HomeMy WebLinkAboutNCC204825_NOT Closeout Documents_20230217North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105
(336) 776-9800
County: Forsyth Project: Bethania Freedman's Park River basin: Yadkin-PeeDee
Person financially responsible: City of Winston-Salem - Robert Prestwood Project #: FORSY-2021-004
Address: PO Box 2511, Winston-Salem, NC 27102
1. Project Location: Bethania-Rural Hall Rd, Winston-Salem
Pictures: No
2. Weather and soil conditions: 50s, sunny, workable soil Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: February 10, 2023
10. Comments: The site was inspected to facilitate a site closure. All construction has been completed and
temporary measures have been removed. Permanent ground cover sufficient to restrain
erosion has been established. No additional self -monitoring or self -inspections are required.
Project is in compliance and released under the SPCA. Termination of coverage under the
NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested
by the permittee via a Notice of Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
If you have any questions, please contact the Winston Salem Regional Office or
nate.gainer@ncdenr.gov or 336-776-9660.
Reported by: Nate Gainer Others present: Jalen Hairston
Date of inspection: February 07, 2023 Time arriving on site: 4:30 PM Time leaving site: 4:45 PM
cc: