HomeMy WebLinkAbout20150465 Ver 2_More Info Received_20230125FUTURE (DASHED)
POTENTIAL UNDERGROUND
DETENTION / WATER RECLAMATION
RECOMMENDED BYPASS OF RR ROW
OFFSITE STORM WATER AROUND
PERIMETER OF FUTURE AP MODULES
PRELIMINARY ROUTE FOR PERIMETER
UTILITY LOOP- WATER, ELECTRIC,
FI BEROPTI C, TELECOM
PREFERRED ROUTE FOR M60"
STORM WATER PIPE BENEATH
AP MODULE
WASTE EcaoocH
�-EXISTING STREAM
IMPACTED BUFFER AREA
(158,858 SF)
z
PREFERRED ROUTING TO
BYPASS WESTERN
RETAINING WALL
AREA OF DRAINAGE
MEASURES ALONG EXISTING
STREAM BOTTOM
PREFERRED RELEASE POINT
AT NORTH TRIBUTARY WITH
LEVEL SPREADER
POTENTIAL UNDERGROUND
DETENTION / WATER RECLAMATION,
TYPICAL
LEGEND
UNDERGROUD
DETENTION uwNrs
i — UNDERGROUND
STORMWATER
PIPE NETWORK
"""' EXISTING STORMWATER
PIPE
"""' EXISTING SECONDARY
STORMWATER PIPE
LEVEL SPREADER
— PERIMETER UTILITY
LOOP
AP FILLING EXPANSION
EXISTING BUILDING
wawa
STEWART
novo nordisk®
PRELIMINARY - DO NOT
USE FOR CONSTRUCTION
SCALE IDIOT
NORTH
NOVO NORDISK
AP FILLING -
WAREHOUSE
EXPANSION
USACE STORM WATER
EXHIBIT
LB Date DescrOon
CONCEPTUAL
STORMWATER PLAN
EX