Loading...
HomeMy WebLinkAboutSW6220804_O&M Agreement/Plan_20230216Operation & Maintenance Agreement Project Name: Project Location: Rebekah Evans 230kV POD Upton Tyson Rd, Fayetteville, NC Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & coi Infiltration Basin Quantity: Infiltration Trench Quantity: Bloretention Cell Quantity: Wet Pond Quantify: Stormwater Wetland Quantity: Permeable Pavement Quantity: Sand Filter Quantity: Rainwater Harvesting Quantity: Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: Dry Pond Quantity:. Disconnected Impervious Surface Present: User Defined SCM Present: Low Density Present: O&M sheets will Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Type: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Chris Spears Title & Organization: Executive Vice President & CEO Street address: 17494 US 421 S City, state, zip: Dunn, NC 28335 Phone number(s): 910.892.8071 /mail: csaears6Dsr c.com Signature: X Date: /y J. — ]!!&n5l% [V , a Notary Public for the State of _ tll� t County of C do hereby certify that S r t ` s� , ey's S personally appeared before me this day of tiZpZl and acknowledge the due execution of the Op rations and Maintenance Agreement. Witness my hand and official seal, Kacey W Johnson Notary Pubfic Harnett County, NC Seat My commission expires �� 3 Low Density Maintenance Requirements Important maintenance procedures: The drainage area to the vegetated conveyance or vegetated receiving area will be carefully managed to reduce the sediment load to the vegetated conveyance or vegetated receiving area. After the initial fertilization to establish the grass in the vegetated conveyance or the vegetated receiving area, fertilizer will not be applied to the vegetated receiving areas. The vegetated conveyance or vegetated receiving area will be inspected quarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request' Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: Vegetation Vegetation is too short or Maintain grassed vegetation such that the swale or vegetated too long. area does not erode during the peak flow from the 10-year storm Trash/debris is present. Remove the trashldebris. Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then re - Vegetated receiving erosive gullies have sod (or plant with other appropriate species) and water until formed. established. Provide lime and a one-time fertilizer application. areas Trees and/or other woody Remove the trees and woody vegetation from the swale, regrade vegetation are present in the swale if necessary and re-establish grass as shown on the the swale. approved plans. Trashldebris is present. Remove the trash/debris. Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then re - erosive gullies have sod (or plant with other appropriate species) and water until formed. established. Provide lime and a one-time fertilizer application. Sediment covers the grass Remove sediment and dispose in an area that will not impact Vegetated conveyances 1 at the bottom of the swale. I streams or SCMs. Re -sod if necessary. swales 1 roadside ditches (other than curb outlet The side slope is steeper Regrade the slopes to the permitted configuration per the swales) than the a approved approved plan and reestablish vegetation. If as -built or existing configuration. conditions do not allow the slopes to be regraded, contact the applicable permitting agency. Determine the source of the problem: soils, hydrology, disease, Grass is dead, diseased or etc. Remedy the problem and replace plants. Provide a one - dying. time fertilizer application to establish the ground cover if necessary. Trees and/or other woody Remove the trees and woody vegetation from the vegetated vegetation are present in conveyance, regrade the vegetated conveyance if necessary and the vegetated conveyance. re-establish grass as shown on the approved plans. Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site, The outlet device (if applicable) The outlet device is damaged Repair or replace the outlet device. Erosion or other signs of damage have occurred at Repair the damage and ikiprove the flow dissipation structure. . the outlet. The receiving water Discharges from the site are causing erosion or sedimentation in the Contact the local NCDEQ Regional Office. receiving water.