: 15,870.000 Engr Quan: 15,870.000 � 41530 Cast cols & caps incl form set up Marine Quan: 15,863.51 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE � �' SEG 4.5 Man Scgmcnt Prccasting 7,050.44 CH Prod: 0.5000 UM Lab Pcs: 4.50 Eqp Pcs: 0.00 2CFL007 Superplastizer@106.75% 15,863.51 M3 15.000 254,014 2CFL025 C] -N Conc (FL@] 06.75% 15,863.51 M3 l 96.500 3,327,589 3FMF METAL FORN[S@106.75 1,561.41 M2 550.000 916,743 CA01 Carpenter Foreman 0.50 3,525.22 MH 23.000 129,776 CA02 Carpenter Jowreyman 1.00 7,050.45 MH 21.000 238,821 CMO1 Concrete Finisher Foreman 1.00 7,050.45 MH 2O.250 229, l00 IWO] Ironwarker Foreman 1.00 7,050.45 MH 28.000 316,437 LA02 Laborer,Skilled 1.00 7,050.45 MH 14.500 170,053 $5,582,532.51 2.0000 MH/M3 31,727.0200 MH [46.567] 1,084,186 3,581,604 916,743 0.4444 Hr/Unit 705.0440 Shifts 2.0000 MH/Unit 68.34 225.78 57.79 44330L Erect conc PC cois & caps Marine Quan: 877.98 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE FRM087 Formwork crcw w/9320 4,389.46 CH Prod: 2.0002 OS Lab Pcs 8.00 Eqp Pcs: 2.00 84303R American 9320 250 T 1.00 4,389.46 HR 291.660 696,212 584,018 85000C 5 KW GENERATOR 1.00 4,389.46 HR 4.550 4,828 15,144 CA01 CarpenterFareman 1.00 4,389.46 MH 23.000 l6],591 CA02 Carpenter Journeyman 4.00 17,557.84 MH 21.000 594,739 LA03 Laborer,unskilled ].00 4,389.46 MH 13.000 96,281 OP05 Operator, Crane>140 T 1.00 4,389.46 MH 28.000 186,759 OP12 Oiler 1.00 4,389.46 MH 14.000 99,964 $2,439,536.65 39.9959 MH/EA 35,115.6800 MH [ 890.911 ] 1,139,335 701,041 599,161 4.9995 Hr/Unit 438.9460 Shifts 39.9960 MH/Unit 1,297.68 798.47 682.43 D � � � **Unrcvicwcd 254,014 3,327,589 916,743 129,776 238,821 229,100 316,437 170,053 5,582,533 351.91 **Unrevicwcd 1,280,230 19,972 161,591 594,739 96,281 186,759 99,964 2,439,537 2,778.58 DMJM Harris RPAMLICO2012 Baris Lenderman Actrvity Resource PAMLICO 2012 REVISION 1 Description Quantity Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4] 10 JCK Description = PRECAST CONCRETE PILE CAP Unit= M3 TakeoffQuan: ] 5,870.000 Engr Quan: 15,870.000 _____> ltem Totals: 4110 - PRECAST CONCRETE PILE CAP $8,022,069.16 4.2118 MH/M3 66,842.70 MH [ 95.836 ] 2,223,521 3,581,604 916,743 701,041 599,161 505.486 15870 M3 140.1 l 225.68 57.77 44.17 37.75 BIDITEM = 4]20 Description = EPDXY-COATED PILF, CAP REINF. STEEL 433 S& I Reinforcing Steelr 2SRF,PDXY Reinforcing St@106.75% 2,358,216.54 KG d2SREPDXYA Restee] Access@]06.75% 2,358,216.54 KG �' 4REBAR Rebar place@101 % 2,358,216.54 KG N $4,276,448.83 Page 5 OS/04/2012 12:28 Total 8,022,069 505.49 JCK Unit= KG TakeoffQuan: 2,358,217.000 Engr Quan: 2,358,217.000 Quan: z,358,216.54 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE **Unrcvicwcd 1.050 2,643,266 2,643,266 0.100 251,740 251,740 0.580 1,381,443 1,381,443 [ ] 2,895,006 1,381,443 4,276,449 1.23 0.59 1.81 _____> Item Totals: 4120 - EPDXY-COATED PILE CAP REINF. STEEL $4,276,448.83 L ] ].813 2358217 KG 2,895,006 1.23 ],381,443 4,276,449 0.59 1.81 BIDITEM = 4130 JCK Description = PT STRAND IN PC COLS & CAPS Unit= KG TakeoffQuan: 349,016.000 F.ngr Quan: 349,016.000 4130 PT strand in PC cols & caps Quan: 349,016.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE PTS 5 Man PT Crcw 3,490.16 CH Prod: 20.0000 UM Lab Pcs: 5.00 Eqp Pcs: 0.00 2PTGROUT PT Grout MaterG106.75% 74.47 M3 300.000 23,849 2PTSTRAND PT STRAND SUPP@106.7 349,016.00 KG 3.]00 1,154,981 IWO1 lronwarker Fareman 2.00 6,98032 MH 28.000 313,290 IWO11 Ironworker Foreman 1.00 3,490.16 MH 28.000 156,645 LA02 Laborer,Skilled 2.00 6,980.32 MH 14.500 168,361 $1,817,125.72 0.0500 MH/KG 17,450.8000 MH [ 1.243 ] 638,296 1,178,830 0.0100 Hr/Unit 349.0160 Shifts 0.0500 MH/Unit L83 3.38 ____> Item Totals: 4130 - PT STRAND IN PC COLS & CAPS D � � � **Unreviewed 23,849 1,154,981 313,290 156,645 168,361 1,817,126 5.21 DMJM Harris RPAMLICO2012 PAMLICO 2012 REVISION 1 Baris Lenderman Activity Description Quantity Resource Pcs Unit BID [TEM = 4130 Description = PT STRAND IN PC COLS & CAPS $1,817,125.72 0.0500 MH/KG 5.206 349016 KG 17,450.80 MH Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract JCK Unit = KG Takeoff Quan: 349,016.000 Engr Quan: 349,016.000 [ 1.243 ] 638,296 1,178,830 1.83 3.38 BID ITEM = 4140 JCK Description= PT BAR IN PC COLS & CAPS Unit= KG Tal<eot�fQuan: 301,852.000 F.ngr Quan: 301,852.000 4140 PT Bar in PC cols & caps Quan: 301,852.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE PTS 5 Man PT Crew 3,018.52 CH Prod: 20.0000 UM Lab Pcs: 5.00 Eqp Pcs: 0.00 2PTBAR PTBarsupply@106.75% 301,852.00 KG 5.000 ],611,]35 diW01 IronwarkerFareman 2.00 6,037.04 MH 28.000 270,953 �' IWO] 1 Nonwarker Fareman 1.00 3,0] 8.52 MH 28.000 135,477 W LA02 Laborer,Skilled 2.00 6,037.04 MH 14.500 145,610 $2,163,175.00 0.0500 MH/KG 15,092.6000 MH [ 1.243 ] 552,040 1,6i 1,135 O.O100 Hr/Unit 301.8520 Shifts 0.0500 MH/Unit 1.83 534 _____> Item Totals: 4140 - PT BAR IN PC COLS & CAPS $2,163,175.00 0.0500 MH/KG ]5,092.60 MH [ 1.243 ] 552,040 1,611,135 7.166 301852 KG 1.83 5.34 BID ITEM = 4170 Description = 96° FIB GIRDERS 367301 Precast Beams A] W4 PC Placing 2PCGFIB96 96" FIB GIRDER@106.75 804380 400 AMP WF,LDER 84303R American 9320 250 T 8TRUSS Dea] girder trus & po IWO1 Ironworker Foreman IW02 lronworker Jorneyman LA02 Laborer,Skilled OPOS Operator, Crane>140 T D � N O 6,480.00 CH 95,299.00 M 1.00 6,480.00 HR 2.00 12,960.00 HR 1.00 HR 1.00 6,480.00 MH 6.00 38,880.00 MH 2.00 12,960.00 MH 2.00 12,960.00 MH Unit= M TakeoffQuan: 95,299.000 Engr Quan: 95,299.000 Quan: 1,944.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE Prod: 3.0000 US Lab Pcs: 13.00 Eqp Pcs: 3.00 1,050.000 106,818,267 11.250 12,312 60,588 291.660 2,] 99,477 1,845,03 i 150,000.000 160,500 28.000 290,834 26.000 1,628,694 L4.500 312,587 28.000 551,412 Page 6 OS/04/2012 1228 Total ],817,126 5.21 **Unreviewed 1,611,135 270,953 135,477 145,610 2,163,175 7.17 2,] 63,175 7.17 106,87 8,267 72,900 4,044,508 160,500 290,834 1,628,694 312,587 551,412 DMJM Harris RPAMLICO2012 Baris Lenderman Actrvity Resource PAMLICO 2012 REVISION 1 Description Quantity Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4170 Description = 96" FIB GIRDERS Unit = M Takeoff Quan: 95,299.000 Engr Quan: 95,299.000 OP12 Oiler 2.00 12,960.00 MH 14.000 295,146 $] 14,174,847.52 43.3333 MH/EA 84,240.0000 MH [] 089 ] 3,078,673 106,818,267 2,372,289 1,905,619 3.3333 Hr/Unit 648.0000 Shifts 43.3333 MH/Unit 1,583.68 54,947.67 1,22031 980.26 367310 S& P Steel x Bracing Quan: 2,916.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE A1 W3 Rebar/ Ironworker Crew 4,859.99 CH Prod: 6.0000 US Lab Pcs: 5.00 F�qp Pcs: ].00 2MISCSTEEL Misc steel@106.75% 802.00 TON 1,500.000 1,284,203 804040 185 CFM 170 HP %0 1.00 4,860.00 HR 18.520 ] 8,565 7W01 IronwarkerForeman 1.00 4,860.00 MH 28.000 218,126 lW02 IronwarkerJorneyman 4.00 19,440.00 MH 26.000 814,347 $2,335,240.48 8.3333 MH/EA 24,300.0000 MH [ 242 ] 1,032,473 1,284,203 18,565 � 1.6667 Hr/Unit 485.9990 Shifts 8.3333 MH/Unit 354.07 440.40 637 N �_____> Item Totals: 4170 - 96" FIB GIRDFRS `�$116,510,088.00 1.1389 MH/M 108,540.00 MH [29.619] 4,111,146 108,102,469 2,390,854 L,905,619 1,222.574 95299M 43.14 l,]34.35 25.09 20.00 BIDITEM = 4180 Description = DECK SLAB REINFORCEMENT STEEL (ASTM A 95 433 S& I Reinforcing Steel 2SRASS Restccl Access@106.75% 12,101,639.96 KG 2SRSS ReinforcingSt@106.75% ]2,101,639.96 KG 4REBARSS Stainless Steel R@101% 12,101,639.96 KG $65,222,393.64 ____> Item Totals: $65,222,393.64 5.390 D � N � Unit= KG Quan:12,101,639.96 g 0.250 4.250 0.580 �] 4180 - DECK SLAB REINFORCEMENT STEEL (ASTM A 95 �] 12101640 KG TakeoffQuan: 12,101,640.000 EngrQuan: 12,101,640.000 G Hrs/Shft: 10.00 Cal: 510 WC: NONE Page 7 OS/04/2012 1228 Total 295,146 1 ] 4,174,848 58,731.92 1,284,203 18,565 218,126 814,347 2,335,240 800.84 1 ] 6,510,088 1,222.57 3,229,625 3,229,625 54,903,628 54,903,628 7,089,141 7,089,141 58,133,253 7,089,141 65,222,394 4.80 0.59 5.39 58,133,253 4.80 7,089,141 65,222,394 0.59 5.39 DMJM Harris RPAMLICO2012 Baris Lenderman Actrvity Resource PAMLICO 2012 REVISION 1 Description Quantity Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BIDITEM = 4190 Description= CONC DECK Unit= M3 TakeoffQuan: 81,391.000 Engr Quan: 81,391.000 366002 Set & strip dk cantilever Quan: 44,571.41 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE FRM081 Formwork Crcw w/7260 11,142.85 CH Prod: 0.5000 UM Lab Pcs 8.00 Eqp Pcs: 3.00 3F1 WOODEN FORMS@106.7 44,571.41 M2 32.250 1,534,454 84308R American 7260 100T 1.00 1],142.85 HR ] 63.010 933,882 882,514 84700C 185 CFM Compressor 1.00 11,142.85 HR 18.520 42,566 163,800 85000C 5 KW GENERATOR 1.00 11,142.85 HR 4.550 12,257 38,443 CA01 Carpenter Fareman 1.00 11,142.85 MH 23.000 410,207 CA02 Carpenter Journeyman 4.00 44,571.41 MH 21.000 1,509,774 LA03 Laborer, unskilled 1.00 11,142.85 MH 13.000 244,414 OPO4 Operator, Crane 9lT 1.00 I 1,142.85 MH 28.000 474,097 d OP] 2 Oiler 1.00 l 1,142.85 MH 14.000 253,763 �-'$6,SOO,170.86 1.9999 MH/M2 89,142.8100 MH [44.55] 2,892,255 1,534,454 988,705 1,084,756 � 02500 Hr/Unit 1,1142850 Shifts 2.0000 MH/Unit 64.89 34.43 22.18 2434 366005 Set & Strip Deck Bulkhead Quan: 1,228.30 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE ACARP3 3 Man Caipanter Crcw 4,913.20 CH Prod: 0.2500 UH Lab Pcs: 3.50 Eqp Pcs: 0.00 3Fl WOODEN FORMS@106.7 1,228.30 M2 32.250 42,287 CA01 Carpenter Foreman 0.50 2,456.60 MH 23.000 90,436 CA02 Carpenter Joumeyman 3.00 14,739.60 MH 21.000 499,277 $631,999.13 14.0000 MH/M2 17,196.2000 MH [ 327.8 ] 589,713 42,287 4.0000 Hr/Unit 491.3200 Shifts 14.0000 MH/Unit 480.10 34.43 366008 Set & Strip Fascia Quan: 12,479.55 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE ACARP3 3 Man Carpcnter Crew 11,885.28 CH Prod: 0.3000 UM Lab Pcs: 3.50 F,qp Pcs: 0.00 3F] WOODEN FORMS@106.7 12,479.55 M2 32.250 429,632 CAOI Carpenter Foreman 0.50 5,942.64 MH 23.000 218,769 CA02 Carpenter Journeyman 3.00 35,655.86 MH 21.000 1,207,776 $1,856,177.29 3.3333 MH/M2 41,598.5000 MH [ 78.048 ] 1,426,545 429,632 0.9524 Hr/Unit 1,188.5280 Shifts 3.3333 MH/Unit 114.31 34.43 366010 F& I Stay-In-Place Deck Forms Quan: 165,742.21 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE FRM08l Farmwork Crew w/7260 10,358.88 CH Prod: 2.0000 UM Lab Pcs 8.00 F.qp Pcs: 3.00 2MISCSTF..EL Misc steel@106.75% 245.66 TON 1,500.000 393,363 2NEOPRENE Neoprene strip@106.75% 47,198.65 LF 0.500 25,192 D � N N Page 8 OS/04/2012 1228 Total * * U nrcvi cwed 1,534,454 1,816,396 206,366 50,700 410,207 1,509,774 244,414 474,097 253,763 6,500,171 145.84 42,287 90,436 499,277 631,999 514.53 ** Unrcvicwcd 429,632 218,769 1,207,776 1,856,177 148.74 ** Unrcviewed 393,363 25,192 DMJM Harris RPAMLICO2012 PAMLICO 2012 REVISION 1 Baris Lenderman Activity Description Quantity Unit Resource Pcs Unit Cost Cost Report BID [TEM = 4190 Description = CONC DECK Unit = M3 2SIP-F Stay-in Place @106.75% 165,742.21 M2 120.000 3GA101 Welding Suppli@106.75% ].23 LS 50,000.000 84308R American 7260 100T 1.00 10,358.89 HR ] 63.010 84700C 185 CFM Compressor 1.00 10,358.89 HR 18.520 85000C 5 KW GENERATOR 1.00 10,358.89 HR 4.550 CA01 Carpenter Foreman 1.00 10,358.89 MH 23.000 CA02 CarpenterJouineyman 4.00 41,435.55 MH 21.000 LA03 Laborer, unskilled 1.00 10,358.89 MH 13.000 OPO4 Operator, Crane 91T 1.00 ] 0,358.89 MH 28.000 OP12 Oiler 1.00 10,358.89 MH 14.000 $26,332,134.43 0.5000 MH/M2 82,871.1100 MH [ 1].138 ] 0.0625 Hr/Unit 1,035.8880 Shifts 0.5000 MH/Unit d Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract TakeoffQuan: 81,391.000 Engr Quan: 81,391.000 21,231,577 65,651 868,179 820,424 39,571 152,276 11,395 35,738 381,346 1,403,553 227,218 440,742 235,909 2,688,768 21,650,132 1622 130.63 �,366012 F& S diaphrams Quan: 25,876.63 M2 Hrs/Shft: 10.00 � � FRM087 Formwork crew w/9320 4,704.84 CH Prod: 0.5000 UM Lab Pcs: 3F1 WOODEN FORMS@106.7 25,876.62 M2 32.250 84303R American 9320 250 T 1.00 4,704.84 HR 291.660 85000C 5 KW GENERATOR 1.00 4,704.84 HR 4.550 CA01 Carpenter Foreman 1.00 4,704.84 MH 23.000 173,201 CA02 Carpenter Journeyman 4.00 18,819.37 MH 21.000 637,471 LA03 Laborer, unskilled 4.00 18,819.37 MH 13.000 412,796 OPOS Operator, Crane>140 T 1.00 4,704.84 MH 28.000 200,178 OPl2 Oiler 1.00 4,704.84 MH 14.000 107,146 $3,911,319.32 2.0000 MH/M2 51,753.2600 MH [402] 1,530,793 0.1818 Hr/Unit 470.4840 Shifts 2.0000 MH/Unit 59.16 366102 Set Bidwell Screed Rail Quan: 58,155.20 M Hrs/Shft: 10.00 CNC90 Scr�ed Rail Crew 11,07718 CH Prod: 1.5000 UM Lab Pcs: 3SCRAIL Screed Rail Ma@106.75% 3,390.11 M 20.000 85000C 5 KW GF..NERATOR 1.00 11,077.] 8 HR 4.550 CA01 Carpenter Foreman 0.50 5,538.59 MH 23.000 203,895 CA02 Carpenter Joumeyman 2.00 22,154.36 MH 21.000 750,438 LA03 Laborcr, unskilled 1.00 11,077.18 MH 13.000 242,974 $1,320,086.42 0.6666 MH/M 38,770.1300 MH [ 13.933 ] 1,197,306 0.]905 Hr/Unit 1,]07.7180 Shifts 0.6667 MH/Unit 20.59 D � N W 65,651 9l 9, l 44 1,008,43 8 0.40 5.55 (.08 Cal: 510 WC: NONE 11.00 Eqp Pcs: 2.00 890,851 798,471 669,797 S,175 16,232 890,857 803,646 686,029 34.43 31.06 26.51 Cal: 510 WC: NONE 3.50 Eqp Pcs: 1.00 72,379 12,185 38,216 72,379 12,185 38,216 1.24 0.21 0.66 Page 9 OS/04/2012 1228 Total 21,231,577 65,651 1,688,603 191,847 47,133 381,346 1,403,553 227,218 440,742 235,909 26,332,134 158.87 **Unreviewed 890,851 1,468,269 21,407 173,201 637,471 412,796 200,178 ] 07,146 3,911,319 151.15 **Unrcviewcd 72,379 50,401 203,895 750,438 242,974 1,320,086 22.70 DMJM Harris RPAMLICO2012 Baris Lenderman Actrvity Resource PAMLICO 2012 REVISION 1 Description Quantity Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID ITEM = 4190 Description= CONCDF.CK Unit= M3 Takeot�fQuan: 81,391.000 6n� Quan: 81,391.000 366104 Pour & Finish Deck & diaph Quan: 81,391.00 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE CNC087 Conc Crew w/9320 10,173.87 CH Prod: 1.0000 UM Lab Pcs 8.00 Eqp Pcs: 6.00 2C0005 4500 PSi Concr@106.75% 85,460.55 M3 153.250 13,980,865 84303R American 9320 250 T 1.00 10,173.88 HR 291.660 1,726,637 1,448,389 85000C 5 KW GENERATOR 1.00 10,173.88 HR 4.550 11,] 91 35,100 85320C Concrbucket 1.-5-3 C 1.00 10,173.88 HR 12.090 83,833 39,169 85340R Pump Truck 1.00 10,173.88 HR 1 11.450 390,677 743,202 85360C Hi-Cyde Concrete Vibr 2.00 20,347.75 HR 1.410 20,551 8,139 CM02 Concrete Finisher Journeym 1.00 10,173.88 MH 18.250 300,957 LA01 Laborer Foreman 1.00 10,173.88 MH 16.500 275,025 � LA02 Laborer,Skilled 2.00 20,347.75 MH 14.500 490,775 F! , LA03 Laborer, unskilled 2.00 20,347.75 MH 13.000 446,320 �OPOS Operator,Crane>140T 1.00 IO,173.88 MH 28.000 432,870 �OP12 Oiler 1.00 10,173.88 MH 14.000 231,696 $20,665,396.61 1.0000 MH/M3 81,391.0200 MH [ 18.116 ] 2,177,643 13,980,865 2,232,889 2,274,000 0.1250 Hr/Unit 1,017.3870 Shifts 1.0000 MH/Unit 26.76 171.77 27.43 27.94 366143 Cure conc diaph & facia Quan: 4,192,72416 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE AFNSH3 3 man Finishcr Crcw 47,916.46 CH Prod: 25.0002 UM Lab Pcs: 3.50 F,qp Pcs: 0.00 3CUREMAT CuringMATF,RIA@]06.75 4,192,724.16 M2 0.550 2,461,653 CMO1 Concrete Finisher Foreman 0.50 23,958.23 MH 2O.250 778,507 CM02 Concrete Finisher Journeym 3.00 143,749.39 MH 18.250 4,252,295 $7,492,454.64 0.0399 MH/M2 167,707.6200 MH [ 0.816 ] 5,030,801 2,461,653 0.0114 Hr/Unit 4,791.64(0 Shifts 0.0400 MH/Unit 1.20 0.59 366144 Rub & Finish conc Quan: 15,967.93 SM Hrs/Shft: 10.00 Cal: 510 WC: NONE AFNSH2 2 Man finish Crew 2,365.61 CH Prod: 3.0000 UM Lab Pcs: 2.25 Eqp Pcs: 0.00 3RUBMAT Rubmat@]06.75% 15,967.93 M2 1.000 17,046 CMO1 Concrete Finisher Foreman 0.25 59].40 MH 2O.250 19,217 CM02 Concrete Finisher Journe}nn 2.00 4,731.24 MH I 8.250 139,956 $176,219.18 0.3333 MH/SM 5,322.6400 MH [ 6.773 ] 159,173 17,046 0.1481 Hr/Unit 236.5610 Shifts 03333 MH/Unit 9.97 1.07 366150 S& I safety rails Quan: 58,155.20 M Hrs/Shft: 10.00 Cal: 510 WC: NONE D � N � Page 10 OS/04/2012 12:28 Total **Unrevicwed 13,980,865 3,175,026 46,291 123,002 1,133,879 28,690 300,957 275,025 490,775 446,320 432,870 231,696 20,665,397 253.90 2,461,653 778,507 4,252,295 7,492,455 1.79 ** Unrcvicwed 17,046 19,217 139,956 176,219 11.04 DMJM Harris RPAMLICO2012 PAMLICO 2012 REVISION 1 Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 4190 Description= CONC DECK Unit= M3 TakeoffQuan: 81,391.000 F,ngr Quan: 81,391.000 ACARP3 3 Man Carpenter Crew 2,769.29 CH Prod: 6.0000 UM Lab Pcs: 3.50 Eqp Pcs: 2.10 3SAFERAIL SafetyRai]@106.75% 58,155.20 M 5.000 310,403 85300C 450 Desck Finisher 1.05 2,907.76 HR 31.500 91,594 85305C Work Bridge 1.05 2,907.76 HR 5.340 15,527 CA01 Carpenter Foreman 0.50 1,384.65 MH 23.000 50,974 CA02 Carpenter Journeyman 3.00 8,307.89 MH 21.000 281,414 $749,913.41 0.1666 MH/M 9,692.5400 MH [ 3.902 ] 332,388 310,403 107,122 0.0476 Hr/Unit 276.9290 Shifts 0.1667 MH/Unit 5.72 5.34 1.84 366151 Access - Conc in superstr dk slabs, HPC Quan: 5.45 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 3EA08 Stair Tower@106.75% l.23 LS ] 00,000.000 131,303 � $131,302.50 [ ] ] 31,303 F! , 24,09220 � �_____> Item Totals: 4190 - CONC DECK $69,767,173.79 7.1930 MH/M3 585,445.83 MH [ 150.972 ] 18,025,386 35,630,998 5,955,659 5,063,691 5,091,439 857.185 81391 M3 221.47 437.78 73.17 62.21 62.56 BID ITEM = 4260 Dcscription= GROOVINGDECK GRIND Grinding Sub 4GRIND Grinding Sub@101% $1,130,480.58 BIDITEM = 4270 Description= BEARING PADS 4270 Bearing Pads FRM22 Expansion Joint Crew #3 D � N CJl Page 11 OS/04/2012 12:28 Total 310,403 91,594 15,527 50,974 281,414 749,913 12.90 131,303 131,303 24,092.20 69,767,174 857.19 Unit= M2 TakeoffQuan: 272,997.000 Engr Quan: 272,997.000 Quan: 275,268.82 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE 272,997.00 SY 4.100 1,130,481 1,130,481 [ ] 1,130,481 1,130,481 4.11 4.11 3,888.00 CH Unit= EA TakeoffQuan: 3,888.000 Engr Quan: 3,888.000 Quan: 3,888.00 EA Hrs/Shft: 10.00 Cal: 510 WC: NONE Prod: ] 0.0000 US Lab Pcs: 3.00 Sqp Pcs: 0.00 DMJM Harris RPAMLICO2012 Baris Lenderman Actrvity Resource PAMLICO 2012 REVISION 1 Description Quantity Pcs Unit Unit Cost Cost Report BID [TEM = 4270 Description = BEARING PADS Unit= EA 2BRNG031 EXP (>8900 KN)@106.75 3,888.00 EA 2,000.000 CA02 Carpenter Journeyman 2.00 7,776.00 MH 21.000 LA03 Laborer, unskilled 1.00 3,888.00 MH 13.000 $8,649,559.45 3.0000 MWEA 11,664.0000 MH [ 60.5 ] 1.0000 Hr/Unit 388.8000 Shifts 3.0000 MH/Unit _____> ltem Totals: 4270 - BEARING PADS $8,649,559.45 3.0000 MH/EA 11,664.00 MH [ 60.5 ] 2,224.687 3888 EA Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract TakeoffQuan: 3,888.000 Engr Quan 8,300,880 263,398 85,282 348,679 8,300,880 89.68 2,135.00 348,679 8,300,880 89.68 2,135.00 3,888.000 � BID ITEM = 4280 F! , Description = EXPANSION JOINT SEALS Unit= M TakeoffQuan: 1,577.000 Engr Quan: 1,577.000 � � 4280 Expansion Joints Quan: 1,577.00 M Hrs/Shft: 10.00 Cal: 510 WC: NONE FRM22 Expansion Joint Crew #3 87.61 CH Prod: 3.0000 UM Lab Pcs: 6.00 F,qp Pcs: 2.00 2EXPJT-M Modular Expans@106.75% 1,577.00 M 500.000 841,724 84515R 45 Ton R.T. (RT745) 1.00 87.61 HR 100.6] 0 3,794 5,020 84900C 200 Amp Welder 1.00 87.61 HR 4.120 98 263 CAOI Ca�penter Foreman 1.00 87.61 MH 23.000 3,225 CA02 Carpenter Journeyman 2.00 175.22 MH 21.000 5,935 IW02 IronworkerJorneyman 1.00 87.61 MH 26.000 3,670 LA03 Laborer, unskilled 1.00 87.61 MH 13.000 1,922 OP02 Operator,Crane<50 T 1.00 87.61 MH 26.000 3,480 $869,131.38 0.3333 MH/M 525.6600 MH [ 7.944 ] 18,232 841,724 3,893 5,283 0.0556 Hr/Unit 8.7610 Shifts 03333 MH/Unit 11.56 533.75 2.47 3.35 _____> Item Totals: 4280 - EXPANSION JOWT 5EALS $869,13138 0.3333 MH/M 525.66 MH [ 7.944 ] 18,232 841,724 3,893 5,283 SS1.130 1577 M l 1.56 533.75 2.47 3.35 BID ITEM = 4290 Description= ACCESSSYSTEM D � N O� Unit = LS Takeoff Quan: 1.000 Engr Quan: 1.000 Page 12 OS/04/2012 1228 Total 8,300,880 263,398 85,282 8,649,559 2,224.68 8,649,559 2,224.68 841,724 8,814 36l 3,225 5,935 3,670 1,922 3,480 869,] 3l 551.13 869,131 551.13 DMJM Harris RPAMLICO2012 Baris Lenderman Actrvity Resource PAMLICO 2012 REVISION 1 Description B�D ITEM = 4290 Description = ACCFSS SYSTF.M 4290 Access System 4METAL Miscell. metal@101 % $54,619.18 Pcs Quantity Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Unit= LS Takeot�fQuan: 1.000 6ng Quan: Quan: 9,260.00 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE 9,260.00 KG 5.840 �l Page 13 OS/04/2012 12:28 Total 1.000 54,619 54,619 54,619 54,619 5.90 5.90 BID [TEM = 4305 Description = 355MM X 800MM CONC PARAPET Unit = M TakeoffQuan: 47,650.000 Engr Quan: 47,650.000 d 4305 S& P conc parapet Quan: 13,532.95 M3 Hrs/Shft: 10.00 Cal: 510 WC: NONE � p CNCO2 Conc Crcw w/35 Ton RT 2,761.82 CH Prod: 0.7000 UM Lab Pcs: 7.00 Eqp Pcs: 5.00 2C0006 5000 PSI Concr@106.75% 14,209.60 CY 157.200 2,384,527 84520R 35 Ton R.T. (RT635C) 1.00 2,761.83 HR 79.870 99,895 120,692 85000C 5 KW GENF,RATOR 1.00 2,761.83 HR 4.550 3,038 9,528 85320C Concrbucket ].-5-3 C 1.00 2,761.83 HR 12.090 22,757 10,633 85360C Hi-Cycle Concrete Vibr 2.00 5,523.65 HR 1.410 5,579 2,209 CM02 Concrete Finisher JournEym 1.00 2,76] .83 MH 18.250 81,699 LAOI Labarer Foreman 1.00 2,761.83 MH 16.500 74,659 LA02 Laborer,Skilled 2.00 5,523.65 MH 14.500 133,227 LA03 Laborer,unskilled 2.00 5,523.65 MH 13.000 121,159 OP02 Operator,Crane<50 T 1.00 2,761.83 MH 26.000 ] 09,707 $3,179,310.04 1.4285 MWM3 19,332.7900 MH [ 25.985 ] 520,450 2,384,527 131,270 143,063 02041 Hr/Unit 276.1820 Shifts 1.4286 MH/Unit 38.46 17620 9.70 10.57 4306 F& S parapet Quan: 76,239.80 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE FRM02 Formwork Crew w/ 35 Ton RT 10,891.40 CH Prod: 1.0000 UM Lab Pcs: 7.00 F,c� Pcs: 2.00 3FM METAL FORMS@106.75 640.38 M2 400.000 273,442 84520R 35 Ton R.T. (RT635C) 1.00 10,891.40 HR 79.870 393,942 475,954 85000C 5 KW GENERATOR 1.00 10,891.40 HR 4.550 11,981 37,575 CAO] Carpenter Foreman 1.00 10,891.40 MH 23.000 400,950 CA02 Carpenter Journeyman 4.00 43,565.60 MH 21.000 1,475,704 LA03 Laborer, unskilled 1.00 10,891.40 MH 13.000 238,899 OP02 Operator,Crane<50 T 1.00 10,891.40 MH 26.000 432,633 $3,741,079.73 1.0000 MH/M2 76,239.8000 MH [ 22.943 ] 2,548,185 273,442 405,922 513,530 D � N v 2,384,527 220,587 12,566 33,391 7,788 81,699 74,659 133,227 121,159 109,707 3,179,310 234.93 **Unreviewed 273,442 869,896 49,556 400,950 1,475,704 238,899 432,633 3,74],080 DMJM Harris RPAMLICO2012 PAMLICO 2012 REVISION 1 Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Page 14 OS/04/2012 1228 Total BID [TEM = 4305 Description = 355MM X 800MM CONC PARAPET Unit = M Takeoff Quan: 47,650.000 Engr Quan: 47,650.000 0.1429 Hr/Unit 1,089.1400 Shifts 1.0000 MH/Unit 33.42 3.59 5.32 6.74 49.07 4307 Rub & finish parapet Quan: 76,239.80 M2 Hrs/Shft: 10.00 Cal: 510 WC: NONE **Unreviewed AFNSH3 3 man Finishcr Crew 10,89] .39 CH Prod: 2.0000 UM Lab Pcs: 3.50 Eqp Pcs: 0.00 3CURE Curing@106.75% 76,239.80 M2 1.000 81,386 81,386 CMO] Concrete Finisher Foreman 0.50 5,445.70 MH 2O.250 ] 76,954 176,954 CM02 Concrete Finisher Journeym 3.00 32,674.20 MH 18.250 966,546 966,546 $1,224,885.91 0.5000 MH/M2 38,119.9000 MH []0.195 ] 1,143,500 81,386 1,224,886 0.1429 Hr/Unit 1,089.1390 Shifts 0.5000 MH/Unit 15.00 1.07 16.07 4308 S& P epoxy rebar Quan: 672,695.29 KG Hrs/Shft: 10.00 Cal: 510 WC: NONE * * Unrcvicwcd �2SR ReinforcingSt@106.75% 672,695.29 KG 1.000 718,102 718,102 V 2SRA Resteel Access@106.75% 672,695.29 KG 0.100 7],810 71,810 �4REBAR Rebarplace@101% 672,695.29 KG 0.580 394,065 394,065 $],183,97734 [ ] 789,912 394,065 1,183,977 1.17 0.59 1.76 _____> Item Totals: 4305 - 355MM X 800MM CONC PARAPET $9,329,253.02 2.8057 MH/M 133,692.49 MH [ 60.4 ] 195.787 47650 M BID ITEM = 4310 Description = TWO BAR MF.TAL RAIL Unit = M 43] 0 Two bar metal rail Quan: 47,650.00 M 4GR GuardRail-SuU@10]% 47,650.00 M 643220 $30,955,927.33 [ ] BIDITEM = 4350 Description = TELEPHONE COND & INSERTS D � N � 4,212,136 3,174,440 354,828 537,192 656,592 394,065 9,329,253 88.40 66.62 7.45 11.27 13.78 8.27 195.79 TakeoffQuan: 47,650.000 Engr Quan: 47,650.000 Hrs/Shft: ]0.00 Cal: 510 WC: NONE 30,955,927 30,955,927 30,955,927 30,955,927 649.65 649.65 Unit= M TakeoffQuan: 23,673.000 Engr Quan: 23,673.000 DMJM Harris RPAMLICO2012 PAMLICO 2012 REVISION 1 Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract B�D ITEM = 4350 Description= TF,LEPHONE COND & INSF.RTS Unit= M Takeot�fQuan: 23,673.000 6ng Quan: 4350 Telephone cond & inserts Quan: 23,673.00 M Hrs/Shft: 10.00 Cal: 510 WC: NONE 4ELEC Electrical Subcon@101% 23,673.00 M 40.930 $978,625.25 L ] BID [TEM = 4360 Description = POWER & CATV SLEF.VES & DUCTS Unit = M TakeoffQuan: 23,673.000 Engr Quan: d 4350 Power & CATV ducts Quan: 23,673.73 M Hrs/Shft: 10.00 Cal: 510 WC: NONE r-� � j4ELEC Electrical Subcon@101% 23,673.00 M 23.390 $559,248.58 [ ] BID [TEM = 9100 Description = OVERHEADS 9200 Site FaciliYies - Complete Operators and drivers for yard equip 20000 hrs 803170 --> 9320 250 TON HOON 15,000.00 HR 804040 --> ] 85 CFM ] 70 HP 7,500.00 HR 804320 =_> 20-50 KW GENER 50- 7,500.00 HR 804380 -> 400 AMP WELDER 7,500.00 HR 805020 --> FLATBAD TRACTO 7,500.00 HR 811 WTRBL 2,500.00 HR 83130C =_> Water truck 2500 GA 625.00 HR 83140C --> Boom truck-12 TON 7,500.00 HR 83150C --> L,owboy 60 ton trailer 5,000.00 HR 83185C Small Vac Sweeper 625.00 HR 83400C => Cat 950F (170 HP) 625.00 HR 83800C =_> Bobcat 553-21.5 HP 2,500.00 HR D � N � Unit = Quan: 291.660 18.520 23.890 11.250 30.830 15.000 33.640 17.980 23.000 37.420 65.070 18.120 23,673.000 Page 15 OS/04/2012 12:28 Total 978,625 978,625 978,625 978,625 41.34 41.34 23,673.000 559,249 559,249 559,249 559,249 23.62 23.62 JCK LS TakeoffQuan: 1.000 F,ngr Quan: 1.000 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 2,545,691 2,135,453 28,650 110,250 39,300 139,875 ]4,250 70,125 61,725 169,500 37,500 6,338 14,688 86,850 48,000 67,000 48,000 23,388 17,169 23,500 21,550 23,750 4,681,] 43 138,900 179,175 84,375 231,225 37,500 21,025 134,850 115,000 23,388 40,669 45,300 DMJM Harris RPAMLICO2012 PAMLICO 2012 REVISION 1 Baris Lenderman Activity Description Resource BID [TEM = 9100 Description = OVERHF,ADS 84535R --> 18 Ton R.T. (RT420) 85105C --> Pump 3-in Subm. Elect 85335C --> Sandblaster 85355C --> Concrete Conveyor 85845R —> Boat, Supervisar(Boss) 85850R Boat, Personnel 25 Per 85855R Boat, Personnel 10 Per 86115C Light Plant 86120C --> Arrow Board OP02 =_> Operator,Crane<50 T $8,279,226.00 45,000.0000 MH/LS d �, I90120 Supervison - Salaried V W L236 �—> Project Manager L240 =_> Project F.ngineer L242 --> Field Engineer L244 --> Office F,ngineer L246 —> QC Engineer L248 --> Secretary L249 --> Office Manager L250 --> Clerk L252 =_> Runner $4,174,690.02 89,300.0000 MWLS I90125 Supervision Hourly L165 —> Machanic L232 --> General Superintendent L238 —> Superint�nd�nt L242] --> Parry Chief L2423 =_> Rodman L2424 =_> Instrument inan $5,055,710.40 97,870.0000 MWLS D � w 0 Quantity Pcs Unit Unit Cost Cost Report Unit = L`, 7,500.00 HR 65.450 2,500.00 HR 4.560 625.00 HR 20.670 625.00 HR 15.760 1,250.00 HR 22.220 1,250.00 HR 70.090 1,250.00 HR 42.070 7,500.00 HR 3.370 7,500.00 HR 5.450 45,000.00 MH 26.000 45,000.0000 MH [ 1287000 ] 45,000.0000 MH/Unit Quan: 7,920.00 MH 62.500 7,920.00 MH 58.000 13,200.00 MH 38.500 15,750.00 MH 38.500 5,000.00 MH 38.500 7,920.00 MH 17.000 7,920.00 MH 45.000 15,750.00 MH 17.000 7,920.00 MH 13.000 89,300.0000 MH [ 3133481 ] 89,300.0000 MH/Unit Quan: 19,800.00 MH 35.000 7,920.00 MH 58.000 26,400.00 MH 45.000 8,750.00 MH 38.000 17,500.00 MH 25.000 17,500.00 MH 30.000 97,870.0000 MH [ 3800910 ] 97,870.0000 MH/Unit 1.00 LS L00 LS Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract JCK TakeoffQuan: 1.000 Engr Quan: 1.000 213,750 277,]25 5,650 5,750 10,013 2,906 3,350 6,500 4,275 23,500 87,613 52,588 25,275 20,250 20,625 1,787,508 1,787,508 3,372,172 3,119,546 1,787,508.00 3,372,171.75 3,i 19,546.25 Hrs/Shft: 10.00 Cal: 510 WC: NONE 628,650 586,238 670,758 800,336 254,075 199,822 463,716 397,373 173,722 4,174,690 4,174,690.02 Hrs/Shft: 10.00 Cal: 510 WC: NONE 1,006,137 586,238 ],545,720 453,180 670,425 794,010 5,055,7] 0 5,055,710.40 Page 16 OS/04/2012 1228 Total 490,875 1 ] ,400 12,919 9,850 27,775 87,613 52,588 25,275 40,875 1,787,508 8,279,226 8,279,226.00 628,650 586,238 67Q758 800,336 254,075 199,822 463,716 397,373 173,722 4,174,690 4,174,690.02 1,006,137 586,238 1,545,720 453,180 670,425 794,010 5,055,710 5,055,710.40 DMJM Harris RPAMLICO2012 PAMLICO 2012 REVISION 1 Baris Lenderman Activity Description Quantity Resource Pcs Unit BID ITEM = 9]00 Description = OVERHF.ADS I90130 Project Vehicles 83000C --> Pick-Up 1/2 Ton $2,640,975.00 I90150 Mechanic budget 831 ] OC —> Mech.Tkr-1 TON $392,100.00 � I90220 Subsistance r-� V '� )SUB8 Subsistancc 9SUB9 Subsistance $],710,393.75 I90225 Consumables 9*DH1 Safety Supplies 9*DH3 Small Tools $1,013,450.72 I90250 Travel & Other Expeuses 3ZF53 Admin/STAFF Ex@106.75 3ZF60 Project Signs@106.75% 9601 Joint venture expenses 9MFDICAL Medical F,xpenses 9SUB1 Air Fare, single 9TR001 Crew Relocation 9TR002 Frmn Relocation 9TR006 Home Office travel $481,373.97 D � w � 172,500.00 HR 15,000.00 HR 375.00 MO 900.00 MO 1,732,986.88 LBHR 1,732,986.88 LBHR 45.00 MO 1.25 LS ].25 LS 1.25 LS 50.00 F.,A 15.00 EA 15.00 EA 45.00 MOS Cost Report Unit Cost Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract JCK Unit = LS TakeotiQuan: 1.000 Engr Quan: 1.000 Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 15310 777,975 1,863,000 [ ] 777,975 1,863,000 777,975.00 I ,863,000.00 Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 26.140 87,600 304,500 [ ] 87,600 304,500 87,600.00 304,500.00 Quan: 1.25 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 1,754250 657,844 1,] 69.500 1,052,550 [ ] 1,710,394 1,368,315.00 Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 0.117 202,759 0.467 810,69] [ ] 1,013,451 1,013,450.72 Quan: 1.25 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 2,000.000 )6,075 5,000.000 6,672 1.169 1 87,712.500 l 09,641 2,923.750 146,188 1,754.250 26,314 2,923.750 43,856 1,] 69.500 52,628 [ ] 481,374 385,099.18 Page 17 OS/04/2012 1228 Total 2,640,975 2,640,975 2,640,975.00 392,100 392,100 392,100.00 657,844 1,052,550 1,710,394 1,368,315.00 202,759 810,691 1,013,451 1,013,450.72 96,075 6,672 1 109,641 146,7 88 26,314 43,856 52,628 481,374 385,099.18 DMJM Harris RPAMLICO2012 PAMLICO 2012 REVISION 1 Baris Lenderman Activity Description Quantity Resource Pcs Unit BID ITEM = 9]00 Description = OVERHF.ADS I90310 Office Supply 9SU001 Supplies 9SU005 PHOTOS 9SU008 Fedex/Postage $1,78934 I90420 Engineering Services 4ENG Engineering@101% �$118,119.50 r�-� V � I90610 Communications 805260 RADIOS 9DCO2 Copy machine 9DC05 Computer 9SU009 Phone/Fax 9SU014 Cell Phone Costs $330,674.26 I90912 Testing Lab 4ECONC Concrct�Testuig@101% $118,119.50 I92150 Trailers & Utilities 805140 --> OFFICE TRAILER 805141 Engs/clients office 85225C TooUOffice Vans 45' 9*DH4 Ice and Water 9SU002 Electric 9SU003 Portajons 9SU004 Dumpsters D � w N 45.00 MOS 45.00 MOS 45.00 MOS 1.00 LS Cost Report Unit Cost Page 18 OS/04/2012 12:28 Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Total JCK Unit = LS TakeotiQuan: 1.000 Engr Quan: 1.000 Quan: 1.25 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 16373 737 5.847 263 17.542 789 [ ] 1,789 l ,431.47 Quan: 1.00 DA Hrs/Shft: 10.00 Cal: 510 WC: NONE 737 263 789 1,789 1,431.47 1] 6,950.000 1] 8,120 118,120 [ ] 118,120 ll8,120 ] 18,119.50 1 18,119.50 Quan: 1.25 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 82,500.00 HR 1.010 83,325 3.75 EA 11,695.000 43,856 25.00 EA 3,508.500 87,713 825.00 DA 81.865 67,539 825.00 DA 58.475 48,242 [ ] 247,349 83,325 197,879.41 66,660.00 Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 83,325 43,856 87,713 67,539 48,242 330,674 264,539.41 1.00 LS 116,950.000 118,120 118,120 [ ] 118,120 ll8,120 ] 18,1 19.50 1 18,119.50 Quan: 1.25 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 45.00 MOS 921.380 28,379 15,986 1.25 LS 150,000.000 200,625 45.00 MOS 500.000 22,500 1,732,986.88 LBHR 0.175 303,966 45.00 MOS 584.750 26,314 45.00 MOS 584.750 26,314 45.00 MOS 1,169.500 52,628 44,364 200,625 22,500 303,966 26,314 26,3 ] 4 52,628 DMJM Harris RPAMLICO2012 PAMLICO 2012 REVISION 1 Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract Page 19 OS/04/2012 1228 Total BID [TEM = 9]00 JCK Description = OVERHF,ADS Unit = LS TakeoffQuan: 1.000 Engr Quan: 1.000 9SU007 Water/Sewer 45.00 MOS 584.750 26,314 26,314 9SUOl5 OfficeCleaning 45.00 MOS 1,169.500 52,628 52,628 $755,651.59 [ ] 488,162 251,504 15,986 755,652 390,529.72 201,202.91 12,788.64 604,521.27 I94010 Bond & lnsurance Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 3Z130 Builders Risk@106.75% 380,000.00 YD 1.045 423,985 423,985 9GA0] Insurance Costs 380,000.00 YD 6.843 2,600,682 2,600,682 9TX001 Permits 1.00 K$ 29,237.500 29,238 29,238 9TX003 Performance Bond 380,000.00 YD 6.950 2,641,114 2,641,114 $5,695,018.88 [ ] 5,695,019 5,695,019 � 5,695,018.88 5,695,018.88 r-� � I94020 Taxes & Duties Quan: 1.00 LS Hrs/Shft: 10.00 Cal: 510 WC: NONE 9AGENT Agent Fees 4.00 EA 584.750 2,339 2,339 9TX008 Equipment Tax, 4% 330,000.00 C 1.754 578,919 578,919 $581,258.00 [ ] 581,258 581,258 581,258.00 581,258.00 _____> lYem Totals: 9100 - OVERHEADS $31,348,550.93 232,170.0000 MH/LS 232,170.00 MH [8221391] 1],017,908 10,218,796 4,572,575 5,303,032 236,239 31,348,551 3],348,550.930 1 LS ll,O17,908.42 10,218,796.07 4,572,57539 5,303,032.05 236,239.00 31,348,550.93 $499,460,807.20 *** Report Totals *** 1,965,156.88 MH 68,137,087 258,981,724 26,452,961 63,332,472 37,216,968 45,339,595 499,460,807 »> indicates Non AddiYive AcYivity ------Report Notes:------ The estimate was prepared with TAKFOFF Quantities. This report shows TAKEOFF Quantities with the resources. "Unreviewed" Activities are marked. Bid Date: Owner: Engineering Firm: Estimator-In-Charge: D � w W � �� �� DMJM Harris RPAMLICO2012 PAMLICO 2012 REVISION 1 Baris Lenderman Activity Description Quantity Resource Pcs Unit Unit Cost Cost Report Perm Constr Equipment Equipment Sub- Labor Material Matl/Exp Ownership Operation Contract BID [TEM = 9]00 JCK Description = OVERHF,ADS Unit = LS TakeoffQuan: 1.000 Engr Quan: * on units of MH indicate average labor unit cost was used rather than base rate. [] in the Unit Cost Column = Labor Unit Cost Without Labor Burdens In equipment resources, rent ° and EOE ° not = 100o are represented as XXXoYYY where XXX=Rento and YYY=EOEo -----Calendar Codes------ 508 REG 40 HR WEEK DAY SHIFTS 510 M-F ]0 HOURS PER DAY (Default Calendar) 610 MO - SA 10 HR/DAY OFF OFFSH[FT D � w � 1.000 Page 20 OS/04/2012 1228 Total D-178 Construction Costs for the Revised Parallel and Pamlico Bridges Dare County, NC North Carolina Department of Transportation May 2012 ARMENI Project No. ACS-167 Prepared for: NCDOT Prepared By: Armeni Consulting Services, LLC � ����,.. CQ�+ISLILTING $ERVICES, LLC 4411 Suwanee Dam Rd, Suite 750 * Suwanee, GA 30024 *(770) 904-4178 www.armeniconsulting.com D-178 D-179 EXECUTIVE SUMMARY SCOPE OF WORK In April 2012, Armeni Consulting Services, LLC (ACS) submitted a cost estimate to the North Carolina Department of Transportation (NCDOT) for the construction of the Parallel (Bonner) Bridge spanning across the Oregon Inlet in Dare County, NC. The estimate was calculated with the use of Heavy Construction Software Services (HCSS) software and, in order to reflect 2012 costs, was strictly based on updating the unit rates that are included in the estimate that was prepared by Finley Engineering Group, Inc. and submitted to NCDOT in 2006. NCDOT subsequently requested ACS to revise the April 2012 cost estimate based on the request for proposal (RFP) for this project (Project B- 2500) and subsequent addendums. In April 2012, ACS also submitted a cost estimate for the construction of the Pamlico Bridge through a portion of the Pamlico Sound in Dare County, NC. That estimate was also based on updating the unit rates of the resources that were included in the estimate that was prepared by Finley Engineering Group, Inc. and submitted to NCDOT in 2006. NCDOT subsequently requested ACS to revise the April 2012 cost estimate based on several new design criteria outlined in e-mail correspondence including the requirement of stainless stee] reinforcing steel in all cast in place concrete. The Pamlico Sound Bridge design is based on an approximate bridge length of 14.8 miles and an overall deck width of 43 feet. It is planned to span from the vicinity of the Oregon Inlet on the north end to the Rodanthe township area on the south end in a horseshoe type configuration through the Pamlico Sound. The superstructure consists of 560 each 139.50' long spans with four 78" bulb tees per span and conventional concrete decking. The foundation estimate is based on 54" prestressed precast concrete cylinder piles with a cast in place concrete pile cap substructure. The Parallel (Bonner) Bridge is a 54 span, 2.7 mile bridge that crosses the Oregon Inlet with a superstructure estimated to be entirely built by erecting precast concrete segments. The foundation is designed with 66" prestressed precast concrete cylinder piles with 20" square concrete piles at the abutments. 1 �I���.��- D-179 � :1 TASK APPROACH ACS was provided a PDF �le of the HCSS estimate file "2006-20" dated 11/29/2006 denoting a total cost of $222,962,625.60 to construct the Parallel Bridge (Bonner). ACS was also provided a PDF fi1e of the HCSS file "2006-22" dated 11/22/2006 showing a tota] cost of $431,061,636.46 to construct the Pamlico Sound Bridge (14.8 miles). The original HCSS software files were not made available to ACS and it was agreed that ACS would need to reproduce these original estimates using the same HCSS software in order to make the appropriate updates of costs that were estimated in 2006. The information shown on the PDFs provided suf�cient detail to allow the reproduction of the resources and rates in an attempt to recreate the estimate file. Several critical cost data had to be interpreted including labor fringes, payroll taxes, worker's compensation rates, United States Longshore and Harbor Workers (USL&H) Rate (known in HCSS as the marine upshift factor) and equipment rental and maintenance rates. Once the total costs were re-established, ACS revised all labor, permanent materials, consumable/expendable materials, subcontractor, equipment and indirect (project overhead) costs to reflect 2012 rates. The updated HCSS cost estimates were submitted to NCDOT in April 2012. The resulting HCSS files serve as a basis to estimate the construction cost of the bridges based on design and specification revisions provided to ACS in April 2012, industry standard methodologies and resources and best available information including the following detailed cost criteria and assumptions: Labor Wage Rates The base hourly and salary wages that were used in the 2006 estimates were escalated at a rate of 3% per year in order to establish 2012 base wage rates. Although the Davis- Bacon act mandates minimum hourly wages according to craft, rates can vary substantially between different contractors. The rates that have been utilized in the estimates have been compared with the North Carolina State Department of Labor Occupational and Wage Estimates to ensure that the prevailing wage rates for pertinent construction crafts in Dare County have been met. Overall, ACS considers the rates that have been established to be conservative throughout the duration of the project. Labor Pavroll Tax and Fringe Rates The estimated total payroll taX rate in the previous estimates was based on 10.45% of the base rate and was not adjusted in the current cost estimates. The fringe rates vary substantially by craft and was escalated 2% per year from the estimated rates in the 2006 cost estimates in order to establish the 2012 rates. 2�I���,�� � :1 D-181 Workers Compensation Rates This rate varies by contractor and also by work environment. The WC rates that were estimated as a basis for the 2006 cost estimates remained unchanged when established in the 2012 cost estimates. The majority of the cost activities included a Worker's Compensation rate of 7.87%. Marine Upshift This factor takes into account the USL&H (United States Longshore & Harbor) rate and varies by contractor. The factor is applied to each Worker's Compensation Rate for any work activity over navigable waters where they do not access their work place via a temporary work trestle. The majority of the cost activities in the 2006 estimate included this factor and was estimated to be 2.26 in the previous estimates. ACS removed this factor from all cost activities eXCept for the installation of the access trestle. Overtime The previous estimates were based on activities primarily working 50 hours per week. Absent a detailed project schedule, the overtime calendar is deemed reasonable and was not revised in the current estimates. Permanent Material Rates The regional sales tax rate of 7% that was applied to all permanent material unit costs in the previous estimates remained unchanged. Prices for the majority of the permanent material were solicited by ACS from various major local and national suppliers including ready miX concrete, post-tensioning material, epoxy coated reinforcing steel, precast concrete piles and deck panels, bearings, expansion joints and furnishing and testing of 54" prestressed cylinder piles. The budgetary prices that were provided by these suppliers were input into the updated estimates as 2012 rates. Consumable/Expendable Material Rates The regional sales tax rate of 7% that was applied to all expendable material unit costs in the previous estimates remained unchanged. No current expendable material rates were solicited although ACS studied all existing material and rates in the previous estimates to ensure that they were within reason based on historical data. Several consumable 3I,�,�`�� 4 D-181 D-182 resources were added to the library as necessary in particular as they related to the installation of the cylinder piles. Subcontractors The only subcontract work that ACS solicited in order to obtain current rates was for the installation of reinforcing steel and testing of the cylinder piles. All other previously established subcontractor rates were studied for reasonableness based on historical data. A 1.00% surcharge that was applied to the majority of the subcontractor base prices in the previous cost estimates remained unchanged. ACS considers this rate as a representation of the subcontractor's bond expense to the contractor. Equipment Rates The majority of the equipment and costs were based on the equipment detailed in the 2006 cost estimate and corresponding 2012 escalated rates. ACS did not solicit current rental rates for the equipment but ensured validity of total project equipment costs based on range of historical percentage of equipment cost when compared to total project cost. Escalation No escalation costs have been taken into account beyond the increases mentioned in this report. Bond & Insurance Rates Bond and insurance costs were included in the indirect overhead costs in addition to the 1% bond rate that was applied to subcontractors as previously mentioned. Profit and Margin As per previous cost estimates, a profit mark-up of 15% was applied to all total labor, burden, permanent material, expendable material, subcontractors and inside and outside rented equipment and maintenance costs. Contingencv As per previous cost estimates, a contingency allowance cost was not included in either of the two revised cost estimates. 4 I � � . �� �: D-182 D-183 Construction Schedule A project construction schedule was not produced by ACS nor was one provided. The indirect costs were primarily based on the precast yard and bridge construction durations that were established in the 2006 cost estimates. $����1��?� D-183 D-184 CONSTR UCTION COST ESTIMA TE SUMMARIES (1) Parallel Bridge (2.7 Miles) 2012 Revised Design Cost Estimate (HCSS File 2012-20R) 2012 Cost Estimate (HCSS File 2012-20) 2006 Cost Estimate (HCSS File 2006-20) Pamlico Bridge (14.8 Miles) 2012 Revised Design Cost Estimate (HCSS File 2012-22R) 2012 Cost Estimate (HCSS File 2012-22) 2006 Cost Estimate (HCSS File 2006-22) e � $ 295,337,602 $ 266,135,434 $ 222,962,626 $ 553,956,502 $ 483,733,048 $ 431,061,636 The cost estimates do not include any pre-construction costs such as design, acquisition or permitting expenses. The estimates do not include any costs related to the construction or demolition of structures along the approaches, relocation of major utilities or maintenance of the bridges upon completion. 6�����`.�� D-184 D-185 CONSTR UCTION COST ESTIMA TE SUMMARIES (2) The following total costs allow for contingencies and escalation in order to compare with the cost calculation methods that were introduced in the 2006 total cost estimates: Parallel Bridge (2.7 Miles) 2012 Revised Design Cost Estimate (HCSS File 2012-20R) 5% Escalation for 21 months 10% Contingency 2012 Revised Design Cost Estimate Total 2012 Cost Estimate (HCSS File 2012-20) 5% Escalation for 21 months 10% Contingency 2012 Revised Design Cost Estimate Total 2006 Cost Estimate (HCSS File 2006-20) 5% Escalation for 21 months 10% Contingency 2012 Revised Design Cost Estimate Total Pamlico Bridge (14.8 Miles) _ $ 295,337,602 $ 26,395,798 $ 32,173,340 $ 353,906,740 _ $ 266,135,434 $ 23,785,854 $ 28,992,129 $ 318,913,417 _ $ 222,962,626 $ 19,927,284 $ 24,288,991 $ 267,178,901 2012 Revised Design Cost Estimate (HCSS File 2012-22R) _ $ 553,956,502 5% Escalation for 21 months $ 49,509,862 10% Contingency $ 60,346,636 2012 Revised Design Cost Estimate Total $ 663,813,000 2012 Cost Estimate (HCSS File 2012-22) _ $ 483,733,048 5% Escalation for 21 months $ 43,233,641 10% Contingency $ 52,696,669 2012 Revised Design Cost Estimate Total $ 579,663,358 2006 Cost Estimate (HCSS File 2006-22) 5% Escalation for 21 months 10% Contingency 2012 Revised Design Cost Estimate Total D-185 _ $ 431,061,636 $ 38,526,134 $ 46,958,777 $ 516,546,547 7�['���� � :. RE VISED CONSTR UCTION COST ESTIMA TE (1) DETAILS PARALLEL (BONNER) BRIDGE (2. 7 Miles) Cost activities within the following bid items of HCSS cost estimate file 2012-20 were reviewed and adjusted based on NCDOT design and spec revisions as well as Armeni Consulting Services research and bridge construction and estimating experience: SID ITEM 2900 — Construction & Removal of Tempora�^v Access 2012 Revised Design Cost Estimate (HCSS File 2012-20R) _ $ 64,026,502 2012 Cost Estimate (HCSS File 2012-20) _ $ 63,092,096 Difference $ 934,406 (+1.5%) Although estimated dredging cost was decreased by approximately $1 M, cost increase is primarily due to reduction in trestle installation production rate based on historical data. Estimated cost to mobilize/demobilize equipment was increased from $600K to $1M. BID ITEM 2910 — Removal of Existin� Brid�e 2012 Revised Design Cost Estimate (HCSS File 2012-20R) _ $ 11,924,550 2012 Cost Estimate (HCSS File 2012-20) _ $ 10,746,304 Difference $ 1,178,246 (+11.0%) Subcontractor demolition unit cost was increased from $179.11 to $200.00 per M2. BID ITEM 2975 — Fishing Pier Surface Improvements 2012 Revised Design Cost Estimate (HCSS File 2012-20R) 2012 Cost Estimate (HCSS File 2012-20) Difference _ $ 456,774 _ $ 0 $ 456,774 (New) Bid Item was added to identify cost to provide a 1,200' long fishing pier as specified per Page 160 in RFP. The cost estimate allowed for the refurbishing a portion of the existing Bonner bridge in order to meet this requirement. 8�I��E,�� � :. D-187 BID ITEM 2976 — Fishing Pier Structural Improvements 2012 Revised Design Cost Estimate (HCSS File 2012-20R) 2012 Cost Estimate (HCSS File 2012-20) Difference _ $ 500,000 _ $ 0 $ 500,000 (New) Should the Contractor elect to modify a portion of the existing Bonner Bridge in order to provide the required 1,200' fishing pier, a$SOOK cost allowance shall be included as specified on Page 160 of the RFP. This Bid Item was added to identify the $SOOK allowance for structural improvements to the existing bridge that will be directed by the Engineer. BID ITEM 2990 — Class AA Concrete Footings 2012 Revised Design Cost Estimate (HCSS File 2012-20R) 2012 Cost Estimate (HCSS File 2012-20) Difference _ $ 20,195,271 _ $ 20,831,072 $ - 635,801 (-3.1%) Removed cost to assist reinforcing steel subcontractor as this cost is typically included in reinforcing steel Bid Items. Reference the NAVIGATIONAL ZONE section for information regarding deduction in estimated cost due to the reduction in navigational zone length when compared to the 2006 estimate. SID ITEMS 3000/3005 — Rein�orcin� Steel (Footin�s) 2012 Revised Design Cost Estimate (HCSS File 2012-20R) 2012 Cost Estimate (HCSS File 2012-20) Difference _ $ 49,808,677 _ $ 12,255,297 $ 37,553,380 (+306.4%) Revised cost estimate includes moving the cost to support the reinforcing steel subcontractor and, particularly, the RFP requirement to furnish stainless steel rebar in all cast in place concrete in lieu of epoxy coated rebar as previously estimated. Reference the NAVIGATIONAL ZONE section for information regarding deduction in estimated cost due to the reduction in navigational zone length when compared to the 2006 estimate. 9�I'��,�� D-187 � :: BID ITEMS 3010/3015 — Spiral Rebar 2012 Revised Design Cost Estimate (HCSS File 2012-20R) 2012 Cost Estimate (HCSS File 2012-20) Difference _ $ 870,835 _ $ 214,478 $ 656,357 (+306.0%) The revised cost estimate includes requirement to furnish stainless steel rebar in lieu of epoxy coated rebar as previously estimated. Reference the NA VIGATIONAL ZONE section for information regarding deduction in estimated cost due to the reduction in navigational zone length when compared to the 2006 estimate. BID ITEM 3020 — 508mm spuare prestressed concrete pile 2012 Revised Design Cost Estimate (HCSS File 2012-20R) 2012 Cost Estimate (HCSS File 2012-20) Difference _ $ 138,838 _ $ 57,404 $ 81,434 (+141.9%) The previous cost estimates had neglected to include purchasing of the concrete piles. The cost increase is also a result of revised production rates based on ACS historical data. SID ITEM 3040 — Dvnamic Pile Test 2012 Revised Design Cost Estimate (HCSS File 2012-20R) _$ 55,127 2012 Cost Estimate (HCSS File 2012-20) _$ 16,099 Difference $ 39,028 (+242.4%) Revised cost estimate includes current unit rate obtained by testing subcontractor and allowance for contractor support costs. BID ITEM 3050 — Axial Load Test on 1676mm cvlinder pile 2012 Revised Design Cost Estimate (HCSS File 2012-20R) _ 2012 Cost Estimate (HCSS File 2012-20) _ Difference $ 740,279 $ 1,838,919 $ -1,098,640 (-59.7%) Revised cost estimate includes cost information obtained by testing subcontractor and allowance for contractor support costs. 10�I'��,�� � :: � :• BID ITEM 3060 — Production Dvnamic Load Test on Cvlinder Pile 2012 Revised Design Cost Estimate (HCSS File 2012-20R) _$ 55,116 2012 Cost Estimate (HCSS File 2012-20) _$ 16,099 Difference $ 39,017 (+242.4%) Revised cost estimate includes current unit rate obtained by testing subcontractor and allowance for contractor support costs. BID ITEM 4190 — Precast Concrete Deck Segments 2012 Revised Design Cost Estimate (HCSS File 2012-20R) 2012 Cost Estimate (HCSS File 2012-20) Difference _ $ 39,768,952 _ $ 41,236,168 $ -1,467,216 (-3.6%) The revised cost is based on a reduction in the overhead duration as well as revising the production rates based on ACS historical data. BID ITEM 4191— Erect PC Deck Se�ments 2012 Revised Design Cost Estimate (HCSS File 2012-20R) 2012 Cost Estimate (HCSS File 2012-20) Difference _ $ 19,095,604 _ $ 22,681,527 $ -3,585,923 (-15.8%) The revised cost is primarily due to a reduction in the production rate of Activity 21100K to erect the 128 non-typical segments from 51,200 man-hours to 8,448 man-hours based on ACS historical data. BID ITEM 4210 — PT Strand in Deck Se�ments 2012 Revised Design Cost Estimate (HCSS File 2012-20R) 2012 Cost Estimate (HCSS File 2012-20) Difference _ $ 11,081,698 _ $ 8,936,355 $ 2,145,343 (+24.0%) The increase in cost is due to a revision in the production rate of the only cost activity in the estimate from 64 KG/MH to 0.025 MH/KG. The revised rate is a blended rate based on ACS historical data that includes installation of the longitudinal and transverse post- tensioning in the precast yard and on site as well as all handling and grouting of the strands. 11 �['���� � :` D-190 BID ITEM 4260 — Grooving Deck 2012 Revised Design Cost Estimate (HCSS File 2012-20R) _ 2012 Cost Estimate (HCSS File 2012-20) _ Difference $ 389,527 $ 200,216 $ 189,311 (+94.6%) The revised cost estimate allows for the cost to grind and groove the deck concrete based on historical subcontractor rates. The cost to profilograph the deck is included in the precast operation portion of the estimate. BID ITEM 4310 — Two Bar Metal Rail 2012 Revised Design Cost Estimate (HCSS File 2012-20R) 2012 Cost Estimate (HCSS File 2012-20) Difference _ $ 2,546,234 _ $ 9,518,628 $ - 6,972,394 (-73.3%) The revised cost estimate is based on historical subcontractor unit rates to furnish and install two bar meta] railing including the cost to drill and epoXy grout the anchors. BID ITEM 4320 — 355mm x 800mm Concrete Parapet 2012 Revised Design Cost Estimate (HCSS File 2012-20R) 2012 Cost Estimate (HCSS File 2012-20) Difference _ $ 0 _ $ 2,554,880 $ - 2,554,880 (Deleted) This Bid Item was deleted due to revised parapet height as per RFP. Reference added Bid Item 4325 for revised parapet cost. SID ITEM 4325 — 355mm x 762mm Concrete Parapet 2012 Revised Design Cost Estimate (HCSS File 2012-20R) 2012 Cost Estimate (HCSS File 2012-20) Difference _ $ 1,734, ll 9 _ $ 0 $ 1,734,119 (New) This Bid Item was added due to revised parapet height as per RFP. Reference Bid Item 4320 for deleted Bid Item. ACS estimated cost includes allowance for separate subs to install epoXy rebar, slip form the concrete and apply a Class V finish along the perimeter of the barrier wall. 12�I��Q,��- D-190 D-191 BID ITEM 4350 — Telephone Conduit & Inserts 2012 Revised Design Cost Estimate (HCSS File 2012-20R) _$ 235,839 2012 Cost Estimate (HCSS File 2012-20) _$ 237,325 Difference $ Negligible The revised cost estimate allows for a subcontractor to furnish and insta114" galvanized steel pipe as per project specs. Of particular note is that this cost does not include any necessary relocation of telephone utilities. BID ITEM 4360 — Power & Cable TV Sleeves & Ductbanks 2012 Revised Design Cost Estimate (HCSS File 2012-20R) _$ 134,765 2012 Cost Estimate (HCSS File 2012-20) _$ 135,614 Difference $ Negligible The revised cost estimate allows for a subcontractor to furnish and install 4.425 km of pipe and duct bank based on historical data. Of particular note is that this cost does not include any necessary relocation of power and cable TV utilities. INDIRECT COSTS 2012 Revised Design Cost Estimate (HCSS File 2012-20R) _ 2012 Cost Estimate (HCSS File 2012-20) _ Difference $ 22,924,253 $ 21,982,226 $ 942,027 (+4.3%) Revisions were made to several cost activities within the indirect portion of the estimate culminating in a cost increase of approximately $1 M. 13�I��E,�� D-191 D-192 NAVIGATIONAL ZONE ACS assessed the pier foundations that would be affected as a result of reducing the navigational zone design requirements to a length of 2,400 feet from the 1,522 meter (4,992') length that was used as a basis to assemble the cost estimate in 2006. The following bid items were created in order to analyze the separate direct cost differences as a result of the reduction in the length of the navigational zone, but are not included in the current project cost estimate: Navi�ational Zone Reduction Cost Savings Bid Item 2991 — Class AA Concrete Footings Reduction (4,038 M3) _ Bid Item 3006 — Stainless Steel Rebar Reduction (191,634 kg) _ Bid Item 3016 — Stainless Steel Spiral Rebar Reduction (5,352 kg) _ Bid Item 3031 — 1676mm Concrete Cylinder Pile Reduction (1,968 M) _ Direct Cost Total Mark-ups PROJECT TOTAL -$ 1,232,590 -$ 1,533,985 -$ 42,841 -$ 2,257,530 -$ 5,066,946 -$ 748,070 -$ 5,815,016 It is estimated that there would be a total project cost reduction of approximately 2% with the design changes that would be implemented as a result of reducing the navigational zone requirements of six foundations. 14���:=��� D-192 D-193 CONSTR UCTION COST ESTIMA TE (1) COMPARISON SUMMAR Y Parallel Bridge (2.7 Miles) 2012 Revised Design Cost Estimate Total Cost = $ 295,337,602 2012 Cost Estimate Total Cost = $ 266,135,434 Difference = $ 29,202,168 (+10.97%) Breakdown of Difference: 2012 Revised Design Labor (Including Burden) _ $ 41,954,824 2012 Labor (Including Burden) _ $ 43,586,258 Difference = $ -1,631,434 (- 3.74%) 2012 Revised Design Permanent Material = $ 106,983,900 2012 Permanent Material = $ 75,953,132 Difference = $ 31,030,768 (+40.86%) 2012 Revised Design Expendable Material = $ 12,641,732 2012 Ex�endable Material = $ 12,764,734 Difference = $ - 123,002 (- 0.96%) 2012 Revised Design Equipment = $ 29,453,669 2012 Equi�ment = $ 28,642,700 Difference = $ 810,969 (+ 2.83%) 2012 Revised Design Subcontractors = $ 57,323,138 2012 Subcontractors = $ 62,073,009 Difference = $ - 4,749,871 (- 7.65%) 2012 Revised Design Other (Bond, Insurance, etc.) _ $ 8,434,661 2012 Other Costs (Bond, Insurance, etc.) _ $ 8,437,930 Difference = $ - 3,269 (- 0.04%) 2012 Revised Design Mark-Up (15%) + Adjustments = $ 38,545,677 2012 Mark-Up (15%) + Adjustments = $ 34,677,671 Difference = $ 3,868,006 (+11.15%) 15�Patic D-193 D-194 RE VISED CONSTR UCTION COST ESTIMA TE (1) DETAILS PAMLICO BRIDGE (14.8 Miles) Cost activities within the following bid items of HCSS cost estimate file 2012-22 were reviewed and adjusted based on NCDOT design and spec revisions as well as ACS research and bridge construction and estimating experience: SID ITEM 2900 — Construction & Removal of Tempora�^v Access 2012 Revised Design Cost Estimate (HCSS File 2012-22R) _$ 55,764,973 2012 Cost Estimate (HCSS File 2012-22) _$ 134,193,303 Difference $ - 78,428,330 (-58.4%) Cost activities pertaining to the installation and removal of both the crane and material trestles were created and estimated by ACS based on historical production rates. The same primary concepts as previously estimated were maintained including constructing the bridge with two headings providing access from each end. Each heading is estimated based upon providing approximately one mile of trestle material that will be jumped as the deck concrete placement progresses. The decrease in cost is primarily due to the reduction in trestle and material installation production rate based on experience and historical data. BID ITEM 3030 — 30" Spuare Precast Concrete Piles 2012 Revised Design Cost Estimate (HCSS File 2012-22R) 2012 Cost Estimate (HCSS File 2012-22) Difference _ $ 44,915,830 _ $ 0 $ - 44,915,830 (Deleted) This Bid Item was deleted due to the revised foundation design calling for 54" cylinder piles at all bents. Bid Item 3035 was created to represent the revised foundation cost. BID ITEM 3035 — 54" Cvlinder Piles 2012 Revised Design Cost Estimate (HCSS File 2012-22R) _$ 0 2012 Cost Estimate (HCSS File 2012-22) _$ 86,582,030 Difference $ 86,582,030 (New) This Bid Item was added due to the revised foundation design calling for 54" cylinder piles at all bents. All piles were assumed to be 100' long. The top 30' of all exterior piles will be filled with 6000 PSI concrete and reinforced with stainless steel rebar. 16�������� D-194 D-195 SID ITEM 3045 — Static Axial Load Test — 54" Cvlinder Pile 2012 Revised Design Cost Estimate (HCSS File 2012-22R) _ 2012 Cost Estimate (HCSS File 2012-22) _ Difference $ 372,975 $ 0 $ 372,975 (New) This Bid Item was added due to revised testing criteria. Cost estimate includes cost information obtained by testing subcontractor and allowance for contractor support costs. BID ITEM 3050 — Axial Load Test 2012 Revised Design Cost Estimate (HCSS File 2012-22R) _$ 0 2012 Cost Estimate (HCSS File 2012-22) _$ 6,286,569 Difference $ -6,286,569 (Deleted) This Bid Item was deleted due to revised foundation testing criteria. BID ITEM 3055 — Lateral Load Test — 54" Cvl Pile 2012 Revised Design Cost Estimate (HCSS File 2012-22R) 2012 Cost Estimate (HCSS File 2012-22) Difference _ $ 77,511 _ $ 0 $ 77,427 (New) This Bid Item was added due to revised testing criteria. Cost estimate includes cost information obtained by testing subcontractor and allowance for contractor support costs. BZD ITEM 3060 — Production Dvnamic Load Test 2012 Revised Design Cost Estimate (HCSS File 2012-22R) _$ 0 2012 Cost Estimate (HCSS File 2012-22) _$ 150,878 Difference $ - 150,878 (Deleted) This Bid Item was deleted due to revised foundation testing criteria. 17���'_ ���� D-195 D-196 BID ITEM 3065 — High Strain Dvnamic Test — 54" Cvlinder Pile 2012 Revised Design Cost Estimate (HCSS File 2012-22R) _$ 461,078 2012 Cost Estimate (HCSS File 2012-22) _$ 0 Difference $ 461,078 (New) This Bid Item was added due to revised testing criteria. Cost estimate includes cost information obtained by testing subcontractor and al]owance for contractor support costs. BID ITEM 4110 — Concrete Caps 2012 Revised Design Cost Estimate (HCSS File 2012-22R) _ 2012 Cost Estimate (HCSS File 2012-22) _ Difference $ 20,527,633 $ 13,907,579 $ 6,620,054 (+47.6%) As a result of the revised foundation design consisting of 54" cylinder piles, ACS performed a detailed take-off of the cast-in-place concrete caps based on typical design sizing criteria. This resulted in a Bid Item concrete quantity revision from 16,782 M3 to 24,246 M3. All cost activities from previous estimate were scrutinized and adjusted based on ACS take-offs and historical production rates. BID ITEM 4120 — Epoxv Rebar in Caps 2012 Revised Design Cost Estimate (HCSS File 2012-22R) _$ 0 2012 Cost Estimate (HCSS File 2012-22) _$ 6,036,584 Difference $ - 6,036,584 (Deleted) This Bid Item was deleted due to revised reinforcing steel criteria and replaced by Bid Item 4130. BZD ITEM 4130 — Stainless Steel Rebar in 2012 Revised Design Cost Estimate (HCSS File 2012-22R) _ 2012 Cost Estimate (HCSS File 2012-22) _ Difference $ 35,561,127 $ 0 $ 35,561,127 (New) This Bid Item was added due to revised reinforcing steel criteria. Due to the necessary increase in cap dimensions, the previous epoxy rebar bid item quantity was increased from to 2,474,010 kg to 3,595,665 kg to obtain the current stainless steel rebar quantity. A cost allowance to provide crane support for the reinforcing steel subcontractor is also a factor in the cost increase. 18�P���� D-196 D-197 BID ITEM 4170 — 78" Bulb Tees 2012 Revised Design Cost Estimate (HCSS File 2012-22R) 2012 Cost Estimate (HCSS File 2012-22) Difference _ $ 100,959,709 _ $ 103,702,406 $ - 2,742,697 (-2.6%) The cost activities that were set up in the previous HCSS estimate were scrutinized and adjusted based on ACS historical production rates. BID ITEM 4180 — Epoxv Rebar in Deck 2012 Revised Design Cost Estimate (HCSS File 2012-22R) _$ 0 2012 Cost Estimate (HCSS File 2012-22) _$ 33,629,788 Difference $ - 33,629,788 (Deleted) This Bid Item was deleted due to revised reinforcing steel criteria and replaced by Bid Item 4185. BID ITEM 4185 — Stainless Steel Rebar in Deck 2012 Revised Design Cost Estimate (HCSS File 2012-22R) 2012 Cost Estimate (HCSS File 2012-22) Difference _ $147,530,208 _ $ 0 $147,530,208 (New) This Bid Item was added due to revised reinforcing steel criteria. Reference notes pertaining to concrete deck Bid Item 4190 providing basis for an increase in reinforcing steel bid item quantity from 13,782,700 kg to 14,917,109 kg. BZD ITEM 4190 — Conc Deck 2012 Revised Design Cost Estimate (HCSS File 2012-22R) 2012 Cost Estimate (HCSS File 2012-22) Difference _ $ 69,134,275 _ $ 76,047,395 $ - 6,913,120 (-9.1 %) ACS performed a detailed take-off of the cast-in-place deck concrete based on a 8'/2" deck thickness, 3" beam haunch and 3'/z" thick stay-in-place (SIP) precast concrete deck panels in order to determine the deck concrete to be placed. ACS also performed a take- off based on an assumed layout of both intermediate and end diaphragms and estimated the cost to form and place diaphragms as a separate cost activity within the Bid Item. The 19��������: D-197 � •: total concrete quantity was revised from 66,263 M3 to 71,842 M3. All cost activities were scrutinized and adjusted based on ACS take-offs and historical production rates. BID ITEM 4260 — Groovin� Deck 2012 Revised Design Cost Estimate (HCSS File 2012-22R) 2012 Cost Estimate (HCSS File 2012-22) Difference _ $ 2,557,415 _ $ 1,507,926 $ 1,049,489 (+69.6%) The quantity was increased from 286,678 M2 to 290,294 M2 due to an apparent take-off error. The revised cost estimate allows for the cost to grind and groove the deck concrete based on historical subcontractor rates. BID ITEM 4300 — 355mm x 762mm Concrete Parapet 2012 Revised Design Cost Estimate (HCSS File 2012-22R) 2012 Cost Estimate (HCSS File 2012-22) Difference _ $ 9,032,941 _ $ 0 $ 9,032,941 (New) This Bid Item was added due to revised parapet height as per RFP. Reference Bid Item 4305 for deleted Bid Item. ACS estimated cost includes allowance for separate subs to install epoxy rebar, slip form concrete and apply a Class V finish along the perimeter of the barrier wall. BID ITEM 4305 — 355mm x 800mm Concrete Parapet 2012 Revised Design Cost Estimate (HCSS File 2012-22R) _$ 0 2012 Cost Estimate (HCSS File 2012-22) _$ 13,868,955 Difference $-13,868,955 (Deleted) This Bid Item was deleted due to revised parapet height and replaced by Bid Item 4300. BID ITEM 4310 — Two Bar Metal Rail 2012 Revised Design Cost Estimate (HCSS File 2012-22R) 2012 Cost Estimate (HCSS File 2012-22) Difference _ $ 15,403,812 _ $ 39,322,435 $ - 23,918,623 (-60.8%) The revised cost estimate is based on historical subcontractor unit rates to furnish and install two bar metal railing including the cost to drill and epoxy grout the anchors. 20�I��Q,��- � •: D-199 BID ITEM 4350 — Telephone Conduit & Inserts 2012 Revised Design Cost Estimate (HCSS File 2012-22R) _$ 1,245,200 2012 Cost Estimate (HCSS File 2012-22) _$ 1,243,779 Difference $ Negligible The revised cost estimate allows for a subcontractor to furnish and insta114" galvanized steel pipe as per project specs. Of particular note is that this cost does not include any necessary relocation of telephone utilities. BID ITEM 4360 — Power & Cable TV Sleeves & Ductbanks 2012 Revised Design Cost Estimate (HCSS File 2012-22R) _$ 711,610 2012 Cost Estimate (HCSS File 2012-22) _$ 710,663 Difference $ Negligible The revised cost estimate allows for a subcontractor to furnish and install 23.673 km of pipe and duct bank. Of particular note is that this cost does not include any necessary relocation of power and cable TV utilities. INDIRECT COSTS 2012 Revised Design Cost Estimate (HCSS File 2012-22R) _$ 37,174,091 2012 Cost Estimate (HCSS File 2012-22) _$ 32,058,108 Difference $ 5,115,983 (+16.0%) Revisions were made to several cost activities within the indirect portion of the estimate culminating in a cost increase of approximately $SM. 21 �I��Q,��- D-199 D-200 CONSTR UCTION COST ESTIMA TE (1) COMPARISON SUMMAR Y Pamlico Bridge (14.8 Miles) 2012 Revised Design Cost Estimate Total = $ 553,956,502 2012 Cost Estimate Total = $ 483,733,048 Difference = $ 70,223,454 (+14.52%) Breakdown of Difference: 2012 Revised Design Labor (Including Burden) 2012 Labor (Includin� Burden Difference 2012 Revised Design Permanent Material 2012 Permanent Material $ 71,186,193 $ 98,433,163 $ - 27,246,970 (-27.68%) $ 310,322,455 � 167.373.926 Difference = $ 142,948,529 (+85.41 %) 2012 Revised Design Expendable Material = $ 9,428,905 2012 Expendable Material = $ 17,971,557 Difference = $ - 8,542,652 (-47.53%) 2012 Revised Design Equipment = $ 49,742,177 2012 Equipment = $ 78,778,299 Difference = $ - 29,036,122 (-36.86%) 2012 Revised Design Subcontractors = $ 29,694,839 2012 Subcontractors = $ 48,847,736 Difference = $ - 19,152,897 (-39.21%) 2012 Revised Design Other (Bond, Insurance, etc.) _$ ll,386,808 2012 Other Costs (Bond, Insurance, etc.) _$ 9,277,061 Difference = $ 2,109,747 (+22.74%) 2012 Revised Design Mark-Up (15%) + Adjustments = $ 72,195,125 2012 Mark-U� (15%) + Adjustments = $ 63,051,306 Difference = $ 9,143,819 (+14.50%) 22�����.��- D-200 D-201 CONTACTS The following is a list of suppliers and subcontractors that were contacted via telephone or e-mail that provided ACS with current cost data: • CMC Rebar (Furnish Stainless Reinforcing Steel) — Contact = Chris Broderick • Bayshore Concrete (Furn Cylinder Piles & Bulb-Tees) — Contact = Gary Shrieves • VSL (Furnish Post-tensioning strand and bars) — Contact = Bob Sward • Applied Foundation Testing (Cyl Pile Load Testing) — Contact = Mike Muchard ATTACHMENT "A" The following six attached PDF documents were generated through HCSS software for each bridge and serve as a back-up to the revised 2012 construction cost summaries: - Bid Totals - Estimate Recap - Cost Report including Overhead - Labor Use Report - Material + Subcontractor Report - Equipment Use Report CREDENTIALS Armeni Consulting Services (ACS) employees who contributed to this report include Carlo Zara, a Senior Estimator and Scheduler with a bachelor's degree in civil engineering and 25 years of combined major bridge construction, estimating and scheduling experience throughout the Unites States. Carlo has been employed with ACS since 2008 and has been responsible for estimating the cost of constructing bridges with both segmental and Florida Bulb-Tee superstructures. Kency Santana and Brian Gensheimer performed quantity take-offs of any design changes, assisted with the review of the 2006 cost estimate methodologies and performed cost estimate revisions as deemed necessary. Kency received her bachelor's degrees in Civil Engineering in 2005 while Brian received his in 2009. Kency and Brian have been estimating quantities and construction costs of several major bridge projects throughout the United States since being employed with ACS in 2009. John Armeni, Owner/President of ACS, managed the assignment, holds a bachelor's degree in civil engineering, is a consultant member of the American Segmental Bridge Institute (ASBI) and has 25 years of combined major bridge construction and estimating eXperience including managing the construction of the Croatan Sound (Virginia Dare) Bridge near Manteo, NC from 1998 to 2000. He has also served as Project Engineer of the precast segmenta] Mid-Bay Bridge in Destin, Florida from 1991 to 1993 and the Neuse River Bridge in New Bern, NC from 1996 to 1998. 23�I'atic D-201 P`A 1�'i L I+�+� �+[� L.I 1'� D B l� I DG E ALT�1�l�1ATIV'E QARE C[]UNTY C�Q�T E�TIM�TE 1�E�'IE�' T�►,'� �{ +� l� I� E � #2 MT�CHA�L �AI�EI�. E1'�+GI1'�EERI1'�G, I1�1C JUNE 1�, 2�11� � - �, _ � �'� =. � ,� �; � .,, -;r. f r, � , <�`�� - c.,�,,, zAro � r��� �•�a . �; ,� -_ # 4 .r ��7 1� '. ��, �+ -=� i ^ A'� � '`- � ". '��T � � � _ Sarb!l�F147 f'ra� laLue.: 5 9'v` � hbf S�t i Snzanr„�if �i���Alirk � . 1 �y �YfiU(i .. 54 L, :� � fw , � �y�1 '"�''" ' 1 ":�.�?.�� � ,M1 �y+w 1j f'?[ddlPrttti . 4 h 4� i.�?�7!,i! �4/� .� ��l � a�:�,�r�� .S, i ! F Cwes H�al SFCrf ............ `""*F.. �,t,. : �. fe36rpency— 4 3 ��„yp� � �RfYDANTHE . 1 � � June 1 S, 2�}l2 Mr. Greg Perfet#i, P.E. State Structures Engin�er NCDOT — Struc:tures Mana�ement Unit 1578 Mail Se�viee �enter Raleigh, NC 27699- I S$� MlcMael Baker Engi�eering, �nc. A ZJ'nit af Mishae! &ak�r Corporatian $Q0� I�e�ency Parkw�y Suate b04 C�ry, T'�I� 275 � $ {919) 481-5702 FAX (919) 463-549q Sut�ject: t'ar�alico '�caun�i Bridgc Alternate T�sk Qrder #2 — Follpw up t[� Cpst EStimate Review Dear Mr. P���fetti: Please find aitaclied atir Final T�sk ? folla�,v-up to the c�st esti�l�ate review for the Pa�nlica Sow�d Sri�ige Corridor as i�equested at our meetin� an April 2, ?� 12 and per correspo�ic�e�ice c�n April 13, �[}12. 'T'he cont��t� of tlle cstiz7�atc r�vi�w are as follo�vs: • �xeeutive Suinmary • Report • �uppc�rtin� I�ata N�D�T t3ad pi-o�ided a]ist af item� far Baker to investigat� that wc�uld illl�]�Ct t11� 201� Escalated Finley Enz;ii�ee�-ing Cc�si Esti�nate. A suminary of these items, as well as the adjusted estinzated cc�st i�np�ct tar eaci� itein and the cui�ulative impact ta ti�e r�veralP cast are surninarized in ou3� �xecuti�c S�im�nary and l��pc�i•t �'ollawin� �13is letter. C�ur spr�adsiieets and atlditic�ilal backup are a�ailable upon rec�tzest. If you wa��ld �ike to discuss axzy of these d•es�iits furtl��r, ptease cc�ntact me at 919-481-5702, c�r Bill Hr��rd at 919-481-57Qfl. Sincerely, IC�A.EL BAK�R J IP+�[�. �- •kJ Dwain Hathaway, P.E. Stru�tures Manager D-203 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW Executive Summary Michael Baker Jr., Inc. (Baker) conducted a cost estimate review at the request of North Carolina Department of Transportation (NCDOT) pertaining to the proposed Pamlico Sound Bridge Corridor (17.5 Mile) Alternative. The purpose of the review was to evaluate both of these project estimates, escalate costs to present value and identify high and/or low cost project components using the original 2006 Finley Engineering Group (FEG) cost estimates for the 2.7 mile Parallel Bridge and the 14.8 mile Pamlico Sound Bridge. The final estimate review report was published on June 13, 2012. Based on changes in design requirements since the original estimate was performed in 2006, NCDOT has compiled a list of items for Baker to investigate that would impact the overall cost. As part of Task Order #2, we have presented the cost impacts in the form of net cost impact to our previous June 13, 2012 report for each item separately, as well as a cumulative impact to the overall cost. The original Finley Engineering Group (FEG) estimate and Baker's current estimate include all direct and indirect construction costs including, but not limited to deinolition, temporary facilities/access, supervision, labor, equipment and materials. Our estimate also includes a 10% contingency for risk and unknowns, which is reasonable for a project of this magnitude. Baker identified the foundations, the potential for delays in schedule due to the probability of storms/hurricanes in this part of the state and the acquiring the environmental permit as the main risks in constructing the 17.5 mile bridge. Additionally, Baker's estimate includes a 3% increase to account for the Design-Build method of procurement and a 2.9% increase to escalate the costs to the midpoint of construction. The estimated amount is intended to represent the "contract cost" or the cost that we would expect to award in an eventual construction contract. It should also be noted that both estimates exclude any costs outside of these construction costs (as defined above). Exclusions include, but are not limited to any and all costs related to escalation costs after Apri12012, roadway approaches or other related construction beyond the limits of work identified by FEG, design costs, NCDOT administrative and/or construction management costs, operation & maintenance of the completed bridge, debt service or other financial costs. During Baker's review of the ariginal FEG estimate (Task 2 item G), some individual bid items exhibited large variations between 2006 cost estimates performed by Finley Engineering Group's (FEG). However, the extended total costs were well in line with each other. NCDOT should be confident moving forward with the estimates based on the original design assumptions and quantities provided by FEG and as confirmed by Baker. A summary of the findings is shown below. June 15, 2012 1 of 64 D-204 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW Baker Cost Estimate Review from Task 1 Report Escalated FEG Estimate (2012) (see Attachment 0) $808,373,988 Item A: "Change navigation zone from 5,000 ft. to 2,400 ft" Net Impact relative to Task 1(see Attachment 2) $6,123,342 (DECR) Item B: "Foundation Changes" Net Impact relative to Item 2-A (see Attachment 4) $5,639,596 (INCR) Item C: "Stainless Steel rebar for up to 12' Above Mean High Water level" Net Impact relative to Item 2-B (see Attachment 1) $121,758,482 (INCR) Item D: "Add Fishing Pier" Net Impact relative to Item 2-C (see Attachment 3) $500,000 (INCR) Item E: "Pamlico Dredging" Net Impact relative to Item 2-D (see Attachment 5) NO $ IMPACT Item F: "Con�rm FEG conduit (items 4350 &4360)" Net Impact relative to Item 2-E (see Attachment 6) NO $ IMPACT Item G: "Other Factors" Net Impact relative to Item 2-F (see Attachment 7) $9�,683,918 (INCR) Item H: "Impact of Davis Bacon" Net Impact relative to Item 2-G (see Attachment 8) NO $ IMPACT June 15, 2012 2 of 64 D-205 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW BAKER COST ESTIMATE REVIEW Pamlico Sound Bridge Corridor Alternative (17.5 Mile) Bridge Original 2006 Cost Escalated Finley Engineering 2012 Baker Revised Cost Estimate (as estimated by Group Estimate (2012) Estimate incorporating Items Finley Engineering A-H from Task Order #2 Group) $673,644,990 $808,373,988 $1,024,832,643 June 15, 2012 D-206 3 of 64 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW l. History Michael Baker Jr., Inc. (Baker) conducted a cost estimate review at the request of North Carolina Department of Transportation (NCDOT) pertaining to the proposed Pamlico Sound Bridge Corridor Alternative. The two (2) estimates provided were prepared by Finley Engineering Group (FEG) in 2006: • Bonner Bridge — Revised Parallel Bridge (2.7 Mile Bridge) estimate dated November 16, 2006 and • Pamlico Sound Bridge (14.8 Mile) estimate dated November 29, 2006. The purpose of the review was to evaluate both of these project estimates, escalate costs to present value and identify high and/ar low cost project components. The estimate review report was submitted on June 13, 2012 as part of Task Order #1. Based on changes in design requirements since the original estimate was performed in 2006, NCDOT has compiled a list of factors for Baker to investigate that would impact the overall cost. A majority of these factors are a result of the design requirements in the NCDOT TIP B-2500 Project Request for Proposals (RFP). As part of Task #2 we have also evaluated FEG's escalated costs to determine if they are in line with established industry practices (see item G, Attachment 7). 2. Report Structure During the process of the Task 1 estimate review, NCDOT transmitted a list of items for Baker to review and incorporate into our cost estimate. This follow up effort to the original (Task 1) as well as our estimate review in this report are referred to as "Task 2." The specific items for follow up were documented in an email from Harry Lucas (NCDOT) received on April 13, 2012. Each requested item will be quoted in this report (labeled A to H), followed by our findings. We have presented the cost impacts in the form of net cost impact to our previous June 13, 2012 "Task 1" report as well as a cumulative impact to the overall cost for each item separately. Attachments are provided as appropriate for each item to refer back to the June 13, 2012 estimate report for both the Parallel Bridge (2.7 Mile) and Pamlico Sound Bridge (14.8 Mile) including the combined total estimated cost (see Attachment 0). June 15, 2012 4 of 64 D-207 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW 3. Cost Estimate Review Findings Our review of the escalated FEG project estimates was completed on April 20, 2012 and has been included as part of Task 2 item G"Other Factors": 4. Follow-Up (Task 2) Items To refer back to the escalated FEG estimate published in our June 13, 2012 `Taslc- 1' report for both the Parallel Bridge and Pamlico Sound Bridges including the combined total estimated cost, please refer to the documentation in Attachment 0. Supporting information is provided in attachments with matching numbering for each item. For each item with a net cost impact, we have attached a matching estimate summary spreadsheet with all revised cells highlighted in yellow. Please note that in the following itemized responses, a net positive cost impact is labeled as "INCR" (for "increase") next to the item amount. A net cost reduction in cost is noted as "DECR" (for "decrease"). Item A: "Change navigation zone from 5,000 ft. to 2,400 ft." "Please verify navigational zone used in 2006 Finley Estimate and adjust costs according to the navigational zone (2,400 ft. — p.46 of RFP) stipulated in the RFP." The B-2500 PB plans dated March 22, 2007 show a navigation zone length of 1,522 meters (4,994 feet), which exceeds the minimum length required of 2,400 feet (732 meters) in the Final RFP (including addendums) dated June 7, 2011 for the current B-2500 design-build project. In order to estimate the cost of the minimum required navigation zone, approximately 791 meters of superstructure had to be converted from high-level to low-level (main span to approach span). This was accomplished by replacing two 91 meter and five 122 meter high-level (main) spans with thirteen 61 meter low-level (approach) spans. The representative spans that were used for quantity development were span 20 (61 meter), span 22 (91 meter), and span 23 (122 meter). Substructure and foundation quantities were developed based on bent 21 and bent 25. Quantities of concrete (cast-in-place and precast), as well as epoxy reinforcing steel, concrete piles, a�zd post-tensioning strand and bar were developed for each span and bent above based on the PB plans. For the post-tensioning strand and bar in the superstructure, a lcg/meter quantity was determined for the approach spans and the main spans based on the total post-tensioning quantities in the PB plans. The appropriate quantity was then applied to the 61 meter span and the 91 June 15, 2012 5 of 64 � 1: NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW and 122 meter spans in order to determine a total post-tensioning quantity per span. Using the above approach, the change in each quantity required when switching from the 1,522 meter navigation zone to the 732 meter navigation zone was determined. In nearly all cases, switching to the shorter navigation zone resulted in a reduction in the total quantity. Net Impact relative to Task 1(see Att. 2) $6,123,342 (DECR) Item B: "Foundation Changes" "Latest Foundation Assumptions: For an all segmental, parallel bridge, Finley's assumptions coincide with recent proposals. For the conventional/segmental parallel bridge, please refer to the attached preliminary plans. For the Pamlico Sound Bridge (14.8 Mile), NCDOT Geotechnical Unit now suggests using 3-54" Concrete Cylinder piles/bent for 13.8 miles, and 4-54" Concrete Cylinder piles/bent for the 1.0 mile near Rodanthe. This is to counter any potential breach at Rodanthe. Outer piles would be filled with concrete I top 30ft." In order to determine foundation quantity changes based on new foundation information, the B-2500 PB plans dated March 22, 2007 were reviewed along with Finley Engineering Group's 11/22/2006 estimate of the 14.8 mile Pamlico Sound Bridge. Based on Finley's Phased Approach Bridge quantities dated I1/29/2006, they assumed 560 spans at a span length of 139.5 feet supported on 30 inch precast concrete piles that were 100 feet long. For this task, we were advised by the NCDOT Geotechnical Unit to assume that three 54" concrete cylinder piles per bent would be used for 13.8 miles of the bridge, while four 54" concrete cylinder piles per bent would be used for the remaining 1.0 mile of the bridge. Assuming the same pile length as Finley did in their estimate, a total number and length of 54" concrete cylinder piles was developed. Net Impact relative to Task 2, item A(see Att. 4) $5,639,596 (INCR) Item C: "Stainless Steel rebar for up to 12' Above Mean High Water level" "The Structures Scope of Work (B-2500 Final RFP) prescribes the minimum corrosion protection measures to be used on this project with the intent to provide a minimum 100 year service life. Reinforcing steel in all cast-in-place concrete members, excluding drilled piers, shall be one of the stainless steel alloys listed in Table 2 of ASTM A955-10a, have minimum yield strength of 60 ksi, and meet all other June 15, 2012 6 of 64 D-209 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW requirements of ASTM A955-10a. Mild reinforcing steel in columns and pile caps, either precast or cast-in-place, below an elevation 12 ft. above MHW must also be stainless steel meeting the above requirements. Mild steel or strand contained in precast superstructure elements that extend into cast-in-place concrete are not required to be stainless steel." Quantities for stainless steel reinforcing steel were developed based on the B- 2500 Parsons-Brinkerhoff (PB) plans dated March 22, 2007 as well as the corrosion requirements in the Final RFP (including addendums) dated June 7, 2011 for the current B-2500 design-build project. All quantities of epoxy reinforcing steel in pile caps, cast-in-place and precast columns and bent caps (below an elevation of 12' above mean high water) were converted into quantities of stainless steel, which were then tabulated based on current unit prices. Since the PB plans were for an entirely segmental superstructure, there is no cast-in- place deck reinforcing steel that needs to be converted to stainless steel; likewise, none of the reinforcing steel extending from the precast superstructure segments was converted to stainless steel. We clarified the intended scope as follows for this item: a. PC Pile (EpoXy) b. Pile Cap — Stainless Steel (SS) c. Column (<12' Above Mean High Water (AMHW)) —(SS) d. Column (>12' AMHW) — (Epoxy) e. Precast Segmental Box Girders (Epoxy) £ PC I Girders (Epoxy) g. CIP Deck (SS) h. CIP Barriers (Epoxy) i. All above (rebar & PT Strands) —(Epoxy) Net Impact relative to Task 2, item B(see Att. 1) $121,758,482 (INCR) Item D: "Add Fishing Pier" "Addition of the Fishing Pier (see p.166 of Final RFP)." The Design-Build RFP dated April 26, 2011 included an allowance of $500,000 for a 1,200 foot long public fishing pier. For consistency we have reflected this allowance here. Net Impact relative to Task 2, item C(see Att. 3) $500,000 (INCR) Item E: "Pamlico Dredging" June 15, 2012 D-210 7 of 64 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW "Pamlico Sound dredging would likely be needed for approximately 8.0 miles (12.8 kilometers) of the 17.5-mile (28.2-kilometer) length of the Pamlico Sound bridge. (See p.xxiii of FEIS 1)." We revisited our April 20, 2012 estimate review report and the assumptions used in our estimates for temporary access. Since we have provided far a full length temporary bridge, our approach would not require any dredging for temporary barge access. There may be some potential cost savings to utilize more barge access and the attendant dredging, but this would also open the project to significant risk of environmental damage as well as the inspections, testing and verifications required for dredging. For this conceptual phase, we recommend the approach that we've included. Net Impact relative to Task 2, item D(see Att. 5) NO $ IMPACT Item F: "Confirm FEG conduit (items 4350 & 4360)" "Please confirm Finley Estimate only accounts for conduit for ITS, & Tele. and not actual utility relocation costs. Utility relocation costs are not required, just clarification that there are substantial additional costs (See Table S-1. Comparison of Alternatives, FEIS1)." We are not aware of what exactly was included in FEG's original bid items #4350 "Telephone Conduit & Inserts" and 4360 "Power & CATV (Community Antenna TV) Sleeves & Ducts". The estimate detail provided did not clarify this other than to identify the bare unit costs as $35/M and $20/M respectively. It appears that whatever was intended, it was calculated as one (1) run for the full length of the bridge. Based on similar conduit costs in RSMeans, these bid item costs would only support relatively small diameter electrical raceways. It seems safe to assume that these bid item amounts are not accounting for any significant utility relocation costs. Net Impact relative to Task 2, item E(see Att. 6) NO $ IMPACT Item G: "Other Costs" "Please review the B-2500 Final RFP and addendums, PCL/HDR's Herbert C. Bonner Bridge Replacement Preliminary plans (see attached), and the attached Federal Highway Administration (FHWA) Tech memo ("Engineering and Construction-Related Tasks Technical Memorandum for NC 12 Replacement of Herbert C. Bonner Bridge", dated January 2009) for any other possible inajor cost-inducing factors added to the scope of worlc for which the Finley estiinate does not address." In this task we reviewed the overall projects scope and our previous estimate and identified three (3) areas where we believed revisions to be appropriate: June 15, 2012 8 of 64 D-211 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW Bid Item 2900 —"Construct and Remove Temporary Access" Baker re-assessed these major cost items and made adjustments as described in Attachment 7. Bid Item 4190 —"Precast Deck Segments" FEG estimators assumed the Contractor is setting up a casting yard exclusively for this project. Baker assumes precast segments will be purchased from a Precast supplier with an existing operation and seginents delivered from the PCI certified Plant to the bridge site. Labor and materials are essentially the same; however the cost of equipment and operations of a Precast Plant can be shared with other projects. The sum of Activities that are component costs of Bid Item 4190 were tabulated to establish the Overhead Markup Rate. Then Direct Costs were reduced by the cost of activities related to casting yard setup and the shared plant operations costs. Casting yard setup costs are captured in the Item 4250 Segmental Casting and Erection Equipment. Task 2 revised unit costs reflect the method above, and also captures Concrete Material Price escalated at 8% using appropriate indeX factors, with remaining costs for labor and incidentals escalated at 20%. Specific to the segmental bridge permanent structural items (4110 thru 4250) and casting erection equipment, we used the following approach: a. Reviewed the 1996 plans prepared by PB for the precast segmental concrete structure in the Parallel Bridge Alignment. b. Identified the plan quantity, number of precast (P/C) pieces, the range of lifting weights and the gross dimensions of the precast segmental elements for both the superstructure (P/C deck segments) and the substructure (P/C Pier Segments). c. Developed a conceptual project construction schedule, assuming a project duration equal to the awarded PCL/HDR contract. d. Estimated a typical pace for segment erection based on past similar projects and generic information from precast plants. e. Estimated the required pace of segmental production (precasting) as a basis for the number of precasting cells required (for both superstructure and substructure) to meet the project milestones. £ Evaluated the Cost Reports detail on items #4ll0 thru #4250 from the HCSS Heavy Bid g. Recomputed a revised Direct Cost with detail for items based on production rates, assumptions and methods presumed independently from the FEG assumptions. h. The method of estimation considers using crews and production rates for each segmental project work item independently of the FEG estimate. June 15, 2012 D-212 9 of 64 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW i. Rates of production and heavy segment lifting equipment are the focus of edits to the subtask direct cost items. j. Reinforcing steel was priced the same as the separate bid items. k. Our approach to the post-tensioning steel is based on the Allegheny River Bridge, a structure of similar construction and size to the Bonner Bridge. l. The estimates are prepared based on current-day dollars, and includes no escalation factor. m. Construction Cost only was considered. NOTE: this estimate review approach does not include design, long term maintenance or CEI costs. These need to be itemized elsewhere. Bid Item 4270 — "Pot Bearings" In further review of our April 20, 2012 report, we found that a vendor quote amount for one (1) single Pot Bearing assembly was posted as the unit price for Bid Item 4270 but that the quantity was assigned as one (1) Lump Sum rather than the correct quantity of (112) each. This obviously understated this bid item amount in Task 1 and has now been corrected in Task 2. Bid Contingency/Risk — Our estimate also includes a 10% contingency far risk and unknowns, which is reasonable for a project of this magnitude. Baker identified the foundations, the potential for delays in schedule due to the probability of storms/hurricanes in this part of the state and the acquiring the environmental permit as �he main risks in constructing the 17.5 mile bridge. Midpoint of Construction — It has become industry standard to approximate the total escalation affect by multiplying the entire project cost by the forecast escalation through half of the construction schedule (or "midpoint construction"). Using the USACoE Civil Works Construction Cost Index, Baker has estimated and applied a 2.9% factar to the overall cost to account for escalation to the midpoint of construction. Bid Item Notes In our review and verification of the estimates we considered each of the bid items from the FEG 2006 estimates. For many of the items, we felt that the use of 2011 NCDOT State wide bid history results was appropriate and no further eXplanation was required. For summaries of the complete bid item comparisons see Attachments 4& 5. For other more complicated items, ar items for which we have prepared bottom- up estimates, we offer the following clarifying information: a. Bonner Bridge — Revised Parallel Bridge (2.7 Mile) Estimate: June 15, 2012 10 of 64 D-213 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW 1) Item 2900 "Construct and Remove Temporary Access" These estimates are based upon a review of the 2006 Finley Engineering Group estimate and plans by Parsons Brinkerhoff dated 1995 — 1997, stamped March, 2007. Assumptions made are listed below each estimate. Raw material prices are gleaned from the most current McGraw Hill Cost Indices. Equipment rates used are the FHWA hourly rate from the current Equipment Watch Rental Rate Blue Book adjusted for North Carolina. Hourly labor rates are conservatively assumed union rates including wage, fringe, tax and insurance — the total hourly cost to the contractor. Crew makeup and productivity are based upon experience and reconciled against the Finley estimate. Markup of 25% to account for overhead and profit is applied in order to match closely with that of Finley's 27% for the Parallel Bridge and 24% for the Pamlico Bridge. Overall, the access scheme represented by Finley's estimate was deemed reasonable and feasible based on available information, and costs were estimated in 2012 dollars accordingly. The scheme from north (downstation) to south (upstation) is as follows: • 1400 meters (4600 feet) of trestle, plus fingers, including a dock; • 2300 meters (8000 feet) of water access including dredging, barges and tugs; and • 300 meters (1000 feet) ofhaul roads to tie in the north and south ends. The trestle is assumed to be 32 ft. wide and made up of pipe pile bents at 16 ft. centers with a superstructure of wide flange shapes and timber. Dredging is assumed to be required to maintain a proper channel for both navigable construction traffic, i.e. tugs and barges, as well as commercial, recreational and enforcement boating activities. The haul road estimates include both aggregate and timber mats. Baker's estimate of direct costs for the trestle, haul roads and marine equipment in sum is higher than Finley's ($28,081,678 vs. $18,763,833) however Baker's overall total direct cost estimate ($38,881,678 vs. $41,640,333) is lower due to its significantly lower estimate of dredging costs ($10,800,000 vs. $22,876,500). Baker estimated the equivalent of 275,250 cubic meters at $39.25/cubic meter including mobilization while Finley estimated 300,000 cubic meters of dredging at $75/cubic meter plus $151,500 mobilization. 2) Item 2910 "Removal of Existing Bridge" Baker's estimate approximates a quantity of concrete in the superstructure and substructure based upon photographs of the existing bridge since no existing p]ans were available. A conservative unit cost of $175/cubic yard is applied based on experience and accounting for the potential for June 15, 2012 11 of 64 D-214 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW environmental/seasonal restrictions and limitations on disposal/recycling options. Additional costs are estimated for the removal and disposal of aluminum railing and miscellaneous metals. Baker's estimate of total direct costs for this item is approximately 24% higher than Finley's ($8,770,000 vs. $7,082,625). The difference in Baker's and Finley's quantity (32,115 vs. 46,750 cubic meters) and cost per unit ($229 vs. $150/cubic meter) offset so the overall difference lies in Baker's estimated costs for the ancillary items. 3) Item 4190 —"Precast Concrete Deck Segments" The FEG estimate assumes the Contractor is setting up a casting yard exclusively for this project. The Baker estimate assumes precast segments will be purchased from a Precast supplier with an existing operation and segments delivered from the PCI certified Plant to the bridge site. Labor and materials are essentially the same; however the cost of equipment and operations of a Precast Plant can be shared with other projects. The sum of Activities that are component costs of Bid Item 4190, Pre cast conc dk segs, were tabulated to establish the Overhead Markup Rate. (see appendix) . Baker's estimate for the Item 4190, is reduced by the cost of activities rela�ed to casting yard setup and the shared component of operations for which Plant infrastructure renders unnecessary. This adjustment of approximately $4,700,000 is offset by the $8,171,654 increase in Segmental Casting and Erection Equipment. 4) Item 4191 —"Erect PC Deck Segments" Baker's review of Heavy Cranes presumed for lifting precast segments indicate the Blue Book Rates are mare expensive than FEG presumed in 2006. The duration on the job was confirmed by independent estimate, but the rate cost differential results in approximately $2,000,000. Crane rates were increased to Blue Book values. See appendix detail. Barge transport assumption eliminated trucking cost but adds barge transport. Barge transport is presumed to be more reliable given the limited access and heavy vacation / fishing traffic to the outer banks. Net increase to this item from transport mode is approximately $2,500,000. The casting yard setup offsets transport cost can be seen in item 4190 reduction. The presumption is segments are precast away from the jobsite due to the environmentally sensitive Outer Banks bridge site at the Oregon Inlet. The site is accessible by commercia] Barge traffic. Transit time for barge transport from Virginia to the Oregon Inlet Bridge. Rates were obtained per tow from Precaster in the Tidewater VA area. June 15, 2012 12 of 64 D-215 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW 5) Item 4250 —"Seg Casting & Erection Equip" The FEG estimate assumes the Contractor is setting up a casting yard. The Baker estimate assumes precast segments will be purchased from a supplier with an existing operation and PCI certified Plant. The specialty equipment costs for construction appear to be basic materials only for item 4250. Information from industry indicated a typical segment form FOB is now $750,000 rather than the $250,000 indicated in the FEG estimate. The FEG estimate assumes cost for setup of a casting yard is captured in the component activities of Bid Item 4190, Pre cast conc dk segs. b. Pamlico Sound Bridge (14.8 Mile) Estimate: 1) Item 2900 "Construct and Remove Temporary Access" - Baker assumes that for the 14.8 mile Pamlico structure, a full length trestle would be constructed of the same design as that assumed for the Parallel Bridge. Conservatively, no economies of scale are assumed in raw material costs or productivity rates. We note that this trestle is not designed to provide clearance for vessel crossings. Should such crossings be required, the trestle (and new bridge) could be built in halves, thereby halving the material costs but possibly increasing the duration of the overall construction. Baker's estimated direct costs for this item are 36°/o higher than Finley's ($129,298,650 vs. $94,928,998), a variance which we attribute to both the degree of detailed information available and the passage of time (inflation). Generally, Finley's approach is similar other than that they include costs for a railroad across the trestle. 2) Item 3030 "30" square p/c piles" Comparison to NJDOT Rt. 52 Causeway Contract B: Summation of Item 502130M (Furnish) and 502157M (Install); quantity 17,915 meters: Engineer's Estimate January 2009: $874.56/meter Letting May 2009 Avg. of Lowest 3 Bidders: $712.48/meter (Note that prices do not include furnishing/installing test piles or pile testing.) Overall, Finley's December 2006 direct cost estimate appears to be in line with the January 2009 Rt. 52 Engineer's Estimate in tenns of expected increases in material prices, equipment costs and labor rates, and the difference in productivity is negligible. June 15, 2012 13 of 64 D-216 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW After applying escalation and location correction factors, for Pamlico Bridge Item 3030, recommend estimated unit price of $818.85/meter. While some individual bid items exhibited large variations between FEG's 2006 estimates and Baker's current findings, the extended total costs reflect very close agreement. NCDOT should be confident moving forward with the estimates based on the original design assumptions and quantities provided by FEG and as confirmed by Baker. Net Impact relative to Task 2 item F(see Att. 7) $94,683,918 (INCR) Item H: "Impact of Davis Bacon" "Any affect from implementation of the Davis-Davis Labor Law." We do not anticipate any impact from implementation of Davis Bacon requirements. The labor rates used for our cost-based estimates were developed from Wage Determination NC65 dated January 6, 2012. Where NC Bid History data has been used, many of these projects would have already included Davis Bacon coinpliance costs. The reinaining bid items which were retained and escalated from FEG's original estimate would not represent a significant cost iinpact from Davis Bacon compliance. Net Impact relative to Task 2, item G(see Att. 8) NO $ IMPACT June 15, 2012 14 of 64 D-217 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW Attachments a. Attachment 1— Supporting Information, Item (C) b. Attachment 2— Supporting Information, Item (A) c. Attachment 3— Supporting Information, Item (D) d. Attachment 4— Supporting Information, Item (B) e. Attachment 5— Supporting Information, Item (E) £ Attachment 6— Supporting Information, Item (F) g. Attachment 7— Supporting Information, Item (G) h. Attachment 8— Supporting Information, Item (H) June 15, 2012 15 of 64 D-218 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW Attachment 0 Parallel Brid e and g Pamlico Sound Brid e g (June 13, 2012 Task 1 report summaries) June 15, 2012 16 of 64 D-219 Parallel Bridge -(See Task 1 Report dated 6/l3/2012, Attch 4): Reordered to reflect hrghest value rtem.s Xo lowest val�e iterns to rdentrfy cost drivers 2012 FEG Unit Price Quantity Escalated Value Bid Item Description (Metric) Units (ENR CCI 2006 to 2012) 2900 Constr & removal of temp access 1.00 LS � 63,551,510.96 $ 3030 1676mm prestr conc cyl pile 29,512.00 M $ 1,422.25 $ 4190 Pre cast conc dk segs 38,918.20 M3 $ 1,061.66 $ 4191 Erect PC dk segs 38,918.20 M3 $ 587.26 $ 2990 Cl AA concrete ffgs 33,711.60 M3 $ 602.83 $ 4180 Rebar in PC dk segs 5,837,700.00 KG $ 2.57 $ 3000 Epoxy coated rebar 4,921,806.00 KG $ 2.57 $ 4210 PT Strand in dk segs 1,543,412.00 KG $ 7.74 $ 2910 Removal of existing Bridge 1.00 LS $ 10,809,508.06 $ 4310 Two bar meta] rail 8,873.44 M $ 1,079.03 $ 4250 Seg casting & erection equip 1.00 LS $ 2,794,015.82 $ 4320 355mm x 800mm conc parapet 8,858.50 M $ 303.12 $ 4270 Pot Bearings 1.00 LS $ 2,448,984.29 $ 4110 Precast concrete cols & caps 3,18130 M3 $ 666.68 $ 3050 Axial ld test on 1676mm cyl pile 4.00 EA $ 462,438.85 $ 4120 Rebar in pc cols & caps 464,426.00 KG $ 2.57 $ 4280 Expansion Joints 127.60 M $ 8,295.67 $ 41A0 PT Bar in PC cols & caps 61,135.00 KG $ 14.03 $ 4230 PT Bar in dk segs 61,135.00 KG $ 12.73 $ A130 PT strand in PC cols & caps 70,298.00 KG $ 7.60 $ 4350 Tcicphonc cond & inserts 1.00 LS $ 238,734.05 $ 3010 Epoxy coated spiral rebar 86,136.00 KG $ 2.57 $ 4260 Grooving deck 43,620.00 M2 $ 4.62 $ 4290 Access System 9,262.00 KG $ 15.42 $ 4360 Power & CATV slceves & ductbanks 1.00 LS $ 136,419.46 $ 3020 508mm sq prestr conerete pile 176.00 M $ 333.05 $ 4340 Solar array support platform 1.00 LS $ 52,224.76 $ 2980 Unclassified structure excavation 460.80 M3 $ 105.13 $ 4300 Approach slabs 1.00 LS $ 44,239.98 $ 4370 Granite slope paving 200.00 M2 $ 1 R498 $ 4380 Navigation Lights 1.00 LS $ 30,829.26 $ 3040 Dynamic pile test 7.00 EA $ 2,31220 $ 3060 Production Dynamic ld test on cyl pile 7.00 EA $ 2,312.20 $ 4330 Filter fabric for drainage 627.60 M2 $ 15.42 $ 2970 Foundation cxcavation 1.00 LS $ Grand Total $ D/B Fee & Risk Cont. $ Marked up Total $ Notes All notes/clarifications from Task 1 apply unless noted otherwise. 1 NCDOT TASK 2 items are idenrified with each sheet based on item list received via email on 4/13/2012. TASK 2 4-13-12 2012 FEG Extended, Escalated Values (ENR CC12006-2012) 63,55 I ,510.96 41,973,501.02 41,318,051.88 22,854,946.46 20,322,431.25 14,991,2]3.60 12,639,197.81 l ] ,946,008.88 10,809,508.06 2,794,015.82 2,685,188.52 2,448,984.29 2,120,921.81 1,849,755.41 1,192,645.97 1,058,527.75 857,601.78 778,370.82 533,983.61 238,734.05 22 ] , I 9725 201,524.40 142,820.04 136,419.46 58,616.45 52.224.76 44,239.98 36,996.00 30,829.26 16,185.37 16,18537 9,677.59 267,555,150.71 8.026.654.52 17of64 D-220 Pamlico Bridge -(See Task l Report dated 6/]3/2012, Attch 5): Reordered to reflect highest value items to lowest valzre items to ider�zify cost drivers 2012 FEC Unit Price Quantity Escalated Value Bid Item Description (Metric) Units (ENR CCI 2006 to 2012) 2900 Constr & removal of temp access 1 LS $ 141,233,115.85 $ 4170 78" Bulb Tees 94,903.00 M $ 1,084.94 $ �4190 Concrete deck 66,263.00 M3 $ 1,268.14 $ 3030 30" sq PC piles 72,542.00 M $ 750.26 $ 4310 Two Bar Metal Rail 47,622.00 M $ 826.46 $ 4180 Epoxy Steel rebar in deck 13,782,700.00 KG $ 2.51 $ 4270 Bearing pads 4,480.00 EA $ 3,323.78 $ 4305 355mm x 800mm conc. parapet 47,622.00 M $ 281.98 $ 4ll0 Concrete caps 16,782.00 M3 $ 789.54 $ 3050 Axial load test 20 EA $ 375,663.53 $ 4120 Epoxy Steel rebar in caps 2,474,010.00 KG $ 2.51 $ 4280 Expansion Joint seals 1,848.00 M $ 819.80 $ 4260 Grooving deck 286,678.00 M2 $ 5.26 $ 4350 Telephone cond & inserts 23,673.00 M $ 52.60 $ 4360 Power & CATV Sleeves & ducts 23,673.00 M $ 30.05 $ 3060 Prod. dynamitic load test 80 EA $ 2,253.98 $ 3040 Dynamic pile test 80 EA $ 2,253.98 $ 4290 Access System 1 �S $ 69,572.88 $ Grand Total $ D/B Fee & Risk Cont. $ Marked up Total $ 201Z FEG Extended, Escalated Values (ENR CCI 2006-2012) 141,233,115.85 102,964,440.43 84,030,495.77 54,425,651.09 39,357,868.61 34,567,011 .60 14,890,552.32 13,428,261.07 13,250,060.28 7,513,270.56 6,204,817.08 1,514,997.79 1,506,779.57 1,245,105.11 711,326.30 180,318.72 180,318.72 69,572.88 517,273,963.75 15,5 ] 8,218.91 532,792,182.66 COMBINED 17.5 MILE PROJECT: $ 808,373,987.90 Notes 1 All notes/clarifications from Task 1 apply imless noted otherwise. NCDOT TASK 2 items are identitled with each sheet based on item list received via email on 4/13/2012. TASK 2 4-13-12 18 of 64 D-221 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW Attachment 1 Item C — Stainless Steel Reinforcement (SUPPORTING INFORMATION) June 15, 2012 19 of 64 D-222 � � �� � �� �� � ����� � �� � � ��� � � ��� � �• �� � � ��� � � �� � � ��� � �� �� � �• ��� � � �� � � ����� � ��� � � • • ���� � • • ����� � • ����� � ���-� � ����� � ��� � � • ����� � ����� � ��� � � �m��� � ����� � ����� � ����� � • ����� � ����� � �m��� � ��� � � ��� � � ����� � ����� � �� � �� 'amlico Brid e-(7'ask 2 Item C- Stainless Steel Reba: Q�a���iy s�a uem ues�.�n��n� (meo-��� z9oo co„sr�� & ��e�no.,ai �r re�„ a i 4170 78" Bulb Tees 9490'_ 4190 Concre�e�ecA 6626-� 3030 1373 mm � c I iIc 52,376. 4310 TwoBarMetel`R2ile 4762; 4180 Euoxv S�eel rebar in deck ( NOtes I NCDOT TASK ? 4-13-I'_ ��� ��� � � � � � � r��� IFYR�FY4Y .���Cnncrcic �J)G.f10 Ma S 811?.35 $ 5.13d.1]?.ON I)Opu -xll�indT��i Iflll F.1 i If10_�Uf1.Uf1 S If1011U11.Uf1 �.Ol)o nlc... S�ecl Rebnr in Ce s 2J]4.O I O.OU KG 5 ')-RS S ?4,iGS.49N5/1 Cos� Based Eetimute: Sec sepera�e shects iiles� S�.el Iteb��r ii� Ueck 13,78?,700.0f1 KG $ 9.85 5 L35,759 sq<,00 Cosl Based Eetiroare; See sxpa�a�e sheels Grand Tntnl S fi20,i97Afi9.%II 18.6R",'o D/BFec&ItiskCon[. S IH.fi11.J�A.Q9 Ift.68°o DBFex—kiskivesswned3"�� MnrleJupTiitnl S fi39,11119,191.%9 14.GK% COMBINEDI7±MILHYROJEC'1': 5 929,fi4R,72417 15.07% \'E'I' INPAC7' TU BO'1"1'OM LINN: ( ItE: 2-B): 5 121,75R,4R1.6fi nuics/clarilicntion. Iinm"I�a.k I u>>ly unlcss notcd othrnvisc. � Stniclurc. Scopc ol Work (B-2i00 finul RI�V) prescribcs ihc minimum cor�osinn promction mcasures to 6c uscJ un this pcojcct with Ihc inlcnt to providc a minimum 100 ycar scrvicc lifc. Rcintorcing stccl in all cast-in-placc concrctc nbcrs, cxduAing dnllcd picrs, shall bc onc ol'thc stninlcss stccl alioys lismd in'1'a61c 2 o(AS7'M A955-I Oa. huvc minimum yicid srccngth of60 ksi. and mcct ell o[hcr �cyuircmcnts ofAS'I'M A95S-� Oa. Mild reinf rcing stccl in columns end caps, ciihcr prccust urcusl-in-plucc, bclow an cicvuliun 12 Il. abovc MH W musl alco 6c stuinl�ss slccl mccting ih� ebovc rcyuircmcnts. Miid smcl or strnd wntaincd in prccusi supersicucwrc cicmcnls �hui cxtcnd into cas�-in-plucc concrctc not rcquircd lo bc sWinl�ss slccl. D-223 20 of 64 SO No.: Bonner Bridge Estimate Subject: Task 2, Item C Stainless Steel Quantities Computed By: SAD Date: 5/2/2012 Checked by: Date: Determine quantity of stainless steel required per B-2500 RFP including Navigation Zone revision Parallel Bridge Item Description 3000 Epoxy Coated Rebar = 3010 Epoxy Coated Spiral Rebar = 4120 Rebar in PC cols and caps = 4130 PT Bar in PC cols and caps = Stainless Steel Rebar = Stainless Steel Spiral Rebar = Stainless Steel Rebar in PC cols and caps = Stainless Steel PT Bar in PC cols and caps = Quantity 2,020,901 kg 0 kg 345,801 kg 9,875 kg 2,685,519 kg 77,597 kg 87,403 kg 48,316 kg Units Pamlico Sound Bridge Item Description Quantity Units 4120 Epoxy Rebar in Caps = 0 kg 4180 Epoxy Rebar in Deck = 0 kg Stainless Steel Rebarin Caps = 2,474,010 kg StainlessSteelRebarin Deck = 13,782,700 kg 21 of 64 D-224 SCRATCH ESTIMATE FORM NCDOT Bonner Bridge Stainless Steel Rebar - Column Installation a� �� May 1, 2012 10% 5% Additional Clarifications: 1. Material Quote from Gerdau Reinforcing Steel, April 30, 2012. 2. Steel quantity based on RS Means production for one week. 3. Crew size based on RS Means 4. Labor rates based on Wage Determination NC65, January 6, 2012. Total Direct Cost: $ 90,405.71 Overhead: 5 9,040.57 Profit: $ 4,520.29 TOTAL ITEM COST: $ 103,966.57 TOTAL COST PER TON: $ 9,040.57 TOTAL COST PER LB: $ 4.52 TOTAL COST PER KG: S 9.97 D-225 22 of 64 SCRATCH ESTIMATE FORM NCDOT Bonner Bridge Stainless Steel Rebar - Deck Installation � °' _y _� 0 ��F,_:.�!�A,.'.� May 1, 2012 10% 5% Additional Clarifications: 1. Material Quote from Gerdau Reinforcing Steel, April 30, 2012. 2. Steel quantity based on RS Means production for one week. 3. Crew size based on RS Means 4. Labor rates based on Wage Determination NC65, January 6, 2012. Total Direct Cost: $ 112,613.21 Overhead: 5 11,261.32 Profit: $ 5,630.66 TOTALITEM COST: $ 129,505.19 TOTAL COST PER TON: $ 8,931.39 TOTAL COST PER LB: $ 4.47 TOTAL COST PER KG: S 9.85 D-226 23 of 64 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW Attachment 2 Item A— Navi ation Zone g (SUPPORTING INFORMATION) June 15, 2012 24 of 64 D-227 C0�7N1VED175ryI11.t:PROJh:CI': 9 tlo2251I.fiAfi.�1 -11.�6'% NN�fI_NPAC'I'I'URI)'fl'U�11.IVY:(RN:'faskl): % (6,121id1.F71 25 of 64 D-228 SO No.: Bonner Bridge Estimate Subject : Task 2, Item A Navigation Zone Change Computed By: SAD Date: 5/2/2012 Checked by: Date: Determine quantity changes due to reduction in navigation zone from 5000 feet to 2400 feet (Negative values indicate a reduction in the quantities shown in the PB plans) Item 2990 3000 3010 3030 4110 4120 4130 4140 4190 4180 4210 4230 Description Class AA Concrete = Epoxy Coated Rebar = Epoxy Coated Spiral Rebar = 1676mm m Prestressed Concrete Piles = Concrete (Precast Substructure Elements) _ Rebar in Precast Concrete Substructure = PT Strand in Precast Concrete Substructure = PT Barin Precast Concrete Substructure = Concrete (Precast Superstructure Elements) _ Rebar in Precast Concrete Superstructure = PT Strand in Precast Concrete Superstructure = PT Bar in Precast Concrete Superstructure = Quantity -1,068 -215,386 -11,784 -816 2.2 -31,222 -11,776 -2,944 -658 -295,481 -177,659 -10,125 D-229 Units 3 m kg kg m 3 m kg kg kg 3 m kg kg New Totals 32,643.6 4,706,420 74,352 28,696 3,183.5 433,204 58,522 58,191 38,260.2 5,542,219 1,365,753 51,010 26 of 64 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW Attachment 3 Item D— Add F i shin P i er g (SUPPORTING INFORMATION) June 15, 2012 27 of 64 D-230 NarallelBrid o-('fxsk2l[emD-AddFishin Pier): 211I2 N'EC l:nit Pricc 2012 HEG Hxlended, Di�Tcrence from Quantih' Eualafed \'alne Eualafed \'alnes Task LC [fems Bidl�em Dexcrl tion �Me�ric� Unils (�:�'HCC121106m2012) (ENRCC12U�fi-2U12� ('%) No[es 290U Constr&rcmwalotrcm�acccss I.00 1.S $ 63.SSIS1096 $ 63.5�1510.96 O.00Yo 3U311 1676mm ireslrconi�c I ile 2R.69[.OU M % 1,422Z 5 40_NI'_94339 0.00% 41911 Prccasrcuncdk�c s 78.?60.20 M+ $ 1.061.66 $ 40.l19.4"/6.97 0.00%, 41')I I�:recil'Cdk��,n 3R.260�0 M3 A 5R726 $ 2Z4(S.�lZUI 0_00°'0 29911 ClMconcrcicti¢s 32.643.60 M3 S 60?.8_ $ 19.67x.bI1fi.GR O.00Yo 41P11 Ribssrinl'Cdksc�w "+542319.00 KG $ 2.57 $ 14.33'_.41R39 0.00% 300U � ox omd rebar 2_020.901.00 KG $ 2.57 5 5.189,673.77 O.00Yo 43111 I"I'SV�nd'm�kseoy 136�.753.OU KG '� 7.74 5 10_i7U.93N32 0_00°i„ ?9111 Rcmoval otczistin� 6rid c I.00 LS $ 10.809.508.06 $ 10.809.5f18.116 0.00% 43111 'I'wobermet�lrail N,R"7344 M $ I,079(13 $ 9.574.6911?2 0_UO% 4250 Se¢cnsiin�&erenione�ui I.00 LS $ 2.�9A,01?.82 $ 2�99,015.8? 0.00"� 43211 l5�mmxh00inmuinc��apci R.N�N.511 M $ 3113_I2 5 26XS.INh_� Il.()0"/0 4270 Pol Bcarin s I.00 LS $ 2.418.984.29 5 2.44R.984.29 0.00°0 411U �a.<�mtcuncreteu�ls&u�s 3,783�U M3 $ 6h6(R $ Z12�3HK_il 000 0 3050 �xiel Id Iesi on Ifi76mm c I ile 4.00 EA $ d62.438.85 $ 1.849,755.41 400"r;, 11211 Rebarin �eulsNeia�s 345,ROI OU KG % 257 $ 8RN,OIfi.97 0.00°0 42R0 Lx o� onJoin�s I?7.60 M $ 8?95.67 $ 1.058527.�5 400% 4140 I''I'H�arinPCiolw&caa 'J.R"]S.pU KG $ 14.03 $ 13N,5'_fi50 0.(IOin 4230 PT 6ar in dl< se� 51.010.00 KG $ I2.�3 $ 649.459.3? 0.00% 413U 1'I'tiirandinl'C��ilsdcu�a SR,522.011 KG 5 ]60 $ 444533_II O.UOo 4550 Telc�hone cond & inserls I.00 LS $ 238,734.05 $ 238.734.OS Q00% 3010 F:poxyuieicJx�irnlreMur 000 KG $ 257 $ kDIV/0! 426� Groovinedeck 43.620.00 M2 $ 0..62 $ 201.524.40 0.00% a2YU A�ce.�x tiy�iein ) 262.00 KG % 15.42 $ 14?.N?II U4 ll ()0%, 4?60 Powcr 8 CATV sleeves & ductbanks I.00 LS $ 136,419.46 $ 136,414A6 0.00% 311211 �UNmm.syprestrc��ncrcie ile 1"Ifi.011 M $ 3i31)5 $ syhlM14� 0_00% 3340 Solarurravsu>>or1 �lalform I.00 LS 5 52,?24.]6 S 52.?24.'16 0.00% 29N(1 Un��l��.�ifinl.ytniilurccxcnvel'ii�n JGU.NU M3 7� I115_I3 y 4fi,444H3 0.(10°n 4300 A� roach slxbs I.00 LS $ 54139.98 $ 44.239.98 0.00°0 437U Uraniiesluepavin�� 30U.OU M2 $ IR49X $ 3(9960U 0_00°0 4�80 Navisa�ionLi�hls I.00 LS $ 30,829.26 $ 3�,82926 0.00% i0411 �ynemic�ilclest ]UO FA % ?,31220 ,$ IG,IN537 0.(10% 3060 ProducrionD�iemicldteeYOncvl ile 7.00 EA 5 2,312.20 5 16,IRS.i7 O.DO% 433f1 F'ilicrFaM1riifr�reina�•e fi2�611 M2 $ 1542 4 9,(,"]"/_�) 0.p0'Y� 2970 Foundanon czcecanon I.00 LS $ AfJD Siainics..� Sleel Rchnr 2_6N� 519.0(1 KG $ 9 Ns g ?(�;i? ;(? IS I] UO% ADD Sminless S[ecI S irnl Rebur 77.s9�.00 KG $ 9.85 5 ]G13304s 0.00% ADIJ Siuinles� Siul Rcherin PC cul� end i-a� N"/.4UJ.U11 KG $ 9.N? �5 N(,I1,YIY i� 0.f10"/n ADD S�ainlessSmclPTBarinPCmisandcc A8.316.00 ICG $ 9.85 5 475,912.60 0.�0% ADn Fishing Pier I 011 LS $ �OO.00OOU $ 51111,111)11(111 Allowance (indudes D-R Fee) GrondTotal $ 2R2,674.107.17 O.IS°o D/6 Fee & Rislc Ginl. S fi.4(5.??z?2 O.UO"/n Ni3 Fec+ RiFk is ussumed 3 0: 17arkcd �p Total S 291,139,33U38 O.I7% Pamliw Bridge -(9'ask 2 Item D- Add Fishing Pier): 21112 f F.G l:nit Price 2U12 FF.G N:xtended. Difference from Qnantih EscalateA �'alne EscalateA �'alnes Task 2-C Ihms Ridltem peecriptii�n (Metric) Unilx (F:�HCCI21111fitn211127 (N:NRCfIZllllfi-21112) ('%) 29f1(1 ('i�n,.�r&rcm��vvloficmpecccs.v I LS $ 141-zi,115_ys ,j 141:?}},II�AS 0_UO"iu 41"/(I "/H"f3ulhTccx 94,90J.OV �A $ II1N4_94 ,�' 1�2.yG4.44043 0-p0"/o 41911 C��ncrcic�lccA (6?61.U0 Ivli $ 12(R_14 F N4f)-f)_49�']7 I](10'% SlcclmberinAcck I 11.Ulll KG I$ 2.51 Miulloedtesl � � ��� 'Ccic>ho�e cuiid & iuscrl� 23.673.00 '�1 �" 5?.60 $ 1.24=,10?.11 0.00°0 Powci & CATV Slec�cs & duc�s 23.673.00 .vN S 30.�5 S � I 13?6.30 0.00% commm IVO[CS �iL��l )0.00 Ku $' 9,g5 $ 13?.�?9,?95.pp O.00Yo Gr'�nJ'f��tal $ fi211,3Y],�6YAll 0_00"/u D/BFec&RixkCnnL 5 Ift,611,9?4UY 0.00"m D/64-ee+Rirkisaxsumed3% Markedup'Ib[al S fi39,011H,393.89 0.00°0 COMRIVF,D1�5\71I,EPROJF.CT: X 910,148,72�.27 0.115/ \'F,T IMPACT TO ROTTOM I.INR f RF.: 2-C): S SOU,OU0.00 D-231 28 of 64 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW Attachment 4 Item B — Foundation Chan e s g (SUPPORTING 1NFORMATION) June 15, 2012 29 of 64 D-232 Parallel Brid e-('faek 2 Item B- Foundation Chan ce): 211I2 F6C l:nit Price 2012 H'E;G HUended, Uifference frnm Quantih' Eualafed \'alne Eualafed \'alnes Task 2-A Ifems Bidl�em Uexcri tion IMe�ric� Unils (�:�'HCC121106m2012) (ENRCC12U�fi-2U12� (%) No[es 290U Constr&rcmwalotrcm�acccss I_00 1.S $ 63.SSIS1096 $ 63.5�1510.96 Q00",6 3U3U I(76mm�reslrconu�vl ilc 28,fi96.00 M $ 1,322Z5 $ 40,N1?94339 0_f)0% 12�vi«dQua�lilieti 41911 Prccasrconcdk�co 3R:?fi11.211 Mi ,� 1.061.66 $ 40.G19,47(.97 0.110"/o Rcvi�YlQunntitic� 41')I Hreci PC dk xe,rv 382GU 30 M3 A 5R726 $ 22 4(N.53Z01 0_l)0°io 12cviscd Quun 29911 ClMconcrcicf�.s i2643.60 M3 i 60?83 S 19.675,611h.6N 0.110% RcvincdQunnlilic> 41 RU 2ebur in PC dk se��c ?,542219.00 KG ,� 2_7 5 11232.41 R i9 0.00% 2e�i�cd Quun - 3000 L ox ootcd rebar 4.706.420.00 KG S 2.57 S 12.OR6D8G56 0.00"� Rcviscd Quanlilics 4211I I"ISVandin�k.ycer I}65,753.UU KG ti 774 5 IU,?"/U.'J2X22 0_OO�i� Revi�cdQunniiiies 2910 Rcmmnlo(cxis�in�6rid�c I.00 LS 5 10,809SOR.06 5 IO,N09,�118Afi U.11�% 43I0 T�v�i bar metal reil 8,X']3 44 M $ I(179 U3 S� y 5']4.69[12_' 11 UO o 425U Se cestin &erecrione u I.00 LS A 2.�9A.01?.82 5 ?,794,015.82 0.00% 4J20 -- �rNO(hnm�nn��aa�el h,R.H..O M 5 3113_I2 $ 2.G1i�_IRNi2 Ol1U% 4270 Pot Bcorin s I.00 LS 5 2.448,98429 5 2.A48,98429 0.00% 41I0 I'rcuvtu�nQetec�ilsNcups 3.IN3�U M3 S G(6(i8 5 212^3HN?I [I110"o 2evi4cxlQuanliiies 3050 Atiialldtestonl676�nmev7 ile 4.00 EA S 462,438.85 5 1.849.755.41 0.00% 41?Il Reharin iia�lv&ceiy 41i21141)0 Kp 5 25"/ $ I.II2.4G'1_R"/ [I00"o Revixed(2uan�iiies 4280 �x ans�onloin6 127.60 M S 8?95.67 S I.O585'_7.75 0.00% 414f1 PTRurinPC�vls'�ceu sy,191_00 K(i 5 14f11 S RI(i303�s [I.OfI"/o RevixedQunnliliew A?30 PT Bar in dk sees 51.010.00 KG S 12.73 S 649A593? 0.00% Revised Quantines 413U PT.strend in PC c<ilw & iv y 58,5221)11 KG 5 '/_61) 5 414.?33_I I (100' o Revisc�l Quan 4350 Tele lione cond & insarts I.00 LS S 238.734.05 S 238.734.05 O.UOi 3UI11 Y.�ucywa[ccls>iralabor 74.3S2.110 KG S ?S'] b I�1119]5,94 (1,00'% ReviacclQuanli�ies A260 Groovin�deck 43.620.00 M2 S 4b2 S 2�I.i'_4A0 0.00% 42911 Au:etirSyxte�n 9,2G2110 KG S Isq? $ 142N?I/04 0,110"/0 A360 Powe� & CATV sle�ves B ductbenks I.00 LS 5 136.419.46 S 136A 19.46 OAO% 302(1 SORinm tic ir � ile I']fi (l0 M 5 i3311? $ ?R 61l 45 � Il0 0 A3A0 Soln�nrravau"ctnlmform I.00 LS S 52?24.76 5 i2224.7fi 0.00°� ?)Nfl I:nclassiFicA..irucium�zcuvntiun 4GO.ft0 AAJ 5 II15.13 5 41i.444.R3 f1,0(IYa 4300 A roachslebs I.00 LS $ A423993 S 44.239.98 0.00% 43]0 (ireniiexli�.e��vin� 2f1111111 M2 5 IR49N $ 3G,91G.U0 ()U()"o 4380 NeviGenon L�i�I�[e I.00 LS $ 30.8?9.?6 S i0.839.36 OAO% 304U Dvnt+mic nlcic�i '/.00 EA $ 2.712.20 5 16.IR53] O.U(1°/a 3060 Produnion UY��+��nic Id levt on c I ile 7.00 EA $ 2312 �U 5 16.18±.37 UDU°� 43J0 Fillerf-ahncliirdreinu.�e 62]611 M2 $ Is4? ,% V.(,"]'/_SY I100"o 2570 FounJation escavation I.00 LS $ c.aoaT��isi x zei,nn,isx.nn a��o � D/BFee.@RiskCa�L S 7.848303.�7 0.00% DBFee+Riskisassumed344: MarkeJu�Tolal S 26Y.45g.4(i.fi7 11()11'% Pamlico BridQe -(Task 2-(Taslc 2[tem B- Foundation Chan es): 2012 FEG L'nit Price 20I2 FEG Esrended, Diffrrence from Quan[ity Fscnlsle�l Value F.scalsle�l Values Ta�k 2-A Ilem> Bid Item n.....�����.� fHictriel �i��n (6\R CCI2006 ro 20121 IENR CCI 2006-20121 1%�1 R4AA I�lL�i � loed resi I I.001 GA I$ 175.6G3.53 I$ & CATV Sleev3 �@Aueis 33(7J.U0 .Vi $ 30.05 $ "/11326-30 0.00"i Ivnxmiiic Inud ic�� NO_00 EA 4' ? 25� 9R S IR� i I R']? 0_()0"� ADD ClussAAConcretc 739fi.U0 M3 $ R02.i5 $ �.9}q,l"/?�R (3(111�M1CDOTStxieWiAcAvc:I�scalaicA2'�3"/o:l:NkCCI ADD Lmernl Lond Test I.OU EA $ �0(I,UOU.l1U $ IUf1,0�U.�11 Receni quoie Crom Ihird pany. Grand Total $ 522,7d9,2YY.9± I.Ob% DB Fee & Rixk Cnnt. $ I?.(824"]9 f10 I f)6i �/6 Pcc �i Risk i> au�mal i^/o Marked �p Total S S;g,4i1,778.95 �_pfi% COMBIVED l75 MILE PROJECT: $ 807,A90,242.62 U.70'% \ET I�iPACT TO BUTI'OM1I LINE ( 2E: 2-A): $ S,fi39,5961Y Notes i AII noie�claritications li�om T�sk I a>Ivunless noled oiherwise. NCUO'I' Pucallel B�i���zr) Bridgc Supenlruclure:'Iwo twms pcopo�ed eil segmentel, just ns lhe Finlzy e�limale nssumed, and lhe ewnr�ed leam wenl wilh a wnvenlional/seginenial comL ination (�ee allached preli�ninury plaiu�. Lutesl TASK 7 Foundmion Assumptions: For an all segmen[nl, parallel bridFe, Finlzy's assumptions coincide wilh recent proposals. For theconventional/segmen4l paraliel bridge, please refzr to the attached preliminaiy plans. For Ihe Pamlico Sound 4-I3-12 Bri�gq NCDOT Ceu�echnicel Unil now suggusls usine 3-54` Con�rele Cylin�icv pilcs/benl for 13.R mil�s, an� 4-54" Concrete Cylinder piles/bent lor the I.0 mle near Ro�enihe. 7his is tu cuunter any potentiel breech al RuJanlhe. Oulcr piles would be tilled with concrete I iap 30fi. 30 of 64 D-233 SO No.: Bonner Bridqe Estimate Subject: Task 2, Item B Foundation Chanqes Computed By: SAD Date: 5/2/2012 Checked by: Date: Pamlico Sound Bridge - 14.8 Miles Item Description Quantity Units Class AA Concrete = 7,396 m3 3030 54" Dia. Concrete Cylinder Pile = 52,376 meters 3050 Static Axial Load Test (ASTM D-1143) = 1 each Lateral Load Test (ASTM D-3966) = 1 each 31 of 64 D-234 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW Attachment 5 Item E— Pamlico Dred in g g (NOT USED) June 15, 2012 32 of 64 D-235 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW Attachment 6 Item F — Confirm FEG Bid Items 4350 &4360 (SUPPORTING INFORMATION) June 15, 2012 33 of 64 D-236 SCRATCH ESTIMATE FORM NCDOT Pamlico Bridge Telephone Conduit & Inserts May 3, 2012 Materials 2"GRSConduit � $8.35� 77667.33� �$ 648,522.21 � Junction Boxes 585.50 389 5 33.259.50 Soaced everv 200 ft SalesTax � 5.75% 10% 5% I $ 39,202.45 Material5ubtotal: $ 720,984.15 Total Direct Cost: $ 1,072,273.48 Overhead: $ 107,227.35 Profit: $ 53,613.67 TOTAL ITEM COST: $ 1,233,114.50 For Reference Escalated 2006 Unit Costs (18.45%) TOTAL UNIT COST PER LF: $ 15.88 $15.82 TOTAL UNI7 COST PER M: $ 52.09 $51.92 Additional Clarifications: 1. Quaniity matches the Pamlico Bridge 2006 estimate 2. Production based on RS Means production rates for Elizabeth City, NC. 2012 Ql 3. Material prices based on RS Means production rates for Elizabeth City, NC. 2012 Ql 4. Labor Rates based on Wage Determination NC120065 - Ol/06/2012 NC65, obtained from www.wdol.gov/wdol/scafiles/davisbacon/NC65.dvb 34 of 64 D-237 SCRATCH ESTIMATE FORM NCDOT Pamlico Bridge Power & CATV Sleeves & Ducts �°� �� :; �9' May 3, 2012 10% 5% Additional Clarifications: Total Direct Cost: $ 608,266.25 Overhead: $ 60,826.63 Profit: $ 30,413.31 TOTAL ITEM COST: $ 699,506.19 TOTAL UNIT COST PER LF: $ 9.01 TOTAL UNI7 COST PER M: $ 29.55 1. Quaniity matches the Pamlico Bridge 2006 estimate 2. Production based on RS Means production rates for Elizabeth City, NC. 2012 Ql 3. Material prices based on RS Means production rates for Elizabeth City, NC. 2012 Ql 4. Labor Rates based on Wage Determination NC120065 - Ol/06/2012 NC65, obtained from www.wdol.gov/wdol/scafiles/davisbacon/NC65.dvb D-238 For Reference Escalated 2006 Unit Costs (18.45%) $9.04 $29.66 35 of 64 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW Attachment 7 Item G — Other Costs (SUPPORTING INFORMATION) June 15, 2012 36 of 64 D-239 Parallel Bridge -(Task 2 Item G- Otl Rid Irem Descri �tion 2`)00 Conntr & ' �val oftcm o iU3U 1676mm �resvconccvl >ileL 4190 Prccu�lconcdk.�ecs 4I91 f'ccl PC dl: s��- 2`)90 CI AA . �.tc ft�. 41tl0 RebariiPC'JA �c�s 31100 1= �oxY ��ated r�.�ar 4? 10 PT Slrand in dk sa�.s 2910 Remo��� I f is[in� Rrid�e 9±I0 Twnb� memlrn'I 4250 Se� castine & eru[ion e u 4320 355�nin x%00 nm co ic �a i'>zt 42"/0 I'nt Rearin�s 4110 Precus� concre�e mis Ze ca �s 3�50 Axialidtettnnlfi7fimmcvl ile aizo Rzna���„ ����iE��a�. 4280 F.x�ansion .loint. 4150 PTBurinPCcols&cnss 4230 I'T Rar in dk se�. 4130 PT.sn�nd in PC col� & ca is 4350 Tale.ilioiecoid&inse'[t ;oio e�„xv�,��ea,���ai�en.��� 4260 Gnrn�intdeck 9290 Accass Svs[em 4360 I'nwer & CATV slezve. & ductb� iks anzo ;ox�n�».- ������,��ece,�ie asao s�i���e�,�Ay.s�> o�� ,ierr��,n z5so t�nciass�red,�uemreeacsvzPon 43�0 Ai>muchslobs 4i7f1 Grenite.-I 43R0 N�viea[ L� hG 1r, 3010 Dm�m-c�-le�es[ 3(160 I'roAuc�-o � De ia�n�c IA [c�� nn cvI i I< aa3o Parr rnn -� r� t�vina�e 370 F�iundn[ion z.r �ve[inn ADD Staiiilvts S[eel Rehar ADD Smiiile.: S ed S�ir�l Reb�r ADD Srainl�..- S tl R�hurin I'C �ols an� c ADD SWiiiles-SrcII'TRari PCcolSand ADD I�ishin¢ Picr ��• � � � � � � � � � � � � � � � � � n+rtereu��e rrom Quantity 21112 Baker 2012 BaAcr "fn.�k 2-F Ite�ns (Metric) Units Gnit Prices ICxtended Vaiue (%) Vo�es I1711 LS $ 4X970,534.72 $ 4ft.97�,?34_72 23.9J"a� Rev�.--dC_sLBa�edl:i ,See�y te�hect(Notrlbelow) 2N,69fi.011 M $ 1,±2R.74 $ iR,129,52i.Oq -657% RSM 3R26U.'�.fl M3 $ RR6.00 $ 33,898,53%20 -16_ -'a� Cost Bo�cd I;.t�nelc Soe uya�nla vhm� �Nelc � below7 (Nole 5 below) 3ri,2fiV�U M3 �R fi76.00 � --,Nh3,N9S10 I?.II"n� Cos B' iLttimel�;S � �ra�nsl �elhole26elow) ?2.64?.611 Mi $ 802.i5 $ 2h,1<J1,�92.4fi 3_10% (2U11)V('DOTSIa \A d 4��:;I�sc I I?-!"�o�,I:\RCCI � SJ2.219.OII KG $ ?21 � 12,24i�_10i99 -1i.94'%0 (2011)NCDOTfD�i I+.6),[ecol I 2]"��;I_VRC'CI 2,1120,9011711 KG $ .31 $ �4fifi,19121 -13.94%� (2U11)NCDOTSIU b\-dA�c;I�c I 1.24 o;LiVRCCI I,16c,7t3.00 KG $ 5.01 $ ft,203,17t 5} Coet B�sai I�.i'imalc. Su.tcpa�alc shccl (Nulc 2 hdow) I Ofl LS A 109fi2,spp,pp $ 10,9fi2,Sf70 00 I 4�% Rev�.- d C at[ F3a.ed F�t nate, See �e� �'ate sheet (Note 4 belnu�) R,R73.44 M $ 3RA.43 $. 3,44fi.710i0 -hA.00"-�� (21111)uCDOTSta U-deP.ve;EcI2J227%;E\RCC[ 100 LS $ 11,4062500f1 $ 11,40fi,2S000 308.Z4% CostR�sedEstiinate,See.e�arate.hezt ft,ASHSp M $ 2R�.69 j� 2.530,7ft4ft7 5.75% (2f711)uCDOTSta U-deAve;Ecl�ed227%;E�RCCI I 011 LS $ 2,4fi4.000.011 $ 2,4fi4,I1f10 00 0.61 % Recent quota: Corrected Task I mst (h'o[e i helinv) 3,IA35p M3 $ 666.6Y � 2,122,184�5� 0.00'0 (2U06)FFCCn.rescalated20°io:F.\RCCI -0.00 FA A 462.4+R RS $ 1,849,75c q� 0.00% (?006) FFC Cosi vscaluted 20°ro: F.`�R CCI iqS,g01.00 KG $ '31 � 7fi4,220_21 -13.94°0 (2011)NCDOT�D'ivl?.3,6),Fscaluted224°o;EVRCCI 127 fi0 M $ R 29�.67 ,$ I,0?ft527 75 0.00% R006) FFC CoE� escalxted 20° o: F\R CCI 9,ft7t 00 KG $ I I.01 � I Oft.7Zi 75 -2151'!-�� Co.�t Rased P_stimate. Su sepa�a�e .shee� (No[e 2 below) 511710.00 KC'C $ I101 $ ?fi1.620_IO -I?.??'n� Co.vcBoseASsrimate.Seeseparete,eheet(Note26el�w) ?N,?2200 KG A 6.01 � 351,71722 -?O.Fx^.�„ Co.�tRasedP_srima[eSeesapv'ste.shee� (No[e2below) I 00 LS ,$ _ R.T+511� $ 23ft,737 OS 0.00% 2006) FFC� Co�� es I teJ 20%: F\R CCI 0.00 KC A 4.fi3 j� (2011)uCDOTID'iv+,6);F.scnla[eA?34'/��;F.NRCCI 43,fi20.00 M2 $ 3.7A $ 97,7f)ft.ft0 -31�'_'i�� (2011)NCDOT(D�ivl.?3,6),F,.calate-0224°o;E�1RCC1 9.262 00 KG $ 15.42 � 142,H2O 04 0.00' o (2006) FFG Co�t vvcalnted �0° o: F\R CCI 100 LS $ Ii6,419A6 $ 13fi,4194fi 0.00% 2006)FFC�Co��vs IteJ20°o:F\RCCI 17fi.00 M A �43A0 j� 9S,63fl40 63.150 (2011)uCDOTSta U-deAve;Ecl� .1�27%;ENRCCI i oo �s s s� �za �e s sz,zza �e o.oni ¢ooa� Fec c��� �,�aia�en zo o: e�a cc� 4fi0.fl0 M3 $ 10599 S 48,i79i9 -0.14% (2011)uCDOTSta WdrAve;Ecl� d�,.24%;F.VRCC[ I 00 LS $ �5 � 16.R2 $ 3?,21 fi.82 ?f1411",,, (201 I) PnDOT Avz, Approa. 147 M2; 0_R I Area Adj_ � plied; Fscal d 2.24 0; F.NR CCI 20000 M? A ?654 5, 11,30R00 -ti9a?%��� (2011)NCDOTRiiR� Claasll(F.;[h�:�loniiicc �[m1:F.calated224"o:FNRCCI I_00 LS $ 41.91R4(1 K 4191R40 35.97% (2011)uCDOT(onchdD��3�:F.�la�cA224°,o:F\RCCI 700 FA $ ?.19X_I6 $ 15787_I2 -493% (2011)�]CDOTSta �A 1^Av.;F_scl�teJ224°i�;E�RCC[ 7-00 FA �A _il'?0 $ 16,ISSi7 0.00°o R006)FFGCnsic. I�rcd20°o:E\RCCI 627fi0 M? $ ?fi3 $ Ifi44?I -h3.01°�� (2011�NCDOT�Di�l�3_6),ECalucd22d"o;tiVRCCI I Ofl LS $ 25.0011_00 $ 2L4,f10(7 00 Es� CY finm Plan.� z6ft551900 KG A 9R5 �6 2C,452,ifi2_IS 0.00% Cos[RasedF_�timah;5ecx�arateslicet,e 77.?9700 KG �S 9-Si $ 764ii0_dS 0.00 o Cn.v R: dF_��imatc 5� uslic�[t R7,403 00 KG A 9 RS $ 9fi0,919 SS 0,00°o Cos R. � I F_��[imaR S c e shcet,e 4R.i16.00 KG �K 9R5 $ 475,91L60 000% Cos R'. dEnmaR 5� usheua I.00 LS % _OO.U00.00 $ ipp.ppp.00 O.OU"o Alluwencc[includa-0.131�cc7'at CrendTOtal 5 265,RIfi3Ofil.l3 -�9G".� D/6 Fer & Risk Cont $ 7,9�9.481.N7 -s.y'7�-„ D/U fcc i Risk is usswncd 3"�; 10% Contin�ency $ 37,-i77,iS4ip Escalationromidpoint(27mos) $ �,9J9.49U.�? Marked up 1'ohel 5 3UY,OY2,588.01 6.I�;t llifference from Quantih 20126aArr 2U726aAer Task2-1'Ifems (Metric) Units L'nit Prlces Extended Value 1%1 Votes I LS $ 155.87U.625.UU $ 155.87U,62S.U0 I �.'t�"„ Rcvis�:d Cost l3usal L's'nma[c Scc s'cpAr�[c �hcct (Notc 4 6clo�a') 94.903.00 M $ I,U40.61 $ 98.7S7,UIU.83 11.Oy% 1201I) PADOTBiU Itcm hiomrv, ORI A�ca Adi. aooli�d: liscalatcd 220."/„ 0.00 KG $ 221 $ (3UI1)NCDO'fStatcWi�cArck:scalarcd2.;A'%;L\RCCL 4,480.OU EA $ 3,7UI.Uy $ 16,SN0,88}.yp 11.35%� (3011)NCDO'I'Sta[�Wi�cAvcGscelvtcd224'%;LNRCCL 7,62200 M ,'6 285.69 $ 13.605,129.18 132% (20111NCDOTSiaieWideAve;F,scaiaied3,24°b:ENRCCI 6,782-00 .'�A3 ,F 845.3i $ 14,186,663.70 7.07"0 (2011)NCDOTStaceWid.Ave;F,scal.��ed3-24%;FNRCCI 100 t�;n R 375.663.?3 ,$ 375,663.53 Q00% (2006)FEGCo,t.scal��M20%;FVRCCI 000 KG $ 221 $ (2011)VCDOTStxeeWideA�-e;Pscalx�aA2.24%;P_NRCCI 1.848-00 M $ 819.80 $ I S 14,997.79 0.00% (20U6) FEG Cosi escala�ed 20%; P_\R CCI 6,678.00 '.vl? $ 224 �6 643.It8.72 -�7;A°�o (2011)NCDOTSwreWidaAve;F.ncalewd324%aErRCCI 7,67J.00 M $ 52.6U $ 1,245,IU?.IL U.OU% (2V06)1�lGCostcscelatrd�0",'o;C\RCCI 3,673.00 M $ 3U.U5 $ 711.J26.}p U.UU% (2006)FEGCostcs'cnluta120"-�;L\RCCL 80 EA $ 2.253.y8 $ INU.}18.72 0.00% 13006) F1:G Cost cscelatcd 20%: k�.\R CCI Lond T�st I.011 [n $ I OO,OU0.00 $ IOO,OOIIDU 0.00°fi Reccm quotc fi'om thi�d puiri. ,�S[eclRcbarinCu>s ',474,010.00 KG $ 9.85 $ Z4,3h8,99ft50 O.OfI% CostBanYlLtimatc;Sc��eparatasheets >a S0.-��.I Rr6arin �i�k 13.7R2700.Oo KG � 9.85 ti 135.7.i9.i9.i_00 0.00"e Cua�� R�.al Fa�iimu�c: Sees�pzn�[cshec�s CravATofal 5 fi15,qy4.A711.17 -0.7V'?;, D/B Fee & Rixk CoN. $ 18 4hA.R7a-I I -u 79��a DB Fu�. �i Riek is asyumul3°io 10"/u ConHngencV % 6339?,9311 43 2.9 % Rscalation to midpoint (21 mo.r) $ 18?84.819-3? �1arked up'CoGI 5 715,7q11,1154 �3 12.f11"f� COMBIM1ED 175 y���,H PROJF.CT: 5 1,024,832,6AZ.53 IO.ID"�� NF.T IMPACT TO BOTTOM I.INF. ( RF,: ?-�): 5 94,683,9I8.26 NOtes i AIl notes/clarificarions t}om"Cask I a> Iv unle,s noted othe�wiee. _ Updare Task I estimate with coet baeed estimates for Segmental Bridge items (solicited cost detaii was obtainzd after Task I repo�t aubmiscion date), updared qnantiry fi�om 61,135 based on engineering plan review. ! U�Aared iask I estimare m revise vicin tor bid itam 9270 "Pot Bearin s' 4 U dared'I�ask I es[ima[e m revise labor ra[es used in [em oi m,truc[ion bid irems (2900 dc 291 U) - bid item 419U now removes items chat were accounred for in�icem 4250 increase for "Cesk I. NCDOT Please irview the B-250U Final RFP and addendunv, PCUHD2's He�t�er[ C Bonner Bridge Replacemenr Preliminary plans(see attached), and [he attached FH W A Tech memo (°Engineering and Cons2mcnon-Rela[ed l'asks TASK � Technfcal Memorandi m for n'C L� Replacement oi7lerberl C 60 -r 6nd�;e'. date4l January 20�9) f r any otI cr poss6la m j -�ost fnducin� taaon ndded m the scope oiwurk for wI ich thc Ti il�, - Tma le do�: na .i�A� ess 41?-I2 37 of 64 D-240 General Summary for Construct and Remove Temporary Access, and Removal of Existing Bridge Items Parallel Bridge Item 2900 - Construct and Remove Temporary Access Baker refined its original estimate as follows: a) "Normalized" labor wage rates with current local wage determination. This refinement lowered labor costs in all activities from the original conservative estimates, however because this item is heavily weighted toward material and equipment costs, the net percentage impact was minimal. b) Increased duration of marine crew to align more closely with Baker's construction schedule. Six months of marine crew costs were added to assure coverage for pile driving, substructure and superstructure construction of portion of bridge to be accessed via barges. c) Reviewed dredging information provided and confirmed that original dredging cost estimate is appropriate. d) Added cost estimate for "Manpower Transport" to account for remote access. Assuming limited vehicular access and parking in environmentally sensitive areas, costs were added to daily transport trades from central staging areas to points of work, and back again. The net change to the marked up estimated cost was approximately +1% ($48.60 million to $48.97 million) Parallel Bridge Item 2910 — Removal of Existing Bridge a) No changes Pamlico Bridge Item 2900 - Construct and Remove Temporary Access Baker refined its original estimate as follows: a) "Normalized" labor wage rates with current local wage determination. This refinement lowered labor costs in all activities from the original conservative estimates, however because this item is heavily weighted toward material and equipment costs, the net percentage impact was minimal. b) Reviewed dredging information provided and confirmed that no dredging is appropriate for this scenario as access is exclusively from trestle. c) Increased length of trestle slightly to account for additional fingers necessary to access substructure units. d) Added cost estimate for "Manpower Transport" to account for remote access. Assuming limited vehicular access and parking in environmentally sensitive areas, costs were added to daily transport trades from central staging areas to points of work, and back again. The net change to the marked up estimated cost was approximately -3.6% ($161.62 million to $155.87 million). 38 of 64 D-241 NCDOT Bonner Bridge Parallel Bridge Item p2900 Construct and Remove quantity rate burden labor material equipment sub 0 TemporaryACCess 1 ulsm material ori[e as umptions steel 1 Ib. $ 0.5� ENR 3/2012 steelsalvage 1 Ib. S 0.25 guess lumber 1 bf $ 0.85 ENR 4/2012 aggregate 1 ton $ 15.00 guess trestle piles 750 $ 3,780.00 $ 2,835,000 $ 2,535,000 pae sai�age �so 5 �i,aeo.00� 5 (i,av,soo� 5 li,av,soo� supersVUCture 6,000 lef. $ 558.0� $ 3,348,000 $ 3,348,000 supersVUCturesalvage�25%) 6,0�0 I.f. $ (139.50) $ (837,000) $ (537,000) timber decking 2,304,00� bf $ O.SS $ 1,958,400 $ 1,958,400 handrall 12,00� I.f. $ 10.00 $ 120,000 $ 120,OQ0 welding, rigging & misc maYl 6,000 I.f. $ 100.0� $ 600,000 $ 600,000 na�i�og sso ioad 5 i,000.00 5 sso,000 3 sso,000 ne operaror i 3,00o nr 5 aa.00 5 ioz,000 3 ioz,000 e oner i a,000 nr 5 zzoo 5 si,000 5 ai,000 p�ie roremao i 3,o0o nr 5 eo.00 5 iso,000 3 ieo,000 p�iejo�roeymao 3 a,000 nr 5 sa.00 5 ase,000 5 aae,000 i a,000 nr 5 zzs.00 S e�s,000 5 e�s,000 pile hammer, leads, etc. 1 3,000 hr $ 125.00 $ 375,000 $ 375,000 weider i a,000 nr 5 is.00 S as,000 5 as,000 pump i s,000 nr 5 zs.00 5 �s,000 5 �s,000 dredge & dispase labor 1 360,000 ry $ 75.0� $ 5,400,000 $ 5,400,000 equipmem i seo,000 cy 5 is.00 5 s,aoo,aoo 5 s,aoa,oao $ 30.0� /ry (from MII, Lou P.) haulroads aggregate 5,185 ton 5 75.00 5 77,775 5 77,778 timber mats 42Q,000 bf $ O.SS $ 357,000 $ 357,000 isc drainage matl, geo, pipe 1 Is 5 50,000.04 5 5�,000 5 50,000 waste z,000 co� 5 s.00 5 io,000 5 io,000 do�er i z,000 hr 5 im.00 S zao,aoo 5 zaa,oao excavacor i z,000 nr 5 iso.00 5 aoo,000 5 aoo,000 loader 1 2,00o hr 5 6o.00 $ 120,000 5 12o,000 criaxies i z,000 nr 5 ao.00 5 i5o,000 5 ieo,000 operator 3 2,000 hr 5 34.00 $ 204,000 $ 204,000 laborforeman 1 2,�00 hr $ 20.0� $ 40,000 $ 40,000 iaborer a z,000 nr 5 is.00 5 ios,000 5 zos,000 barne equipment ge �w/w���n cyp��ap s s,000 nr 5 ss.00 5 z,zoo,000 5 z,zoo,000 material barge 4 5,000 hr $ 115.00 $ 2,300,000 $ 2,304,000 crane barge 4 5,�00 hr $ 265.0� $ 5,300,000 $ 5,300,000 tug 4 5,000 hr $ 225.00 $ 4,500,000 $ 4,500,000 captain 4 5,000 hr $ 34.00 $ 68�,000 $ 680,000 deck hand 4 5,000 hr $ 27.00 $ 540,000 5 54o,000 laborer 4 5,000 hr $ IS.00 $ 36�,000 $ 360,000 anpower transport ans/6uses 4 7,000 hr $ 20.0� $ 560,000 $ 560,000 labor 50 875 hr $ 25.00 $ 1,093,750 $ 1,093,750 $ 39,176,428 labor material equlpment subcontractor �osc 5 9,z�a,�so 5 �,esi,e�s S zz,zso,000 S mcai �osc 5 s9,ve,aza is profit 15% 15% 15% 15% unitcost $ 39,176p28 Is overhead 30% 10% 10% 30% markup 5 9,794,1o7 Is 25.0% $ 2,318,688 $ 1,912,919 $ 5,562,500 $ unit price $ 48,970,535 Is total price $ 48,970,535 notes: trestle 1 as me 46001.f. trestle and 20 fingers at 66 I.f, each, total 60001.f. of trestle, includes dock haul roads 2 useu24" pipe plles, 2 per pier, 16 ft. span = 6000 I.f. / 16 k. x 2= 750 piles 15 agree with assumption of 10001.f. of haul roads total north and south end 3 pipe piles 24" diam x 1/2" wall = 1261bs/I.f. 16 as me 2000 crew hours to build, maintain and remove 6 guess superstrucWre: cap beam 35 ft. x 15016s/ft +7 ea. stringers 18 ft. x 1001bs/ft 17 combination of aggregate and timber mats 5 superstructure per span =[�35 x 150) +�7 x 18 x 100�]/16 ft. = 111616s/I,f. 18 equipment rental rates current FHWA North Carollna Blue Book rates 6 decking 12" x 12" tlmber mats, e equipment 7 handrail guess 201bs./I.f. steel 19 as me barges and tugs for 2.S Years 8 as e rate of installation and removal of one 16 ft, span of trestle per day 20 equipment rental rates current FHWA North Carolina Blue Book rates 9 6000 I.f. / 16 ft. = 375 units to install and remove = 375 crew days x 8 hours/daY = 3�00 crew hours anpower transport 10 hauling assume 20 tons/load, 6000 tons steel +5000 tons timber (50 pcf) = SSO loads 21 as verage headcount of 50 for 3.5 years, average hourly rate of $25, 11 equlpment rental rates current FHWA North Carolina Blue Book rates 1 hour/day, 250 days/year = 875 hours dredge & barge 12 as e of SOOO l.f. of water access 13 as me 3 years of dredging to keep channel open 14 as me 100 ft. wide channel x 4 ft. de th dred ed er ear= 120,000 c/ ear= 360,000 c total 39 of 64 D-242 NCDOT Bonner Bridge Pamlim Bridge Item #2900 [onstruct and Remove quantity rate burden labor material equipment sub cost TemporeryACCess 1 uls RldtPfldl pfIC2 dS5llRIptIOf15 steel 1 Ib. $ O50 ENR 3/2012 steelsalvage 1 Ib. S 0.25 guess lumber 1 bf 5 0.85 ENR 4/2012 aggregate 1 ton $ 15.00 guess tresUe piles 10,000 ea $ 3,780.00 5 37,800,000 $ 37,800,000 pile salvage 10,000 ea $ (1,890.00� $ (18,900,000) $ (18,900,000) superstructure 80,000 I.f. S 558.00 5 44,640,000 $ 44,640,000 superstructure salvage (25�) 80,000 I.f. $ (139.50� $ (11,160,000) $ (11,160,000) timber decking 30,720,000 bf 5 0.85 5 26,112,000 $ 26,112,000 handrail 160,000 I.f. $ 10.00 5 1,600,000 $ 1,600,000 welding, rigging & misc maYl 80,000 I.f. $ 100.00 5 8,000,000 $ 8,000,000 hauling 7,322 load $ 1,000.00 $ 7,322,000 $ 7,322,000 crane operator 1 40,000 hr $ 34.00 $ 1,360,000 $ 1,360,000 crane oiler 1 40,000 hr S 27.00 $ 1,080,000 S 1,080,000 pile foreman 1 40,000 hr $ 60.00 5 2,400,000 $ 2,400,000 pilejourneyman 3 40,000 hr S 54.00 5 6,480,000 S 6,480,000 crane 1 40,000 hr $ 225.00 $ 9,000,000 $ 9,000,000 pile hammer, leads, etc. 1 40,000 hr $ 125.00 $ 5,000,000 $ 5,000,000 welder 1 40,000 hr 5 15.00 5 600,000 5 600,000 pump 1 40,000 hr $ 25.00 $ 1,000,000 $ 1,000,000 manpowertransport vans/tuses a io,000 nr S zo.00 5 soo,000 S aoo,000 labor 50 1,250 hr $ 25.00 $ 1,562,500 5 1,562,500 $ 124,696,500 labor material equipment submntractor cos[ $ 12,882,500 $ 95,414,000 $ 16,400,000 $ totalcost $ 124,696,500 Is profit 15% 15% 15% 15% unitcost $ 124,696,500 Is overhead 10% 10% 10% 10% markup $ 31,174,125 Is 25.0% 5 3,220,625 $ 23,853,500 $ 4,100,000 $ - unitprice $ 155,8�0,625 Is total pri<e $ 155,870,625 notes trestle 1 assume 14.8 miles, say 78,0001.f.+2,0001.f. of fingers so SO,OOO l.f. of tresHe to install and remove Z if required to keep navigable channel open, build trestle half way, remove, build from other end (1/2 material cost, same labor/equip) 3 use24"pipepiles,2perpier,l6ft.span=80,0001.t./16ft.x2=10,000piles 4 pipe piles 24" diam x 1/2" wall = 1261bs/I.f. 5 guess superstructure: cap beam 35 ft. x 1501bs/ft. + 7 ea. stringers 18 k. x 1001bs/ft 6 superstruciure per span =[(35 x 150) + �7 x 18 x 100)]/16 fG = 1116 Ibs/I.f. 7 decking 12" x 12" timber mats, 8 handrail guess 201bs./Lf. steel 9 assume rate of installation and removal of one 16 ft. span of trestle per day 10 80,000 I.f. / 16 ft. = 5000 units to install and remove = 5000 aew days x 8 hours/day = 40,000 crew hours 11 hauling assume 20 tons/load, 82,440 tons steel +64,000 tons timber (50 pcf) = 73221oads 12 equipment rental rates current FHWA North Carolina Blue Book retes manpower transport 13 assume average headcount of 50 for 5 years, average hourly rate of $25, 1 hour/day, 250 days/year = 1250 hours erage headcount of 50 for 3.5 years, average hourly rate of 525, 1 hour/da , 250 da s/ ear = 875 hours 40 of 64 D-243 NCDOT Bonner Bridge Parallel Bridge Item N2910 Removal of Existing Bridge quantity rate 6urden labor material equipment sub cost 1 uls demo by unit mst conaete demo labor 1 42,000 cy $ 87,50 $ 3,675,000 $ 3,675,000 concrete demo equipment 1 42,000 cy $ 87,50 $ 3,675,000 $ 3,675,000 $ 175.00 /cyguess aluminum demo labor 1 28,000 I.f. S 10.00 5 250,000 $ 280,000 aluminum demo equipment 1 28,000 I.f. 5 10.00 5 280,000 $ 280,000 5 20.00 /I.f. guess aluminumsalvage 1 Z80,000 Ib 5 (0.50) /Ibguess 5 (140,000) $ (140,000) misc dams, bearings labor 1 1 Is S 500,000.00 $ 500,000 $ 500,000 misc dams, bearings equip. 1 1 Is $ 500,000.00 $ 500,000 $ 500,000 $ 1,000,000.00 $ 8,770,000 labor material equipment subcontractor �osc 5 a,ass,000 $ �lao,000� 5 a,ass,000 5 mcai �on 5 g,no,000 is profit 15% 15% 15% 15% unitcost 5 8,770,000 Is overhead 30% 10% 10% 10% markup $ 2,192,500 Is 25.0% $ 1,113,750 $ (35,000) $ 1,113,750 $ - unitprice $ 10,962,500 Is total price S 10,962,500 notes: remove existing bridge 1 assume 2.S+miles in length, say 14,000 I.f., 32 ft. wide 2 asmme deck x-sec say 32 ft. wide, 9" thick, sidewalk 1 ft. x 1 ft., parapet is 1 k. x 3 k., haunches 5 sq. k. so 37 sq. k. X 14k / 27 = 19k cy deck 3 assume 4 beams, say 6 sq. k. x-section = 13k cy beams 4 assume substructure lOk cy 5 total 19k + 13k + lOk = 42k ry concrete to demolish & dispose 6 assume aluminum railing full length n.b. and s.b., 5 Ibs/Lf. tubing, plus 5 Ibs/Lf. brackets, mtal 101bs./Lf. erage headcount of 50 for 3.5 years, average hourly rate of $25, 1 hour/da , 250 da s/ ear= 875 hours 41 of 64 D-244 NCDOT Bonner Bridge Parallel Bridge Item #4190 -Precast Concrete Deck Segmei Description Ea. Quantity Units Sub Com onenl Aclivilies 20500 Casting Yard StaYf 1 LS 20500A Geom Conhal Staff I LS 20500A001 Cost of Land 1 LS 20500A003 Clear and Grub 1 LS 20500A005 Grade and L,evel 1 LS 20500A007 Stone Fill L LS 20500A009 Fencing 1 LS 20500�01 I Lights L LS 20500A015 Utility 1 LS 20500AOL7'I'railers 1 LS 20500A019 Expenses 1 LS 20500A021 Office Mach I LS 20500B01 Sct Up Rebar Jigs 1 LS 20500B02 Survey Platforms I LS 20500B03 Casting Machine Foundatio�s ] LS 20500B04 Cauopies 1 LS 20500B05 Gantry Crane Rail 1 LS 20500B06 Set-Up Casting Machines 1 LS 20500D Specialty Engi�eering I 1 LS 20500L Castin� Yard L'quip & Op's 1 LS 20500F Concrete Raw Material 38,918 M3 S 20500F Concrete Embeds 1 20500G03 Fom� Pier & end bent special 1 20500G05 Fonn typical seg's 1 20500H Pour Segments 1 205001 Clean & Rub Segments 1 20500K Store Segments 1 20500L DismanYle Casfing Yard 1 �- ORIGINAL FEG COST REPORT as baseline COST Burden COST Material Equipment Cost $ 1,690,495 $ 1,690,495 $ 831,532 $ 831,532 $ 1,000,000 $ 1,OOQ000 $ 37,875 $ 37,875 $ 163,872 $ 163,872 $ 537,584 $ 537,584 $ 89,763 $ A9,763 $ 63,125 $ 63,125 $ 26,750 $ 26,750 $ 96,525 $ 96,525 $ 141,775 $ 141,775 $ 53,500 $ 53,500 $ 9Q552 $ 90,552 $ 17,935 $ 17,935 $ 217,679 $ 217,679 $ 53,545 $ 53,545 $ 535,045 $ 535,045 $ I60,180 $ 16Q1R0 $ 1,000,000 $ 1,000,000 $ 3,912,416 $ 3,912,416 ]90.00 � 7,394,458.00 $ 7,394,45R $ J,212,013 $ 1,2I2,013 $ A25,739 $ 425,739 $ 4,95Q444 $ 4,950,444 $ 1,206,379 $ 1,206,379 $ 945,781 $ 945,781 $ 66,918 $ 66,918 $ 150,302 $ 150,302 R - $ Subtotals $ 18,465,711 $ 7,394,458 $ 1,212,013 $ 27,072,182 Profit I S % Notes: Overhead 12% 1 HCSS Cost Report Cor paralleL aligmnenY ltem 4190 has several componenC activities Markup $ 7,341,976 2 This spreadsheet confi�ms [hese items total up to die D[RECT COST Grand Total $ 34,414,158 This spreadsheet caLculates the blended overhead % from the B[D TOTALS BID ITEM $ 34,416,920 42 of 64 D-245 NCDOT Bonner Bridge Parallel Bridge Item #4790 -Precast Concrete Deck Seg� Description Ea. Quantity Units Delele Castr��g Yard Se/u Cas[ 20500 Casting Yard Staff 1 LS 20500A Geom Conhal Staff I LS ?-(}?f3E}RH�3�1--C' �.-�.�����' am# 1 LS _ _ 1 LS ,�������,:�_.., .._,t....,,, 1 LS . .�� 1 LS _—�„-«,o � -.--aaa..:g 1 LS _ 1 LS �� 1 LS ��R� 1 LS ?^�^��s�, 1 LS _ . 1 LS . °°'- 1 LS .. - 1 LS n.��.�..�r� ..,i..� 1 LS ?9�BN�84�arie�ies 1 LS 1 LS � 1 LS 20500D Specialry Engineering � 1 LS 20500E Casting Yard Equip & Op's Q� LS 20500F Concrete Embeds 20500G03 Fom� Pier & end bent special 20500G05 Fonn typical seg's 20500H Pour Segments 205001 Clean & Rub Segments 20500K Store Segments subtotal labor/incide��tals escalation 1 1 1 1 1 1 1 ; - MODIFI�D COST BASED �STIMATE COST Burden COST Material $ 1,69Q495 $ 831,532 � - $ - $ - $ - $ - $ - $ - $ - � - $ - $ - $ - $ - $ - $ - $ - $ 1,000,000 $ 3,912,416 $ A25,739 $ 4,95Q444 $ 1,206,379 $ 945,781 $ 66,918 $ - S 14,285,510 S 2,857,101.93 Materia! Cast - Concrete 20500F Concrete 2aw Materia] 38,918 M3 $ 190.00 S 7,394,458.00 material escalation 8.3 % $ 613,740.01 Subtotals $ I5,029,704 � 25,150,810 Notes: 1 deLete casting yard component activities - These i[ems are now included in Itcm 4250 Segmenfal Cas[ing Equipmen[ 2 20500E Casting Yard Equip & Operalions is shared with other projccts at producer 3 take half of these items. And attribute to this project. 4 Profit Margin Increased by 10%: accounts for Prime Contractor Profit on top of Precaster Profit 5 Raw Material Concrete escalated 83% Nov 2006 to March 2012 Bereau Labor Statistics PPI for Ready Mix Concrete 6 Labor/ Incidentals escalated 20% ENR-PPI D-246 ment $ J,212,013 Cost $ 1,690,495 $ 831,532 9� - $ - R - $ - $ - $ - R - $ - $ - $ R - $ R - $ - $ - $ - $ 1,000,000 X I.I�C,.208 $ 1,2I2,013 $ 425,739 $ 4,950,444 $ 1,206,379 $ 945,781 $ 66,918 $ - $ 2,857,102 $ 7,394,458 $ 613,740 $ 1,212,013 $ 25,I50,810 Profit __ �� Overhead 12% Markup $ 9,335,981 Grand Total $ 34,456,790 RATE $ 8S6 $/M3 43 of 64 NCDOT Bonner Bridge Parallel Brid e Cost Worksheet for: Item #419] - Frect PC dk se s Descri tion Quantity Units Rate Rurden I,abor Materinl F, ui ment Cust DIRECT COST from FEG COST REPORT $ 14,974,92C BID li'EM = 4191 Crane Prices deduci Ac[ivity 21100K - Grect Picr Se�nents Manitowoc4100Gane -6100 HRS $ 126.ft6 $ (811,904) Activi 21 J OOL - Ereci Bal Cani Se s Manitowoc4100Crane -4406 ❑RS $ 126.R6 $ (558,945) Se�men� Trans �ort h>> Trt�ek - deduct Delete toadin � and truckine Activiry?1700F] 7 Ga. $ (2,3IR,204A0) $ (2,318,204) lnjlate remainder (a, 10� ENR CC/ Suhtotals 0 0 0$ 11,2R5,873 Inflateremainder a120% ENRCCI 20% Markup $ 2257,175 Subtotal $ 13,�43,047 1072 Crnne Prices - odd Ac[ivi[V 21 100K - Hrect Pier Seemcnts Manitowoc 4100 Gane 6400 HRS $ 291.80 $ 1,867.520 Ac[ivi 21100L - 8rect Bal Can[ Se s Manitowoc 4100 C�2ne 4406 HRS $ 291.80 $ 1,285,671 20/1 Se men� Trans �ort by Bar�Qe - odd add bar e se meni trans ort 87 Tri $ 50,000.00 $ 4,3�0,000 Subtotals $ 5 $ $ 21.046238 Profit IS% Overhead 10 % Markup $ 5261,�60 Grand To[al $ 26,307,795 Unit=M3 38,9I8.2 M3 UNIT $ 676 $IM3 Notes: 1 Barge tri rates from Baysho2 concrete 2 Bar c can hold I800 Tons of se2ments or I50 fee[ max 3 Presume I( se � ment� er barge 75 tu�is each segmene 4 $6Q000 er tow in Bluc Wa[er (inclodii� � Ove�fiead) 5 $SO,OOO.ertowinlntrrcosealWateiway(includin Ove�i�ead) 6 sue $SQ000 averaQe er tow (without Overhead) 7 Total se ments= 1419 inte al (25)= 1394 8 Cranc Rates revised for Blue Book Values 9 assumes blue book rute is com. arvble to DIRI3CT COST rate 10 Acbvi[ies Refere��ce FEG COS'I REPOR'I 44 of 64 D-247 SO No.: Bonner Bridge Estimate Subject : Task 2, Item � Addendum to Task 1 Estimate Parallel Bridge Segment Breakdown Computed By. GDS Date: 5/2/2012 Checked by: Date: Substructure; Precast Piers ref: PB plan sheets: Pier # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 CAP # pcs• 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Stem # pcs• 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 3 4 5 5 5 CONC m^3 17.4 22.3 24.9 25.1 25.5 25.1 25.1 25.1 25.2 25.1 25.1 25.1 25.5 25.1 25.1 24.1 24.9 24.9 26.4 31.6 25.6 17.2 28.8 45.7 65.7 94.2 91.2 103.1 � �: CHECK QTY and TOTAL SEGMENT NUMBER FOR CASTING CELL NEEDS 37, 177-207 45 of 64 SO No.: Bonner Bridge Estimate Subject : Task 2, Item G Addendum to Task 1 Estimate Parallel Bridge Segment Breakdown Computed By. GDS Date: 5/2/2012 Checked by: Date: Pier # 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 CAP # pcs• 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 53 Hollow # pcs• 5 5 6 5 5 5 5 6 5 5 5 5 6 5 5 5 5 5 3 2 2 2 2 1 1 152 SEGMENTS CAST Plan Quantity 3088.4 m^3 FEG Estimate Qty 3181.3 m^3 total m^3 101.3 99.3 114.2 99.3 101.3 99.3 114.2 99.3 101.3 101.3 99.3 114.2 99.3 101.3 103 90.5 92.9 62.2 37.3 42.3 52 39.5 26.8 16.7 16.7 2994.9 m^3 D-249 46 of 64 SO No.: Bonner Bridge Estimate Subject : Task 2, Item G Addendum to Task 1 Estimate Parallel Bridge Segment Breakdown Computed By. GDS Date: 5/2/2012 Checked by: Date: Substructure; Precast Piers CHECK PICK WEIGHT FOR CRANES SIZED ref: PB plan sheets: 37, 177-207 tvpical P/C/ column sesment (max height segment) Area Volume tVpical P/C/ column cap Area # pcs. height height m^3 Hollow mm ft 1 3950 13.0 23.5 2.4 x 5.8 = 1.6 x 5.0 = 5.9 m^2 SOLID 1150 2.4 x 0 x x 4.0 = m 3.8 16.1 5.8 = 0.0 = 14.0 m^2 x 1.2 = m CASTING CELL NEEDS 205 total segments (substructure piers) 53 caps 152 hollow typical are full depth have a variable and a fulldepth and a cap form use =_> 3 casting forms for substructure D-250 16.1 m^3 pick CY weight Ton 30.7 62.2 14.0 m^2 8.0 m^2 5.9 23.5 m^3 21.1 42.6 Ton 14.0 m"2 0.0 m^2 14.0 m"2 pick weight 21.0 42.6 CY Ton 47 of 64 SO No.: Bonner Bridge Estimate Subject : Task 2, Item G Addendum to Task 1 Estimate Parallel Bridge Segment Breakdown Computed By. GDS Date: 5/2/2012 Checked by: Date: Superstructure; Precast Deck Se�ments CHECK PICK WEIGHT FOR CRANES SIZED typical superstructure se�ment typical bent (pier) superstructure segment expansion bent (pier) superstructure se�ment Max variable depth superstructure se�ment Inte�ral bent superstructure segment m^3 CY 27.7 36.2 pick weight 73.4 Ton pick m^3 CY weight 31.6 41.3 83.7 Ton m^3 CY 26.0 34.0 m^3 CY 28.3 37.0 m^3 35.2 D-251 CY 46.0 pick weight 68.9 Ton pick weight 75.0 Ton pick weight 93.2 Ton �: � •� SO No.: Bonner Bridae Estimate Subject : Task 2, Item G Addendum to Task 1 Estimate Parallel Bridge Segment Breakdown Computed By. GDS Date: 5/2/2012 Checked by: Date: Parallel Bridge Item #4191 # 3.6m 1.8/2.4 EJ # 2.4 deep total # Description Units Span Len. M Len. M segments segments segments segments 1 1 37 9 1 0 10 2 61 16 1 0 17 3 61 16 1 0 17 4 61 16 1 0 17 5 37 9 2 0 11 Unit 1 totals 257 2 6 37 9 1 0 10 7 61 16 1 0 17 8 61 16 1 0 17 9 61 16 1 0 17 10 61 16 1 0 17 ll 61 16 1 0 17 12 61 16 1 0 17 13 37 9 2 0 11 Unit 2 totals 440 3 14 37 9 1 0 l0 15 61 16 1 0 17 16 61 16 1 0 17 17 61 16 1 0 17 18 61 16 1 0 17 19 61 16 1 0 17 20 61 16 1 0 17 21 37 9 2 0 11 Unit 3 totals 440 4 22 91 16 3 ll 30 23 122 18 2 22 42 24 122 18 2 22 42 25 122 18 2 22 42 26 91 16 3 11 30 Unit 4 totals 548 5 27 91 16 3 11 30 28 122 18 2 22 42 29 122 18 2 22 42 30 122 18 2 22 42 31 91 16 3 ll 30 Unit 5 totals 548 6 32 91 16 3 11 30 33 122 18 2 22 42 34 122 18 2 22 42 35 122 18 2 22 42 36 91 16 3 11 30 Unit 6 totals 548 49 of 64 D-252 SO No.: Bonner Bridge Estimate Subject : Task 2, Item G Addendum to Task 1 Estimate Parallel Bridge Segment Breakdown Computed By. GDS Date: 5/2/2012 Checked by: Date: 7 37 91 16 3 11 30 38 122 18 2 22 42 39 122 18 2 22 42 40 122 18 2 22 42 41 91 16 3 ll 30 Unit 7 totals 548 8 42 91 16 3 11 30 43 122 18 2 22 42 44 122 18 2 22 42 45 122 18 2 22 42 46 91 16 3 11 30 Unit 8 totals 548 9 47 91 16 3 11 30 48 122 18 2 22 42 49 91 16 3 ll 30 Unit 9 totals 304 10 50 37 9 1 0 10 51 61 16 1 0 17 52 61 16 1 0 17 53 50 13 1 0 14 54 35 8 3 0 11 Unit 10 totals 244 total bridge length 4425 836 99 484 1419 meters segments segments segments total # segments 50 of 64 D-253 SO No.: Bonner Bridge Estimate Subject : Task 2, Item G Addendum to Task 1 Estimate Parallel Bridge Segment Breakdown Computed By. GDS Date: 5/2/2012 Checked by: Date: CASTING YARD EQUIPMENT 1 assume 2 pier segment cell 2 assume 2 Expansion joint segment ccll 3 assume 3 shallow typical segment cell 4 assume 3 deep typical s�gment cell 5 6 7 8 9 10 11 12 13 14 15 16 17 PRODUCTION RATES 1 pier segment per cell per week 1 expansion jt segment per cell per wcek 3 typica13.6m segment per cell per week 2 deviator 3.6m segment per cell per week 2 typica12.4m seginent per cell per week 2 deviator 2.4m se �ng lent per cell per week weeks of casting (full production) weeks of casting (add 30% for learning curve - ramp up) x 2 81 105 = 2 2 4.5 3 3 3 17.5 segments cast per wk 3.5 /day two years ERECTION RATES build one cantilvers at a time. two headings: need two Manitowok 4100 cranes plus a lighter duty crane for other support 18 days per month factoring bad weather and holidays erect 2.5 precast segments per heading per day total segments = 1419 segments 18days x 2 headings x 2.5 segments per heading = 90 segmets per month 1419 segments / 90 segmets per month 15 months 15% increaseforlearning curve 18 months erection time using two cranes. FEG estimate of 6400 hrs is confirmed. D-254 51 of 64 d N � � Bonner Bridge - Cost Estimate Evaluation CONCEPTUAL CONSTRUCTION SCHEDULE - PARALLEL BRIDGE - SEGMENTAL ITEMS cn N 0 � rn � Notes: 1. Assumed Contract Duration = 5 years from April 2012 similar to reference project B-2500 Item C Bid Summary Letting Date JULY 19, 2011 FINAL COMPLETION NOV 16 2016 2. Durations indicate approximate available time and sequcnce 3. acceleration possible by doubling crews & equipment for most operations 4. Only items for Segmental Bridge Elements critical path included �� '.Ja� 300 250 <o � rn T 200 3 � O O V! C O � d R 150 m 0 U U'i W O �-n � � 100 50 Jai COn$truCt��n �tem Chal ` °Ready Mixed Concrete -Hot-Rolled Bars, Plates, & Structural Shapes � Fabricated Steel Plate uace d � N CS� V cn �P O � rn � Chanqes in PPIs for Specific Construction Inputs http://www.bls.qov/ppi/home.htm Notes: (1) PPI index values provided for each month in years 1998-2008, when provided by BLS (2) All indexes subject to revision four months after original publication. (3) Values are not seasonally adjusted WPU1333 -- Ready Mixed Concrete 9. � .- �- .- 136.1 136,5 136.7 139.4 139.8 140.6 141.2 141•1 141•1 141 141.1 141.1 139.7 142.1 142.4 142.5 143.3 144.1 143.5 143.5 143.3 143.6 143.8 143.8 143.3 143.2 1.56% 145.4 145.1 145.7 147 146.8 147.6 147.3 147.5 148.8 148.5 148 148.1 147.1 3.35% 147.6 149.6 149.5 150.2 151 148.7 150.4 150.6 151.4 151.4 151.6 151.8 150.3 2.50% 152.1 149.9 149.9 150.5 150.4 150.1 149.9 149.8 150.3 149.8 149.5 150.1 150.2 -1.12% 150.2 150.1 150.6 150.7 150.7 150.6 150.4 150.9 150.5 150.8 151.9 151.8 150.8 1.13% 153.8 155.9 155 155.2 155.6 156.6 157.1 159 162.3 163.6 164.7 165 158.7 8.70% 170.7 172.3 173.6 174.5 175 175.3 179.2 180 181.7 181.9 183.9 183.7 177.7 11.33% 193.4 195.9 195.9 197.2 197.5 197.9 200.1 200.3 200.6 200.9 201.8 202.2 198.6 10.07% 206.2 206.7 207.6 207.3 206.7 206.7 207.3 207.3 207.5 206.7 208 208.4 207.2 3.07% 210 209.9 210.2 210.7 211.5 212.2 212 211.7 213.7 215.5 216.5 217.1 212.6 4.17% 222.2 222.1 220.2 218.6 218.1 218.3 218.1 216.5 216.2 214.5 214.1 214.8 217.8 -1.06% 214.6 214.2 214.4 212.7 212.2 212.3 212.4 211.4 211.1 211.2 212.1 212.2 212.6 -1.21% 212.3 211.4 211.4 210.3 210.6 210.9 211 210.6 211 211 212.6 213.5 211.3 0.61% � >_?5 11-.� Z15.1 For Concrete raw material Supply, us an esc�lation of 215.1/ 198.G = 1.083 =+8.3% Page-1 Common Labor Index History � ENR: Engineering News Record � McGraw-Hill Construc... Page 1 of 2 ;� subscribe contact us advertise _, industry jobs even[s FAQ YVcicon c i' liu:aci 3ak.e�� Jr. � Your Account j iogout ^�`�' M�cGraw Hill - COHSIRIICIIOH E � �'�� � SUBSCRIBE TODAY & receive immediate web access Engine�ering hl�wrs-Record Search our site: I INFRASTRUCTURE BLDGS BIZ MGMT POLICY EQUIPMENT PEOPLE MULTIMEDIA OPINION TECH EDUCATION ECONOMICS TOP LISTS REGIONS CURRENT LO5T5 MATEftIAL TRENDS HISTORIGAL INDIGES QUAftTERLV COST REPORT$ ECONOMIG STIMULUS FAQ share: more » print email ,-� comment Common Labor Index History - as of May 20�2 view au Nistorica� �ndices » Text size: A l4 ENR'S COMMON LABOR INDEX (1990-2012) YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2012 19472 19537 19686 19686 19686 2011 19079 19134 19162 19166 19166 19209 19256 19256 19424 19400 19466 19466 2010 18502 1S53S 1S53S 18538 18698 18744 18891 18892 18836 19038 19103 17193 2009 18016 15016 18016 18016 18162 18201 18201 18217 18296 18335 18335 15467 2008 17084 17097 17097 17097 17128 17137 17231 17399 17779 17976 17976 17976 2007 16521 16521 16521 16534 16694 16694 16�01 16831 16946 16946 17084 17084 2006 15943 16018 16045 16045 16045 16045 16065 16065 16173 16489 16515 16521 2005 15284 15290 15290 15306 15408 15447 15474 15658 15829 15831 15921 15921 2004 14684 14702 14516 14845 14845 14884 14900 15038 15239 15247 15247 15284 2003 14075 14241 14241 14264 14264 14417 14432 14493 14518 14551 14566 14566 2002 13669 13669 13745 13727 13772 13812 14003 14003 14003 14003 14021 14021 2001 13066 13066 13073 13109 13113 13168 13282 13300 13397 13411 13461 13461 2000 12547 12552 12657 12687 12746 12795 12795 12827 12827 12941 12979 13063 1999 12243 12243 12243 12288 12288 12373 12426 12426 12489 12509 12516 12547 1998 11835 11859 11909 11909 11909 11960 12043 12058 12117 12201 12230 12233 1997 11572 11551 11582 11582 11670 11682 11727 11753 11766 11�88 11530 11835 1996 11316 11332 11332 11341 113�8 11420 11456 11509 11539 11563 11568 11572 1995 11010 11024 11024 11033 11052 11052 11177 11238 11243 11292 11294 11316 1994 10719 10719 10719 10763 10777 10833 10868 10921 10967 10981 11002 11002 1993 10395 10395 10425 10425 10425 10430 10541 10546 10655 10666 10675 10719 1992 10071 10071 10125 10159 10171 10171 10236 10354 10385 10385 10395 10395 1991 9796 9793 9794 9796 9884 9921 9987 10013 10039 10057 10071 10071 1990 9543 9543 9553 9553 9568 9608 9615 9684 9745 9745 9796 9796 SOUP.CE FOR THE DATA HERE � inflation November 200G to May 201 Z 19G8G / i G515 = 19.2% D-258 � `. ��. . . : I I `_' � _, ._, _ ._' T �°�.,�`i_;I.f ,"_,,:;'�._'C�'_��_?I� �,_l�'��_�... � ....s.t ..�,..,wr�. �k. EIV�.COI� � PbHAM� �HAHNELS GLQBbI TAlENT �i.,.�v ;� - �°*� � � �, i� ^ �� �I..-�~` � �IL � • This week's content • A�chive • Subscribe to ENR • Order back issues • Manaae Subscriotion Most Viewed on ENR.com • The Top Ten Biggest Wastewater Treatment Plants • ENR Showcases Great Shots: The Winners of the 2011 Photo Contest • HDR Readies For Battle in Tampa Bay Water Dispute Most Commented On enr.com • Since Owners are Demanding Designers Carry Higher Insurance Limits, Is a'Split-LimiY Approach Best? • Texas Rated Most Improved For Sub-Friendly Policies Video � 55 of 64 http://enr.construction.com/economics/historical_indices/Common_Labor_Index_History.asp 5/3/2012 Skilled Labor Index History � ENR: Engineering News Record � McGraw-Hill Construction Page 1 of 2 ;� subscribe contact us advertise _, industry jobs even[s FAQ YVcicon c i' liu:aci 3ak.e�� Jr. � Your Account j iogout ^�`�' M�cGraw Hill - COHSIRIICIIOH E � �'�� � SUBSCRIBE TODAY & receive immediate web access Engine�ering hl�wrs-Record Search our site: I INFRASTRUCTURE BLDGS BIZ MGMT POLICY EQUIPMENT PEOPLE MULTIMEDIA OPINION TECH EDUCATION ECONOMICS TOP LISTS REGIONS CURRENT LO5T5 MATERIAL TRENDS HISTORICAL INDICES QUAftTERLV GOST REPORTS ECONOMIG STIMULUS FAQ share: more » print email l,.-i comment Skilled Labor Index History - as or May 20�2 View all Historical Indices � Text size: A l�1 ENR'S SKILLED LABOR INDEX (1990-2012) YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2012 8809 8820 8848 8848 8848 2011 8644 8644 8644 8652 8652 8711 8725 8745 8763 8773 8793 8800 2010 8356 8391 8391 8391 8437 8449 8494 8499 8517 8593 8634 8645 2009 8112 8112 8112 8112 8171 8191 8200 8240 8251 8255 8255 8356 2008 7796 7796 7796 7803 7818 7815 7846 7861 7975 8103 8105 8107 2007 �459 7459 7464 7466 75�9 7579 7590 �644 7701 7718 7793 7796 2006 7201 7207 7209 7213 7213 7213 7218 7224 7266 7416 7450 7459 2005 6912 6926 6926 6926 6972 6981 6997 7065 7157 7164 7199 7199 2004 6644 6660 6672 6672 6672 6698 6717 6728 6838 6874 6878 6912 2003 6366 6393 6411 6421 6426 6487 6515 6553 6569 6596 6604 6616 2002 6097 6097 6109 6109 6148 6166 6242 6264 6291 6306 6333 6338 2001 5874 5874 5874 5892 5906 5948 5978 5984 6052 6065 6065 6067 2000 5641 5650 5676 5676 5714 5735 5750 5764 5770 5812 5817 5873 1999 5474 5474 5474 5489 5495 5521 5548 5545 5589 5596 5605 5635 1998 5294 5314 5317 5317 5317 5345 5369 5387 5416 5463 5471 5473 1997 5177 5177 5179 5152 5203 5203 5231 5263 5267 5280 5285 5294 1996 5016 5020 5020 5028 5039 5060 5075 5123 5133 5160 5164 5177 1995 4881 4892 4894 4903 4909 4909 4945 4967 4982 4998 5017 5016 1994 4766 4764 4764 4776 4782 4806 4816 4835 4865 4878 4578 4880 1993 4653 4653 4665 4665 4665 4662 4720 4720 4749 4757 4762 4766 1992 4539 4529 4536 4542 4553 4555 4593 4627 4639 4642 4551 4653 1991 4389 4387 4387 4390 4421 4440 4475 4493 4504 4520 4539 4539 1990 4242 4242 4248 4250 4267 4308 4310 4332 4372 4374 4387 4389 SOIJP.CE FOR THE DATA HERE inflation November ZOOG to May 201 Z 8848 / 7450 = 18.7% D-259 EN�.COI`� � PbHAM� �HAHNELS • This week's content �L�B�I T��E� � • A�chive <.�' • Subscribe to ENR j..,.�v � R�* : - �� .^�� �, � , i � �3 • Order back issues i -,I.:: .�� I. . . • Manaae Subscriotion ����•� Most Viewed on ENR.com • The Top Ten Biggest Wastewater Treatment Plants • ENR Showcases Great Shots: The Winners of the 2011 Photo Contest • HDR Readies For Battle in Tampa Bay Water Dispute Most Commented On enr.com • Since Owners are Demanding Designers Carry Higher Insurance Limits, Is a'Split-LimiY Approach Best? • Texas Rated Most Improved For Sub-Friendly Policies Video � 56 of 64 http://enr.construction.com/economics/historical_indices/Skilled Labor_Index_History.asp 5/3/2012 � Print Date Wed 18 April 2012 Cn v 0 � rn � Time 09:31:10 Labor OBNC: Outer Banks NC Labor Library 2012-04-06 New Report Title Page Outer Banks North Carolina Labor Library. Labor rates based on Wage Determination NC120065 - 01/06/2012 NC65, obtained from www.wdol.gov/wdol/scafiles/davisbacon/NC65.dvb This report is not copyrighted, but the information contained herein is For Official Use Only. Currency in US dollars Print Date Wed 18 April 2012 Description 2012 Labor Listing Building Workers Asbestos Worker Asbestos Workers LaborCost1 Bricklayers / Masons Bricklayers LaborCost1 Bricklayers, (Semi-Skilled) LaborCost1 Tile Mozaic/Terrazzo Workers d LaborCost1 N � Tile Layers, (Floor) LaborCost1 Tile Layers, (Semi-Skilled) LaborCost1 Carpenters Carpenters LaborCost1 Pile Drivers LaborCost1 Cement Finishers / Plasters / Lathers Cn � Cement Finishers 0 � LaborCost1 � �P Lathers LaborCost1 Time 09:31:10 Labor OBNC: Outer Banks NC Labor Library 2012-04-06 New Report 2009 Labor Listing Page 1 LaborRate JBaseWage Travel TaxableFringe NonTaxFringe Subsistence 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 27.13 0.00 13.13 1.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 19.38 0.00 8.73 1.00 0.00 LaborCost1 19.38 0.00 8.73 1.00 0.00 LaborCost1 19.38 0.00 8.73 1.00 0.00 LaborCost1 19.38 0.00 8.73 1.00 0.00 LaborCost1 19.38 0.00 8.73 1.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 15.66 0.00 1.37 1.00 0.00 LaborCost1 24.95 0.00 9.75 1.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 14.02 0.00 0.00 1.00 0.00 LaborCost1 18.13 0.00 1.31 1.00 0.00 Currency in US dollars Print Date Wed 18 April 2012 Description Plasters, (Semi-Skilled) LaborCost1 Plasters LaborCost1 Electricians Electricians LaborCost1 Operating Engineers Equip. Operators, Crane/Shovel LaborCost1 � Equip. Operators, Light N LaborCost1 � N Equip. Operators, Medium LaborCost1 Equip. Operators, Oilers LaborCost1 Outside Workers Outside Equip. Operators, Light LaborCost1 Glazers / Painters / Paperhangers Glaziers � LaborCost1 � o Painters, Ordinary � LaborCost1 Laborers Time 09:31:10 Labor OBNC: Outer Banks NC Labor Library 2012-04-06 New Report 2009 Labor Listing Page 2 LaborRate JBaseWage Travel TaxableFringe NonTaxFringe Subsistence LaborCost1 18.13 0.00 1.31 1.00 0.00 LaborCost1 18.13 0.00 1.31 1.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 17.10 0.00 1.47 1.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 19.25 0.00 2.37 1.00 0.00 LaborCost1 14.71 0.00 2.33 1.00 0.00 LaborCost1 19.25 0.00 2.37 1.00 0.00 LaborCost1 14.71 0.00 2.33 1.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 14.71 0.00 2.33 1.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 14.36 0.00 1.97 1.00 0.00 LaborCost1 14.36 0.00 1.97 1.00 0.00 0.00 0.00 0.00 0.00 0.00 Currency in US dollars Print Date Wed 18 April 2012 Description Laborers, (Semi-Skilled) LaborCost1 Skilled Workers LaborCost1 Pipefitters / Plumbers Plumbers LaborCost1 Sprinkler Installers LaborCost1 Steam/Pipefitters LaborCost1 � Iron Workers N W Rodmen, (Reinforcing) LaborCost1 Structural Steel Workers LaborCost1 Welders, Structural Steel LaborCost1 Roofers Roofers, Composition LaborCost1 Roofers, (Semi-Skilled) oLaborCost1 � Sheet Metal Workers � Sheet Metal Workers Sheet Metal Workers Time 09:31:10 Labor OBNC: Outer Banks NC Labor Library 2012-04-06 New Report 2009 Labor Listing Page 3 LaborRate JBaseWage Travel TaxableFringe NonTaxFringe Subsistence LaborCost1 10.29 0.00 1.82 1.00 0.00 LaborCost1 10.57 0.00 0.67 1.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 17.34 0.00 2.09 1.00 0.00 LaborCost1 17.34 0.00 2.09 1.00 0.00 LaborCost1 23.90 0.00 9.25 1.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 18.75 0.00 5.62 1.00 0.00 LaborCost1 18.75 0.00 5.62 1.00 0.00 LaborCost1 18.75 0.00 5.62 1.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 13.55 0.00 0.80 1.00 0.00 LaborCost1 13.55 0.00 0.80 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Currency in US dollars Print Date Wed 18 April 2012 Description LaborCost1 Teamsters Truck Drivers, Heavy LaborCost1 Truck Drivers, Light LaborCost1 Elevator Elevator Constructors LaborCost1 Field Office Workers Field Office Management Personnel � Personnel Clerks N LaborCost1 ,�p Field Engineering Personnel Engineers, Project LaborCost1 Engineers, Quality Control LaborCost1 Schedulers LaborCost1 Field Safety, Security, and Fire Personnel Safety Engineers LaborCost1 � �-' Engineers O � � Environmental Engineer LaborCost1 Time 09:31:10 Labor OBNC: Outer Banks NC Labor Library 2012-04-06 New Report 2009 Labor Listing Page 4 LaborRate JBaseWage Travel TaxableFringe NonTaxFringe Subsistence LaborCost1 13.09 0.00 1.28 1.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 12.50 0.00 1.21 1.00 0.00 LaborCost1 12.50 0.00 1.21 1.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 42.09 0.00 20.35 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 13.21 0.00 2.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 24.62 0.00 2.87 0.00 0.00 LaborCost1 19.95 0.00 2.87 0.00 0.00 LaborCost1 24.62 0.00 2.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 19.95 0.00 2.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 100.00 0.00 0.00 0.00 0.00 Currency in US dollars Print Date Wed 18 April 2012 Description Regested Proffessional engineer LaborCost1 Outside (General) Workers Carpenters Outside Carpenters LaborCost1 Electricians Outside Electricians LaborCost1 Operating Engineers Outside Equip. Operators, Heavy (Group1) LaborCost1 � Outside Equip. Operators, Medium �i LaborCost1 Outside Equip. Oilers LaborCost1 Laborers Outside Laborers, (Semi-Skilled) LaborCost1 Iron Workers Outside Steel Workers LaborCost1 Teamsters � N Outside Truck Drivers, Heavy 0 � LaborCost1 � �P Time 09:31:10 Labor OBNC: Outer Banks NC Labor Library 2012-04-06 New Report 2009 Labor Listing Page 5 LaborRate JBaseWage Travel TaxableFringe NonTaxFringe Subsistence LaborCost1 200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 14.21 0.00 0.41 1.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 17.10 0.00 1.47 1.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 19.25 0.00 2.37 0.00 0.00 LaborCost1 14.71 0.00 2.33 1.00 0.00 LaborCost1 14.71 0.00 2.33 1.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 10.57 0.00 0.67 1.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 18.75 0.00 5.62 1.00 0.00 0.00 0.00 0.00 0.00 0.00 LaborCost1 12.50 0.00 1.21 1.00 0.00 Currency in US dollars USACE - Civil Works Construction Cost Index - 3/31/2012 CWBS - FEATURE CODES 02 RELOCATIONS 03 RESERVOIRS 04 DAMS OS LOCKS 06 FISH & WILDLIFE FACILITIES 07 POWER PLANT 08 ROADS, RAILROADS & BRIDGES 09 CHANNELS & CANALS 10 BREAKWATER & SEAWALLS 11 LEVEES & FLOODWALLS 12 NAVIGATION PORTS & HARBORS 13 PUMPING PLANT 14 RECREATION FACILITIES 15 FLOODWAY CONTROL & DIVERSION STRUCTURE 16 BANK STABILIZATION 17 BEACH REPLENISHMENT 18 CULTURAL RESOURCE PRESERVATION 19 BUILDINGS, GROUNDS & UTILITIES 20 PERMANENTOPERATINGEQUIPMENT COMPOSITE INDEX (WEIGHTED AVERAGE) CWBS - FEATURE CODES 02 RELOCATIONS 03 RESERVOIRS 04 DAMS OS LOCKS 06 FISH & WILDLIFE FACILITIES 07 POWER PLANT 08 ROADS, RAILROADS & BRIDGES 09 CHANNELS & CANALS 10 BREAKWATER & SEAWALLS 11 LEVEES & FLOODWALLS 12 NAVIGATION PORTS & HARBORS 13 PUMPING PLANT 14 RECREATION FACILITIES 15 FLOODWAY CONTROL & DIVERSION STRUCTURE 16 BANK STABILIZATION 17 BEACH REPLENISHMENT 18 CULTURAL RESOURCE PRESERVATION 19 BUILDINGS, GROUNDS & UTILITIES 20 PERMANENTOPERATINGEQUIPMENT COMPOSITE INDEX (WEIGHTED AVERAGE) Table A-1 Quarterly Cost Indexes by CWBS Feature Code Base Year 1967 = 100 1Q12 2011 Wt % (Oct-Dec) 5% 769.73 5% 828.67 15% 760.74 2% 763.19 5% 748.15 10% 713.92 10% 769.73 3% 780 5% 765.04 5% 787.06 10% 818.34 5% 771.65 5% 771.65 2% 748.15 2% 772.74 2% 795.95 2% 771.65 5% 771.65 2% 771.65 100% 770.86 2Q12 2012 (J a n-M a r) 773.39 832.61 764.35 766.82 751.7 717.31 783.71 768.67 790.8 822.23 775.32 775.32 751.7 776.41 799.73 775.32 775.32 775.32 774.52 3Q12 2012 (Apr-Jun) 777.04 836.54 767.97 770.44 755.26 720.71 777.04 787.41 772.31 794.54 826.11 778.98 778.98 755.26 780.08 803.51 778.98 778.98 778.98 778.18 4Q12 2012 (Jul-Sep) 780.' 780. 783. 807. 1Q13 2012 (Oct-Dec) 784.02 844.05 774.86 777.36 762.04 727.17 784.02 794.48 779.24 801.67 833.53 785.97 785.97 762.04 787.08 810.72 785.97 785.97 785.97 785.16 Table A-1 Quarterly Cost Indexes by CWBS Feature Code Base Year 1967 = 100 1Q14 2013 Wt % (Oct-Dec) 5% 79637 5% 857.34 15% 787.06 2% 789.6 5% 774.04 10% 738.63 10% 79637 3 % 806.99 5% 791.51 5% 814.29 10% 846.66 5% 798.35 5% 798.35 2% 774.04 2% 799.48 2% 823.49 2% 79835 5% 798.35 2% 798.35 100% 797.53 2Q14 2014 (Jan-Mar) 799.57 860.79 790.23 792.78 777.15 741.6 810.24 794.7 817.57 850.06 801.56 801.56 777.15 802J 826.81 801.56 801.56 801.56 800.74 2Q13 2013 (Jan-Mar) 786.72 846.96 777.53 780.03 764.66 729.68 786.72 797.21 781.92 804.43 836.4 788.68 788.68 764.66 789.79 813.52 788.68 788.68 788.68 787.87 3Q13 2013 (Apr-Jun) 790.07 850.57 780.84 783.36 767.92 732.79 790.07 800.61 785.25 807.86 839.96 792.04 792.04 767.92 793.16 816.98 792.04 792.04 792.04 791.23 4Q13 2013 (Jul-Sep) 793.42 854.17 784.15 786.68 771.17 735.9 793.42 804.01 788.58 811.28 843.52 795.4 795.4 771.17 796.52 820.45 795.4 795.4 795.4 794.58 3Q14 4Q14 1Q15 2Q15 3Q15 4Q15 2014 2014 2014 2015 2015 2015 (Apr-Jun) (Jul-Sep) (Oct-Dec) (Jan-Mar) (Apr-Jun) (Jul-Sep) 802.77 805.98 810.09 813.76 817.43 821.1 864.24 867.69 872.12 876.07 880.02 883.97 793.4 796.57 800.63 804.25 807.88 811.51 795.95 799.13 803.21 806.84 810.48 814.12 780.27 �83.38 78738 790.94 794.51 798.08 744.57 747.54 751.36 754J6 758.16 761.57 802.77 805.98 810.09 813.76 817.43 821.1 813.49 816.73 820.9 824.62 828.33 832.05 797.88 801.07 805.15 808.8 812.45 816.1 820.85 824.13 828.33 832.08 835.83 839.59 853.47 856.88 861.25 865.15 869.05 872.95 804.78 807.99 812.11 815.79 819.47 823.15 804.78 807.99 812.11 815.79 819.47 823.15 780.27 783.38 787.38 790.94 794.51 798.08 805.91 809.13 813.26 816.94 820.62 82431 830.12 833.43 837.68 841.48 845.27 849.07 804.78 807.99 812.11 815.79 819.47 823.15 804.78 807.99 812.11 815.79 819.47 823.15 804.78 807.99 812.11 815.79 819.47 823.15 803.95 807.16 811.27 814.95 818.63 822.3 Escalation Factor, 21 months to mid-point of construction (3Q12 to 2Q14): 2.90% D-266 63 of 64 NCDOT PAMLICO SOUND BRIDGE ALTERNATIVE FOLLOW-UP TO COST ESTIMATE REVIEW Attachment 8 Item H— D avi s B ac on (NOT USED) June 15, 2012 64 of 64 D-267