Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW1220801_Stormwater Report_20230214 (5)
Appendices Rip Rap Apron Sizing Phase 1 Erosion Control Do = 12" 10 Year Discharge = 3 cfs 3Do = 3' in- ---TT La = 6' 3 5 10 20 50 100 200 500 1000 Discharge (ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). Rev. 12/93 8.06.3 Appendices Rip Rap Apron Sizing Phase 2 Erosion Control Do = 18" 10 Year Discharge = 8 cfs 3Do = 4.5' in- La = 10' 3 5 10 20 50 100 200 500 1000 Discharge (ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). Rev. 12/93 8.06.3