Loading...
HomeMy WebLinkAboutNC0033111_033111A06 ATC with Certification_20230221 North Carolina Department of Environmental Quality | Division of Water Resources 512 North Salisbury Street | 1611 Mail Service Center | Raleigh, North Carolina 27699-1611 919.707.9000 February 21, 2023 Mr. Travis Dupree VP, Project Management & Engineering Carolina Water Service, Inc. of NC 5821 Fairfield Road, Suite 401 Charlotte, North Carolina 28209 SUBJECT: Authorization to Construct A to C No. 033111A06 Carolina Water Service, Inc. of NC Fairfield Harbour Subdivision WWTP NPDES Permit No. NC0033111 Dear Mr. Dupree: A letter of request for an Authorization to Construct was received January 17, 2023, by the Division of Water Resources (Division). With additional information received on February 20, 2023, final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 0.6 MGD Fairfield Harbour Subdivision WWTP, with discharge of treated wastewater into the Neuse River in the Neuse River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Addition of one (1) 58,166-gallon pre-anoxic zone and one (1) 56,004-gallon post-anoxic zone to the existing aeration treatment tank #1, and one (1) 59,653-gallon pre-anoxic zone and one (1) 55,179-gallon post-anoxic zone to the existing aeration treatment tank #2, installation of two (2) 313 GPM influent pumps and two (2) 625 GPM internal recycle pumps to each treatment tank, and one (1) 4.4 HP submersible mixer to each proposed anoxic zone, replacement of existing blowers with three (3) 1,475 SCFM blowers for aeration/digester and two (2) 204 SCFM EQ blowers, and installation of all necessary piping and controls in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0033111 issued effective July 1, 2018, and shall be subject to revocation unless the wastewater Mr. Travis Dupree, VP, Project Management & Engineering February 21, 2023 Page 2 of 3 treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0033111. It is the Owner’s responsibility to ensure that the as-constructed project meets the requirements of all applicable regulations and statutes, the ATC Permit Application package, and all of the requirements contained herein. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Washington Regional Office, telephone number (252)946-6481, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on-site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit and the ATC Permit Application package. Mail the Certification to: Division of Water Resources, WQ Permitting – NPDES, 1617 Mail Service Center, Raleigh, NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the project plans and specifications shall be maintained on file by the Permittee for the life of the facility. Mr. Travis Dupree, VP, Project Management & Engineering February 21, 2023 Page 3 of 3 During the construction of the proposed additions/modifications, the Permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor’s responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. The issuance of this ATC does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Min Xiao, PE at telephone number (919) 707-3644 or by email at min.xiao@ncdenr.gov. Sincerely, for Richard E. Rogers, Jr. Director, Division of Water Resources by Min Xiao, PE NPDES Industrial Permitting Unit With Engineer’s Certificate attached: cc: NPDES Files ecopy: Eldon Leo Green, Jr., PE Green Engineering, P.L.L.C. Email: elg@greeneng.com DWR Washington Regional Office, Water Quality Programs Without Engineer’s Certificate attached: cc: Craven County Health Carolina Water Service, Inc. of NC Fairfield Harbour Subdivision WWTP Authorization to Construct No. 033111A06 Issued February 21, 2023 NPDES Permit No. NC0033111 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Fairfield Harbour Subdivision Wastewater Treatment Plant, located in Craven County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Addition of one (1) 58,166-gallon pre-anoxic zone and one (1) 56,004-gallon post-anoxic zone to the existing aeration treatment tank #1, and one (1) 59,653- gallon pre-anoxic zone and one (1) 55,179-gallon post-anoxic zone to the existing aeration treatment tank #2, installation of two (2) 313 GPM influent pumps and two (2) 625 GPM internal recycle pumps to each treatment tank, and one (1) 4.4 HP submersible mixer to each proposed anoxic zone, replacement of existing blowers with three (3) 1,475 SCFM blowers for aeration/digester and two (2) 204 SCFM EQ blowers, and installation of all necessary piping and controls in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Registration No.____________________ Date__________________ Mail this Certification to: Attn: Min Xiao, PE NPDES Industrial Permitting Unit DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617