Loading...
HomeMy WebLinkAboutSW6221002_Supplement-EZ Form_20230214SUPPLEMENT-EZ COVER PAGE FORMS LOADED 2 3 4 5 6 Project Name Project Area {ac} _Coastal Wetland Area (ac) Surface Water Area (ac) Is this project High or Low I]enslty? Does this projBCt use an off -site SCM? COMPLIANCE WITH 021-11.9003(4) 7 ! Width of vegetated_ setbacks provided (feet) _ 8 Will the vegetated setback remain vegetated? 9 If BUA is propmed in the setback, does it meet NCAC 02H.1003(4)(c-d)? 10 Is streambank stabilization proposed'. on this-1)miect? Avonlea Subdivision 21.74 0 T - 0 _ Huh No 30' WA N/A No NUMBER AND TYPE OF SCMs: 11 Infiltration System _ T 12 Bioretention Cell 13 iWet Pond 2 14 IStormwater Wetland 15 ;Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting RWH 18 Green Roof 19 Level Spreader -Filter Strip (LS-FS) Disconnected Impervious Surface (DIS) 20 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 , Bayfilter 26 Filterra FORMS LOADED DESIGNS CERTIFICATION 27 Name and Title- 28 i Organization: 29 'Street address: 30 City, State, Zip: 31 Phone numbers : 32 Email: Donald L. Cu :. Jr., PE / Project Manager Curry Engineering___ 205 S. Fuguay Ave. Fu ua -Varina NC 27526 919-552-0849 don@cu"eng.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. LiDI2ii:i l 1�ti�v Seal C260'a4e Signature of Designer Date DRAINAGE AREAS 1 'is this a high -density project? Yes 2 If so, number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 7 2 4 Tyoe of SCM Wae Pane Wet Pond Wet Pond l 5 Total drainage area (sq ft) 9469M _ 528385 272687 1JI 6 Onsite drainage area (sq ftL 946998 528385 — 272687 y 7 Offsite drainage area (sq ft) _ _ - 0 6 Total BUA in project (sq ft) 46_4009 sf 283294 sf _0 165756 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) 309000 sf 198000 sf 111000 sf _ New BUA not on subdivided lots (subject to _ 10 permitting) (sf) 155009 sf 85294 sf 54756 sf 11 Offsite BUA (sq ft) sf sf sf 12 Breakdown of new BUA not on subdivided lots: - Parking(sq ft) _ 3pp© s( 300p sf s{ - Sidewalk sq ft_) 37744 of _ _ 17774 if 13315 sf Roof (sq ft) sf _ sf sf Roadway (sq ft) 104265 sf $4520 sf 41441 sf Future (sq ft) sf _ sf of Other, please specify in the comment box below (sq ft) 10000 sf 10000 sf sf New infiltrating permeable pavement on subdivided 13 lots (sq ft) Sr sf of New infiltrating permeable pavement not on 14 subdivided lots (sq ft) sf sf of 115 Existing BUA that will remain (not subject to _ permitting) (sq ft) Sf of g} of sf sf of sf sf 96 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 54% 1.0 In _ 25330 of i le 49% .0 in of d 61% 1.01n i 15423 d� Simpla 19 Design storm (inches) _ 20 Demon volume of SCM (cu ft) 21 Calculation method for design volume ADDITIQNALJNF0RMATi0N _ Please use this space to provide any additional information about the 22 drainage area(s)- Pond #1: 1oxo sf Impervious allocated for —amen ft-y WET POND - 1 Drainage area number 1 2 — 2 Minimum required treatment volume cu ft 23674 CT _ 13793 cf GENERAL MVC FROMON the SCM sized to treat the SW from all surfaces at build -out? 3;lsVs Yes the SCM located away from contaminated soils? _YBS Yea Yes 5What are the side slopes of the SCM (H:V)? _ 3;1 3:1 _ 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? N4 No Are the infers, outlets, and receiving scream protected from erosion 7i f 10-year storm)? Yes Yes — I Is there an overflow or bypass for Inflow volLime In excess of the _ a!! et! volume? Yes Yes Pump (preferred) 9 What is the method for dewatering the SCM for maintenance? _ pump (preferred) 10 If applicable, will the SCM Ge cleaned out after construction? Yes Yes 11, Does the maintenance access comply with General MDC (8)? _ Yes Yes -12 Does the drainage easemnt ecomply with General MDC (9)? Yes _ 13 If the SCM Ps.on a single family lot, does (will?) the plat comply with General MDC (10)? No No 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that compilesvAth (3aneral MDC (12)? Yes Yes 16 Does the SCM follow the device speclftr MDC? _Yes Ys_ 17 Was the_SCM dew -ned by an NC licensed �fe@5ional7 - - --- - Yes Yes wrrpmo MSCFROM 02H ado 18 Sizing method used SA/DA 19 Has a stagelslorage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment 170.50 removal) (fmsl) SAIDA Yes 167.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 171.50 168.00 22 Elevatlan or the bottom of the Vegetated shelf final) - 176.00 172.50 173.00 231 Elevation Of the permainefft pool fmsl) 176,50 _ 24 Elevation of the toe of the vegetaled shelf (fms)J 177.00 25 Elevation of the tem rary pool (tm_sl) _ — 178,00 26 SLirfacearea of the main permanent pool (s[guarefeet) 114_$0 27 Volume of the main permanent pool (cubic feet) 31572 of 173.50 174.30 773i{ 21812 of 28 Average depth of the main pool (feet) 3,23 ft 29 Average depth equation used Equation 3 3,2&ft Equation 3 396.0 ft 30 If using equalion 3, main o-W perimeter {feet) 594.0 ft 31 If uslnAequaflon 3, w_fdth of subrwV_W v . shelf: { 32: Volume of the forebay (cubic feet) 3.0 ft 3.0 ft 48B2cf 4070 cf 33' Is this 15�20% of" volume in the main pool? Yes Yes 34 Clean -out de th forrforeba inches) S6 in 36 in 35 Design volume of SCM (cu ft) 25330 cf 15423 cf 36.Is the outlet an orifice or a weir? Orifice Orifice 37 If urfrrce, orifice diameter {Inches 2 in 2 in 38 If weir, weir het hchtt (inches) bt: 39 If weir, weir I h Cirlohes) _ in 40; Drawdoyvn time for the temporary! i7ni { ) &12; In In 3.37 41 Are the inlet(s) and outlet located in a manner that avoid7 s short- Yes grculti Yes 42 Are berms or baffles provided to Impra the flow path? Yes No dal f fa, h of fr m-hay at entrance (Incher) 48 in 48 in 44 Depth of forebay at exit {inches) 36 in 45 Does water flow out of the forebay in a non -erosive manner? J Yes 36 in Yes 46 Width of the vegetated shelf feet 6 ft 6 ft 47 Slope of vegetated shelf (N-V) 6:1 48 Does the office drawdown from below the top surface of the Yes permanent pool? 6:1 Yes 49. Does the pond minimize impacts to the receiving channel from the 1- r, 24-hr storm? Yes Yes 50'Am fountains proposed? (If Y, please provide documentation that No MDC 9) is met No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment Fescue or _ Centipede Fame or Ceftilwe 54 Hasp Ianti n Ian been provided for the vegetated shelf? Yes _ Yes _a ADDITIONAL. INFORMATION 55 Please use this space to provide any additional information about the wet pond(s) 'WPbt orifice = 2.25" [ref line 37). WPp2 orifice = 1.75" (ref. Irte 37) Wet Pond 3 3:12 PM 2/14/2023