Loading...
HomeMy WebLinkAboutSW3221001_SHWT Report_20230216Civil - Geotechnical - Surveying February 8, 2023 Mr. Ken Foster Ridgeline Corporation PO Box 39 Cornelius, NC 28031 Reference: Brighton Park Subdivision Seasonal High -Water Table Evaluation CESI Project Number 220143.000 Mr. Foster: Peryour request, Concord Engineering & Surveying, Inc. (CESI) has performed an evaluation of seasonal high-water table (SHWT) within the location of four of the seven storm detention ponds (BMP's) for the Brighton Park Subdivision project in Mt. Pleasant, North Carolina. It is noted that SHWT data was not warranted for BMP #3 and #6. These ponds will be constructed within fill sections of the project. On February 24, 2022, hand auger borings were performed at staked locations for BMP locations #1, #2, #4, and #5. Once the hand auger boring was compete and initial data logged, the test boring was allowed to acclimate. On March 7, 2022 CESI returned to the site to observe the conditions and backfill the auger hole. The following is the data acquired and the seasonal high water level recommendations. BMP #1 SHWT Ground (Hub) Elevation 611.29 Bottom of Hand Auger Boring 606.79 (auger refusal) Water Level on March 7t" (11-day duration) not encountered Proposed Bottom of Sand 609.0 2' Sand to SHWT Separation Elevation 607.0 45 Spring Street, SW P.O. Box 268 Concord, NC 28026-0268 704-786-5404 www.cesicgs.com NC License No. C-0263 A hand auger boring was advanced adjacent to the survey stake where auger refusal was encountered at 4.5' below ground level. We offset multiple times on a radius of approximately 7' from the survey stake. Auger refusal was again encountered at corresponding elevations. No groundwater was encountered at the time of hand auger boring or after an 11-day duration. Based on our observations it was determined that the seasonal high groundwater table elevation at the BMP #1 test location is deeper than 606.79. It was noted that prior to auger refusal, we encountered leaf litter and topsoil underlain by fine sandy SILT (ML) soils. The actual elevation of the SHWT could not be confirmed due to the presence of refusal rock. However, it is our understanding that this location can be raised slightly (2.4') to meet the design requirements. BMP #2 SHWT Ground (Hub)Elevation 643.11 Bottom of Hand Auger Boring 627.61 Water Level on March 7t" (11-day duration) not encountered Proposed Bottom of Sand 630.00 2' Sand to SHWT Separation Elevation 628.00 A hand auger boring was advanced adjacent to the survey stake to a depth of 15.5' below ground surface. Grass and topsoil underlain with fine sandy SILT (ML) soils was encountered in the auger cuttings. No groundwater was encountered at the time of hand auger boring or after an 11-day duration. Based on our observations it was determined that the seasonal high groundwater table elevation at the BMP #2 test location is deeper than 627.61. This elevation supports the use of a sand filter basin at the current location and elevation. BMP #3 SHWT Ground Elevation Proposed Bottom of Sand Seasonal High -Water Table 623.0 625.5 Deeper than 623.0 BMP #3 will be constructed in a fill section. A minimum of 2.5' of clearance to SHWT will be achieved. 45 Spring Street, SW P.O. Box 268 Concord, NC 28026-0268 704-786-5404 www.cesicgs.com NC License No. C-0263 BMP #4 SHWT Ground (Hub)Elevation 627.21 Bottom of Hand Auger Boring 622.21 Water Level on March 7t" (11-day duration) 623.71 Proposed Bottom of Sand 628.40 2' Sand to SHWT Separation Elevation 626.40 A hand auger boring was advanced adjacent to the survey stake to a depth of 5' below ground surface. The auger cuttings consisted of leaf litter underlain by fine sandy SILT (ML) soils. No groundwater was encountered at the time of hand auger boring. However, stabilized groundwater was encountered 3.5' from the surface at the 11-day duration mark. Based on our observations it was determined that the seasonal high groundwater table elevation at the BMP #2 test location is approximately than 623.71. This elevation supports the use of a sand filter basin at the current location and elevation. BMP #5 SHWT Ground (Hub) Elevation 610.73 Bottom of Hand Auger Boring 607.23 (auger refusal) Water Level on March 7t" (11-day duration) not encountered Proposed Bottom of Sand 610.00 2' Sand to SHWT Separation Elevation 608.00 A hand auger boring was advanced adjacent to the survey stake where leaf litter, topsoils and fine sandy SILT (ML) soils were encountered with hand auger refusal at 3.5' below ground level. It was noted that the auger refusal elevation is deeper than the required 2' bottom of sand separation, so no offsets were performed. No groundwater was encountered at the time of hand auger boring or after an 11-day duration. Based on our observations it was determined that the seasonal high groundwater table elevation at the BMP #6 test location is deeper than 607.23. This elevation supports the use of a sand filter basin at the current location and elevation. 45 Spring Street, SW P.O. Box 268 Concord, NC 28026-0268 704-786-5404 www.cesicgs.com NC License No. C-0263 BMP #6 SHWT Ground Elevation 606.0 Proposed Bottom of Sand 615.5 Seasonal High -Water Table Deeper than 606.0 BMP #3 will be constructed in a fill section. Approximately 9.5' of clearance to SHWT will be achieved. We appreciate the opportunity to be of service to you and we look forward to helping you through project completion. If you have any questions, please feel free to call. Respectfully submitted, �C A rRf '�fr r 27837 2 1 U �(i✓ QN 4� James G. (Jay) Eaves III, PE Division Engineer 45 Spring Street, SW P.O. Box 268 Concord, NC 28026-0268 704-786-5404 www.cesicgs.com NC License No. C-0263 eirignton ParK - bftl�i fiorings uiap Feature 1 r CE M P-2 ?4 • IL fJ `BMP-3 (BMP-4 `BMP-5 `BMP-6 Google Earth i!O ol OR . x �oaios'S'61 Z A�' W, W, 0 ft