HomeMy WebLinkAboutNC0026557_System Performance Annual Report - 2022_20230213I. General Information
Facility System Name:
Person in Charge:
Description of System:
Town of Bryson City
Annual Performance Report
Water Quality Regional Operations
Asheville Regional Office
Town of Bryson City
315 Riverview Drive
Swain County
Permit Wastewater Treatment: NCO026557
Collections Permit: WQCS00170
Wastewater Plant ORC-Environmental, Inc.
Collection System ORC-Travis McCall
Bryson City operates a 0.6 MGD wastewater treatment facility located at 315 Riverview Road southwest
of Bryson City in Swain County. The treatment components include: mechanical bar screen, two contact
stabilization treatment units consisting of influent pumping, reaeration zones, secondary clarifiers, sludge
digester, belt press, sludge dry storage, chlorination, and dechlorination. Discharge from the treatment
enters into the Tuckasegee River, a class B water within the Little Tennessee River Basin. The Town
operates a sanitary sewer system composed of gravity sewer lines, constructed of various materials,
including vitrified clay, PVC and ductile iron. Seven lift stations are presently operating within the
collection system.
II. Notice of Violations: Summary of System Performance from January 1, 2022-December 31,
2022
April 2022
Sanitary Sewer Overflow (SSO) on April 20, 2022 at Greenlee Street and Island Street Intersection. The
Town unclogged sewer service and replaced VCP in the service line with new PVC. Flushed the storm
basin with fresh water.
May 2022
The North Carolina Division of Water Resources conducted an inspection of the Bryson City Collection
System on May 3, 2022. The following violations were noted:
1) Sewer and FOG Ordinances -An enforceable FOG Ordinance that includes an enforceable
Grease Trap Program had not been created.
The Town's attorney is currently reviewing the new FOG Ordinance. After review, the board
will adopt the ordinance.
2) Reporting Requirements -Wastewater Performance Reports have not been submitted annually.
A report was completed and emailed to Lauren Armeni on 7/26/22 for Jan 2021-Dec 2021.
3) Inspections -The annual observation of the entire system has not been documented. High priority
line inspections have not been documented.
Appropriate paperwork sent by Lauren Armeni is being used for documentation.
4) Lines/Right-of-Ways/Aerial Lines -Gravity sewer line cleaning has not been documented.
Appropriate paperwork sent by Lauren Armeni is being used for documentation.
5) Pump Stations -Lift station logs do not include the minimum required information.
Appropriate paperwork sent by Lauren Armeni is being used for documentation.
May 2022
On May 6, 2022, there was a power outage at 1565 East Deep Creek causing a 3000-gallon spill at the
Water Treatment Sludge Tank.
The Town paid the assessed penalty of $1813.78.
On May 26, 2022, there was an overflow of 3700 gallon from the manhole located at 45 Everett Street.
On this date, the area experienced flooding. Duke Energy released water from the dam in Jackson County
which in turn created flooding in multiple low-lying areas. Manholes and cleanouts in the Darnell Farms
and Bear Hunter Campground area were under water causing sewer lines to surcharge and the manhole at
45 Everett Street to overflow.
Pumps were finally able to catch up with the system.
November 2022
On November 28, 2022, there was a 40 gallon Sanitary Sewer Overflow (SSO) at 65 Veterans Boulevard
due to grease entering the system from multiple restaurants.
The maintenance crew jetted the sewer line and cleaned up the debris.
December 2022
On December 1, 2022 there was a 55-gallon SSO at 1430 Jenkins Branch due to debris in the line.
Maintenance jetted the sewer line and cleared the blockage.
III. Work Performed
Date
Work Performed
1/7/22
Brought manhole 4375 up to grade
1/10/22
Cleaned sewer line
1/11/22
Cleared sewer line right of way
1/12/22
Began relaying undersized sewer main
1/13/22
Continued work on sewer line
Clean 125' from manhole 115-116
1/18/22
Worked on influent pump station
1/24/22
Finished sewer line upgrade
1/25/22
Inspected sewer main -curve to new
development -located with camera
1/26/22
Used large sewer camera to locate taps
1/27/22
Changed riser on manhole #337A
2/11/22
Put sewer pot on clean out
Ran push camera through tap
Ran camera up sewer line
Camera line looking for tap
Jet washed sewer line
2/14/22
Rebuilt sewer service
Location
Recycling Center
190 Carringer Street
Orchard Street
Orchard Street
Orchard Street
Bryson Branch Road
WWTP
Orchard Street
Black Hill
Bryson Walk
West Deep Creek
Carringer Street
Church Avenue
Bryson Walk
Bryson Ave & First Citizens
First Citizens Bank
Jetted and camera sewer line
Pine Avenue
Camera sewer line
Above Marianna Black Library
2/15/22
Repaired sewer line
Fryemont Street
2/23/22
Jetted sewer line
Pine Avenue
Worked on pump station
Governor's Island
2/28/22
Installed 4" sewer tap
Governor's Island
3/3/22
Exposed 6" sewer line to jet line
Pine Avenue
Manhole inspections
Bryson Yard
Cleaned line
Pine Avenue
3/4/22
Installed clean out on line
Pine Avenue
3/7/22
Camera line
Across Street from Berry Patch
3/8/22
Made sewer tap
Bryson Branch -Parker
3/10/22
Videoed sewer lines
Pine Avenue
Black Hill
3/14/22
Jetted sewer line
Dr. Riddle to McDonald's
3/17/22
Cleaned floats
WWTP
Governor's Island
Worked on starter
Rec Park Pump Station
3/18/22
Removed debris from check valve
WWTP Lift Station
3/28-4/1/22
Worked on sewer line project
Black Hill
4/4/22
Set manhole
Black Hill
4/6/22
Grouted manhole risers
Black Hill
4/7/22
Made 2 4" sewer taps
Franklin Grove Church Rd
4/13/22
Installed cleanout on 4" sewer line
Industrial Park Rd
4/14/22
Put sewer tracing dye in manhole -check for leak Coca-Cola Plant
4/20/22
Fixed collapsed service on sewer line
Greenlee Street
5/3/22
Jetted sewer line
First Baptist Church
Inspected manholes and lift stations
Powell Lumber
WWTP
5/10/22
Fixed omni beacon
Rec Park Pump Station
5/11/22
Jetted sewer line
McDonald's
Worked on pump station
Governor's Island
5/13/22
Mowed sewer right of way
Bryson Yard
5/27/22
Replaced alternating relay and untangled floats
Carringer Street
6/6/22
Cleaned out pump
WWTP
6/8/22
Installed 4" sewer cleanout
Winding Way -Allman
6/9/22
Installed new pump
WWTP
6/22/22
Installed new soft start -pump #2
WWTP
6/27/22
Pulled pump and cleaned floats
Lackey Hill Pump Station
6/28/22
Located manhole
Hwy 19
Manhole inspections
Carringer Street
6/30/22
Jetted sewer lines
Bus Garage
Walgreens
River St
7/7/22
Jetted sewer line
Arlington Ext.
7/11/22
Pulled pump
Lackey Hill
Jetted sewer line
Grace Christian Academy
7/12/22
Camera sewer line
School House Hill -Tremont St
7/15/22
Camera sewer line
Fryemont Street
7/19/22
Hooked bypass pump
WWTP Lift Station
Cleaned floats
7/22/22
Jetted sewer line
Dr. Riddle to McDonald's
7/25/22
Put bracket on pump #3
WWTP
7/27/22
Relayed sewer service
River View
7/28/22
Replaced off/on floats
Governor's Island Pump Station
8/2/22
Unclogged sewer main with Vac truck
Everett Street
8/3/22
Cleaned sondie and tube
WWTP Pump Station
Jet washed sewer lines
Clifton Avenue
Arlington Avenue
8/8/22
Dye tested sewer line
Twin Oaks to Ingles
8/9/22
Installed rebuilt omni beacon
Lackey Hill Pump Station
8/9/22
Replaced wires for alarm
Lackey Hill Pump Station
Cleaned sondie
WWTP
8/16/22
Cleaned pump #1
Lackey Hill Pump Station
Cleaned sondie
WWTP
8/17/22
Cleaned pump 42
Lackey Hill Pump Station
8/19/22
Cleaned sondie
WWTP
8/29/22
Cleaned sondie
WWTP
8/30/22
Brought manhole up to grade
Above BJs Quick Stop
9/2/22
Abandoned old sewer line
Black Hill
9/13/22
Used camera to locate lost manhole
Beside Deep Creek Church
9/16/22
Changed floats
Governor's Island Pump Station
10/3/22
Hooked up bypass
WWTP Lift Station
10/4/22
Made sewer tap
Deep Creek -Estes
10/6/22
Located and raised manhole
Recycling Center
10/10/22
Replaced pump
Powell Lumber
10/11/22
Cleaned wet well
WWTP Lift Station
10/17/22
Replaced mechanical seal -pump #2
Rec Park Pump Station
10/20/22
Replaced sewer pot cleanout
Industrial Park
10/26/22
Cleaned sewer lines
Hospital Hill
10/28/22
Worked on priming issues
Rec Park Lift Station
11/18/22
Unclogged sewer manhole
Trailer Park -School House Hill
11/21/22
Unclogged sewer line
150 Water Street
11/28/22
Jetted sewer line
Main and Veterans to Bojangles
11/30/22
Cleaned fog rod
WWTP
12/1/22
Jetted sewer line
Jenkins Branch
12/2/22
Jetted sewer line
Dr. Riddle to McDonald's
Locust Street
12/5/22
Located manholes
Governor's Island
12/8/22
Cleaned and adjusted fog rod
WWTP
12/12/22
Jetted, camera, located taps on sewer lines
Camp Living Water to
Florida Avenue
12/16/22
Cleaned around all pump stations
Cleaned floats
12/20/22
Made 4" sewer tap
Bryson Walk -McLeod
Jetted sewer line
Holly Hills
12/22/22
Installed rebuilt check valve
Rec Park Pump Station
Jetted sewer lines
Suttons
School House Hill
Camera sewer line
Jenkins Branch
IV. Notification
This report has been made available by advertising in the Smoky Mountain Times and on the Town of
Bryson City's website. A copy may also be picked up at the Bryson City Town Hall Monday through
Friday between 8:00 a.m-5:00 p.m.
V. Certification
I certify under the penalty of law that this report is complete and accurate to the best of my knowledge. I
further certify that this report has been made available to the public.
Wastewater Plant ORC-Environmental Inc./Dale Wike
Da e
1 3f- z 3
Date
Co ection System Back-up ORC-Travis McCall Date