HomeMy WebLinkAboutSW1220801_Stormwater Report_20230214 (3)SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1 Project Name
2 !Project Area (ac)
3 'Coastal Wetland Area (ac)
4 Surface Water Area (ac)
5 is this ro'ect High or Low Density?
-. _
6 Does this project use an off -site SCM?
Sparks Drive Commercial Building
1.37
0
0
High
No
7 Width of vegetated setbacks provided (feet) >30 ft
8 Will the veaetated setback remain vegetated? N/A
9 If BUA is proposed in the setback, does it meet NCAC 02H. 1 003(4)(c-d)? N/A
10 Is streambank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
11
Infiltration System
12
r1
Bioretention Cell
13
Wet Pond
4
Stormwater Wetland
25
, Bayfilter
_
26 Filterra
FORMS LOADED
DESIGNER CERTIFICATION
27 Name and Title:
Kevin Pulis, PE
28 Or anization:
Tarr Group, LLC
29 I!Street address:
8650 E. State Rd 32
30 City, State, Zip:
Zionsville, IN 46077
31 Phone number(s):
843-633-3579
32 Email:
kevin@tarr-group.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications,
operation and maintenance agreements and other supporting information are consistent with the information provided here.
H tCIAIRp1''''',,
''
%.
SEAL
042797
FNGINE��
019nature or DmIgner
al /,Qg 1A 02 3
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this project have low density areas?
No
If so, number of low densitydrainage areas
0
t54
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
Wet Pond
5
Total drainage area (sq ft)
59677
48600
6
Onsite drainage area (sq ft)
59677
48600
7
Offsite drainage area (sq ft)
zero
zero
8
Total BUA in project (sq ft
36409 sf
32532 sf
9
New BUA on subdivided lots (subject to permitting)
(sq ft
zero
zero
10
New BUA not on subdivided lots (subject to
permitting) (so
zero
zero
11
Offsite BUA (sq ft)
zero
zero
12
Breakdown of new BUA not on subdivided lots:
- Parking (sq ft)
27108 sf
23231 sf
- Sidewalk (sq ft)
1435 sf
1435 sf
- Roof (sq ft)
- Roadway (sq ft)
- Future (sq ft)
- Other, please specify in the comment box
below (sq ft
New infiltrating permeable pavement on subdivided
1 lots (sq ft
New infiltrating permeable pavement not on
subdivided lots (sq ft)
7378 sf
7378 sf
zero
zero
zero
zero
488 sf
488 sf
13
zero
zero
14
zero
zero
15
Existing BUA that will remain (not subject to
permitting) (sq ft)
zero
zero
16
Existing BUA that is already permitted (sq ft)
zero
zero
17
Existing BUA that will be removed (sq ft)
zero
zero
18
Percent BUA
61 %
67%
19
Design storm inches
1.0 in
20
Design volume of SCM (cu ft)
2645 cf
21 1 Calculation method for design volume
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
488 sf represents dumpster enclosure. The SCM is being oversized to
account for the 3,877 sf of drive aisle that bypasses.
Simple
WET POND
1 Drainage area number 1
21 Minimum required treatment volume cu ft 2645 cf
UtNt
iL Iylul murvi 62H .luau
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
>30 ft
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
IAA/FT PnK]n Mnr FRnm n7H _1 OSR
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl)
989.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
989.50
22
Elevation of the bottom of the vegetated shelf (fmsl)
993.00
23
Elevation of the permanent pool (fmsl)
994.00
24
Elevation of the top of the vegetated shelf (fmsl)
994.00
25
Elevation of the temporary pool (fmsl)
995.25
26
Surface area of the main permanent pool (square feet)
1642 sf
27
Volume of the main permanent pool (cubic feet)
2562 cf
28
Average depth of the main pool (feet)
3.05 ft
29
Average depth equation used
Equation 3
30
If using equation 3, main pool perimeter (feet)
110.0 ft
31
If using equation 3, width of submerged veg. shelf (feet)
6.0 ft
32
Volume of the forebay (cubic feet)
496 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
30 in
35
Design volume of SCM (cu ft)
3188 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
1 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
2.25
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42
Are berms or baffles provided to improve the flow path?
Yes
43
Depth of forebay at entrance (inches)
48 in
44
Depth of forebay at exit (inches)
36 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
permanentpool?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
yr, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC(9) is met.)
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Fescue
54
Has a P antinq plan been provided for the vegetated shelf?
Yes
DITIONAL INFORMATION
55
Please use this space to provide any additional information about the
wet pond(s):
Exact SHWT elevation not established, geotech report says it is deep. Clay liner
used to establish permanent pool.
The SCM has been oversized to account for BUA that bypasses.