Loading...
HomeMy WebLinkAboutNCC204060_NOT Closeout Documents_202302134HOLLY SPRINGS iDipm we The owrcc. Town of Holly Springs Engineering Department Certificate of Completion For Soil Erosion and Sedimentation Control PROJECT Hawthorne at Holly Springs PHASE N/A LAND DISTURBING PERNHT NO. 20-2020 FINANCIALLY RESPONSIBLE Hawthorne at Southern Cross, LLC PARTY This is to certify that on the above referenced project the grading has been completed, all utilities and streets have been installed, and permanent stabilization has been successfully achieved in or along all roads and utilities in accordance with the approved erosion control plan. With this certificate, the Town of Holly Springs Engineering Department certifies that the above referenced project is in final compliance with the Town's Soil Erosion and Sedimentation Control Ordinance and therefore closes the active erosion control file for the above referenced project. 2-7-23 Erosion Control Inspector Note: This document does not preclude the Town from taking action on future land disturbance or other erosion or sedimentation issues at this site. 9024 Certificate of Completion Page 1 2/25/2006