HomeMy WebLinkAboutNCC230483_ESC Approval Submitted_20230223ROY COOPER xi
Governor
ELIZABETH BISER
Secretary +-
DOUGLAS ANSEL PUPA �
Interim Director NORTH CAROLINA
Environmental Quaftty
February 9, 2023
LETTER OF APPROVAL WITH MODIFICATIONS
BCM Associates, LLC
Attention: Carl Carney, Manager
PO Box 1724
Clemmons, NC 27012
RE: Project Name: Hwy 64 Retail Development
Acres Approved: 2.6
Project ID: DAME-2023-019
County: Davie
City: Mocksville
Address: Hwy 64
River Basin: Yadkin
Stream Classification: C
Submitted By:. Blue Ridge Environmental Consultants, P.A.
Date Received by LQS: January 12, 2023
Plan Type: New
Dear Mr. Carney:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
modifications required for approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for
this project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of
this project changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG010000 permit require that the following documentation be
kept on file at the job site:
North Carolina Department of Environmental Quality I Division of Energy, Mineral, and Land Resources
Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105
336-776-9800
Letter of Approval with Modifications
BCM Associates, LLC
February 9, 2023
Page 2 of 3
1. The approved E&SC plan as .well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, .it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to. ensure compliance with
the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply
to this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if there
is any change in the information included on the form. In addition, it would be helpful if you notify this
office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
Al
� v
Nicole Chiles, El
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
c: Blue Ridge Environmental Consultants, P.A.
Attn: Justin Church, PE
1520 Meadowview Drive
Wilkesboro, NC 28697
Letter of Approval with Modifications
BCM Associates, LLC
February 9, 2023
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Hwy 64 Retail Development
Project ID: DAVIE-2023-019
County: Davie
Modifications pursuant to applicable North Carolina General Statutes and/or Reitulations.
1. All surface runoff from the proposed disturbed areas must be routed to an erosion control device.
Please modify Temporary Diversion #1 to keep the eastern extension between Phases 1 and 2
and extend the northern edge of the diversion to the sediment basin within the limits of
disturbance. [G.S. 113A-57(3)]
2. Any off -site borrow and waste required for this project must come from a site with an approved
erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the
Division of Solid Waste Management. Trash/debris from demolition activities or generated by
any activities on site must be disposed of at a facility regulated by the Division of Solid Waste
Management or per Division of Solid Waste Management or Division of Water Resources rules
and regulations. [i 5A NCAC 413 .0110]
3. Additional measures may be required - The applicant is responsible for the control of sediment
on -site. If the approved erosion and sedimentation control measures prove insufficient, the
applicant must take those additional steps necessary to stop sediment from leaving this site.
[I5ANCAC 413 .0115]
4. The NCGOl has a $100 yearly fee and our office often receives closure inspection requests days
prior to yearly NCG01 fee payment due dates. Be advised the project requires a closure
inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate
NCG 1 coverage. The closure inspection should not be requested until after the site has
achieved full vegetative stabilization and measures have been removed. The removal of
temporary ESC measures, including basins, requires prior approval. Often, a full growing season
is necessary between initial seeding/mulching and removal of measures. Please plan your
construction accordingly to avoid contacting our office prematurely for a closure inspection.
Also be advised you may be asked for representative site pictures prior to a closure inspection.
[General Comment]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NC 010000 NPDES for Construction Activities